Draft Revenue Policy 2020-2021

Page 1

REVENUE POLICY 2020 - 2021

Record No: 20/27051 Adopted: Proposed by 31 July 2020

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 1


Document Title

REVENUE POLICY 2020 - 2021

Council Adopted

Proposed by 31 July 2020

Council Resolution No

Enter Resolution No

Version Number

1.0

Responsible Department

CORPORATE AND COMMUNITY SERVICES

Date to be Reviewed

Enter Review Date

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 2


Table of Contents 1.

Proposed Rates.....................................................................................................................................................4

2.

Water Pricing ........................................................................................................................................................5

3.

Sewerage Pricing ..................................................................................................................................................6

4.

Waste Management .............................................................................................................................................7

5.

Waste Facility/Environmental Levy ......................................................................................................................8

6.

Onsite Sewerage Annual Management Fee .........................................................................................................8

7.

Statement of Borrowings .....................................................................................................................................9

8.

Proposed Capital Works/Expenditures ................................................................................................................9

9.

Private Works .......................................................................................................................................................9

10. Proposed fees, charges and policies (Appendix 1) .............................................................................................10 11. Policy History ......................................................................................................................................................11 12. Reviews...............................................................................................................................................................11

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 3


1. Proposed Rates Under the NSW Government’s rate protection commitment, total approved rate income levels that were in place prior to the establishment of the new council will continue for a further two years, this being the last year. The proposed 2020/21 Revenue Policy for Federation Council includes a 2.6% increase in total general rate income in accordance with the NSW Government rate peg. Council’s 2020/2021 Ordinary/General rating revenue policy is summarised as follows:Rate Types

Category

Number of Assessments

Area

Former Corowa

Ad Valorem Amount in Cents

Base Rate

Yield $

$

Ordinary

Farmland

616

All

0.205791

$ 290.87

$ 2,018,775

Ordinary

Residential

5,604

All

0.350476

$ 290.87

$ 3,689,429

Ordinary

Business

557

All

0.602389

$ 290.87

$ 737,614 * $ 6,445,818

Total Rateable Assessments: Rate Types

Category

6,777 Number of Assessments

Total Ordinary Rate Yield: Area

Former Urana

Ad Valorem Amount in Cents

Minimum Rate

Yield $

$

Ordinary

Farmland

503

All

0.245390

$ 135.56

$ 1,614,142

Ordinary

Residential

557

All

1.815475

$ 211.00

$ 135,883

Ordinary

Business

107

All

1.604870

$ 211.00

$ 54,375

Total Rateable Assessments:

1,167

Total Ordinary Rate Yield:

$ 1,804,400

Farmland For land categorised Farmland (former Corowa Shire) it is proposed to levy an ad valorem amount of 0.205791c/$ with a base rate of $290.87 to yield $2,018,775 and for Farmland (former Urana Shire) it is proposed to levy an ad valorem amount of 0.245390c/$ with a minimum rate of $135.56 to yield $1,614,142. Residential For land categorised Residential (former Corowa Shire) throughout the Council Area it is proposed to levy an ad valorem amount of 0.350476c/$ with a base rate of $290.87 to yield $3,689,429 and for Residential (former Urana Shire) it is proposed to levy an ad valorem amount of 1.815475c/$ with a minimum rate of $211.00 to yield $132,883.

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 4


Business For land categorised as Business (former Corowa Shire) within Council Area it is proposed to levy an ad valorem amount of 0.602389c/$ with a base rate of $290.87 to yield $737,614 and for Business (former Urana Shire) it is proposed to levy an ad valorem amount of 1.604870c/$ with a minimum rate of $211.00 to yield $54,375.

2. Water Pricing Council's water charges are levied in accordance with the NSW State Government Best Practice Pricing Principles. Corowa, Howlong and Mulwala Water Charges The 2020/2021 water access charges will increase by 8.5% on the 2019/2020 charges. Residential water usage charges will be increased to $1.66 Kl with usage over 450 Kl at $2.40 per kl. Access Charges are as follows: Meter Sizes / Details

2019/20 Access Charges $

20mm

$105.00

Proposed 2020/2021 Access Charges $ $114.00

25mm

$165.00

$178.20

32mm

$267.00

$291.90

40mm

$423.00

$456.00

50mm

$657.00

$712.50

80mm

$1,683.00

$1,824.00

100mm

$2,625.00

$2,850.00

150mm

$5,907.00

$6,412.50

300mm

$23,640.00

$25,650.00

400mm

$42,024.00

$45,600.00

Water consumption to 450 kl

$1.60 per Kl

$1.66 per Kl

Consumption over 450 Kl

$2.35 per Kl

$2.40 per Kl

Parks and Gardens Water Water use for parks and gardens within the towns will be charged at a reduced rate of 50% of the standard fee. This recognises the cost of production and the community benefit derived from such use.

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 5


3. Sewerage Pricing Corowa, Howlong, Mulwala and Villages (Urana and Oaklands) The Residential Sewerage Access Charge for Corowa, Howlong and Mulwala is to be levied at $725.00 and for the villages of Urana and Oaklands the levy will be $647.00. The Corowa, Howlong and Mulwala vacant land sewer charge of $580.00 provides a concession in that these properties do not create a load on the sewer treatment works or pump stations. This is 80% of the full fee.

2019/2020

$705.00 $630.00 $564.00

Description of Charge

Residential sewerage access charge (Corowa, Mulwala & Howlong) Residential sewerage access charge Urana & Oaklands Vacant sewerage access charge (Corowa, Mulwala & Howlong) NB: 80% of $725.00

$ Amount Annual Proposed for 2020/2021

Numbers

Income raised (before pensioner rebates)

$725.00

4,605

$3,246,525

$647.00

335

$211,050

$580.00

149

$84,036

Corowa, Howlong and Mulwala Non-residential/Business & Industry: The following fees are based on best practice pricing. Meter Sizes / Details

20mm Water Service multiplied by discharge factor

2019/20 Sewer Access Charges $ $414.00

Proposed 2020/21 Sewer Access Charges $ $426.00

25mm Water Service multiplied by discharge factor

$645.00

$665.70

32mm Water Service multiplied by discharge factor

$1,059.00

$1,090.50

40mm Water Service multiplied by discharge factor

$1,650.00

$1,704.00

50mm Water Service multiplied by discharge factor

$2,580.00

$2,662.50

80mm Water Service multiplied by discharge factor

$6,600.00

$6,816.00

100mm Water Service multiplied by discharge factor

$10,320.00

$10,650.00

$1.35/Kl multiplied by consumption & discharge factor $705.00

$1.39/Kl multiplied by consumption & discharge factor $725.00

Cost of Waste Discharges to Sewer Minimum Combined Charge

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 6


4. Waste Management The Local Government Act 1993 does not allow domestic waste management to be subsidised from the general rate. All costs associated with collection and disposal of domestic waste must be financed from a charge(s) for that purpose: In accordance with Section 496 of the Local Government Act, 1993, Council make an annual Kerbside Waste Charges (a)(i) and (a)(ii) for the provision of domestic waste management services for each occupied property within the designated waste collection as detailed in the table below, or are located outside the designated area but use the service; In accordance with Section 496 of the Local Government Act, 1993, Council make an annual Domestic Waste Management Charge (b) of $42 per annum for each vacant property within the designated waste collection areas; In accordance with Section 501 of the Local Government Act, 1993, Council make an annual Business Kerbside Waste Charges (c)(i) and (ii) per annum for the waste management services for each property categorised as Business in accordance with Section 493 of the Act and where those properties are located within the designated waste collection; That in accordance with Section 501 of the Local Government Act, 1993, Council make an annual Rural Waste Management Charge (d) of $42 per annum for each property and where those properties are located outside Council’s designated waste collection areas;

(a) (I) All serviced ratepayers Section 496 (user charge) – serviced by Cleanaway – 3 bin service (a) (ii) All serviced ratepayers Section 496 (user charge) – serviced by private contractor – single bin service (b) All vacant land in serviced areas. Section 496 (user charge) (c) (i) Business Kerbside Waste Section 501 – serviced by Cleanaway – 3 bin service

5,323 services x $351

$1,868,373

404 services x $309

$124,836

482 services x $42

$20,244

429 services x $386

$165,594

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 7


(c) (ii) Business Kerbside Waste Section 501 – serviced by private contractor – single service (d) Rural Waste Management Charge Section 501

150 services x $340

$51,000

71 services x $42

$2,982

5. Waste Facility/Environmental Levy Council provides a Waste facility in Corowa and Howlong and a transfer station in Mulwala and in the former Urana Shire area disposal sites with limited access at Oaklands and Urana (including provisions for decommissioning when environmental issues occur). With Council having EPA compliance and associated landfill legacy issues at all sites that need improving an increase from $45 to $55 is needed.

It is proposed that the following charge be levied under Section 501 of the Local Government Act 1993: 2019/20

Description

2020/21

Quantity

Amount

$45

All ratepayers

$55

7,944 assessments

$436,920

6. Onsite Sewerage Annual Management Fee Council regulates properties with onsite sewerage management systems. This includes maintaining a register, risk rating, inspections and monitoring against performance standards. This management fee will be used to fund the inspection and management program.

It is proposed that the following charge be levied under Section 501 of the Local Government Act 1993: Description Non-sewered properties with dwellings/businesses

Quantity 1062 parcels x $20

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Amount $21,240

Page 8


7. Statement of Borrowings Provision has been made within the budget for the payment of principal and interest on loan borrowings. Borrowings Proposed external borrowings for the 2020 – 2021 Delivery Program is $5.09 million and includes:

Year

Description

$ Amount

2020/2021

Corowa Swimming Pool

$1.5 million

2020/2021 2020/2021

Howlong Industrial Estate All Abilities Playground Mulwala

$2.0 million $0.45 million

2020/2021

Urana Aquatic Centre

$0.34 million

2020/2021

LED Lighting Upgrade

$0.8 million

2022/2023

Mulwala Water Treatment

$2.0 million

2023/2024

Mulwala Water Treatment

$2.0 million

8. Proposed Capital Works/Expenditures Provision has been made within the budget for the proposed Capital Works encompassing asset renewal, upgrades and new works/projects. Proposed Capital Works/Expenditures for the two years 2019/2020 to 2021/2022 Delivery Program is $44,847,258 and is including the additional remaining merger funding provided by the NSW State Government for the newly created Federation Council:

Year 2020/2021 2021/2022 2022/2023 2023/2024

$ Amount $21,172,669 $15,135,021 $13,009,904 $11,569,711

9. Private Works "The Council may by agreement with the owner or occupier of any private land carry out on the land any kind of work that may lawfully be carried out on the land" (S.67(1)). Due to the unpredictable nature of costs relating to the supply of materials for Private Works undertakings, it is not possible to develop an accurate schedule of fees and charges that would apply for the coming twelve-month period.

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 9


“Council carries out work for external parties on private land. In performing this work Council is generating additional income and/or acting in a community service role. Income from these works will cover all incremental direct costs and overheads and where appropriate add a profit element. The profit element of pricing varies with the relevant organisations taking into account the considerations of service to the community and general market competitiveness." These private works include: 

Kerb and gutter construction (as per fees and charges),

Road and associated works contribution,

Drainage contribution,

Water supply related works, and

Sewerage and drainage connection.

Private Work’s charges will therefore be calculated on the basis of the cost to Council (inclusive of on-costs)/ normal market values plus a margin of 20% to cover administration and overhead costs. The total calculated cost will be subject to GST at the applicable rate (currently 10%).

It is strongly recommended that a quotation/estimate be obtained from Council prior to requesting/ordering Private Work’s undertakings. Note: In accordance with Council Private Works Policy, the client is to authorise the work and agree to pay the estimated cost prior to work commencing. The proposed private hire rates for each item of Council plant and fees for the supply of services and materials is shown within the Fees & Charges 2018/2019 listing.

10. Proposed fees, charges and policies (Appendix 1) (Provided in accordance with Section 404 of the Local Government Act 1993) The following statement provides details of each fee and charge levied by Federation Council under the provisions of Chapter 15 Part 10 of the Local Government Act 1993. It outlines the nature of each fee or charge and the pricing policy used by Council in setting each fee or charge. The fees and charges are presented under functional headings as provided by AAS27. Those goods and/or services subjected to GST have been identified in the attached Schedule of Fees and Charges as GST included.

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 10


Some goods and/or services supplied by Council have been declared "GST free" or are excluded under Division 81 of the legislation. For goods and/or services, which are "GST free" or excluded from GST no mention of GST appears in the Schedule of Fees and Charges.

11. Policy History Version

Date

1.0

24 June 2020

Changes / Amendments Original Policy for 2020/2021

12. Reviews Enter review schedule for the policy

NOTE: This is a controlled document. If you are reading a printed copy please check that you have the latest version by checking it on Councils Electronic Document system. Printed or downloaded versions of this document are uncontrolled.

Federation Council - REVENUE POLICY 2020 - 2021 Reference: 20/27051 Version No: 1.0

Page 11


Appendix 1: FEES & CHARGES 2020/2021

Record No: 20/27051 Adopted: Proposed by 31 July 2020

Federation Council - Appendix 1:FEES & CHARGES2020/2021 Reference: 20/27051 Version No: Enter background information relevant to this policy

Page 1


Table Of Contents Federation Council........................................................................................................................................6 Administration.............................................................................................................................................................6 Sundry Fees.................................................................................................................................................................................6 Dishonoured Cheque.......................................................................................................................................................................................6 Books for Sale..................................................................................................................................................................................................6

General Office Services..............................................................................................................................................................7 Plan Copies.......................................................................................................................................................................................................7 Photocopies......................................................................................................................................................................................................9 Others................................................................................................................................................................................................................9

Government Information (Public Access) Act........................................................................................................................10 Advertising in Urana District Newsletter.................................................................................................................................10 Council Compiled – Per Month.....................................................................................................................................................................10 Council Compiled – Per Annum....................................................................................................................................................................12 Customer Compiled – Per Month..................................................................................................................................................................13 Customer Compiled – Per Annum................................................................................................................................................................13 Monthly Posted Newsletter............................................................................................................................................................................14 Urana District Maps........................................................................................................................................................................................14

Rates...........................................................................................................................................................................................15 Certificates.................................................................................................................................................................................16

Public Order and Safety...........................................................................................................................................17 Pet registration annual permit..................................................................................................................................................17 Dog/Cat Lifetime Registrations................................................................................................................................................17 Impounding Fees.......................................................................................................................................................................18 Miscellaneous Impounding Fees..................................................................................................................................................................18 Companion Animals Release Fees...............................................................................................................................................................18 Sale of Impounded Dog/Cat...........................................................................................................................................................................18

Livestock Impounding...............................................................................................................................................................18 Cat cage......................................................................................................................................................................................19

Health.........................................................................................................................................................................20 Licences/Public Health Act.......................................................................................................................................................20

Environment..............................................................................................................................................................24 Noxious Weeds..........................................................................................................................................................................24 Waste Facility Levy....................................................................................................................................................................24 Waste Disposal Charges – Corowa, Howlong, Mulwala Transfer Station, Urana and Oaklands.......................................24 Wheelie bin......................................................................................................................................................................................................24 Small load........................................................................................................................................................................................................24 Medium load....................................................................................................................................................................................................25 Large load.......................................................................................................................................................................................................26 Truck load.......................................................................................................................................................................................................27 Construction and demolition.........................................................................................................................................................................27 Mattresses.......................................................................................................................................................................................................28 Asbestos.........................................................................................................................................................................................................28 Tyre..................................................................................................................................................................................................................29 Lounge.............................................................................................................................................................................................................30 eWaste.............................................................................................................................................................................................................31

Page 2 of 90


Polystyrene.....................................................................................................................................................................................................32 Others..............................................................................................................................................................................................................32

Bin Collection Services.............................................................................................................................................................33 Bin Collection Services – Urana, Oaklands, Rand, Morundah and Boree Creek.................................................................34

Community Services and Education.......................................................................................................................35 Preschool (Rand, Urana, Oaklands and Boree Creek)...........................................................................................................35

Housing and Community Amenities.......................................................................................................................36 Cemeteries.................................................................................................................................................................................36 Lawn Cemetery: Corowa, Howlong and Mulwala........................................................................................................................................36 Monumental Cemetery: Corowa, Howlong and Mulwala............................................................................................................................36 Interment of Ashes.........................................................................................................................................................................................36 Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield.........................................................................36 Plaques............................................................................................................................................................................................................37 Miscellaneous Charges..................................................................................................................................................................................37 Right of Burial (reservation of graves or ashes).........................................................................................................................................37

Water Supplies..........................................................................................................................................................38 Water Supply from Standpipe – Corowa.................................................................................................................................38 Water Supply from Standpipe – Urana, Boree Creek, Rand and Oaklands..........................................................................38 Water Supplies for Corowa, Mulwala and Howlong...............................................................................................................38 Access Charges..............................................................................................................................................................................................38 Usage Consumption Charges.......................................................................................................................................................................42 Water Charge for Balldale..............................................................................................................................................................................42 Connection Fees.............................................................................................................................................................................................42 ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................42

Water Meters..............................................................................................................................................................................43

