Portfolio - Architectural Technology Student

Page 1

PORTFOLIO

Foojan Moniri T.

2019-2022

FOOJAN MONIRI T.

ARCHITECTURAL TECHNOLOGY STUDENT

Currently a co-op student in 3rd year of the architectural technol ogy program at George brown college. As an international stu dent with hands on experience, I am excitetd that I am to devel oping my knowledge, technical and personal skills in my journey following my dream career.

I belieave bold and good design can help people to experience space with better quality.

(647) 877 0742 foojan.moniri.t@gmail.com www.linkedin.com/in/foojan-moniri-t Toronto,ON

EDUCATION

Architectural Technology

George Brown College, Toronto, Ontario, CA

Bachelor of Architectural Science Aazad University, Parand, Tehran, Iran

Jan 2021Expected Apr 2022 Sep 2012May 2017

WORK EXPERIENCE

Freelance Architect

Personal Project, Family Villa, Charan Village, Alborz, Iran

•Prepared Sketches, 3D models and blueprints using SketchUp

•Conducted site visits to monitor the progress and

•Produced as built drawings

Junior Architect

Pajoohesh Consulting Engineers, Tehran, Iran

•Generated technical drawings of three subway stations

•Corrected the redline drawings

•Provided preliminary design layouts for metro station’s entrance

Architecture Office Manager

White Line Design Association, Tehran, Iran

•Prepared presentations

•Planned, communicated and executed events

•Developed new office procedural guidelines, improving office function efficiencies by 30%

Junior Architect and Interior Design Intern

Arshiform Studio, Tehran, Iran

•Created measured drawings from existing stores

•Contributed to the interior design of commercial

•Created 3d sketchup model of the designed projects

Mar 2020Jan 2020 Jan 2019Jun 2020 Jul 2018Jan 2019 Mar 2014Sep 2014

2

ADDITIONAL EXPERIENCE

Design of the Multi Purpose Cultural Facility of Bam, Bam, Iran Cooperation in creating of physical model

• Contributed to creating the physical model of a local proj ect by compressed earthen panels

Dec 2019

VOLUNTARY WORK

Drawing a Dream

Voluntary campaign for restoration of Algen historic village Iran Rural, Emarat Khorshid and Algen Foundation

• Contributed to producing the floor plan drawings of the Heritage buildings

Dec 2019

WORKSHOPS

ArchiGraph, Graphic Desin, Tehran, Iran

Workshop on Regeneration – Project TAAR II, Isfahan, Iran Workshop on Regeneration – Project TAAR I, Isfahan, Iran

Atelier Sigman, College of Fine Arts, University of Tehran, Terrachidia and INTBAU

• Aimed to frame the problems in the contexts of conservation, sus tainability, indigenous fabrication, and resiliency.

• Investigated possible solutions through discussions, and hands-on work.

Architecture and Interior Design

Iranian Architecture Center, Tehran, Iran

• Passed courses including Design Fundamentals, CAD Drawings, Materials and designed an interior project

Jul 2019 Sep 2019 Sep 2018 Jun 2013Nov 2013

SOFT SKILLS

Creativity Dynamic Collaboration in Team

Learning Self-motivation

TECHNICAL SKILLS

Autodesk AutoCAD

Autodesk Revit

Enscape

Adobe Photoshop

Adobe InDesign

Adobe Illustrator MS Office (Word, Excel, PowerPoint)

3D Scanning

LANGUAGES

English Spanish Persian

HOBBIES

Cooking Yoga Meditation

Listening to music

books

3
Continuous
Adaptability
SketchUp
Reading
Photography

CONTENTS

MELBERT HEIGHTS

CAR DEALERSHIP

SHORELINE MEDITATION & YOGA CENTRE

MIXED-USE BUILDING

CONTAINER HOUSE IN NATURE

DESIGN WORK

MODEL

4
01
6 02 BMW
12 03 OLD
16 04
20 05
24 06 GRAPHIC
30 07 PHOTOGRAPHY 32 08 PHYSICAL
34
5 ACADEMIC

The Melbert Heights, a mid-rise multigenera tional condiminium complex located on the Melbert and Rathburn intersection is a one of a kind building that fuses exceptional interior design with the property’s architectural DNA to create a big, bold and beautiful structure that captivates the eye and gives residents a range of perspectives that engages the imagination.

