ARCHITECTURE

Page 1

FRANCESCA

ESPOSITO

ARCHITECT


WORK EXPERIENCE


BEAT 81

01.2020 _ 01. 2022

WHS ARCHITEKTEN 03.2018 _ 09. 2019

KILLINGER&WESTERMANN ARCHITEKTEN 04.2016 _ 03. 2018

JULIAN BREINERSDORFER ARCHITEKT 01.2015 _ 02. 2016

ARCHITETTO MASSIMO ESPOSITO 06.2009 _ 05.2019


BEAT 81

BERLIN, DEUTHSCHLAND 01.2020 _ 01.2022 Planning, design and construction management

BEAT81 is a berliner fitness company. It was a great experience that helped me to broaden my skills and competencies. I had to manage projects from the early stages of location scouting, check the compatibility of locations, study the space design, look for construction companies, control the budget, up to the construction site supervision. Working for a StartUp also taught me what it means to be flexible and to have to find immediate solutions to problems of any kind. Here I found myself organising and standardising the process, I had to manage the communication between all the stakeholders and do a lot of time management.



Fundamentmauerwerk

-3.00 OKFF

ca. +0.30

H=1.97

urg-S tra

775

Fundamentmauerwerk

ca. +0.40

3,78

H=2.48

OKFF

ca. +0.30

ße

ca. +0.40

-3.00

+0.50

Fundamentmauerwerk

375

7,76 4,62

Fundamentmauerwerk

ca. +0.40

+0.50

UK UZ

RLS 01.02 Lagerfläche und Technikraum NRF: 27,58 m2 U: 31,461 m RH: 2,300 m

-0.98

A

RLS 01.04 Coach Studio NRF: 57,82 m2 U: 38,7935 m RH: 2,590 m

Fundamentmauerwerk

Fundamentmauerwerk UK Versprung

-0.15

ca. +1. 30

-Luxe mb

ca. +1.20

13,745

Ausgang (Durchbruch)

-3.93

RLS 01.01 Empfang NRF: 55,24 m2 U: 46,439 m RH: 3,280 m

Ausgang

2,68 5

4,13 5 Lichtschacht

Rost

OKFF Eingangspodest

H=2.2 5 ELT UV

-0.72

UK Stu

-3.94

-2.83

OKFF

2,36 5

OKFF

UK Versprung

abgehängter Bereich H=3.28

Sportb oden Hartbo den

rz

11,26

UK Decke

ELT UV

H=1.9 7 ELT UV

± 0.00

-0.17

-0.42

16,385

1,36 5

OKFF

Fenster im EG

RLS 01.03 Studio NRF: 222,57 m2 U: 61,9235 m RH: 3,280 m

H=2.0 Leinw and

42 ng

Einga

2,66

13 5 -2.95

16,10 5

OKFF

2

4,09 5

Lichtschacht

8

-2.95

H=2.0

B

+1.15

+0.18

Rosa

+0.22

OKFF

Lichtschacht

Lichtschacht

B -3.95 OKFF

+0.22

g

-0.17

2,73

Ausgan

14,525 Fund

amen tmau erw

UK Versprung

+1.15

ca. +1.

