4
3
2
1
B
B 18.50 17.75
.38
(.92)
2X .27 thru
DRAWN
Derek Foster
A
FIRST
11/29/2009
CHECKED
Notes:
mcyr
12/3/2009 UNLESS OTHERWISE SPECIFIED
1) Material: 3/4" steel EMT tubing 2) Remove all burrs and sharp edges
TOLERANCES: (INCHES)
TITLE +/- 1/32
FRAC. .00
+/- .01
.000
+/- .005 +/- .25 Deg.
ANGULAR 4
3
A
200 Bedford Street, Manchester, NH 03101 (603) 666-3906 -- FAX (603) 666-3907
2
Handle, Goal Ramp SIZE
B SCALE
REV
DWG NO
GE-10054 SHEET 1 OF 1
1