Feasibility Study Report
BRADFORD BID FEASIBILITY STUDY
bradford_bid BradfordBID bradfordbid.co.uk
1
2
Feasibility Study Report
Feasibility Study Report
3
4
Feasibility Study Report
Feasibility Study Report
EXECUTIVE SUMMARY
5
POSSIBLE PROJECTS The principal projects determined by the results of the survey will focus on aspects of the following key issues
Earlier this year, Heartflood were commissioned to undertake a feasibility study into the possibility of introducing a Business Improvement District (BID) into Bradford city centre. The study began in July 2017 and culminates in the release of this summary report in November 2017. Responses were received from a comprehensive sample of 203 businesses, representing approximately 35% of those within a defined Bradford city centre area and covering the retail, leisure, office and service sectors. With 70% of those completing the survey in favour of a BID, we believe that there is an overwhelming demand across the entire commercial offer in the city centre to move towards the development of a BID. From the responses, we therefore recommend that Bradford should move towards detailed consultation ,given that 70% of the sample are supportive of the proposals, we believe that there is more than sufficient demand for the City to move on to the next phase of BID development – namely detailed consultation and development of a draft business plan built around the following recommendations: •A timetable to be adopted for businesses to vote on a BID for Bradford based on a detailed, fully costed business plan in September/October 2018, with a view to a five-year BID term starting in December 2018 he proposed boundary of the BID to cover the whole of the •T City Centre, including the shopping centres (Kirkgate and Broadway)
01 DELIVER A STRATEGY TO REDUCE THE NUMBER OF EMPTY SHOPS
01
•A n exemption level is to be set at £12,000 – meaning that those properties with a Rateable Value of less than £12,000 would not be liable to pay the BID levy, although they are situated within the BID boundary and will gain some benefits because of this.
203
04
02
70%
03
Dec ‘18
10
1.25% Proposed levy fee
05
£12,000 Exemption level
08
13
Rateable Value
DAYTIME WARDENS/HOSTS/ AMBASSADORS
EVENING ECONOMY PROJECTS, POSSIBLY TO GAIN NATIONAL ACCREDITATION
MARKETING AND PROMOTION TO PROJECT THE CITY TO A FAR WIDER AUDIENCE
06 STREET CLEANSING & WASHING, INCLUDING CHEWING GUM REMOVAL
SECURITY IMPROVEMENTS
BID launch date
04
05
07
Businesses in favour of a BID
03 PROJECTS TO ENCOURAGE INVESTMENT
MORE MAJOR EVENTS OR FESTIVALS
Businesses surveyed
• 1.25% is the most appropriate rate of levy to apply to the BID • A reduction of 25% of the BID levy to be proposed for premises within managed centres which already pay a service charge - this is because the service charge they pay already includes some of the benefits that the BID intends to deliver
02
11
14
GREATER LOBBYING, REPRESENTATION AND CHAMPIONING OF THE CITY
EVENING WARDENS/ MARSHALS/ PASTORS
IMPROVEMENTS TO PAVING, LANDSCAPING AND STREET FURNITURE
IMPROVEMENTS TO PROBLEM AREAS, GRAFFITI OR FLY-TIPPING REMOVAL
09 NEW SEASONAL EVENTS
12
15
STREET MARKETS
CITY CENTRE STREET ENTERTAINMENT
6
Feasibility Study Report
Feasibility Study Report
BUSINESS IMPROVEMENT DISTRICTS Since the introduction of Business Improvement District legislation in 2004, more than 280 Business Improvement Districts have been created across the UK and the Republic of Ireland. In Yorkshire the most significant is Leeds BID, although one has been created and is working well in Keighley. The majority of BIDs focus upon town and city centres, although they are not confined to these areas; several have been formed in out of town industrial or commercial areas. BIDs operate by raising a small levy to pay for additional services to help boost the performance of participating businesses (usually a small percentage of National NonDomestic or Business Rateable Values) with the actual levy percentage varying depending on the area in question and the cost of the activities defined in the Business Plan. In most towns and cities with a BID, businesses pay an annual levy of between 1% and 1.5% of the actual Rateable Value of their business premises. Any BID business plan is subject to a vote of potential levy payers and the voting papers are sent to either the tenant of the business or to the landlord (in the case of vacant units) inside the defined boundary that forms the BID. This report identifies what we consider to be the most appropriate potential boundary for the Bradford City Centre BID.