30

+0.18

+1.15

-2.95

erk

OKFF

93

+0.13

OKFF

4,395

ca +0.38

2,81

+0.17

-2.94

3,62

1,385

2,07

85 1,25

OKFF

14

OKFF

OKFF

1,15

2,42 5 -2.96

-2.95

80

2,23

-2.95

-2.95

H=2.35

OKFF

125 3,08

1,05

RLS 01.08 Toiletten NRF: 22,38 m2 U: 35,418 m RH: 2,260 m

1,23

54

4,28

+0.86

5

46

5

3,55

5

-2.96 OKFF

H=2.24

H=2.02

RLS 01.05 Flur NRF: 13,36 m2 U: 23,416 m RH: 2,340 m

A

OKFF

OKFF

ELT UV

-2.95

-2.95

RLS 01.07 Umkleide Frauen NRF: 20,09 m2 U: 23,7205 m RH: 2,340 m

RLS 01.04 Coach Studio NRF: 57,82 m2 U: 38,7935 m RH: 2,590 m

RLS 01.06 Umkleide Männer NRF: 16,01 m2 U: 18,0035 m RH: 2,180 m

RLS 01.03 Studio NRF: 222,57 m2 5 U: 61,9235 m RH: 3,280 m

0

RLS 01.06 RLS 01.01 Umkleide Männer NRF: 16,01 m2 Addresse U: 18,0035 m

10

Rosa-Luxemburg Straße 17 RH: 2,180 m 10178 Berlin

Lichtschacht

Lichtschacht

UKD -0.41

UKD -0.43 UKD -0.65

3,505

3,28

2,175

1,96

UKD -0.76

2,015

ELT UV

2,75

+0.29

1,20

2,45 5

+1.24 +0.38

OKFF

+0.85

2,585

OKF -2.94

OKF -3.00

OKF -3.93

UG Schnitt AA' RLS 01.03 Studio NRF: 222,57 m2 U: 61,9235 m RH: 3,280 m

RLS 01.01 Empfang NRF: 55,24 m2 U: 46,439 m UKD+3.42

Gitter

UKD -0.43 UKD -0.72

Fundamentmauerwerk

2,105

3,025

3,525

3,795 OKF -3.53

UKD+3.45

3,445

6,26

Gitter

4,13

Schnitt - Knick

Neue Schönhauser Str. 1b 10 17 8 Berlin Deutschland

3,88 5

+1.21

+0.80

HZG

RLS 01.09 Lagerfläche und Technikraum NRF: 18,07 m2 U: 17,079 m RH: 2,310 m

63

-2.94

H=2.26

1,00

OKF -2.83

OKF ±0.00

Nutzungsänderung Maßstab

Blattgröße

Datum

1:100

420*297 A3

07.09.20


DIRCKSENSTR. 99

ROSALUXEMBURG STR. 17

VOßSTR. 33

GRÄFESTR. 71


STALLSCHREIBER STRAßE BERLIN, DEUTHSCHLAND W H S Architekten 03.2018 _ 09.2019 Ausführungsplanung

Brauerstrasse 2 and 3 are two housing projects by the Italian architect Franco Stella and bya the berliner office Nalbach Architekten. An apartment building and a single-family villa in the courtyard overlooking the river. Our office deals with the construction, from the design phase forward. We had the opportunity to work with a number of outstanding experts, with whom we discussed the study of all the constructive details of the complex. Construction works began in the spring 2016 and is expected to be completed in the summer 2018.


LIMAS

TRAßE


Betongeländer = 1,01 üOKFFB innen 8,395m

2.OG Detail gilt auch für 4.OG darüber, allerdings mit OK Betongeländer +10cm Abdeckblech 5° Gefälle pulverbeschichtet "weiß" gem. Farbkonzept 12

F

Sockelbereich Rahmen - Ausführung aus unverrottbarem Material mit Einhalt der Schallschutz- und U- Werte des Fensterelements zB. PUR-Recyclingmaterial (Phonotherm o.glw.)

17

20 12 5

VK Fassade

Aufbau Balkonbelag - Hartholzdielen Bangkirai 1. Wahl, mit FSC-Zertifikat, Stärke 25mm, feine/grobe Riffelung, - Holz-Unterkonstruktion aus Bangkirai 45x70mm auf höhenverstellbarem Stelzlager mit Balkenauflage - Verschraubung mit Edelstahl-Terrassenschrauben mit Linsensenkkopf, versenkt - Abdichtung an Fenster-/ Türelementen sowie Durchdringungen durch Flüssigkunststoff, z.B. Triflex o. glw. Fertigteil mit 2% Gefälle, integrierter Einlauf und Entwässerungsleitung Flachdachablauf Edelstahl mit Klemmflansch, einteilig, Auslauf seitlich, mit Siebkorb, DN 70, z.B. LORO-X Drainlet o. glw.

75

Phonotherm o. glw.

BRH GLH RD FD VK IK AK UK UZ AHD OKFF 7,3850m KB OKFF OKRD UKRD UKFD LH RR

115

Stahlwinkel verzinkt

5 166

14

Blechabdeckung "grau" gem. Farbkonzept

Fassadenrost engmaschiger Stahl-Gitterrost 30/10 im Profilrahmen, feuerverzinkt, aufgeständert, höhenverstellbar, Breite 150 mm, z.B. SitaDrain Klassik o. glw.

165

1,175

15

Brüstungshöhe Rohbau ab OKFF Geländerhöhe Absturzsicherung Rohdecke Fertigdecke Vorderkante Innenkante Aussenkante Unterkante Unterzug Abhangdecke Kernbohrung Oberkante Fertigfußboden Oberkante Rohdecke Unterkante Rohdecke Unterkante Fertigdecke Lichte Höhe Regenfallrohr

Folie dampfdicht

15

15

10

31

- Alle Maße sind am Bau vor Ausführung verantwortlich zu prüfen bzw. am Bau zu nehmen. Unstimmigkeiten sind der Bauleitung und dem Architekten umgehend mitzuteilen. Der Ausführende ist verpflichtet, den Auftraggeber auf etwaige Unstimmigkeiten der Ausführungsplanung hinzuweisen (VOB/B), andernfalls haftet der Auftragnehmer. - Bei Ausführungsänderungen ist der Architekt einzubeziehen. - Die Planung der Fachingenieure und Sonderfachleute ist unbedingt zu beachten. Bei der Bauausführung gilt dieser Plan nur in Verbindung mit den Planungen und Berechnungen der Fachingenieure sowie den Angaben der Sonderfachleute. - Alle Maßnahmen sind gem. den allgemein anerkannten Regeln der Technik, den aktuellen DIN-Normen und der Herstellerangaben auszuführen. - Alle Höhenangaben der Rohbaubemaßung beziehen sich auf Oberkante Rohdecke (OKRD), soweit nicht anders angegeben. - Alle Höhenangaben der Ausbaubemaßung, wie z.B. Brüstungs-, Geländerund Türhöhen beziehen sich auf Oberkante Fertigfussboden (OKFF). - Die Ausbaumaße und Höhenangaben von Vorsatzschalen und Wänden in Bädern sind Fertigmaße. - Türen in Massivwänden: Rohbauöffnungsmaße, Höhe bezogen auf OKFF

