Component supplier must do: 1. Technical Construction File 2. Factory Production Control (FPC) 3. Risk Assessment parts 4. Declare application of parts “Declaration of Incorporation”
schedule CE responsibilities/documents residential doors
Door producer must do: A. Technical Construction File with: b. Risk Assessment door c. Level 4 self declaration on technical aspects d. Mandated level 3 testing on essential requirements by accredited lab (SP), leading to ITTR e. Mandated life span testing door (30.000 cycles for RES) f. Make Declaration of Performance with all needed manuals etc. (see J) (and Declaration of Conformity in case of power operated doors) g. Installation manual H. Factory Production Control (FPC) and of course produce the door… What has Flexi-Force already prepared for the door producer? Mandated Initial Type Test Report (d) from SP of door combinations on name producer Life span testing complete door (e) for 30.000 cycles Concept / example (!) risk analyses of complete door (b) Declaration of Incorporation (4) which is base for Technical File (A) Concept (!) of Declaration of Performance and Conformity (f) Concept (!) of manuals (f,g and J): user, service logbook, dismantling, maintenance, installation manual Concept (!) of service log book, Instructions and check list
Flexi-Force Declaration of Incorporation critical hardware
panel supplier Declaration of Incorporation for panel
door producing company
e-operator supplier Declaration of Incorporation for operator + safety edge + control
dealer / installer
end user of the door
The end user must receive from installer (J): -User manual -Service log book -Maintenance manual -Dismantling instructions -IIA DECLARATION OF PERFORMANCE/ CONFORMITY -CE-PLATE ID on the door.
© FF 2005. All rights reserved