Sewerage Services....................................................................................................................................................44 Residential Pricing....................................................................................................................................................................44 Maintenance Charges – Urana and Oaklands.........................................................................................................................44 Non-Residential Pricing............................................................................................................................................................44 Without Water Service...................................................................................................................................................................................44 With Water Service.........................................................................................................................................................................................44 Liquid Trade Waste Charges.........................................................................................................................................................................45 Category 1...........................................................................................................................................................................................................................................................................45 Category 2...........................................................................................................................................................................................................................................................................45 Category 3 – Large 20kL/day and industrial....................................................................................................................................................................................................................45 Excess Mass Charges........................................................................................................................................................................................................................................................45 Biochemical Oxygen Demand (BOD)................................................................................................................................................................................................................................45 ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................45

pH charges..........................................................................................................................................................................................................................................................................46 Tankered Waste..................................................................................................................................................................................................................................................................46 Reinspections.....................................................................................................................................................................................................................................................................46 Testing.................................................................................................................................................................................................................................................................................46

Sewerage Drainage Plans..............................................................................................................................................................................46

Miscellaneous Charges.............................................................................................................................................................46

Recreation and Culture.............................................................................................................................................48 Urana Ski & Aquatic Committee...............................................................................................................................................48 Memberships..................................................................................................................................................................................................48 Equipment Hire...............................................................................................................................................................................................48

Hall and meeting room hire......................................................................................................................................................48 Hire of Hall, Boree Creek...............................................................................................................................................................................48 Functions.............................................................................................................................................................................................................................................................................48

Page 3 of 90


Hire of Other Items.............................................................................................................................................................................................................................................................48

Urana Chambers, Urana.................................................................................................................................................................................49 Small Community Group Meetings...................................................................................................................................................................................................................................49

Hire of Memorial Hall, Oaklands....................................................................................................................................................................49 Functions.............................................................................................................................................................................................................................................................................49

Hire of School of Arts Hall, Rand..................................................................................................................................................................49 Functions.............................................................................................................................................................................................................................................................................49 Hire of Tables and Chairs..................................................................................................................................................................................................................................................50

Hire of Soldiers Memorial Hall, Urana..........................................................................................................................................................50 Functions.............................................................................................................................................................................................................................................................................50

Itinerant Entertainment / Business Providers..............................................................................................................................................50 Large Hall Hire (Corowa Memorial Hall).......................................................................................................................................................51 Small – Medium Hall Hire (Odd Fellows, Mulwala Civic Centre, Howlong Community Centre)..............................................................52 Meeting Rooms (Corowa Civic Centre, Howlong Resource Centre).........................................................................................................52 Hall Bonds & Cleaning...................................................................................................................................................................................53

Swimming pools........................................................................................................................................................................54 Urana and Oaklands Swimming Pools.........................................................................................................................................................54 Howlong Swimming Pool...............................................................................................................................................................................54

Sports ground............................................................................................................................................................................55 Morundah Recreation Ground.......................................................................................................................................................................55 Facility Hire.........................................................................................................................................................................................................................................................................55

Victoria Park....................................................................................................................................................................................................55 Sporting Clubs Contribution.............................................................................................................................................................................................................................................55 Facility Hire.........................................................................................................................................................................................................................................................................55

Oaklands Recreation Ground........................................................................................................................................................................55 Functions.............................................................................................................................................................................................................................................................................55

Rand Sports Ground......................................................................................................................................................................................55 Sporting Clubs Contribution.............................................................................................................................................................................................................................................55

Mining, Manufacturing and Construction...............................................................................................................56 Transport and Communication................................................................................................................................57 Aerodrome Fees........................................................................................................................................................................57 Annual Landing Fees.....................................................................................................................................................................................57 Site Fees..........................................................................................................................................................................................................57

Heavy Vehicle Access Permit...................................................................................................................................................57

Economic Affairs.......................................................................................................................................................58 Caravan Park – Ball Park..........................................................................................................................................................58 Powered Sites.................................................................................................................................................................................................58 Unpowered Sites............................................................................................................................................................................................58 Cabins..............................................................................................................................................................................................................58

Caravan Park – Urana................................................................................................................................................................59 Unpowered Sites............................................................................................................................................................................................59 Powered Sites.................................................................................................................................................................................................59 Cabin 2-5.........................................................................................................................................................................................................59 Cabin 1(only)...................................................................................................................................................................................................59 Linen................................................................................................................................................................................................................60 Miscellaneous Caravan Park Fees................................................................................................................................................................60

Saleyards....................................................................................................................................................................................60 Drafting Fees & Holding.................................................................................................................................................................................60 Agent Yard Fees per head.............................................................................................................................................................................60 Disposal Fee...................................................................................................................................................................................................60 Feeding Fee.....................................................................................................................................................................................................60

Page 4 of 90


Truck Wash – Avdata Billing System...........................................................................................................................................................61 Ear tags...........................................................................................................................................................................................................61 Promotion........................................................................................................................................................................................................62

Private Works.............................................................................................................................................................................62 Miscellaneous.................................................................................................................................................................................................62

Development Fees....................................................................................................................................................64 Development Application Fees................................................................................................................................................64 Estimated Development Cost (GST exempt)...............................................................................................................................................64

Development Advertising Fees................................................................................................................................................64 Integrated / Designated / Development Requiring Concurrence...........................................................................................65 Subdivision Fees.......................................................................................................................................................................65 Other Planning and Environment Fees...................................................................................................................................66 Modification of Consent............................................................................................................................................................67 Review Development Determination Fees..............................................................................................................................67 Estimated Development Cost (GST exempt)...............................................................................................................................................67

Construction Certificates and Complying Development Certificates (Including GST) Fees..............................................68 Residential Class 10.......................................................................................................................................................................................68 ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................68

Residential Class 1.........................................................................................................................................................................................69 Commercial / Retail........................................................................................................................................................................................69 Industrial / Warehouse Class 7 & 8...............................................................................................................................................................69 Other................................................................................................................................................................................................................70 Construction Certificate and Inspections for Rural....................................................................................................................................70

Building Inspection Fees..........................................................................................................................................................70 Residential Class 10.......................................................................................................................................................................................70 Residential Class 1.........................................................................................................................................................................................70 Commercial/Retail Classes 2 to 6 and 9.......................................................................................................................................................70 Industrial/Warehouse Class 7 & 8.................................................................................................................................................................71 Other................................................................................................................................................................................................................71

Minor Development Packages..................................................................................................................................................71 Residential Minor Developments estimated cost........................................................................................................................................71

Building Certificate Sec 6.26....................................................................................................................................................72 Building Certificate Sec 6.26 – Authorised work.........................................................................................................................................72 Building Certificate Sec 6.26 – Unauthorised work.....................................................................................................................................72

Local Government Act Section 64 Developer Servicing Plans.............................................................................................72 Per Water Equivalent Tenement (ET)............................................................................................................................................................72 Per Sewerage Equivalent Tenement (ET).....................................................................................................................................................72 ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................72

Local Government Act Section 68 Approval...........................................................................................................................73 Plumbing and Drainage (includes Application/Approval and Inspections)..............................................................................................73 Other Approvals.............................................................................................................................................................................................73

Riverina Regional Library Fees and Charges.........................................................................................................74 External Charges.......................................................................................................................................................................74

Page 5 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Federation Council Administration Sundry Fees Dishonoured Cheque Dishonoured Cheque Handling Fee

$25 + cost recovery Last YR Fee

$25 + cost recovery In addition to bank charges - as per cost to Council

Books for Sale Billabidgee – History of Urana

$35.00

$31.82

$3.18

$35.00

Page 6 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$10.00

$10.00

Year 20/21 GST

Fee (incl. GST)

Comment

General Office Services Plan Copies A2 – black and white

continued on next page ...

$1.00

$11.00

Our suggestion is the introduction of a new printing fee to be imposed when applications are lodged electronicall y. It is recommend ed that a minimum fee of $100 apply to applications that require the Council to be the applicant's printing service, which are very time consuming and an unnecessary drain on our limited resources. It is hoped that this fee will encourage applicants to fulfill their requirement s more expeditiousl y.

Page 7 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

A2 – colour

$15.00

$14.55

$1.46

$16.01

Our suggestion is the introduction of a new printing fee to be imposed when applications are lodged electronicall y. It is recommend ed that a minimum fee of $100 apply to applications that require the Council to be the applicant's printing service, which are very time consuming and an unnecessary drain on our limited resources. It is hoped that this fee will encourage applicants to fulfill their requirement s more expeditiousl y.

A2 – colour on glossy

$20.00

$19.09

$1.91

$21.00

Increase by rate peg to the nearest dollar

A1 – black and white

$20.00

$19.09

$1.91

$21.00

A1 – colour

$25.00

$23.64

$2.36

$26.00

Increase by rate peg to the nearest dollar

A1 – colour on glossy

$30.00

$28.18

$2.82

$31.00

Increase by rate peg to the nearest dollar

A0 – black and white

$30.00

$28.18

$2.82

$31.00

Increase by rate peg to the nearest dollar

A0 – colour

$35.00

$32.73

$3.27

$36.00

A0 – colour on glossy

$40.00

$37.27

$3.73

$41.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Plan Copies [continued]

Page 8 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

A4 – black and white

$0.25

$0.23

$0.02

$0.25

A4 – black and white – up to 10 copies

$0.22

$0.20

$0.02

$0.22

A4 – black and white – per sheet thereafter

$0.11

$0.10

$0.01

$0.11

A4 – black and white – double sided copy

$0.40

$0.36

$0.04

$0.40

A4 – colour

$0.55

$0.50

$0.05

$0.55

A4 – colour – double sided

$1.00

$0.91

$0.09

$1.00

A3 – black and white

$0.65

$0.59

$0.06

$0.65

A3 – black and white – per copy double sided

$1.00

$0.91

$0.09

$1.00

A3 – colour

$2.00

$1.82

$0.18

$2.00

A3 – colour – double sided

$3.00

$2.73

$0.27

$3.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Photocopies

Others Scanning (self service library only)

Free Last YR Fee

Free Facsimile – receive per page

$0.80

$0.73

$0.07

$0.80

Facsimile – send in AUS per page – first page

$2.50

$2.27

$0.23

$2.50

Facsimile – send in AUS per page – subsequent page(s)

$0.80

$0.73

$0.07

$0.80

Folding & Stapling per hour

$30.50

$27.73

$2.77

$30.50

Laminating – per A4 size sheet

$2.20

$2.00

$0.20

$2.20

Laminating – per A3 size sheet

$6.50

$5.91

$0.59

$6.50

Laminating – per poster size

$7.50

$6.82

$0.68

$7.50

Binding documents – Thermal binder

$8.80

$8.00

$0.80

$8.80

Binding documents – Hole Punch binder

$8.80

$8.00

$0.80

$8.80

In increments of 15 minutes

Page 9 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Government Information (Public Access) Act GIPA information – informal

$20.00

$20.00

$0.00

$20.00

This is a new fee introduced in 2019 mainly for people to access neighbour details. It is already reducing the amount of requests and any further increase may not be necessary and will not be financially advantageo us to Council by more than $5.00 per annum. Some stability for these fees will also assist customer service staff.

Application fee in accordance with the GIPA (Fees and Charges)

$30.00

$30.00

$0.00

$30.00

No changes to legislated fees.

Order Processing charge after first hour per hour

$30.00

$30.00

$0.00

$30.00

No changes to legislated fees.

$59.09

$5.91

$65.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be approporiate

Advertising in Urana District Newsletter Council Compiled – Per Month Full Page

continued on next page ...

$55.00

Page 10 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Council Compiled – Per Month [continued] Half Page

$35.00

$40.91

$4.09

$45.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be approporiate

Quarter Page

$23.00

$30.00

$3.00

$33.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be approporiate

Classified

$6.00

$9.09

$0.91

$10.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be approporiate

Thank you notices (including Obituaries and general thank you)

$6.00

$9.09

$0.91

$10.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Page 11 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Full Page

$530.00

$509.09

$50.91

$560.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Half Page

$332.00

$327.27

$32.73

$360.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Quarter Page

$200.00

$209.09

$20.91

$230.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Classified

$68.00

$65.45

$6.55

$72.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Council Compiled – Per Annum

Page 12 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Full Page

$40.00

$40.91

$4.09

$45.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Half Page

$30.00

$31.82

$3.18

$35.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Quarter Page

$15.00

$18.18

$1.82

$20.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

$400.00

$390.91

$39.09

$430.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Customer Compiled – Per Month

Customer Compiled – Per Annum Full Page

continued on next page ...

Page 13 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Customer Compiled – Per Annum [continued] Half Page

$265.00

$268.18

$26.82

$295.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Quarter Page

$135.00

$150.00

$15.00

$165.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Monthly Posted Newsletter Posted Newsletters

$3.50 per issue

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Last YR Fee

$2 per issue Outside of Council Boundary

Urana District Maps Property

continued on next page ...

$6.00

$7.27

$0.73

$8.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate Page 14 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Photocopies per single sheet

$4.00

$4.09

$0.41

$4.50

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Township Map Reduced – photocopy

$3.00

$3.18

$0.32

$3.50

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Council Road Network – laminated

$12.00

$11.82

$1.18

$13.00

No increase in long time and due to production costs, and rounding to the nearest dollar as advised, it was agreed this increase would be appropriate

Council Property Maps – laminated

$95.00

$87.27

$8.73

$96.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Urana District Maps [continued]

Rates Interest on overdue Rates and Charges

1 July 2020 to 31 December 2020 (inclusive) will be 0.0% per annum 1 January 2021 to 30 June 2021 (inclusive) will be 7.0% per annum Last YR Fee

7.50% The interest rate has been set at 0.0% for the first half of the 2020-21 financial year in response to the financial impacts faced by the community as a result of the COVID-19 Pandemic. Current year – copy of Rates and Water Notices

$25 per request Last YR Fee

$25 per request Provided within 10 working days Ratepayers are able to register for eNotices at https://federationcouncil.formsport.com.au with current and historical record available in the portal. Following registration, rates and water notices will be delivered via email.

continued on next page ...

Page 15 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Rates [continued] Previous year – copy of Rates and Water Notices

$25 per request Last YR Fee

$25 per request Provided within 10 working days Ratepayers are able to register for eNotices at https://federationcouncil.formsport.com.au with current and historical record available in the portal. Following registration, rates and water notices will be delivered via email. Urgency Fee on provision of Rates and Water Notices

$50.00

$50.00

$0.00

$50.00

Provided within 3 working days Supply/Search of information from rating and allied records of Council by members of staff

$35 per half hour Last YR Fee

$35 per half hour Use of Valuer General Books without staff assistance

Free Last YR Fee

Free

Certificates Section 603 Rates Certificate

$85.00

$85.00

$0.00

$85.00

Section 603 Certificate and water meter reading

$150.00

$150.00

$0.00

$150.00

Water meter reading

$65.00

$65.00

$0.00

$65.00

Section 608 Outstanding Notice Certificate

$20.00

$21.00

$0.00

$21.00

Section 10.7 (2) Certificate

$53.00

$53.00

$0.00

$53.00

Section 10.7 (5) Certificate

$80.00

$80.00

$0.00

$80.00

Property Sewer Service Diagram

$75.00

$77.00

$0.00

$77.00

Certificate Section 735A

$60.00

$60.00

$0.00

$60.00

Certificate Section 121 ZP

$60.00

$60.00

$0.00

$60.00

Dwelling Entitlement

$80 per lot Last YR Fee

$80 per lot Bushfire Attack Level (BAL) Certificate

$385.00

$350.00

$35.00

$385.00

Swimming Pool Compliance Certificate (safety inspection e.g fencing)

$150.00

$136.36

$13.64

$150.00

Swimming Pool Compliance Certificate (safety inspection e.g fencing) – Reinspection fee

$100.00

$90.91

$9.09

$100.00

Priority Certificate Urgent Request

50% surcharge Last YR Fee

50% surcharge Extra Charge Applies to All Certificate Types Certificate cancellation fee

50% of original fee Last YR Fee

50% of original fee Page 16 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Public Order and Safety Pet registration annual permit From 1 July 2020 the NSW Government will also introduce annual permits for owners of non-desexed cats, restricted dog breeds, and dogs declared to be dangerous. Undesexed cats

$0.00

$80.00

$0.00

$80.00

In line with recent government changes to legislation.

This fee is applicable to owners of cats not desexed by four months of age in addition to their one-off lifetime pet registration fee. Restricted and declared to be dangerous dog breeds

$0.00

$195.00

$0.00

$195.00

In line with recent government changes to legislation.

Owners of dogs of a restricted breed or declared to be dangerous will be required to pay an annual permit in addition to their one-off lifetime pet registration fee. This applies to dogs that are already registered.

Dog/Cat Lifetime Registrations General (Not Desexed)

$207.00

$207.00

$0.00

$207.00

Desexed animal

$58.00

$58.00

$0.00

$58.00

Desexed animal owned by eligible pensioner

$25.00

$25.00

$0.00

$25.00

Registered Breeder

$58.00

$58.00

$0.00

$58.00

Includes pensioners

Working dogs

No charge Last YR Fee

No charge Dogs in the service of the State

No charge Last YR Fee

No charge Assistance animals

No charge Last YR Fee

No charge Microchipping

At cost Last YR Fee

At cost Certificate of Compliance

$150.00

$150.00

$0.00

$150.00

Required for dangerous and restricted dog enclosures

Page 17 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Impounding Fees Miscellaneous Impounding Fees Motor Vehicles

$64 per week + costs + 48% Last YR Fee

$62 per week + costs + 48% Shopping Trolley

$200.00

$50.00

$0.00

$50.00

Signs

$200.00

$200.00

$0.00

$200.00

Dog/Cat Release Fee

$50.00

$51.50

$0.00

$51.50

Daily Maintenance Fee Dog/Cat

$15.00

$15.50

$0.00

$15.50

Microchipping Fee

$55.00

$55.00

$0.00

$55.00

Reduced fee will encourage more trolleys to be collected from Council's impounding facility

Companion Animals Release Fees

Sale of Impounded Dog/Cat Costs may include registration fee, microchipping fee and the cost of de-sexing Rescue organisation

$10.00 Last YR Fee

Charged at cost

Livestock Impounding Council will recover the actual costs of a livestock impounding exercise from the identified owner prior to release of sale

Cost recovery

Last YR Fee

Cost recovery Impounding Fee – All Livestock (including Horses, Cattle, Sheep, Goats & Pigs)

$55.00

$56.50

$0.00

$56.50

Feeding Fee – All Livestock (including Horses, Cattle, Sheep, Goats & Pigs)

$55.00

$56.50

$0.00

$56.50

Out of working hours release fee

At cost Last YR Fee

At cost

continued on next page ...