WU-Beton

Mauerwerk nichttragend

Stahlbeton

25

Metallständerwand / Gipskarton

Beton unbewehrt

OKRD 7,2200m

Wärmedämmung hart

Betonfertigteil

Wärmedämmung weich Index

01

Oberkante Fertigfußboden Oberkante Rohfußboden

Rohbautoleranz ±25

266

20

18

20

Mauerwerk tragend

Höhenpunkt Gelände Höhe Fertigfußboden / -decke

4

INDEX ÄNDERUNGEN

23.09.19

C

Blechfarben ergänzt

21.06.19

B

Abdeckblech angepasst, Beschriftungen ergänzt

08.08.18

A

Planerstellung, Upload Freigabe

UKRD 7,0000m

105

6

DN50

Höhe Rohfußboden / -decke

DATUM

34

EPDM-Bahn als 2. DIchtungsebene, Gefälle nach außen

23 4

28

STA PROJEKT

Luisenpark Stallschreiberstraße 10969 Berlin

BAUHERR

Instone Real Estate Development GmbH Chausseestraße 111 10115 Berlin

PLANUNG LPH 5

wiewiorra hopp schwark Gesellschaft von Architekten mbh Bülowstraße 66 - Hof B, 10783 Berlin

INHALT

Detail Holzfenster Balkon Hoffassade, Achsen 24, 32

PLANNR.

3a_ARC_5_Q0_DE_XX_3001_C_F

VK Fassadenband UKUZ 6,7500m Multifunktionsband Abhangdecke - Zementgebundene Bauplatte 12,5mm, 1-lagig, außenraumgeeignet, z.B. Knauf Aquapanel o. glw. - Fugen und Verschraubungen flächenbündig verspachtelt - UK aus korrosionsgeschützten, beschichteten Metallprofilen und Abhängern, z.B. Protektor K400 KS/FS o. glw. gemäß Statik - Oberfläche gestrichen, Farbe "weiß" gem. Farbkonzept

Bauteil

Verfasser

LPH

Quadrant

1:5

1,01 Dichtfolie dampfdiffusionsdicht

Stahlwinkel verzinkt

Spannseilhalter - aus Aluminium-Druckguss z.B. WAREMA S01 o. glw.

17

OKFF 7,385m

14

17 25

165

8

22

Fensterbank -Aluminium 3mm, innenseitige Antidröhnbeschichtung - 5° Gefälle - pulverbeschichtet "grau" gem. Farb- und Materialkonzept,

5° Gefälle

25

25 25

Multifunktionsband EPDM-Bahn als 2. Dichtungsebene, Gefälle nach außen

Ebene

MASSSTAB

23.09.2019

Phonotherm o. glw. 2. Obergeschoss

Planart

DATUM

8,395m OK Kämpferprofil

OKRD 7,220m

Plan Nr.

Index Status

PLANFORMAT DIN A3

- Alle Maße sind am Bau vor Ausführung verantwortlich zu prüfen bzw. am Bau zu nehmen. Unstimmigkeiten sind der Bauleitung und dem Architekten umgehend mitzuteilen. Der Ausführende ist verpflichtet, den Auftraggeber auf etwaige Unstimmigkeiten der Ausführungsplanung hinzuweisen (VOB/B), andernfalls haftet der Auftragnehmer. - Bei Ausführungsänderungen ist der Architekt einzubeziehen. - Die Planung der Fachingenieure und Sonderfachleute ist unbedingt zu beachten. Bei der Bauausführung gilt dieser Plan nur in Verbindung mit den Planungen und Berechnungen der Fachingenieure sowie den Angaben der Sonderfachleute. - Alle Maßnahmen sind gem. den allgemein anerkannten Regeln der Technik, den aktuellen DIN-Normen und der Herstellerangaben auszuführen. - Alle Höhenangaben der Rohbaubemaßung beziehen sich auf Oberkante Rohdecke (OKRD), soweit nicht anders angegeben. - Alle Höhenangaben der Ausbaubemaßung, wie z.B. Brüstungs-, Geländerund Türhöhen beziehen sich auf Oberkante Fertigfussboden (OKFF). - Die Ausbaumaße und Höhenangaben von Vorsatzschalen und Wänden in Bädern sind Fertigmaße. - Türen in Massivwänden: Rohbauöffnungsmaße, Höhe bezogen auf OKFF

BRH GLH RD FD VK IK AK UK UZ AHD KB OKFF OKRD UKRD UKFD LH RR

Brüstungshöhe Rohbau ab OKFF Geländerhöhe Absturzsicherung Rohdecke Fertigdecke Vorderkante Innenkante Aussenkante Unterkante Unterzug Abhangdecke Kernbohrung Oberkante Fertigfußboden Oberkante Rohdecke Unterkante Rohdecke Unterkante Fertigdecke Lichte Höhe Regenfallrohr WU-Beton

Mauerwerk nichttragend

Stahlbeton

Tritotherm-Zarge o. glw.

