Portfolio 2015

Page 1

POR TFO LIO

PO TFO LIO


CV

ARQºFRANCISCO CASTELO BRANCO WORK EXPERIENCE 2013/14 | Junior Associate at COOP HIMMELB(L)AU, Vienna Austria 2012/13 | internship and Architect at X-Architekten, Vienna Austria 2011 | worked at Context Architects, Porto Portugal 2009 | collaborated with Carlos Prata Offices, Porto Portugal EDUCATION AND TRAINING 2013 | Member of the Chamber of Architects of Portugal (n. 21503) 2010 | completed Integrated Master Degree in Architecture with the master thesis intitled “MEDIA FACADE” oriented by Architect Pedro Gadanho; 2004 | started the graduation in Architecture at FAUP, Porto; 2004 | completed high school in Colégio Luso-Francês, Porto.

04/07/86 EMAIL. fcbtudojunto@gmail.com PHONE. +4368120123779 (AT) +351916506533 (PT)

WORKSHOPS AND LECTURES 2010 | attended international seminar “On The Surface, public space and architectural images in debate” with the participation of Beatriz Colomina, Christian Gaenshirt, Filip Dujardin, M. Graça Dias, Pedro Gadanho 2009 | attended international colloquium “Designing Light - emerging light in architecture” with the participation of Dietrich Newmann (USA), Elvira Fortunato (PT), Mark Major (GB), Campo Baesa (ES) 2008 | attended the workshop of Digital Photography Cameras 2008 | attended the conferences and workshop of CinemArchitecture, Faup, Oporto 2005 | attended conferences “(i)Materiality in contemporary architecture” with the participation of Eduardo Souto Moura and Iñaki Ábalos 2004 | attended the workshop “The Comic Visuals” integrated in the Cinema, Television, Video and Multimedia Festival in Avanca, Portugal 2003 | attended the workshop “Directing in one scenic decor” integrated in the Cinema, Television, Video and Multimedia Festival in Avanca, Portugal PERSONAL SKILLS AND COMPETENCES Portuguese as mother language written and spoken English team-spirit, organised and with initiave strenght SOFTWARE SKILLS ArchiCAD, AutoCad, Vectorworks, Sketchup

COOP HIMMELB(L)AU (Vienna, Austria) CCB - CONVENTION CENTER BAKU, AZERBAIJAN MOCAPE, CHINA

X-ARCHITEKTEN (Vienna, Austria) FIRMA IAF WH HUBER A01 WETTBEWERB

CONTEXT ARCHITECTS (Porto, Portugal) TURBINE CITY EXHIBITION S HOUSE FRAGA HOUSE

COMPETITIONS Performance Architecture (Honorable Mention) Badel Block, Zagreb

ACADEMIC PROJECTS (FAUP, Porto) MASTER THESIS PROJ V. URBAN PROJECT PROJ IV. MUSEUM PROJ III. HOUSING UNIT PROJ II. MODULE


Mr. Castelo Branco is very motivated and insightful and we are convinced that his level of commitment and thoughtfulness will enable him to further develop his productive and hardworking attitude as an architect in the future. Mr. Castelo Branco has been a most valuable member of our team and we thank him for his excellent work and wish him all the best for his future professional path. We are confident that Mr. Castelo Branco will succeed in all his endeavours and will

Letter of Recommendation 25.11.14 KS-SL/kn

make a positive contribution to whatever activities or organizations he is associated with and can recommend him to any future employer. With best regards

To whom it may concern,

COOP HIMMELB(L)AU th

Mr. Francisco Castelo Branco born on 4

of July 1986 worked in our studio COOP

HIMMELB(L)AU in Vienna as architect from August 2013 until December 2014. Mr. Castelo Branco responsibly collaborated on the following projects: Convention Centre Baku/ Azerbaijan

Karolin Schmidbaur

Design Development Phase, Detailed Design Development Phase

Design Partner

2D drafting (floor plans, ceiling plans, metal work/ceiling details, elevations façade)

Lighting plan/concept – coordination and consulting

Museum of Contemporary Art and Planning Exhibition Shenzhen/ China Design Development Phase, Construction Documents •

2D drafting (ceiling plans, details, lighting)

We came to know Mr. Castelo Branco as a determined and dedicated young architect who mastered his work with diligence, even with a heavy work load and when working under pressure. Given his helpful and open nature and his great capacity for teamwork Mr. Castelo Branco was respected and valued by his colleagues and superiors. He proved to have a quick grasp of the different tasks he was assigned to, always solving them not only with precision, but also with intelligence.


COOP HIMMELB(L)AU

CCB - CONVENTION CENTER BAKU 2013/2015 Location: Baku, Azerbaijan Program: Conference Center /Auditorium/Offices Status: In construction (Opening mid 2015) Tasks demanded: 2D Drafting plan/detailing

Design Principal & Principal in Charge: Wolf D. Prix Project Leader: Christian Labud, Günther Weber Project Architect: Martin Jelinek Design Architect: Alexander Ott

The Convention Center Baku is a multifunctional building with clearly structured but flexible rooms and spacious public areas covered by a shared, elegantly curved shell. The heart of this international conference center is the auditorium for 3,500 visitors that is flanked by 15 conference rooms and spacious networking areas. The auditorium can be used for many purposes, thanks to its flexible seating and rolling floor systems: for conferences or symposiums, trade shows and exhibitions, as a theater, for banquets, or divided by curtains and mobile partitions for several simultaneous events. The office wing and the media center on the upper floor can be accessed through the main foyer and separate entrances.Areas for building services, deliveries and a kitchen that can serve 1500 guests are on the ground floor below the conference level.

Project Team: Rachele Albini, Lukas Allner, Anar Alijev, Nurana Aliyeva, Marina Andronescu, Clement Aquilina, Michael Beckert, Johannes Behrens, Martina Bighignoli, Jan Brosch, Francisco Castelo Branco, Amit Chelouche, Mateusz Chodorowski, Chrysa Daflouka, Morteza Farhadian Dehkordi, Tyler Doherty, Miguel Sanchez-Enkerlin, Francois Gandon, Erim Gölkalpay, Sophie Grell, Reinhard Hacker, Friedrich Hähnle, Simon Hirtz, Alexander Krylov, Dimiter Kokalanov, Halina Krzyzanowska, Chang Kyu Lee, Jan-Markus Ludwig, Montgomery de Luna, Karin Miesenberger, Ruslan Nasibov, David Neudecker, Martin Neumann, Magdalena Piekarz, Thomas Pukljak, Akvile Rimantaite, Shima Roshanzamir, Julia Roßner, Danae Rothental, Jing JIng Ruan, Penelope Ruettimann-Thomas, Floris Jonker Roelants, Miguel Sanchez-Enkerlin, Brandon





LEGEND CEILING DETAILS: FOR PLANNING DETAILS PLEASE REFER TO PLANNING DOCUMENTS C32-35-P

LINEAR LIGHT

+7.50 RAFT EDGE

GE

8.10

+7.70 RAFT ED

EDGE RAFT

SPRINKLER

SMOKE DETECTOR CU

+7.50 RA FT

EDGE

.00 CUT +8

+7.50

ROUND LIGHT

SQUARE LIGHT

220

T

00 0.

CU

+1

B04

T 0 .0 +8

MOTION DETECTOR

0R +7.5

AFT

GE ED

700/ 1000

VENTILATION SLOT

B00

FACADE TYPE 5.2

FACADE TYPE 5.2

220

220 EI2 30-C

SC2.GC0 Gypsum board, Insulated

EI2 30-C

EI2 30-C

EI2 30-C

EI2 30-C

EI2 30-C

220

220

220

220

B00 500/800

SC2.GC0 Gypsum board, Insulated

SC1.SC2 Stainless steel, channeling grid system

EI2 30-C

EI2 30-C

220

B00 500/800

SC4.SP0 Stainless steel, 3D formed panels

SC4.SP0 Stainless steel, 3D formed panels

SC4.SP0 Stainless steel, 3D formed panels

220

B00 500/800

B00 500/800

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

8.10

SC2.GC0 Gypsum board, Insulated

STEEL TRUSS

LOUDSPEAKER

8.10

B00 700/1000

B00 700/1000

B00 700/1000

B00 700/1000

B00 700/1000

B00 700/1000

CAMERA

OUTDOOR GARDEN

B05

B00 500/800

220 B00 500/800

EI2 30-C

220

220 B00 500/800

1

2

3

4

5

1

2

3

4

5

B00 500/800

STEEL TRUSS

7 9 10 11

12

12

13

13

14

14

EI2 30-C

EI2 30-C

220

6 steps 16.66 / 26

11 STEPS 18.18 / 26.50

8.10

DISCLAIMER: DIMENSIONS: units = meter FLOORPLANS: cut = finished floor REFLECTED CEILING PLANS: cut = bottom of the ceiling

220

B00 800/800 220

B00 800/800

220

220

EI2 30-C

20

220

19

20

EI2 30-C

19

220

220

17 18

220

220 EI2 30-C

220

EI2 30-C

16

17 18

EI2 30-C

The Fireconcept and drawings have to be followed! The structural requirements defined in the structural concept and plans have to be followed. All structural required elements of steelworks or the facade that need to be embedded into the concrete structure have to be considered. All measurements and dimensions have to be rechecked and verified by the contractor on own's responsibility on site. Variations from drawn and written documents must be communicated immediately to the planner as well as the construction manager.

B08

B00 800/800

6 steps 16.66 / 26

B00 500/800

RC0.CC0 RC0.CC1 Coating on concrete Hydrophobic coating on concrete

15

16

B00 800/800

220

SC2.GC0 Gypsum board, Insulated

SC2.GC0 Gypsum board, Insulated

220

15

SC2.GC0 Gypsum board, Insulated

EI2 30-C

220

SC2.GC0 Gypsum board, Insulated

8

9

220

6

8

EI2 30-C

5

7

220

4

6

EI2 30-C

3

4 5

220

2

3

11

EI2 30-C

1

2

10

220

1

B00 500/800

220

220

220

SC2.GC0 Gypsum board, Insulated

SC2.GC0 Gypsum board, Insulated

SC2.GC0 Gypsum board, Insulated

+7.50 RAFT EDGE

B00 500/800

RC0.CC1 Hydrophobic coating on concrete

10 STEPS 11 STEPS 17.50 / 26.5018.18 / 26.50

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS

220

SC2.GC0 Gypsum board, Insulated

+7.70 RAFT EDGE

SC2.GC0 Gypsum board, Insulated

B07

STEEL TRUSS

RC0.CC0 Coating on concrete

8.10

EI2 30-C

FACADE TYPE 2.2

220

INDEX / İNDEKS DATE / TARİX

COMMENT / QEYD

8.10

+8.00 +7.50 RAFT EDGE

+7.70 RAFT EDGE +7.50 RAFT EDGE

MAIN ENTRANCE AUDITORIUM

EI2 30-C

8 steps 18.18 / 26.50

220

11 steps 18.42 / 26.50

EI2 30-C

PLAN NUMBER / CİZGİ NÖMRƏSİ:

RESTRICTED ARCHITECT / MEMAR:

220

AZƏRBAYCAN RESPUBLIKASI ƏMLAK MƏSƏLƏLƏRI DÖVLƏT KOMITƏSI SPENGERGASSE 37 A - 1050 WIEN

SPOC: Mr.Adil A. Mammadov Adviser to Minister Ministry of Finance

OBERMEYER Project Management GmbH

B10

220

Hansastrasse 40, 80686 München, Germany SPOC : Mr.Bahram Rad - Head of Branch

11 steps 13 steps 18.18 / 26.50 18.42 / 26.50

CONSTRUCTION COMPANY:

220

8.10

11 steps 18.18 / 26.50

N

FILE NAME - PLOT FILE / FAYL ADİ - ŞƏKİLİN ADİ: EI2 30-C

CREATION DATE /

B11

FILE NAME - PLAN FILE / FAYL ADİ - PLAN ADİ:

CHBL__-03-CCBCC-020-oooooo-C-BAA001-130930.dwg REFERENCE PLAN NUMBER / İSTİNAD PLANI NÖMRƏSİ:

PLAN SIZE / PLAN ÖLÇÜ:

1

4

7

2

5

8

3

6

9

CONVENTION CENTER BAKU BAKI KONQRES MƏRKƏZI

NETWORKING AREA

A22

8.10

A23

8.10

A24

8.10

A25

8.10

A26

8.10

A27

REFLECTIVE CEILING PLAN

PE 2.1

LL

LL 8.10

LEVEL 020 (+8.00)

8.10

A28

A29

MJ

1:100

DESIGN DEVELOPMENT

CC - CONVENTION CENTER

8.10

FCB REVIEWED / RƏYÇİ:

PHASE / FAZA:

CONTENT / MƏZMUN:

220

AUTHOR / MÜƏLLİF:

A0 1189 x 841 mm SCALE / MİQYAS:

-

SC2.GC0 Gypsum board, Insulated

QURAŞDIRMA:

2013-06-30

CHBL__-03-CCBCC-020-100003-C-BAA001-130930.pdf

220

PROJECT / LAYIHƏ:

ORIUM

Location: 50 Yusif Safarov Street, Baku AZ1025, Republic of Azerbaijan

PROJECT MANAGEMENT:

from 050 to 000 RC0.CC1 Hydrophobic coating on concrete

11 x 6 =

2013-09-30

Prj.Nr. / Layihə Nö: P-1307 CLIENT / MÜŞTƏRİ:

TEL +43 (1) 546 60- 0 FAX +43 (1) 546 60- 600

220

Overrun: 4120mm

-1 =

130930

LAST CHANGE / SON DƏYİŞİKLİK:

STATE COMMITTEE ON PROPERTY ISSUES OF THE REPUBLIC OF AZERBAIJAN

+6.80 PIT DEPTH

Pit depth: 1710mm

11 steps 18.42 / 26.50

220

220

SC8.PC0 Acoustic Ceiling

INDEX / İNDEKS:

CCBCC-020-100003-C-BAA001

CHBL__-03

from 030 to 020

from 020 to 000 RC0.CC1

Hydrophobic coating on concrete EI2 30-C

220

PREFIX / PREFİKS:

8.10

11 steps 18.18 / 26.50

EI2 30-C

EI2 30-C

11 steps 18.18 / 26.50

220

220

B09

SC2.GC0 Gypsum board, Insulated

crete

21

B06

B00 500/800

EI2 30-C

C

0.00 CUT +1

220

RANCE ICES

B03

FACADE TYPE 2.2

LOCAL PARTNER:


X-Architekten 2012- mid 2013 FIRMA IAF HOUSE HUBER WETTBEWERB BUSINESS CENTER A01


A

6

RDOK + 7.37 5 RDOK + 7.41

Attika Detail 6.001

RR

4

Gefälle 2%

3 +5.845

+8.05

+7.87

+6.523 +6.225

+5.365

+4.22 5

+4.22 5

+4.225

+4.22 5

7

RDOK + 7.37 5

+ 2.17

+3.375

+2.43

+2.49 +2.19

+ 0.90

+ 0.90

+0.86

OK Attika + 7.92 B

2

A

OK Attika + 8.05

A

A +8.05

+7.92

+7.90

6

Attika Detail 6.002

RDOK + 7.46

7

RDOK + 7,59

B

ANSICHTEN SÜD

1

B

+8.05

+7.87

+7.87

+6.523

+6.465 +6.225 STUK +6.225

+5.845

+5.80 +5.365 +4.24 5

+4.24 5

+4.22 5

+3.395

+2.34

+2.49

+ 0.90

+ 0.90

+2.60

+2.43 STUK +2.43

+2.19

+ 2.17

Eingangstür

+2.11

Fix

2011/2012 Location: Frauental, Deutschlandsberg Disctrict, Austria Program: Office building; addition of an entrance, groundfloor space, staircase and one more level to the pre-existent (total of 350 m) Client: IAF - Industrieanlagentechnik Type: Commission Status: In construction Tasks demanded: Vorentwurf / Entwurf / Einreichung / Ausführungsplanung

+8.05

+7.92

1

FIRMA IAF

6

7

7

X-Architekten

RDOK + 7.45

OK Attika + 7.91

2

Gefälle 2% RR

OK + 7.68 5

Gefälle 2%

NER WIN OUSE 4 ET HRD 201 AWA

C

Gefälle 2%

3

FBD 15/15

Attika Detail + 6.003

OK Attika 7.87

6

5

RDOK + 7,59

RDOK + 7.41

B

OK Attika + 8.05

Att 6.

5

C

FOK +/- 0.00 FOK +/- 0.00

+1.16 +0.86

-0,33

-0.36

ANSICHTEN OST

ANSICHTEN WEST B

A

A

B

+7.90


189,

230, 8 208 1013 228, 5

113, 4 290, 7

F06

15,8 15,8 15,8

260

260

F04

1

RDOK -0.20

Untersicht Treppe Metall-Konstr. geknickte Blechteile auf UK

3

F06.2

C 228 290 Fix

3

130, 2

189, 4 264, 2

208 1013 228, 5

290, 7

113, 4 68,5 18,4

C

250

300

245

165

85

165

135 21

165 21 4,5

135

165

143,7

135

165

165

121,5

3

C

Untersicht Treppe Metall-Konstr. geknickte Blechteile auf UK

F06.1

2

3

226 109 Fix

21,7

108, 4 21 ,9

189, 4

4

228, 6

118 200 Fix

165

4

264

230, 8

VWS - Fassade Aussenputz (Bestand) Hohlziegel (Bestand) Innenputz (Bestand) VWS - Fassade (nicht brennbar) STB - Wand Spachtelung

W04 10,00 cm

Trennwand Büros GK - Ständerwand

W05 0,5 cm 25,00 cm 5,00 cm

Gebäudetrennwand (zu Bestand) Spachtelung STB - Wand Innendämmung Heraklith / Tectalan

- 0,33

W06 0,5 cm 20,00 cm 0,5 cm

B

Innenwand STB (Sanitär, OG1) Spachtelung STB - Wand Spachtelung

DA01 - (Neubau Holdielen 26,5cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 26,50 cm Decke Hohldielen im Gefälle 2% 35,50 - 65,50 cm abgehängte Decke (Material?)

145, 1 290, 7

DA02 - (Neubau Holdielen 16,0cm)DA02 - (Neubau Holdielen 16,0cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 16,00 cm Decke Hohldielen im Gefälle 2% 46,00 - 76,00 cm abgehängte Decke (Materialität?)

2+2= 4m

68,2

VWS - Fassade STB - Wand Spachtelung

Dachaufbauten:

96,4

FOK +/- 0.00 - 0.02 STUK aussen

A

Dämmung weich

Fußbodenaufbauten:

W03 25,00 cm 25,00 cm 0,5 cm

1013

207, 7

20, 0 5

Bodenplatte

W02 25,00 cm 2,50 cm 38,00 cm 1,50 cm

972, 7

25

11 ST 15,7 G. 403,9 5/30 ,3

Kontur

50 200 Fix OK Rigol

5+2.19

114,5 18,4

Bodenplatte

OK Säule + 2.33 3

126

OK=RDUK

OK STB Wand + 0.85 OK Blech + 0.90

144 233 Fi x

Rigol

FOK

266,9

80

300

226

109

100 210

01 Windfang 5.8 m² Schmutzmatte

+/- 0.00 200 UK 10/6+ 2.212 4,512,5 WS12,5 WS 10/6 UK UK=RDOK OK=FOK+85 UK=FOK + 150 + 2.60

177 160

300

Kontur

OK Rigol +/- 0.00 - 0.02 STUK + 2.43 5 186 240 Fix

UK + 2.33

UK + 2.25

6

300

12,5

FOK +/- 0.00 RDOK - 0.20 + 3.08 5

UK UK + 2.21 + 2.19

FOK +1.73

231 240 Fi x

18,4

PH 90

25,00 cm 25,00 cm 0,5 cm

Nive Bo ausp denp ru latte ng

UK RDUK + 2.513

OK Rigol FOK - 0.33 - 0.31 STUK + 0.86 231 Wandaufbauten: 240 Fi W01 x

OK Säule + 1.56 1

UK FOK + 2.43

Bodenplatte

579,53

129,2

11 STG. 15,75/33,1

439,47

260 100

UK 22 + 3.10

UK + 2.60

PH 90

19

Dämmung hart

Bodenplatte

12,5

20

UK +/- 0.00

Ziegel

Kontur

UK + 1.31

37,7

PH 90

12

16 02 Treppenhaus 17 25.00 m² Linoleum 18

5

Kontur

Beton

5

UK + 0.86

+ 1.31

21

BA 1 BA 2

Fix

8,8

177 160

11,2

70 200

70 200

5,8

2

UK UZ + 2.92 5

70 200 70 200

PH 90

WS 20/10 UK=RDOK OK=RDUK

B

Fluchtbeleuchtung Schlauch einlegen Rigo l

FOK +/- 0.0013 RDOK14 - 0.5015

UK +/-1 0.00

21,8

128 ,6

WS 69/9 UK=FOK UK OK=FOK + 60

FOK 42UK +/- 0.00 + 2.60

Träger 2 x HEA 120 oberhalb

4

F06.2

230, 8

lauf

114, 1

FPH 85

C W05

4 56 75

177 160

4

Linoleum

177 160

Untersicht Treppe Metall-Konstr. geknickte Blechteile auf UK

121,5

290

4

11 ST 15,7 G. 5/30 ,3 Hand

147, 9

UK UZ + 7.01

100 166

100 151 56 75

56 75

177 160

90 200

5

Verglasung emailliert im Wandbereich

PH 90

7 6

Verglasung emailliert im Wandbereich

± 0,00 05 Empfang 31.70 m²

?

PH 90

8

06 Besprechungsraum1 24.06 m² Beschichtung

550

Linoleum

WS 20/10 UK=RDOK OK=RDUK

+ 1.16

3

07 Büro 11.66 m²

1

Vorderkante Podest Ortbeton

5 404,3

...

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

100 260

FOK +3.46 5

OK +3.30 5

UK STUK + 1.16

2366,7

6

GRUNDRISS EG

300

228 268 Fix

5,6

Handlauf

Deckensprung oberhalb

778

100 220

100 220 131

150

90 200

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.04

FOK +3.46 5

- 0.33 FOK - 0.31

9

100 260

Linoleum

UK OK + 2.60Rigol

WS 20/6 11 UK=RDOK OK=RDUK 10 DDB 20/20

Estrich schneiden 10breit Versorgung von Bodendose

Detail Glasportal Bürotüren

Abfluss (Bestand)

08 Grossraumbüro 66.85 m²

F03

1769,69

261,4 20

21,9

313 263 Fix 19

311,2

5,2

10

100 220

11 STG. 15,75/33,1

148,2

148,2 294,2

162

152 24,2

192 20

5,8

4 200 80

24,2 5,8

10

15,8 10

80

167 20

294,2

202,8

220

142

233,4

218,1

138,9

20,4

1520

10

200 80

258,4

Handlauf

120

336,6 5 STG. 15,9/30 94,7

62 20 10 80 100 368

100 132

100 120

260,6

Detail 6.023 - Schnitt E-E / M 1:20

7

96,6

359,5 396,8

7

PH 90

WS 10/6 UK=RDOK OK=RDUK

FBDB 23/250 Lüftung, Klima lt. Statik in best. VSD 26,5 ohne Unterstellung möglich.

Epoxi

6

100

163,2

8

14

18 Teeküche 2.82 m²

Bodenplatte

Vorderkante Podest Ortbeton

ÄNDERUNGEN

2110

131

Deckensprung oberhalb

113,6

WDB NICHT E__(ELEKTRO) WS SCHON ! (HEIZUNG)

Strangentlüftung

38 WC Herren 5.20 m² Epoxi

37 WC Damen 3.60 m² Epoxi

177 160

100

184,5

IAF - Industrieanlagentechnik Frauental Ges.m.b.H. Ing. Ludwig Neumannstr. 4 A - 8523 Frauental

9

Kontur

70 200

227 ,4

UK + 2.60

OK - 0.33

DA03 - (Neubau Ortbeton 16,0cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 16,00 cm Decke Ortbeton im Gefälle 2% 46,00 - 76,00 cm abgehängte Decke (Materialität?)

OK STB Wand - 0.38 OK Blech - 0.33

30

OK -0.33

RDOK -0.50

8

7

6

Tragende + konstruktive Bauteile sind nach statischer Erfordernis auszulegen. Wärme- und Schallschutz sowie Vermeidung von Kondensatbildung sind nach bauphysikalischer Erfordernis auszulegen. Die zutreffenden ÖNorm-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sind zu berücksichtigen.

Naturmaße nehmen - Koten prüfen!

25 12,5 12,5

23 Treppenhaus 12

15,8

1 10

135 ,7

OK Wand + 3.415 STUK + 6.525

0,5 12,5 12,5 Legende: AR = Abfallrohr FOK = fertige Fussbodenoberkante RR = Regenabfallrohr RDOK = Rohdeckenoberkante PS = Putzschacht RDUK = Rohdeckenunterkante oberhalb KS = Kanalsohle OK = Oberkante BEST. = Bestand UK = Unterkante DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) UZ = Unterzug lt. Statik RH = Raumhöhe

20

F06.2

18

10

FOK +1.73 5 OK +1.57

16,5

11

RDOK -0.50

WD = Wärmedämmung BRE = Brandrauchentlüftung WDB = Wanddurchbruch DDB = Deckendurchbruch FDB = Fussbodendurchbruch WS = Wandschlitz BS = Bodenschlitz

UK +1.37

Treppenauflager schallentkoppelt

4

Untersicht Treppe Metall-Konstr. geknickte Blechteile auf UK

4

106 ,5

30 30

8

lauf

E

467,9

9

RDOK -0.20

1

Treppenauflager schallentkoppelt

Vorderkante Podest Ortbeton 96,4

29

10

228 290

D

Fix

5

FOK +0.00

94,5

12 2

15,8

F06.1

123 ,3

94,4

104 ,5

11 4.5

OK Podest + 1.57 UK Podest 241 + 1.37 ,1

5.002

29

17

FBD 10/10

PLANNUMMER

15 1,5 6,5 3 8,5 0,5

B

HÖHENBEZUG LT. NATURAU F05 - (Fussboden EG - Neubau) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich Arch.DI (Estrich eventl.schleifen - Bettina Brunner ZT KEG Staatlich befugte und beeidigte sofern erforderlich) Ziviltechniker 7,00 cm Heizestrich Industriezeile 36/4 PAE-Folie 3,00 cm Trittschalldämmung A-4020 Linz Tel.: +43 (0)732 791607 5,50 cm gebundene EPS - Beschüttung Fax: +43 (0)732 7916075 1,50 cm F-Isolierung Millergasse 13 15,00 cm Unterbeton A-1060 Wien 20,00 cm Glasschaumschotter Tel.: +43 (0)1 95 82 022

104,5 30

15,8

FCB / HG

15,8

GEZEICHNET

130/88

Detail 6.025 - Treppenauflager Podest / M 1:10 13

1,5

PLANGRÖSSE

1:50

5 30

3

15,8

MAßSTAB

1133

30

33,1

PROJEKTNUMMER

12.9.2012

30

Vorderkante Podest Ortbeton

Diese Zeichnung bzw. Ausarbeitung ist geistiges Eigentum des Architekten und damit gesetzlich geschuetzt. Jede Benutzung, Veroeffentlichung, Vervielfaeltigung, Ueberarbeitung oder Weitergabe an Dritte in Verbindung mit einer anderen Arbeit oder einem anderen Projekt bedarf der Zustimmung des Architekten. Durch die Uebernahme des Planes akzeptiert die ausfuehrende Firma die darauf dargestellten Anordnungen. Geschriebene Planmasse auf dieser Zeichnung haben Vorrang gegenueber gezeichneten Dimensionen. Der Auftragnehmer verpflichtet sich vor Arbeitsbeginn alle Masse und Bedingungen seine Arbeit betreffend, auf der Baustelle verantwortlich zu ueberpruefen. Abweichungen gegenueber dargestellten oder schriftlichen Anordnungen muessen dem Architekten bzw. der Bauleitung unverzueglich schriftlich mitgeteilt werden.