Page 18 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Livestock Impounding [continued] Council Stock Pound – Release fee (Horse, Ass, Mule, Cattle or camel)

$56.50 per head Last YR Fee

$55 per head Stock Pound – Release fee (Sheep, goat or pig)

$56.50 per head Last YR Fee

$55 per head Driving & transportation costs (including pre pound release)

At cost Last YR Fee

At cost

Cat cage Bond (refundable)

$0.00

$100.00

$0.00

$100.00

To cover cost of cat trap replacement should it not be returned or go missing.

$0.00

$22.73

$2.27

$25.00

Cover the cost of staff time to coordinate the pick and delivery of cat traps including the collection of any animals trapped.

New fee structure Hire per week

New fee structure

Page 19 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

$0.00

$50.00

$0.00

$50.00

Previously one fee was applied for all types of commercial use activities. These fee categories are in line with newly adopted Commercial Use of Footpath Policy and provide a fair application of fees based on the applicant's usage of the footpath

$0.00

$80.00

$0.00

$80.00

Previously one fee was applied for all types of commercial use activities. These fee categories are in line with newly adopted Commercial Use of Footpath Policy and provide a fair application of fees based on the applicant's usage of the footpath

Fee (incl. GST)

Comment

Health Licences/Public Health Act Commercial use of footpath – advertising/signs annual fee /sign

New fee structure Commercial use of footpath – new application (+annual fee applicable)

New fee structure

continued on next page ...

Page 20 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Licences/Public Health Act [continued] Commercial use of footpath – outdoor dining annual fee / chair

$0.00

$20.00

$0.00

$20.00

Previously one fee was applied for all types of commercial use activities. These fee categories are in line with newly adopted Commercial Use of Footpath Policy and provide a fair application of fees based on the applicant's usage of the footpath

$0.00

$50.00

$0.00

$50.00

Previously one fee was applied for all types of commercial use activities. These fee categories are in line with newly adopted Commercial Use of Footpath Policy and provide a fair application of fees based on the applicant's usage of the footpath

Firewood permit

$30.00

$31.00

$0.00

$31.00

Approval to Install and Operate – Onsite Sewage / Septics

$50.00

$51.50

$0.00

$51.50

Cover increasing costs to deliver service

Onsite Sewage / Septic Inspection

$120.00

$123.00

$0.00

$123.00

Cover increasing costs to deliver service

New fee structure Commercial use of footpath – street vending annual fee /m2

New fee structure

continued on next page ...

Page 21 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Cover increasing costs to deliver service

Licences/Public Health Act [continued] Onsite Sewage / Septic Re-Inspection

$80.00

$82.00

$0.00

$82.00

Onsite Sewage / Septic Annual Charge

$20.00

$20.00

$0.00

$20.00

Cooling Towers Inspection

$150.00

$152.50

$0.00

$152.50

Cover increasing costs to deliver service

Cooling Tower Improvement Notice or Prohibition Order

$560.00

$560.00

$0.00

$560.00

Regulatory fee set by legislation

Public Swimming Pool – (motels, hotels, hospitals, schools etc.) Inspection (e.g water quality)

$90.00

$92.00

$0.00

$92.00

Cover increasing costs to deliver service

Public Swimming Pool – (motels, hotels, hospitals, schools etc.) Re-Inspection (e.g water quality)

$60.00

$61.50

$0.00

$61.50

Cover increasing costs to deliver service

Food Premises Inspection

$150.00

$154.00

$0.00

$154.00

Cover increasing costs to deliver service

Food Premises Inspection – Schools, Pre-schools and Daycare Facilities

$150.00

$154.00

$0.00

$154.00

Cover increasing costs to deliver service

Free of charge

No change

Food Premises Inspection – Community facilities and sporting clubs

Last YR Fee

Free of charge

continued on next page ...

Page 22 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Licences/Public Health Act [continued] Food Inspection (Low Risk)

$0.00

$90.00

$0.00

$90.00

Proposed new fee to cover situations where the food business is low risk / minimal food preparation but they are still required to be registered with Council and inspected (i.e. motels that provide cereal, toast, bacon & eggs). The normal inspection fee is $150

Food Re-Inspection

$100.00

$102.50

$0.00

$102.50

Cover increasing costs to deliver service

Food Improvement Notice

$330.00

$330.00

$0.00

$330.00

Regulatory fee set by legislation

Client Requested Food Inspection and Compliance Report

$210.00

$215.00

$0.00

$215.00

Cover increasing costs to deliver service

Skin Penetration Inspection

$150.00

$154.00

$0.00

$154.00

Cover increasing costs to deliver service

Skin Penetration and Hairdressing Re-Inspection

$100.00

$102.50

$0.00

$102.50

Cover increasing costs to deliver service

Skin Penetration Improvement Notice or Prohibition Order

$270.00

$270.00

$0.00

$270.00

Regulatory fee set by legislation

Hairdressing (No Skin Penetration) Inspection

$90.00

$92.00

$0.00

$92.00

Cover increasing costs to deliver service

Public Health Act Registration/Inspection Fee

$154.00

$154.00

$0.00

$154.00

Page 23 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Certificate under Section 64

$65.00

$66.50

$0.00

$66.50

Inspections – Inspection

$150.00

$155.00

$0.00

$155.00

$45.00

$55.00

$0.00

$55.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Environment Noxious Weeds

Waste Facility Levy All Ratepayers – Waste Facility / Environmental Levy

EPA compliance and associated landfill legacy issues at all sites need improving.

Council provides a Waste facility in Corowa and Howlong and a transfer station in Mulwala. Limited access at Urana and Oaklands disposal sites (including provisions for decommissioning when environmental issues occur).

Waste Disposal Charges – Corowa, Howlong, Mulwala Transfer Station, Urana and Oaklands New fee structure

Wheelie bin Household waste accepted only (not commercial origin) WHEELIE bin (240 litre bin) – green

$20.00

$4.55

$0.45

WHEELIE bin (240 litre bin) – co mingled recycle

$5.00 Free Last YR Fee

Free WHEELIE bin (240 litre bin) – waste

$5.00

$4.55

$0.45

$5.00

$18.18

$1.82

$20.00

Small load Household waste accepted only (not commercial origin) SMALL load (up to an average sedan boot or half a small trailer) – green SMALL load (up to an average sedan boot or half a small trailer) – co mingled recycle

$20.00

Free Last YR Fee

Free

continued on next page ...

Page 24 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

$20.00

$36.36

$3.64

$40.00

"This fee is calculated based on burial costs including a legacy overhead, managemen t overhead, compliance overhead, and gate fee overhead. It works out to be $80 per cubic meter The percentage increase here is not comparable because the volumes are different."

$36.36

$3.64

$40.00

This fee is calculated based on actual cost to shread green waste per cubic meter. Unfortunatel y the days of burning green waste at minimal cost are gone.

Fee (incl. GST)

Comment

Small load [continued] SMALL load (up to an average sedan boot or half a small trailer) – waste

Medium load Household waste accepted only (not commercial origin) MEDIUM load (up to approximately 1m3 – single axel trailer or ute tray) – green

MEDIUM load (up to approximately 1m3 – single axel trailer or ute tray) – co mingled

$20.00

Free Last YR Fee

Free

continued on next page ...

Page 25 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

$40.00

$72.73

$7.27

$80.00

"This fee is calculated based on burial costs including a legacy overhead, managemen t overhead, compliance overhead, and gate fee overhead. It works out to be $80 per cubic meter The percentage increase here is not comparable because the volumes are different"

$54.55

$5.45

$60.00

This fee is calculated based on actual cost to shred green waste per cubic meter. Unfortunatel y the days of burning green waste at minimal cost are gone.

Fee (incl. GST)

Comment

Medium load [continued] MEDIUM load (up to approximately 1m3 – single axel trailer or ute tray) – waste

Large load Household waste accepted only (not commercial origin) LARGE load (any volume larger than 1m3 but less than 1.5m3 – incl. large trailer) – green

LARGE load (any volume larger than 1m3 but less than 1.5m3 – incl. large trailer) – co mingled recycling

$20.00

Free

Last YR Fee

Free

continued on next page ...

Page 26 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

$40.00

$109.09

$10.91

$120.00

$60.00

$36.36

$3.64

$40.00

Fee (incl. GST)

Comment

Large load [continued] LARGE load (any volume larger than 1m3 but less than 1.5m3 – incl. large trailer) – waste

"This fee is calculated based on burial costs including a legacy overhead, managemen t overhead, compliance overhead, and gate fee overhead. It works out to be $80 per cubic meter The percentage increase here is not comparable because the volumes are different"

Truck load TRUCK load – green /m3 TRUCK load – co mingled recycling /m3

not accepted Last YR Fee

not accepted TRUCK load – waste /m3

$60.00

$72.73

$7.27

$80.00

This fee is calculated based on burial costs including a legacy overhead, managemen t overhead, compliance overhead, and gate fee overhead. It works out to be $80 per cubic meter

$0.00

$54.55

$5.45

$60.00

New fee, this is actual cost Council incurs to crush this material for reuse

Construction and demolition Construction & demolition – concrete and masonry /m3

continued on next page ...

Page 27 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Construction and demolition [continued] Construction & demolition – timber /m3

$0.00

$36.36

$3.64

Construction & demolition – scrap metal /m3

$40.00

New fee, this is actual cost Council incurs to crush this material for reuse

Free Last YR Fee

Construction & demolition – co mingled /m3

$0.00

$163.64

$16.36

$180.00

New fee, this is actual cost Council incurs to crush this material for reuse

Mattresses – Single/Double

$30.00

$45.45

$4.55

$50.00

This fee represents the actual cost plus 20% managemen t and compliance overhead to recycle this product

Mattresses – Queen/King

$30.00

$72.73

$7.27

$80.00

This fee represents the actual cost plus 20% managemen t and compliance overhead to recycle this product

Mattresses with or without base

Asbestos Accepted in Corowa only

continued on next page ...

Page 28 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Asbestos up to 1m3

$300.00

$327.27

$32.73

$360.00

This fee is calculated based on burial costs (as it must be burried immediately staff must drop what they are doing and attend to it) including a legacy overhead, managemen t overhead, compliance overhead, and gate fee overhead. It works out to be $80 per cubic meter

Asbestos over 1m3 – per m3

$300.00

$327.27

$32.73

$360.00

This fee is calculated based on burial costs (as it must be burried immediately staff must drop what they are doing and attend to it) including a legacy overhead, managemen t overhead, compliance overhead, and gate fee overhead. It works out to be $80 per cubic meter

Tyre R<20 – each

$15.00

$18.18

$1.82

$20.00

This fee represents the actual cost plus 20% managemen t and compliance overhead to recycle this product

Tyre R20 to R40 – each

$40.00

$36.36

$3.64

$40.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Asbestos [continued]

Tyre Not accepted at Mulwala Transfer Station

continued on next page ...

Page 29 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$80.00

$72.73

$7.27

$80.00

Lounge – 1 seat

$0.00

$8.18

$0.82

$9.00

New fee for recycling this product. Fee is calculated based on actual cost +20% managemen t and compliance overhead

Lounge – 2 seat

$0.00

$16.36

$1.64

$18.00

New fee for recycling this product. Fee is calculated based on actual cost +20% managemen t and compliance overhead

Lounge – 3 seat

$0.00

$24.55

$2.45

$27.00

New fee for recycling this product. Fee is calculated based on actual cost +20% managemen t and compliance overhead

Lounge – additional seat

$0.00

$8.18

$0.82

$9.00

New fee for recycling this product. Fee is calculated based on actual cost +20% managemen t and compliance overhead

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Tyre [continued] Tyre R>40 – each 2019/2020 charges were: Heavy truck tyre $40 each Tractor/earth moving equipment tyre $110 each

Lounge

Page 30 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

eWaste eWaste – National Television & Computer Recycling scheme

Free Last YR Fee

eWaste – Household appliance

$0.00

$9.09

$0.91

$10.00

New fee, e-waste recycling. Council pays $400 per tonne to recycle e-waste in Melbourne. This fee reflects the expected actual cost to Council for this service.

eWaste – Whitegoods

$0.00

$18.18

$1.82

$20.00

New fee for gassed whitegoods (air-conditio ners, fridges and freezers). Council has an obligation under Federation legislation to degass the products prior to them being recycled into scrap metal

Page 31 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$0.00

$18.18

Year 20/21 GST

Fee (incl. GST)

Comment

Polystyrene Polystyrene over 1m3 – per m3

$1.82

Polystyrene less than 1m3 – per m3

$20.00

New fee. Albury will take polystyrene for free and recycle it. Federation will take less than 1m3 (domestic amounts) for free and transport it to Albury as a service for the rate payers, but over 1m3 (commercial amounts) we will need to recoup transport costs to Albury

Free Last YR Fee

-

Others Cardboard

Free Last YR Fee

Carpet roll / 0.5m diameter

continued on next page ...

$0.00

$31.82

$3.18

$35.00

New fee for the recycling of old carpet. Fee is calculated on an actual cost +20% managemen t and compliance overhead. Material is transported to recycling company for this product in Cootamundr a

Page 32 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$0.00

$31.82

Year 20/21 GST

Fee (incl. GST)

Comment

Others [continued] Textiles /m3

$3.18

Chemical drums – triple rinsed

$35.00

New fee for the recycling of old carpet. Fee is calculated on an actual cost +20% managemen t and compliance overhead. Material is transported to recycling company for this product in Cootamundr a

Free Last YR Fee

Used oil

Free Last YR Fee

Unsecured Load Penalty

$50.00

$45.45

$4.55

$50.00

Waste classification testing

At cost including administration and management + 20%

A new fee. Council landfills can only accept certain types of waste, on occasions it is not clear as to the classification of the type of waste and Council must get the waste tested before we can accept it. This will be at the clients cost, not Councils cost.

Last YR Fee

-

Bin Collection Services Any kerbside waste service provided to business will attract GST. Business – Kerbside collection (incl. Recycle Bin – standard 240L)

continued on next page ...

$374.00

$350.91

$35.09

$386.00

Page 33 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Bin Collection Services [continued] Residential – Kerbside collection (incl. Recycle Bin – standard 240L)

$340.00

$351.00

$0.00

$351.00

Residential – Kerbside collection (incl. Recycle Bin – upsize 360L)

$350.00

$361.00

$0.00

$361.00

Residential – Additional Recycle Bin

$140.00

$145.00

$0.00

$145.00

Residential – Additional Garbage Bin

$240.00

$248.00

$0.00

$248.00

Residential – Weekly Garbage Collection (Medical Waste)

$160.00

$165.00

$0.00

$165.00

Residential – Downsize of any bin

No change in fee Last YR Fee

No change in fee Ratepayers – Rennie, Daysdale, Savernake, Buraja and Coreen Village Skip charge

$40.00

$42.00

$0.00

$42.00

Ratepayers located within the rural townships of Rennie, Daysdale, Savernake, Buraja and Coreen will be levied a charge of $40.00 for the provision of community domestic waste collection ‘skip type’ bins located within these villages

Bin Collection Services – Urana, Oaklands, Rand, Morundah and Boree Creek Any kerbside waste service provided to business will attract GST. Business – Kerbside waste service (incl. 240L Standard Bin)

$330.00

$309.09

$30.91

$340.00

Residential – Kerbside waste service (incl. 240L Standard Bin)

$300.00

$309.00

$0.00

$309.00

Unoccupied Lot Service charge (Vacant Land)

$40.00

$42.00

$0.00

$42.00

Farmland, Outside Council Area – Kerbside waste service (incl. 240L Standard Bin)

$330.00

$340.00

$0.00

$340.00

Replacement Garbage Bin

$100.00

$103.00

$0.00

$103.00

Page 34 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Community Services and Education Preschool (Rand, Urana, Oaklands and Boree Creek) Education Levy (per term)

$20.00

$25.00

$0.00

$25.00

There hasn't been a rise since 2017

Booking Fee (one off per child)

$20.00

$25.00

$0.00

$25.00

There hasn't been a rise since 2017

Full Fee/Session (per term)

$25 per day or $12.50 per day for concession card holders Last YR Fee

$25 per day or $12.50 per day for concession card holders Subject to change from the start of term 1 January 2020 Late pickup child(ren)

$1/Minute until pickup - Max $25/session Last YR Fee

$1/Minute until pickup - Max $25/session

Page 35 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Housing and Community Amenities Cemeteries Lawn Cemetery: Corowa, Howlong and Mulwala Does not include plaque 1st interment (includes plot, grave digging, perpetual maintenance)

$2,235.00

$2,084.55

$208.45

$2,293.00

2nd interment (reopening, includes grave digging)

$1,110.00

$1,034.55

$103.45

$1,138.00

Childs interment (includes plot, grave digging, perpetual maintenance)

$1,130.00

$1,053.64

$105.36

$1,159.00

Monumental Cemetery: Corowa, Howlong and Mulwala Interment (includes land for grave and perpetual grounds maintenance)

$1,450.00

$1,351.82

$135.18

$1,487.00

$710.00

$661.82

$66.18

$728.00

$330.00

$307.27

$30.73

$338.00

$70.00

$71.00

$0.00

$71.00

Columbarium niche (includes plaque)

$740.00

$690.00

$69.00

$759.00

Garden – general location (includes plaque)

$720.00

$670.86

$67.09

$737.95

Individual rose garden – specific location (includes plaque)

$995.00

$927.27

$92.73

$1,020.00

Individual rose garden – 2nd interment (includes plaque)

$390.00

$363.64

$36.36

$400.00

Existing grave no lid

$240.00

$223.64

$22.36

$246.00

$195.00

$181.82

$18.18

$200.00

Does not include grave digging or monumental works Childs interment (includes land for grave and perpetual grounds maintenance) Does not include grave digging or monumental works Reopening and internment Does not include grave digging or monumental works Permit for erection of monument

Interment of Ashes

Does not include plaque Removal and return of ashes

Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield Purchase Site Only (Single 2.4m x 1.2 m)

$250.00

$232.73

$23.27

$256.00

Purchase Site Only (Double 2.4m x 2.4m)

$500.00

$466.36

$46.64

$513.00

Interment Preparation costs (per burial)

$220.00

$204.55

$20.45

$225.00

Permit for erection of monument

$70.00

$71.00

$0.00

$71.00

Application to construct or alter monument

$80.00

$82.00

$0.00

$82.00

Application to install/remove ashes in an existing grave

$80.00

$74.55

$7.45

$82.00

continued on next page ...