Metallständerwand / Gipskarton

Beton unbewehrt

Rahmenlüfter -Feuchtegeführtes Zuluftelement Aereco ZFH(V) 5-35 -Rahmeneinbau -Bei erhöhtem Schallschutzbedarf : ZFHA 5-35 mit Wetterschutzhaube WHAI 02 RAL Farbton gem. Farbkonzept Holzfensterelement - Fenster bzw. Fenstertür als Dreh-Kipp-Flügel - Profiltiefe 80 mm, mit Dreifach-Isolierverglasung nach Anforderung - Lüftung über selbstregelnde Rahmenlüfter - Rahmenaufdopplung im Sockel- bzw. Sturzbereich - beschichtet gem. Farbkonzept - Gesamt U-Wert erf. 0,9 W/m2K

Index

01

Oberkante Fertigfußboden Oberkante Rohfußboden Höhenpunkt Gelände Höhe Fertigfußboden / -decke Höhe Rohfußboden / -decke

4 25

20

DATUM

INDEX ÄNDERUNGEN

24.09.19

C

23.05.19

B

Ergänzung EPDM-Bahn, Multifunktionsband und Triotherm-Zarge

03.09.18

A

Planerstellung, Upload Freigabe

Halter Sonnenschutz partiell 25

79

12

Tritotherm-Zarge o. glw.

15

VK Fassadenband

VK Fassade 37 12

15

Detail gilt für 1., 2., 3., 4. und 5.OG allerdings bei 4.OG und 5.OG mit OK Kämpferprofil +10cm

Blechfarben ergänzt

STA PROJEKT

Luisenpark Stallschreiberstraße 10969 Berlin

BAUHERR

Instone Real Estate Development GmbH Chausseestraße 111 10115 Berlin

PLANUNG LPH 5

wiewiorra hopp schwark Gesellschaft von Architekten mbh Bülowstraße 66 - Hof B, 10783 Berlin

INHALT

Detail Holzfenster mit Fassadenband Blech, Hoffassade

PLANNR.

3a_ARC_5_Q0_DE_XX_3039_C_F

16 1

91

Multifunktionsband

55

EPDM-Bahn als 2. Dichtungsebene, Gefälle nach außen

Wärmedämmung weich

Mauerwerk tragend

Halter Putzträgerplatte partiell

Fugenausbildung 5° Gefälle, H= 60 mm, T= 40 mm

Sonnenschutz - außenliegende Raffstore-Jalousie seilgeführt, verdeckt eingebaut, elektromotorisch betrieben - Behangstoß + Teilung in Bezug zur Fensteraufteilung nach Angabe Architekt - wetterfeste Einbrennlackierung gem. Farbkonzept Pakethöhe H=239 mm Aussparungsbreite B=120 mm Lamellenbreite 80mm

Wärmedämmung hart

Betonfertigteil

22

Fassadenaufbau - Aluminium-Kassettenbleche d=3 mm, gekantet, mit unsichtbarer Aufhängung, pulverbeschichtet gem. Farbkonzept "weiß" - Fugenbreite Mindestmaß 15 mm, Fugen mit Blech hinterlegt, Blechstärke 3 mm, Befestigung einseitig, Überlappung min. 15 mm - innenseitige Antidröhnbeschichtung - Hinterlüftungsebene min. 40 mm - Unterkonstruktion gem. statischen Erfordernissen nach Bemessung des Auftragnehmers, mit thermischer Trennung - mineralische Dämmung, hydrophob, schwarz kaschiert, WLS 035, d=160 mm - Stahlbetonwand/MW 200 mm bzw. 250 mm - Innenputz 15 mm

20

8

VK Fassade

VK Fassade

6

36 1

54

34

28

6,6800m UK Fassadenband

Bauteil

Verfasser

LPH

Quadrant

Planart

Ebene

Plan Nr.

Index Status

DATUM

MASSSTAB

PLANFORMAT

24.09.2019

1:5

DIN A3


28 7

F

OKRD +3,78 1,10

UKF +3,58

DE02

C

D

1,64

E

F

54

56

71

E

10 73

20

OKRD +3,78

19

gdecke ium-Kassettenbleche 3mm onstruktion wie bei Fassadenaufbau atischen Erfordernissen messung des Auftragnehmers breite Mindestmaß 15 mm sichtbarer Aufhängung, hinterlüftet eitige Antidröhnbeschichtung beschichtet gem. Farbkonzept