RDUK + 7.21

RDUK + 7.11

DATUM

1

EG

17

228 268

C

RDUK + 7.21

Fix

OK Wand + 3.415

Detail 6.024 - Treppenauflager EG / M 1:10

DACHAUFSICHT 1:200

1,2

Millergasse 13 A-1060 Wien Tel.: +43 (0)1 95 82 022 Fax: +43 (0)1 20 81 970

20

110 252

6

Industriezeile 36/4 A-4020 Linz Tel.: +43 (0)732 791607 Fax: +43 (0)732 7916075

30

Fix

Arch.DI Bettina Brunner ZT KEG Staatlich befugte und beeidigte Ziviltechniker

INDEX G: Maße Innenausbau Trockenbau

F07 - Fussboden Nassbereich (OG1) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung 5,50 cm gebundene EPS - Beschüttung 20,00 cm Decke Ortbeton 20,00 cm Dämmung Mineralwolle 10,00- 40cm abgehängte Decke Aussenbereich

PLANINHALT

SCHNITT Detail 6.020 - Treppe OGAA 1:50 SCHNITT BB 1:50 Treppengeomrtrie M 1:20CC 1:50 SCHNITT

BAUVORHABEN

S A

F04 - (Fussboden EG - Bestand) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich Bestand Klebereste entfernen, eventl.schleifen sofern erforderlich) 6,00 cm Tragende +Estrich Bestand konstruktive Bauteile sind nach statischer Erfordern PAE-Folie Kondensatbildung sindBestand nach bauphysikalischer Erfordernis ausz 8,00 cm resultierenden Wärmedämmung Bestand sind zu berücksichtig baulichen Notwendigkeiten 1,50 cm gebundene Beschüttung Bestand 1,50 cm F-Isolierung Bestand Naturmaße neh 15,00 cm Unterbeton Bestand Rollierung Bestand

F06.2 - Fussboden Eingang Rampe 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 8,50 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 5,40 - 36,5 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

HÖHENBEZUG LT. NATURAUFNAHME +0,00 = FOK Bestand EG

SCHNITT BB

Bestand bleibt erhalten

F03 - (Fussboden Ortbeton OG - Neubau) Änderung Bodenbeschichtung au 0,50 cm INDEX B: Bodenbelag Linoleum verklebt Spachtelung Bodenplatte, BDD Regenabfallrohr, Maßang Voranstrich neu F 06.1 and F 06.2, Änderung in Aufbau (Estrich eventl.schleifen INDEX C: Änderung sofern erforderlich)Angaben Haustechnik, 7,00 cm lt. StatikHeizestrich PAE-Folie Änderung Durchgang zur Kantine 3,00 cm INDEX D: Trittschalldämmung 5,50 cm INDEX E: gebundene EPSUntersicht - Beschüttung Treppe (Faltu korrektur 22,00 cmINDEX F: Decke Ortbeton Maße Nasszelle OG, F Änderung 30,00 cm abgehängte Decke (Materialität?)

F06.1 - Fussboden Eingang 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 8,50 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 6,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

RW Kanal DN 150, 2%

1

BAUHERR OG - Bestand + Neu) F02 - (Fussboden 0,50 cm Bodenbelag Linoleum verklebt IAF - Industrieanlagentechnik Spachtelung Frauental Ges.m.b.H. Voranstrich Ing. Ludwig Neumannstr. 4 (Estrich eventl.schleifen - 8523 Frauental sofernAerforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm ÄNDERUNGEN Trittschalldämmung 5,50 cm gebundene EPS - Beschüttung 26,50 cmINDEX A: Hohldiele (Bestand) Anpassung Koten, Angabe OK 10,00 cm Wärmedämmung (Bestand) Treppensteigung, Anpassung 15,00 cmAnpassung abgehängte Decke

Fax: +43 (0)1 20 81 970

RDOK -0.50

RDOK -0.50

POLIE

F01 - (Fussboden Hohldielen OG - Neubau) BAUVORHABEN 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Zubau und Aufstockung d Voranstrich Firma IAF - -Industrieanlag (Estrich eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich KG: 61055 Schamberg PAE-Folie Gem.: Frauental a.d.L., Ing. Ludwig Ne 3,00 cm Trittschalldämmung GST. Nr.: 248/3 5,50 cm gebundene EPS - Beschüttung EZ.: 216 26,50 cm Decke Hohldielen 23,50 cm abgehängte Decke

F06 - Fussboden Eingang Schmutzmatte 2,00 cm Schmutzmatte PROJEKTNUMMER MAßSTAB 7,00 cm DATUM Heizestrich versiegelt PAE-Folie 13. 11. 2012 1133 1:50 3,00 cm Trittschalldämmung Diese Zeichnung bzw. Ausarbeitung ist geistiges des Architekten und damit gesetzlich geschuet 6,50 cm Verbindung gebundene EPS Eigentum - Beschüttung mit einer anderen Arbeit oder einem anderen Projekt bedarf der Zustimmung des Architekten. 1,50 cm Geschriebene Planmasse F-Isolierung auf dieser Zeichnung haben Vorrang gegenueber gezeichneten Dimensionen. zu ueberpruefen. Abweichungen gegenueber dargestellten oder schriftlich 15,00 cmauf der Baustelle verantwortlich Unterbeton 20,00 cm Glasschaumschotter

F06.2

1

RDOK -0.20

OK 19,4 -0.02

RDOK -0.20

BAUHERR

Vorderkante Podest Ortbeton

2

30

86,5

4442,5

6 5 4

8m 4= 2+ 2+ 0 UK 80 +1.37

1

6 STUK + 2.80

AR FOK = fertige Fussbodenoberkante RR RDOK = Rohdeckenoberkante PS RDUK = Rohdeckenunterkante oberhalb KS OK = Oberkante BEST UK = Unterkante DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) UZ = Unterzug lt. Statik RH = Raumhöhe

444 ,1

S VW

F05

F06.1

RDOK -0.17 5

Gem.: Frauental a.d.L., Ing. Ludwig Neumannstr. 4 GST. Nr.: 248/3 EZ.: 216

10

Legende:

+

FOK +/- 0.00

UK +1.37

17

W01 OK -0.36

RDUK Podest Ortbeton +3.085

Detail 6.024

PH 90

0

Vorderkante

UK +2.925

KG: 61055 Schamberg

104,3

OK Wand + 0.85 STUK + 2.49

12

10 1 10,8

B

d an W

UK +2.925

96,4

8 7

13

FOK

105,3 +1.73 5 11der und Aufstockung des12,5 bestehendes 12,5 OK 865 Bürogebäudes Firma IAF - Industrieanlagentechnik +1.57 Frauental Ges.m.b.H

12,5 12,5Zubau

DA03 - (Neubau Ortbeton 16,0cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 16,00 cm Decke Ortbeton im Gefälle 2% 46,00 - 76,00 cm abgehängte Decke (Materialität?)

779 ,7

423 ,7

90 200

B ST

RDUK +3.04

+2.60

A

OK Attika + 8.05

9

RDOK +3.305

POLIERPLAN

BAUVORHABEN

Innenwand STB (Sanitär, OG1) Spachtelung STB - Wand Spachtelung

18,4

,8% e5 mp Ra

RDUK +3.105

RDOK + 7,59

FOK +3.465

94,3

OK +1.57 94,3

Fix

RDOK +3.305

30 29 FOK 12 +1.73 5 11

10

W06 0,5 cm 20,00 cm 0,5 cm

109,5

100

13

EI2 30 -C

100

30

5

194,5

UK +3.08 5

OK Wand + 0.85 STUK + 2.44

12,5

C

184,5 30

18

A

OK Wand + 4.26 5 STUK + 6.22 5

Gebäudetrennwand (zu Bestand) Spachtelung STB - Wand Innendämmung Heraklith / Tectalan

OK Säule + 6.15 8

193,9

PH 90

PH 176

PH 176

177 160

30

Beschichtung

177 160

30

FPH 90

E-Schläuche einlegen lt. Angabe Haustechnik

E-Tunnel zu Halle(Bestand)

A

30

A

15

100 160

30

20 16,5

30

+4.26 5

20 16,5

100

320

320

30,1

17 16

7 19 0 16 14

PH 176

3xFBD DM 15 im Hohlbereich der Diele

Strangentlüftung (Bestand) unter RDUK zum Herren WC verbinden

Detail 6.027

20

18

30

6

155

10

22

E-Schläuche einlegen lt. Angabe Haustechnik

Fix

14

4

30

F03

30

RW

BRH 100

21 Träger 2 x HEA19 120 oberhalb

166,2

AB SW DN 100

RDUK + 3.10 5

100 260

WS 6/10 Vorderkante UK=RDOK+150 Podest Ortbeton OK=RDUK

70 160

F02

PH 85

RDOK +3.305

5

W04

F01

0 10

Fix

F03

+4.26 5

Beschichtung

?

Linoleum

OK Säule + 2.44 8

WDB 60/60 Tür EI2 30-C als Tapetentür mit Putzoberfläche bündig in Wand

PH 90 10 Serverraum 8.85 m²

Bodenplatte

± 0,00

210 160

OK Attika + 7.87

Attika Detail 6.002

OK Säule + 6.31 9

114 194 Fi x

5

Trennwand Büros GK - Ständerwand

W05 0,5 cm 25,00 cm 5,00 cm

DA02 - (Neubau Holdielen 16,0cm)DA02 - (Neubau Holdielen 16,0c 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 16,00 cm Decke Hohldielen im Gefälle 2% 46,00 - 76,00 cm abgehängte Decke (Materialität?)

493 ,5

DDB 20/20

FOK +/- 0.00 RDOK - 0.17 5 BRH 100 RDUK + 3.04

03 Grossraumbüro 54.70 m²

+ 7.42

560,2

SW Kanal Bestand

09 Archivieren 12.92 m²

WS 84/9 UK=FOK OK=FOK + 90

177 04 160 Windfang 5.70 m² Niv Schmutzmatte

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

30 183 30

29

9,5 11

5

Bodenplatte

Detail 6.026

Detail 6.025

111 202 Fi x

RDUK

VWS - Fassade (nicht brennbar) STB - Wand Spachtelung

W04 10,00 cm

210 220

,4 18

14

71,1 6,7

2

0 10 0 20

W01

OK Wand + 4.26 5

189 209 Fi x Vorderkante Podest Ortbeton

FOK + 3.46 5 RDOK + 3.30 5

UK + 2.50

WDB DM 15 OK=RDUK DDB 20/20 WS 20/6 UK=RDOK OK=RDUK

158,1

UK + 2.10

132,8

Knick RDUK

RW Kanal DN 150, 2%

FOK - 0,34

OK Säule + 5.95 2

108,1

WDB 20/20 OK +3.04

STUK + 2.31

Kontur

7,8 10

B

+ 7.41

Abdichtung

6,4 15

15

6

RDOK

Schmutzwasser

Dämmung weich

96,4

16

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

,5 12

0 21 0 7 1Schnittführung Fix

3,2 16

W01

Dämmung hart 424,4

17 Vorderkante Podest Ortbeton

22

WDB 20/20 OK =RDUK

Bo ea de usp np ru latt ng e

Kontur 7,5 84

+6.66 5

Regenwasser

190 198

3

59 60 Fix 1

RDOK - 0.53 5 RDUK + 3.04 1,8 21

90

Ziegel

18

UK UZ +7.01

126 200

B

166,2

OK Säule + 6.47 1 231 241 Fi x

237, 73

VWS - Fassade Aussenputz (Bestand) Hohlziegel (Bestand) Innenputz (Bestand)

W03 25,00 cm 25,00 cm 0,5 cm

Hauptverteilerkasten Elektro

7 OK Wand - 0.39 STUK STUK UK + 2.54 + 2.34+ 2.34

OK Säule + 2.34 1

Bodenplatte

Achsen

0 58

UK +3.08 5

RDUK verläuft schräg

0 10 0 17

Stahlbeton

426,3

19

20 21

RDUK E-Schläuche einlegen lt. Angabe + 7.32 Haustechnik

FPH 85

577,3

BA 1 BA 2

143,2

Kontur

H FP

+7.87

20

B

Säule DM 25

514,8

408 2,9 14

,5 12

RDOK verläuft schräg

OK Beton +3.41 5 21

19

1

2366,7

- 0,36

9,3

0 21 0 16

Gefälle 2%

Gully

OK Säule + 2.21 8

211,2

A ,4 87

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.10 5

0 16

161,2

25

3,5 11 0,9 44

Fix

Gefälle 2%

1

3,2 16

FOK DA02 +3.46 5 OK 22 Detail+3.30 6.002 5

DA01

Detail 6.002

6

Fix

1,9 15

F03

0 10 0 16

DA03 +7.92

7

4

84

8

4

5 10

1

3

PH 18 0

80 14

= Wärmedämmung = Brandrauchentlüftung E-Schläuche = Wanddurchbruch einlegen lt. Angabe = Deckendurchbruch Haustechnik = Fussbodendurchbruch = Wandschlitz = Bodenschlitz

2

BRH 100

AR = Abfallrohr OK Wand WD RR = Regenabfallrohr+ 0.85 BRE PS = Putzschacht WDB STUK KS = Kanalsohle + 2.17 DDB BEST. = Bestand FDB WS BS 84

25 25

FOK = fertige Fussbodenoberkante RDOK = Rohdeckenoberkante RDUK = Rohdeckenunterkante oberhalb OK = Oberkante Sickerschacht UK = Unterkante Bestand DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) UZ = Unterzug lt. Statik RH = Raumhöhe

OK Säule + 5.73 9 113,2

UK + 2.10

0 10 0 17

Legende:

108,1 552,5

1 Detail 6.022 - Schnitt D-D / M1:20 Fix

Detail 6.021 - Schnitt C-C / M 1:20

105,1

449,9

SW K Besta anal nd

F07 - Fussboden Nassbereich (OG1) 3,2 0,50 cm Bodenbelag Linoleum verklebt 16 Spachtelung Voranstrich ,9 (Estrich eventl.schleifen 39 sofern 3erforderlich) 3,2 OK Säule 7,00 cm Heizestrich 16 PAE-Folie + 2.24 7 3,00 cm Trittschalldämmung 5,50 cm25 gebundene EPS - Beschüttung 20,00 2,8Decke Ortbeton Kontur 25cm 17 Dämmung Mineralwolle 20,00 cm 10,00- 40cm abgehängteBodenplatte Decke Aussenbereich

SCHNITT CC

163,1

7 22 60 Fix 1

- Decken - und Wandaufbauten lt. Bauphysik.

OK Säule + 5.53 5

162,9

16

- Bauangaben im Ausbau (Leichtbau) sind im Architekten-Polierplan nicht vermerkt. Erforderliche Durchbrüche sind dem HKLS-Plan zu entnehmen bzw. mit dem Bauherrn abzuklären;

16 17 18

2

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

22

- Gebäudedurchführungen müssen absolut dicht mit RDS Rohrdurchführungen ausgebildet werden;

B

170,9

177 160

A

10

E-Schläuche einlegen lt. Angabe Haustechnik

FPH 85

10

3

1

90 26 0

B

7

13,9

F06.2 - Fussboden Eingang Rampe 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 8,50 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 5,40 - 36,5 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

- Ausführung des Kanals It. ÖNORM 2500 ff, EN 752/1-3;

422,4

OK Wand + 3.41 5 STUK

15

3

VWS - Fassade STB - Wand Spachtelung

W02 25,00 cm 2,50 cm 38,00 cm 1,50 cm

DA01 - (Neubau Holdielen 26,5cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 26,50 cm Decke Hohldielen im Gefälle 2% 35,50 - 65,50 cm abgehängte Decke (Material?)

23+ 3 6.52 5 292 Fix Vorderkante Podest Ortbeton

Linoleum 14

4

Linoleum

10

- Ausführung der Türen und Tore bei Brandabschnitten in El230-c.

100 108

37,7

Fix

AB SW DN 100

592

2

- Sämtliche Schleusen sind mit mech. bzw. natürlicher Be - und Entlüftung auszustatten;

5

25 Büro 17.41 m²

E-Schläuche einlegen lt. Angabe Haustechnik

114,1

F06.1 - Fussboden Eingang 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 8,50 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 6,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

PLANNUMMER

GEZEICHNET

OK Wand + 4.26 5 STUK + 5.36 5

PH 90 302

PLANGRÖSSE

- Die Auflagen desFCB Baubescheids, die zutreffenden 5.001 G 110/90 / RK ÖNorm-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sind bei der Ausführung genauesten zu beachten.

1:50

10

Linoleum

UK UZ + 2.92 5

MAßSTAB

RDUK + 7.32

2 20 2 11

A

Fix

15%

1133

110 220

177 114 PROJEKTNUMMER

OK 13. 11. 2012 -0.33

7

W01 25,00 cm 25,00 cm 0,5 cm

Dachaufbauten:

+ 1.37 23 12 Treppenhaus 17.00 13m²

8

4

26 Büro 17.41 m²

177 62

20

DATUM

9

6

43,310

5

OK Podest + 1.57 UK Podest

10

100 189

GRUNDRISS OG1

Diese Zeichnung bzw. Ausarbeitung ist geistiges Eigentum des Architekten und damit gesetzlich geschuetzt. Jede Benutzung, Veroeffentlichung, Vervielfaeltigung, Ueberarbeitung oder Weitergabe an Dritte in Verbindung mit einer anderen Arbeit oder einem anderen Projekt bedarf der Zustimmung des Architekten. Durch die Uebernahme des Planes akzeptiert die ausfuehrende Firma die darauf dargestellten Anordnungen. Geschriebene Planmasse auf dieser Zeichnung haben Vorrang gegenueber gezeichneten Dimensionen. Der Auftragnehmer verpflichtet sich vor Arbeitsbeginn alle Masse und Bedingungen seine Arbeit betreffend, auf der Baustelle verantwortlich zu ueberpruefen. Abweichungen gegenueber dargestellten oder schriftlichen Anordnungen muessen dem Architekten bzw. der Bauleitung unverzueglich schriftlich mitgeteilt werden.

11

1515

422,4

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

Ram pe

972, 7

1013 228, 6 165 290, 7

F06.2 RDOK -0.50

oberhalb

21,7

189, 4

4 230, 8

264

207, 7

20, 0 5

108, 4 21 ,9

25

100 210

UK UZ + 2.92 5

118 200

177 160

145, 1 1

548

B

RDUK + 7.21

+1,7 3 FBD 10/10

Linoleum

+3,46 5

1 W0

1515

FOK + 3.46 5 RDOK + 3.30 5

10

5 44

E-Schläuche einlegen lt. Angabe Haustechnik

RDUK + 7.11

24 Besprechung2 27.8 m²

Detail 6.070 - Glasportal / Bürotüren Deckensprung

3

300

226 109 Fix

5,8

12,5

11 STG. 15,75/33,1

11 ST 15,7 G. 403,9 5/30 ,3

FOK +/- 0.00

10

10

300,4

F06 - Fussboden Eingang Schmutzmatte 2,00 cm Schmutzmatte 7,00 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 6,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

- Rohbauöffnungen von Fenstern und Türen müssen im Detail mit der ausführenden firma abgestimmt werden. Etwaige Änderungen des lichten Maßes können die Folge sein.

Strangentlüftung EG

Linoleum

0 43

177 62

C Fix

226

109

11,2 439,47 579,53

177 160

Rigol

177 160

260 100

70 200

70 200

177 160

177 160

96,4

W05

4 56 75

56 75

56 75

70 200 70 200

90 200

90 200 177 160

A

240,5

177 114

FPH 85

114, 1 68,5 18,4

100 166

100 151

150

177 160

8,8

260,6

10 10 PH 90 302 UK UZ + 2.92 5

177 160

100 160

177 160

131

3

C

A 190 198

177 62 15%

Ram pe

90 26 0 12,5

264, 2

11 15

11 ST 15,7 G. 5/30 ,3

147, 9

778

100 220

100 220 408 100 108

177 62 Deckensprung oberhalb

399,5

320 86,5 260

C

RDOK -0.20

Millergasse 13 A-1060 Wien Tel.: +43 (0)1 95 82 022 Fax: +43 (0)1 20 81 970

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

FBDB 23/250 Lüftung, Klima lt. Statik in best. VSD 26,5 ohne Unterstellung möglich.

FBDB in diesem Bereich notwendig?

Kopierer 140x80

+ 7.21

UK UZ + 6.72

BA 1 BA 2

21,7

127 ,2

OK Wand + 3.41 5

RDUK

Abfluss WC im Gefälle (1%) Vertiefung in Rohdeke lt. Statik u. Rücksprache mit Installateur

444 ,1

228 ,2

Fix

F06.1

Industriezeile 36/4 A-4020 Linz Tel.: +43 (0)732 791607 Fax: +43 (0)732 7916075

Heizungsv erteiler 115/60/8,5

STUK + 5.73

169

6

195 188

F06

- Alle tragenden und konstruktiven Bauteile müssen nach GRUNDRISS EG geprüfter statischer Berechnung hergerstellt werden. Die GRUNDRISS Abdichtungen sind OG1 It. ÖNorm, der Wärme- und Schallschutz It. Bauphysik auszuführen.

Arch.DI Bettina Brunner ZT KEG Staatlich befugte und beeidigte Ziviltechniker

210

779 ,7

113 ,1

Fix

S VW

OK -0.02

OK -0.29

-0.36

5

OK STB 4 3 Wand 2 - 0.38 OK Blech - 0.33

10

9

8

7

6

FOK +1.73 RDOK 11 +1.57

Linoleum

Linoleum 180

Heizungsv erteiler 115/60/8,5

395 ,5

194 181

+

2366,7

GRUNDRISSOKEG

OK - 0.33

130

98,9

Fix

114,5 18,4

20

80 34 OG 200 Wc-Herren 4.00 m²

311,7

216 170

RDUK 45 +3.08

68,2

121,5

118,3

Fix

266,9 165

80 108 200

Schachtwand Leichtbau

100 163

80

180

3.50 m²

Linoleum

Fix

245

10

31,7 20

80 33 200 Vorraum WC

3xFBD DM 15

WS 15/15 OK=RDUK Decke ü. OG UK=RDOK Decke ü. EG

80 W06 20/20 20010FBD100 10 10 80 10 2043,310

216 160

165

WBD 60/15 UK =RDOK

FBD 20/20

Fix

W02

135

FBD 20/20

108

37 WC-Damen 35 WC-Herren 2.3 m² 2.10 m² Linoleum

UK =RDOK

206 146

300 165

2

135

- Alle Maße sind vor Baubeginn örtlich und rechnerisch zu Naturmaße nehmen - Koten prüfen! prüfen; eventuelle Unstimmigkeiten sind mit den Architekten und der örtlichen Bauaufsicht abzustimmen. Die Werkpläne HÖHENBEZUG LT. NATURAUFNAHME +0,00 = FOK Bestand gelten nur in Verbindung mit den EG Detailplänen der Architekten, sowie den Schal - und Bewehrungsplänen des Statikers; PLANINHALT

168

Linoleum

31 Gang 4.17 m² 80 Linoleum 200

Fix

165

F05 - (Fussboden EG - Neubau) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung 5,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

und

20

35 Wc-Damen OG 4.52 m² WBD 60/15

124 ,9

WDB ca. 150x30 - Lüftung ca. 100x10 - Klima OK +7.27 Bitte Rücksprache mit dem Bauherrn halten!

Detail 6.070 - Glasportal / Bürotüren

Fix

300

135

Dachabdichtung Foliendach Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) Dampfsperre Decke Ortbeton im Gefälle 2% abgehängte Decke (Materialität?)

3

27 Großraumbüro OG 158.60 m²

110 136

165

4,4 35

100 130

300

2+2= 4m

3

2

10 F04 - (Fussboden EG - Bestand) 7 0,50 cm Bodenbelag Linoleum 12 verklebt SpachtelungFix Voranstrich 00 (Estrich Bestand Klebereste1ent2 fernen, eventl.schleifen 11 sofern erforderlich) 6,00 cm Estrich Bestand OK Säule PAE-Folie Bestand + 5.44 3 8,00 cm Wärmedämmung Bestand 1,50 cm gebundene Beschüttung Bestand 1,50 cm F-Isolierung Bestand 15,00 cm Unterbeton Bestand Rollierung Bestand

2

5

160

RDOK + 3.30 5

Säule DM 25

0 10 0 22

85

cm

0,5 cm 16,00 cm 46,00 - 76,00 cm

4 29 13 Fix 2

165

- Naturmaße nehmen!

Alle Maße sindundinSchallschutz cm angegeben. Sturzunterkanten Tragende + konstruktive Bauteile sind nach statischer Erfordernis- auszulegen. Wärmesowie Vermeidung von Kondensatbildung sind nach bauphysikalischer Erfordernis auszulegen. Die zutreffenden ÖNorm-Vorschriften mit allen daraus Parapethöhen beziehen sich auf FFOK; resultierenden baulichen Notwendigkeiten sind zu berücksichtigen.

16.10 m²

Wandaufbauten:

16 STG. 18,5/27

10

Fix

250

121,5

0,5 cm

15,00 - 40,00 - Rohbautoleranzen beachten!

