http://fiatech.org/images/stories/events/techconference/2007/Jones_McLaren

Page 1

Enterprise Engineer for Assets Mike W. Jones Vice President Global Marketing McLaren Software April 22, 2007

1


Asset Management Challenges Capital Projects: Implement large scale changes. Create and revise documentation associated with

assets. Engineering documents and drawings may need to be modified by multiple project teams working in parallel.

Document changes must be recorded and

communicated in a controlled manner. Engineering and Operations tend to work in their own worlds.

January 2007

www.mclarensoftware.com

2


Enterprise Asset Management (EAM) If you need EAM …

...you will also need a quality assurance process to

ensure that the people and systems that rely on these official documents and drawings access the right version.

January 2007

www.mclarensoftware.com

3


Coming Up With A Solution Enterprise Engineer Customer Advisory

Board Comprised of 20 customers Provides direct interaction with McLaren

technical resources Provides a forum to share and issues Uses Special Interest Groups to drive new product designs / features

January 2007

www.mclarensoftware.com

4


Enterprise Engineer for Assets Overview Vault Handover Vault Quality Controller

Vault Manager

Released Masters

Handover Team

Vault Liaison Vault Audience

Projects The Asset VaultArea is anisowner-operator’s controlled Handover used when reconciling Documents cannot modified directly in thedrawings Vault. library of approved, as-built documents and documents prior to be transfer into the Vault. Documents to be revised must bemajor copied to a project. required to operate and maintain physical assets/facilities.

Project A

A Vault is divided into two principal areas, the masters area contains the source documents in their native format and the released area contains published copies of the approved documents for public consumption.

Project C

Project B January 2007

www.mclarensoftware.com

5


Enterprise Engineer for Assets Overview Vault Handover Vault Quality Controller

Released Vault Manager Masters

Handover Team

Vault Liaison External vendors/contractors

Project A

January 2007

• No access to the Vault and can only interact with Vault Quality Controllers Handover Audience Team Vault Vault Liaison theManagers internal engineering(QC) functions. (Owner-Operator’s internal engineering function) Approve changes made during Reconcile Can differences access the and non-editable update documents released •• Manage the vault structure May be only given direct access the handover project area but after documents. handover from a project • Implement internal projects and oversee capital only people within the company can access the Withdraw superseded andfor obsolete documents • Provide final authorization documents to be projectsVault delivered by external vendors Vault. • released Create revisions forand into maintenance the Vault contractors documents requiring urgent modifications • Note: If the engineering oversight function is • outsourced Request Vault revision orthis role thendocuments the peoplefor performing reference need to be given either Vault Liaison or Handover Team access even though an external company • Cannot edit any documents within the Vault or employs them. Project B Handover area Transmittals and Submittals are used to transfer documents to and from vendors/contractors

www.mclarensoftware.com

Vault Audience

Project C

6

External Parties


Questions?

7


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.