2009-2021
P O R T F O L I O The selective works admission. Liu Tsai-Chieh +886-958-280-596 forestliu7@gmail.com No.171, Changchun Rd., Xindian Dist., New Taipei City 231,
Content
04
Rain garden
12
Reception center
Garden design
Interior design
06
Guan-Du square
Wooden deck design
14
Tree Bank
Urban design
10
Dong-Xing Elementary school
Amenity design
Competition Winner
Education
team work
Sep 2010- June 2014 Taipei, Taiwan
▪ Wen-haw, Feng-yuang park renovation / 2021
Personal INFO.
LIU TSAI-CHIEH +886-958-280-596 forestliu7@gmail.com No.171, Changchun Rd., Xindian Dist., New Taipei City 231, Taiwan (R.O.C.)
▪ Campus aesthetic environment reconstruction / 2021 ▪ Riverbank bicycle lane / 2020 ▪ Campus aesthetic environment reconstruction / 2020 ▪ Bei-Po park design / 2019 ▪ Bei-Tou MRT station square / 2019
Bechelor of Architecture Design
Experience July 2013 - Sep 2013 Taipei, Taiwan
Competition Winner personal work
selected by TKUA department journal.
Photoshop Illustrator Lightroom Indesign Twinmotion Lumion
+++ +++ ++ ++ +++ +++
+ Participate in interior, installation design projects. + Coordinate construction site issue among consulter, office, and client. + In charge of schematic design to construction design drawing, presentation, Built 3D model and rendering
Revit Autocad Grasshopper Rhino Sketch up
+ +++ + +++ +++
▪ Urban design 'Working city' / 2013
exhibited on URS127 exhibtion.
▪ Architecture "Forest Island' / 2012 exhibited on TKU&NTUST architecture exhibtion. selected by TKUA department journal.
Language
Chinese Mandarin native English IELTS Overall 6.0
Landscape firm Intern
June 2016 - July 2017 Noiz Architects Taipei, Taiwan interior designer Japan, Tokyo
selected by IEAGD 6x2 international competition
Software Skill
Environmental Arts Design Studio + Working closely with the project manerger to develop design proposal for landscape architectural project. + Specific task including initial tree modeling and schematic design developing, meeting with client.
▪ LID guideline / 2019
▪ Thesis design ''Tree Bank'' / 2014
Tamkang University Department of Architecture .
Sep 2019 - Mar 2021 Taipei, Taiwan
Green Earth Operations Inc. Landscape designer
+ Participate in landscape and public space design projects, mainly rain water collection related.(LID) + In charge of schematic to construction design. ranging from rain garden, ecological pool, steel bridge, rainwater collected playground, and many competitions. + 3D modeling and rendering, shop drawing .
01.
Water collecting square Rain Garden Design
Landscape design New Bei-tou,Taipei, Taiwan Contribution: 100%SD Planning proposals Concept development 100%DD Detail drawing Plant arrangement Duration: 2019-05 to 2019-11 Supervisor: Keising-Yao (kyiu@greenearthops.com) 4
Area:
40 sqm
Moderate
Wet
Moderate Buffer Canna indica L.
Pennisetum alopecuroides (L.) Spreng.
Pentas l Hedychium coronarium Koenig anceolata (Forsk.) Schum.
∅ 10cm HDPE Pipe
H=41cm Bioretention Soil TH=35cm , ∅ 1-3cm Gravel Stone
The rain garden captures water runoff and allows it to soak into the ground. after several purify processes such as infiltrating , filtering , sediment....then released to the city drainage system.The vegetation selected emphasizes conservation and use of local natural features which can tolerate wet and dry conditions.
Hedychium coronarium Koenig
Curb Cleanout
Lantana camara L. var. aculeata (L.) Moldenke.
The sunken rain garden located in the center of the Bei-tou square, plays an important role in this area.The pavement around the rain garden arrange as an impervious surface with 1% slope to help the run-off can be collected well.