FOK +3.465

-G

F

INDEX B: Änderung Bodenbeschichtung auf Linoleum (Pläne u. Aufbauten), Kontur DA02 - (Neubau Holdielen 16,0cm)DA02 - (Neubau Holdielen 16,0cm) Bodenplatte, BDD Regenabfallrohr, Maßangaben Bereich Nassräume Aufbauten 5,00 OG cm ergänzt,Kiesbett neu F 06.1 and F 06.2, Änderung in Aufbauten EPS - Beschüttung,0,5 Maße cm Fensterband Dachabdichtung Foliendach - 40,00 cm inWärmedämmung im Gefälle verlegt INDEX C: Änderung Angaben Haustechnik, Anpassung Treppe OG15,00 (Verbindung Kantine) Gefälledämmung (in Mittel 27,00 cm) lt. Statik 0,5 cm Dampfsperre INDEX D: Änderung Durchgang zur Kantine im OG, Stützen im OG16,00 cm Decke Hohldielen im Gefälle 2% 46,00 - 76,00 cm abgehängte Decke (Materialität?) INDEX E: korrektur Untersicht Treppe (Faltung) Hinweise und Anmerkungen INDEX F: Änderung Maße Nasszelle OG, FBDB 23/250 Decke über EG f. Lüftung, Klima DA03 - (Neubau Ortbeton 16,0cm) INDEX G: Maße Innenausbau Trockenbau und Glaser, Änderungen Glastüren - Gebäudeachsen siehe Polierplan 5.004 5,00 cm Kiesbett

FOK +3.465

189

Linoleum

Linoleum

Linoleum 70- Neubau) F03 - (Fussboden Ortbeton .0 OG OK 0,50 cmSäule Bodenbelag il 6 Linoleum verklebt eta + 5.78 8 DSpachtelung 0 Voranstrich 10 2 1 (Estrich1eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung 96 gebundene EPS 5,50 cm 3 - Beschüttung 13 22,00 cm Decke ix Ortbeton F 30,00 cm abgehängte Decke (Materialität?) 0

B

B

30 Büro 17.00 m²

210 122

20

DA01 - (Neubau Holdielen 26,5cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach ÄNDERUNGEN 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) INDEX A: Anpassung Koten, Angabe OK Säulen, Entfall Säule bei 0,5 Eingang lt. Statik, cm Dampfsperre Anpassung Treppensteigung, Anpassung Angabe WS in Parapeten, Wandstück bei Eingang 26,50 cm Decke Hohldielen im Gefälle 2% 35,50 - 65,50 cm abgehängte Decke (Material?) Bestand bleibt erhalten

- 0,33

388

Fix

396,8

Dachaufbauten:

5

UK UZ + 6.72

218 110

14

Innenwand STB (Sanitär, OG1) Spachtelung STB - Wand Spachtelung

H FP

RDUK

1

4

E-Schläuche einlegen lt. Angabe Haustechnik

0,8 11

RDUK +2.31

W06 0,5 cm 20,00 cm 0,5 cm

Haustechnik

FBD 20/20

,9 13

261,4

BRH 100

A

5

6

96,6

Bodenplatte

50 200 Fix FOK F03 OK Rigol +/- 0.00 - 0.02 STUK +2.19

UK UK + 2.21 + 2.19

OK STB Wand + 0.85 OK Blech + 0.90

IAF - Industrieanlagentechnik Frauental Ges.m.b.H. Ing. Ludwig Neumannstr. 4 A - 8523 Frauental

Gebäudetrennwand (zu Bestand) Spachtelung STB - Wand Innendämmung Heraklith / Tectalan

9,6 11

7

BAUHERR

+7.87

W05 0,5 cm 25,00 cm 5,00 cm

9,3 15

UK + 2.60

KG: 61055 Schamberg

Gem.: Frauental a.d.L., Ing. Ludwig Neumannstr. 4 GST. Nr.: 248/3 EZ.: 216

Knick OK E-Schläuche Geschossdecke einlegen lt. Angabe

29 Büro 15.60 m²

F02 - (Fussboden OG - Bestand + Neu) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung ren 5,50 cm gebundene EPS - Beschüttungrotü ü 8 Hohldiele (Bestand) 26,50 cm / B28 18 10,00 cm rtal Büro 8 Wärmedämmung (Bestand) 4 1 abgehängte Deckespo 15,00 cmix la

Linoleum

85

RDUK + 7.11

Linoleum

32 Lager 1.74 m²

seitlich

0 10 5 19

PH 90 FPH 85

1

0 30

PH 90

Kontur

VWS - Fassade (nicht brennbar) STB - Wand Spachtelung

Zubau und Aufstockung des bestehendes Bürogebäudes der W04 Trennwand Büros 10,00 cm GK - Ständerwand Firma IAF - Industrieanlagentechnik Frauental Ges.m.b.H

B

OK Säule + 2.33 3

126 FOK +/- 0.00 200

POLIERPLAN

25

85

01 Windfang 5.8 m² Schmutzmatte

UK

WS 10/6+ 2.212 WS 10/6 UK=RDOK OK=FOK+85 UK=FOK + 150 OK=RDUK

VWS - Fassade Aussenputz (Bestand) Hohlziegel (Bestand) Innenputz (Bestand)

Lager 36.4 m²

ca.133

OK Wand RDUK + 4.26 5 + 7.28 5 STUK RDOK + 6.46 5 25 Wandstück + 2.65 5

+ 7.21

B

H FP

PH 90

144 233 Fi x

W02 25,00 cm 2,50 cm 38,00 cm 1,50 cm

4 36

F01 - (Fussboden Hohldielen OG - Neubau) 3,4 0,50 cm Linoleum verklebt 16 Bodenbelag Spachtelung Voranstrich OK Säule (Estrich eventl.schleifen 0,3 sofern erforderlich) + 6.00 3 12 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung 5,50 cm gebundene EPS - Beschüttung 26,50 cm Decke Hohldielen 23,50 cm abgehängte Decke

38

+2,67

STUK 110 220 + 4.87 EI 2 30 STUK -C + 4.87

9,2 10

PH 90

UK + 2.33

UK + 2.25

Abdichtung

BAUVORHABEN

Bodenplatte

UK + 2.513

UK + 2.60

Dämmung weich

7,2 13

Fußbodenaufbauten: ,8

7,5 84

PH 90

Kontur

DA02

OK Rigol +/- 0.00 - 0.02

VWS - Fassade STB - Wand Spachtelung

W03 25,00 cm 25,00 cm 0,5 cm

1 15 93 Fix 1

Bodenplatte

Träger 2 x HEA 120 oberhalb

WS 20/10 UK=RDOK OK=RDUK

Nive Bo ausp denp ru latte ng

UK FOK + 2.43

FOK +/- 0.00 STUK RDOK - 0.20 + 2.43 5186 RDUK + 3.08 5 240 Fix

Linoleum

W01

UK 22 + 3.10

231 240 Fi x

Schmutzwasser

Schnittführung

0 10 0 22

Kontur

UK +/- 0.00

Dämmung hart

W01 25,00 cm 25,00 cm 0,5 cm

5 16 6 18

Gefälle 2%

+8.05

Linoleum

21

OK Säule + 1.56 1

12,5

20

Wandaufbauten:

0 10 0 22

FOK 42UK +/- 0.00 + 2.60

UK + 1.31

Regenwasser

7

Fix

2

Verglasung emailliert im Wandbereich

± 0,00

18

UK Linoleum 19 +/-1 0.00

550

07 Büro 11.66 m²

WS 20/10 UK=RDOK OK=RDUK

16 02 Treppenhaus 17 25.00 m²

4 3

05 Empfang 31.70 m²

Bodenplatte 163,2

5

12

FOK +/- 0.0013 RDOK14 - 0.5015

OK Rigol FOK - 0.33 - 0.31 STUK + 0.86 231 240 Fi x

Stahlbeton

Ziegel

9,9 57

1

6

Bodenplatte

Achsen

Beton

,1 99

113,6

06 Besprechungsraum1 24.06 m² Beschichtung

A

100 260

Linoleum

+ 1.31

7

Kontur

OK Säule + 6.18 8

3 6,2 36

100 260

8

5

UK + 0.86

WS 69/9 UK=FOK UK OK=FOK + 60

9

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

Detail Glasportal Bürotüren

Abfluss (Bestand)

WS 20/6 11 UK=RDOK OK=RDUK 10 DDB 20/20

Estrich schneiden 10breit Versorgung von Bodendose

FBDB 23/250 Lüftung, Klima lt. Statik in best. VSD 26,5 ohne Unterstellung möglich.

Epoxi

B

Fluchtbeleuchtung Schlauch einlegen Rigo l

7,2 13

8,2 15

0 10 7 17

Strangentlüftung

18 Teeküche 2.82 m²

+ 1.16

BA 1 BA 2

0,9 14 0,5 44

8 15 5 17

38 WC Herren 5.20 m² Epoxi

WS 10/6 UK=RDOK OK=RDUK

Verglasung emailliert im Wandbereich

PH 90

UK

OK + 2.60Rigol - 0.33 FOK - 0.31

UK STUK + 1.16

21,8

128 ,6

d an W

F04

RDOK -0.17 5

37 WC Damen 3.60 m² Epoxi

70 200

PH 90

B ST

FOK +/- 0.00

+2.67

Kontur

WDB NICHT E__(ELEKTRO) WS SCHON ! (HEIZUNG)

,8% e5 mp Ra

90

PH 176

PH 176

?

OK Wand + 0.85 STUK + 2.44

Fix

RDOK +2.51

E-Schläuche einlegen lt. Angabe Haustechnik

70 160

1

14

2

8m 4= 2+ 2+ 0 80

FPH 90

UK + 2.60

PH 90

08 Grossraumbüro 66.85 m²

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.04

444 ,1

227 ,4

Innenkante Parapet

8 15

80 14

Fix

Strangentlüftung (Bestand) unter RDUK zum Herren WC verbinden

WS 6/10 UK=RDOK+150 OK=RDUK

Brandwand

OKEI Wand 2 30-C + 0.85 STUK + 2.49

Fix

3

7 19 0 16

210 160

4

A

E-Tunnel zu Halle(Bestand)

1769,69

E-Schläuche einlegen lt. Angabe Haustechnik

Fix

STUK + 2.80

10

Träger 2 x HEA 120 oberhalb

423 ,7

90 200

1 21 5 15

90

5

9,5 11

5

86

5 STG. 15,9/30

PH 176

3xFBD DM 15 im Hohlbereich der Diele

100 260

W03

0 10 3 18

7,8 10

RDUK +3.04

+3.465

RW

Beschichtung

Bodenplatte

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

OK Säule + 2.44 8 6,4 15

F02

RDOK +3.305

RDUK + 3.10 5

779 ,7

6

AB SW DN 100

BA 2 BA

3,4 13

WD = Wärmedämmung BRE = Brandrauchentlüftung WDB = Wanddurchbruch DDB = Deckendurchbruch FDB = Fussbodendurchbruch WS = Wandschlitz BS = Bodenschlitz

AR = Abfallrohr RR = Regenabfallrohr PS = Putzschacht KS = Kanalsohle BEST. = Bestand

6,1 10

RDUK +7.28

Kontur 3,2 16

7,5 84

0 58

FOK +3.465

WDB 60/60 Tür EI2 30-C als Tapetentür mit Putzoberfläche bündig in Wand

EI2 30 -C

FOK = fertige Fussbodenoberkante RDOK = Rohdeckenoberkante RDUK = Rohdeckenunterkante oberhalb OK = Oberkante UK = Unterkante DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) UZ = Unterzug lt. Statik RH = Raumhöhe

Linoleum

Schnittpunkt Innenkante Parapet 4,9 20 u. Innenkante Leichtbauwand an Bestandswand

2,9 617

Legende:

8 15

0 21 0 17

Bodenplatte

DDB 20/20

10 Serverraum 8.85 m²

71.8 m² 9,6 14

8 15 6 16

Beschichtung

?

Linoleum

Fix

18,4

2

,5 12

H FP

RDUK RDUK +7.21 +7.11 UK +6.72

3,2 16

B

UK + 2.10

132,8

SW Kanal Bestand

09 Archivieren 12.92 m²

WS 84/9 UK=FOK OK=FOK + 90

03 Grossraumbüro 54.70 m²

F07 - Fussboden Nassbereich (OG1) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung 5,50 cm gebundene EPS - Beschüttung 20,00 cm Decke Ortbeton 20,00 cm Dämmung Mineralwolle 10,00- 40cm abgehängte Decke Aussenbereich

109,5 194,5

9,1 10

+7.37 5

STUK + 2.31

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.04

± 0,00

+7.90

F06.2 - Fussboden Eingang Rampe 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 8,50 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 5,40 - 36,5 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

493 ,5

Kontur

Detail 6.003

Gefälle 2%

5

25

1,9 15

0 10 0 17

A

OK Wand + 4.26 5 STUK + 6.22 5

5,1 10

84

DA03

F06.1 - Fussboden Eingang 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 8,50 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 6,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

Fix

,5 12

5 10

Fix

OKGully Säule + 2.21 8

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.10 5

193,9

UK + 2.50

0 10 0 16

2

25 25

4 18 0 16

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

3

F06 - Fussboden Eingang Schmutzmatte 2,00 cm Schmutzmatte 7,00 cm Heizestrich versiegelt PAE-Folie 3,00 cm Trittschalldämmung 6,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

B

210 220

PH 90

Bo ea de usp np ru latt ng e

E-Schläuche einlegen lt. Angabe Haustechnik

B

F05 - (Fussboden EG - Neubau) 0,50 cm Bodenbelag Linoleum verklebt Spachtelung Voranstrich (Estrich eventl.schleifen sofern erforderlich) 7,00 cm Heizestrich PAE-Folie 3,00 cm Trittschalldämmung 5,50 cm gebundene EPS - Beschüttung 1,50 cm F-Isolierung 15,00 cm Unterbeton 20,00 cm Glasschaumschotter

0 10 1 15

0 21 0 16

0 10 0 17

Fix

OK Wand + 0.85 STUK + 2.17

8,00 cm 1,50 cm 1,50 cm 15,00 cm

Fix

DDB 20/20 WS 20/6 UK=RDOK OK=RDUK

155

560,2

WDB 20/20 OK +3.04

Knick RDUK

WDB DM 15 OK=RDUK

177 04 160 Windfang 5.70 m² Niv Schmutzmatte

Fix

0 10 0 20

Fix

1,8 21

166,2

114 194 Fi x

5

195 188

59 60 Fix 1

RDOK - 0.53 5 RDUK + 3.04

FOK - 0,34

Fix

B

126 200

Bodenplatte

OK Säule + 2.24 7

Bodenplatte

1

143,2

Kontur

3,2 16

RW Kanal DN 150, 2%

OK Wand - 0.39 STUK STUK UK + 2.54 + 2.34+ 2.34

OK Säule + 2.34 1

158,1

+ 7.42

sofern erforderlich) Estrich Bestand PAE-Folie Bestand Wärmedämmung Bestand gebundene Beschüttung Bestand F-Isolierung Bestand Unterbeton Bestand Rollierung Bestand

6,00 cm

OK Säule + 6.15 8

WDB 20/20 OK =RDUK

25

7 22 60 Fix 1

,4 87

2,9 14

108,1

RDUK

194 181

0,9 44

Decke Hohldielen im Gefälle 2% abgehängte Decke (Materialität?)

DA03 - (Neubau Ortbeton 16,0cm) 5,00 cm Kiesbett 0,5 cm Dachabdichtung Foliendach 15,00 - 40,00 cm Wärmedämmung im Gefälle verlegt Gefälledämmung (in Mittel 27,00 cm) 0,5 cm Dampfsperre 16,00 cm Decke Ortbeton im Gefälle 2% 46,00 - 76,00 cm abgehängte Decke (Materialität?)

Hauptverteilerkasten Elektro

BA 1 BA 2

7

Fix

- Bauangaben im Ausbau (Leichtbau) sind im Architekten-Polierplan nicht vermerkt. Erforderliche Durchbrüche sind dem HKLS-Plan zu entnehmen bzw. mit dem Bauherrn abzuklären;

166,2 577,3

- 0,36

9,3 3,5 11

Kontur

189 209 Fi x Vorderkante Podest Ortbeton 111 202 Fi x

6

2

80 14

2,8 17

211,2

OK Säule + 5.95 2

2366,7

UK + 2.10

- Gebäudedurchführungen müssen absolut dicht mit RDS Rohrdurchführungen ausgebildet werden;

216 170

PH 18 0

- Ausführung des Kanals It. ÖNORM 2500 ff, EN 752/1-3;

W04

161,2

Fix

113,2

552,5

RDUK + 7.32

E-Schläuche einlegen lt. Angabe Haustechnik

FPH 85

100 163

OK Säule + 5.73 9

- Ausführung der Türen und Tore bei Brandabschnitten in El230-c.

3,2 16

Fix

108,1

216 160

105,1

449,9

Fix

- Sämtliche Schleusen sind mit mech. bzw. natürlicher Be - und Entlüftung auszustatten;

E-Schläuche einlegen lt. Angabe Haustechnik

206 146

Fix

163,1

Fix

162,9

110 136

OK Säule + 5.53 5

100 130

Fix

,9 13

170,9

SW K Besta anal nd

9,9 33

OK Wand + 4.26 5

FOK + 3.46 5 RDOK + 3.30 5

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

16,00 cm 46,00 - 76,00 cm

OK Säule

FPH 85

210 122

Fix

7

1

13,9

GRUNDRISS OG1

- Decken - und Wandaufbauten lt. Bauphysik.

231 241 Fi x

22

514,8

Linoleum

Linoleum

E-Schläuche einlegen lt. Angabe Haustechnik

218 110

0,8 11

9,6 11

OK Wand + 4.26 5 STUK + 5.36 5

- Die Auflagen des Baubescheids, die zutreffenden ÖNorm-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sind bei der Ausführung genauesten zu beachten.

DA01

10

2

oberhalb

RDUK + 7.32

2 20 2 11

A

Fix

- Rohbauöffnungen von Fenstern und Türen müssen im Detail mit der ausführenden firma abgestimmt werden. Etwaige Änderungen des lichten Maßes können die Folge sein.

Gefälle 2%

20 21

237, 73

100 + 6.31 9 189

114,1

Sickerschacht Bestand

422,4

25 Büro 17.41 m²

100 132

9,3 15

- Alle Maße sind vor Baubeginn örtlich und rechnerisch zu prüfen; eventuelle Unstimmigkeiten sind mit den Architekten und der örtlichen Bauaufsicht abzustimmen. Die Werkpläne gelten nur in Verbindung mit den Detailplänen der Architekten, sowie den Schal - und Bewehrungsplänen des Statikers;

25 25

10

OK Säule + 6.47 1

Hand lauf

368 422,4

26 Büro 17.41 m²

100 120

9,2 10

7,5 84

- Alle Maße sind in cm angegeben. Sturzunterkanten und Parapethöhen beziehen sich auf FFOK;

- Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergerstellt werden. Die Abdichtungen sind It. ÖNorm, der Wärme- und Schallschutz It. Bauphysik auszuführen.

1

UK UZ + 7.01

85

1 W0

18 19

4

10

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

E-Schläuche einlegen lt. Angabe Haustechnik

0 10 2 11

9,9 57

,1 99

- Naturmaße nehmen!

300,4 5 44

16 17

3 2

Säule DM 25

Vorderkante Podest Ortbeton

15

4

1515

OK Säule + 5.44 3

- Gebäudeachsen siehe Polierplan 5.004 - Rohbautoleranzen beachten!

5

592

FOK + 3.46 5 RDOK + 3.30 5

+3,46 5

H FP

6,1 10

Fix

43,310

Detail 6.070 - Glasportal / Bürotüren Deckensprung

8 15

30

2 10 7 12

548

10

Linoleum

96 3 13

10

Linoleum

18,4

Büro 16.10 m²

0 10 2 11

Fix

0 10 0 22 0 10 0 22

9,1 10

Hinweise und Anmerkungen

3 6,2 36

25

5,1 10

B

/ 28

rtal spo Gla

70 6.0 tail De

OK Säule + 5.78 8

27 Großraumbüro OG 158.60 m²

0 43

Deckensprung oberhalb

5

2

8 18 8 14

Fix

Linoleum

ren rotü Bü

Beton

Stahlbeton

Ziegel

Regenwasser

Dämmung hart

Schmutzwasser

Dämmung weich

Abdichtung

DETAILPLAN

Achsen Schnittführung


Verglasung Verglasung zw. Fensterbrett zw. Fensterbrett und Sturz und Sturz eingeklebt, eingeklebt, Silskonfuge Silskonfuge lt. Glasstatik lt. Glasstatik und Bauphysik und Bauphysik (Schalldämwert) (Schalldämwert)

BereichTrennwandanschluss BereichTrennwandanschluss Gläser hinterseitig Gläser hinterseitig emmailliert emmailliert bzw.mitbzw.mit Folie beklebt. Folie beklebt. Farbe Weiß, Farbelt.Weiß, Architekt lt. Architekt Breite 10cm Breite 10cm

Naturmassnahme Naturmassnahme

BereichTrennwandanschluss BereichTrennwandanschluss Gläser hinterseitig Gläser hinterseitig emmailliert emmailliert bzw.mitbzw.mit Folie beklebt. Folie beklebt. Farbe Weiß, Farbelt.Weiß, Architekt lt. Architekt Breite 10cm Breite 10cm

Verglasung Verglasung lt. Glasstatil lt. Glasstatil und Bauphysik und Bauphysik (Schalldämwert) (Schalldämwert)

Verglasung Verglasu lt. Gl (Schalldämwert) (Schalldä

SchlossSchloss für Profilzylinder für Profilzylinder mit Saltobeschlag mit Saltobeschlag Gegenkasten Gegenkasten und Druckergarnitur und Druckergarnitur Edelstahl, Edelstahl, fein matt fein matt SchlossSchloss - Dorma, - Dorma, Office Junior OfficeClassic Junior Classic DruckerDrucker - FSB 1023 - FSB 1023

RPH +4,26 5

220

Sichtschutzstreife Sichtschu Punkt satiniert Punkt sa o

220

220

220

220

220

Sichtschutzstreifen Sichtschutzstreifen Punkt satiniert Punkt satiniert od. Folieod. Folie

RPH +4,26 5

SchlossSchloss für Profif Gegenkasten Gegenka un Edelstahl, Edelstahl fein m SchlossSchloss - DormaDruckerDrucker - FSB 10 -

UntererUnterer Eckbeschlag Eckbeschlag mit Achse mit und Achse und Bodenlager Bodenlager Dorma 01.109 Dorma 01.109

Detail 6.001 - Attika

0,5

0,5

99

99

0,5 300,5 0,530 0,5

99

99

100

100

101010 101010

100

100

170

170

1 320

Abdeckblech Alu beschichtet mit perforierter Aufkantung

+8.05

20 12

0,5

0,5

216,4 216,4

10

206,2 206,2

10,2 10,2

2 x Z-Profil 2 x Z-Profil verschraubt verschraubt SteifenSteifen lt. Erfordernis lt. Erfordernis (beschichtet? (beschichtet? Farbe Farbe lt. Architekt) lt. Architekt)

25 A

26,6

52,5 2,55

Ansicht Säule STB FPH +4.315

Hinweise Hinweise undund Anmerkungen Anmerkungen

10

2,5

Stufenwandwinkel Stufenwandwinkel (Knauf(Knauf Danoline Danoline ConturContur o.ä.) o.ä.) beschichtet, beschichtet, Farbe Farbe lt. Architekt lt. Architekt Anschlussdichtung Anschlussdichtung mit mit Trennwandkitt Trennwandkitt

10

aussen

Steher:Steher: CW 50CW 50 bei Montage an harte bei Montage an harte

FPH +4,315

FPH +4,315

RDUK RDUK +7,263 +7,263

0,5

0,5

Detail Detail 6.032 6.

Det

Unterlagsblech Unterlagsblech WinkelWinkel ca. 60/80 ca. 60/80 aussen lt. Statik lt. Statik

Formrohrkonstr. ca. 50/80 Formrohrkonstr. ca. 50/80 lt. Statik lt. Statik

Fensterbrett durchlaufend Säule ausgenommen (rund)

25

W01

UK UK abgeh. abgeh. Decke Decke +6,665 +6,665

Randelemente Randelemente ungelocht ungelocht

U-Profil U-Profil erhöhterhöht Alu 30/50 Alu 30/50 (Einbringen (Einbringen Scheibe) Scheibe) auf UKauf geschraubt UK geschraubt

Beplankung Beplan FüllungFüllun Rolli

Vollwärmeschutzsystem UK Verglasung UK Verglasung 25 cm

5

Randelemente ungelocht Randelemente ungelocht U-Profil U-Profil erhöhterhöht Alu 30/50 Alu 30/50 (Einbringen (Einbringen Scheibe) Scheibe) auf UKauf geschraubt UK geschraubt

Stufenwandwinkel Stufenwandwinkel (Knauf(Knauf Danoline Danoline ConturContur o.ä.) o.ä.) beschichtet, beschichtet, Farbe Farbe lt. Architekt lt. Architekt Anschlussdichtung Anschlussdichtung mit mit Trennwandkitt Trennwandkitt

Stufenwandw Stufenw (Knauf(Knauf Danoli beschichtet, beschic F Anschlussdich Anschlu Trennwandkit Trennw

Detail 6.012 - Fixverglasung EG/OG unten

Fixverglasung

Fixverglasung Glastüre - Unterer Eckbeschlag Glastüre - Unterer Einbau aller Elemente lt.Eckbeschlag ÖNORM: mit Achse und Bodenlager mit Achse und Bodenlager -Anschluss innen dampfdicht DormaDorma 01.10901.109 -Anschluss aussen diffusionsoffen, auf UKauf geschraubt UK geschraubt (wind + schlagregendicht)

Schallschutzfolie) Schallschutzfolie)

Befestigung Seilführung punktuell

Glastüre - Unterer Eckbeschlag Glastüre - Unterer Eckbeschlag

aussen

Trennwandkitt Trennwandkitt FOK FOK +3,465 +3,465

Fensterbrett durchlaufend Säule ausgenommen (rund)

mit Achse und Bodenlager mit Achse und Bodenlager Befestigung Seilführung punktuell

U-Profil Alu 20/30 U-Profil Alu 20/30 UK geschraubt auf UKauf geschraubt

UK Verglasung UK Verglasung Formrohrkonstr. ca. 30/80 Formrohrkonstr. ca. 30/80 ca. 60/80 WinkelWinkel ca. 60/80 lt. Statik lt. Statik

Silikonfuge Silikonfuge

DormaDorma 01.10901.109 auf UKauf geschraubt UK geschraubt

Bereich Türöffnung Bereich Türöffnung Erhöhung UK UK Erhöhung (Kunststoffleiste o.ä.) o.ä.) (Kunststoffleiste

UK Verglasung UK Verglasung Formrohrkonstr. ca. 30/80 Formrohrkonstr. ca. 30/80 WinkelWinkel ca. 60/80 ca. 60/80 lt. Statik lt. Statik

aussen

FOK FOK +3,465 +3,465

Fensterbrett durchlaufend Säule ausgenommen (rund)

Fensterbrett durchlaufend Knick in Diagonale Säule ausgenommen (rund)

Kabelkanal

Vollwärmeschutzsystem 25 cm

Vollwärmeschutzsystem 25 cm 25 A

W01

25

99

Befestigung Seilführung punktuell

RPH +4,26 5

Einbau aller Elemente lt. ÖNORM: -AnschlussVerglasung innenVerglasung dampfdicht lt. Glasstatik lt. Glasstatik -Anschlussund aussen und diffusionsoffen, Bauphysik Bauphysik (wind + schlagregendicht) (Schallschutz; VSG mit (Schallschutz; VSG mit

RPH +4,265

100

99

0,5

Fixverglasung

Detail 6.017 - Fixverglasung OG unten

Kabelkanal

25 A

aussen

100

0,5

Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphysik

25 UK UK abgeh. abgeh. Decke Decke +6,665 +6,665

1010 1010 165,9 165,9

Detail Detail 6.031 6.031 - Glasportal --Glasportal Bürotüren Bürotüren OG oben oben Detail 6.018 Fixverglasung OGOG unten

einzelne Montagewinkel (thermisch getrennt)

Randelemente ungelocht Randelemente ungelocht

Zwischenlage (Filz o.ä.) Zwischenlage (Filz o.ä.) Füllung: Füllung: Fa. Isover RollinoRollino Fa. Isover o.glw. o.glw.