Page 36 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield [continued] General Grave Digging (Funeral Directors to arrange with Trevor Gladstone)

As arranged with Contractor Last YR Fee

As arranged with Contractor Wall Section – Niche

$220.00

$204.55

Exhumation – Removal Fee at cost

$20.45

$225.00

At cost - contractor to determine Last YR Fee

At cost - contractor to determine

Plaques Pioneer Cemetery memorial wall

$350.00

$326.36

$32.64

$359.00

Placement of plaque (Office of Australia War Graves)

$110.00

$101.82

$10.18

$112.00

$365.00

$340.00

$34.00

$374.00

Miscellaneous Charges Weekend Interment Surcharge

Right of Burial (reservation of graves or ashes) Fully prepaid fee plus administration fee

As above + $50 Last YR Fee

As above + $50

Page 37 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Water Supplies Water Supply from Standpipe – Corowa Council has established Avdata Key controlled Standpipes in Corowa, Howlong, Mulwala and Balldale. Keys are available at Council's Offices in Corowa and Mulwala at a cost of $35.00

$2.45 per Kl

Last YR Fee

$2.45 per Kl

Water Supply from Standpipe – Urana, Boree Creek, Rand and Oaklands Per Kilolitre (Minimum Charge $10.00) (Subject to change by Riverina Water)

$3.24 per kl Last YR Fee

$3.24 per kl Price set by Riverina Water and subject to change Additional 'callout' fee per load

$20.00

$20.00

$0.00

$20.00

$0.00

$114.00

Water Supplies for Corowa, Mulwala and Howlong Access Charges The measurement refers to meter size and not pipe size 20mm

continued on next page ...

$105.00

$114.00

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

Page 38 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

25mm

$165.00

$178.20

$0.00

$178.20

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (receommne ded 25/75, currently at 12/88)

32mm

$267.00

$291.90

$0.00

$291.90

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (receommne ded 25/75, currently at 12/88)

40mm

$423.00

$456.00

$0.00

$456.00

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Access Charges [continued]

continued on next page ...

Page 39 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

50mm

$657.00

$712.50

$0.00

$712.50

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

80mm

$1,683.00

$1,824.00

$0.00

$1,824.00

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

100mm

$2,625.00

$2,850.00

$0.00

$2,850.00

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Access Charges [continued]

continued on next page ...

Page 40 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

150mm

$5,907.00

$6,412.50

$0.00

$6,412.50

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

300mm

$23,640.00

$25,650.00

$0.00

$25,650.00

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

400mm

$42,024.00

$45,600.00

$0.00

$45,600.00

Align charges with Best Practice Water Supply and Sewerage guidelines of appropriate split between the revenue generated from access charges to consumption charges (recommend ed 25/75, currently at 12/88)

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Access Charges [continued]

Page 41 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Usage Consumption Charges Residential usage – up to 450 Kl annual

$1.66 per Kl Last YR Fee

$1.60 per Kl Residential usage – in excess of 450 Kl annual

$2.40 per Kl Last YR Fee

$2.35 per Kl Business usage

$1.66 per Kl Last YR Fee

$1.60 per Kl Major industry usage

$1.30 per Kl Last YR Fee

$1.26 per Kl

Water Charge for Balldale All water consumption

$1.28 per Kl Last YR Fee

$1.28 per Kl Access Charge/Meter Rental

$250 per annum Last YR Fee

$250 per annum

Connection Fees 20mm Meter ( Extra Meter)

$440.00

$440.00

$0.00

$440.00

Price on application

All additional main to meter services

Last YR Fee

Price on application Install service, tap main, supply and install meter (main to meter service)

Price on application

2019/2020 fee was a flat rate of $1,550

Last YR Fee

Standard Water Connection Fee (All Towns) Last YR Fee

By Contract to $1600 By contract Water Connection (exist service – subdivision)

$550.00

$550.00

$0.00

$550.00

Mains Tapping Fee

$625.00

$625.00

$0.00

$625.00

Disconnection Fee

$175.00

$175.00

$0.00

$175.00

Reconnection Fee

$550.00

$550.00

$0.00

$550.00 Page 42 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Water Meters Domestic water pressure test

$80 (to be refunded if flow test proves not to meet flow rate of 0.25l/s) Last YR Fee

$80 (to be refunded if flow test proves not to meet flow rate of 0.25l/s) Water main pressure test

$125.00

$125.00

$0.00

$125.00

Reading Fee – Mulwala, Howlong, Corowa & Balldale

$65.00

$65.00

$0.00

$65.00

Meter test fee (refunded if faulty)

$120.00

$120.00

$0.00

$120.00

Emergency Repairs due to damage caused by public utilities and contractors

$300 minimum then costs Last YR Fee

$300 minimum then costs

Page 43 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Sewer Access Charge

$705.00

$725.00

$0.00

$725.00

Vacant Land Without Water Service

$564.00

$564.00

$0.00

$564.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Sewerage Services Residential Pricing

Maintenance Charges – Urana and Oaklands Sewerage Access Charge

$630.00

$647.00

$0.00

$647.00

$564.00

$580.00

$0.00

$580.00

Non-Residential Pricing Without Water Service Vacant Land Without Water Service

With Water Service 20mm Water Service

$426.00 multiplied by discharge factor Last YR Fee

$414.00 multiplied by discharge factor 25mm Water Service

$665.70 multiplied by discharge factor Last YR Fee

$645.00 multiplied by discharge factor 32mm Water Service

$1,090.50 multiplied by discharge factor Last YR Fee

$1,059.00 multiplied by discharge factor 40mm Water Service

$1,704.00 multiplied by discharge factor Last YR Fee

$1,650.00 multiplied by discharge factor 50mm Water Service

$2,662.50 multiplied by discharge factor Last YR Fee

$2,580.00 multiplied by discharge factor 80mm Water Service

$6,816.00 multiplied by discharge factor Last YR Fee

$6,600.00 multiplied by discharge factor 100mm Water Service

$10,650.00 multiplied by discharge factor Last YR Fee

$10,320.00 multiplied by discharge factor Cost of Waste Discharged to Sewer

$1.39/Kl multiplied by consumption & discharge factor Last YR Fee

$1.35/Kl multiplied by consumption & discharge factor

continued on next page ...

Page 44 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$705.00

$725.00

$0.00

$725.00

Application Fee (New Application)

$96.00

$98.00

$0.00

$98.00

Annual Trade Waste Fee

$96.00

$98.00

$0.00

$98.00

Non-complying Trade Waste Usage Charge (per kL)

$1.80

$1.85

$0.00

$1.85

Name

Year 20/21 GST

Fee (incl. GST)

Comment

With Water Service [continued] Minimum Combined Charge

Liquid Trade Waste Charges Category 1

Complying Trade Waste Treatment Charge (per kL)

Nil Last YR Fee

Nil

Category 2 Application Fee (New Application)

$193.00

$198.00

$0.00

$198.00

Non-complying Trade Waste Usage Charge (per kL)

$16.15

$16.60

$0.00

$16.60

Complying Trade Waste Treatment Charge (per kL)

$1.80

$1.85

$0.00

$1.85

Application Fee (New Application)

$646.00

$663.00

$0.00

$663.00

Annual Trade Waste Fee

$646.00

$663.00

$0.00

$663.00

$0.75

$0.80

$0.00

$0.80

Suspended solids > 300mg/L

$1.04

$1.07

$0.00

$1.07

Total Nitrogen 100mg/L

$0.21

$0.22

$0.00

$0.22

Total Phosphorus > 20mg/L

$1.65

$1.70

$0.00

$1.70

Sulphate > 500mg/L

$0.17

$0.20

$0.00

$0.20

Sulphide > 1mg/L

$1.65

$1.70

$0.00

$1.70

$0.81

$0.83

$0.00

$0.83

Category 3 – Large 20kL/day and industrial

Trade Waste Treatment Charge (per kL)

Minimal $0.05 increase to cover cost of service.

Excess Mass Charges

Minimal $0.03 increase to cover cost of service.

Biochemical Oxygen Demand (BOD) For BODs < to 300mg/L

Page 45 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$0.45

$0.47

$0.00

$0.47

Chemical toilet

$18.02

$18.50

$0.00

$18.50

Food Waste Disposal Charge (per bed)

$30.00

$30.80

$0.00

$30.80

Effluent liquid (per kL)

$2.40

$2.45

$0.00

$2.45

Name

Year 20/21 GST

Fee (incl. GST)

Comment

pH charges For discharge of trade waste no complying with the approval limits for pH

Tankered Waste

Septic Tank sludge (per kL)

$24.65/kl Last YR Fee

$24.02/kl

Reinspections Re-inspection Charge

$90.00

$93.00

$0.00

$93.00

Testing Private analytical testing by Quotation

Cost plus 40% Last YR Fee

Cost plus 40%

Sewerage Drainage Plans Dwelling Houses (Irrespective of Number of Closets)

$65.00

$65.00

$0.00

$65.00

Other Buildings – For First Closet

$65.00

$65.00

$0.00

$65.00

For each additional closet urinal or sanitary fitting

$10.00

$10.00

$0.00

$10.00

Alterations to Sewerage Drainage Plans

$65.00

$65.00

$0.00

$65.00

Extra Copy of Prepaid Sewerage Drainage Plan

$7.00

$7.00

$0.00

$7.00

Plan of sewer connection point

$75.00

$75.00

$0.00

$75.00

Sewer Permit Fee

$70.00

$70.00

$0.00

$70.00

Approval to install New Waste System

$160.00

$160.00

$0.00

$160.00

Approval to operate Existing Waste System

$78.00

$78.00

$0.00

$78.00

Compliance Certificates

$53.00

$53.00

$0.00

$53.00

Miscellaneous Charges Mains Tapping Fee (when junction is not provided)

Price on application Last YR Fee

Price on application Septic Tank Application

continued on next page ...

$50.00

$50.00

$0.00

$50.00

Page 46 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Miscellaneous Charges [continued] Emergency Repairs

$325 plus costs Last YR Fee

$325 plus costs

Page 47 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Family Ski Club Membership

$50.00

$45.45

$4.55

$50.00

Full day Launching fee

$20.00

$18.18

$1.82

$20.00

Half Day Hire

$20.00

$18.18

$1.82

$20.00

Full Day Hire

$40.00

$36.36

$3.64

$40.00

Full Hall Rent

$200.00

$181.82

$18.18

$200.00

Main Hall

$30.00

$27.27

$2.73

$30.00

Rehearsals

$10.00

$9.09

$0.91

$10.00

Supper Room

$40.00

$36.36

$3.64

$40.00

Tea Facilities

$25.00

$22.73

$2.27

$25.00

Land Sales

$100.00

$90.91

$9.09

$100.00

Meetings

$50.00

$45.45

$4.55

$50.00

Education and Training

$50.00

$45.45

$4.55

$50.00

$6.00

$5.45

$0.55

$6.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Recreation and Culture Urana Ski & Aquatic Committee Memberships

Equipment Hire

Hall and meeting room hire Hire of Hall, Boree Creek Functions

Hire of Other Items Trestle Tables Chairs

$1 each Last YR Fee

$1 each Glasses per box Beer Jugs and Carafes

$5.00

$4.55

$0.45

$5.00 $1 each Last YR Fee

$1 each Plates

$5/dozen Last YR Fee

$5/dozen

continued on next page ...

Page 48 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Hire of Other Items [continued] Cups & Saucers

$5/dozen Last YR Fee

$5/dozen Cutlery

$5/dozen pieces Last YR Fee

$5/dozen pieces Urns

$10.00

$9.09

$0.91

Salt & Pepper

$10.00 $5/box Last YR Fee

$5/box Round Tables

$10.00

$9.09

$0.91

$10.00

Tablecloths

$2.00

$1.82

$0.18

$2.00

Full Day

$65.00

$59.09

$5.91

$65.00

Half Day

$35.00

$31.82

$3.18

$35.00

Tea/Coffee per head

$4.00

$3.64

$0.36

$4.00

Urana Chambers, Urana Small Community Group Meetings

Hire of Memorial Hall, Oaklands Functions Breakages

$4.00 per Item Last YR Fee

$4.00 per Item Hire of Hall BBQ (BYO Gas)

$30.00

$27.27

$2.73

$30.00

Refundable Deposit

$150.00

$150.00

$0.00

$150.00

Refundable deposit for cutlery, crockery & glasses

$50.00

$50.00

$0.00

$50.00

Replacement of chairs & tables

Cost Price Last YR Fee

Cost Price Hire of Hall

$200.00

$181.82

$18.18

$200.00

Main Hall (all day or night)

$80.00

$72.73

$7.27

$80.00

Main Hall (1/2 night til midnight)

$40.00

$36.36

$3.64

$40.00

Hire of School of Arts Hall, Rand Functions

continued on next page ...

Page 49 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Meeting Room/Kitchen and Supper Room

$40.00

$36.36

$3.64

$40.00

Meeting Room and Kitchen

$15.00

$13.64

$1.36

$15.00

Meeting Room

$10.00

$9.09

$0.91

$10.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Functions [continued]

Hire of Tables and Chairs Round Tables

$2 each Last YR Fee

$2 each Flip up chairs

$1 each Last YR Fee

$1 each Old Trestle tables

$2 each Last YR Fee

$2 each Chairs

$1 each Last YR Fee

$1 each

Hire of Soldiers Memorial Hall, Urana Functions Tables and chairs are included in the hire charge Bond

$200.00

$200.00

$0.00

$200.00

Main Hall

$100.00

$90.91

$9.09

$100.00

Main Hall and Kitchen/Bar

$150.00

$136.36

$13.64

$150.00

Main Hall, Kitchen/Bar and Crockery

$200.00

$181.82

$18.18

$200.00

Supper Room – Day

$30.00

$27.27

$2.73

$30.00

Supper Room – Night

$50.00

$45.45

$4.55

$50.00

Supper Room and Kitchen/Bar

$100.00

$90.91

$9.09

$100.00

Supper Room, Kitchen/Bar and Crockery

$150.00

$136.36

$13.64

$150.00

Entire access to Hall

$200.00

$181.82

$18.18

$200.00

Entire access to Hall Crockery and Glasses

$250.00

$227.27

$22.73

$250.00

Itinerant Entertainment / Business Providers Land Use / Itinerant Traders Permit

$155 per day Last YR Fee

$150 per day

Page 50 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Large Hall Hire (Corowa Memorial Hall) Daily Hire

$0.00

$431.82

$43.18

$475.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Use of Kitchen (charged in addition to hall hire)

$0.00

$181.82

$18.18

$200.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Weekly Hire

$0.00

$1,890.91

$189.09

$2,080.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Page 51 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Small – Medium Hall Hire (Odd Fellows, Mulwala Civic Centre, Howlong Community Centre) Daily Hire

$0.00

$181.82

$18.18

$200.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Weekly Hire

$0.00

$590.91

$59.09

$650.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

$150.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Meeting Rooms (Corowa Civic Centre, Howlong Resource Centre) Daily Hire

continued on next page ...

$0.00

$136.36

$13.64

Page 52 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Meeting Rooms (Corowa Civic Centre, Howlong Resource Centre) [continued] Per Hour Hire

$0.00

$36.36

$3.64

$40.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Hall Bonds & Cleaning Reduced fees for community and charitable organisations can be applied for under Council's Hall and Facilities Hire Operational Policy. Cleaning

By Quotation

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Last YR Fee

General Bond

continued on next page ...