20

D

Einfügepunkt Licht

20

C

VK Fassadenband

60 1,72

1,61

28 7 10 73

2,55 3

2,85

2,39 28 7 19

BBW

DE02 41

41 1,56 2

56 20 6

20

19

2,55 3 Landschaftsbau Bewegungsmelder

56 20

Planung Hochbau

1,03

BA 3A

TRH 2 TRH 2

BA 3A

1,20

TRH 2

BA 3A

PLANNR: 3a_ARC_5_Q0_DE

28.01.19 C und Berechnungen Außenmaßeder derFa I mit den Planungen Zweite - Alle Maßnahmen sind gem.aktualisiert, den allgemein an auszuführen. 18.01.19 Hausnummer aktu BAUNULL ±B 0.00 = +34,70 üN - Alle Höhenangaben der Rohbaubemaßung b A der Ausbaubemaßung, Planerstellung, Up - 20.12.18 Alle Höhenangaben w (OKFF) bzw. Oberkante Blendrahmen gem. D -- PROJEKTBETEILIGTE Alle Maße sind amund BauHöhenangaben vor Ausführungvon veran Die Ausbaumaße Vo umgehend mitzuteilen. Der Ausfü - Architekten Türen in Massivwänden: Rohbauöffnungsma hinzuweisen (VOB/B), andernfalls haftet der - als "barrierefrei" beschriftete Wohnungen weA - Architekt Bei Ausführungsänderungen LPH 1sind - 4 ist der Architekt Axthe barrierefrei umbaubar -- Die Planung der Fachingenieure Sonder Maße der Fensterteilung sind denund Ansichten BA 1A und BAund3A GmbH mit den Planungen Berechnungen der Fa - Alle Maßnahmen sind gem. den allgemein an Architekt LPH 1 - 4 Grünt auszuführen. - BA Alle Höhenangaben der Rohbaubemaßung b 1B und BA 3B 3a_ARC_5_Q0_DE - PLANNR: Alle Höhenangaben der Ausbaubemaßung, w (OKFF) bzw. Oberkante Blendrahmen gem. D Architekt LPH 5 wiewio - Die Ausbaumaße und Höhenangaben von Vo ± 0.00Rohbauöffnungsma = +34,70 üN - BAUNULL Türen in Massivwänden: Gesel - als "barrierefrei" beschriftete Wohnungen we barrierefrei umbaubar sind Tragwerksplanung HMI P - PROJEKTBETEILIGTE Maße der Fensterteilung sind den Ansichten

für Ba

Planung Hochbau

90 1,05 1,03

77

15 8 78 15 8 0 5

OKRD 90 -0,045

59

59 +1,04m üOKFF Unterste Einwurfsöffnung 59

C 77

+34,30m ü NHN

OKFF +0,12

PVC DN 70 Ableitung in Sickerrigole Ablauf mit Begleitheizung

59

1,03

59

Prüter aedvic

STA 10969 Berlin

+34,30m ü NHN

STA

AUSF

Bauherr Luisenpark PLANINHALT Einga Stallschreiberstraße Instone Real Estate Developm Chausseestraße 10969 Berlin 111

PLANNUMMER 3a_AR 10115 Berlin Bauteil Verfa Tel: +49 (0)30 / 610 9102 0 Datum: 05.07.2019 OKFF +0,12

OKRD -0,045

Noorm

wiewio Prüter Gesel

Freianlagenplanung Wigge LPH 5 - 7 Lands Bauherr Brandschutz hhp B Instone Real Estate Developm Ingen Chausseestraße 111 Vermessung aedvic Luisenpark 10115 Berlin Noorm Stallschreiberstraße Tel: +49 (0)30 / 610 9102 0

PLANPHASE Sickerrigole 30x30x100

59

1,05

Axthe hhp BP HMI GmbH Ingen für Ba Grünt aedvic Hocht

Noorm

59

Planung Landschaftsbau

15 8 78

Freianlagenplanung Wigge Architekt LPH 5 wiewio PROJEKTBETEILIGTE LPH 5 - 7 Lands Gesel

10969 Berlin HLSE-Planung Vermessung

59

OKRD -0,045

805 +1,05m 15 üOKFF Griff 3 18

Wärmeschutz und Hocht Architekt LPH 1 -4 Axthe Schallschutz PLANNR: 3a_ARC_5_Q0_DE BA 1A und BA 3A GmbH HLSE-Planung Prüter Architekt LPH 1 - 4 Grünt BAUNULL ± 0.00 = +34,70 üN BA 1B und BA 3B

STA

59

+1,04m üOKFF +1,70m üOKFF OKFF Unterste Einwurfsöffnung +0,12 Oberste Einwurföffnung

Planung Hochbau

3,80

77

OKFF +0,15 16 5 16 5

Bodenaufbau siehe Detail DE_XX_5021

Maße der Fensterteilung sind den Ansichten -- Alle Maße sind am Bau vor Ausführung veran 02.05.19 F Briefkästen aktual Architekten umgehend mitzuteilen. Der Ausfü hinzuweisen (VOB/B), andernfalls haftet der A 17.04.19 E Wandleuchte entfä - Bei Ausführungsänderungen ist der Architekt 28.03.19 D Türstationen Höhe - Die Planung der Fachingenieure und Sonder