FOK FOK +3,465 +3,465

1

Fixverglasung

Oberflächen Oberflächen Befestigung punktuell 2,5 52,5 2,55Seilführung 2,5

- Glastüren - Glastüren als Pendeltüren; als Pendeltüren; - Beschläge - Beschläge Edelstahl; Edelstahl; - Glasstärke - Glasstärke nachnach stat.stat. Erfordernis Erfordernis - Verglasung - Verglasung nachnach Bauphysik Bauphysik (Schallschutz) (Schallschutz) Detail 6.002 --oberer Attika - oberer / unterer / unterer Anschluss Anschluss bündig bündig in abgeh. in abgeh. Decke Decke / Fussboden / Fussboden versenkt. versenkt. Die Die Scheiben Scheiben müssen müssen im Schadensfall im Schadensfall getauscht getauscht werden Abdeckblech werden Alu beschichtet Deckblech mit Dachabdichtungsfolie mit Estrich perforierter Aufkantung können können ohne ohne dassdass manman denden Estrich beschädigt; beschädigt; punktförmig zurückgelascht - Fugen - Fugen Silikon, Silikon, Farbe Farbe lt. Architekt; lt. Architekt; 5 - Bauangaben - Bauangaben im Ausbau im Ausbau sindsind im Architektenim ArchitektenFolienblech, mechanisch Ausführungsplan nichtnicht vermerkt. vermerkt. Erforderliche Erforderliche gesichert, HorizontalDA02 Ausführungsplan stösse mit Folie Gefälle 2% Durchbrüche Durchbrüche sindsind sindsind demdem HKLS-Plan HKLS-Plan zu zu abgeklebt ebtnehmen ebtnehmen bzw.bzw. mit dem mit dem Bauherrn Bauherrn abzuklären abzuklären - Rohbautoleranzen - Rohbautoleranzen beachten; beachten; OSB-Platte - Naturmaßnahme - Naturmaßnahme erforderlich; erforderlich;

1

Sonnenschutz Raffstore, Unterputzsystem, seilgeführt, mechanisch (elektr. Steuerung)

Einbau aller Elemente lt. ÖNORM: Metallständerwand Metallständerwand -Anschluss innen dampfdicht beplankt doppeltdoppelt beplankt -Anschluss aussen diffusionsoffen, Beplankung: Beplankung: (wind + schlagregendicht) 2 x 1,25cm GKF-Platten 2 x 1,25cm GKF-Platten

RPH +4,265

165,4 0,5 165,4 0,5

UK Fassade RDUK RDUK verläuft Unterlagsblech Unterlagsblech +7,263 +7,26 3 Einbau aller Elemente lt. ÖNORM: schräg (selbe Höhe -Anschluss innen dampfdicht Winkel ca. 60/80 Winkel ca. 60/80 wie STUK) -Anschluss aussen lt. Statik lt. Statik diffusionsoffen, Beplankung 2x1,25cm Beplankung 2x1,25cm GK GK (wind + schlagregendicht) UK Verglasung UK Verglasung (Fa. Isover FüllungFüllung RollinoRollino (Fa. Isover o.glw.)o.glw.) Formrohrkonstr. ca. 50/80 Formrohrkonstr. ca. 50/80 lt. Statik lt. Statik

Detail 6.015 - Fenster OG unten Fensterelement Drehkipp

W02

312,4 312,4

99

STUK verläuft schräg

Stufenwandwinkel Stufenwandwinkel (Knauf(Knauf Danoline Danoline ConturContur o.ä.) o.ä.) beschichtet, beschichtet, Farbe Farbe lt. Architekt lt. Architekt Anschlussdichtung Anschlussdichtung mit mit Trennwandkitt Trennwandkitt

25

110

99

Vollwärmeschutzsystem 25 cm

Durchführung (Bohrung) für Steuerung Sonnenschutz produktabhängig

(wind + schlagregendicht)

aussen 10 10

WinkelWinkel (ähnlich (ähnlich Stufenwandwinkel Stufenwandwinkel Knauf Knauf Danoline Danoline Contur) Contur) beschichtet, beschichtet, Farbe Farbe lt. Architekt lt. Architekt

110

W01

25

Fensterelement Drehkipp UK UK abgeh. abgeh. Decke Decke +6,665 +6,665 2,5

10

20 0,520 0,5

Detail Detail 6.030 6.030 Glas - Glas Trennwand Trennwand / Fixverglasung /oben Fixverglasung OG OG Detail 6.016 - -Fixverglasung OG

W01

UK Fassade RDUK RDUK verläuft +7,26 3 +7,26 3 Einbau aller ElementeGleitender lt. ÖNORM: schräg Gleitender Deckenanschluss Deckenanschluss (selbe Höhe -Anschluss innen dampfdicht Anschlussdichtung Anschlussdichtung mit mit wie STUK) -Anschluss aussen diffusionsoffen, Trennwandkitt Trennwandkitt

Ansicht Säule STB

20 12

40 15

25

99 100

einzelne Montagewinkel (thermisch getrennt)

Z - Profil Stahl durchlaufend thermisch getrennt, 10 vollflächig 10 14 14 verkleben Randelemente ungelocht Randelemente ungelocht VWS

RDUK +7.32

99 100

Sonnenschutz Raffstore, Unterputzsystem, seilgeführt, mechanisch (elektr. Steuerung) STUK verläuft schräg

OSB-Platte 22 mm (aussentauglich)

RDOK +7.59

25

Durchführung (Bohrung) für Steuerung Sonnenschutz produktabhängig

Folienblech, mechanisch gesichert, Horizontalstösse mit Folie abgeklebt

Anschluss VWS mittels Dichtprofil

0,5

Vollwärmeschutzsystem 25 cm

3

Gefälle 2%

0,5

1010 1010

25

Deckblech mit Dachabdichtungsfolie punktförmig zurückgelascht

DA01

169,5 169,5

Detail Detail 6.029 - GKOG - GK Trennwand Trennwand OG OG A 6.029 Detail 6.014 - Fenster oben

Detail Detail 6.028 6.028 - Abgehängte - Abgehängte Decke Decke / Randanschluss / Randanschluss

A

1 320

0,5

0,5

0,5

0,5

0,5

166,5 166,5

Ansicht Säule STB

1 335

Ansicht Säule STB

1 335

Ansicht Säule STB

166,5 166,5

3,2 m

1

50

3,2 m

1 50

UntererUnterer EckbescE Bodenlager Bodenlag Dorma 01.109 Dorma 01

FOK FOK +3,465+3,465

A

0,5

A

25

Unterlagsblech Unterlagsblech

25

Vollwärmeschutzsystem 25 cm

25

Unterlagsblech Unterlagsblech

W01

2

W01

A Detail 6.008 - Fenster EG oben

W01

235,5

220

Anschluss Trennwand Glasschwert 0,5

99

Aufsicht Fensterbrett durchlaufend

472

122

0,5 20

225Unterlagsblech

25

Winkel ca. 60/80 lt. Statik

Winkel ca. 60/80 lt. Statik

UK Verglasung Formrohrkonstr. ca. 50/80 lt. Statik

UK Verglasung Formrohrkonstr. ca. 50/80 lt. Statik

10

14

Randelemente ungelocht

UK abgeh. Decke +6,665

Stufenwandwinkel (Knauf Danoline Contur o.ä.) beschichtet, Farbe lt. Architekt Anschlussdichtung mit Trennwandkitt

2,5

10 5 2,5

Randelemente ungelocht

UK abgeh. Decke +6,665

Stufenwandwinkel (Knauf Danoline Contur o.ä.) beschichtet, Farbe lt. Architekt Anschlussdichtung mit Trennwandkitt

Randelemente ungelocht U-Profil erhöht Alu 30/50 (Einbringen Scheibe) auf UK geschraubt

UK abgeh. Decke +6,665

Stufenwandwinkel (Knauf Danoline Contur o.ä.) beschichtet, Farbe lt. Architekt Anschlussdichtung mit Trennwandkitt

Randelemente ungelocht U-Profil erhöht Alu 30/50 (Einbringen Scheibe) auf UK geschraubt

3

177 114 oberhalb

W01

100 120

190 198

177 62

177 160

261,4 20

121,5

165

25

FOK RDO

Legende:

FFOK = Fussbodenober RDOK = Rohdeckenobe OK = Oberkante UK = Unterkante DUK = Deckenunterka FPH = Fertigparapeth RPH = Rohbauparape STUK = Sturzunterkant UZ = Unterzug lt. St FTÜ = Fertigteilüberla RH = Raumhöhe AR = Abfallrohr

RPH FPH

alle vertikalen Stösse (auch Glaseck) Fixverglasung = Nurglassstoss mit Silikonfuge

A

A

Stahlb

Beton

Ziegel

RDUK +7,263

Beplankung 2x1,25cm GK Füllung Rollino (Fa. Isover o.glw.)

UK abgeh. Decke +6,665

Stufenwandwinkel (Knauf Danoline Contur o.ä.) beschichtet, Farbe lt. Architekt Anschlussdichtung mit Trennwandkitt

aussen

5

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bis Aussenkante der Randemmaillierung.

Dämm

Dämm

Unterlagsblech Nurglasstösse Silikonfugen

Winkel ca. 60/80 lt. Statik UK Verglasung Formrohrkonstr. ca. 50/80 lt. Statik 10

Winkel (ähnlich Stufenwandwinkel Knauf Danoline Contur) beschichtet, Farbe lt. Architekt

96,6

396,8

Det

innen

260 100

20

Beplankung 2x1,25cm GK Füllung Rollino (Fa. Isover o.glw.)

RDUK +7,263

PH 90

7

Bodenplatte

OG

Fixverglasung

100 210

12

2 x Z-Profil verschraubt Steifen lt. Erfordernis (beschichtet? Farbe lt. Architekt)

Unterlagsblech

Kontur

163,2

Glasportal Bürotüren Besprechung EG Grundriss

Vollwärmeschutzsystem 25 cm RDUK +7,263

1

2

Fensterbrett durchlaufend Knick in Diagonale Säule ausgenommen (rund)

Gleitender Deckenanschluss Anschlussdichtung mit Trennwandkitt

113,6 14

RPH FPH +4,26 5 +4,3 15

1

Säule STB in Wandebene

aussen

RDUK +7,263

PH 90 302

177 62

177 62

99 0,5

Silikonfugen

Nurglasstösse

Unterer Eckbeschlag mit Achse und Bodenlager Dorma 01.109

Detail 6.032 - Glas Trennwand / Fixverglasung OG (Bereich Treppe)

100 108

220 100

Ansicht Säule STB

Ansicht Säule STB Abdichtung

Abdichtung

0,5

Detail 6.031 - Glasportal Bürotüren OG oben

OK Wand + 0.85 STUK + 2.44

W02

0,5

220 100

Ansicht Säule STB

Silikonfugen

Nurglasstösse

99 0,5

Silikonfugen

Nurglasstösse

Silikonfugen

220

220

220 0,5

40

Nurglasstösse

Silikonfugen

Nurglasstösse

99 0,5

Silikonfugen

Nurglasstösse

Silikonfugen

Nurglasstösse

Silikonfugen

Nurglasstösse

0,5

Silikonfugen

Nurglasstösse

99

Nurglasstösse

Silikonfugen

Silikonfugen

0,5

Detail 6.030 - Glas Trennwand / Fixverglasung OG

3

Ansicht Säule STB 220 100

220 100

220 100

220 100

Detail 6.029 - GK Trennwand OG

25

Detail 6.020 - Fixverglasung horizontal

Befestigung Seilführung punktuell

Detail 6.028 - Abgehängte Decke / Randanschluss

8m 4= 2+ 2+

E-Schläuche einlegen lt. Angabe Haustechnik

Fix

A

+3,465 RDOK +3,305

10

160,5

Träger 2 x HEA 120 oberhalb

FPH 90

OK Wand + 0.85 STUK + 2.49

70 160

1

126 200

Einbau aller Elemente161lt. ÖNORM: 0,5 -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht)

Fix

99

210 122

0,5

100 200

165,9

165 186

1

865

WS 6/10 UK=RDOK+150 OK=RDUK

Linoleum

197 160

Vollwärmeschutzsystem 25 cm

245,5 FOK

10

03 Grossraumbüro 54.70 m²

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

E-Schläuche einlegen lt. Angabe Haustechnik

A

Fix

14

165,4 0,5

312,4

?

Bodenplatte

100 183

OK Säule + 2.44 8

800

Sichtschutzstreifen Punkt satiniert od. Folie 25

OG1

100

WS 84/9 UK=FOK OK=FOK + 90

WS 20/6 UK=RDOK OK=RDUK

Kontur

± 0,00

Fix

99

1010

210 170

,5 119

20 0,5

312,4

12,5

Fix

,8 107

10,2

110

DDB 20/20

177 04 160 Windfang 5.70 m² Nive Schmutzmatte

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.04

210 160

206,2

10

211,8

Bodenplatte

,4 156

100

216,4

227 160

1010

0,5

Fix

320

99

100 170

,2 163

0,5

59 160

100

169,5

Fix

101010

1

WDB DM 15 OK=RDUK

RDOK - 0.53 5 RDUK + 3.04

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

FOK +/- 0.00 RDOK - 0.17 5 RDUK + 3.10 5

Kontur

,5 847

100

170

Fix

580

99

RW Kanal DN 150, 2%

FOK - 0,34

Bode ausp nplat rung te

E-Schläuche einlegen lt. Angabe Haustechnik

OK Säule + 2.21 8

B

Fensterbrett durchlaufend Säule ausgenommen (rund) Kabelkanal BKA-3 Alu 170x69

Verglasung lt. Glasstatil und Bauphysik (Schalldämwert)

OK Säule + 2.24 7

Bodenplatte

90

0,5 30 0,5

,2 163

Kontur

184 160

,2 163

335

99

B

FPH

0,5

1

OK Wand + 0.85 STUK + 2.17

Sickerschacht Bestand

,9 151

166,5

Winkeloberlichtbeschlag mit Anschlageinsatz Fa Dorma 01.144

,8 172

OK Säule + 2.34 1

100 200

FOK +3,465

aussen

84

50

1

Winkeloberlichtbeschlag und Eckbeschlag mit Zapfen Fa Dorma 01.140 u. 01.110

105

FOK +3,465

Fixverglasung 166,5

,9 339

Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht)

7 OK Wand - 0.39 STUK STUKUK + 2.54 + 2.34+ 2.34 143,2

Kontur

Bodenplatte

,2 163

Schloss für Profilzylinder mit Saltobeschlag Gegenkasten und Druckergarnitur Edelstahl, fein matt Schloss - Dorma, Office Junior Classic Drucker - FSB 1023

Unterer Eckbeschlag mit Achse und Bodenlager Dorma 01.109

Detail 6.013 - Fenster EG unten

87,4

,9 142

BA 1 BA 2

- 0,36

9,3 ,5 113

25

Schloss für Profilzylinder mit Saltobeschlag Gegenkasten und Druckergarnitur Edelstahl, fein matt Schloss - Dorma, Office Junior Classic Drucker - FSB 1023

FOK +3,465

0 148

25

5

PH 180

SW Kana Best l and

2

BereichTrennwandanschluss Gläser hinterseitig emmailliert bzw.mit Folie beklebt. Farbe Weiß, lt. Architekt Breite 10cm

Verglasung lt. Glasstatil und Bauphysik (Schalldämwert)

105,1

PH 180

Befestigung Seilführung punktuell

RPH +0,85

U-Profil Alu 30/50 in Decke eingelegt

BereichTrennwandanschluss Gläser hinterseitig emmailliert bzw.mit Folie beklebt. Farbe Weiß, lt. Architekt Breite 10cm

OK Säule + 5.53 5

163,1

Einbau aller Elemente lt. ÖNORM: 120 -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht)

,9 440

Zargenblech lt. statischer Erfordernis im Bereich Säule ausgenommen vertikal an Säule vorbeigeführt

162,9

449,9

19 0,5

+6,665

Zargenblech lt. Winkeloberlichtbeschlag statischer Erfordernis mit Anschlageinsatz Dorma 01.144 im BereichFaSäule ausgenommen vertikal an Säule vorbeigeführt

Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht -AnschlussSichtschutzstreifen aussen diffusionsoffen, Punkt satiniert od. Folie (wind + schlagregendicht)

FPH +0.90

Streifen UK Drainagematte abgeh. Decke

RDOK -0,20

Dampfsperre

Winkeloberlichtbeschlag und Eckbeschlag mit Zapfen Fa Dorma 01.140 u. 01.110

Fix

OK

482

aussen

-0,02 Glasportal Bürotüren Besprechung OG Ansichten

Detail 6.031

UK abgeh. Decke +6,665

151 193

FOK +/-0,00

Gefälle 6%

Rigol aufklappbar im Mörtelbett

Det

Fix

Befestigung Seilführung punktuell

100 200

F06.2

100 177

160,5

7

170,9

100 160

Unterer Eckbeschlag mit Achse und Bodenlager Dorma 01.109

1

aussen

100

E-Schläuche einlegen lt. Angabe Haustechnik

1

114,1 13,9

Fix

W03

161

Streifen U-Profil Alu 30/50 in Decke eingelegt Drainagematte

5

Schloss für Profilzylinder mit Saltobeschlag Gegenkasten und Druckergarnitur Edelstahl, fein matt Schloss - Dorma, Office Junior Classic Drucker - FSB 1023

RPH +4,26 5

Rigol aufklappbar im Mörtelbett

RDOK -0,20

BereichTrennwandanschluss Gläser hinterseitig emmailliert bzw.mit Folie beklebt. Farbe Weiß, lt. Architekt Breite 10cm

25

0,5

Türschwelle

0,5

Fensterelement Drehkipp

100 170

25

Sichtschutzstreifen Punkt satiniert od. Folie

A

RDUK +7.28

Verglasung lt. Glasstatil und Bauphysik (Schalldämwert)

OK -0,02

99

235,5

RDUK + 7.32 OK Wand + 4.26 5 STUK + 5.36 5

12,5

16

BereichTrennwandanschluss Gläser hinterseitig emmailliert bzw.mit Folie beklebt. Farbe Weiß, lt. Architekt Breite 10cm

FOK +/-0,00

Detail 6.030

Dampfsperre

Z - Profil Stahl durchlaufend thermisch getrennt VWS vollflächig verkleben

Winkeloberlichtbeschlag mit Anschlageinsatz Fa Dorma 01.144

0,5

1

1 W0

202 112

A

Fix

210 160

15

Verglasung zw. Fensterbrett und Sturz eingeklebt, Silskonfuge lt. Glasstatik und Bauphysik (Schalldämwert)

Ansichten

Anschluss VWS mittels Dichtprofil

RDOK +7.44

165,9

245,5

Boden Dose einlegen lt. Elektro (Deckel selbe Oberfläche wie Boden)

E-Schläuche einlegen lt. Angabe Haustechnik

100 112

OK Säule + 5.44 3

Fix

abgeh. Decke +6,665

Winkeloberlichtbeschlag und Eckbeschlag mit Zapfen Fa Dorma 01.140 u. 01.110

1

F06.1

Fixverglasung

10

102 127

Fix

218 110

U-Profil Alu 30/50 in Decke eingelegt UK

U-Profil Alu 30/50 in Decke eingelegt

165,4

Detail 6.009 - Fenster EG unten

100 200

OSB-Platte 22 mmGlasportal (aussentauglich) Bürotüren

0,5

Schwellenblech Niro

312,4

Linoleum

96 133

85

99

Nurglasstösse Silikonfugen

Detail 6.007 - Fixverglasung EG unten

Eingangstür

158 175 ,19 359

+7.90

Gefälle 2%

100

158 166

216,4 DA03

0,5

1010

Fix

99

312,4

16.10 m²

100 112

Fix

13,9

Detail 6.005 - Eingangstür EG unten 100

tail De

,6 119

0,5

Folienblech, mechanisch 1010 gesichert, Horizontal200,5 stösse mit Folie abgeklebt

Linoleum

,8 110

169,5

12,2

188 148

Fix

OK Säule + 5.78 8

B

Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bis Aussenkante der Randemmaillierung.

30 Büro 17.00 m²

Linoleum

,3 159

1

3

207

U

FBD 20/20

en rotür l Bü 28 porta Büro Glas

,2 109

169,5

100

Fixverglasung Trennwandanschluss:

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bist Aussenkante der Randemmaillierung.

,5 847

0,5

Naturmassnahme

1

1

,9 579

99

U-Profil Alu 30/50 in Decke eingelegt

STUK verläuft schräg

aussen

E-Schlä einlegen Haustec

FPH

RDUK

RDUK + 7.11

E-Schläuche einlegen lt. Angabe Haustechnik

29 Büro 15.60 m²

99,1

0,5 30 0,5

1010

OK Säule + 6.00 3

,3 120

85

+ 7.21

B

,4 163 25

,1 106

99

320

Nurglasstösse Silikonfugen

,2 137

,8 364

Detail 6.032

7

FPH

100

Fixverglasung

OK Säule + 6.18 8

158

0,5

101010

DGB 95,7

,2 137

100 151

166,5

100

Glasportal Bürotüren Ansichten A

,5 440

,2 158

,1 109

Abdeckblech Alu beschichtet mit perforierter Aufkantung

Nurglasstösse Silikonfugen

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bis Aussenkante der Randemmaillierung.

Innenkante Parapet

,9 140

Fensterelement Drehkipp

25

Glasabschluss schräg geschliffen

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bist Aussenkante der Randemmaillierung.

,6 149

Schnittpunkt Innenk ,9 204 u. Innenkante Leich an Bestandswand

1 ,9 672 BA 2 BA

,4 133 158

0 148

2

,1 105

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bis Aussenkante der Randemmaillierung.

PH 95

(wind + schlagregendicht)

2

365 1

592

211 155

Nurglasstösse Silikonfugen

Detail 6.003 - Attika

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bis Aussenkante der Randemmaillierung.

Deckblech mit Dachabdichtungsfolie punktförmig zurückgelascht 167

-Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht)

Fix

Trennwandanschluss: Spalte ausstopfen (Mineralwolle o.ä.) 2-teilige Silikonfuge bis Aussenkante der Randemmaillierung.

Nurglasstösse Silikonfugen

0,529,5 0,5

Glasportal Bürotüren aller Besprechung Grundriss Elemente lt. OG ÖNORM:

10

Fix

Detail 6.029

Verglasung zw. Fensterbrett und Sturz eingeklebt, Silskonfuge lt. Glasstatik und Bauphysik (Schalldämwert) Naturmassnahme

aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht 422,4 -Anschluss aussen diffusionsoffen, (wind + schlagregendicht)

10

10

422,4

10

10

12,4

UK Fassade verläuft Einbau aller Elemente lt. ÖNORM: schräg (selbe Höhe -Anschluss innen dampfdicht wie STUK) -Anschluss aussen diffusionsoffen,

Ramp e 15%

56,6

STUK verläuft schräg

UK Fassade verläuft schräg (selbe Höhe wie STUK) Einbau

Fix

354,4

STUK verläuft schräg

100 195

10

UK Fassade verläuft schräg (selbe Höhe wie STUK) Einbau

213

430

gleicher Hohlraum wie bei Raffstore - Beleuchtungskörper

Durchf (Bohru Steuer Sonne produk

Fix

10

gleicher Hohlraum wie bei Raffstore - Beleuchtungskörper

einzelne Montagewinkel (thermisch getrennt)

Sonnenschutz Raffstore, Unterputzsystem, seilgeführt, mechanisch (elektr. Steuerung)

0 30

445

aussen

90 260

Glasportal Bürotüren Grundriss

25

aussen

UK UZ + 2.92 5

Glasportal Bürotüren Grundriss

STUK verläuft schräg

Durchführung (Bohrung) für Steuerung Sonnenschutz produktabhängig

einzelne Montagewinkel (thermisch getrennt)

12,5

W02

Vollwärmeschutzsystem 25 cm

100 160

25

Vollwärmeschutzsystem 25 cm

177 114

einzelne Montagewinkel (thermisch getrennt)

Det

W01

25

177 114

25

5

Vollwärmeschutzsystem 25 cm

5

25

Deckensprung

16 RDUK verläuft schräg

Detail 6.006 - Fixverglasung EG oben

W01

Deckensprung oberhalb

Detail 6.004 - Eingangstür EG oben

Z - Profil Stahl durchlaufend thermisch getrennt VWS vollflächig verkleben

Ansicht Säule STB

15

Anschluss VWS mittels Dichtprofil

Ansicht Säule STB

40

22 mm (aussentauglich)

RDOK verläuft schräg

Randelemente ungelocht

100,5

430 214

1

U-Profil erhöht Alu 30/50 (Einbringen Scheibe) auf UK geschraubt

0,5 334,5

99,5

DE

19,50,5

42 42

BAUVORHABEN

Zubau und Aufsto der Firma IAF - In

KG: 61055 Schamber Gem.: Frauental a.d.L GST. Nr.: 248/3 EZ.: 216

INDEX A: ...