$0.00

$500.00

$0.00

$500.00

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Page 53 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$0.00

$1,000.00

$0.00

$1,000.00

Family season ticket

$105.00

$95.45

$9.55

$105.00

Single season ticket

$60.00

$54.55

$5.45

$60.00

Adult entry

$4.00

$3.64

$0.36

$4.00

Child entry

$3.00

$2.73

$0.27

$3.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Hall Bonds & Cleaning [continued] Licensed Bond

Previously, fees and charges for halls were listed separately. Fees and charges have been condensed and groups into the categories of meeting rooms, small hall and large hall hire.

Swimming pools Urana and Oaklands Swimming Pools

Non Swimming Supervising adult

No charge Last YR Fee

No charge With School per entry

$1.60/student Last YR Fee

$1.60/student Clubs, private swimming classes and functions out of normal hours/hr

$82.00

$74.55

$7.45

$82.00

Family season ticket

$0.00

$0.00

$0.00

$0.00

Adult season ticket

$0.00

$0.00

$0.00

$0.00

Child season ticket

$0.00

$0.00

$0.00

$0.00

Adult entry

$0.00

$0.00

$0.00

$0.00

Supervising adult

$0.00

$0.00

$0.00

$0.00

Child entry

$0.00

$0.00

$0.00

$0.00

With School per entry

$0.00

$0.00

$0.00

$0.00

Howlong Swimming Pool

Page 54 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Sports ground Morundah Recreation Ground Facility Hire Hire of Facility

$100 min contribution Last YR Fee

$100 min contribution

Victoria Park Sporting Clubs Contribution Billabong Crows Football Netball Club

$1,000.00

$909.09

$90.91

$1,000.00

Vintage Machinery

$500.00

$454.55

$45.45

$500.00

Campdraft

$500.00

$454.55

$45.45

$500.00

Refundable Deposit

$100.00

$100.00

$0.00

$100.00

Club House and Kitchen facilities (day)

$50.00

$45.45

$4.55

$50.00

Club House and Kitchen facilities (night)

$100.00

$90.91

$9.09

$100.00

Function Room

$150.00

$136.36

$13.64

$150.00

Kitchen

$50.00

$45.45

$4.55

$50.00

Bar

$50.00

$45.45

$4.55

$50.00

$3,300.00

$3,000.00

$300.00

$3,300.00

$500.00

$454.55

$45.45

$500.00

Facility Hire

Oaklands Recreation Ground Functions

Rand Sports Ground Sporting Clubs Contribution Rand Walbundrie Walla Football Club Rand Cricket Club Other Users

Donation Last YR Fee

Donation

Page 55 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Mining, Manufacturing and Construction The Council will discontinue selling quarry material to the public from 2018/2019

Page 56 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Transport and Communication Aerodrome Fees Annual Landing Fees Regular Users Commercial

$1,000 p.a./t MTOW Last YR Fee

$1,000 p.a./t MTOW Minimum charge applied to aircraft less than 1 tonne Regular Users Non Commercial

$500 p.a./t MTOW Last YR Fee

$500 p.a./t MTOW Minimum charge applied to aircraft less than 1 tonne Aircraft Parking Fees

$5 per day Last YR Fee

$5 per day This fee applies regardless of time spent on ground on any day. Applies to powered and non powered aircraft Commercial >4t MTOW

$3.20 per tonne per landing Last YR Fee

$3.20 per tonne per landing This rate will apply for use by Parachute Training School

Site Fees Terminal Building

$110 per day Last YR Fee

$110 per day

Heavy Vehicle Access Permit Class 1 & 3 heavy vehicles for non-interstate journeys

$0.00

$72.00

$0.00

$72.00

Page 57 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Economic Affairs Caravan Park – Ball Park Minimum stay of 2 nights in all accommodation except for Budget Cabins (where 1 night's stays are accepted) Stay 7 nights - Get 7th Night Free - Only applies in non-peak times.

Powered Sites rate per night Normal

$32.00

$29.09

$2.91

$32.00

Peak

$45.00

$40.91

$4.09

$45.00

Additional Adults (ages 16 years and above) / night

$15.00

$13.64

$1.36

$15.00

Children (aged to 15)

Free Last YR Fee

Free

Unpowered Sites rate per night Normal

$25.00

$22.73

$2.27

$25.00

Peak

$35.00

$31.82

$3.18

$35.00

Additional Adults (ages 16 years and above) / night

$15.00

$13.64

$1.36

$15.00

Children (aged to 15)

Free Last YR Fee

Free

Cabins All based on 2 people, 1 car per site rate per night Self contained units (SCU)

$140 - $165 Last YR Fee

$140 - $165 2 units Villa Units (VU)

$140 - $165 Last YR Fee

$140 - $165 3 units Executive Units (EU)

$125 - $155 Last YR Fee

$125 - $155

continued on next page ...

Page 58 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Cabins [continued] $120 - $145

Standard Plus Units (SPU)

Last YR Fee

$120 - $145 3 units $110 - $140

Standard Units (SU)

Last YR Fee

$110 - $140 3 units $95 - $130

Budget Units (BU)

Last YR Fee

$95 - $130 7 units Additional Adults (ages 16 years and above) / night

$15.00

$13.64

$1.36

$15.00

Children (ages to 15)

$10.00

$9.09

$0.91

$10.00

Linen packs – single

$10.00

$9.09

$0.91

$10.00

Linen packs – double/queen

$17.00

$15.45

$1.55

$17.00

Per night (2 persons)

$20.00

$18.18

$1.82

$20.00

Extra charge per person over 5 years

$5.00

$4.55

$0.45

$5.00

$120.00

$109.09

$10.91

$120.00

$25.00

$22.73

$2.27

$25.00

Caravan Park – Urana Unpowered Sites

Per week (2 persons)

Powered Sites Per night (2 persons)

$2 per night Discount on powered sites to Pensioner Concession Card Holders Extra charge per person over 5 years

$7.50

$6.82

$0.68

$7.50

$150.00

$136.36

$13.64

$150.00

Per night (2 persons)

$110.00

$100.00

$10.00

$110.00

Extra charge per person over 5 years

$10.00

$9.09

$0.91

$10.00

Per night (2 persons)

$90.00

$81.82

$8.18

$90.00

Extra charge per person over 5 years

$10.00

$9.09

$0.91

$10.00

Per week (2 persons – pay 6 get 7th free)

Cabin 2-5

Cabin 1(only)

Page 59 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

$10.00

$9.09

Year 20/21 GST

Fee (incl. GST)

Comment

Linen Hire – per bed

$0.91

$10.00

Miscellaneous Caravan Park Fees Sewerage Waste Dump

No charge if in park, otherwise $5 Last YR Fee

No charge if in park, otherwise $5 Washing Machine (per load)

$4.00

$3.64

$0.36

$4.00

$4.00

$3.64

$0.36

$4.00

coin operated Clothes Dryer (per load) coin operated

Saleyards Drafting Fees & Holding Sheep – 0 to 1,000 head

$0.37 per head Last YR Fee

$0.36 per head Sheep – Over 1,000 head

$0.22 per head Last YR Fee

$0.21 per head

Agent Yard Fees per head Agent Yard fees per head

$1.73 per head

Cover increasing costs to deliver service

Last YR Fee

$1.67 per head

Disposal Fee Unfit for Sale

$200.00

$181.82

$18.18

$200.00

Feeding Fee Per day per head

$1.15 per head Last YR Fee

$1.10 per head

Page 60 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Truck Wash – Avdata Billing System Purchase of Key

$42 per key

Increase to cover replacement costs of key.

Last YR Fee

$35 per key Use of Facility

$1.00 per minute

Minimal increase to cover cost of service.

Last YR Fee

$0.90 per minute

Ear tags Administration charge

$25.00

$45.45

$4.55

$50.00

These categories of fees have not previously been included in Council's list of approved fees and charges however but should be. Although not listed they have been applied at the saleyards.

Ear tags / tag

$0.50

$0.91

$0.09

$1.00

These categories of fees have not previously been included in Council's list of approved fees and charges however but should be. Although not listed they have been applied at the saleyards.

Page 61 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Display and/or demonstration

$0.00

$136.36

$13.64

$150.00

NEW – For any private business wants to set up a display or stall to market their product to farmers

Promotional signage / sign

$0.00

$500.00

$50.00

$550.00

NEW – to allow private business to advertise at the saleyards. Maximum size 950mm x 810mm. Subject to approval

$30.00

$30.00

$0.00

$30.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

Promotion

Private Works Miscellaneous Temporary Road/Footpath Occupation Variable Messaging System (VMS) Board

Price on application Last YR Fee

Price on application Plant Hire Rates for Private Works, State Roads, etc

By quotation Last YR Fee

By quotation

Plant hire rates are set from time to time on the basis of the internal cost to Council (inclusive of on-costs)/ normal market values, plus a margin of 20% to cover administration and overhead costs. The total calculated cost will be subject to GST. Council pricing reflects nature of service and costs. Total charge will include min. 1 hour hire plus site establishment cost and return in addition to the time worked. Major private works - price to be obtained by quotation. Note 1: All Council plant is only to be operated by competent Council staff. Staff may donate out of normal working hours wages to community organisations. Note 2: Please note overtime rates will apply if work is to be undertaken or completed outside of normal working hours. Note 3:

Actual cost + 20% + GST Last YR Fee

Actual cost + 20% + GST Council pricing reflects nature of service and costs - Due to unpredictable nature of costs relating to the supply of materials for private work, it is not possible to provide a schedule of fees for various works. Fees for works will be on the basis of total cost plus 20% margin plus GST.

continued on next page ...

Page 62 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Miscellaneous [continued] Note 4:

Bonds will be released subject to satisfactory completion of the works. Bond administration is subject to relevant council policies and procedures Last YR Fee

Bonds will be released subject to satisfactory completion of the works. Bond administration is subject to relevant council policies and procedures

Page 63 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Development Fees Development Application Fees Estimated Development Cost (GST exempt) Up to $5,000 $5,001 to $50,000

$110.00

$110.00

$0.00

$110.00

$170 plus an additional $3 for each $1,000 (or part of $1,000) of the estimated cost. Last YR Fee

$170 plus an additional $3 for each $1,000 (or part of $1,000) of the estimated cost. $50,001 to $250,000

$352 plus an additional $3.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $50,000. Last YR Fee

$352 plus an additional $3.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $50,000. $250,001 to $500,000

$1,160 plus an additional $2.34 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000 Last YR Fee

$1,160 plus an additional $2.34 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000 $500,001 to $1,000,000

$1,745 plus an additional $1.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000 Last YR Fee

$1,745 plus an additional $1.64 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000 $1,000,001 to $10,000,000

$2,615 plus an additional $1.44 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000 Last YR Fee

$2,615 plus an additional $1.44 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000 More than $10,000,000

$15,875 plus an additional $1.19 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000 Last YR Fee

$15,875 plus an additional $1.19 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000 Development requiring Concurrence from State Agency

$320.00

$320.00

$0.00

$320.00

Residential DA – Estimated cost <$100,000

$100.00

$93.64

$9.36

$103.00

Increase by rate peg to the nearest dollar

Residential DA – $100,000 to $500,000

$130.00

$121.82

$12.18

$134.00

Increase by rate peg to the nearest dollar

Development Advertising Fees

continued on next page ...

Page 64 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Development Advertising Fees [continued] Residential DA – More than $250,000

$180.00

$168.18

$16.82

$185.00

Commercial/Industrial – Estimated cost <$250,000

$150.00

$140.00

$14.00

$154.00

Commercial/Industrial – More than $250,000

$200.00

$186.36

$18.64

$205.00

Subdivision DA – Less than 10 Lots

$125.00

$116.36

$11.64

$128.00

Subdivision DA – More than 10 Lots

$165.00

$154.55

$15.45

$170.00

Standard Bed and Banks Development Advertising

$250.00

$233.64

$23.36

$257.00

$2,220.00

$2,220.00

$0.00

$2,220.00

Designated Development Advertising

Increase by rate peg to the nearest dollar

If development advertising doesn't use full amount a portion can be refunded to applicant. EP&A Regulation 2000 Part 15 Division 1 Clause 252 (2) LEP/DCP Advertising Fee

$1,105.00

$1,105.00

$0.00

$1,105.00

If development advertising doesn't use full amount a portion can be refunded to applicant. EP&A Regulation 2000 Part 15 Division 1 Clause 252 (2)

Integrated / Designated / Development Requiring Concurrence Integrated Development Approval Fee

$320.00

$320.00

$0.00

$320.00

$140.00

$140.00

$0.00

$140.00

$320.00

$320.00

$0.00

$320.00

$140.00

$140.00

$0.00

$140.00

$920.00

$920.00

$0.00

$920.00

EP&A Regulation Part 15 Division 2 Clause 253 Integrated Development Approval Processing Fee EP&A Regulation Part 15 Division 2 Clause 253 Development requiring Concurrence Approval Fee EP&A Regulation Part 15 Division 2 Clause 252A Development requiring Concurrence Approval Processing Fee EP&A Regulation Part 15 Division 2 Clause 252A Designated Development Additional Fee EP&A Regulation Part 15 Division 2 Clause 251

Subdivision Fees Subdivision with New Road

$665 + $65 per lot Last YR Fee

$665 + $65 per lot EP&A Regulation 2000 Part 15 Division 1 Clause 249 No New Road

$330 + $53 per lot Last YR Fee

$330 + $53 per lot EP&A Regulation 2000 Part 15 Division 1 Clause 249 Boundary Adjustment

$75.00

$75.00

$0.00

$75.00

EP&A Regulation 2000 Part 15 Division 1 Clause 249 continued on next page ...

Page 65 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Subdivision Fees [continued] Strata

$330 + $65 per lot Last YR Fee

$330 + $65 per lot EP&A Regulation 2000 Part 15 Division 1 Clause 249 Civil Construction Certificate – Involving 1-3 Lots

$150.00

$136.36

$13.64

Civil Construction Certificate – Involving 4-10 Lots

$150.00 $50 per lot Last YR Fee

$50 per lot Civil Construction Certificate – Involving more than 10 lots

$500 + $35 per lot in excess of 10 lots Last YR Fee

$500 + $35 per lot in excess of 10 lots Civil Construction Inspections – Involving 1-10 Lots

$45 per lot Last YR Fee

$45 per lot Civil Construction Inspections – Involving more than 10 lots

$450 + $35 per lot in excess of 10 lots Last YR Fee

$450 + $35 per lot in excess of 10 lots Issuing Of Subdivision Certificate

$100.00

$105.00

$0.00

$105.00

Increase by rate peg to the nearest dollar

$115.00

$0.00

$115.00

Increase by rate peg to the nearest dollar

Other Planning and Environment Fees Tree Removal Permit

$110.00

2018/2019 - include inspection Request for Development Records

$55 per hour (Additional photocopy/printing charges apply) Last YR Fee

$55 per hour (Additional photocopy/printing charges apply) Copy of Certificate

$13.00

$13.00

$0.00

$13.00

Certified Copy Of Document Or Map

$53.00

$53.00

$0.00

$53.00

Private Certifier Document Lodgement – Complying Development Certificate

$36.00

$36.00

$0.00

$36.00

$36.00

$36.00

$0.00

$36.00

EP&A Regulation 2000 Part 15 Division 1 Clause 263 (2) Private Certifier Document Lodgement – Construction Certificate EP&A Regulation 2000 Part 15 Division 1 Clause 263 (2)

continued on next page ...

Page 66 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Other Planning and Environment Fees [continued] Private Certifier Document Lodgement – Occupation Certificate

$36.00

$36.00

$0.00

$36.00

$36.00

$36.00

$0.00

$36.00

Private Certifier Inspection Request

$200.00

$190.91

$19.09

$210.00

Increase by rate peg to the nearest dollar

General Inspection Request

$150.00

$140.91

$14.09

$155.00

Increase by rate peg to the nearest dollar

Registration of Swimming Pool on www.swimmingpoolregister.nsw.gov.au

$10.00

$9.09

$0.91

$10.00

$71.00

$71.00

$0.00

$71.00

EP&A Regulation 2000 Part 15 Division 1 Clause 263 (2) Private Certifier Document Lodgement – Subdivision Certificate EP&A Regulation 2000 Part 15 Division 1 Clause 263 (2)

Modification of Consent s96(1) – To correct a minor error, wrong description or miscalculation s96(1A) or 96AA(1) – Minimal environmental impact and simple assessment

50% original fee up to max $645 Last YR Fee

50% original fee up to max $645 Modification of BASIX Certificate / Amendment to Certificate

$65.00

$65.00

$0.00

s96(2) or 96A(1) – Potential environmental impact or Development for use only – not involving the erection of a building, the carrying out of work, the demolition of a work or building, subdivision or the like

$65.00 50% original fee

Last YR Fee

50% original fee Erection of a dwelling-house only where estimated cost is $100,000 or less.

$190.00

$190.00

$0.00

$190.00

$55.00

$0.00

$55.00

Review Development Determination Fees Estimated Development Cost (GST exempt) Up to $5,000

$55.00

In accordance with Clause 257B Environmental Planning and Assessment Regulation 2000 a Maximum Fee of $190 is payable for development involving the erection of a dwelling-house with an estimated cost of construction of $100,000 or less.

continued on next page ...