Tragwerksplanung HMI P Freianlagenplanung Wigge für Ba LPH 5 - 7 Lands Wärmeschutz Hocht Luisenpark und Brandschutz hhp B Schallschutz StallschreiberstraßeIngen

VK Fassade

Planung Landschaftsbau

1,05

18 3

OKFF +0,15 OKRD -0,015

Änderungen

Architekt LPH 5 HLSE-Planung

6 1,50

Bodenaufbau siehe Detail DE_XX_5021

90

15 8 0 5 2,62 OKRD -0,015

+1,65m Info-Tafel

Index

D der Rohbaubemaßung Türstationen Höhe - 28.03.19 Alle Höhenangaben b - Alle Höhenangaben der Ausbaubemaßung, w 28.01.19 C Außenmaße der I (OKFF) bzw. Oberkante Blendrahmen gem. D aktualisiert, Zweite - Die Ausbaumaße und Höhenangaben von Vo B Hausnummer aktu - 18.01.19 Türen in Massivwänden: Rohbauöffnungsma H Unterkonstruktion - 05.07.19 als "barrierefrei" beschriftete Wohnungen we 20.12.18 A Planerstellung, Up barrierefrei umbaubar sind Index aktualisiert 04.06.19 G

Architekt LPH 1 -4 Vermessung Wärmeschutz und BA 1B und BA 3B Schallschutz Planung Landschaftsbau

20

2,62 56

+1,04m üOKFF Unterste Einwurfsöffnung

+1,05m üOKFF Griff

OKFF +0,15

3,80

92

2,50 Bodenaufbau siehe Detail 54 5 DE_XX_5021

A Planerstellung, Up Betonfertigteil

Architekt LPH 1 - 4 Brandschutz Tragwerksplanung BA 1A und BA 3A

8 17

+1,70m üOKFF Oberste Einwurföffnung 15 8 78

2,62

22 25

3,80

10

2,50

EG-Foyer

OKRD -0,015

D

57 5

41

54 5

92

E

Planebene ±0,00

VK Fassadenband

18 3

HINWEIS: Zwischen Fußleiste und Treppenbelag ist eine Bewegungsfuge auszubilden.

F

32

25

22

D

17

Einfügepunkt

+1,05m üOKFF Griff

3,43

22

22 2,65 25

2,30

E

Planebene ±0,00

22

22

22

OKRD +0,71

2,74 6

8

1,56 2

Lauf: T 1.0

5 Stg. HINWEIS: Zwischen Fußleiste und Treppenbelag ist eine Bewegungsfuge 15,6 / 28,0 auszubilden. HINWEIS: Wandbereich ist über der Treppe freitragend zu führen; Durchbigung des Treppenlaufes ist zu gewährleisten!

69°

57 5

+1,70m üOKFF Licht VK Fassade Oberste Einwurföffnung

DE02 41

+1,65m Info-Tafel

HINWEIS: Wandbereich ist über der Treppe freitragend zu führen; HINWEIS: Zwischen Fußleiste und Durchbigung des Treppenlaufes ist zu Treppenbelag ist eine Bewegungsfuge gewährleisten! auszubilden.

OKRD +0,13

OKRD -0,17

OKRD +3,78 UKF +3,58

16 5 3,43 16 5

28

1,11

Einfügepunkt Licht

C 41 1,56 2

25

1,20

F

D

OKFF +0,93

OKRD +0,13

OKRD -0,17

Planebene ±0,00

Bodenaufbau siehe Detail DE_XX_5009

22

Bodenaufbau siehe Detail DE_XX_5022

25

PVC DN 70 Anschluss an die Entwässerungsebene TG Außenanlagen gem. Planung GLP 2,5% Gefälle

OKRD +0,71

EG-FoyerD 1,10

HINWEIS: Wandbereich Lauf: T 1.0 ist über der Treppe5freitragend Stg. 28 zu führen; 28 Durchbigung 28 des 28ist zu Treppenlaufes 15,6 / 28,0 gewährleisten!