6
01 MELBERT HEIGHT June 2022 Studio 5 Autodesk Revit Enscape Group Project (4 persons) Contributed to: - Design Process - 3D Modeling - Floor Plan Dsign - Technical Drawing

The incorporation of an indoor/ outdoor design with numer ous hangout areas around the building help with communica tion while still retaining aspects of an apartment complex that draws people to renting the place. The residents are ex pected to see netural colour schemes such as off whites, squash oranges and lincolin greens. the design also includes liveliness from plants that will be scattered among the complex including green roofs that are designed efficiently to reduce energy use and help residents feel closer to nature.

Foojan Moniri T. | ACADEMIC 7th Floor 18.00 8th Floor 21.00 Roof Top 24.00 Ground Floor 0.00 2nd Floor 3.00 3rd Floor 6.00 4th Floor 9.00 5th Floor 12.00 6th Floor 15.00 7th Floor 18.00 8th Floor 21.00 Roof Top 24.00
East Elevation West Elevation North Elevation South Elevation Swimming Pool Court Yard Green Terrace Green Roof

Atrium Main Entrance

The building houses a large open concept atrium and a main entrance area that feature large sections of glass and provide residents vertical access. The two feature entranc es accomodate numerous amenity spaces for occupants like a fitness room and many more. The neutral tones used for fixtures, furnishings and materials create an ambiance that embraces the lighting of early morning and late afternoon. this composition aims to emanate a comfortable yet dynamic feeling of modernism through a delicate marriage of light and line.

Cross Section

Ground Floor 0.00 2nd Floor 3.00 3rd Floor 6.00 4th Floor 9.00 5th Floor 12.00 6th Floor 15.00 7th Floor 18.00 8th Floor Roof Top 24.00 Parking Level 3.05
A-A Cross Section B-B Exploded Floor Plans & Vertical Access Diagram

Whilst the apartment decor scheme is primarily a clean and crisp white backdrop, colour ful accents of orange, blue and green create a ripple in the calm setting. The units feature a styl ish living/dining room combo, a large dining kitchen with a break fast table and an island bar. The units range from a single bed bachelor apartment to three lux urious modern bedrooms units.

One of the residential units is designed so that two generations, old and young, can live peacefully together. The goal of this design was to encourage as much interaction as possible be tween two generations.

9 Foojan Moniri T. | ACADEMIC 4 Bedroom - Interior 3
Bedroom - Interior
10 HH HH GG GG 31 31 1500 0 350 1040 920 3500 920 4040 4550 200 200200 920 390 1250 200 1200 200 2950 200 200 3200 150 5160 920 590 920 300 920 550 920 1350 350 600 3840 5650 350 3340 920 3200 150 600 1100 600 150 3900 150 2500 150 2450 2030 150 1020 1440 920 100 150 100 920 2890 150 1250 150 90 920100 150 90 920 100 150 1200 2590 1250 5190 450 860 680 920 50 500 440 1340 9 m² Bedroom 1 9 m² BEDROOM 2 20 m² MASTER BEDROOM 5 m² W/C 4 m² BATHROOM 9 m² BATHROOM 1 m² TRASH CHUTE SHAFT 2 m² CL 1 m² Storage 1 m² Closet 1 m² Closet Not Enclosed Balcony 7700 10290 10440 10750 15500 15500 14 m² Room 2 m² TRASH CHUTE AREA 16 m² Room 33 m² LIVING ROOM 9 m² KITCHEN 600 1200 2000 6400 600 4400 3320 W1 W4 W4 W2 W1 W4 W1 W1 W2 W4 W2 W2 24061756 1774 2378 2405 2404 2403 2409 2408 1773 1769 33 2 2 2 2 22 3 HVAC W1 W4 W4 W4 W4 W4 W4 W4 W2 W2 W4 3000 HH HH GG GG 31 31 2378 HVAC $$ $ $ $ $ $ $ $ $ $ $ SP SD SP SD SP SD SP SD 3 Bedroom Detail Plan 3 Bedroom RCP Plan

Floor

Kichen Design

In the interior spaces such as kitchen sustanable material including wood and recyclable glass tiles for wall are used in this project. Also using greenary and plants helps to im proove people mood and air quality.