For any BID to be successful, there needs to be a majority of positive votes from the total number of votes cast AND these positive votes must also form the majority of the total aggregated Rateable Values of all the votes cast. It is always the intention of a BID to create projects and activities within a town or city over and above those which already happen. A BID is not, therefore, a mechanism to allow any public or private sector body to cease providing existing, established activities or divest the cost of providing them.
EXISTING BIDS IN THE AREA
Levy Incone
£ 16 2 , 0 0 0
It is always the intention of a BID to create projects and activities within a town or city over and above those which already happen.
Levy Incone
Skipton
£286,0 0 0
Est.
Keighley
2 014
L evy Inco n e
£790,0 0 0
Otley
York
Est.
2 014
Est.
2 015
Est.
2 015
Levy Incone
£2,0 0 0,0 0 0
Leeds
The maximum term covered by a BID business plan is five years and the continuation of any BID beyond this initial term is reliant on the generation of a new business plan and a renewal ballot of the businesses within the BID area. BIDs generally involve the creation of a Company Limited by Guarantee, which limits the financial liability of any Company Director to £1. A Board of between 12-16 Company Directors is usually formed from BID levy paying organisations to create a representative and business-led group of Directors to oversee the financial, managerial and operational arrangements for the BID. The Chairman of the Board is invariably a local business person.
£70,0 0 0
Levy Incone
Est.
2 015
Levy Incone
L evy In co n e
£ 4 2 7, 0 0 0
£282,0 0 0
Halifax
Wakefield
Est. Levy Incone
Est .
2 017
2 017
£970,0 0 0
Manchester Est.
2 013
30 miles
7
8
Feasibility Study Report
Feasibility Study Report
BRADFORD CITY CENTRE OVERVIEW
THE BUSINESS SURVEY
Bradford is a major metropolitan urban centre, which sits strategically within the major motorway network that serves West Yorkshire, including the principal M62 link across the Pennines into Lancashire. It is well served by rail and has a major international airport within easy driving distance of the City Centre. The City Centre principally serves the day to day convenience needs of a relatively local catchment with little or no major appeal beyond this, although the recent Broadway and Sunbridge Wells developments have added a wide range of retail & leisure operators, widening the pull of the City Centre beyond its usual limited catchment population. The City Centre contains a range of ancillary services, including a number of banks, building societies, property agents, motor dealerships and professional services. There are also many churches, mosques and other places of worship, as well as a post office, University, health centres, cinemas and theatres, a library, a police station and a number of wellestablished facilities for a culturally diverse community.
The core of Bradford city centre with our initial BID boundary contains 585 business rate payers with a defined total Rateable Value of £37,413,100. These premises range from small specialist independent companies to significant national multiple operators. Feedback was sought from a strong, representative sample of all sizes and types of businesses within our defined boundary as to their attitude towards a Business Improvement District. It is important to note that while a tentative boundary line has been drawn to include the bulk of the City Centre as commonly recognised, this boundary will be ‘tested’ to ensure it is the correct delineation of the BID area and ultimately it may well change to reflect the different responses we record from businesses about the BID.
