Brochure pour UTSRAK

Page 1



Mission Statement Quality Policy Introduction Company structure Activities Overview of Projects Handled

Summary


Our mission is to excel at what we do, to provide the best services in our fields of expertise, from Marine, and Industrial Steel Fabrication, Construction and Reconditioning, to Insulation and Refractory works. Through constant monitoring and continuous efforts to improve our performance, selective recruitment and extensive training of our employees, and through utilization of modern technologies and equipment we shall perform professionally and up to international standards satisfying our customers and exceeding their expectations.

Mission Statement


It is the policy of UNIMARINE TECHNICAL SERVICES to maintain and implement an efficient and effective quality assurance program planned and developed with all management functions to achieve sustained, profitable growth by providing services which constantly satisfy the needs of its customers, and exceed their expectations. The objectives of our Quality Management System are to:

•Perform quality works conforming with international standards and at optimized costs.

•Demonstrate total commitment to customer satisfaction.

•Incorporate high levels of responsibility towards personal and environmental safety.

• Promote Quality Management as being the responsibility of each and every employee.

• Maintain a well established Quality Management System through adapting procedures that work towards constant monitoring and continual improvement of the system.

Qualty Policy


Since its inception in 1996, M/s UniMarine Technical Services LLC (UTS) has grown to become one of the leading establishments in the region. With its base in Ras Al Khaimah and branches in Dubai and Fujairah, UTS is considered one of the well-settled organizations that can undertake a wide range of turnkey projects. UTS offers its clients an integrated, multi-disciplined line of services both in Marine and Industrial fields in all aspects of Engineering. Our scope of work covers everything from design and supervision to material supply, fabrication and erection. UTS first and foremost goal is “client satisfaction”. Through planning, monitoring, and proper follow up of each individual activity we have been able to maintain our well-earned reputation of being highly reliable and genuinely professional. Matters of health, safety, and the environment are also among our primary concerns. All protective and preventive measures regarding HSE issues are taken, from proper disposal of waste to employee training, and utilizing necessary safety gear and equipment. We have undertaken the major projects and we can proudly say that we have achieved our goals adequately in all projects. Through utilizing the latest technologies, and selective recruitment and extensive training of personnel, we have always been able to perform up to clients’ expectations giving the best work quality in the intended time.

Introduction


How to contact us Fabrication facility (to contact) :

UniMarine Technical Services LLC P.O. Box 3634 KhorKhwair, Ras Al Khaimah Phone : +971 7 2668241 Fax : +971 7 2668682 Email : unimarine@union.ae Web site : www.utsrak.com

Head office :

UTS Freezone Office :

Union Holding Company

Rak Investment Authority Business

P.O. Box 108

Center

Al Nakheel, Ras Al Khaimah

P.O.Box 31291

Phone : +971 7 2220777

Al Hamra Freezone, Ras Al Khaimah

Fax : +971 7 2220666

Phone : +971 7 2447998

+971 7 2220888

Fax : +971 7 2447994

+971 7 2220999 Web site : www.union.ae

M/s UniMarine Technical Services LLC is a subsidiary of the well-reputed Union Holding Company. Other subsidiaries under the group are as follows:

1.

Emirates Stevedoring Company

2.

Union Shipping Agencies

3.

Union Trading

4.

JOG Union Engineering

Company Structure


UTS can undertake wide range of activities including, but not limited to:

• Pipe work and erection of equipment and machineries (LPG, Natural Gas, Nitrogen, Hydrogen, Oxygen, Compressed Air, Fuel Oils, Water, etc.) including cleaning, radiography, and pressure testing.

• Steel structure fabrication and renewal for various steel structures in addition to ships, barges, tugs, and other floating objects.

•Grit blasting.

•Airless spraying and conventional painting.

•Desludging and chemical cleaning of tanks afloat and ashore.

•Hot and cold, internal and external industrial thermal insulation.

• Refractory linings (bricks, monolithics, gunning mixes) for cement plants, chemical plants, boilers and furnaces and all other types of equipment.

•Fabric Expansion Joints for Turbine exhausts and different hot gas ducts.

•Building insulation including ceilings and removable partitions.