Page 67 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Estimated Development Cost (GST exempt) [continued] $5,001 to $250,000

$85 plus an additional $1.5 for each $1,000 (or part of $1,000) of the estimated cost. Last YR Fee

$85 plus an additional $1.5 for each $1,000 (or part of $1,000) of the estimated cost. In accordance with Clause 257B Environmental Planning and Assessment Regulation 2000 a Maximum Fee of $190 is payable for development involving the erection of a dwelling-house with an estimated cost of construction of $100,000 or less. $250,001 to $500,000

$500 plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000. Last YR Fee

$500 plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000. $500,001 to $1,000,000

$712 plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000 Last YR Fee

$712 plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000 $1,000,001 to $10,000,000

$987 plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000 Last YR Fee

$987 plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000 More than $10,000,000

$4,737 plus an additional $0.27 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000 Last YR Fee

$4,737 plus an additional $0.27 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000 Development Application with no physical works / change of use Additional fee if advertising required as per EP&A Act

$142.00

$142.00

$0.00

$142.00

Refer to Development Advertising Section of this document. Last YR Fee

Refer to Development Advertising Section of this document. Maximum fee applicable $620

Construction Certificates and Complying Development Certificates (Including GST) Fees Residential Class 10 Includes non habitable garage, pergola, shed, carport, fence, aerial, wall, pool and sign 100 sqm or less floor area 101 sqm & greater

$147.00

$133.64

$13.36

$147.00 $201 + $1.80/sqm Last YR Fee

$201 + $1.80/sqm

Page 68 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Residential Class 1 Includes single detached house or fire separated house, boarding house > 300sqm and/or 12 persons accomodation 50 sqm or less floor area 51 sqm to 200 sqm

$141.00

$128.18

$12.82

$141.00 $209 + $1.80/sqm Last YR Fee

$209 + $1.80/sqm 201 sqm to 500 sqm

$262 + $1.55/sqm Last YR Fee

$262 + $1.55/sqm Over 501 sqm

$262 + $1.25/sqm Last YR Fee

$262 + $1.25/sqm

Commercial / Retail Includes 2 or more sole occupancy units, other residential, office, shop, dwellings inside class 5, 6, 7, 8 & 9, health, place of public assembly or worship, church, schools, club 200 sqm or less floor area

$262 + $1.00/sqm Last YR Fee

$262 + $1.00/sqm 201 sqm to 2,000 sqm

$515 + $1.00/sqm Last YR Fee

$515 + $1.00/sqm 2,001 sqm to 5,000 sqm

$800 + $1.00/sqm Last YR Fee

$800 + $1.00/sqm Over 5,000 sqm

$1,849 + $0.80/sqm Last YR Fee

$1,849 + $0.80/sqm

Industrial / Warehouse Class 7 & 8 Includes car parks, storage, display, production, factory assembly or worship, church, school, club 200 sqm or less floor area

$262 + $1.00/sqm Last YR Fee

$262 + $1.00/sqm 201 sqm to 2,000 sqm

$515 + $1.00/sqm Last YR Fee

$515 + $1.00/sqm

continued on next page ...

Page 69 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Industrial / Warehouse Class 7 & 8 [continued] 2,001 sqm to 5,000 sqm

$800 + $1.00/sqm Last YR Fee

$800 + $1.00/sqm Over 5,000 sqm

$1,849 + $0.80/sqm Last YR Fee

$1,849 + $0.80/sqm

Other Where no square meterage applicable, i.e. swimming pools, fences, retaining walls.

$175.00

$159.09

Review Of Construction Certificate And Issue Of New Certificate (Including GST)

$15.91

$175.00

25% of original fee (min $27.50) Last YR Fee

25% of original fee (min $27.50) Modification of Complying Development Certificate

50% of original fee Last YR Fee

50% of original fee

Construction Certificate and Inspections for Rural Less than 500 square metres Greater than 500 square metres

$918.00

$857.27

$85.73

$943.00

$1,018.00

$948.18

$94.82

$1,043.00

Building Inspection Fees Residential Class 10 Package includes critical stage inspections only (includes non habitable garage, pergola, shed, carport, fence, aerial, wall, pool, sign) 100 sqm or less floor area

$268.00

$250.00

$25.00

$275.00

Greater than 100sqm

$536.00

$500.00

$50.00

$550.00

Residential Class 1 Package includes critical stage inspections only (includes single detached house or fire separated house, boarding house > 300 sqm and/or 12 persons accommodation) 50 sqm or less floor area

$268.00

$250.00

$25.00

$275.00

Greater than 50sqm

$536.00

$500.91

$50.09

$551.00

Commercial/Retail Classes 2 to 6 and 9 Package includes critical stage inspections only (includes 2 or more sole occupancy units, other residential, office, shop, dwellings inside class 5,6,7,8 & 9, health, place of public assembly or worship, church, continued on next page ...

Page 70 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Commercial/Retail Classes 2 to 6 and 9 [continued] schools, club) 200 sqm or less floor area

$408.00

$380.91

$38.09

$419.00

201 sqm to 500 sqm

$793.00

$740.91

$74.09

$815.00

501 sqm to 2,000 sqm

$1,304.00

$1,218.18

$121.82

$1,340.00

2,001 sqm to 5,000 sqm

$1,744.00

$1,628.18

$162.82

$1,791.00

Over 5,000 sqm

$2,110.00

$1,970.00

$197.00

$2,167.00

Industrial/Warehouse Class 7 & 8 Package includes critical stage inspections only (includes car park, storage, display, production, factory assembly, laboratory, manufacturing) 200sqm or less floor area

$408.00

$381.82

$38.18

$420.00

201 sqm to 500 sqm

$652.00

$609.09

$60.91

$670.00

501 sqm to 2,000 sqm

$915.00

$854.55

$85.46

$940.01

2,001 sqm to 5,000 sqm

$1,304.00

$1,218.18

$121.82

$1,340.00

Over 5,000 sqm

$1,744.00

$1,628.18

$162.82

$1,791.00

Where no square meterage applicable, i.e. swimming pools, fences, retaining walls.

$268.00

$250.00

$25.00

$275.00

Reinspection of building work (i.e. Work not ready or defective)

$151.00

$140.91

$14.09

$155.00

Single Inspection

$151.00

$140.91

$14.09

$155.00

Other

Minor Development Packages Residential Minor Developments estimated cost Less than $1,000

$150.00

$140.91

$14.09

$155.00

Increase by rate peg to the nearest dollar

$1,001 to $10,000

$300.00

$281.82

$28.18

$310.00

Increase by rate peg to the nearest dollar

$10,001 to $20,000

$500.00

$468.18

$46.82

$515.00

Increase by rate peg to the nearest dollar

More than $20,000

Revert to separate DA / CC / Inspection Fee calculation Last YR Fee

Revert to separate DA / CC / Inspection Fee calculation

Page 71 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Building Certificate Sec 6.26 Building Certificate Sec 6.26 – Authorised work Class 1 or 10 Building

$250.00

$250.00

$0.00

$250.00

Other structures less than 200 square metres

$250.00

$250.00

$0.00

$250.00

Other structures floor area between 200 – 2,000 square metres

$250 + $0.50 per sqm over 200sqm Last YR Fee

$250 + $0.50 per sqm over 200sqm Other structures floor area greater than 2,000 square metres

$1,165 + $0.75 per sqm in excess of 200sqm Last YR Fee

$1,165 + $0.75 per sqm in excess of 200sqm Additional Inspection

$90.00

$90.00

$0.00

$90.00

Building Certificate Sec 6.26 – Unauthorised work Class 1 or 10 Building

$250 + DA/CC Last YR Fee

$250 + DA/CC Other structures less than 200 square metres

$250 + DA/CC Last YR Fee

$250 + DA/CC Other structures floor area between 200 – 2,000 square metres

$250 + $0.50 per sqm over 200sqm + DA/CC Last YR Fee

$250 + $0.50 per sqm over 200sqm + DA/CC Other structures floor area greater than 2,000 square metres

$1,165 + $0.75 per sqm in excess of 200sqm + DA/CC Last YR Fee

$1,165 + $0.75 per sqm in excess of 200sqm + DA/CC Additional Inspection

$90.00

$90.00

$0.00

$90.00

Local Government Act Section 64 Developer Servicing Plans Per Water Equivalent Tenement (ET) Corowa, Howlong and Mulwala

$5,225.00

$5,225.00

$0.00

$5,225.00

Per Sewerage Equivalent Tenement (ET) Corowa, Howlong and Mulwala

$4,400.00

$4,400.00

$0.00

$4,400.00

Urana

$4,110.00

$4,110.00

$0.00

$4,110.00

Oaklands

$4,250.00

$4,250.00

$0.00

$4,250.00 Page 72 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Local Government Act Section 68 Approval Plumbing and Drainage (includes Application/Approval and Inspections) Single Storey Dwelling

$287.00

$295.00

$0.00

$295.00

Double Storey Dwelling

$410.00

$421.00

$0.00

$421.00

Alterations and Swimming Pools

$154.00

$158.00

$0.00

$158.00

Commercial/Industrial

$461.00

$474.00

$0.00

$474.00

Other Approvals Approval to operate a caravan park

$5.00 per site Last YR Fee

$4.50 per site Woodheater – Approval & Inspections

$90.00

$93.00

Modification of LGA Section 68 Approval

$0.00

$93.00

Increase by rate peg to the nearest dollar

50% of applicable fee Last YR Fee

50% of applicable fee Septic Tank Approval/Registration

$50 annually Last YR Fee

$50 annually LGA Section 68 Approvals not listed above

$250.00

$257.00

$0.00

$257.00

Page 73 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

Riverina Regional Library Fees and Charges External Charges Inter Library Loan search fee

$4.40

$4.00

$0.40

$4.40

Inter Library Loan – fee for loan requests from non-reciprocal libraries

$16.50

$15.00

$1.50

$16.50

Library Loan from overseas

Cost recovery Last YR Fee

Cost recovery Inter Library Loan – Rush fee

$33.00

$30.00

$3.00

$33.00

Inter Library Loan – Express fee

$49.50

$45.00

$4.50

$49.50

Reservation fee

$1.00

$1.00

$0.00

$1.00

Replace member card

$2.00

$2.00

$0.00

$2.00

Replacement charge for lost/damaged periodicals and articles

$5 plus replacement cost Last YR Fee

$5 plus replacement cost Replacement charge (lost/damaged collection items other than periodicals and articles

$10 plus replacement cost Last YR Fee

$10 plus replacement cost Replace lost or damaged CD/DVD case (One-Time CD/DVD/MP3 cases)

$3.30

$3.30

$0.00

$3.30

Replace lost or damaged CD/DVD case (multi-CD sound recording cases)

$11.00

$11.00

$0.00

$11.00

continued on next page ...

Page 74 of 90


Name

Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Year 20/21 GST

Fee (incl. GST)

Comment

External Charges [continued] Overdue item fines – Charge per item per work day plus overdue notice fee

$0.10 per work day plus $2 overdue notice fee. Maximum $12 per item.

An exemption applies to fines on overdue items borrowed under the following member categories: Mobile Library; Book Clubs; Branch Libraries; Housebound ; Home Library; Hospitals & Nursing Homes; Inter-LibraryLoan Libraries; Wagga Community Links. This exemption does not extend to lost or damaged items. Periods of amnesty apply when no overdue items fines are charged for specified periods – Specified days to be announced.

Last YR Fee

$0.10 per work day plus $2 overdue notice fee. Maximum $12 per item. Library Bags

$2.00

$1.82

$0.18

$2.00

Library Backsacks

$5.01

$4.55

$0.46

$5.01

Mobile Library – A4 printing/photocopying (black & white)

$0.20

$0.18

$0.02

$0.20

Mobile Library – A4 printing/photocopying (colour)

$0.55

$0.50

$0.05

$0.55

Programs

$2.00 - $50.00 depending on content Last YR Fee

$2.00 - $50.00 depending on content Professional Research Fee – per hour (includes photocopying & postage)

$66.00

$60.00

$6.00

$66.00

Visitor’s Fee (non-refundable) – one month

$33.00

$30.00

$3.00

$33.00

continued on next page ...

Page 75 of 90


Year 19/20 Last YR Fee (incl. GST)

Fee (excl. GST)

Visitor’s Fee (non-refundable) – three month

$88.00

$80.00

$8.00

$88.00

RRL Membership Fee for non-residents (excluding eligible reciprocal members and residents of Wahgunyah and Yarrawonga) – twelve months

$110.00

$110.00

$0.00

$110.00

RRL Membership Fee for Victorian residents of Wahgunyah and Yarrawonga – full membership – twelve months

$55.00

$55.00

$0.00

$55.00

Name

Year 20/21 GST

Fee (incl. GST)

Comment

External Charges [continued]

RRL membership for Victorian residents of Wahgunyah and Yarrawonga – limited membership no charge

Nil

Last YR Fee

Nil

RRL Book Club Membership fee (per club of up to 10 members)

$400.00

$400.00

$0.00

$400.00

Replacement charge for lost or damaged Book Club collection items

$40.00

$40.00

$0.00

$40.00

Replacement charge for e-Readers that are lost or damaged beyond reasonable repair (repair cost more than $75)

$165.00

$165.00

$0.00

$165.00

Replacement charge for lost or damaged e-Reader charging cords

$36.30

$36.30

$0.00

$36.30

Page 76 of 90


Fee Name

Parent

Page

Index of all fees Other $1,000,001 to $10,000,000 $1,000,001 to $10,000,000 $1,001 to $10,000 $10,001 to $20,000 $250,001 to $500,000 $250,001 to $500,000 $5,001 to $250,000 $5,001 to $50,000 $50,001 to $250,000 $500,001 to $1,000,000 $500,001 to $1,000,000

[Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Residential Minor Developments estimated cost] [Residential Minor Developments estimated cost] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)]

64 68 71 71 64 68 68 64 64 64 68

[Residential Class 10] [Residential Class 10] [Access Charges] [With Water Service] [Residential Class 10] [Access Charges] [Lawn Cemetery: Corowa, Howlong and Mulwala]

68 70 40 44 68 41 36

[Commercial / Retail] [Industrial / Warehouse Class 7 & 8] [Commercial/Retail Classes 2 to 6 and 9] [Industrial/Warehouse Class 7 & 8] [Commercial / Retail] [Industrial / Warehouse Class 7 & 8] [Commercial/Retail Classes 2 to 6 and 9] [Industrial/Warehouse Class 7 & 8] [Commercial / Retail] [Industrial / Warehouse Class 7 & 8] [Residential Class 1] [Commercial/Retail Classes 2 to 6 and 9] [Industrial/Warehouse Class 7 & 8] [Access Charges] [Connection Fees] [With Water Service] [Access Charges] [With Water Service] [Lawn Cemetery: Corowa, Howlong and Mulwala]

69 70 71 71 69 69 71 71 69 69 69 71 71 38 42 44 39 44 36

[Access Charges] [Access Charges] [With Water Service]

41 39 44

[Access Charges] [Access Charges] [With Water Service]

41 39 44

[Residential Class 1]

69

1 100 sqm or less floor area 100 sqm or less floor area 100mm 100mm Water Service 101 sqm & greater 150mm 1st interment (includes plot, grave digging, perpetual maintenance)

2 2,001 sqm to 5,000 sqm 2,001 sqm to 5,000 sqm 2,001 sqm to 5,000 sqm 2,001 sqm to 5,000 sqm 200 sqm or less floor area 200 sqm or less floor area 200 sqm or less floor area 200sqm or less floor area 201 sqm to 2,000 sqm 201 sqm to 2,000 sqm 201 sqm to 500 sqm 201 sqm to 500 sqm 201 sqm to 500 sqm 20mm 20mm Meter ( Extra Meter) 20mm Water Service 25mm 25mm Water Service 2nd interment (reopening, includes grave digging)

3 300mm 32mm 32mm Water Service

4 400mm 40mm 40mm Water Service

5 50 sqm or less floor area continued on next page ...

Page 77 of 90


Fee Name

Parent

Page

5 [continued] 50 sqm or less floor area 501 sqm to 2,000 sqm 501 sqm to 2,000 sqm 50mm 50mm Water Service 51 sqm to 200 sqm

[Residential Class 1] [Commercial/Retail Classes 2 to 6 and 9] [Industrial/Warehouse Class 7 & 8] [Access Charges] [With Water Service] [Residential Class 1]

70 71 71 40 44 69

[Access Charges] [With Water Service]

40 44

[Plan Copies] [Plan Copies] [Plan Copies] [Plan Copies] [Plan Copies] [Plan Copies] [Plan Copies] [Plan Copies] [Plan Copies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Photocopies] [Water Charge for Balldale] [Powered Sites]

8 8 8 8 8 8 7 8 8 9 9 9 9 9 9 9 9 9 9 42 58

[Unpowered Sites]

58

[Cabins]

59

[Water Supply from Standpipe – Urana, Boree Creek, Rand and Oaklands] [Estimated Development Cost (GST exempt)]

38

[Building Certificate Sec 6.26 – Authorised work] [Building Certificate Sec 6.26 – Unauthorised work] [Ear tags] [Urana and Oaklands Swimming Pools] [Howlong Swimming Pool] [Howlong Swimming Pool] [Agent Yard Fees per head] [Annual Landing Fees] [Connection Fees] [Waste Facility Levy]

72 72 61 54 54 54 60 57 42 24

[Water Charge for Balldale] [Plumbing and Drainage (includes Application/Approval and Inspections)] [Sewerage Drainage Plans] [Category 1] [Category 3 – Large 20kL/day and industrial] [Category 1] [Category 2] [Category 3 – Large 20kL/day and industrial]

42 73

8 80mm 80mm Water Service

A A0 – black and white A0 – colour A0 – colour on glossy A1 – black and white A1 – colour A1 – colour on glossy A2 – black and white A2 – colour A2 – colour on glossy A3 – black and white A3 – black and white – per copy double sided A3 – colour A3 – colour – double sided A4 – black and white A4 – black and white – double sided copy A4 – black and white – per sheet thereafter A4 – black and white – up to 10 copies A4 – colour A4 – colour – double sided Access Charge/Meter Rental Additional Adults (ages 16 years and above) / night Additional Adults (ages 16 years and above) / night Additional Adults (ages 16 years and above) / night Additional 'callout' fee per load Additional fee if advertising required as per EP&A Act Additional Inspection Additional Inspection Administration charge Adult entry Adult entry Adult season ticket Agent Yard fees per head Aircraft Parking Fees All additional main to meter services All Ratepayers – Waste Facility / Environmental Levy All water consumption Alterations and Swimming Pools Alterations to Sewerage Drainage Plans Annual Trade Waste Fee Annual Trade Waste Fee Application Fee (New Application) Application Fee (New Application) Application Fee (New Application) continued on next page ...