585
Businesses rate payers
£37.4 Million
FA C T S A B O U T B R A D F O R D
Bradford
4
th
largest metropolitan district
5
th
Economy set to increase by
25%
over the next ten years
largest city in the UK
(Source: 2011 census data)
(in terms of population) in England
£9.5bn economy
Total Rateable Value
the youngest city in Europe
17,000 businesses
& more FTSE 100 companies than any other north of England city
The feedback was captured in the form of an online, structured questionnaire which was carefully designed to disseminate a number of key pieces of information from the business community. The online survey ran from July to the end of October to give adequate time for local businesses to engage with it and give their considered opinions. It was supplemented by hard copies that were distributed to various businesses including members of the West & North Yorkshire Chamber of Commerce. The survey was promoted during two open business meetings which were attended by over 30 businesses and ultimately the entire survey process yielded a total of 203 responses. • 50% of respondents were from independent businesses, with 50 % being from multiple, franchise or other operators • Business satisfaction about how well Bradford is currently performing was generally low, with the following levels of dissatisfaction being expressed about specific aspects of the City’s offer: Perceived performance of aspects of the City Centre “Do you think that Bradford City Centre achieves its potential as a…”
Percentage of responders who indicated that City Centre performance was negative or neutral compared with a positive take
Retail centre
92%
Professional services hub
93%
Place to dine out
91%
Place to spend leisure time
94%
Day visits
89%
Weekend break location
97%
71% of businesses thought that their trading area should be included within the potential BID boundary
9
10
Feasibility Study Report
Feasibility Study Report
The explanations given as to why businesses feel that Bradford under-performs were given as:
usinesses prioritised how they felt BID income B should be spent as follows:
81%
The image of Bradford locally and nationally
71%
High levels or perceptions of crime
70%
Insufficient range of shops
67%
Quality of the shopping environment around the shops
Daytime wardens/hosts/ambassadors
The main competitor locations were considered to be:
91% Leeds Online retail
21%
42% 97%
Bradford's out of town retail parks
12% 31%
19%
Halifax Huddersfield
11%
49%
Other areas of Yorkshire not listed here Keighley
8%
8%
42% 42% 41%
New seasonal events, including more Christmas activities
49%
Too few customers
Wakefield Shipley Other areas of Bradford
43%
Greater lobbying, representation and championing of the City
50%
Insufficient promotion and marketing of the total city offer
49%
Security improvements, possibly to include more policing
52%
Lack of places to eat or drink
50%
Improvements to problem areas, such as graffiti or fly-tipping removal
52%
Quality of the leisure offer
56%
Marketing and promotion to project the City to a far wider audience
Street cleansing & street washing, to include chewing gum removal
59%
The appearance of retail units
72%
Projects to encourage investment into Bradford
More major town centre events or festivals
63%
Street begging
78%
Improving the appearance of empty shops
56% of respondents felt that Bradford would benefit quite a lot or hugely from the additional spend a BID would bring, with 35% indicating that there would be some benefit and just 9% considering that there would be no benefit
• 70% were in favour of the BID concept being tested by ballot, 22% were undecided and 8% were against the idea of balloting • When asked how much they would be prepared to pay as a levy, 58% agreed with 1% of Rateable Value, 25% nominated 1.25% and 17% proposed paying up to 1.5% of Rateable Value • 71% of businesses surveyed felt that they should be included within the potential BID area, while 22% were undecided and 7% indicated that they should remain outside a BID boundary
38%
• There was a clear mandate for all types of business to be included, with 74% of the survey respondents supporting this - only 21% indicated that they wanted retail & leisure only and just 5% felt that retail only was the best option • Businesses are relatively confident about the future, with 35% predicting their turnover would rise over the next 6-12 months, 46% considering that it would remain static and just 19% who anticipate a reduction in turnover
Throughout the survey period, we monitored responses to ensure that they formed a representative sample of the business community within the area identified in terms of the size, type, sector and geographical spread of respondents. We are satisfied that the survey responses are a representative initial sample of the Bradford City Centre Business Community and, with 70 % in favour, the results show ample support for pursuing a BID.
11
12
Feasibility Study Report
Feasibility Study Report
13
th W ing
N or
Lane
d tall
d
Hill Side Road
Nut
Lane
y Ro a
Otle
te
H ea p S t.
Parade
Anne
East G
at
e
St
re
rn
et
t
St
re
et
B
Sc
Bu
re
es
by
Hu
et
dS t.
ld
tS t
.
et et
de
Ba
ee
n
Bradford Playhouse
Jo
St
re
et
Ga
Gr
Ea
ck
st
Pa
rn
ra
ap Ch
St
ri
tS tre
re
Har
St el
et re
.
el
St
bo
rS t.
Ch
ne
La ar Vic
ck
m
et
et
te
or
et
C
ur
St
sS tre
et re rS t
er
re
ov
ap
t
Roa
Pine
et S t re ta in Cap on R oad Bolt
Heap
et
S tr e
al R oad Can
Heap
o Br h
g St re et rK ir
we Lo
ay dw oa
et
re St
et
Ake
Br
t
rk
se
ph
St
re
et
rk
Ha
St
re
P Hall Ings
The Leisure Exchange
reet St
s
s
Au
gu
tu
New
Cr
e Str oft
et
Bed
tr dS for
Ch
and
eet
os
Str
eet
Wa
ke
Edw
et
ia
hg
ve
ann
Street
Street
re
et
St re e t
A64
W en lo c k
St
Ca rr o ll
S tr e e t
ad
Filey
Dryden Street
Bus Services including Airport Link.