•Acoustical insulation for sound absorption for turbines and generators.

•Roofing and wall cladding including thermal insulation and weatherproofing.

•Scaffolding internal and external.

Activities


Marine Projects

•MT Al Safa

180 tons of steel renewal, mainly bulkheads.

Carried out main engine overhauling alongside Saqr Port jetty.

•MT Miraj

168 tons of steel renewal and various floating repairs alongside Saqr Port prior to drydocking.

This vessel was brought to Saqr Port consecutively four times.

•MT SeaWind

Various floating repairs including cargo lines, engine room pipelines and forepeak steel renewal.

•MT Al Marwah

Floating repairs alongside Saqr Port.

Overhauled windlass and renewed pipelines.

•MT Al Rahma

Steel renewal 60 tons.

Renewal of various pipelines, and refurbishment of accommodation.

Lifeboat – complete overhauling and testing for survey.

Overview of Project Handled


•MT Bador

Coating of 4 nos. chemical tanks using Sigma Phenguard.

This job was carried out under high quality specifications and recommendations with joint warranty of 10 years.

•MT Mina

Chemical tanker – double bottom repairs, engine room piping, main deck hydraulic lines etc.

•MT Salman Al Farisi

•Barge Maryam

200 tons of steel renewed on bulkheads, deck longitudinal and main deck.

•Barge Aliyah

Floating repairs in Ras Al Khaimah including steel renewal, piping, main deck accessories.

160 tons of steel renewal carried out mainly deck plating.

•MV Sea Hope

Bulbous bow repairs and 30 tons of steel renewal carried out alongside Saqr Port

Carried out all kinds of survey repairs.

•MV Sea Queen

25 tons of steel and various survey repairs

Fitted new pipelines for cement loading

Overview of Project Handled


•MV Panoria

Bulbous bow repairs: Complete bulbous bow is repaired alongside jetty in Abu Dhabi after rolling and dishing to the shape. Total steel 6.0 tons.

•MV Sea Queen

Erected hanging scaffolding using floating pontoons. Emergency rescue repairs upon hogging the vessel in Saqr Port.

•MV You King

High-pressure cleaning of cargo hold approx. 12,000sq.m.

•MT Eltokaween

•W.S. Berber

•MT Adabas

Carried out various floating repairs at KhorFakkan anchorage.

•NMS 501

Carried out blasting and painting of fresh water tanks at Al Jadaf.

Overview of Project Handled


Industrial Projects

• Fabrication and erection of more than 15 Klms.(90,000 inch-meter) of piping and related machinery and equipment in Guardian Glass Factory in R.A.K.

•Fabrication and erection of ladders, stairs, platforms, handrails, in Guardian Glass Factory in R.A.K.

• Fabrication and erection of more than 18 Klms.(96,000 inch-meter) of piping and related machinery and equipment in J.B.F.-R.A.K. Polyester Plant.

company, Approx. 600 tons.

•Erection of belt conveyor for cement loading from RAK Cement Company to Saqr Port

•Scaffolding of 40,000cub.m. in RAK Cement Company for the execution of new project.

•Scaffolding over 36,000 cub.m in GCC Gulf Cement Company NewKiln Project.

•Shutdown jobs for cement companies, gas plant, and refineries

•Erection of utility crane at RAK Gas Commission premises

•Pipeline work for Emirates General Petroleum Corporation (Emarat)

• Tank refurbishment for RAK Gas Commission. Tank no. 106 – a petroleum storage tank 55m dia x 18.0m height

•Laying pipelines in RAK Gas Commission premises.

•Various offshore steel refurbishment and repair jobs for RAK Gas Commission.

Overview of Project Handled


• Designed, procured materials, executed civil foundation, steel structure fabrication, erection, purlins and cladding of a shed for limestone storage in RAK Cement Company under the inspection of M/s Halcrow.

Overall size : 195mx44mx26m height • Designed and constructed 1 no. shed for Asia Oil and Gas at Ras Al Khaimah. Overall size : 30mx30mx7m height • Completed refurbishment of RAK Municipality “MRF” building reconstruction.

Overall size : 86mx50mx12m

Scope includes design, civil, truss and roof cladding.