68

46 45 45 45 45 45 Page 78 of 90


Fee Name

Parent

Page

A [continued] Application fee in accordance with the GIPA (Fees and Charges) Application to construct or alter monument Application to install/remove ashes in an existing grave Approval to Install and Operate – Onsite Sewage / Septics Approval to install New Waste System Approval to operate a caravan park Approval to operate Existing Waste System Asbestos over 1m3 – per m3 Asbestos up to 1m3 Assistance animals

[Government Information (Public Access) Act]

10

[Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Licences/Public Health Act]

36

[Sewerage Drainage Plans] [Other Approvals] [Sewerage Drainage Plans] [Asbestos] [Asbestos] [Dog/Cat Lifetime Registrations]

46 73 46 29 29 17

[Functions] [Hire of Other Items] [Books for Sale] [Sporting Clubs Contribution] [Others] [Others] [Functions] [Cat cage] [Preschool (Rand, Urana, Oaklands and Boree Creek)] [Subdivision Fees] [Functions] [Cabins] [Certificates] [Bin Collection Services]

55 48 6 55 9 9 50 19 35 65 49 59 16 33

[Bin Collection Services – Urana, Oaklands, Rand, Morundah and Boree Creek] [Usage Consumption Charges]

34

[Sporting Clubs Contribution] [Others] [Others] [Certificates] [Dog/Cat Lifetime Registrations] [Certificates] [Certificates] [Noxious Weeds] [Other Planning and Environment Fees] [Hire of Other Items] [Hire of Tables and Chairs] [Others] [Tankered Waste] [Urana and Oaklands Swimming Pools] [Howlong Swimming Pool] [Howlong Swimming Pool] [Powered Sites] [Unpowered Sites] [Cabins] [Monumental Cemetery: Corowa, Howlong and Mulwala]

55 32 32 16 17 16 16 24 66 48 50 33 46 54 54 54 58 58 59 36

[Lawn Cemetery: Corowa, Howlong and Mulwala]

36

[Subdivision Fees]

66

36 21

B Bar Beer Jugs and Carafes Billabidgee – History of Urana Billabong Crows Football Netball Club Binding documents – Hole Punch binder Binding documents – Thermal binder Bond Bond (refundable) Booking Fee (one off per child) Boundary Adjustment Breakages Budget Units (BU) Bushfire Attack Level (BAL) Certificate Business – Kerbside collection (incl. Recycle Bin – standard 240L) Business – Kerbside waste service (incl. 240L Standard Bin) Business usage

42

C Campdraft Cardboard Carpet roll / 0.5m diameter Certificate cancellation fee Certificate of Compliance Certificate Section 121 ZP Certificate Section 735A Certificate under Section 64 Certified Copy Of Document Or Map Chairs Chairs Chemical drums – triple rinsed Chemical toilet Child entry Child entry Child season ticket Children (aged to 15) Children (aged to 15) Children (ages to 15) Childs interment (includes land for grave and perpetual grounds maintenance) Childs interment (includes plot, grave digging, perpetual maintenance) Civil Construction Certificate – Involving 1-3 Lots continued on next page ...

Page 79 of 90


Fee Name

Parent

Page

C [continued] Civil Construction Certificate – Involving 4-10 Lots Civil Construction Certificate – Involving more than 10 lots Civil Construction Inspections – Involving 1-10 Lots Civil Construction Inspections – Involving more than 10 lots Class 1 & 3 heavy vehicles for non-interstate journeys Class 1 or 10 Building Class 1 or 10 Building Classified Classified Cleaning Client Requested Food Inspection and Compliance Report Clothes Dryer (per load) Club House and Kitchen facilities (day) Club House and Kitchen facilities (night) Clubs, private swimming classes and functions out of normal hours/hr Columbarium niche (includes plaque) Commercial >4t MTOW Commercial use of footpath – advertising/signs annual fee /sign Commercial use of footpath – new application (+annual fee applicable) Commercial use of footpath – outdoor dining annual fee / chair Commercial use of footpath – street vending annual fee /m2 Commercial/Industrial Commercial/Industrial – Estimated cost <$250,000 Commercial/Industrial – More than $250,000 Compliance Certificates Complying Trade Waste Treatment Charge (per kL) Complying Trade Waste Treatment Charge (per kL) Construction & demolition – co mingled /m3 Construction & demolition – concrete and masonry /m3 Construction & demolition – scrap metal /m3 Construction & demolition – timber /m3 Cooling Tower Improvement Notice or Prohibition Order Cooling Towers Inspection Copy of Certificate Corowa, Howlong and Mulwala Corowa, Howlong and Mulwala Cost of Waste Discharged to Sewer Council has established Avdata Key controlled Standpipes in Corowa, Howlong, Mulwala and Balldale. Keys are available at Council's Offices in Corowa and Mulwala at a cost of $35.00 Council Property Maps – laminated Council Road Network – laminated Council Stock Pound – Release fee (Horse, Ass, Mule, Cattle or camel) continued on next page ...

[Subdivision Fees]

66

[Subdivision Fees]

66

[Subdivision Fees]

66

[Subdivision Fees]

66

[Heavy Vehicle Access Permit]

57

[Building Certificate Sec 6.26 – Authorised work] [Building Certificate Sec 6.26 – Unauthorised work] [Council Compiled – Per Month] [Council Compiled – Per Annum] [Hall Bonds & Cleaning] [Licences/Public Health Act]

72 72 11 12 53 23

[Miscellaneous Caravan Park Fees] [Facility Hire] [Facility Hire] [Urana and Oaklands Swimming Pools]

60 55 55 54

[Interment of Ashes] [Annual Landing Fees] [Licences/Public Health Act]

36 57 20

[Licences/Public Health Act]

20

[Licences/Public Health Act]

21

[Licences/Public Health Act]

21

[Plumbing and Drainage (includes Application/Approval and Inspections)] [Development Advertising Fees]

73

[Development Advertising Fees] [Sewerage Drainage Plans] [Category 1]

65 46 45

[Category 2]

45

[Construction and demolition] [Construction and demolition]

28 27

[Construction and demolition] [Construction and demolition] [Licences/Public Health Act]

28 28 22

[Licences/Public Health Act] [Other Planning and Environment Fees] [Per Water Equivalent Tenement (ET)] [Per Sewerage Equivalent Tenement (ET)] [With Water Service] [Water Supply from Standpipe – Corowa]

22 66 72 72 44 38

[Urana District Maps] [Urana District Maps] [Livestock Impounding]

15 15 19

65

Page 80 of 90


Fee Name

Parent

Page

C [continued] Council will recover the actual costs of a livestock impounding exercise from the identified owner prior to release of sale Cups & Saucers Current year – copy of Rates and Water Notices Cutlery

[Livestock Impounding]

18

[Hire of Other Items] [Rates]

49 15

[Hire of Other Items]

49

[Large Hall Hire (Corowa Memorial Hall)] [Small – Medium Hall Hire (Odd Fellows, Mulwala Civic Centre, Howlong Community Centre)] [Meeting Rooms (Corowa Civic Centre, Howlong Resource Centre)] [Companion Animals Release Fees] [Dog/Cat Lifetime Registrations] [Dog/Cat Lifetime Registrations] [Integrated / Designated / Development Requiring Concurrence] [Development Advertising Fees] [Estimated Development Cost (GST exempt)]

51 52

[Integrated / Designated / Development Requiring Concurrence]

65

[Integrated / Designated / Development Requiring Concurrence]

65

[Estimated Development Cost (GST exempt)]

64

[Connection Fees] [Dishonoured Cheque] [Promotion] [Companion Animals Release Fees] [Dog/Cat Lifetime Registrations] [Water Meters] [Plumbing and Drainage (includes Application/Approval and Inspections)] [Livestock Impounding]

42 6 62 18 17 43 73

[Certificates] [Sewerage Drainage Plans]

16 46

[Ear tags] [Functions] [Preschool (Rand, Urana, Oaklands and Boree Creek)] [Tankered Waste] [Miscellaneous Charges] [Water Meters]

61 48 35 46 47 43

[Functions] [Functions] [Modification of Consent]

50 50 67

[eWaste] [eWaste]

31 31

[eWaste] [Cabins] [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Interment of Ashes] [Unpowered Sites] [Powered Sites]

31 58 37

D Daily Hire Daily Hire Daily Hire Daily Maintenance Fee Dog/Cat Desexed animal Desexed animal owned by eligible pensioner Designated Development Additional Fee Designated Development Advertising Development Application with no physical works / change of use Development requiring Concurrence Approval Fee Development requiring Concurrence Approval Processing Fee Development requiring Concurrence from State Agency Disconnection Fee Dishonoured Cheque Handling Fee Display and/or demonstration Dog/Cat Release Fee Dogs in the service of the State Domestic water pressure test Double Storey Dwelling Driving & transportation costs (including pre pound release) Dwelling Entitlement Dwelling Houses (Irrespective of Number of Closets)

52 18 17 17 65 65 68

19

E Ear tags / tag Education and Training Education Levy (per term) Effluent liquid (per kL) Emergency Repairs Emergency Repairs due to damage caused by public utilities and contractors Entire access to Hall Entire access to Hall Crockery and Glasses Erection of a dwelling-house only where estimated cost is $100,000 or less. eWaste – Household appliance eWaste – National Television & Computer Recycling scheme eWaste – Whitegoods Executive Units (EU) Exhumation – Removal Fee at cost Existing grave no lid Extra charge per person over 5 years Extra charge per person over 5 years continued on next page ...

36 59 59 Page 81 of 90


Fee Name

Parent

Page

E [continued] Extra charge per person over 5 years Extra charge per person over 5 years Extra Copy of Prepaid Sewerage Drainage Plan

[Cabin 2-5] [Cabin 1(only)] [Sewerage Drainage Plans]

59 59 46

F Facsimile – receive per page Facsimile – send in AUS per page – first page Facsimile – send in AUS per page – subsequent page(s) Family season ticket Family season ticket Family Ski Club Membership Farmland, Outside Council Area – Kerbside waste service (incl. 240L Standard Bin) Feeding Fee – All Livestock (including Horses, Cattle, Sheep, Goats & Pigs) Firewood permit Flip up chairs Folding & Stapling per hour Food Improvement Notice Food Inspection (Low Risk) Food Premises Inspection Food Premises Inspection – Community facilities and sporting clubs Food Premises Inspection – Schools, Pre-schools and Daycare Facilities Food Re-Inspection Food Waste Disposal Charge (per bed) For BODs < to 300mg/L For discharge of trade waste no complying with the approval limits for pH For each additional closet urinal or sanitary fitting Full Day Full Day Hire Full day Launching fee Full Fee/Session (per term) Full Hall Rent Full Page Full Page Full Page Full Page Fully prepaid fee plus administration fee Function Room

[Others] [Others] [Others]

9 9 9

[Urana and Oaklands Swimming Pools] [Howlong Swimming Pool] [Memberships] [Bin Collection Services – Urana, Oaklands, Rand, Morundah and Boree Creek] [Livestock Impounding]

54 54 48 34

[Licences/Public Health Act] [Hire of Tables and Chairs] [Others] [Licences/Public Health Act] [Licences/Public Health Act] [Licences/Public Health Act] [Licences/Public Health Act]

21 50 9 23 23 22 22

[Licences/Public Health Act]

22

[Licences/Public Health Act] [Tankered Waste] [Biochemical Oxygen Demand (BOD)] [pH charges]

23 46 45 46

[Sewerage Drainage Plans]

46

[Small Community Group Meetings] [Equipment Hire] [Memberships] [Preschool (Rand, Urana, Oaklands and Boree Creek)] [Functions] [Council Compiled – Per Month] [Council Compiled – Per Annum] [Customer Compiled – Per Month] [Customer Compiled – Per Annum] [Right of Burial (reservation of graves or ashes)] [Functions]

49 48 48 35 48 10 12 13 13 37 55

[Interment of Ashes] [Dog/Cat Lifetime Registrations] [Hall Bonds & Cleaning] [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Other Planning and Environment Fees] [Government Information (Public Access) Act] [Hire of Other Items] [Residential Class 10] [Construction Certificate and Inspections for Rural] [Residential Class 1]

36 17 53 37

18

G Garden – general location (includes plaque) General (Not Desexed) General Bond General Grave Digging (Funeral Directors to arrange with Trevor Gladstone) General Inspection Request GIPA information – informal Glasses per box Greater than 100sqm Greater than 500 square metres Greater than 50sqm

67 10 48 70 70 70

H Hairdressing (No Skin Penetration) Inspection [Licences/Public Health Act] continued on next page ...

23 Page 82 of 90


Fee Name

Parent

Page

H [continued] Half Day Half Day Hire Half Page Half Page Half Page Half Page Hire – per bed Hire of Facility Hire of Hall Hire of Hall BBQ (BYO Gas) Hire per week

[Small Community Group Meetings] [Equipment Hire] [Council Compiled – Per Month] [Council Compiled – Per Annum] [Customer Compiled – Per Month] [Customer Compiled – Per Annum] [Linen] [Facility Hire] [Functions] [Functions] [Cat cage]

49 48 11 12 13 14 60 55 49 49 19

[Livestock Impounding]

18

[Interment of Ashes]

36

[Interment of Ashes]

36

[Noxious Weeds] [Connection Fees]

24 42

[Integrated / Designated / Development Requiring Concurrence] [Integrated / Designated / Development Requiring Concurrence]

65 65

[External Charges] [External Charges]

74 74

[External Charges] [External Charges] [Rates] [Monumental Cemetery: Corowa, Howlong and Mulwala]

74 74 15 36

[Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Subdivision Fees]

36

[Functions]

55

[Others] [Others] [Others] [Functions] [Itinerant Entertainment / Business Providers] [Large load]

9 9 9 48 50 26

[Large load]

26

[Large load]

27

[Preschool (Rand, Urana, Oaklands and Boree Creek)] [Development Advertising Fees] [Residential Minor Developments estimated cost] [Construction Certificate and Inspections for Rural] [Other Approvals] [External Charges] [External Charges] [External Charges]

35 65 71 70 73 74 74 74

I Impounding Fee – All Livestock (including Horses, Cattle, Sheep, Goats & Pigs) Individual rose garden – 2nd interment (includes plaque) Individual rose garden – specific location (includes plaque) Inspections – Inspection Install service, tap main, supply and install meter (main to meter service) Integrated Development Approval Fee Integrated Development Approval Processing Fee Inter Library Loan – Express fee Inter Library Loan – fee for loan requests from non-reciprocal libraries Inter Library Loan – Rush fee Inter Library Loan search fee Interest on overdue Rates and Charges Interment (includes land for grave and perpetual grounds maintenance) Interment Preparation costs (per burial) Issuing Of Subdivision Certificate

66

K Kitchen

L Laminating – per A3 size sheet Laminating – per A4 size sheet Laminating – per poster size Land Sales Land Use / Itinerant Traders Permit LARGE load (any volume larger than 1m3 but less than 1.5m3 – incl. large trailer) – co mingled recycling LARGE load (any volume larger than 1m3 but less than 1.5m3 – incl. large trailer) – green LARGE load (any volume larger than 1m3 but less than 1.5m3 – incl. large trailer) – waste Late pickup child(ren) LEP/DCP Advertising Fee Less than $1,000 Less than 500 square metres LGA Section 68 Approvals not listed above Library Backsacks Library Bags Library Loan from overseas continued on next page ...

