Portfolio _ Stefano Piedimonte

Page 1

PORTFOLIO part 1 Selection of projects

To build in the existing part 2 Professional experiences

Stefano Piedimonte A : Via Domenico De Dominicis, 30 Roma T :+393402948407_+447922948195 M: piedimonte@hotmail.it








Red South Metro Doha - Entrnces Design Coordinator Establish a Network Identity recognizable in the urban surrounding was the aim of UN Studio who defined the concept and the Branding Manual of the Doha Metro Stations. The design further aims to incorporate and integrate all functional and technical aspects of the network and stations into a coherent architectural expression. The most Iconic part of the project are the Entrances, buildings that have the function to receive users and to be reference in the city. 3TI PROGETTI has been appointed as BIM Designer, of the Red Line South underground with a mandate to implement and deliver the individual station. As Lead Designer to delivering world class design to our client all the process follow the most updated BIM procedures and workflow.

C. Elevations C. Elevations

D. Section

TASKS PERFORMED Technical interface with contractors and client (QDVC) Coordination of design and modelling between Doha and Rome Quality check of BIM models

Front Elevation DOHA METRO RED LINE SOUTH UNDERGROUND

Jan 13th 2017

OQBA IBN NAFIE STATION– ENTRANCE 01

Front Elevation DOHA METRO RED LINE SOUTH UNDERGROUND

6

Jan 13th 2017

Red South Metro Doha - Statutory approvals coordinator OQBA IBN NAFIE STATION– ENTRANCE 01

5

DOHA METRO RED LINE SOUTH UNDERGROUND

Jan 13th 2017

OQBA IBN NAFIE STATION– ENTRANCE 01

5

KeyPlan

The Red Line runs for about 40 km from Al Wakra in the south to Lusail in the north. The line also connects Hamad International Airport at Terminal 1 to the city centre. It has 17 stations. Qatar Rail’s metro network will have big impact on the lives of Doha’s population providing a convenient and practical service with a specific mission: Create a world-class public transportation network. To rech this goal has been a must to define and follow strictly the fire and life sefety strategy and be secure that every single detail is compliant with the code. Qatar civil defence is the istitution appointed to approve the design and is referring to the most updated National fire protection association code. One of the scope of work of 3TI is to deal with the approval of the architectural and MEP design regardin the fire and life safety.

N QIBLA

M010

M030 M032

M104 M010

M020 M040

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:

CONSTRUCTION

MAINTENANCE/CLEANING

DECOMMISSIONING/DEMOLITION

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement

NTS KeyPlan

N

QIBLA

M010

NTS

M030 M032

M104

Reference Documents:

M010

M020

M003-QGD-ARC-MD3-BSSB020-ZZ-15990 REV.4.2 M003-QGD-STR-MD3-BSSB020-ZZ-49000 REV.4 M003-QGD-STR-MD3-BSSB020-ZZ-68704 REV.2

TASKS PERFORMED M040

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION 0

Scale:

0.5

1

1.5

2

SCALE 1:50 Drawing Revision History Rev Description 4 DD2 SUBMISSION

Design support in order to verify compliance with the code

In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following:

2.5 [m]

CONSTRUCTION App.

Date 25.08.16

Coordination of fire and life safety submissions

Purpose of Issue:

MAINTENANCE/CLEANING

Design Validation: Date:

SONO Reference: DVE Reference: Client

Date:

Interface with local consultant

Qatar Railways Company P.O. Box 29988 Doha - Qatar

DECOMMISSIONING/DEMOLITION

FILE NAME: M003-QGD-ARC-MD2-BSSB020-ZZ-15995.rvt 4.1

Originator:

Contractor:

Tornado Tower, 33rd Floor Dafna Area, P.O. Box 19389 Doha, Qatar

Qatar Integrated Railway Project Design + Build Package 2 Red Line South Underground Discipline:

ARCHITECTURE

Drawing Title:

ARCHITECTURE

NTS

M40/M104 SWITCHBOX 3D MASSING Originator: Drawn

NTS

Contractor: MLI

19.01.17

Checked

FMI

19.01.17

Approved

MRI

19.01.17

Scale:

Checked Approved

Sheet Size:

Drawing No:

M003-QGD-ARC-DWG-BSSB020-ZZ-15979 1

2

5

10 M @ 1 : 100 100mm on Original

THE DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON IS LICENSED TO THE QATAR RAILWAYS COMPANY AND IS CONFIDENTIAL AND SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION. © QATAR RAILWAYS COMPANY.

A1 Rev:

4.1

Reference Documents: M003-QGD-ARC-MD3-BSSB020-ZZ-15990 REV.4.2 M003-QGD-STR-MD3-BSSB020-ZZ-49000 REV.4 M003-QGD-STR-MD3-BSSB020-ZZ-68704 REV.2

0

Scale:

0.5

1

1.5

2

2.5 [m]

SCALE 1:50 Drawing Revision History Rev 4

Description DD2 SUBMISSION

App.

Date 25.08.16

Purpose of Issue:

Design Validation: Date:

SONO Reference: DVE Reference: Client

Date:

Qatar Railways Company P.O. Box 29988 Doha - Qatar

Originator: FILE NAME: M003-QGD-ARC-MD2-BSSB020-ZZ-15995.rvt 4.1

0

Viaduct Vestone south to Idro nord - BIM specialist

Contractor:

Tornado Tower, 33rd Floor Dafna Area, P.O. Box 19389 Doha, Qatar

Project:

Qatar Integrated Railway Project Design + Build Package 2 Red Line South Underground Discipline:

ARCHITECTURE

Drawing Title:

ARCHITECTURE

NTS

M40/M104 SWITCHBOX 3D MASSING Originator: Drawn

20/01/2017 17:25:54

20/01/2017 17:25:54

Quaity check of BIM models

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement

Project:

NTS

Contractor:

Interprogetti s.r.l perform structural design and architecture activities, carried out with an innovative, multidisciplinary and sustainable approach, aim to solve complex design problems. This approach has led to acquire soon the BIM international standards and to innovate the design process in accordance with this new technology. The Viaduct Vestone was a strategic project designed by Interprogetti of 3.2 km which includes two bridges. The project was implemented with BIM that allowd an accurated bill of quantity, an easy management of information as well as an adaptability to design changes not achievable otherwise.

MLI

19.01.17

Checked

FMI

19.01.17

Approved

MRI

19.01.17

Scale:

Drawing No:

Checked

Approved

Sheet Size:

1

2

5

10 M @ 1 : 100 100mm on Original

THE DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON IS LICENSED TO THE QATAR RAILWAYS COMPANY AND IS CONFIDENTIAL AND SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION. © QATAR RAILWAYS COMPANY.

A1

Rev:

M003-QGD-ARC-DWG-BSSB020-ZZ-15979 0

4.1

TASKS PERFORMED Development of BIM Revit Structure models Extrapolation of data from BIM BIM graphic setting out Interface with Structural engineers




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.