Overview of Project Handled


Tank Cleaning Project

•BP AMOCO

Sajaa Refinery

Tank No. 202

Size : 83.0m dia x 14.0m height

T his tank is situated at Hamriyah Free Zone, Sharjah mainly for condensate products. We ventilated the tank, removed 750 tons of sludge, cleaned the tank up to 2.0m height, and made it ready for Hot work.

T his project was carried out under strict safety precautions. Our Technicians are well trained in all safety procedures.

•BP AMOCO

Sajaa Refinery

Cleaned 2 nos. storage tanks

Size : 25.0m dia x 12.0m height

•DIVER MARINE

Cleaned 2 nos. fuel storage tanks

Size : 10.0m dia x 10.0m height

Overview of Project Handled


•RAK GAS COMMISSION

Tank #106

Size : 55m dia x 18.0m height

D esludged the tank, repaired damaged bottom plate, renewed sumps, renewed floating deck seal, fabricated new rail, blasted and painted on external and internal.

•VOPAK ENOC

D esludged 9 nos. tanks of different products and disposed 500 tons of sludge, erected scaffolding and cleaned the side and roof.

•VARUN SHIPPING

•RED SEA MARINE SERVICES

Cleaned 96 nos. tanks in 12 different tanker vessels.

•FAL SHIPPING

Cleaned 36 nos. ships oil tanks.

Cleaned 58 nos. tanks in 15 different ships.

•ARAPHIL SHIPPING

Cleaned 9 nos. tanks.

Overview of Project Handled


Blasting and Painting project

•Fujairah Refinery Co. Ltd. (formerly known as Metro Oil Corporation)

6 nos. petroleum storage tanks.

Grit blasting to SA 2½ and apply two coats of paint.

Total area: 54,000sq.m.

Note : Scaffolding erected – 32,500cub.m.

•Gulf Development Marine Services

Grit blasting and painting of barge and ship tanks.

Total area : 16,000sq.m.

•Six Construct Ltd.

Grit blasting to SA 2½ 800 nos. sheet piles and painting of the same using coal-tar epoxy paint to obtain DFT of 375 microns.

•Nishant Import & Export

MT Hansa

Tanks blasted and applied Sigma Phenguard in 15 nos. tanks (10 years warranty).

Area = 9,300sq.m.

Scaffolding – 6,000cub.m.

Overview of Project Handled


•Gulf Spic Contracting Co.

Grit blasting and three coats painting of fertilizer machineries.

Total area : 95,000sq.m.

•SDEM Emirates LLC

Grit blasting and painting of all steel structure in RAK Cement Company (2 years project).

Total area : 124,000sq.m.

Note : Scaffolding erected – 68,500cub.m.

•Bakri Navigation Company

Grit blasting and painting of different ships.

Total area : 31,000sq.m.

•RAK Cement Company

Cover to Limestone / Silica Storage

A project, which required 5,000sq.m. blasting and painting

•Fujairah Marine Services

Blasting of Petroleum tanks in Fujairah Refinery premises – 4 nos.

Total area : 12,000sq.m.

Blasting of fresh water tank in Fujairah Port.

Total area : 1,500sq.m.

Overview of Project Handled


•Goltens Co. Ltd.

Blasting of 35 nos. tanks in different ships.

Total area : 3,600sq.m.

•RAK Gas Commission

Blasting of storage tank no. 106 & 107

Total area : 16,000cub.m.

Blasting of incinerator, glycol contactor and knockout drum.

Total area : 2,400sq.m.

Note : Scaffolding erected – 12,000cub.m.

•Red Sea Marine Services

Tank blasted and applied Sigma Phenguard (10 years warranty for chemicals).

Total area : 2,000sq.m.

•Akron Trade & Transport

MV Vega

Hydroblasting of 4 nos. tanks approx. 2,000sq.m.

•ETA Electric Co.

Blasting and painting of water storage tank in Umm Al Quwain R.O Plant

Dia = 35.0m

Height = 5.0m

Overview of Project Handled


Thermal Insulation Projects

•JBF RAK plastic company

Ras Al Khaimah UAE

Installation of over 6,000 Sqms. of thermal insulation for the new SSP plant on piping, ducts and equipment.