P
n
Ro
Exchange
et
to
le
Lane
P The Leisure ip
gs
P ge
ll
In
id
ezer S treet
Vicar
Br
Crown Court
er
da
ra
D
Eben
m
re
re
St.
ke
St
olk G dns
t Cr oss
am
Ai
Grea
y
St. George’s Hall
H
Citizens Advice Bureau
le
et
Crown Court
Sh
re
Britannia House
e Street
St
et
ge
s Roa d
t St.
G eorg
ay
dw Br
oa
L
ne La
n to
or H
We s
B r it
ro
As
St.
Jacobs Well
d
e
Pa
T
oa er R
P Sharpe Street m
t
ac
ck
Little Germany
Ma
all
nd Ra
on
hg
ck
Pl
e
S t.
Su bw ay
hest
m
As
Ba
ne
at
Leed
Visitor Information
N orf
W
e
ee
e U Mill pper erga t
te
G o it S i de
Te t l e y
tb
es
W
L e e m in
. St
d oa
Br
et re G
St r ee t
S a c kv il l e
Ba rr y St re et
A l bi o n Str e e t
Ful ton S t r e et Street
St.
ho
So
eS t.
St
Prov Te t l e y S t r e et
t St ree t
Vi n c e n d S t.
fi e l lm
Ho
lm We s t h o
re
St
ok ro
in
ce S t. iden
Place
croft Long
eet t St r cen
ce Pla
ire na ee Gr
w
e ac tP l ur t
nd te es W
. St
ne
O
Co
St
re
et
Ba
pt
an W
ig
di
ra
is
re
se
St
D
rt
et
Rd .
St. Th om as’ s
et re
St
ys
et
et re
St
on
S ug de n S t .
Pa
et
od
ce Te r ra dg efi eld Se
n
ha
re
lS tr
et
et re
St
Akam Road
ug
St
rre
St.
Ho lm es
yn ne Str e
t
o r S tr ee
t t S ttrr eet Jowe
Va
ll
Ty
ke rS t.
Ha rd a
on e St .
M en s t
Gayn
W
V in
Spin kS t.
Hi nd
S
Hi
G
er
rk
P
ad
pp
ne
et
nd
Ro
er S tre
U
La
re ad
.
er
St
Ro St
et
et
t
re
Pe
Hi
re
ee
.
ey
at
ne
ng sl
ke
Ca
St
Str
Cl
le ar
Pa
ld
nk
Butl
la
el
.
ne
Ba
m
W
W
Ty
pi
Ko
t. s os n S Cr gto in
Kent
Manc
re
et
arpe
re
Fie
i ll
ay bw Su
Sh
a rL
re
r St. W.
A658
Bradford Interchange Railway & Bus Station
Science and Media Museum Local Studies Library Ice Rink
eet
Ba
ca
ce
t
ra
la Str
rm
St
yn
Vi
le
e ll
tt
St
15
y
Ga
t
r Te
C
on S tre
Li
on
et
tr e e on S
ce
e
ee
gt
.
N
Nels
Tr
ra
ill
St r
Hill
ay
ok
r Te
nv
ster
et
tt
id
W
ro
ve
an
Che
W il t
e
ev
Subway
at
tur
Sto
St
et
g
Pic
e
hb
eg
e
n lli
nk
t
P
in
yd
h
ee
nn
Gl
rc
tr ll S
re
ay
et
re
Bradford Cathedral
We
City Hall
sW
re
St
h
W
ad
St
Br
Magistrates Court
ce
St
t or
Ave
et
Ro
ard ll Y
te
nk
Wa
t
d r al C l o s e
Ha
t Ba
les
dra
Stre
ley
et
re e
ate
e Ro ad
The Pavilion
t
S tr e e
ba
Butle
Burnett Street
ce
k St
r id g
Prin
ut
ro
M
Chester St.
So
G
Mo
y rle
he
Kala Sangam
Pie Ban
erg
ha
et
ee
Ca
The Broadway ar
Ken
Sun
t ree l St Va l
re
y
stl
C
re
St r e e t
Alhambra Theatre
n Road
und
Mil
St ill
Hu
te
Ch
Ari
Feasibility Study Report
ap
ad
e
e
ad
ga
City Park
.