11 Ground Floor 0 SPANDREL GLASS WALL ASSEMBLY STUCCO FINISH COAT 25mm AIR SPACE 45mm ROXUL FLEXIBATT INSUL. (RSI 1.15 (BY WINDOW MANUFACTURER) 92mm STEEL STUDS a 400mm O.C FURRING 89mm BATT INSULATION (RSI 2.11 6 MIL POLY VAPOUR BARRIER 12 mm GYPSUM BOARD FINISH (TOTAL RSI 3.25) FOUNDATION WALL SHOCK THERMAL BREAK ISOKOBR TYPE CM 50mm CONC. PAVERS ON GRAVEL OR CRUSHED STONE ON PROTECTION BOARD ON ROOFING MEMBRANE ON POURED CONC, SLAB SLOPED TO DRAINS @ 2% MIN. REFER TO STRUCT'L DWGS. INSULATED CONCRETE SLAB ON GRADE VERTICAL ALUMINUM PROFILE, REYNAERS CW 50 COLOUR 49/7621 HORIZONTAL ALUMINUM PROFILE REYNAERS CW 50 COLOUR 49 7G21 TRIPLE GLAZING GLASS 150 2% SLOPE 2nd
3000 TRIPLE GLAZING FILLED WITH ARGON VISION PANEL FIRE STOP FACTORY GLAZED ALUMINUM SPANDREL PANEL MULLION DEPTH SIZED TO RESIST HORIZONTAL LOAD (WIND LOAD) BETWEEN ATTACHMENT POINTS, AS WELL AS SUPPORT SELF WEIGHT WOOD FLOORING FLOOR FINISH POURED CONC. SLAB DRYWALL TRIPLE GLAZING VISION PANEL WATERPROOFING MEMBRANE VERTICAL MULLION BEYOND CONTINUOUS ALUM. ANGLE FOR WPM AND ANCHORING OF PANELIZED UNIT FIELD INSTALLED SEALANT AND WEEPS CAST IN PLACE ANCHOR SHOCK THERMAL BREAK ISOKOBR TYPE CM 7th Floor 18000 STONE BALLAST PERMEABLE FABRIC MEMBRANE RIGIT INSULATION (RSI=3.55) ROOFING MEMBRANE ON POURED CONCRETE SLAB SLOPED TO DRAINS @ 2% MIN. REFER TO STRUCTURAL DRAWINGS METAL CAP FLASHING PRECAST PANEL WOOD CURB WITH BATT INSULATION FIBER BOARD ASPHALT FELT FLASHING TAPERED WOOD BLOCHING BITUMINOUS MEMBRANE CONNECTED TO TOP OF PRECAST LINE OF WEATHER SEAL AT PANEL JOINTS LINE OF AIR SEAL AT PANEL JOINTS PARAPET FLASHING SLOTTED INSERT LATERAL SUPPORT Wall Section

CAR

The design of this project was inspired by the front grill of the 2021 BMW M3. For this design Project we came to an agreement that we should use BMW. BMW is one of the biggest German car manufactures. They are also the very few manufactures that have fulling electric sedans, SUVs, and sport cars. They also have various amount vehicles that use gasoline. In our Dealership we wanted to have a top view of the show rooms, so we added a mezzanine.

12
02 BMW
DEALERSHIP Apil 2022 Studio 4 Autodesk Revit Enscape Group Project (2 persons) Resposible for: - Design Concept - 3D Modeling - Floor Plan Dsign - Technical Drawing -Renders

Foojan Moniri

13 RECEPTION 16SQM SHOW ROOM NEW 205SQM SHOW ROOM OLD 155 m MULTIMEDIA 15 m VR ROOM 10.5 m DEALER STORE 36 m GENERAL MANAGER 20 m NEW SALES PERSON SQM PRE OWNED SALES 12 m2 CUSTOME R WAITING 36SQM NEW SALES MANAGER 12 m FASTLANE SERVICE DEPARTMENT MAINTENANCE STORAGE SERVICE MANAGER TECH. PARTS TECH. PARTS COUNTER RETAIL PARTS COUNTER RETAIL PARTS PARTS DEPARTMENT WOMEN W.R. W.R ELEC. ROOM TOOL ROOM ST. RUNG LADDER SKYLIGHT ABOVE SKYLIGHT ABOVE SLOPE UP TO TECH. PARTS SLOPE SLOPE SLOPE DN SLOPE SLOPE SLOPE SLOPE DETAIL/ WASH BAY SHARED CONNECTOR TRENCH DRAIN SLOPE GREETING PODIUM GREETING PODIUM SLOPE TRENCH DRAIN 6 CONTROLLER OFFICE 10.2 m DEALER OFFICE 15 m SPARE OFFICE 10.8 m MEETING ROOM 10.8 m WC WC GENERAL OFFICE AREA 20 m S.T LOCKER ROOM MALE 12 S.T LOCKER ROOM FEMALE WR.SHOWER 4.5 m WR.SHOWER 4.5 m MISCELLANEOUS STORAGE 12 m S.T. LUNCH ROOM 20 m SALES & ADMIN LUNCH ROOM 25 m FIRST AID ROOM SECURITY OFFICE SKYLIGHT ABOVE SKYLIGHT ABOVE OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW ST. RUNG LADDER COMPRESSOR ROOM
T. | ACADEMIC
Interior
View - Showroom
Interior
View - Dealer Store
Interior
View - Reception Ground Floor Plan Second Floor Plan

Solar Panles and Wind Tourbine are used in this project as a sustain able features using renewable energies in order to produce requred electricity for this car dealership and Electric Vehicle Charging Sta tion. The panels and tuurbines are attached on top of the roof for Electric Vehicle Charging Station and on the roof of service area.