Aster scaberrimus Hayata
Drain
50x50x60(LWH) Mainhole INV=4.80 Exsiting Mainhole INV=4.76
PRODUCED BY AN AUTODESK STUDENT VERSION
Buffer
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
Overflow ∅ 10cm PVC Pipe INV=5.02 ∅ 10cm HDPE Pipe
Infitration
Buffer
Runoff
Impermeable Unit Pavers
5
02.
Guan-Du Square Waterfront renovation
Street funiture design North district , NewTaipei City, Taiwan Group Work
Contribution: 100%SD Planning proposals Concept development 100%DD Detail and construction design Duration: 2020-08~2020-12 Instructor: Keising-Yao (kyiu@greenearthops.com)
Rain
Runoff Bioretention
Outflow
TH=35cm , ∅ 1-3cmGravel Stone 40x30x110cm Stone cage
6
210kgf/cm2 ground beam
Infiltration
Ground Beam Typ1.
Typ 2.
Typ 3.
Typ 4.
Typ 5.
Typ 6.
Plan 7
Ground beam Typ2.
Ground beam Typ3.
wooden square
terraced slope
platform
wooden footway
Stone cage
Ground beam Typ5.
8
Ground beam Typ1.
Ground beam Typ6.
There are four systems composed of the wooden deck, wooden paver coving, wooden bar, steel beam,and ground beam. The wooden deck is located near the riverside, as the foundation of the site is not solid, therefore the ground beam as the main structure system. As the heading and ending side of slope has various gradients to make axon drawing with relative elevation for the layout work.
Wooden paver
Wooden bar
Steel beam
Ground beam 9
Water collecting courtyard Amenity design Hsinchu City, Taiwan Group Work 10
PRODUCED BY AN AUTODESK STUDENT VERSIO
Dong-Xing elementary
RODUCED BY AN AUTODESK STUDENT VERSION
03.
Contribution: 100%SD Planning proposals Concept development 100%DD Detail and construction design Duration: 2019-05~2019-09 Instructor: Keising-Yao (kyiu@greenearthops.com)
11
04.
Dunnan reception center Housing Reception Center Design Interior design Da-an Dist,Taipei, Taiwan
Contribution: 80%SD Planning proposals Concept development 40%DD Detail drawing Duration: 2016-7to 2016-12 Supervisor: Kesuke Toyoda (kt@noizarchitects.com) Area: 12
207sqm
Curvy box study
13
Tree bank
Moveable tree unit system
05.
14
Nei-Hu Taipei,Taiwan Individual work / Academic work Urban design
Semester: Fall 13' Duration:2013-09 to 2014-05 Instructor:Albert I-LI HO a.ho@hohou.com Course:Architecture designer Area:24,188 sqm
Tree transfer issue In Taiwan, while a land was in the process of being developed , thousands of trees will be facing a transplant issue. Most of the trees died from transfer process. However, people in Taiwan care of trees a lot becacuse It's always sunny in Taiwan, trees provide shade for people form sunburn. Therefore many people condemn and fight for this issue.
Tree bank 07.
Tree bank 06.
Tree bank 09.
Tree bank 05.
Tree bank 04.
Tree bank 03.
Tree bank 02.
Tree bank 01.
Urban problems + How to create a system to saving and loading tree as a bank in the city ? + What are software and hardware devices will be needed?
As a tree park + In this treebank system, how to deal with human activity and tree’s transplantation?
15
Oreginal method The way the government deals with the tree transfer issue is to carry them to undeveloped land or marginal areas at suburban temporary, which is not a good approach for those of impaired trees because the location is too far from where the trees grow.
Treebank-brench Treebank-main Highway
Delivery radience Site
Tree bank urban system
New circulation In terms of the distance issue, the strategy is to input a "Tree banks" system to create connection among surrounding parks. Main banks in charge of distribution ; while branch banks build for maintaining local green coverage to be a new urban green system.
living period of tree 16
truck scale
transportation radious
traffic
component
treebank group
matchmaker
Function & Process There are various large equipments, supporting the activities need including education, exhibition, tree hospital.
