$-*."5& "$5*7*454 .64&6. $".
$MŔNBUF QSPCMFN ŔT B CŔH QSPCMFN UIBU UIF XPSME IBT CFFO USZŔOH UP TPMWF GPS B MPOH UŔNF CVU ŔU ŔT OPU SFTPMWFE BT B SFTVMU PG UIF DBQŔUBMŔTU TZTUFNT ŔO UIF XPSME BOE PO UIF DPOUSBSZ ŔU ŔT SBQŔEMZ QSPHSFTTŔOH UPXBSET B XPSTF SF SFTVMU FWFSZ EBZ $MŔNBUF "DUŔWŔTUT wBŔNT UP UBLF B DPNQMFUFMZ PQQPTŔUF TUBODF BHBŔOTU UIF TZTUFN CZ DSFBUŔOH B HSPVQ VOEFS UIF OBNF PG BOE UP SFWFSTF UIŔT TZTUFN BOE UP SFWFSTF ŔUT SFTVMUT *O UIŔT QSPKFDU UIF DPODFQU PG B NVTFVN GPDVTFE PO SBŔTŔOH B NPSF DPOTDŔPVT HFOFSBUŔPO CZ ŔOUFSBDUŔOH XŔUI UIF TPDŔFUZ XŔUI BO ŔOUFSBDUŔWF NVTFPMPHZ DPODFQU XIFSF DMŔNBUF BDUŔWŔTUT DBO HBUIFS BOE FYQSFTT UIFNTFMWFT BOE UIBU XŔMM SBŔTF UIF BXBSFOFTT PG UIF TPDŔFUZ
(306/% '-003 1-"/ 4$"-&
'*345 '-003 1-"/ 4$"-&
#"4&.&/5 '-003 1-"/ 4$"-&
4&$0/% '-003 1-"/ 4$"-&
$ $ 4&$5*0/ 4$"-&
% % 4&$5*0/ 4$"-&
5)*3% '-003 1-"/ 4$"-&
& & 4&$5*0/ 4$"-&
'035) '-003 1-"/ 4$"-&
" " 4&$5*0/ 4$"-&
# # 4&$5*0/ 4$"-&
' ' 4&$5*0/ 4$"-&
SYSTEM SECTION 1.Grass 2.Soil 3.Membrane water insulation 4.Heat insulation 5.Reinforce concrete 6.Steel deck 7.I Profil steel beam
1
1.Alimunium panel insulation 2.L steel profil 3.Heat insulation 4.Screed concrete 5.Heat insulation 6.Reinforce concrete 7.Membrane water insulation 8.Steel deck 9. I Profil steel beam 9
8
7
6
5
4
3 2
1
1.Steel beam 2.Angle iron 3.I Profil steel beam 4.Shear stud 4 3 2
SECTION DETAIL The structure is designed with a completely steel system and it is constructed with a column beam system. The tree observed in this image is a completely artificial tree. The system detail is shown according to 1/50 scale detail in order to express the contrast between the natural tree in the other section. Raft Foundation
1
2
3
4
5
6
7
SITE PLAN
Mass Formation Diagram
AXONOMETRIC VÄ°EW
SILHOUETTE
LEFT VÄ°EW
RIGHT VÄ°EW
A-A SECTION
Circulation Diagram
GROUND FLOOR PLAN 1/200 SCALE
C
WC
WC
FIRE ESCAPE
GIFT SHOP TICKET SALES
B
LIBRARY
ENTRANCE ARCHIVE
CORR DIGITAL
IDOR
B
DIGITAL WORKSHOP
DIGITAL CORRIDOR
C
BASEMENT FLOOR PLAN C
E
D
F
MECHANICAL ROOM
STAFF ROOM
B
B
STORAGE
CAR PARK
A
A F
C
D
E
FIRST FLOOR PLAN C
E
D
F
WC
WC
B
B LIBRARY
CONFERENCE
LOAD LIFT OPEN AREA
PERMANENT EXHIBITION AREA
WAITING AREA
COFFEE SHOP
A F
PERMANENT EXHIBITION AREA
C
D
E
A
SECOND FLOOR PLAN C
D
E
F
WC
WC
OFFICES B
B LOAD LIFT
OPEN AREA
TEMPORARY EXHIBITION AREA
TEMPORARY EXHIBITION AREA A
OPEN EXHIBITION AREA
PERFORMANCE AREA
A
F
C
D
E
THIRD FLOOR PLAN C
D
E
F
DIGITAL WALL
OPEN AREA
B
B
OPEN CONFERENCE AREA
OPEN AREA
WORKSHOP ROOM
SEMI-OPEN EXHIBITION AREA
A
OPEN EXHIBITION AREA A F
C
D
E
A-A SECTION 1/200 SCALE
B-B SECTION 1/200 SCALE
C-C SECTION 1/200 SCALE
D-D SECTION 1/200 SCALE
E-E SECTION 1/200 SCALE
F-F SECTION 1/200 SCALE
ENTERENCE
RAMP
FIRST FLOOR
LIBRARY
FIRST FLOOR
SECOND FLOOR
TEMPORARY OPEN EXHIBITION AREA
FOURTH FLOOR
TEMPORARY EXHIBITION AREA
OPEN AMP