Edm
Ro
id al
S
St
d
n
ley
ps
D
Ive
Sunbridge Wells City Library Impressions Gallery
tr
ate
Chu
The Wool Exchange
ga
n
Great Ho r to
Va l
ea
cc
e
ns
lto
Bradford University: Main campus and all buildings, approximately 500m further along Great Horton Road.
rk
e ee
South g a
Bradford College: All buildings.
o
W
ad
ad Pi
Ki
at
t ga
Qu
tg
Sunb
ll
et
Ro
Ro
T
es
W
Je
et
Kirkgate Centre & Market
P W
Stre
ley
ley
ne
tl e y
N
St. me
re
La
P ri e s
St
tt
kg
y
d
Ro a
t
ke
l
ce er t m me e Co Str
le
et
nd
ea Gr
uc
et
et
ar
nR oa
P
re
et
b ec
ar
m
Our recommended boundary would cover approximately 585 business listings and we recommend that University further consideration be given to the inclusion of both the Little Germany area and the various phases of Bradford of the Forster Square Retail Park. For the purposes of income calculation, we have included the Little ad Germany area and listed the Forster Square areas separately. Ro to
D
T
Southgate
St
e
D
d
Bradford College
We have based our income calculations for the estimated BID income on the above parameters and are confident that it offers sufficient common interest across the wider business community that the proposed projects would impact positively on all eligible voters.
r Ho
re
Education Quarter
C
ch
ers
g lin
Given that approximately 71% of respondents indicated that they considered a BID should occupy their area of the City Centre, the following geographical area is considered to be the prime plan for the proposed BID area. Ri
Ink
e Ro a
k Du
ate
b
St
Que
m Tu
. St
es
Stre
Ba
rg
t
N
ew
Jo
hn
et re St J n am h o
rth swo
TAXIS
h
lle
nto
C
Mi
or
U
re
et
ridg
ua
re
nb
Sq
wson
a
St
Su
et
ad
of
J
.
Grattan Road
re
Ro
cr
e
.
.
ad
Th
w
Ra
cc
y
.
et
e
e
sS t
y
Forster Square Railway Station
le
Pl
re
nd
Wa
H o ld
TAXIS
e
St
Long l a
Ho
i d le St. d
ar
ill
St
d
N
or
o Br
at
ise
Bla St.
ac
in
tis t
t
y
Pl
dh
Ba p
o
ne M
e re
D
Pl
un
ha
at
Pi
er
ll di
n
ill
Ro
ith
on
The Green
Oastler Centre & Market
pp
so
dh
et
Sm
m
e
P Westgate
w
re
C
ck
et
ch
Lo
ng
d si
L
n
Ra
St
et
e an
tg
so
de
er
r
an
St
es
w
God win Street
ow
G
t at
Ro
ge
W
St
ra
in
Ba
un
.
w
Pa
oa d nR
St
S
St
th
id
s
Ra
.
Ro
m
or
br
nd
St
ad
g
ls
la
y
Ro
th
ng
ar
or
rth
P
et
North Parade
J a m e s g ate
Ro
es
an
le
e tr
N
ha
m
St
or
Lo
m
re
re
at
Si
fi r
Forster Square Shopping Park
lg
r
In
St
St
ho
No
o
St. lme
al
D
P
ey
Ri
he
MAIN BOUNDARY OPTIONS FOR THE BRADFORD BID B
t ly
et
P
The Bazaar
H
M
re
ew
N
tta
L
et
St
re
M
et
ad
C
Listerhills Road
re
y
n to
ad
Northgate
ne
a Gr
St
ar
Ro
Ro
La
Si
k on
m
N
H
fi r
n
er
m
am
Sc
ar
S ol
t.