Glasportal Bürotüren Besprechung EG Ansichten


7

6

5

4

3

2

1

OK +7,05

Eingangstür

r ento rag Ga

OK +3,22

7

630

6

270

5

2

530

B

C

C

B

OK +7,00

Beton

Stah

Ziegel

Reg

Dämmung hart

Schm

Dämmung weich

Abdi

POLIER

BAUVORHABEN

B

B A

AR = Abfallr FOK = fertige Fussbodenoberkante RR = Regen RDOK = Rohdeckenoberkante PS = Putzs RDUK = Rohdeckenunterkante oberhalb KS = Kanal OK = Oberkante BEST. = Besta UK = Unterkante DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) UZ = Unterzug lt. Statik RH = Raumhöhe

C

D

1

ANSICHT NORD

300

4

120

3

470

Legende:

Um- und Zubau Wohnhaus Familie Hub

A

OK +7,00

Franz-Pichler-Weg 12 A-8530 Deutschlandsberg GST. Nr. 400 / 1 KG: 61059 Sulz EZ: 194 BAUHERR

Fr. Dr. DI Maria Huber Hr. Dr. DI Christian Huber Franz-Pichler-Weg 12 A-8530 Deutschlandsberg ÄNDERUNGEN

INDEX A: ... WDB 20/20 OK = RDUK

X-Architekten

bz a r Vo

+ 2,66

261,6

WDB 20/20 OK = +165

+ 0,04

288 165

OK +/-0,00

100 50

50

541

90

8,5

175

RDS Strom DN 80 OK = +50 über RDOK

+ 0,04

Naturmaße nehmen -

ANSICHT WEST

HÖHENBEZUG LT. NATURAUFNAHM 541

RDS Wasser DN 80 OK = +50 über RDOK

146

PLANINHAL Arch.DI Bettina Brunner ZT KEG Staatlich befugte und beeidigte Ziviltechniker

C

C

B

A

ANS

Industriezeile 36/4 A-4020 Linz Tel.: +43 (0)732 791607 Fax: +43 (0)732 7916075 Millergasse 13 A-1060 Wien Tel.: +43 (0)1 95 82 022 Fax: +43 (0)1 20 81 970

B

B

OK +0,15

15

B

A

50

100

RDS Lüftung DN 250 UK = +100 über RDOK

50

ANSICHT OST 146

135

OK +0,15

388

OK +0,15

PROJEKTNUMMER

DATUM

23.11.2012

1123

MAßSTAB

1:50

PLANGRÖS

90/90

Diese Zeichnung bzw. Ausarbeitung ist geistiges Eigentum des Architekten und damit gesetzlich geschuetzt. Jede Benutzung Verbindung mit einer anderen Arbeit oder einem anderen Projekt bedarf der Zustimmung des Architekten. Durch die Uebern Geschriebene Planmasse auf dieser Zeichnung haben Vorrang gegenueber gezeichneten Dimensionen. Der Auftragnehmer auf der Baustelle verantwortlich zu ueberpruefen. Abweichungen gegenueber dargestellten oder schriftlichen Anordnungen

Fußb

Wandaufbauten: W01 Außenwand erdberührend (zu warm) 20cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand 1,5cm Innenputz 48cm 1,5cm Innenputz 20cm porosierter Hohlziegel HLZ 1,5cm Innenputz

D

1

23cm

2

3

4

5

6

7

C

W02 Innenwand tragend Ziegel

OK +7,00

W05 Außenwand EG (Bestand Zubau) 20cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) ca.30cm Ziegelwand (Bestand) 1,5cm Innenputz ca. 53cm

270

W06 Außenwand erdberührend (Technik) 10cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand 36,5cm

DA02 Dach Wintergarten 3cm Isolierglas VSG im Gefälle (2%) 3cm DA03 Flachdach über OG (Gründach extensiv) 20-34cm Substrat Bewässerungsmatte Vlies / Wurzelschutzschicht 2cm Wasserspeicher + Drainagematte Vlies 0,5cm Dachabdichtung (Foliendach) 2-16cm Gefälledämmung 14cm Wärmedämmplatte EPS 0,5cm Dampfsperre (Klebefolie mit Alueinlage) 20cm Stahlbetonplatte 15cm abgehängte Decke 0,5cm Spachtelung 73,5cm

C

D

1

470

2

120

3

300

4

530

5

6

7

270

3cm 2,5cm 20cm 1,5cm 35,5c

F04 0,5cm 6cm

61cm

Dachaufbauten:

630

F02 1,5cm 7cm

W09 Aussenwand Stahlbeton (Garage) 5cm vorgehängte Fassade 5cm Hinterlüftung Windbremse 10cm Wärmedämmung Mineralwolle 20cm Stahlbetonwand 40cm

493

ANSICHT SÜD

3cm 2,5cm 20cm ca. 3 1,5cm 65,5

3cm 5cm 1,5cm 25cm 20cm

W11 Garagenwand zu Innenraum (OG) 10cm Wärmedämmplatte 20cm Stahlbetonwand 1,5cm Innenputz 31,5cm

OK +0,15

F01 1,5cm 7cm

W07 Innenwand nicht tragend Ziegel 1,5cm Innenputz 10cm porosierter Hohlziegel HLZ 1,5cm Innenputz 13cm

W10 Aussenwand Ziegel OG 5cm vorgehängte Fassade 10 cm Hinterlüftung Windbremse 20cm Wärmedämmung Mineralwolle 20cm porosierter Hohlziegel HLZ 1,5cm Innenputz 56,5cm

OK +3,22

DA04 Flachdach über unbeheizt (überschüttet) min. 38cm Überschüttung 10cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 2-15cm Gefällebeton (2%) 25cm Stahlbetondecke

F07 0,5cm 7cm

3cm 3cm 1,5cm 12cm 20cm

47cm

F09 12cm

5cm 1,5cm 5-11c 20cm ca. 3 1,5cm 75-81

F10 0,5cm 6cm

3cm 3cm 1,5cm 25cm

39cm

F11 1,5cm 7cm

3cm 2,5cm 20cm 10cm 44cm

min. 77,5cm DA05 Flachdach über beheizt (überschüttet) min. 150cm Überschüttung 26cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 2-14cm Gefällebeton (2%) 20cm Stahlbetondecke min. 199,5cm

7

C

min. 61,5cm

6

5

4

3

2

1

D

DA06Dach über Stiege (überschüttet) min. 20cm Überschüttung 20cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 20cm Stahlbetondecke im Gefälle betoniert

OK +7,05

Legende:

A OK +7,00

BAUVORHABEN

B B

AR = Abfallro FOK = fertige Fussbodenoberkante RR = Regen RDOK = Rohdeckenoberkante PS = Putzsc RDUK = Rohdeckenunterkante oberhalb KS = Kanals OK = Oberkante BEST. = Bestan UK = Unterkante DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) UZ = Unterzug lt. Statik RH = Raumhöhe

C

D

7

630

6

270

5

530

4

300

3

120

2

470

ANSICHT NORD

r ento rag Ga

Eingangstür

OK +3,22

1

2012/2013 Location: Deutschlandsberg, Austria Program: Family house (172 m) Client: Fr. Dr. DI Maria Huber / Hr. Dr. DI Christian Huber Type: Commission Status: In construction Tasks demanded: Vorentwurf / Entwurf / Einreichung / Ausführungsplanung

OK +3,22

B

WH HUBER

OK +3,22

C

C

B

Beton

Stahl

Ziegel

Rege

Dämmung hart

Schm

Dämmung weich

Abdic

POLIER

Um- und Zubau Wohnhaus Familie Hub

A

OK +7,00

Franz-Pichler-Weg 12 A-8530 Deutschlandsberg GST. Nr. 400 / 1 KG: 61059 Sulz EZ: 194 BAUHERR

Fr. Dr. DI Maria Huber Hr. Dr. DI Christian Huber Franz-Pichler-Weg 12 A-8530 Deutschlandsberg


120

HÖHENBEZUG LT. NATURAUFNAHME

+0,00 = +382,86 ü. Adria

PLANINHALT Arch.DI Bettina Brunner ZT KEG Staatlich befugte und beeidigte Ziviltechniker

Industriezeile 36/4 A-4020 Linz Tel.: +43 (0)732 791607 Fax: +43 (0)732 7916075

GRUNDRISS OG DACHAUFSICHT

DATUM

08.04.2013

PROJEKTNUMMER

1123

MAßSTAB

1:50/1:100 1:50

GEZEICHNET

RK / HG / AL

15

5

F04

FOK -5,60

4 3

RDOK -5,76

2 1

RDUK -6,01

PLANNUMMER

UK -6,12

5.002

25

10

543

263

210

F04

12

115

A 25

RDUK +2,88

273 15 12 88

SCHNITT CC

68 174 10 20 20 358 68 2520 100 174 10 20 358 25

25 25

25 243

Achsen

Schmutzwasser RDUK -3,33 541 Abdichtung

UK -3,44

UK -6,12

A

Franz-Pichler-Weg 12 A-8530 Deutschlandsberg GST. Nr. 400 / 1 25 EZ: 194 KG: 61059 Sulz

543

B

C 427

25

215

Fr. Dr. DI Maria Huber Hr. Dr. DI Christian Huber Franz-Pichler-Weg 12 A-8530 Deutschlandsberg ÄNDERUNGEN

25

Naturmaße nehmen - Koten prüfen!

SCHNITT E E

Drainage DN100 PVC

RDUK -1,25

Schnittführung

BAUHERR

600

W06

Hackschnitzelraum

RDOK - 1,00

12

Schleuse: Sturzhöhe Innen- u.Aussentür, Garage: Fußbodenaufbau, Entfall seitl.Verdunstungsrinne,

25

OK Gefällebeton + 2,78

11 10

183

263,5

13

= Wärmedämmung WDB 60/10 Achse2 = Brandrauchentlüftung UK=+0,00 = Wanddurchbruch lt.HT-Angabe = Deckendurchbruch 17 = Fussbodendurchbruch 16 = Wandschlitz 15 = 14 Bodenschlitz

298,5

Stahlbeton RDOK -3,08 Regenwasser

Schotterrasen

ände t.Gel Bes

WD BRE WDB DDB FDB WS BS

INDEX A: ...

215

RDUK +2,58

20

Detail 6.0xx

Flachstahltrittstufen einseitig eingespannt, verkleidet

DA04

Um- und Zubau Wohnhaus Familie Huber

25 25

25

SCHNITT DD

25

Detail 6.408

68 20 15 270 20

15

12

C 427

Detail 6.408

1

25

25

14

OK Gef.beton +2,90

16

Wärmedämmung befahrbar Beschickungsöffnung Hackschnitzellager Abdeckung lt. HT-Technik Absprache mit Bauherrn erforderlich GOK+3,22

POLIERPLAN

RDOK -5,76

RDUK -6,01

UK -3,44

B

25

88

25

25 183

298,5 25 243

B

B

4 3 2 1

Gefällebeton 2%

25

FOK -5,60

OK XPS 30cm ü.GOK

RDOK +3,08

B

360

146 Dämmung weich 15 10

100

15

299

270 14 20

63 20

263

273 15

378

210

53 10 20 14 210 102,5 12,5

263,525

2

555 25

20 68 Detail 6.106.3

299 20 288 21 555

13

10

BAUVORHABEN

Drainage DN100 PVC

5

4

9

+5,82

W10

Gang

13

3 2 1

15

Dämmung hart

11

/27 k .18 tati 8 Stg lt.S 15 ege 7 Sti 6

25

Hackschnitzelraum

Ziegel 14

2520

Detail 6.106

68 20

15 20 53 270

VS G

Fix verg lasu ng

20 288 21

3

1

2

Detail 6.106.3

20 68 299

270 14 20

273 15 12 20 276

4

25

E 360 25

358

Anschluss Schleuse Errichtung später

273 15 88 25

Gully

11

25

OK Wand +6,95

RDUK +6,07

/27 .18 10 Stg9 178 7

FOK -2,91

16

244

146

600

C

RDOK +6,27

Detail 6.0xx

Beton

RDUK -1,25

RDUK -3,33 541

10 9

DA03

25

6

5

RDOK - 1,00

13 12 10

215

+4,82

+3,22

12

W06

25

11

/27 k .18 tati 8 Stg lt.S 15 ege 7 Sti 6

16

Anschluss Schleuse Errichtung später

5

6 68

Detail 6.303 Garage

20 285 14 68 2520 100 174 10 20

OK Gefällebeton + 2,78

15

8

RDOK -3,08

2 1

25

13 12

3

4

5

68 285 14

12 15 20

Schotterrasen

11 9

DUK +5,92

W10

RDUK -2,00

16

12

298,5 3

FOK -2,91 15 14

15 20 53

Detail 6.303 Garage

20

20 53 85 200 34 273 Detail 6.106

C

263

115 25

20 53 285 12 29 20 2 68 20 20

DA04

17

14

RDUK -0,12

/27 k .18 tati Stg lt.S 7 17 ege 6 Sti

B

Gefälle Dach 2%

183

RDUK -0,09

4

RDUK -2,00

25 PLANGRÖSSE

135/90

Wärmedämmung befahrbar Beschickungsöffnung Hackschnitzellager Abdeckung lt. HT-Technik Absprache mit Bauherrn erforderlich GOK+3,22

ände t.Gel Bes WDB 60/10 Achse2 UK=+0,00 lt.HT-Angabe

C

25

AR =4 Abfallrohr FOK = fertige Fussbodenoberkante Detail 6.102.2 RR 3 = Regenabfallrohr RDOK = Rohdeckenoberkante FOK RDOK 2 PS = Putzschacht RDUK = Rohdeckenunterkante +0,15 oberhalb RDOK 1 +/-0,00 KS = Kanalsohle = Oberkante GOK-0.02 OK -0,20 BEST. = Bestand UK = Unterkante DUK = Deckenunterkante tte tonpla FPH = Fertigparapethöhe (in cm ü. FOK) lbe Stah ik RDUK RDUK ü. RDOK) RPH = Rohbauparapethöhe (in cm lt.Stat -0,09 STUK = Sturzunterkante (Rohbaumass) -0,12 RDUK UZ = Unterzug lt. Statik -0,40 Detail 6.00x RH = Raumhöhe 9 /27 tik 8 8 tg.1 lt.Sta 7 S 17 ege 6 Sti

DA06

20

20

270 14

B

RDOK +/-0,00

1

RDUK

SCHNITT CC

Albertplatz 1 A-1080 Wien Tel.: +43 (0)1 95 82 022 Fax: +43 (0)1 20 81 970

Diese Zeichnung bzw. Ausarbeitung ist geistiges Eigentum des Architekten und damit gesetzlich geschuetzt. Jede Benutzung, Veroeffentlichung, Vervielfaeltigung, Ueberarbeitung oder Weitergabe an Dritte in Verbindung mit einer anderen Arbeit oder einem anderen Projekt bedarf der Zustimmung des Architekten. Durch die Uebernahme des Planes akzeptiert die ausfuehrende Firma die darauf dargestellten Anordnungen. Geschriebene Planmasse auf dieser Zeichnung haben Vorrang gegenueber gezeichneten Dimensionen. Der Auftragnehmer verpflichtet sich vor Arbeitsbeginn alle Masse und Bedingungen seine Arbeit betreffend, auf der Baustelle verantwortlich zu ueberpruefen. Abweichungen gegenueber dargestellten oder schriftlichen Anordnungen muessen dem Architekten bzw. der Bauleitung unverzueglich schriftlich mitgeteilt werden.

RDUK +2,58

Flachstahltrittstufen einseitig eingespannt, verkleidet

9

Fussboden OG ü. Schleuse + HT - Raum Belag (Parkett 2-Schicht) Heizestrich Folie Trittschall-Dämmplatte gebundene Leichtschüttung Stahlbetonplatte (Neubau) Dämmplatte

5

RDOK -1,81

Drainage DN100 PVC

RDUK -1,25

243

Naturmaße nehmen - Koten prüfen!

RDUK +2,88

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

25

C

OK Gef.beton +2,90

16

Detail 6.0xx

RDOK - 1,00

13

12

427

Legende:

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

W06

Hackschnitzelraum

17 16 15

14

Gefällebeton 2%

GOK +0,15

14

B

B

XPS COK 30cm ü.GOK

RDOK +3,08

15

12

4 3 2

-0,40 Detail 6.00x

555

A

SCHNITT E E

Schotterrasen

OK Gefällebeton + 2,78

Schotterrasen

ände t.Gel Bes

17

W10

Gang

17

platte lbeton Stah ik lt.Stat

25

C

360

C

Anschluss Schleuse Errichtung später

B

+4,82

B

7

+5,82

RDUK +6,07

11

B

F02

Best.GOK +2,81

Best.Aussenwand im Bereich Weinkeller ungedämmt OK Wand Siehe auch Grundriss EG

Gully

/27 .18 10 Stg

F11 1,5cm 7cm 3cm 2,5cm 20cm 10cm 44cm

RDVK Rohdeckenvorderkante über Grundrissebene

C

RDOK +6,27

13

39cm

25

Detail 6.102.2

DA03

RDUK +2,58

UK

3cm 3cm 1,5cm 25cm

RDVK Rohdeckenvorderkante in Grundrissebene

541

FOK +3,22

Gefälle

+6,95

Detail 6.0xx

263,5

RDOK -1,81

16

A

Rigol befahrbar

6

DA06

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

B

B

B

GOK +3,22

DA04

-3,33 Fussboden EG (Schleuse) 541 -3,44 Beschichtung Estrich Folie Trittschall-Dämmplatte gebundene Leichtschüttung Abdichtung 3 - lagig (bituminös) Bodenplatte STB Unterbauplanum

F10 0,5cm 6cm

146

10

Wärmedämmung befahrbar Beschickungsöffnung Hackschnitzellager Abdeckung lt. HT-Technik Absprache mit Bauherrn erforderlich GOK+3,22

Fussboden OG (Garage) RDOK versiegelt im Gefälle Betonplatte Folie -3,08 Dämmmatte,hochdruckfest (Gummigranulat) 1,5cm Abdichtung 3 - lagig (bituminös) 20-17cm Stahlbetonplatte (Neubau) ca.30cm Decke (Bestand) 1,5cm Innenputz 75-81cm RDUK

DA06 Dach über Stiege (überschüttet) min. 20cm Überschüttung 20cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 20cm Stahlbetondecke im Gefälle betoniert min. 61,5cm

RDUK +2,88 Weinkeller

4

F09 12cm

+2,25 RDUK +2,88

WDB 60/10 Achse2 UK=+0,00 Gitterrost lt.HT-Angabe

11 Folie 3cm Trittschall-Dämmplatte 10 470 Leichtschüttung 3cm gebundene 7 9 k 1,5cm.18/2Abdichtung 8 3 - lagig (bituminös) tati tg .SUnterbeton 12cm (Neubau) RDUK 7 7 S ge lt Glasschaumschotter 120cm 6 e -1,25 Sti 5 Unterbauplanum 47cm

3

DA04 Flachdach über unbeheizt (überschüttet)

10cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 2-15cm Gefällebeton (2%) 25cm Stahlbetondecke min. 77,5cm

F09 Gefälle

RDOK EG F07 Fussboden g RDUK RDUK ffüllun Beschichtung Au0,5cm -1,00 7cm hlraum Heizestrich -0,09 Ho -0,12

2

DA03 Flachdach über OG (Gründach extensiv) 20-34cm Substrat Bewässerungsmatte RDOK Vlies / Wurzelschutzschicht -5,76 2cm Wasserspeicher + Drainagematte Vlies 0,5cm Dachabdichtung (Foliendach) 2-16cm Gefälledämmung 14cm Wärmedämmplatte EPS 0,5cm Dampfsperre (Klebefolie mit Alueinlage) 20cm StahlbetonplatteUK 15cm abgehängte Decke -6,12 0,5cm Spachtelung 73,5cm

543 min. 38cm Überschüttung

F10

61cm

OK Gef.beton +2,90

Durchbrüche und Wandschlitze lt. HT-Plan / Absprache mit Bauherrn erforderlich Rohbaulichten für Türen und Fenster nach Festlegung des Bauproduktes / Absprache mit Bauherrn erforderlich. FOK Lichtauslässe in Decke über Erdgeschoss nach Absprache mit dem Bauherrn.

Best.GOK +2,66

178

RDOK -0,20

2 1

3cm 4 5cm 1,5cm 25cm 20cm

Gefällebeton 2%

einseitig eingespannt, verkleidet

Estrich 6 Folie Trittschall-Dämmplatte gebundene FOK Leichtschüttung Abdichtung 3 - lagig (bituminös) RDOK +0,15 Stahlbeton (Neubau) Bodenplatte Glasschaumschotter +/-0,00 Unterbauplanum

5

OK XPS 30cm ü.GOK

GOK RDOK +3,22 +3,08

Oberlichtverglasung VSG im Gefälle

5

GOK-0.02

3

RDUK -3,33

15

Sektional - Industrietor (z.B. Fa. Hörmann), flächenbündig

FOK i.Gefälle RDOK +3,22bis+3,19 +3,08

Gefälle

DUK +5,92

FOK +0,15

F04

FOK -5,60

3cm

+6,95

Garage

5

A

RDUK +6,07

146

Detail 6.102.2

6

5

1

1

A

RDOK +6,27

Gefälle Dach 2%

RDUK -0,12

11

10

Dachaufbauten:

/27 k 9 .18 tati 8 Stg DA02 lt.S Dach Wintergarten 15 ege3cm7 Isolierglas VSG im Gefälle (2%) Sti 4

3 2

RDOK FOK -2,91 -3,08

W11 Garagenwand zu Innenraum (OG) 15 10cm Wärmedämmplatte 14 20cm Stahlbetonwand 13 1,5cm Innenputz 12 31,5cm

25

DA03

15

12 15

20 68 Detail 6.106.3

RDOK +/-0,00

FOK +0,15

120

W01

RDUK -2,00

6cm

FOK +0,15

-0,20

300

8 10 tg.1 7S 9

1 UG Fussboden

F04

W10 Aussenwand Ziegel OG 5cm vorgehängte Fassade 5cm Hinterlüftung Windbremse 20cm Wärmedämmung Mineralwolle 20cm porosierter Hohlziegel HLZ FOK 1,5cm Innenputz -2,91 51,5cm

+4,82

17 Fussboden OG über Gang Belag (Parkett 2-Schicht) 16 Heizestrich 15 Folie 14 Trittschall-Dämmplatte RDUK DUK 13 Detail 6.0xx gebundene Leichtschüttung +2,88 +2,78 Stahlbetonplatte (Neubau)12 Innenputz /27 11 Flachstahltrittstufen

8 Kellerersatzraum 0,5cm Beschichtung 7

+5,82

W10 W10

Gang

F11

+3,08

3cm Detail 6.0xx 2,5cm einzelne Stufen Flachstahl 20cm eingespannt1,5cm 35,5cm in STB -Wand

A

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

14

Best.Aussenwand im Bereich Weinkeller ungedämmt Siehe auch Grundriss EG

541

GOK +0,15

B 68

Detail 6.200

20 15 270 20 14

B 273

B

F02

Best.GOK +2,81

FOK RDOK +0,15 +/-0,00

146

470

W11

FOK +3,22

A

RDOK -1,81

Gully

RDUK +6,07

Fussboden OG über Bestand Belag (Parkett 2-Schicht) Heizestrich Folie Schlafen 3cm Trittschall-Dämmplatte 2,5cm gebundene Leichtschüttung 20cm Stahlbetonplatte (Neubau) ca. 30cmZiegel (Bestand) 1,5cm Innenputz RDOK 65,5cm F02 1,5cm 7cm

Platte? W09 Aussenwand Stahlbeton (Garage) 5cm vorgehängte Fassade tte tonpla Deckenplatte 5cm Hinterlüftung ahlbe lt. Angabe Statik St tatik Windbremse lt.S 10cm Wärmedämmung Mineralwolle RDUK 20cm Stahlbetonwand 40cm -0,40 Detail 6.00x

C

Gang

Detail 6.102.2

RDUK -0,12

RDOK -1,00

OK Attika +7,00

W10

RDUK +2,88 Weinkeller

DA06 530

1

2

3

4

299 Schotterrasen

RDUK -0,12

FOK +3,22

F02

W07 Innenwand nicht tragend Ziegel Detail 6.102.2 1,5cm Innenputz Detail 6.00x 10cm porosierter Hohlziegel HLZ 1,5cm Innenputz RDOK 13cm GOK-0.02

SCHNITT DD

288

244

Rigol befahrbar Best.GOK +2,66

Gefälle

F07

OK Wand +6,95

+6,95

RDOK +6,27

Fußbodenaufbauten:

Innenwand tragend Ziegel

W06 Außenwand erdberührend (Technik) 10cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand 36,5cm

RDUK -6,01

RDUK -1,25

A

GOK +3,22

Verstärkungsrippe Aussparung in Bestandswand lt. Statik

Gang

210

378

102,5 12,5

lung Auffül um Hohlra

DUK +5,91

C F09 Gefälle

RDUK +2,88

Gefälle Dach 2%

C

DA03 Gefälle 2%

1,5cm 7cm

W05 Außenwand EG (Bestand Zubau) 10 Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) ca.30cm Ziegelwand (Bestand) +2,25 Detail 6.102.2 1,5cm Innenputz ca. 43cm

+2,25

Gitterrost

Gefälle 2%

21

12 15 20

12

20 285

29 20 2

FOK i.Gefälle RDOK +3,22bis+3,19 +3,08

F10

FOK +0,15

20

15 12

Garage

Schotterrasen

B

Oberlichtverglasung VSG im Gefälle

DUK +5,92 F01

23cm

C

Oberlichtverglasung VSG im Gefälle

2025

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

E

25

12

B

541

Gefälle

F07

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

Sektional - Industrietor (z.B. Fa. Hörmann), flächenbündig

63 20

B

210

Kellerersatzraum

F02

WA05 +6,95

14

285

BF02

FOK +3,22 Rampe 7,7% Fr. Dr. DI Maria Huber Hr. Dr. DI Christian Huber Franz-Pichler-Weg 12 A-8530 Deutschlandsberg

RDUK +6,07

W02

W10

1,5cm Innenputz 20cm porosierter Hohlziegel HLZ 1,5cm Innenputz

Best.GOK +2,81

RDOK +/-0,00

GOK +3,22

RDUK DUK +2,88 +2,78

einzelne Stufen Flachstahl eingespannt in STB -Wand

Zimmer

W10

B

Rampe 7,7%

68

RDOK +6,27

Gefälle

Best.Aussenwand im Bereich Weinkeller ungedämmt Siehe auch Grundriss EG

+6,95

W01 Außenwand erdberührend (zu warm) 20cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand Bad 1,5cm Innenputz 48cm

F02

FOK +3,22

Rigol befahrbar

Wandaufbauten:

Zimmer

FOK -2,91 RDOK -3,08

DERZEIT NICHT PLANUNGSGEGENSTAND

63 15 20 53 14 2820 78

F07

20

20 53

15 12 20

Franz-Pichler-Weg 12 Gang A-8530 Deutschlandsberg GST. Nr. 400 / 1 KG: 61059 Sulz EZ: 194

BAUHERR

F07

W01

C Detail 6.303 Garage

RDOK +/-0,00

Best.GOK +2,92

Gefälle 2%

DA03

GOK +3,22

A

Gully

DUK abgehängte Decke +5,92

Bad

Drainageschotter Drainage DN100 PVC Schotterkoffer 270 Drainagevlies

F11

RDOK +3,08

25

120

Schnittführung

167

245

273 Detail 6.200

68

146

270

Gang

OK Attika Abdichtung+7,00

RDUK -0,12

Garage: Fußbodenaufbau, Entfall seitl.Verdunstungsrinne,

WA05

= Fussbodendurchbruch = Wandschlitz = Bodenschlitz

Schmutzwasser

Gefälle 2% FOK +0,15

273

20 20 10

= Wärmedämmung = Brandrauchentlüftung = Wanddurchbruch

Hausarbeit

DUK +5,91 Um- und Zubau Wohnhaus Familie Huber W11

A

5

C 299

B

285

1

7

53 10 20 14

B

276

300

= DeckendurchbruchWA10 WA07

207

15 20 53 270 14 20 28

B A

F09

541

299

Schlafen

A

Best.Bauteil Stahlbeton

Weinkeller Wintergarten

244 15 20 53 270

146

RDUK -3,33

GOK +3,22

Gang

RDUK +2,88

Drainage DN100 PVC

VS G Fix verg lasu ng

270 14 20 273 20

Deckenplatte lt. Angabe Statik

C

OK XPS 30cm ü.GOK

Gefälle RDOK Gefälle +3,08

Gefälle 2%

A

Platte?

SCHNITT CC

Achsen

Sektional - Industrietor (z.B. Fa. Hörmann), flächenbündig

Best.GOK +2,66

W09

Detail 6.00x

12

SCHNITT BB

530

6

7

B 90

RDOK +3,08 Stahlbeton

6

7 20 53 285 12

D 12 15 20

15 20 53

RDUK -0,12

+2,25

15

273 12 15

29 20 2

20

20 14

2

273

288

3

4 F07

RDUK -0,12

20

B

B Detail 6.408.2

68 20 79

68

Detail 6.200

20 15

100 120

270

DERZEIT NICHT PLANUNGSGEGENSTAND

E 5

6 Detail 6.104.1

1

25

34

Bad

DA02 WD BRE WDB DDB FDB WS BS

F09

GefälleFOK i.Gefälle Gefälle +3,22bis+3,19

FOK+3,22

FOK +3,22

30cm ü.GOK GOK FOK Gully RDOK +0,15 +0,15 +/-0,00

73 12

Detail 6.106.3

1 68

15 20 53

20 299

270 14

20

C20 10

200

183

285

388

378 20 53 25

85

20

2

25

68

63 15 20 53 207 14 2820 78 15 12

12 20

3

120 288 73 12

Verstärkungsrippe Aussparung in Bestandswand lt. Statik

Gang

POLIERPLAN

20 BAUVORHABEN

15

1

183

Zimmer

F02

270

F01

RDUK Regenwasser +2,88

20 14

-1,02

RDOK +6,27

FOK +3,22

INDEX A: ...