3A.T2.E0_W036_01

25

E

+1,65m Info-Tafel

1,50

10 5

1,09

WE01

1,10

32

69°

2,74 6

DE02 41

54 5

28

207 3,07

22

2,85 22

Planung Hochbau

1,05

1,20

22

Planung Hochbau

OKFF +0,93

28

1,72

1,61

Bodenaufbau siehe Detail DE_XX_5009

F 22

OKRD -0,17

Bodenaufbau siehe Detail DE_XX_5022

1,05

2,5% Gefälle

207

2,39

Landschaftsbau

2,55 3Planung

OKRD +0,13

Lieferung Hochbau, Montage durch Landschaftsbau

EG

28

92

28

Index Änderungen Beton B unbewehrt Hausnummer aktu

20.12.18

VK Fassadenband

21

16 5 16 5

35

3A.T2.E0_W036_01

41 5 OKRD +0,71

3A.T2.E0_W035_01

UKF +3,58

1,50

2,65

1,00

OKFF +0,93

1,20

E 207

3,07

EG

Bodenaufbau siehe Detail DE_XX_5009

207

28

OKRD +3,78

WE01

202,30

Lauf: T 1.0 5 Stg. 1,72 15,6 / 28,0 10 5

1,09

8

VK Fassade

3,43

35

2,65 20

1,61

2,30

2,39

Bodenaufbau siehe Detail DE_XX_5022

EG-Foyer D

WE01

10 7 3

Planung Hochbau

1,05

3A.T2.E0_W035_01 2,85

Planung Landschaftsbau

41 5

1,20

F1 7

19 6

32

10

28

2,50

20

20

10

3,07 1,00

28

10

WE01

28 7 10 7 3

2,85

28 7

OKRD +3,78

28

3A.T2.E0_W036_01

E207

2,39

2,55 3 PVC DN 70 Gitterrost Anschluss an die Längsstabrost in Edelstahl, Entwässerungsebene TG mit Auffangwanne Außenanlagen aus gem.Edelstahl Planung80mm, GLP Bodenablauf DN 70, Rost 2 geteilt, Begleitheizung z.B. K60 Gitterrostsysteme

D 207

EG

28

2,5% Gefälle

Planung Landschaftsbau

Lieferung Hochbau, Montage durch Landschaftsbau

2,55 3

Lieferung Hochbau, Montage durch Landschaftsbau

Gitterrost Längsstabrost in Edelstahl, mit Auffangwanne aus Edelstahl 80mm, Bodenablauf DN 70, Rost 2 geteilt, Begleitheizung z.B. K60 Gitterrostsysteme

3A.T2.E0_W035_01

28

1,20

57 5

C

21

10

Gitterrost Längsstabrost in Edelstahl, mit Auffangwanne aus Edelstahl 80mm, Bodenablauf DN 70, Rost 2 geteilt, Begleitheizung z.B. K60 Gitterrostsysteme

PVC DN 70 Anschluss an die Entwässerungsebene TG Außenanlagen gem. Planung GLP

E

10 5

1,09

Planung Landschaftsbau

Bewegungsmelder Bewegungsmelder

DA03 DA03

VK Fassadenband

Einfügepunkt Licht

20

20

OKRD +3,78

2,74 6

F

5 2,31

F

41 5

2,55 3Planung

Planung Hochbau Planung Hochbau DA03

DA02

1,10

69°

1,20

gdecke

13°

1,72

C

2,79 5

UKF +3,58

D

E 1,61

D Türstationen Höhe Metallständerwand / Gipskarton WU-Beton

Datum 18.01.19

Datum

21

1,11

OKRD +3,78

Planung Landschaftsbau

Planung Hochbau

10 73

1,05

2,85 2,85 22

22 22

DA02 DA02

DA03 DA03 DA03 DA03

27 1

BBW Abhan

20

10

dTs

35

gdecke

2,79 5

2,74 6

WE01

WE01

DA03

DA01

60 1

1,49

25

20

20

60

92

F F 1,20

3,42 5

1,00

DA02

DA01 Bewegungsmelder

DA03

25

20

1,11

1,21

10 x

DA02

DA01

1,49 °

69

Fliesenspiegel

Mauerwerk nichttragend E Wandleuchte entfä

28.03.19

28.01.19 C Außenmaße der I INDEXLISTE Stahlbeton / geschützter aktualisiert,Bereich Zweite

- Alle Maße sind am Bau vor Ausführung veran Mauerwerk tragend / geschützte Architekten umgehend mitzuteilen. Der Ausfü nichttragend 05.07.19 H Unterkonstruktion hinzuweisen Mauerwerk (VOB/B), andernfalls haftet der A - Bei Ausführungsänderungen ist der Architekt 04.06.19 G Index/ aktualisiert Metallständerwand Gipskarton - Die Planung der Fachingenieure und Sonder 02.05.19 F und Berechnungen Briefkästen aktual mit den Planungen der Fa INDEXLISTE - Alle Maßnahmen sind gem. den allgemein an 17.04.19 E Wandleuchte entfä auszuführen.

10

D

DA03

DA01

1,10 92

Startpunkt

27 1

Abhan

Bewegungsmelder

60 1 X

BBW

5 2,31

E

D

E

gdecke

2,79 5

2,74 6

3,42 5

10

OKRD +3,78

W035

DA03

Bewegungsmelder

DA03

x Bewegungsmelder

x

DA03

13°

Bewegungsmelder

°

69

Fliesenspiegel

1,21 X

DA02

x

DA03

DE02 DE02 DE02

DA03 60 1 25

Startpunkt

E

dTs

86

DA03

Bewegungsmelder

DE02

28 28

DE02

Bewegungsmelder

4,54 5 4,54 5

DA03

DE02

28

DA02

BBW DA02

BBW

4,54 5

EG-Treppenlauf 18 Stg. 17,97 / 26,28

DA03

DA01

W035

22 22

Bewegungsmelder

DA02

BBW

UG-Treppenlauf 18 Stg. 17,4 / 26,5 UG-Treppenlauf 18 Stg. 17,4 / 26,5

VK RD

EG-Treppenlauf 18 Stg. 17,97 / 26,28

Startpunkt

Fliesenspiegel Fliesenspiegel

Startpunkt

DA03

+0,71 +0,93

DA01

DA03

X

1

E

75

1,05

2,39 DA01

UG-Treppenlauf 18 Stg. 17,4 / 26,5 VK RD Fliesenspiegel

Startpunkt +0,71 +0,93 +0,71 +0,93

VK RD

Stb-Brüstung h = 1,205Stb-Brüstung ü OKRD) h = 1,205 ü OKRD) Stb-Brüstung h = 1,205 ü OKRD)