14 Ground Floor 0.00 Second Floor 3.10 Top of Second Floor 5.50 Top of Showroom 8.50 PRE OWNED SALES PERSON GENERAL SALES MANAGER NEW SALES PERSON LOUNGE MEZZENAINE PRE OWNED SALES PERSON MULTIMEDIA
North Elevation South Elevation East Elevation West Elevation

Ground Floor Framing Plan

Second Floor Framing Plan

Foojan Moniri

Materials

Exterior

For our two-story BMW Dealership, for the exte rior walls we chose to use Glazed Curtain walls for the front of our dealership. The Curtain walls are floor to ceiling to get the most natural light ing to show off the cars and Curtain walling has a beautiful aesthetic finish to it. Curtain walling is also rated highly for sustainability.

For the other exterior wall material, we chose to use reinforced Poured Concrete. Concrete is popular for most dealerships because it is high ly sustainable, durable, and long lasting with thermal insulation also quick when installing.

For the exterior fast lane, we used Metal tiles and for the other service area we chose to us metal siding. Metal tiles will not chip, scratch, stain, or break which makes it an amazing du rable material. Metal siding is also extreme ly durable, and it also resists cracking in bad weather.

Flooring

For the interior flooring for our Dealership, we chose to use Porcelain floor tiles. Porcelain Floor tiles is used by most dealerships for example Ford located in Windsor the biggest dealership in Canada. Porcelain is sustainable, very tough and it is very easy to keep clean.

15 1 2 3 4 5 6 A B C D D1 E F 1x G H 2x 4x 7 A B C D D1 E 1x G H 2x 4x
T. | ACADEMIC

Old Shoreline Meditation & Yoga Center is Lo cated at Bathurst Street and Davenport Road, Toronto, is a sustainable facility wich designed in a way to respond its needs as much as possible.

The building is formed of two cube which is have intersected from the two corners. an in the main building which designed for the main space for studio there is 7 window which each is as a symbol

16
03 OLD SHORELINE MEDTATION & YOGA CENTRE December 2021 Studio 3 SketchUp Enscape
17 MV Right Elevation Rear Elevation Left Elevation Front Elevation 1 2 3 4 5 6 7 8 Vestibule Foyer Meditation/Yoga Studio Storage Utility Room WC Kitchenette Terrace 1 2 3 4 4 5 6 7 8 Foojan Moniri T. | ACADEMIC 6

Sustainable Features

Solar Hot Water Hating

This system by using renewable energy can provide almost 60% of the hot water for a small building. It means SDHW system with us ing 60% less energy result in not only savng money but also helps to reduce carbon footprint.

Solar PV Systems

A Photovotaic System generate elctricity through a process using the sunlight. This systems works by linking nuber of panels together because each panel produce small enegy. To use the electricity provided by a solar PV system there need an inverter to convert the current from DC to AC.

Rain Water Harvesting System

This system is used to reduce the amount of water usage. it col lects the rain water and stores it un a tank fo later use. By add ing a pump and a purification system it can be used as potable water.

Wind Turbine

Wind Turbines are used in two different scales which here a smallscale is suggested. It’s another solution to generatee electricity and help to reduce use of fossil fuels, saving money as well as redusing pollution .

WaterSeer Device

This device provide water catching the moisture from the air throght the process of condensation. It has a tank undergroung so the device use this tempreture difference between grade lev el and underground.

Hempcrete

Hempcrete is chosen for exterior materioal as it is made of bio fiber and mineral binder and it works as a good insulation. It also called “bonded cellulose insulation”. This material has a good texture and make a good combination with wood as the first ex terior material.

Wood Siding

Wood is the first choice for this project as it is one of the most sus tainable and eco-friendly material. Canada has a large amount of wood resources so it’s locally available. AAlso it’s a durable material which is an important factor in sustainability.

18

Foojan Moniri T.