Sa
so
P
ad at
Gr
w
Station walking route Follow pavement markers
W
P
Ra
Ro
ne
on
nk Lo Li ng c r o ft
Location of Information Points
nt
La
Buses not Rstopping at the Interchange oa d use Hall Ings and Market Street i
m
e
ha
dg
ing
S
un Airport b r Link Bus Service i
or
nn
24hr Taxi Rank
TAXIS
In
a
e
t
Str
mm
ac
ee
n
et
Main Crossing Points
tr
r Da
re
St
d
re
Re Main car parks shown - Jacobs Well is be cc temporary; evenings a and weekends only S
l fi e
et
t nS
o yR
Pl
Cit
no
e wd
S
so
Shopmobility ad
ad
S
on
Ha
ht
Baby Changing Facilities
Ro
ld
e l l fi
Ha
e tr
Ty
585
ug
Changing Places Toilet
P
Th
Ho
e
reet
ane bL
Ro Disabled Toilet aFacilities d
Tr a
P
n
Va l
Pe
y
do
arf
El el
olton Road
lo
C
k
Lum
be
ic
uar
te Male & Female Toilet Facilities S e Ab
w dg
Ma
Feasibility Study Report
hi
Sq
14
W
Wh
Selected Key
7
16
Feasibility Study Report
Feasibility Study Report
LEVY OPTIONS FOR THE BID AREA We have chosen to model scenarios in the range of 1% to 1.75% as these rates will give sufficient funding to achieve a fairly ambitious portfolio of projects, as hinted at by the survey returns. In Bradford’s case, our detailed examination of the RV listing suggests that approximately 1,350 businesses in the proposed area would be under the suggested threshold and their annual BID levy would have generated approximately £75,000 per year. We anticipate that some of this number may voluntarily contribute towards any BID - setting a threshold does not exclude any business from playing an active part in a BID if the owners/ occupiers choose to do so.
Reduced levy (%)
Total levy income
1
0.75
£335,475
1.05
0.7875
£352,249
1.1
0.825
£369,023
1.15
0.8625
£385,796
1.2
0.9
£402,570
1.25
0.9375
£419,344
1.3
0.975
£436,118
1.35
1.0125
£452,891
1.4
1.05
£469,665
1.45
1.0875
£486,439
1.5
1.125
£503,213
1.55
1.1625
£519,986
1.6
1.2
£536,760
1.65
1.2375
£553,534
1.7
1.275
£570,308
1.75
1.3125
£587,081
C O M PA R I S O N W I T H E S TA B L I S H E D B I D S
A BID generally takes the form of a five-year proposal, although a very few have been set up for shorter periods. We suggest that a BID for Bradford be considered for a fiveyear period to allow the maximum amount of time for the BID projects to become accepted, actioned and generate positive results.
The following BIDs are considered to represent a good comparable sample range to Bradford in terms of geographical location, BID levy percentage and overall income.
BIDs are run as non-profit making organisations and so the budget within any BID business plan will propose income being equal to expenditure over the life of the BID period. Furthermore, BIDs operate as very lean organisations, with typically no more than 20% of expenditure being used for operating costs, meaning that the majority of BID expenditure is on improvement projects.
The latest ratings information has been applied in order to determine a range of possible levies and corresponding incomes per year and these, as well as a total income figure for the five-year period, are shown as follows:
Standard levy (%)
FINANCIAL INCOME MODELLING
At this preliminary stage, the recommended levy is considered to offer the best balance of income with a manageable size of BID. Specifically, our recommendation is a levy rate of 1.25%, together with our recommendations that an exemption be applied to any premises with a rateable value below £12,000 and the suggestion that levy reduction of 25% is applied to tenants of managed centres who pay a service charge. We would, however, emphasise that all of these recommendations should be subject to further testing and refinement through subsequent detailed business consultation. To succeed in a BID ballot, a majority of total votes and total Rateable Value needs to be achieved and we consider that our recommendations would ensure a good mix of small and large businesses in the BID area.
Bradford faces the challenge of a combined Rateable Value of the City Centre yielding a very modest sum if a 1% levy is applied. It is therefore very important that the levy chosen for Bradford generates sufficient income to deliver the major improvements which have been identified.
The bulk of BID income is derived from the Business Levy and it is prudent to set an anticipated collection rate of between 95%-98% depending on the view of the Local Billing Authority. Although, BIDs have been proven to generate significant additional income in the form of grants, sponsorships, voluntary business contributions and trading activities as they develop, with the likelihood that a BID would generate an additional 10-20% of income by the end of its first five-year term. Patently, the more additional income that can be generated over and above the levy, the better and more effective the additional activity programme can be and the better the return on investment provided to each levy payer.
City
RV Levy %
Levy Payers
Indicative Levy Income
Halifax
1.75
654
427,000
Manchester
1.4
400
970,000
Leeds
1.25
1,090
2,000,000
Wakefield
1.25
482
282,000
Liverpool
1.2
890
720,000
Sheffield
1.0
500
847,000
York
1.0
900
790,000
Hull
1.0
1,148
460,000
Bradford (proposed)
1.25
585
419,344
Average of the above
1.23
739
768,372
17
BIDs are run as non-profit making organisations and so the budget within any BID business plan will propose income being equal to expenditure over the life of the BID period.