772

20

Zimmer

RDOK +/-0,00

F02

RDOK +6,27

DA03

Gefälle 2%

Gefälle 2%

RDUK +6,07

630

+6,95

ÄNDERUNGEN

541

Bad

FOK +3,22

20

B

167

245

Detail 6.408.2

15

68 20 79 100

4

276 Detail 6.103.2 / 6.103

Ziegel

300

Best.GOK +2,92

90

OK Gefällebeton + 2,78

DA03

OK Attika +7,00

E

D 3

299

28

DN250m m

273

Vorsatzschale

15 20 53 71,5 270 14 20

90

14

104

20

20

27 300

12 15 20

90

7

20 68

15 20 53

195

270

Detail 6.104.1

Best.Ba uteil OK +2,88

378

388 25

25

25 20 68 195 104 20

F02

Beton

+0,15 DA02

GOK-0,02

DERZEIT NICHT PLANUNGSGEGENSTAND

63 15 20 53 207 14 2820 78 167

246

1 Detail 6.106.3

68 20

15 20 53 14 10

20

20

299

12

B

AR = Abfallrohr FOK = fertige Fussbodenoberkante RR = Regenabfallrohr RDOK = Rohdeckenoberkante PS = Putzschacht RDUK = Rohdeckenunterkante oberhalb RDUK OK = Oberkante DUKKS +5,92 = Kanalsohle +6,07 BEST. = Bestand UK = Unterkante DUK = Deckenunterkante FPH = Fertigparapethöhe (in cm ü. FOK) RPH = Rohbauparapethöhe (in cm ü. RDOK) STUK = Sturzunterkante (Rohbaumass) Kind UZ = Unterzug lt. Statik RH = Raumhöhe

15

15 20 53 270 20 28 245

Best.GOK+2,64

Gefälle 2%

F07

DUK abgehängte Decke +5,92

Garage

Garage

OK Attikablech +7,00

2025

20 10

20

Drainage DN100 PVC

Dämmung weich

20 10

GOK + 3,22

RDUK

Drainageschotter +6,07 Drainage Drainage DN100 PVC DN100 PVC Schotterkoffer Drainagevlies

+4,28 Gang

+6,95

Gully

RDUK +5,32 +6,07

W11

OK XPS

F07

RDUK +2,88 Wintergarten

Dämmung hart

20

14

299

270

68

2

3

RDUK +6 STB- ,07 RDOK Deck +6,2 e d= 20cm 7

25

DN250m m

Vorsatzschale

4

458,04

D

2

71,5

Gla sd im G ach G 15efälle20VS53 2%

270

GL 210 20 14 GL 277 27 246 12 15 20 276

3

4 Lu ftra um

W04

25

B

Zufahrt Garage Schotterrasen ca. 61m²

RD 2% d= UKGefälle lt.S + ta 2,5 tik 8

340

15

10

490

90

100

273

20

DDB 100/100

1

Gefälle 2%

Gefälle 2%

+5,28 DUK +5,91

Rampe 7,7%

DA03

RDOK +6,27

F Teilschnitt

Öffnung Hackschnitzelraum g OK Hochzug u.Abdeckun nach HT-Erforderniss

D

100

Detail 6.103.2 / 6.103

+5,92

+4,12

20

+ 1,14

OK Attikablech OK XPS +7,00 WA05 30cm ü.GOK GOK +0,15 RDOK Gully +6,27

Gang

C

Gefälle

W06

OK XPS 30cm ü.GOK

Legende:

120

20 68

Gefälle

Best.GOK +2,92

Gefälle 2% DDB 20/60

RDUK -3,33

über Gefälle 2% Grundrissebene RDVK Rohdeckenvorderkante

400

110 10 30 10

195

20

104

153,4

SCHNITT BB

Best.GOK+2,64

Edelstahl kamin Abdeckrost 100/100 30/10

GOK +3,22

RDUK -1,25

F09

RDOK

GOK +3,22

GOK +3,22

C DA03

OK Attika +7,00 Gefälle 2%

F Teilschnitt

320

20

2390

16,7 93,2

300

480

90

Fussboden + HT - Raum RDUK OG ü. Schleuse RDOK=FOK-1,00 Belag (Parkett 2-Schicht) +5,32 -0,12 Heizestrich Folie Trittschall-Dämmplatte gebundene Leichtschüttung

W09

GOK +0,15

A

470

B RDUK -0,12

146

F07

541 Stahlbetonplatte (Neubau) Garage Dämmplatte

-3,08 FOK+3,22

RDVK Rohdeckenvorderkante in Grundrissebene

+6,95

GOK-0,02

-1,02

2,5cm 20cm 10cm 44cm

OK XPS 30cm ü.GOK

B

Gefälle 2%

2025

renze stückg Grund

20

SCHNITT E E

E

Best.Bauteil Stahlbeton

552

F11 1,5cm

7cm 17 Stg.18/27 Stiege lt.Statik 3cm

W10

Durchbrüche und Wandschlitze lt. HT-Plan / Absprache mit Bauherrn erforderlich Rohbaulichten für Türen und Fenster nach Festlegung des Bauproduktes / Absprache mit Bauherrn erforderlich. Lichtauslässe in Decke über Erdgeschoss nach Absprache mit dem Bauherrn.

OK Gefällebeton + 2,88

WA10

FDB 20/60

+ 0,14

10

131 179

600

93,2

RDVK

541

RDVK

Hausarbeit

RDOK +/-0,00

120

W10

Fussboden EG (Schleuse) Beschichtung Estrich WDB 80/80 Folie 2% UK=+0,35 3cmGefälle Trittschall-Dämmplatte RDOK Leichtschüttung lt.HT-Angabe 3cm gebundene WDB 60/10 1,5cm Abdichtung 3 - lagig (bituminös) +/-0,00 UK=+0,00STB 25cm Bodenplatte WDB 80/55 lt.HT-Angabe Unterbauplanum UK = -0,40 39cm lt.HT-Angabe

FOK +0,15

+6,95

DA02

Best.Bauteil Stahlbeton WDB 30/30 OK= +1,35 lt.HT-Angabe

Technik

F10 0,5cm 6cm

A +6,95

630

Best.GOK+1,64

73,4 2020

OK XPS 30cm ü.GOK

17 47cm

F11

Fussboden OG (Garage) Betonplatte versiegelt im Gefälle 14 Folie RDUK 13 einzelne Stufen RDUK DUK Dämmmatte,hochdruckfest (Gummigranulat) 12 Flachstahl +2,88 1,5cm Abdichtung 3 - lagig (bituminös) +2,88 +2,78 eingespannt (Neubau) 11 20-17cm Stahlbetonplatte in STB -Wand, 10 ca.30cm Decke (Bestand) verkleidet 1,5cm Innenputz 9 75-81cm

DA06 Dach über Stiege (überschüttet) min. 20cm Überschüttung 20cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 20cm Stahlbetondecke im Gefälle betoniert min. 61,5cm

SCHNITT FF

+3,08

Hausarbeit

B

153,4

Detail 6.408.3

RDUK +2,88

2

202010 93,2 10,4

+6,95

W01

A

W02

16

DA04 Flachdach über unbeheizt (überschüttet) min. 38cm Überschüttung 10cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 - lagig (bituminös) 2-15cm Gefällebeton (2%) 25cm Stahlbetondecke min. 77,5cm

GOK +0,15

20

Fixverglasung

300

DL 80 DL 200

10

RDOK +3,08

120

Detail 6.407.4

16

17

W07

93,2

Schrankraum F11 Parkett Abgeh.Decke WA07 8,2m² RH 2,7m

3

GL 80 RR GL 80 DN 100

DL 80 DL 200

12

13

73,4

10

C

Gang

RDVK RDVK

FOK +0,15

14

10

Detail 6.105.2

20 10

20 20 10

20

F01

15

8

450

FOK +3,22

9

450

PH 0

RDVK RDVK

445

Schlafen Eltern F11 Parkett Abgeh.DeckeRDUK DUK +5,92 +6,07 22,2m² RH 2,7m Kind

10

10

Detail 6.104.4

20

RDOK +6,27

437

11

4

5

6

7

2

3

1

Fixverglas. VSG

145

100

10 100 10

FOK +3,22

20

DA03

C

10

530

10

100

einzelne Stufen Flachstahl einseitig eingespannt

448 OK Attika +7,00

-1,02

F01

+6,95

WA10

Fussboden EG Beschichtung Schlafen Heizestrich Gang Folie Trittschall-Dämmplatte gebundene Leichtschüttung Abdichtung 3 - lagig (bituminös) Unterbeton (Neubau) RDOK RDOK Glasschaumschotter +3,08 Unterbauplanum

F09 15 12cm

20-34cm Substrat Bewässerungsmatte Vlies / Wurzelschutzschicht 2cm Wasserspeicher + Drainagematte Vlies RDUK 0,5cm Dachabdichtung (Foliendach) Unterfangung -0,12 +5,28 2-16cm Gefälledämmung lt. Statik 14cm Wärmedämmplatte EPS 0,5cm Dampfsperre (Klebefolie mit Alueinlage) 20cm Stahlbetonplatte 15cm abgehängte Decke 146 0,5cm Spachtelung +4,28 73,5cm

120

Rigol

Fixverglasung

GL 295 GL 80

FOK +3,22 W02

20

131 179

10 20

10

W03

10

640

PH 0

258

PH 160

W07

17 Stg. 18/27

FDB/DDB 432/100

4

20

F Teilschnitt

280

280

FDB 50/30

Handlauf

135

+0,15

Gefälle 2%

W00

GOK 146 + 0,15

10 20

Wäscheabwurfschacht Einwurf beitseitig

270

22

PH 0

180

Bad Eltern htet F00 Heizestrich beschic Abgeh.Decke 16,1m² RH 2,7m

HT-FDB 20/20

FOK +3,22

3cm 3cm 1,5cm 12cm 20cm

WA07

Drainage DN100 PVC

100 15 15 10 20 10

40 20

10

477

Absturzsicherung VSG H=100

F02

120

DL 80 DL 200

5

GL 350 GL 100

10

GOK-0,02

Strasse verlegen ca. 120m²

Zufahrt Garage Schotterrasen ca. 57m²

OK XPS 30cm ü.GOK

F07 0,5cm

7cm Kind

Gang

WDB 30/50 UK=+1,00

DA02 Dach Wintergarten 3cm Isolierglas VSG im Gefälle (2%) 3cm

W06

GOK + 3,22

HT-DDB 15/15 lt.HT-Planung erforderl. Absprache mit Bauherrn

10

20

70

GL 345 GL 273

GL 80 GL 255

1

DL 80 DL 200

RDUK -1,25

W02

10

Detail 6.102.5

250

RDVK

250

+4,12

W07

Kind RDUK F01/F02 Parkett -3,33 Abgehängte Decke 13,4m² RH 2,70m

STUK+5,97

115

Detail 6.406.4

10

10

RDVK

Detail 6.102.6

410

Fix

WDB 80/55 UK = -0,40 lt.HT-Angabe

537

Gefälle 2%

+5,92

WDB 80/80 UK=+0,35 lt.HT-Angabe

Detail 6.407.4

250

250

+6,95

B 20

lt.HT-Angabe

160 10 RDOK=FOK-1,00

,08 K +3 RDO ,88 20cm d= K +2 RDU -Decke STB

10

20

3

Rigol befahrbar RDVK

WC F00 Heizestrich besch. 1,9m² WDB cke 60/10 Abgeh.De UK=+0,00 RH 2,7m lt.HT-Angabe

6

3cm 5cm 1,5cm 25cm 20cm

F02 FDB 50/30

Gefälle 2%

Fussboden UG RDOK Beschichtung Estrich +6,27 Folie Trittschall-Dämmplatte gebundene Leichtschüttung Abdichtung 3 - lagig (bituminös) Bodenplatte Stahlbeton (Neubau) RDUK Glasschaumschotter Unterbauplanum +6,07

DUK +5,92

F07+6,95 RDOK FOK+0,15 DA03 über OG (Gründach extensiv) +/-0,00 +0,15Flachdach FBD 20/20

W10

DDB 20/60

Dachaufbauten:

+6,95

GOK +3,22

F02

DDB 20/20 W11 Garagenwand zu Innenraum (OG) 10cm Wärmedämmplatte 20cm Stahlbetonwand 1,5cm Innenputz 31,5cm

Gefälle

100 WDB200 30/30 DL OK= +1,35

Auskragungslänge L=355cm

120

GL 175 Fix GL 200

630

10

2390

SCHNITT FF 4

2A

73,4

Stiege lt.Statik Kind F01/F02 Parkett Abgehängte Decke 13,4m² RH 2,70m RDOK W00 -3,08

PH 90

DUK +2,78 DL 160

Technik + 3,22

DL 80 DL 200

Detail 6.101.4

20/20

RDUK +2,88

FOK +3,22

GL 54 GL 165

RDVK

Gefälle 1%

RDVK RDVK

20 60,4 201,8 Gang W07 HT-FDB

einzelne Stufen Flachstahl eingespannt in STB -Wand, 93,2 verkleidet

17 Stg.18/27

15 10

D

16

12 11 10 9

RDUK -0,12

+ 3,22

RR DN 100

15

PH 90 W01

W10 Aussenwand Ziegel OG 5cm vorgehängte Fassade 5cm Hinterlüftung FOK+3,22 Windbremse 20cm Wärmedämmung Mineralwolle 20cm porosierter Hohlziegel HLZ 1,5cm Innenputz 51,5cm

F04 0,5cm 6cm

61cm

W09 Aussenwand Stahlbeton (Garage) 5cm vorgehängte Fassade 5cm Hinterlüftung Windbremse Bad Eltern Kind 10cm Wärmedämmung Mineralwolle Stahlbetonwand Wäscheab+4,1220cm wurfschacht 40cm

Hausarbeit

DL 550 DL 220

F11

RDOK +3,08

14 13

GL 54 GL 165

GL 116 Fix GL 180

FOK Gefälle 2%

eplankt Sektional-Industrietor,b

20

Detail 6.200

120

10 120 10 10 120 10 236,3 Gang DL 80 F01/F02 Parkett DL 200 27,9m² PH 0 Abgeh.Decke 2,7m ng PH 0 RHFixverglasu

10 20 130

10

Unterfangung 10 lt. Statik

Überzug/Attika

10

DL 100 DL 200 EI30-C

W11

WDB 30/50 UK=+1,00

FBD 20/20

Schlafen

17

F07Bad Heizestrich besch. F00RDOK FOK+0,15 3,6m² +/-0,00 W02 Abgeh.Decke RH 2,7m

GL 116 Fix GL 180

E

F02

93,2

13 42

GL 45 GL 270

5

r min.Einschubtiefe Sektionalto

344

RDVK

226 311

Hausarbeit

Gefälle 1,5%

W02

FDB 50/30

DDB 20/20

GL 230 GL 240

6

+6,95

Verdunstungsrinne

FOK + 3,19

FOK +3,22

FOK +3,22

FOK+3,22

7

+ 2,66

Oberlichtverglasung VSG Gefälle 2%

Wäscheabwurfschacht

Fixverglasung

Detail 6.200

1% Gefälle

RDVK

20 135

PH 68

GOK + 3,22

W09

RDVK RDVK

Bad Eltern

BRH Kind100 Steg i.Gef. 7,7% Glas 2,9m² F01

10cm porosierter Hohlziegel HLZ 1,5cm Innenputz 13cm

Detail 6.108.3

Garage DA03 F09 Beton, beschichtet 38,6m² +6,98 mind.RH 2,85m

10

C

PH 68

GL 180 Fix GL 80

GL80 GL80 20 10 10

GL 173 GL 550

394

344

DL 106 DL 200

PH 100

Innenwand nicht tragend Ziegel +5,92 W07 1,5cm Innenputz

F01

321

Detail 6.301

Detail 6.107.4

(Technik) Gefälle 2% 10cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand 36,5cm

Detail 6.103.2 / 6.103

B

Fix

7

20

10 10

10 10

Detail 6.200

Gefälle 2%

Fernsehen / Gäste 23,2m² RH 2,96m

C

B

A

20 10

350

280

10 94

201

380

280

107

C

DA03

+6,98

Gefälle 2% Außenwand erdberührend +6,95W06

2

B

DA03B

4

A

F Teilschnitt

F02 Fussboden OG über Gang 1,5cm Belag (Parkett 2-Schicht) 7cm Heizestrich Folie 3cm Trittschall-Dämmplatte 2,5cm gebundene Leichtschüttung Oberlichtverglasung VSG 20cm Stahlbetonplatte (Neubau) Gefälle OK Attika 2% 1,5cm Innenputz +6,95 +7,0035,5cm

W05 Außenwand EG (Bestand Zubau) 10 Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) ca.30cm Ziegelwand (Bestand) 1,5cm Innenputz ca. 43cm

Detail 6.408

Innenwand tragend Ziegel

23cm

D

Fussboden OG über Bestand Belag (Parkett 2-Schicht) Heizestrich Folie 3cm Trittschall-Dämmplatte 2,5cm gebundene Leichtschüttung 20cm Stahlbetonplatte (Neubau) ca. 30cmZiegel (Bestand) 1,5cm Innenputz 65,5cm

C

F01 1,5cm 7cm

1,5cm Innenputz 20cm porosierter Hohlziegel HLZ 1,5cm Innenputz

198

115

25

E

Fußbodenaufbauten:

W01 Außenwand erdberührend (zu warm) 20cm Perimeterdämmung XPS 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand 1,5cm Innenputz 48cm

198

Drainageschotter Drainage DN100 PVC Schotterkoffer Drainagevlies

RDUK -1,25

SCHNITT BB

Wandaufbauten:

767

470

RDUK -3,33

SCHNITT FF

965

GOK +0,15

FOK -2,91 RDOK -3,08

RDUK -3,33

W02

RDOK -1,00

lung Auffül um Hohlra

2

3

4

5

6

W01

25

25

C

RDOK -3,08

Gitterrost

1

300

25

Deckenplatte lt. Angabe Statik

20 530

F10

FOK +0,15

25

210 Platte?

276

270

102,5 12,5

15

Detail 6.00x

12

12 15

RDUK -0,12

630

Kellerersatzraum 378

F07

RDOK +/-0,00

20

Drainage DN100 PVC

in STB -Wand

273

273

288 GOK +0,15

Verstärkungsrippe Aussparung in Bestandswand lt. Statik

Gang

7

183

2

3

Wintergarten

OK XPS 30cm ü.GOK

Drainage DN100 PVC

RDUK -1,25

276

4

GOK +0,15

RDOK=FOK-1,00 17 Stg.18/27 Stiege lt.Statik

W01

W09

73 12

WDB 80/55 UK = -0,40 lt.HT-Angabe

RDUK -0,12

Unterfangung lt. Statik

Detail 6.104.1

WDB 60/10 UK=+0,00 lt.HT-Angabe

388

WDB 80/80 UK=+0,35 lt.HT-Angabe

OK XPS 30cm ü.GOK

1

12 15

FOK+0,15

378

RDOK +/-0,00

W06

25

F07

WDB 30/30 OK= +1,35 lt.HT-Angabe

Technik

25

246

Gang

WDB 30/50 UK=+1,00

FBD 20/20

20

in STB -Wand, verkleidet

10 9

Vorsatzschale

Hausarbeit

HÖHENBEZUG LT. NATURAUFNAHME

SCHNITT DD

+0,00 = +382,86 ü. Adria

PLANINHALT Arch.DI Bettina Brunner ZT KEG Staatlich befugte und beeidigte Ziviltechniker

SCHNITTE

Industriezeile 36/4 A-4020 Linz Tel.: +43 (0)732 791607 Fax: +43 (0)732 7916075 Albertplatz 1 A-1080 Wien Tel.: +43 (0)1 95 82 022 Fax: +43 (0)1 20 81 970

DATUM

08.04.2013

PROJEKTNUMMER

1123

MAßSTAB

1:50

PLANGRÖSSE

GEZEICHNET

155/90

RK / HG / AL

PLANNUMMER

5.003

Diese Zeichnung bzw. Ausarbeitung ist geistiges Eigentum des Architekten und damit gesetzlich geschuetzt. Jede Benutzung, Veroeffentlichung, Vervielfaeltigung, Ueberarbeitung oder Weitergabe an Dritte in Verbindung mit einer anderen Arbeit oder einem anderen Projekt bedarf der Zustimmung des Architekten. Durch die Uebernahme des Planes akzeptiert die ausfuehrende Firma die darauf dargestellten Anordnungen. Geschriebene Planmasse auf dieser Zeichnung haben Vorrang gegenueber gezeichneten Dimensionen. Der Auftragnehmer verpflichtet sich vor Arbeitsbeginn alle Masse und Bedingungen seine Arbeit betreffend, auf der Baustelle verantwortlich zu ueberpruefen. Abweichungen gegenueber dargestellten oder schriftlichen Anordnungen muessen dem Architekten bzw. der Bauleitung unverzueglich schriftlich mitgeteilt werden.

25

600

25


C

OK +3,22

+ 2,66

A

C

DrainageschotterDrainageschotter Drainage DN100Drainage PVC DN100 PVC Schotterkoffer Schotterkoffer Drainagevlies Drainagevlies

+ 0,04

RDOK -1,00

Übersicht Ansicht Ost

Abdi B

Innenwand, tragend Fensterbanknicht Kunststein Gipskartonständerwand

Verglasungsprofile

A

Fensterbank Kunststein

innen

innen

15

Glasgeländer, VSG d=nach Glasstatik 100

/1

9

Formrohr, xxx lt.Statik

Typ 2A

dauerelastische Fuge Gang Estrichrandstreifen Typ 2A

nach Wahl Arch.

20 1,5 12 3 3 7 1,50,5 33 7

RDOK +/-0,00

FOK dampfdichter Anschluss dauerelastische Fuge

+0,15

Estrichrandstreifen

1,5 3 3 7

Gang

Schiebetürelement RDUK Profile Farbe Anthrazit -0,12 nach Wahl Arch. 20 12

dauerelastische Fuge

20 0,5 12

RDUK Estrichrandstreifen -0,12

FOK dauerelastische Fuge dampfdichter Anschluss RDUK A Estrichrandstreifen

FOK dampfdichter Anschluss +0,15

RDOK +/-0,00

RDOK +/-0,00

Tropfblech

A

RDUK -0,12

F07

+0,15 -0,12

RDOK +/-0,00

RDUK -0,12

A

5

1

FASSADENSCHNITT 6.105 DET.6.105.1

W06 Außenwand erdberührend (Technik) W10 Aussenwand 10cm Perimeterdämmung XPS Ziegel OG 5cm 3 -vorgehängte Fassade 1,5cm Abdichtung lagig (bituminös) 5cm Hinterlüftung 25cm Stahlbetonwand Windbremse 36,5cm 20cm Wärmedämmung Mineralwo 20cm nicht porosierter Hohlziegel HLZ W07 Innenwand tragend Ziegel 1,5cm Innenputz 1,5cm Innenputz 51,5cm 10cm porosierter Hohlziegel HLZ 1,5cm 13cm W09 5cm 5cm 10cm 20cm 40cm W10 5cm 5cm

Innenputz W11 Garagenwand zu Innenraum 10cm Wärmedämmplatte 20cm Stahlbeton Stahlbetonwand Aussenwand (Garage) 1,5cm Fassade Innenputz vorgehängte 31,5cm Hinterlüftung

Windbremse Dachaufbauten: Wärmedämmung Mineralwolle Stahlbetonwand DA02 Dach Wintergarten 3cm Isolierglas VSG im Gefälle (2 3cm Aussenwand Ziegel OG

Konsole Se

vorgehängte Fassade DA03 Flachdach über OG (Gründa Hinterlüftung 20-34cmSubstrat Windbremse Bewässerungsmatte 20cm Wärmedämmung Mineralwolle Vlies / Wurzelschutzschicht 20cm porosierter Hohlziegel HLZ 2cm Wasserspeicher + Drainagem 1,5cm Innenputz Vlies 51,5cm 0,5cm Dachabdichtung (Foliendach 2-16cm Gefälledämmung W11 Garagenwand zu Innenraum (OG) 14cm Wärmedämmplatte EPS 10cm Wärmedämmplatte 0,5cm Dampfsperre (Klebefolie mit 20cm Stahlbetonwand 20cm Stahlbetonplatte 1,5cm Innenputz 15cm abgehängte Decke 31,5cm 0,5cm Spachtelung 73,5cm Dachaufbauten:

Tr Konsole Farbe nach Se Wa

Einbau aller Elemente lt. -Anschluss innen da Tr -Anschluss aussen diffusio Farbe nach Wa (wind + schlagreg Flachdach über unbeheizt (ü DA02 DachDA04 Wintergarten min. 38cm Überschüttung 3cm Isolierglas VSG im Gefälle (2%) -lt. Angaben B Einbau aller Elemente lt. 10cm XPS im Gefälle verlegt 3cm 1,5cm Abdichtung 3 - lagig (bitumin innen da 2-15cm Gefällebeton (2%)extensiv) DA03 -Anschluss Flachdach über OG (Gründach 25cm Stahlbetondecke 20-34cmSubstrat min. 77,5cm -Anschluss aussen diffusio Bewässerungsmatte Vlies / Wurzelschutzschicht DA06 Dach +über (überschüttet (wind + Stiege schlagreg 2cm 5,0cm Wasserspeicher Drainagematte Vorgehängte Konsole Se Vliesmin. 20cm Überschüttung 20cm XPS imAngaben Gefälle verlegt 0,5cm5,0cm Dachabdichtung -lt.(Foliendach) B 1,5cm Hinterlüftung Abdichtung 3 - lagig (bitumin 2-16cm Gefälledämmung 20cm Stahlbetondecke im Gefälle b 14cm Wärmedämmplatte EPS Windbremse min. 61,5cm 0,5cm Dampfsperre (Klebefolie mit Alueinlage) 20cm Stahlbetonplatte 15,0cm Wärmedämmu 15cm abgehängte Decke 0,5cm Spachtelung 25,0cm 5,0cm Stahlbetonwan VorgehängteTr 73,5cm Farbe nach Wa DA045,0cm Flachdach über unbeheizt (überschüttet) Hinterlüftung min. 38cm Überschüttung

10cm XPS im Gefälle verlegt Einbau aller3Windbremse Elemente lt. 1,5cm Abdichtung - lagig (bituminös) 2-15cm Gefällebeton Wärmedämmu (2%) 15,0cm 25cm -Anschluss Stahlbetondecke innen da min. 77,5cm 25,0cm Stahlbetonwan -Anschluss aussen diffusio DA06 Dach über Stiege (überschüttet) min. 20cm Überschüttung (wind + schlagreg 20cm XPS im Gefälle verlegt 1,5cm Abdichtung 3 --lt. lagig (bituminös) Angaben B 20cm Stahlbetondecke im Gefälle betoniert min. 61,5cm

5,0cm Vorgehängte Legende: 5,0cm FFOK =Hinterlüftung Fussbodenoberkante RDOK = Rohdeckenoberkante OK =Windbremse Oberkante UK = Unterkante 15,0cm DUK =Wärmedämmu Deckenunterkante FPH = Fertigparapethöhe 25,0cm RPH =Stahlbetonwan Rohbauparapethöhe STUK UZ FTÜ RH AR