Page 83 of 90


Fee Name

Parent

Page

L [continued] Licensed Bond Linen packs – double/queen Linen packs – single Lounge – 1 seat Lounge – 2 seat Lounge – 3 seat Lounge – additional seat

[Hall Bonds & Cleaning] [Cabins] [Cabins] [Lounge] [Lounge] [Lounge] [Lounge]

54 59 59 30 30 30 30

[Functions] [Functions] [Functions] [Functions] [Functions] [Functions] [Connection Fees] [Miscellaneous Charges]

48 50 49 49 50 50 42 46

[Usage Consumption Charges] [Mattresses] [Mattresses] [Medium load]

42 28 28 25

[Medium load]

25

[Medium load]

26

[Functions] [Functions] [Functions] [Functions] [Water Meters] [Dog/Cat Lifetime Registrations] [Companion Animals Release Fees] [With Water Service] [External Charges]

50 50 50 48 43 17 18 45 74

[External Charges]

74

[Modification of Consent]

67

[Other]

70

[Other Approvals] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Residential Minor Developments estimated cost] [Miscellaneous Impounding Fees]

73 64 68 71 18

[Subdivision Fees] [Urana and Oaklands Swimming Pools] [Category 1]

65 54 45

[Category 2]

45

[Powered Sites] [Unpowered Sites] [Miscellaneous] [Miscellaneous]

58 58 62 63

M Main Hall Main Hall Main Hall (1/2 night til midnight) Main Hall (all day or night) Main Hall and Kitchen/Bar Main Hall, Kitchen/Bar and Crockery Mains Tapping Fee Mains Tapping Fee (when junction is not provided) Major industry usage Mattresses – Queen/King Mattresses – Single/Double MEDIUM load (up to approximately 1m3 – single axel trailer or ute tray) – co mingled MEDIUM load (up to approximately 1m3 – single axel trailer or ute tray) – green MEDIUM load (up to approximately 1m3 – single axel trailer or ute tray) – waste Meeting Room Meeting Room and Kitchen Meeting Room/Kitchen and Supper Room Meetings Meter test fee (refunded if faulty) Microchipping Microchipping Fee Minimum Combined Charge Mobile Library – A4 printing/photocopying (black & white) Mobile Library – A4 printing/photocopying (colour) Modification of BASIX Certificate / Amendment to Certificate Modification of Complying Development Certificate Modification of LGA Section 68 Approval More than $10,000,000 More than $10,000,000 More than $20,000 Motor Vehicles

N No New Road Non Swimming Supervising adult Non-complying Trade Waste Usage Charge (per kL) Non-complying Trade Waste Usage Charge (per kL) Normal Normal Note 3: Note 4:

Page 84 of 90


Fee Name

Parent

Page

O Oaklands Old Trestle tables Onsite Sewage / Septic Annual Charge Onsite Sewage / Septic Inspection Onsite Sewage / Septic Re-Inspection Order Processing charge after first hour per hour Other Buildings – For First Closet Other structures floor area between 200 – 2,000 square metres Other structures floor area between 200 – 2,000 square metres Other structures floor area greater than 2,000 square metres Other structures floor area greater than 2,000 square metres Other structures less than 200 square metres Other structures less than 200 square metres Other Users Out of working hours release fee Over 5,000 sqm Over 5,000 sqm Over 5,000 sqm Over 5,000 sqm Over 501 sqm Overdue item fines – Charge per item per work day plus overdue notice fee

[Per Sewerage Equivalent Tenement (ET)] [Hire of Tables and Chairs] [Licences/Public Health Act] [Licences/Public Health Act] [Licences/Public Health Act] [Government Information (Public Access) Act]

72 50 22 21 22 10

[Sewerage Drainage Plans] [Building Certificate Sec 6.26 – Authorised work]

46 72

[Building Certificate Sec 6.26 – Unauthorised work]

72

[Building Certificate Sec 6.26 – Authorised work]

72

[Building Certificate Sec 6.26 – Unauthorised work]

72

[Building Certificate Sec 6.26 – Authorised work] [Building Certificate Sec 6.26 – Unauthorised work] [Sporting Clubs Contribution] [Livestock Impounding] [Commercial / Retail] [Industrial / Warehouse Class 7 & 8] [Commercial/Retail Classes 2 to 6 and 9] [Industrial/Warehouse Class 7 & 8] [Residential Class 1] [External Charges]

72 72 55 18 69 70 71 71 69 74

[Powered Sites] [Unpowered Sites] [Feeding Fee] [Meeting Rooms (Corowa Civic Centre, Howlong Resource Centre)] [Water Supply from Standpipe – Urana, Boree Creek, Rand and Oaklands] [Unpowered Sites] [Powered Sites] [Cabin 2-5] [Cabin 1(only)] [Powered Sites] [Unpowered Sites] [Monumental Cemetery: Corowa, Howlong and Mulwala] [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Urana District Maps] [Plaques] [Plaques]

58 58 60 53

[Sewerage Drainage Plans] [Miscellaneous]

46 62

[Hire of Other Items] [Polystyrene] [Polystyrene] [Monthly Posted Newsletter] [Rates]

48 32 32 14 16

[Certificates] [Testing] [Other Planning and Environment Fees]

16 46 66

P Peak Peak Per day per head Per Hour Hire Per Kilolitre (Minimum Charge $10.00) (Subject to change by Riverina Water) Per night (2 persons) Per night (2 persons) Per night (2 persons) Per night (2 persons) Per week (2 persons – pay 6 get 7th free) Per week (2 persons) Permit for erection of monument Permit for erection of monument Photocopies per single sheet Pioneer Cemetery memorial wall Placement of plaque (Office of Australia War Graves) Plan of sewer connection point Plant Hire Rates for Private Works, State Roads, etc Plates Polystyrene less than 1m3 – per m3 Polystyrene over 1m3 – per m3 Posted Newsletters Previous year – copy of Rates and Water Notices Priority Certificate Urgent Request Private analytical testing by Quotation Private Certifier Document Lodgement – Complying Development Certificate continued on next page ...

38 59 59 59 59 59 59 36 36 15 37 37

Page 85 of 90


Fee Name

Parent

Page

P [continued] Private Certifier Document Lodgement – Construction Certificate Private Certifier Document Lodgement – Occupation Certificate Private Certifier Document Lodgement – Subdivision Certificate Private Certifier Inspection Request Professional Research Fee – per hour (includes photocopying & postage) Programs Promotional signage / sign Property Property Sewer Service Diagram Public Health Act Registration/Inspection Fee Public Swimming Pool – (motels, hotels, hospitals, schools etc.) Inspection (e.g water quality) Public Swimming Pool – (motels, hotels, hospitals, schools etc.) Re-Inspection (e.g water quality) Purchase of Key Purchase Site Only (Double 2.4m x 2.4m) Purchase Site Only (Single 2.4m x 1.2 m)

[Other Planning and Environment Fees]

66

[Other Planning and Environment Fees]

67

[Other Planning and Environment Fees]

67

[Other Planning and Environment Fees] [External Charges]

67 74

[External Charges] [Promotion] [Urana District Maps] [Certificates] [Licences/Public Health Act] [Licences/Public Health Act]

74 62 14 16 23 22

[Licences/Public Health Act]

22

[Truck Wash – Avdata Billing System] [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield]

61 36

[Council Compiled – Per Month] [Council Compiled – Per Annum] [Customer Compiled – Per Month] [Customer Compiled – Per Annum]

11 12 13 14

[Sporting Clubs Contribution] [Sporting Clubs Contribution] [Bin Collection Services]

55 55 34

[Water Meters]

43

[Connection Fees] [Functions] [Facility Hire] [Functions]

42 49 55 49

[Dog/Cat Lifetime Registrations] [Other Planning and Environment Fees]

17 67

[Annual Landing Fees] [Annual Landing Fees] [Functions] [Reinspections] [Other]

57 57 48 46 71

[Interment of Ashes] [Monumental Cemetery: Corowa, Howlong and Mulwala] [External Charges]

36 36 74

[External Charges]

74

[External Charges] [External Charges]

74 74

36

Q Quarter Page Quarter Page Quarter Page Quarter Page

R Rand Cricket Club Rand Walbundrie Walla Football Club Ratepayers – Rennie, Daysdale, Savernake, Buraja and Coreen Village Skip charge Reading Fee – Mulwala, Howlong, Corowa & Balldale Reconnection Fee Refundable Deposit Refundable Deposit Refundable deposit for cutlery, crockery & glasses Registered Breeder Registration of Swimming Pool on www.swimmingpoolregister.nsw.gov.au Regular Users Commercial Regular Users Non Commercial Rehearsals Re-inspection Charge Reinspection of building work (i.e. Work not ready or defective) Removal and return of ashes Reopening and internment Replace lost or damaged CD/DVD case (multi-CD sound recording cases) Replace lost or damaged CD/DVD case (One-Time CD/DVD/MP3 cases) Replace member card Replacement charge (lost/damaged collection items other than periodicals and articles continued on next page ...

Page 86 of 90


Fee Name

Parent

Page

R [continued] Replacement charge for e-Readers that are lost or damaged beyond reasonable repair (repair cost more than $75) Replacement charge for lost or damaged Book Club collection items Replacement charge for lost or damaged e-Reader charging cords Replacement charge for lost/damaged periodicals and articles Replacement Garbage Bin

[External Charges]

76

[External Charges]

76

[External Charges]

76

[External Charges]

74

[Bin Collection Services – Urana, Oaklands, Rand, Morundah and Boree Creek] [Functions] Replacement of chairs & tables [Other Planning and Environment Fees] Request for Development Records [Sale of Impounded Dog/Cat] Rescue organisation [External Charges] Reservation fee [Bin Collection Services] Residential – Additional Garbage Bin [Bin Collection Services] Residential – Additional Recycle Bin [Bin Collection Services] Residential – Downsize of any bin Residential – Kerbside collection (incl. Recycle [Bin Collection Services]

Bin – standard 240L) Residential – Kerbside collection (incl. Recycle Bin – upsize 360L) Residential – Kerbside waste service (incl. 240L Standard Bin) Residential – Weekly Garbage Collection (Medical Waste) Residential DA – $100,000 to $500,000 Residential DA – Estimated cost <$100,000 Residential DA – More than $250,000 Residential usage – in excess of 450 Kl annual Residential usage – up to 450 Kl annual Restricted and declared to be dangerous dog breeds Review Of Construction Certificate And Issue Of New Certificate (Including GST) Round Tables Round Tables RRL Book Club Membership fee (per club of up to 10 members) RRL Membership Fee for non-residents (excluding eligible reciprocal members and residents of Wahgunyah and Yarrawonga) – twelve months RRL Membership Fee for Victorian residents of Wahgunyah and Yarrawonga – full membership – twelve months RRL membership for Victorian residents of Wahgunyah and Yarrawonga – limited membership no charge

34 49 66 18 74 34 34 34 34

[Bin Collection Services]

34

[Bin Collection Services – Urana, Oaklands, Rand, Morundah and Boree Creek] [Bin Collection Services]

34

[Development Advertising Fees] [Development Advertising Fees] [Development Advertising Fees] [Usage Consumption Charges] [Usage Consumption Charges] [Pet registration annual permit]

64 64 65 42 42 17

[Other]

70

[Hire of Other Items] [Hire of Tables and Chairs] [External Charges]

49 50 76

[External Charges]

76

[External Charges]

76

[External Charges]

76

[Modification of Consent]

67

[Modification of Consent]

67

[Modification of Consent]

67

[Hire of Other Items] [Others] [Certificates]

49 9 16

34

S s96(1) – To correct a minor error, wrong description or miscalculation s96(1A) or 96AA(1) – Minimal environmental impact and simple assessment s96(2) or 96A(1) – Potential environmental impact or Development for use only – not involving the erection of a building, the carrying out of work, the demolition of a work or building, subdivision or the like Salt & Pepper Scanning (self service library only) Section 10.7 (2) Certificate continued on next page ...

Page 87 of 90


Fee Name

Parent

Page

S [continued] Section 10.7 (5) Certificate Section 603 Certificate and water meter reading Section 603 Rates Certificate Section 608 Outstanding Notice Certificate Self contained units (SCU) Septic Tank Application Septic Tank Approval/Registration Septic Tank sludge (per kL) Sewer Access Charge Sewer Permit Fee Sewerage Access Charge Sewerage Waste Dump Sheep – 0 to 1,000 head Sheep – Over 1,000 head Shopping Trolley Signs Single Inspection Single season ticket Single Storey Dwelling Skin Penetration and Hairdressing Re-Inspection Skin Penetration Improvement Notice or Prohibition Order Skin Penetration Inspection SMALL load (up to an average sedan boot or half a small trailer) – co mingled recycle SMALL load (up to an average sedan boot or half a small trailer) – green SMALL load (up to an average sedan boot or half a small trailer) – waste Standard Bed and Banks Development Advertising Standard Plus Units (SPU) Standard Units (SU) Standard Water Connection Fee (All Towns) Stock Pound – Release fee (Sheep, goat or pig) Strata Subdivision DA – Less than 10 Lots Subdivision DA – More than 10 Lots Subdivision with New Road Sulphate > 500mg/L Sulphide > 1mg/L Supervising adult Supper Room Supper Room – Day Supper Room – Night Supper Room and Kitchen/Bar Supper Room, Kitchen/Bar and Crockery Supply/Search of information from rating and allied records of Council by members of staff Suspended solids > 300mg/L Swimming Pool Compliance Certificate (safety inspection e.g fencing) Swimming Pool Compliance Certificate (safety inspection e.g fencing) – Reinspection fee

[Certificates] [Certificates]

16 16

[Certificates] [Certificates] [Cabins] [Miscellaneous Charges] [Other Approvals] [Tankered Waste] [Residential Pricing] [Sewerage Drainage Plans] [Maintenance Charges – Urana and Oaklands] [Miscellaneous Caravan Park Fees] [Drafting Fees & Holding] [Drafting Fees & Holding] [Miscellaneous Impounding Fees] [Miscellaneous Impounding Fees] [Other] [Urana and Oaklands Swimming Pools] [Plumbing and Drainage (includes Application/Approval and Inspections)] [Licences/Public Health Act]

16 16 58 46 73 46 44 46 44 60 60 60 18 18 71 54 73

[Licences/Public Health Act]

23

[Licences/Public Health Act] [Small load]

23 24

[Small load]

24

[Small load]

25

[Development Advertising Fees]

65

[Cabins] [Cabins] [Connection Fees] [Livestock Impounding]

59 59 42 19

[Subdivision Fees] [Development Advertising Fees] [Development Advertising Fees] [Subdivision Fees] [Excess Mass Charges] [Excess Mass Charges] [Howlong Swimming Pool] [Functions] [Functions] [Functions] [Functions] [Functions] [Rates]

66 65 65 65 45 45 54 48 50 50 50 50 16

[Excess Mass Charges] [Certificates]

45 16

[Certificates]

16

[Hire of Other Items] [Functions] [Small Community Group Meetings]

49 48 49

23

T Tablecloths Tea Facilities Tea/Coffee per head continued on next page ...

Page 88 of 90


Fee Name

Parent

Page

T [continued] Temporary Road/Footpath Occupation Terminal Building Textiles /m3 Thank you notices (including Obituaries and general thank you) Total Nitrogen 100mg/L Total Phosphorus > 20mg/L Township Map Reduced – photocopy Trade Waste Treatment Charge (per kL) Tree Removal Permit Trestle Tables TRUCK load – co mingled recycling /m3 TRUCK load – green /m3 TRUCK load – waste /m3 Tyre R<20 – each Tyre R>40 – each Tyre R20 to R40 – each

[Miscellaneous] [Site Fees] [Others] [Council Compiled – Per Month]

62 57 33 11

[Excess Mass Charges] [Excess Mass Charges] [Urana District Maps] [Category 3 – Large 20kL/day and industrial] [Other Planning and Environment Fees] [Hire of Other Items] [Truck load] [Truck load] [Truck load] [Tyre] [Tyre] [Tyre]

45 45 15 45 66 48 27 27 27 29 30 29

U [Pet registration annual permit] Undesexed cats [Disposal Fee] Unfit for Sale Unoccupied Lot Service charge (Vacant Land) [Bin Collection Services – Urana, Oaklands, Rand, Morundah

Unsecured Load Penalty Up to $5,000 Up to $5,000 Urana Urgency Fee on provision of Rates and Water Notices Urns Use of Facility Use of Kitchen (charged in addition to hall hire) Use of Valuer General Books without staff assistance Used oil

17 60 34

and Boree Creek] [Others] [Estimated Development Cost (GST exempt)] [Estimated Development Cost (GST exempt)] [Per Sewerage Equivalent Tenement (ET)] [Rates]

33 64 67 72 16

[Hire of Other Items] [Truck Wash – Avdata Billing System] [Large Hall Hire (Corowa Memorial Hall)] [Rates]

49 61 51 16

[Others]

33

[Residential Pricing] [Without Water Service] [Miscellaneous] [Cabins] [Sporting Clubs Contribution] [External Charges] [External Charges]

44 44 62 58 55 74 76

V Vacant Land Without Water Service Vacant Land Without Water Service Variable Messaging System (VMS) Board Villa Units (VU) Vintage Machinery Visitor’s Fee (non-refundable) – one month Visitor’s Fee (non-refundable) – three month

W [Cemetery – Monument and Columbarium: Urana, Boree Creek, Oaklands & Hopefield] [Miscellaneous Caravan Park Fees] Washing Machine (per load) [Others] Waste classification testing Water Connection (exist service – subdivision) [Connection Fees] [Water Meters] Water main pressure test [Certificates] Water meter reading [Miscellaneous Charges] Weekend Interment Surcharge [Large Hall Hire (Corowa Memorial Hall)] Weekly Hire [Small – Medium Hall Hire (Odd Fellows, Mulwala Civic Centre, Weekly Hire Howlong Community Centre)] [Wheelie bin] WHEELIE bin (240 litre bin) – green [Wheelie bin] WHEELIE bin (240 litre bin) – co mingled

Wall Section – Niche

recycle WHEELIE bin (240 litre bin) – waste continued on next page ...

[Wheelie bin]

37 60 33 42 43 16 37 51 52 24 24 24 Page 89 of 90


Fee Name

Parent

Page

W [continued] Where no square meterage applicable, i.e. swimming pools, fences, retaining walls. Where no square meterage applicable, i.e. swimming pools, fences, retaining walls. With School per entry With School per entry Woodheater – Approval & Inspections Working dogs

[Other]

70

[Other]

71

[Urana and Oaklands Swimming Pools] [Howlong Swimming Pool] [Other Approvals] [Dog/Cat Lifetime Registrations]

54 54 73 17

Page 90 of 90


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.