•Guardian Glass Factory

Ras Al Khaimah UAE

Installation of over 3,000 Sqms. of thermal insulation on piping and hot gas ducts.

•Societe de Ciment Libanais (SCL)

Chekka, Lebanon (now Holcim).

Kiln Seven

Supply, and installation of thermal insulation for the new production line on filters, piping, conditioning towers, ducts, and chimney.

Client : SCL

Consultant: Polysius

Main Contractor: GEC Alstom / SDEM

Overview of Project Handled


•Gulf Cement Company (GCC)

Ras Al Khaimah UAE

New Kiln Project 7200TPD

Installation of over 10,000 Sqms. of thermal insulation for the new production line on raw mill cyclones and ducts, and bag house ducting.

•Cimenterie Nationale (CN)

Chekka, Lebanon.

Supply, and installation of thermal insulation for the new production line on filters, piping, conditioning towers, ducts, and chimney.

Client : CN

Consultant : CN

Main Contractor : Djuro Djakovich.

•Zahrani Power Plant

Zahrani, Lebanon.

Supply and installation of thermal insulation for gas turbines, steam turbine, boilers, piping, tanks, and chimneys.

Client : Electricite de Liban

Consultant : Electricite de France

Main Contractor : Ansaldo Energia SpA

Overview of Project Handled


•Ciment de Sibline (CDS)

Sibline, Lebanon.

Production Line II

Supply and installation of thermal insulation for the new production line on filters, piping, conditioning towers, ducts, and chimney.

Client : CDS

Consultant : Technip

Main Contractor : Consolidated Contractors Co.

•Ciment de Sibline (CDS)

Sibline, Lebanon.

Coal Mill

Supply and installation of thermal insulation for the Coal Mill Project on dust collectors, fans, pulverized coal silos, mill and hot gas ducts, and chimney.

Client : CDS

Consultant : KOCH TRANSPROTTECHNIK GMBH.

Overview of Project Handled


•Beddawi Power Plant

Beddawi, Lebanon.

Supply and installation of thermal insulation for gas turbines, steam turbine, boilers, piping, tanks, and chimneys.

Client : Electricite de Liban

Consultant : Electricite de France

Main Contractor : Ansaldo Energia SpA

•Lebanon Chemical Company (LCC)

Selaata Lebanon.

Supply and installation of thermal insulation for sulfur tanks, piping, boilers, absorption towers, and heat exchangers.

Client : LCC

Overview of Project Handled


refractory Lining Projects

•Societe de Ciment Libanais (SCL)

Chekka, Lebanon (now Holcim).

Kiln Seven

Full installation of 3400 tons of brickwork and monolithics for the new production line in cyclones, precalciner, gooseneck, kiln, chutes and ducts, cooler, etc.

Client : SCL

Consultant : Polysius

Main Contractor : GEC Alstom / SDEM

•Ciment de Sibline (CDS)

Sibline, Lebanon.

Gooseneck Project

Full installation of 900 tons of brickwork and monolithics for the gooseneck of the new production line. In calcining chamber, calcining chamber upper and lower outlets, calcining ducts, and chutes.

Client : CDS

Consultant : PSP Engineering

Overview of Project Handled


•Ras Al Khaimah Cement Company (RAKCC)

Ras Al Khaimah UAE

Removal and replacement of brickwork and monolithics for the new production line in cyclones, precalciner, gooseneck, kiln, chutes and ducts, cooler, etc.

•Ciment de Sibline (CDS)

Sibline, Lebanon.

Production Line II

Full installation of 1450 tons of brickwork and monolithics for the new production line in cyclones, precalciner, gooseneck, kiln, chutes and ducts, cooler, etc.

Client : CDS

Consultant : Technip

Main Contractor : Consolidated Contractors Co.

•Cimenterie Nationale (CN)

Chekka, Lebanon.

Full installation of 1650 tons of brickwork and monolithics for the new production line in cyclones, precalciner, gooseneck, kiln, chutes and ducts, cooler, etc.

Client : CN

Consultant : CN

Main Contractor : Djuro Djakovich.

Overview of Project Handled




Turn static files into dynamic content formats.