= Sturzunterkante = Unterzug lt. Statik = Fertigteilüberlager lt. Stat = Raumhöhe = Abfallrohr

Stahlbeton

20

Dämmung weich Stahlbeton

DET

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik Tropfblech

F07 Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik Tropfblech

Schnitt Q

Schnitt Q 15

DET.6.104.1

1

1

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

RDOK +/-0,00

Abdichtung

RDOK +/-0,00

0,5

FOK dampfdichter Anschluss +0,15

F07

+0,15

/1

0,5

Schiebetürelement FOK dampfdichter Anschluss Formrohr, xxx Profile +0,15 dauerelastischelt.Statik Fuge Farbe Anthrazit

Wintergarten

Leibungsverk Fassaden

FFOK = Fussbodenoberkante RR RDOK = Rohdeckenoberkante RRSK Beton PS OK = Oberkante UK = Unterkante KS DUK = Deckenunterkante GV FPH = Fertigparapethöhe Ziegel BA RPH = Rohbauparapethöhe LÜ STUK = Sturzunterkante AL UZ = Unterzug lt. Statik ZUL FTÜ = Fertigteilüberlager lt. Statik DämmungPThart RH = Raumhöhe BEST. AR = Abfallrohr AD

F07

Wintergarten Tragende Stahlbauteile lt.Statik

F07

08.04.2

36,5cm

Diese Zeichnu W07 tragend Innenwand tragend Zie Innenwand ZiegelnichtVerbindung m 1,5cm Innenputz Innenputz Geschriebene 10cm Hohlziegel porosierter Hohlziegel HLZ porosierter HLZ auf der Bauste 1,5cm Innenputz Innenputz 13cm

Legende:

Glassteg, Gefälle 7,7%, Litex-Bedruckung d=nach Glasstatik

Estrichrandstreifen

Außenwand (zu erdberührend warm) W06 erdberührend Außenwand (T DATUM Perimeterdämmung XPS 10cm Perimeterdämmung XPS Abdichtung (bituminös) 1,5cm3 - lagig Abdichtung 3 - lagig (bitumin Stahlbetonwand 25cm Stahlbetonwand Innenputz

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

/1

Gang

FOK +3,22

Schiebetürelement

DET.6.102.4

DET.6.104.3 DET.6.104.2 DET.6.104.1

DET.6.105.1 DET.6.104.1

15

Glasgeländer, VSG d=nach Glasstatik Tragende Stahlbauteile lt.Statik

RDOK +3,08

innen

DET.6.104.2

Kantenschutzprofil Glassteg, Gefälle 7,7%, Litex-Bedruckung dauerelastische Fuge d=nach Glasstatik

Fassadenpaneel im Innenraum

OG Schlafzimmer Eltern FOK +3,22 RDOK +3,08

3

RDUK +2,88

FOK +3,22

Detail 6.104.2 - Fassade Detail / Fixverglasung 6.104.2 Detail - Fassade / 6.104.2 Deckenanschluss /- Fixverglasung Fassade / Fixverglasung / Deckenanschluss / Deckenanschluss

20 1,5 3,5 3 20 7

15 Kantenschutzprofil dauerelastische Fuge

RDUK +2,88

OG Schlafzimmer Eltern FOK +3,22 RDOK +3,08

DET.6.104.1

DET.6.103.1

2

3 4

0,5 3,5 0,5 3 7

9

FOK +3,22

RDUK +2,88 RDOK +3,08

3,5 3 7

9

OK +4,22

Typ 2A

UK abgehängte Decke Gang +5,92

20

16

0,51,5

/1

1,5

Typ 2A

16

RDUK -0,12

2

DET.6.103.2

DET.6.103.2

DET.6.102.2

4

DET.6.102.1

DET.6.103.1

DET.6.102.2 DET.6.102.1

5

RDUK Ganzglas-Ecke,verklebt Estrichrandstreifen +2,88

Kantenschutzprofil dampfdichter Anschluß dauerelastische Fuge

+4,22

+3,08

Rigol im Mörtelbett

Detail 6.104.3 - Fixverglasung Detail/ 6.104.3 Sonnenschutz Detail - Fixverglasung 6.104.3 - Fixverglasung / Sonnenschutz / Sonnenschutz

1

FASSADENSCHNITT 6.104

FASSADENSCHNITT 6.105

2

DET.6.104.3

DET.6.102.4

3

2

3 4

FASSADENSCHNITT 6.104

FASSADENSCHNITT 6.103

DET.6.103.3

4

DET.6.103.3

5

DET.6.102.3

DET.6.102.3 DET.6.101.2 DET.6.101.1

5 6

dauerelastische Fuge

/1

UK abgehängte Decke Gang verlaufend OKmit Glasdach-Randprofil

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) Fassadenpaneel im Innenraum -lt. AngabenRDOK Bauphsik

Montagewinkel

RDUK -0,12

Gefälle 2%

Bad Eltern

Stufenisolierglas, d=nach Glasstatik Typ 2A

FOK +3,22

1,5 3 3 7

A

DA02

16

-lt. Angaben Bauphsik

UK abgehängte Decke Gang +5,92

RDOK +3,08

UV-betändige Abdeckung Randverbund

-Anschluss innen dampfdicht Estrichrandstreifen Schnitt L 0,5cm Beschichtung -lt. Angaben Bauphsik -Anschluss aussen diffusionsoffen, dampfdichter Anschluss FOK (wind + schlagregendicht) 7,0cm Heizestrich +0,15 RDOK -lt. Angaben Bauphsik Folie +/-0,00 Schiebetürelement RDOK Tropfblech 3,0cm Trittschall-Dämmplatte +/-0,00 Rigol im Mörtelbett 3,0cm gebundene Leichtschüttung RDUK -0,121,5cm Abdichtung 3 - lagig (bituminös) dauerelastische Fuge Verglasung, klar Einbau aller Elemente lt. ÖNORM Montagewinkel 7 12,0cm Unterbeton (Neubau) d=nach Glasstatik -Anschluss innen dampfdichtRDUK Estrichrandstreifen 20,0cm Glasschaumschotter -0,12 -Anschluss aussen diffusionsoffen, UnterbauplanumEinbau aller Elemente lt. ÖNORM FOK dauerelastische Fuge RDUK dampfdichter (wind + schlagregendicht) A Anschluss +0,15 -Anschluss innen dampfdicht Estrichrandstreifen -0,12 -Anschluss aussen diffusionsoffen, -lt. Angaben Bauphsik dampfdichter Anschluss FOK (wind + schlagregendicht)

RDOK +/-0,00

FASSADENSCHNITT 6.103

FASSADENSCHNITT 6.102

DET.6.102.4

5 6

DET.6.102.4 DET.6.101.3

6

DET.6.101.2 DET.6.101.1

6

Verglasung, klar d=nach Glasstatik

0,5

+0,15

RDOK

dampfdichter Anschluß +3,08

7

Einbau aller Elemente lt. ÖNORM -Anschluss innen Schiebetürelement dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) RDUK +2,88 Angaben Einbau aller-lt. Elemente lt.Bauphsik ÖNORM Verglasung, klar 7 -Anschluss innen dampfdicht d=nach Glasstatik -Anschluss aussen diffusionsoffen, Tropfblech Einbau aller Elemente lt. ÖNORM dauerelastische Fuge (wind + schlagregendicht)

Gang

UK abgehängte Decke Gang verlaufend mit Glasdach-Randprofil

durchlaufender Montagewinkel UK (thermisch+5,82 getrennt) lt.Statik

GOK +0,15 Einbau aller Elem Leibungsverk W02 Innenwand tragend Ziegel -Anschluss in 1,5cm Innenputz Fassaden 20cm porosierter Hohlziegel HLZ -Anschluss aussen 1,5cm Innenputz 23cm (wind + sc W05 Außenwand EG (Bestand Zu 10 Perimeterdämmung -lt.XPS An 1,5cm Abdichtung 3 - lagig (bitumin

ca.30cm Ziegelwand (Bestand) 1,5cm Innenputz ca. 43cm Wandaufbauten:

W02 1,5cm 20cm 1,5cm 23cm

FOK +3,22

Estrichrandstreifen Ganzglas-Ecke,verklebt

Tropfnase

Fassadenpaneel im Innenraum

GOK +0,15

W01 20cm 1,5cm 25cm 1,5cm 48cm

STUK

Stufenisolierglas, d=nach Glasstatik

100

RDUK F02 0,5cm Beschichtung +2,88 Estrichrandstreifen Putzprofil 7,0cm Heizestrich FOK Gang Folie +3,22 3,0cm Trittschall-Dämmplatte RDOK 3,0cm Leichtschüttung 0,5cm gebundene Beschichtung +3,08 Schnitt L 1,5cm 7,0cm Abdichtung Heizestrich 3 - lagig (bituminös) dauerelastische Fuge 12,0cm Unterbeton (Neubau) Gang Folie 31 Leibungsverkleidung Estrichrandstreifen 20,0cm 3,0cm Glasschaumschotter Trittschall-Dämmplatte Fassadenpaneel 3,0cm Unterbauplanum gebundene Leichtschüttung dampfdichter Anschluss FOK +0,15 1,5cmRDUK Abdichtung 3 - lagig (bituminös) +2,88 dauerelastische Fuge Putzprofil 12,0cm Unterbeton (Neubau) Estrichrandstreifen RDOKGlasschaumschotter 20,0cm +/-0,00 Unterbauplanum dampfdichter Anschluss FOK

A

FASSADENSCHNITT 6.102 FASSADENSCHNITT 6.101

FASSADENSCHNITT 6.101 DET.6.101.3

7

7

31

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik SCHNITT Q

-Anschluss innen dampfdicht Einbau aller Elemente lt. ÖNORM -Anschluss aussen diffusionsoffen, OG Kinderzimmer + schlagregendicht) -Anschluss innen (wind dampfdicht +3,22 -lt. AngabenFOK Bauphsik -Anschluss aussen diffusionsoffen, RDOK +3,08 Grundriss Erdgeschoss (wind + schlagregendicht) -lt. Angaben Bauphsik Einbau aller Elemente lt. ÖNORM BESTAND -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, Fensterelement RPH +4,12 (wind + schlagregendicht) Drehkipp-Beschlag FPH +4,12 -lt. Angaben Bauphsik

RDOK +3,08

OK +0,15

Detail 6.104.1 - Fassade Detail / Sockel 6.104.1 Detail - Fassade 6.104.1 /- Sockel Fassade / Sockel

Montagewinkel

SIEHE DETAILPLAN 6.200

DET.6.408.2

10 10 10

EinbauVerglasung, aller Elemente lt. ÖNORM klar -Anschluss innen dampfdicht Montagewinkel -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

DA02

Gefälle 2%

Leibungsverk einzelne Fassaden (thermisc

Wandaufbauten:

W01 Außenwand erdberührend (zu w 20cm Perimeterdämmung XPS DET.6.410.1 1,5cm Abdichtung 3 - lagig (bituminös) 25cm Stahlbetonwand 1,5cm Innenputz 48cm

DET.6.410.1

W09 EG Aussenwand Stahlbeton (Ga W05 Außenwand (Bestand Zubau) 5cm vorgehängte 10 Perimeterdämmung XPS Fassade 5cm 3 -Hinterlüftung 1,5cm Abdichtung lagig (bituminös) Windbremse ca.30cm Ziegelwand (Bestand) 10cm Wärmedämmung Mineralwol 1,5cm Innenputz 20cm Stahlbetonwand ca. 43cm 40cm

Abdichtung

SCHNITT Q FOK+0,15

F02

FOK +3,22

+0,15

Estrichrandstreifen Abschlußprofil +5,21 Gefälle 2% Bad Eltern dampfdichter Anschluß dauerelastische Fuge dauerelastische Fuge

UV-betändige Abdeckung Randverbund

durchlaufender Montagewinkel UV-betändige Abdeckung Randverbund (thermisch getrennt) lt.Statik Leibungsverkleidung Stufenisolierglas, d=nach Glasstatik Fassadenpaneel

dauerelastische Fuge

Fixverglasung aussen flächenbündig mit Glassteg, Litex-Bedruckung Fassadenpanelled=nach Glasstatik FOK+0,15

Gang

Bad Eltern

1,5 3 3 7

0° ,0 93

RDUK +2,88

Abschlußprofil dauerelastische Fuge

Leibungsverkleidung Fassadenpaneel

Verglasung, farbig Farbe nach Wahl Arch.

7

SIEHE DETAILPLAN 6.200

SIEHE DETAILPLAN 6.200

SIEHE DETAILPLAN 6.200

DET.6.408.3

DET.6.407.3 DET.6.407.2

31

Fixverglasung aussen flächenbündig mit Fassadenpanelle

FOK+0,15

Einbau aller Elemente lt. ÖNORM

innen

dauerelastische Fuge

DET.6.410.2

Winkelprofil Trennstreifen/Spachtelung RDUK +6,07

GOK +3,22

einzelne (thermisc

Einbau aller Elem -Anschluss einzelnein -Anschluss(thermisc aussen (wind + sc An Einbau aller-lt. Elem -Anschluss in DET.6.105.2 -Anschluss aussen (wind + sc GOK +3,22 -lt. An

DET.6.105.2

OK +3,22

dauerelastische Fuge

Abdeckung lt. Randverbund EinbauUV-betändige aller Elemente ÖNORMGefälle 2% Stufenisolierglas, d=nach Glasstatik Leibungsverkleidung -Anschluss innen dampfdicht Fassadenpaneel -Anschluss aussen diffusionsoffen, Tropfnase (wind + schlagregendicht) Ganzglas-Ecke,verklebt UK durchlaufender Montagewinkel Angaben +5,82 Einbau aller-lt. Elemente lt.Bauphsik ÖNORM (thermisch getrennt) lt.Statik -Anschluss innen dampfdicht Verglasung, klar d=nach Glasstatikdiffusionsoffen, -Anschluss aussen (wind + schlagregendicht) Fassadenpaneel im Innenraum -lt. Angaben Bauphsik

Estrichrandstreifen

DET.6.104.4

OK +3,22

STUK

Ganzglas-Ecke,verklebt

Gang

DET.6.104.4

Dachabdichtungsfolie

Abschlußprofil +5,21 dauerelastische Fuge

Leibungsverkleidung Fassadenpaneel

7

DET.6.102.5

20 12

Rigol

RDUK +2,88 RDOK +3,08

Glassteg, Litex-Bedruckung d=nach Glasgeländer, VSGGlasstatik d=nach Glasstatik

OG Kinderzimmer FOK +3,22 RDOK +3,08

innen

Fensterbank, Kunststein Gefälle 2% +6,95 OK Waschsockel +4,12 Latexanstrich Kinderzimmer dauerelastische Fuge

Einbau aller Elemente lt. ÖNORM +7,00 -AnschlussOK innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

OK +7,00

UK abgehängte Decke STUK +5,92

AbdichtungAbdichtung

RDVK

BESTAND

Innenwand, nicht tragend Gipskartonständerwand

Dachabdichtungsfolie

Abdeckblech, Anthrazit Farbe nach Wahl Arch. OK F02 Dampfsperre

A

RDUK +6,07

DET.6.102.5 DET.6.102.6

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

Kinderzimmer dauerelastische Fuge

Fassadenschnitt 6.201

Dampfsperre

20 12

RDUK -0,12

10

RDOK +6,27

OK +7,00

Abschlußprofil +5,21 Winkelprofil dauerelastische Fuge Trennstreifen/Spachtelung

Abdichtung

31

10

Abdeckblech, Anthrazit RDOK Farbe nach Wahl Arch. OK +6,27 Dachabdichtungsfolie Dampfsperre +6,95

UK abgehängte Decke +5,92 RDUK +6,07 Winkelprofil RDOK +6,27 Trennstreifen/Spachtelung DET.6.410.2 DET.6.410.3 UK abgehängte Decke Dampfsperre +5,92 OK

einzelne Montagewinkel (thermisch getrennt)

15

Beton

Ziegel

BAUVORHABEN

A-8530 Deutschla GST. Nr. 400 / 1 KG: 61059 Sulz E

Dämmung weich INDEX A: ...

DETA

BAUVORHABEN

Um- und Zubau Wohnhau Franz-Pichler-Weg 12 A-8530 Deutschlandsberg GST. Nr. 400 / 1 KG: 61059 Sulz EZ: 194

INDEX A: ...

N

HÖHENBEZU

dauerelastische Fuge 15

5

20

Arch.D Staatl Zivilte

15

Indus A-40 Tel.: Fax:

dauerelastische Fuge

Albert A-108 Tel.: + Fax: +

08.04.2013

A

innen

Profile Farbe Anthrazit

Fenstertür Drehkipp-Beschlag

Um- und Zubau

Dämmung Franz-Pichler-Weg hart

DATUM

10

A

OK +6,95

Gefälle 2%

20

DET.6.102.6 DET.6.102.5

Farbe nach Wahl Arch.

Gefälle 2%

Umlaufender Kiesstreifen 10

0

229

RDOK +/-0,00

OK +4,12

Tropfblech, xxx

Parapet aussen Fixverglasung Einbau aller Elemente lt. mit ÖNORM flächenbündig PH=0 PH+0,60 -Anschluss innen dampfdicht Fassadenpanelle -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) 6 Angabenlt.Bauphsik Einbau aller-lt. Elemente ÖNORM Verglasung, klar -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, Verglasung, farbig FOK+0,15 (wind + schlagregendicht) Farbe nach Wahl Arch. -lt. Angaben Bauphsik Parapet Fixverglasung aussen PH=0 PH+0,60 flächenbündig mit Montagewinkel Fassadenpanelle

OK+0,15

F07

FOKRDUK +0,15 -0,12

+5,92

U-Winkel

6

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht einzelne Montagewinkel -Anschluss aussen diffusionsoffen, (thermisch getrennt) (wind + schlagregendicht) Angabenlt.Bauphsik Einbau aller-lt. Elemente ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

KantenschutzFuge dauerelastische Fassadenschnitt 6.201 Abdeckblech, Anthrazit dauerelastische Fuge Fensterbank, Kunststein A OK +7,00

DET.6.102.5 DET.6.101.4

einzelne Montagewinkel (thermisch getrennt)

W10

A

+5,90 OK +4,12

A

Gefälle 2%

DET.6.410.3

Fensterbank, Kunststein STUK UK abgehängte Decke

Abdichtung

FOK+0,15

Estrichrandstreifen 31 dampfdichter Anschluss

B A dauerelastische Fuge +6,07

A

Abdichtung

dauerelastische Fuge

dauerelastische Fuge

10

RDUK

B

Abdichtung

RDUK -0,12

+ 0,44

+ 0,04

dauerelastische Fuge

Abdichtung

Formrohr, xxx lt.Statik

,0 93

Terrasse Holzdeck

Profile Farbe Anthrazit 31 Arch. nach Wahl

Rigol

RDOK +/-0,00

RDVK

+/-0,00

FOK +0,15

Terrasse Holzdeck

dampfdichter Anschluss Gang

+ 0,44

+0,15 + 0,04 Kantenschutz

Fixverglasung aussenGlasgeländer, VSG Abschlußprofil Einbau aller Elemente lt. ÖNORM d=nach Glasstatik flächenbündig mit dauerelastische Fuge -Anschluss innen dampfdicht Leibungsverkleidung Fassadenpanelle Fassadenpaneel -Anschluss aussen diffusionsoffen, 15 (wind + schlagregendicht) -lt. Angaben Bauphsik Glaseinfassung

W10

durchlaufendes U-Profil lt.Statik

OK +0,15

Dachabdichtungsfolie Umlaufender Kiesstreifen

Umlaufender Kiesstreifen DET.6.101.4

Abdichtung

0,5cm Beschichtung Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht 7,0cm Heizestrich -Anschluss aussen diffusionsoffen, Folie (wind + schlagregendicht) dauerelastische Fuge 3,0cm Trittschall-Dämmplatte durchlaufendes U-Profil RDUK 3,0cm Beschichtung gebundene Leichtschüttung 0,5cm lt.Statik +2,88 BESTAND 1,5cm Heizestrich Abdichtung 3 - lagig (bituminös) 7,0cm Abschlußprofil FOK+3,06 12,0cm Unterbeton (Neubau) Grundriss Obergeschoss Folie dauerelastische Fuge 20,0cm Glasschaumschotter 3,0cm Trittschall-Dämmplatte Unterbauplanum 3,0cm gebundene Leichtschüttung 1,5cm Abdichtung 3 - lagig (bituminös) 12,0cm Unterbeton (Neubau)EG Gang OK FOK +0,15 +0,60 Gang20,0cm Glasschaumschotter RDOK +/-0,00 Unterbauplanum Profile 0,5cm Beschichtung OK Farbe Anthrazit 7,0cmObergeschoss Heizestrich Grundriss +0,60 Wahl Arch. Gang nach Folie dauerelastische Fuge 3,0cm Trittschall-Dämmplatte Profile 3,0cm gebundene F07Leichtschüttung Estrichrandstreifen RDVK Farbe Anthrazit 1,5cm Abdichtung 3 - lagig (bituminös) Formrohr, xxx EG Gang nach Wahl Arch. Rigol 12,0cmFOK Unterbeton (Neubau) dampfdichter Anschluss lt.Statik FOK +0,15 +0,15 RDOK +/-0,00 OK+0,15 dauerelastische Fuge20,0cm Glasschaumschotter FOK+0,15 Unterbauplanum F07 Estrichrandstreifen RDOK 0°

A

10

+ 0,04

AbdichtungAbdichtung

31

OK +0,60

UK abgehängte Decke +5,92 RDUK +6,07 RDOK + 0,04 dauerelastische Fuge +6,27 STUK Dampfsperre UK abgehängte Decke +5,90 +5,92 OK

Detail 6.103.2 - Schiebetür Detail / Deckenanschluss 6.103.2 Detail - Schiebetür 6.103.2 - Schiebetür / Deckenanschluss / Deckenanschluss

31

FOK+3,06

SCHNITT Q

RPH +4,12 FPH +4,12

SCHNITT Q durchlaufendes U-Profil lt.Statik

W10

Abschlußprofil dauerelastische Fuge

BESTAND

Dachabdichtungsfolie

STUK +5,90

OK +7,00

W10

DET.6.106.2 DET.6.106.1

Gefälle 7,7%

226,5 226,5

dauerelastische Fuge

RDUK +2,88 RDOK +3,08

1,5

Montagewinkel dauerelastische Fuge

F02

01,5 10

durchlaufendes U-Profil lt.Statik

6,4

Rigol

Rigol im Mörtelbett

SCHNITT Q

108,2

31 dauerelastische Fuge RDUK Estrichrandstreifen +2,88 Abschlußprofil dampfdichter Anschluß FOK dauerelastische Fuge +3,22

Schiebetürelement

Rigol im Montagewinkel Verglasung, Mörtelbettfarbig durchlaufendes U-Profil Farbe nach Wahl Arch. lt.Statik Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht Montagewinkel -Anschluss aussen diffusionsoffen, Verglasung, klar (wind + schlagregendicht) d=nach Glasstatik -lt. Angaben Bauphsik

RDOK +3,08

229

Montagewinkel (thermisch getrennt) lt.Statik Abschlußprofil dauerelast.Fuge

DET.6.408.3

FASSADENSCHNITT 6.106

FASSADENSCHNITT 6.106 DET.6.106.2 DET.6.106.1

Gefälle 7,7%

27

Verglasung, klar Verglasung, farbig Farbe nach Wahl Arch. Einbau aller Elemente lt. ÖNORM Montagewinkel (thermisch getrennt) -Anschluss innen dampfdicht lt.Statik Verglasung, farbig -Anschluss aussen diffusionsoffen, Abschlußprofil durchlaufendes Farbe nach dauerelast.Fuge Wahl Arch. (wind + schlagregendicht) 7 U-Profil Angabenlt.Bauphsik Einbault.Statik aller-lt. Elemente ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, Rigol im klar Verglasung, (wind + schlagregendicht) Verglasung, klar Mörtelbett d=nach Glasstatik -lt. Angaben Bauphsik

+3,22

Glasboden lt.Glasstatik Litex-Bedruckung Design nach Wahl Arch.

-Anschluss aussen diffusionsoffen, (wind + schlagregendicht) W10 -lt. Angaben Bauphsik

RDUK Gefälle 2% +6,07

Kantenschutz

C

Konsole Seilführung Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht punktuell

DET.6.408.3

BESTAND Einbau aller Elemente lt. ÖNORM DA02 FOK -Anschluss innen dampfdicht Stufenisolierglas d= nach Glasstatik RDUKF02 +3,22 Umlaufender Kiesstreifen -Anschluss aussen diffusionsoffen, Estrichrandstreifen Waschsockel Gefälle 2% +6,07 (wind + schlagregendicht) 10 20 10 Latexanstrich 10 STUK UK abgehängte Decke Dachabdichtungsfolie RDOK +5,90 -lt. Angaben BauphsikW10 verlaufend mit Glasdachdauerelastische Fuge Kantenschutz Randprofil +3,08 dauerelastische Fuge dauerelastische Fuge Einbau aller Elemente lt. ÖNORM FOK -Anschluss innen dampfdicht +3,22 Estrichrandstreifen Einbau aller Elemente lt. ÖNORM Einbau aller Elemente lt. ÖNORM -Anschluss aussen diffusionsoffen, Dampfsperre -Anschluss innen dampfdicht -Anschluss innen dampfdicht SCHNITT Q 15 -Anschluss aussen diffusionsoffen, -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) RDOK (wind + schlagregendicht) (wind + schlagregendicht) Angaben BESTAND +3,08 Einbau aller-lt. Elemente lt.Bauphsik ÖNORM -lt. Angaben Bauphsik -lt. Angaben Bauphsik Kinderzimmer DA02 -Anschluss innen dampfdicht Stufenisolierglas d= nach Glasstatik Tropfblech, xxx Leibungsverkleidung RDUK -Anschluss aussen diffusionsoffen, F02 Fassadenpaneel +6,07 15 (wind + schlagregendicht) Waschsockel RDUK STUK UK abgehängte Decke -lt. Angaben BauphsikW10 +5,90 +2,88 Latexanstrich verlaufend mit GlasdachEinbau aller Elemente lt. ÖNORM: Glaseinfassung dauerelastische Fuge Kantenschutz Randprofil Fixverglasung aussen dauerelastische Fuge -Anschluss innen dampfdicht Abschlußprofil U-Winkel dauerelastische Fuge FOK -Anschluss aussen diffusionsoffen, Tropfblech, xxx flächenbündig mit dauerelastische Fuge Estrichrandstreifen (wind + schlagregendicht) +3,22 Fassadenpanelle

Verglasung, klar

RDOK +3,08

dampfdichter Anschluß FOK

6,4

AbdichtungAbdichtung

Verglasung, klar

C

RDOK +6,27

Dampfsperre

Umlaufender Kiesstreifen

DET.6.408.3 DET.6.407.4

Sonnenschutz Raffstore, Unterputzsystem, manuell, einzelne Montagewinkel seilgeführt, (thermischAnordnung getrennt) lt. Bauphysik Einbau Sonnenschutz aller ElementeRaffstore, lt. ÖNORM Unterputzsystem, manuell, -Anschluss innen dampfdicht seilgeführt, Anordnung -Anschluss aussen diffusionsoffen, lt.(wind Bauphysik + schlagregendicht) Leibungsverkleidung -lt. Angaben Bauphsik Fassadenpaneel

Luftraum Ansichtsfläche Schiebetürkonstr.EG 6,4

F02

Abdichtung

Fixverglasung aussen flächenbündig mit Fassadenpanelle

Glasgeländer, VSG

Estrichrandstreifen d=nach Glasstatik

Abdichtung

Montagewinkel (thermisch getrennt) lt.Statik

RDVK

8F02

6,4 dampfdichter Anschluß FOK dauerelastische Fuge +3,22

Abdichtung

Detail 6.102.6 - Horizontalschnitt - Verglasungsanschluss - Schwert

C

Estrichrandstreifen

31

Abdichtung

Detail 6.102.5 - Horizontalschnitt -Fensteranschlüsse

Leibung Fassadenpaneel

Tropfblech, beschichtet, Farbe Anthrazit nach Wahl Arch.