Trees move in.
Green house
Nursery
Display
Showroom
Transplant square
17
New system of system tree bank Transplant period
Evergreen tree Conifer tree Broadleaf tree Palm tree
Process
System
Root system
Transportation system
Water system
TreeBox unit
Hanging Radious
Drip Irrigation
Museum system Trees Pattern The process of tree transplanting is the most crucial part deciding the life or death of the trees. Since then, this project uses the standard transplanting procedure as the basis of design development. There are four systems form this transplanting park, and they are dealing with the root, water, transportation, exhibition of this park.
All transplanted tree can be moved depends on their feature. 18
An effective transport system can cover every part in site.
Main water system followed Treebox display system from the main stucture. deal with trees' circulation continously.
The initial design action is zoning, using the diameter of the crane car’s working area as basis. As a result, the whole area is divided into five zones and the crane cars can locate any trees at any place. The next step is to arrange the irrigation system, which responds to such a changeable environment. After the irrigation system, is to construct a crane system extending out from the greenhouse so that it will be much easier to deploy trees and take care of the sick one.
green house ( tree hospital )
B-B’ section
spring/summer
fall/winter
activity
activity
tree layer
tree layer
circulation
circulation
treebox layer
treebox layer
19
Pattern of trees Controaling densities & activities
The tree box is a 5 meters by 5 meters unit. There are fixed tree boxes in the center and around the central area is the changeable tree boxes. The more central the changeable tree boxes is located, means the tree in it will be replaced more frequently.
Full
static activities
dynamic activities
spring/summer
spring/summer
winter/fall
winter/fall
fine frequently fixed
areas
Season is the main factor of the arrangement of the trees in park. The transplanting rate of spring and winter are usually lower than the rate of fall and summer. As long all different kinds of trees are move-in and move-out, the special character of this park will be different. This part is trying to prescribe a set of rules to control the arrangement of trees to form the activity space.
fixed tree
dynamic activities
static activities
20
Plant market
Tour navigation
Film screening21
Tree hospital This south-located greenhouse is the threshold of whole transplanting park. Before moving a tree into the park, health examination is a necessary task. All the sick trees will be cured in the greenhouse and separated from the health trees. After the treatment, the trees shall be delivered into the park. In conclusion, this greenhouse contains ED unloading area,control room, treatment area Program and temporary area for tree. The greenhouse D. curing area E. office is a steel-structured building with crane system in it.
Steel-structured
Tree hospital plan B1 N
0
12
3m
tree strotegy
5
tree strotegy
3
curing area
2
curing area
C.
4
B.
1
temporary area
Program A. temporarily area B. working coriidor C. tree storage
A.
Tree hospital plan 1F 02
6
N 0
22
Crane system
12
3m
12m
Working system healthy tree unhealthy tree
23
Detail of the tree box An empty tree box is a platform paved by punched-plate, with four columns at the button, by adding roofs or walls, people can conduct various activities in the tree box.There are several different types of tree box to contains from shallow-root to deep-root trees. Also, there is different equipment that can meet different need of different tree.
Irrigation system
With four pipes attach on, the tree box can water the trees around.
Glasses
Glass can show people the Soil condition and the underground environment that growing trees.
Cable system
Using cable to enforce the structure of tree box.
Tree in
Tree out
Punched-plate
Aiming to fit different kind of trees’ need,there are several kinds of punchedplate that can be installed on tree box.
Steel column Type
Vender
Steel column can lift up the punchedplate from ground, for better draining.
Steel structure
Steel structure can hold the glasses and supporting the weight of soil and tree.
24
Isolate
Arbor
Special Exhibition
Gallery
Typology of tree box Tr e e b o x a l s o s h o w s t h a t t h e s o i l
Root exhibition hall
information for exhitbition , people can see different trees fit in different soil condition
Vender
of different tree.
Small seating area
Large seating area
Spiral tree bleachers
Tree tunnels
Tree platform
Moveable reaction area
Activity platform
Tree museum Little tree tunnel
Isolating area
25