Low Flow Toilet

Low flow toilet is an answer to water conservation. This product from EAGO use significantly less amount of water than a standard option.

Recycled Glass Mosaic Tile

This mosaic tile is chosen for interionr material as it is recyled and and has one of the important factors of sustain ability.

Triple Glazed Window

This part of building has a significant role in energy eficiency. Triple glazed window effect on building envelope performance and as a result helps to save energy.

Floor Heating System

This system is one of the best alterna tives for energy eficiency. It heating up the floor by radient heat in a short time.

19
Natural Ventilation Sun Penetration Thermal Mass
| ACADEMIC

Site Plan

Project

for:

This project is a mixed-use building with the goal of learning the structural design of a large scale build ing. It includes mercantile occupancy, business and personal service ob ground floor and residen tial suites on second and third floor. This project is designed meeting the Ontario Building Code re quirements.

20
04 MIXED-USE BUILDING November 2021 Studio 3 AutoCAD DRAWN: DATE: SCALE: PROJ. NO: SHEET OF X PROJECT NAME: SHEET TITLE: NO DATE REVISIONS DRWN A-3.0 F.M 16-10-21 1 PROJECT 1 - PHASE 2 ELEVATIONS DRAWN: DATE: SCALE: PROJ. NO: SHEET OF PROJECT NAME: SHEET TITLE: NO DATE REVISIONS DRWN A-3.0 F.M 16-10-21 1 PROJECT 1 PHASE 2 ELEVATIONS South Elevation East Elevation NO DATE REVISIONS DRWN A-1.1 F.M 16-10-21 1:250 PROJECT 1 PHASE SITE PLAN
Group
(2 persons) Responsibl
- To set the CAD standard layers - Drawings which are presented

Plan Detail

Wall Section

21 Foojan Moniri T. | ACADEMIC
Section SHEET TITLE: NO DATE REVISIONS DRWN
DRAWN: NO DATE REVISIONS DRWN A-4.0 F.M 16-10-21 PROJECT PHASE CROSS SECTIONS

Parking Level

Ground Floor

22 DRAWN: SCALE: PROJECT NAME: SHEET TITLE: NO DATE REVISIONS DRWN A-2.0 F.M 16-10-21 1 PROJECT 1 PHASE PARKING LEVEL 1 PLAN (P1) SHEET TITLE: NO DATE REVISIONS DRWN GROUND FLOOR PLAN

Second Floor

Third Floor

23 Foojan Moniri T. | ACADEMIC DRAWN: DATE: SCALE: PROJ. NO: SHEET OF PROJECT SHEET TITLE: NO DATE REVISIONS DRWN A-2.2 M.S 16-10-21 1 PROJECT 1 PHASE 2 SECOND FLOOR PLAN PROJECT NAME: SHEET TITLE: NO DATE REVISIONS DRWN THIRD FLOOR PLAN

This facility is a container located in beautiful na ture which is designed in three sections to live, work, and play. There are a kitchen, a Livingroom, and a master bedroom. The glass room located on the right side of the budling provides a calm place with a beautiful view to work and read. And the Playroom at the left side with separate access exists in order to entertain and having fun.

The entry of the Playroom has distance from the main entrance due to providing tranquillity for people in the home relaxing or working. The front yard is an outdoor location that can be used to play, work in the fresh air, or have a barbecue.

24
05 CONTAINER IN NATURE March 2021 Visual Communication SketchUp Photoshop Enscape

This project is designed based on a modular cube. The First one is for the bedroom, which is shown at the bottom of the diagram. The sec ond one is twice the basic form, including a living room and kitchen. The third cube is made of glass located be tween the first and sec ond module as a work place. And the last one is added to this project for a play room for en tertainment.

Play Work Live

25 Foojan Moniri T. | ACADEMIC
Bedroom Livingroom & Kitchen Workplace Play room

Living Room

Play Room

Dining Room

26 Garden Home Office/Study Room Bedroom Bathroom
Kitchen

Interior

Play Room

Kitchen Home Office

27
Foojan Moniri
T. | ACADEMIC
28
29 PERSONAL

GRAPHIC DESIGN WORKS

July 2019 ArchiGraph

Photoshop

30 06

Foojan Moniri T.

PERSONAL

31
|

07 PHOTOGRAPHY

September 2019 Taar, Isfahan, Iran

32

Foojan Moniri T.

33
| PERSONAL

PHYSICAL MODEL

July 2019 Muti Purpose Cultural Facility of Bam, Bam, Iran

34 08

Foojan Moniri T.

35
| PERSONAL

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.