C

Litex-Bedruckung Design nach Wahl Arch. Stegkonstruktion Stahlbauteile lt.Statik 108,2

Luftraum Wintergarten

Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) dauerelastische Fuge

7

aussen aussen

RDUK +6,07

dauerelastische Fuge Glasboden lt.Glasstatik Fassadenpaneel

Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) dauerelastische Fuge

RDVK

Abdi

20

10

10

1,5 W10

Tropfblech Farbe nach Wahl Arch.

B

A

OK +7,00

Konsole Seilführung STUK OG Gang UK abgehängte Decke punktuell FOK +3,22 +5,90 Leibungsverkleidung Abschlußprofil Ganzglas-Ecke,verklebt +5,92 RDOK +3,08 Fassadenpaneel Verglasung,klar Raffstore, Einbau allerSonnenschutz Elemente lt. ÖNORM Kantenschutz Unterputzsystem, manuell, -Anschluss innen Seilführung dampfdicht Konsole FOK+3,22 dauerelastische Fuge -Anschluss aussen diffusionsoffen, seilgeführt, Anordnung RDVK punktuell 8 Umfassungszarge, Stahl Garagentür EI230-C lt. Bauphysik (wind + schlagregendicht) Schattennut Fassadenpaneel Luftraum Angabenlt.Bauphsik Ansichtsfläche Schiebetürkonstr.EG Einbau aller-lt. Elemente ÖNORM Stegkonstruktion Stahlbauteile lt.Statik -Anschluss innen dampfdicht Verglasung, klar -Anschluss aussen diffusionsoffen, OG Gang (wind + schlagregendicht) Glasgeländer,FOK VSG+3,22 Abschlußprofil Ganzglas-Ecke,verklebt d=nach Glasstatik RDOK +3,08 -lt.Leibungsverkleidung Angaben Bauphsik Verglasung,klar Luftraum Fassadenpaneel

198

211

10

Fixverglasung aussen flächenbündig mit Fensterelement

A

FOK+3,22

Rigol

Abdichtung

A

B

Wintergarten

RDVK

W10

Anschluss an Verglasungsprofil 5-10mm Mineralwolle o.ä. Fuge dauerelastisch verschließen

Montagewinkel (thermisch getrennt) lt.Statik FOK +3,22 bis +3,19 RDOK +3,08 Einbau aller Elemente lt. ÖNORM: -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht)

Rigol

Detail 6.103.1 - Schiebe

10

A

durchlaufendes 7 U-Profil lt.Statik

durchlaufendes U-Profil lt.Statik

Detail 6.101.1 - Fassadenverglasung Detail 6.101.1 Detail / Sockel - Fassadenverglasung 6.101.1 - Fassadenverglasung / Sockel / Sockel

10 Kantenschutzprofil

A

A

Verglasungsprofile Farbe Anthrazit nach Wahl Arch.

Umfassungszarge, Stahl Schattennut

Garagentür EI230-C

Detail 6.101.2 - Fixverglasung Detail/ 6.101.2 Deckenanschluss Detail - Fixverglasung 6.101.2 - Fixverglasung / Deckenanschluss / Deckenanschluss

211

20

RPH +4,12 FPH +4,12

198

Detail 6.104.4 - Horizontalschnitt -Fixverglasung / Wandanschluss

10

Fensterelement Drehkipp-Beschlag

OK +0,15

Kantenschutz

B

Fassadenschnitt 6.103

SCHNITT L

Detail 6.102.1 - Fixvergl

innen

+5,90

Einbau aller Elemente lt. ÖNORM -Anschluss dampfdicht einzelneinnen Montagewinkel -Anschluss(thermisch aussen diffusionsoffen, getrennt) (wind + schlagregendicht) Angabenlt.Bauphsik Einbau aller-lt. Elemente ÖNORM DET.6.407.4 -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, OK OK +3,22 (wind+3,22 + schlagregendicht) -lt. Angaben Bauphsik + 2,66 + 2,66

Gefälle Anthrazit 2% Abdeckblech, RDOK Farbe nach Wahl Arch. OK Dachabdichtungsfolie +6,27 +6,95 Dampfsperre

A

Gefälle 2% A

B

OK +7,00

A

Abdichtung

innen

dauerelastischeSTUK Fuge

SCHNITT L

Fensterbank Kunststein

Kantenschutz

+ 2,66

einzelne Montagewinkel OK +7,00 C (thermisch getrennt) C

SCHNITT L

RPH +4,12 FPH +4,12

UK abgehängte Decke + 2,66 +5,92 RDUK +6,07 RDOK + 0,04 + 0,04 +6,27 UK abgehängte Decke Dampfsperre +5,92

27

Detail 6.101.3 - Fixverglasung Detail/ 6.101.3 Attika Detail - Fixverglasung 6.101.3 - Fixverglasung / Attika / Attika

Leibung mit Glaselement

Absturzsicherung VSG H=100 Montage an Stockrahmen Raffstore beachten aussen

Fixverglasung aussen flächenbündig mit Fensterelement Tropfblech, beschichtet Farbe Anthrazit nach Wahl Arch.

Fenstertür Drehkipp-Beschlag

Profile Farbe Anthrazit nach Wahl Arch.

innen

Vorgehängte, hinterlüftete Fassade Verkleidung Glaspaneel, Farbe xxx

1

5 15

dauerelastische Fuge

Abdi

OG Schlafzimmer Eltern FOK +3,22 RDOK +3,08

STUK +5,90

OK +3,22

Gefälle 2%

Fassadenschnitt 6.102

OK +6,95

Umlaufender Kiesstreifen

SCHNITT L

OG Kinderzimmer FOK +3,22 RDOK +3,08

Dachabdichtungsfolie OK +3,22

SCHNITT L

Einbau aller Elemente lt. ÖNORM -Anschluss innen dampfdicht -Anschluss aussen diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik

RDUK Gefälle 2% +6,07

FOK +3,22 bis +3,19 RDOK +3,08

Montagewinkel Fixverglasung aussen durchlaufendes Einbau aller Elemente lt. ÖNORM U-Profil (thermisch getrennt) lt.Statikmit flächenbündig lt.Statik -Anschluss innen dampfdicht -Anschluss aussenFassadenpanelle diffusionsoffen, (wind + schlagregendicht) Fixverglasung aussen SCHNITT Q -lt. Angaben Bauphsik flächenbündig mit Fassadenpanelle Fassadenpaneel

A

Innenwand, nicht tragend Gipskartonständerwand

Dampfsperre

Umlaufender Kiesstreifen

7

Montagewinkel (thermisch getrennt) Einbau aller Elemente lt. ÖNORM lt.Statik -Anschluss innen dampfdicht aller Elemente lt. ÖNORM: -AnschlussEinbau aussen diffusionsoffen, -Anschluss innen dampfdicht Verglasung, klar (wind + schlagregendicht) -Anschluss aussen diffusionsoffen, d=nach Glasstatik (wind + schlagregendicht) Angabenlt.Bauphsik Einbau aller-lt. Elemente ÖNORM -Anschluss innen dampfdicht -Anschluss aussenFassadenpaneel diffusionsoffen, (wind + schlagregendicht) -lt. Angaben Bauphsik SCHNITT Q Montagewinkel (thermisch getrennt) lt.Statik Fassadenpaneel

A

Abdi

10

RDOK +6,27

A

A

OK +7,00

C

dauerelastische Fuge

Verglasung, klar d=nach Glasstatik

A

A

B

SCHNITT L

Detail 6.105.2 - Horizontalschnitt -Fixverglasung / Fenstertür / Wandanschluss

20

20 12

A

Fassadenpaneele Eckbildung mit Glasüberstand

15

Montagewinkel

20 10

A

A

A

RDUK -0,12

OK +7,00

OK +0,15

durchlaufendes U-Profil lt.Statik

31

Gefälle 2% A

Gefälle 2% Abdeckblech, Anthrazit Farbe nachRDOK Wahl Arch. OK Dachabdichtungsfolie +6,27 +6,95B A C Dampfsperre

Abdeckblech, Anthrazit Farbe nach Wahl Arch.

A

Gefälle 2%

OK +7,00

Übersicht Ansicht Übersicht Süd Ansicht Süd

Umlaufender Kiesstreifen Dachabdichtungsfolie Umlaufender Kiesstreifen

DET.6.408.2

10

Gefälle 2%

Dachabdichtungsfolie Umlaufender Kiesstreifen

OK +6,95

Übersicht Ansicht Übersicht West Ansicht West

Detail 6.102.4 - Fenstersturz Detail / Attika 6.102.4 Detail - Fenstersturz 6.102.4 - Fenstersturz / Attika / Attika

10

Übersicht Ansicht Übersicht Ost Ansicht Ost Umlaufender Kiesstreifen

Abdeckblech, Anthrazit Farbe nach Wahl Arch.

A

Gefälle 2%

OK +7,00

OK +6,95

Fassadenschnitt 6.103

Abdichtung

OK +6,95

Abdeckblech, Anthrazit Farbe nach Wahl Arch.

A

Gefälle 2%

OK +7,00

Detail 6.103.3 - Fixverglasung Detail/ 6.103.3 Sonnenschutz Detail - Fixverglasung 6.103.37 - Fixverglasung / Sonnenschutz / Sonnenschutz

Abdeckblech, Anthrazit Farbe nach Wahl Arch.

A

OK +6,95

Fassadenschnitt 6.102

DET.6.407.3

Gefälle 2%

Detail 6.104.1 - Fassad RDUK -0,12

RDOK -1,00

Fassadenschnitt 6.103

Abdeckblech, Anthrazit Farbe nach Wahl Arch.

A

Gefälle 2%

OK +7,00

Detail 6.103.1 - Schiebetür Detail / Sockel 6.103.1 Detail - Schiebetür 6.103.1 - Schiebetür / Sockel / Sockel

OK +6,95

RDVK

FASSADENSCHNITT 6.106

innen

Fassadenschnitt 6.102

Abdeckblech, Anthrazit Farbe nach Wahl Arch.

A

Schiebetürelement

DET.6.106.2

OK +0,15

Gefälle 2%

DET.6.407.2

Fassadenschnitt 6.101

20-34cm Substrat OK +7,00 Bewässerungsmatte Vlies / Wurzelschutzschicht 2cm Wasserspeicher + Drainagematte Fenstertür Fenstertür 20-34cm Vlies Substrat Profile Farbe Anthrazit Profile Farbe Anthrazit Drehkipp-Beschlag Drehkipp-Beschlag 0,5cm Dachabdichtung (Foliendach) Bewässerungsmatte nach Wahl Arch.nach Wahl Arch. 2-16cm Gefälledämmung Vlies / Wurzelschutzschicht 14cm EPS 2cm Wärmedämmplatte Wasserspeicher + Drainagematte Fassadenschnitt 6.101 0,5cm Dampfsperre (Klebefolie mit Alueinlage) Vlies Fixverglasung aussen Fixverglasung aussen 20cm Stahlbetonplatte 0,5cm Dachabdichtung (Foliendach) flächenbündig mit flächenbündig Fensterelement mit Fensterelement 15cm Abgehängte Decke OK +7,00 2-16cm Gefälledämmung Tropfblech, beschichtet Tropfblech, beschichtet 0,5cm 14cm Spachtelung Wärmedämmplatte EPS Farbe Anthrazit nach FarbeWahl Anthrazit Arch.nach Wahl Arch. 0,5cm Dampfsperre (Klebefolie mit Alueinlage) 20cm Stahlbetonplatte aussen aussen AbsturzsicherungAbsturzsicherung VSG H=100 VSG H=100 20-34cm Substrat Montagewinkel Montagewinkel 15cm Abgehängte Decke 1 1 Montage an Stockrahmen Montage an Stockrahmen Bewässerungsmatte 0,5cm Spachtelung Raffstore beachten Raffstore beachten Vlies / Wurzelschutzschicht FassadenpaneeleFassadenpaneele 2cm Wasserspeicher + Drainagematte Leibung mit Glaselement Leibung mit Glaselement Eckbildung mit Glasüberstand Eckbildung Vlies mit Glasüberstand Vorgehängte, hinterlüftete Vorgehängte, Fassade hinterlüftete Fassade 0,5cm Dachabdichtung (Foliendach) Verkleidung Glaspaneel, Verkleidung Farbe Glaspaneel, xxx Farbe xxx 2-16cm Gefälledämmung 14cm Wärmedämmplatte EPS glasung alschnitt /-Fixverglasung Wandanschluss/ Wandanschluss Detail 6.105.2 - Horizontalschnitt Detail 6.105.2 - Horizontalschnitt -Fixverglasung /-Fixverglasung Fenstertür / Wandanschluss / Fenstertür / Wandanschluss 0,5cm Dampfsperre (Klebefolie mit Alueinlage) 20cm Stahlbetonplatte 15cm Abgehängte Decke 0,5cm Spachtelung

Montagewinkel

RDOK -1,00

15

Detail 6.102.2 - Fixverglasung Detail/ 6.102.2 Deckenanschluss Detail - Fixverglasung 6.102.2 - Fixverglasung / Deckenanschluss Detail / Deckenanschluss 6.102.3 - Fensterparapet Detail 6.102.3 Detail - Fensterparapet 6.102.3 - Fensterparapet

20

Detail 6.102.1 - Fixverglasung Detail/ 6.102.1 Sockel Detail - Fixverglasung 6.102.1 - Fixverglasung / Sockel / Sockel

15 5

Fassadenschnitt 6.101

RDUK -0,12

RDOK -1,00

B

20 15

A

5

OK +7,00

DET.6.106.1

A

15

OK +7,00

Montagewinkel

RDOK -1,00

INDEX

OG Schlafzimmer OG Eltern Schlafzimmer Eltern FOK +3,22 FOK +3,22 RDOK +3,08 RDOK +3,08 dauerelastische dauerelastische Fuge Fuge

innen

RDOK -1,00

BAUVORHA

PROJEKTNUMM

Naturmaß 1123

Diese Zeichnung bzw. Ausarbeitung ist geistiges Eigentum des Ar Verbindung mit einer anderen Arbeit oder einem anderen Projekt Geschriebene Planmasse auf dieser Zeichnung haben Vorrang ge auf der Baustelle verantwortlich zu ueberpruefen. Abweichungen

HÖHENBEZUG LT. NAT

Arch.DI Bettina Brunner ZT

Detail 6.101.1 - Fassad


HANDEL / D OG 3

BEGEGNUN

OG 3

BÜRO

OG 2

OG 2

OG 1

OG 1

PROGRAM LOBBY HANDEL /

ZIRKULATION

PROGRAMM

ANSCHLUSS ZUM BAHNHOF

LOBBY

ANLIEFERUNG UND TIEFGARAGEN EINFAHRT

HANDEL / DIENSTLEISTUNG / SPORT

RESTAURA

KONFERENZ HANDEL / DIENSTLEISTUNG / SPORT

BÜRO

RESTAURANT (BETRIEBSRESTAURANT)

BEGEGNUNGSRAUM BÜRO

BÜRO ATELIERS / ZEITBÜRO

EG

ATELIERS /

EG

KONFEREN

KONFERENZ MEDIATHEK / LOUNGE / BIBLIOTHEK

MEDIATHE

TECHNIKFLÄCHEN PARKPLÄTZE

UG -1

UG -1

TECHNIKFL

PARKPLÄT

UG -2

UG -2

5m

ATRAKTIVER DREHPUNKT

Zugänglichkeit

Arkaden im Quartier Belvedere

Akzentuierung

Hochwertige Mitte

X-Architekten & JDS

0

Wettbewerb Business Center A01 Business Center A.01” 101.003

5

Gärten

10

+20,50

-6,30

2013 Location: Wiedner Guertel, Hauptbahnoff Program: High-rise Office Buildings / Shopping (90.000 m2) Client: SIGNA Type: Closed Competition Status: Not selected Tasks demanded: Modell / Plan design / Conceptual ideas / Meetings

+20,50

-6,30

-6,30

+20,50

Regelgeschoss 1:200 [5.OG] -6,30

1. Untergeschoss 1:200

ABLEITUNG DES WINDES DURCH GEBÄUDEFORM WIND HAUPTRICHTING WEST NORDWEST


OG OG OG OG OG 8 OG OG OG7

OG

Geladener Wettbewerb Business Center A.01” OG 23 OG 22 OG 21 OG 20 OG 19 OG 18 OG 17 OG 16

OG 15 OG 14 OG 13 OG 12 OG 11 OG 10 OG 09

OG 8 OG 7

OG 6 OG 5

101.003 OG 23 OG 22 OG 21 OG 20 OG 19 OG 18 OG 17 OG 16

OG 15 OG 14 OG 13 OG 12 OG 11 OG 10 OG 09

OG 8 OG 7

OG 6 OG 5

Erschließung Das Konzept der Erschließung basiert im Prinzip auf einer klaren Trennung zwischen öffentlichen Zugängen und kontrollierten Eingängen (Schleuse). Es ist möglich jedem Eingang zum Büro- bzw. Hotelkomplex eine eigene Adresse zuzuordnen. Öffentliche Zugänge („Einschnitte“) zur Begegnungszone befinden sich am Südtiroler Platz, am Gürtel, an der GertrudeFröhlich-Sandner-Straße. Es besteht Anschluss an die Halle Nord des Bahnhofes über EG sowie auch UG1. Verbindung der Zugänge durch den Gebäudekomplex. Anbindung an den Bahnhof sowie der S-Bahn Station (Stiege 17). Die Ebenen der Mitte sind eigenständig durch Rolltreppen und Aufzüge erschlossen. Jeder der drei Baukörper besitzt einen kontrollierten Eingang (Lobby), der zu den Büros bzw. in das Hotel führt. Ausgehend von den Lobbys erschließen Kerne (Personen-, Lasten,- Feuerwehraufzüge und Fluchttreppenhäuser) den Gebäudekomplex in der Vertikalen.

ZIRKULATION OG 4

OG 4

OG 6 OG OG5

OG

OG 4 OG OG

OG 3

OG

OG 2

OG

OG 1

ANSCHLUSS ZUM BAHNHOF ANLIEFERUNG UND TIEFGARAGEN EINFAHRT

OG

KONFERENZ HANDEL / DIENSTLEISTUNG / SPORT OG 3

“Geladener Wettbewerb Business Center A.01”

OG 3

BEGEGNUNGSRAUM BÜRO

101.003 OG 2

OG 2

PROGRAMM

EG

OG

LOBBY HANDEL / DIENSTLEISTUNG / SPORT ZIRKULATION

PROGRAMM

OG 1

ANSCHLUSS ZUM BAHNHOF

LOBBY

ANLIEFERUNG UND TIEFGARAGEN EINFAHRT

HANDEL / DIENSTLEISTUNG / SPORT

OG 1

KONFERENZ HANDEL / DIENSTLEISTUNG / SPORT

BÜRO

RESTAURANT (BETRIEBSRESTAURANT)

BEGEGNUNGSRAUM BÜRO

BÜRO ATELIERS / ZEITBÜRO

EG

RESTAURANT (BETRIEBSRESTAURANT)

EG

ATELIERS / ZEITBÜRO

MEDIATHEK / LOUNGE / BIBLIOTHEK

MEDIATHEK / LOUNGE / BIBLIOTHEK

TECHNIKFLÄCHEN UG -1

UG -1

TECHNIKFLÄCHEN PARKPLÄTZE

UG -2

0

5

UG -

UG

UG -2

10

5m

UG

+20,50

ATRAKTIVER DREHPUNKT

+20,50

EG

KONFERENZ

KONFERENZ

PARKPLÄTZE

UG -


CONTEXT ARCHITECTS

Turbine City Exhibition @ DOGA 2011 Location: Doga, Oslo Program: Exhibition of the Turbine City Project (310 m2 room) Client: Doga Type: Commission Status: Completed Team: João Vieira Costa, Francisco Castelo Branco, Eugénio Cardoso, Leonor Cício Tasks demanded: “Info Booth” development / Modell making of the Turbines / Local montage



CONTEXT ARCHITECTS

S House

2011 Location: Miranda do Douro, Portugal Program: 160 m2 (house) Client: Julieta Type: Commission Status: Preliminar-study Team: João Vieira Costa, Francisco Castelo Branco, Eugénio Cardoso, Leonor Cício Tasks demanded: Concept / Modell / Plan design


CONTEXT ARCHITECTS

Scarps House

2011 Location: Miranda do Douro, Portugal Program: 160 m2 (house) Client: Julieta Type: Commission Status: Preliminar-study Team: João Vieira Costa, Francisco Castelo Branco, Eugénio Cardoso, Leonor Cício


MASTER THESIS

MEDIA FACADE 2010/11, FAUP Architectural Master Thesis oriented by Architect Pedro Gadanho

Media Facade is a new and recent architectural language introduced by the use of digital media displays on the surface of buildings. With the integration of a digital medium in the project’s development, the turns surface into a dynamic and a communicative membrane, which also represents a new aesthetic, functional and evolucionary expression on the discipline. For the subject, the historical geneses and concept evolution explores what a media facade is or can be, as an integrated element in architecture. The link between publicity and animated lights are the first approach of architecture as a media facade. “The simulated city” in the 90s, as Toyo Ito describes, represents today’s contemporary immaterial space of information that a media facade can translate into a formal building. The aesthetic expressions of an imateriallity are well known in the work of Jean Nouvel, as on the essays of Venturi’s “Architecture as signs and systems”. The integration of a “monitor effect” on the surface follows an “augmentation” of architecture as a cultural and informative building, generator of a new urban space. “What happens when tv leaves home and goes back to public space?” is the question made about the perception of architecture as it is envelopped by this media language in the 20th century; Projects like Peter Cook’s BIX, realities:united’s Spots, Led Action Façade, or N-Building relate new functions of a digital display integrated in the surface, while Diller Scofidio’s Blur or Nox’s D-Tower explore architecture as an expressive medium to find relations between tecnology and new ways of incorporating space and the invisible networks. “2010; A Space Odissey”: today, we may think of “media facade” beyond an ordinary tv set attached to a building; there are new opportunities of thinking the physical structure of architecture and the imaterial flux as a whole.


ABLE R O N HO ION MENT

2012 Location: Guimar達es Program: Hoax / Happening Client: Guimar達es European Capital of Culture Type: Open Competition Status: Honorable mention Team: Francisco Castelo Branco, Margarida Amial, Miguel Gomes, Cassandra Carvas

PERFORMANCE ARCHITECTURE


defined between comfortable spaces to stay or spaces of

and retails stores to the open plaza in front of the Market (allowing the continuity of the commercial activity in this space), and the coffee/restaurants along the closed squares. The Meeting Point is held by the Distillery (rehabilitated as a culture centre), and in front we decided to create a new special program for the block with a public Library (that can also function as an extension of the culture centre). With a school in the surrounding block, this is a good opportunity to bring a new program that can make the transition between the culture centre, the squares around and the building sculptured design as a ramp. Also in the ground level, roots for bicycles and terraces for the coffees are designed within the guidelines.

New Construction Purposes and Capacities

"Th

Our concept for the new construction of the Badel Block program that could deal at the same time with both day/ public range. The creation of this mixed use within the block has provid and a hotel above the ground level, while coffee houses, mark the street level. The urban space balances between squares with a more turned around the Distillery or the Playground area withi squares like the commercial plaza linked with the Market Library. In this point we also designed the parking entrance conne public space design.

Developing the upper floors, the idea is simple: in the middle axis of the block we have space for offices and on the last floors we made housing modules with roof terraces with a beautiful view over the block and the city. The plan of the proposed design was thought to take advantage for the best solar exposition in every situation, for both the program inside the buildings or the urban space. the Badel Block For this competition, our main goal was to obtain a concept design that could guarantee a quality urban space that could meet all the functional and spatial criteria required to create a new and modern segment of the city centre, while adding value to the wider urban area and providing a reminder of the historical development of the site. As so, the new Badel Block and its new identity with an urban sculpture that stretches the city into an exciting new meeting point, provide everyday an environmental quality space for its inhabitants and for the urban context of Zagreb

The program in the ground level is structured along the d and retails stores to the open plaza in front of the Market in this space), and the coffee/restaurants along the close The Meeting Point is held by the Distillery (rehabilitated a create a new special program for the block with a public L the culture centre). With a school in the surrounding block, this is a good opp transition between the culture centre, the squares aroun Also in the ground level, roots for bicycles and terraces fo

Developing the upper floors, the idea is simple: in the mi on the last floors we made housing modules with roof ter city.

The plan of the proposed design was thought to take adv tion, for both the program inside the buildings or the urb the Badel Block

For this competition, our main goal was to obtain a conce space that could meet all the functional and spatial criter the city centre, while adding value to the wider urban are opment of the site. As so, the new Badel Block and its ne the city into an exciting new meeting point, provide every ants and for the urban context of Zagreb

BADEL BLOCK COMPETITION 2012 Location: Zagreb, Croatia Program: Housing, Renovation Block, Pre-existent elements Client: DAZ Type: Open Competition Status: Not selected Team: Francisco Castelo Branco, Margarida Amial, Inês Lencastre

?

?



AN EMPTY URBAN SPACE TRANSFORMED INTO AN EXPLOSIVE URBAN SPACE

PROJECT V URBAN PROJECT 2010 FAUP Location: East Side of Porto, Portugal Program: Urban spaces and design , Refurbishment, Housing, Offices and development of new local and central opportunities

LOW COST HOTEL (3) RESTAURANTS SHOPPING BUSINESS CENTER (2) METRO AND TRAIN ACCESS CAR PARKING (1) BICYCLE PATHS GREEN ZONES HEALTH CLUB (4) ALL THIS COMBINED WITH HIGH-TECH MEDIA FACADES


EXHI

OFFICES

BITION SPACE

PROJECT IV MUSEUM

OFFICES EXHIBITION SPACE

SOCIAL SPACES PATIUM PUBLIC ACTIVITIES

D

NE

EFI

AN

D UN

AM

YS T

IC

white walls deny the poor surroundings, outstanding itself as a misterious box

an open patium in the interior turns all main activities into it

PI

EC

E

SUR

RO U

ND

ING

ON THE INSIDE

2009 FAUP Location: Matosinhos, Porto Program: 500 m2 Museum

FULLY DISCOVERED


PROJECT III HOUSING UNIT

2012 FAUP Location: Rotunda Boavista, Porto Program: Housing within an urban block development



PROJECT II MODULE

ED ECT HE SEL E OF TYEAR N E AS O OF TH 7 0 T / S 6 BE 200

2006 FAUP Location: Abstract Field Program: Module of a 3 and 2 rooms’ flat tipology


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.