18
Feasibility Study Report
Feasibility Study Report
L I K E LY V OT I N G PAT T E R N S
NEXT STEPS
RISKS
Whilst it is difficult to anticipate the voting patterns of all the businesses in the likely BID area, the survey suggests that there is considerable support for a BID in Bradford, with 70% of businesses responding positively to this survey question.
Our experience is that the timescale and workload for a BID proposal is approximately 9-12 months.
The basic inherent risk in any BID process is that the ballot is rejected, by failing to gain the required majority of votes cast or failing to gain the majority of the aggregate Rateable Value of votes cast.
In addition, Heartflood have extensive recent experience of leading successful BID projects and so are aware of the contacts and likely voting patterns for a significant number of the national multiple businesses, with a number of the known supportive organisations trading in Bradford. The result of this survey combined with the presence of a number of known positive BID voters suggests the strong likelihood that a BID could be created here within the next year.
The vast majority of BID ballots have been successful.
Nov 17
Nov 17 - Mar 18
April 2018
Decision taken to develop a BID proposal
Business liaison and consultation on proposed business plan
Notification to Secretary of State and Local Authority of intention to hold a ballot
1
2
3
July 18
June 18
June 18
Notice of Ballot issued
Launch of business plan
Provision of a definitive business plan to the Local Authority
6
5
4
The vast majority of BID ballots have been successful. Certainly, all that Heartflood have recently been involved with (in Cheltenham, Hastings, Hereford, Stratford upon Avon and Worcester) have been successful, although the Client should be aware that the risk always exists of a BID ballot being unsuccessful. This can result in:
• Zero return on the significant investment of time, effort, energy and money in developing the BID proposal
• Loss of reputation and credibility of the organisation(s) proposing and championing the BID process
• An informal requirement for a cooling-off period
Sept 18 Ballot papers issued
7
Formal announcement of the results of the Ballot
of at least 2-3 years before any reattempt is made to develop a BID within the City An additional risk is the potential for the final ballot result to be challenged through a statutory process that is contained within the legislation. Voting irregularities or lack of appropriate consultation can generate a Secretary of State appeal. To our knowledge, no BID has been quashed through this appeals process but it is very debilitating, costly and time consuming to fight and, of course erodes the five-year period of BID operation that can have lasting, long-term impact on BID achievement and subsequent success.
19
20
Feasibility Study Report
Feasibility Study Report
R E C O M M E N D AT I O N S
Having considered the survey returns and mulled over the outcome in the light of our extensive, combined experience, our key recommendations are as follows: • Bradford moves immediately towards detailed consultation and ultimately the production of a draft BID business plan • A timescale is adopted with a view to a BID ballot taking place in Bradford in Autumn 2018 and a BID operating from December 2018, subject to a positive vote • Further extensive consultation is carried out with the City Centre Business Community around the following outline proposals: a) The BID boundary to cover the designated area defined on page 12
e) Priority projects be drawn up into a draft business plan should focus on:
These recommendations would result in the following:
1. Deliver a strategy to reduce the number of empty shops
o 585 eligible business premises being part of a BID
2. Projects to encourage investment into Bradford
oA nnual BID Levy income of the order of £419,344
3. Marketing and promotion to project the City to a far wider audience
oT otal BID over a five-year BID term will be close to £2,096,720
4. More major city centre events or festivals
5. Street cleansing & street washing, to include chewing gum removal
6. Improvements to problem areas, such as graffiti or fly-tipping removal
7. Security improvements, possibly to include more policing
8. Greater lobbying, representation and championing of the City
9. New seasonal events, including more Christmas activities
10. Daytime wardens/hosts/ambassadors
11. Evening wardens/marshals/pastors
12. Street markets
13. Evening economy projects, possibly to gain national accreditation
14. Physical improvements to paving, landscaping and street furniture
15. City centre street entertainment
b) A 1.25% BID levy being proposed c) A reduced rate of 1% to be proposed for premises within managed centres who already pay a service charge d) A BID term to be proposed to cover the maximum period of five years
21
22
Feasibility Study Report
Feasibility Study Report
23
24
Feasibility Study Report
bradford_bid BradfordBID bradfordbid.co.uk