OKRD

+0,71 1,43

DA02 OKRD

+0,71 2,85

DA02

OKRD

+0,79

2,85 60 2,85

DA01 60

DA03

5

4

86

D

DA03

1,20 5 Bewegungsmelder

1,43

Bewegungsmelder

OKRD

+0,71

DA02 1,43

Bewegungsmelder

dTs OKRD

+0,79

VK RD

5

4

DA03

3 3

75

21

D

5

4

1

OKRD

dTs

+0,79

AnkerschienenAnkerschienen gem. gem. Ankerschienen gem. Planung Kone Planung Kone Planung Kone

VK RD DA03

VK RD

RWA-Taster RWA-Taster

1

Rückholtaster Aufzug

RWA-Taster

VK RD

1

OK Auflager

X

VK RD

13°

W036

2,39

1,20 5 1,20 5

22 25 22

dTs

25 Rückholtaster Aufzug

VK RD OKRD

OKRD

+0,005

OK Auflager -0,085

Bewegungsmelder -0,015

Digitale Info-Tafel, Referenzprodukt :

OK Auflager -0,085 x

-0,085

20

10

x

D

Media-NEL 22 Zoll Bewegungsmelder

DA03 DA03

Rückholtaster Aufzug

VK RD

OKRD

OKRD

-0,015

+0,005

2,00 2,00

-0,015 +0,15 -0,015 +0,15

OKRD

lichtes Öffnungsmaß=1,10 -0,015

OKRD OKRD

OKRD

-0,045

2,65 22 2,65 25

92 1,34 4

1,50 OKRD

OKRD

-0,015

+0,005

2,00 OKRD

OKRD

-0,015

-0,015 +0,15

DA03

Digitale Info-Tafel, Referenzprodukt :

Media-NEL 22 Zoll Bewegungsmelder

1,10

Beton unbewehrt H Unterkonstruktion Betonfertigteil G Index aktualisiert Mauerwerk tragend / geschützte F Briefkästen aktual

17.04.19

1,20

Abhan

2

OK Auflager +0,675

ke 21

1,49

F

2,74 6

5 2,31

ec

92

27 1

DE01

ha W036 n

D 0034

69

Fliesenspiegel

3 +0,675

dTs

21

5 2

02.05.19

05.07.19 04.06.19

°

F

D

21

Startpunkt

3,42 5

Ab

gd

288

D 21°

L:1,00m

Digitale Info-Tafel, Referenzprodukt : Media-NEL 22 Zoll

e

E10

D

ck

3

16 5 16 5

1,09 1,09

-0,045 -0,045 +0,14

-0,045 -0,045 +0,14

(+34,82 ü NHN) +0,12

DE02 DE02

1,22 80 -0,045 57 +0,14

DE02 DE02

80

W035

1,10

3 X

1,21

F

Einfügepunkt Licht

10

lichtes Öffnungsmaß=1,10 lichtes Öffnungsmaß=1,10 -0,015

de

5 1

DE01

1,22

VK RD

86

KH Kämpferhöhe ab OKFF BW Brandwand RD Rohdecke BBW Bauart Brandwand FT Fertigteil F90 feuerbeständige Wand VK Vorderkante feuerhemmende Wand F30 IK Innenkante StTr Steigleitung trocken AK Aussenkante T90 feuerbeständige Tür UK Unterkante feuerhemmende Tür T30 UZ Unterzug T30RS feuerhemmende, rauchdichte Tü AhD Abhangdecke RS rauchdicht und selbstschließend LK Lichtkuppel LEGENDE BRANDSCHUTZ BD Bodendurchbruch (b/t) LEGENDE ALLGEMEIN DD Deckendurchbruch (b/t) BW Brandwand KBZ-D/B/W Bauart Kernbohrzone - Rohbau Decke/Boden/W BRH Brüstungshöhe ab OKF BBW Brandwand WD Wanddurchbruch (b/h) GLH Geländerhöhe Absturzsicherung F90 feuerbeständige Wand WA Wandaussparung (b/t/h) maßgeblicher betretbarer Fläc feuerhemmende Wand F30 BT Bodentank (leer) KH Kämpferhöhe ab OKFF StTr Steigleitung trocken HKV HeizkreisverteilerTür RD Rohdecke T90 feuerbeständige ELT Stromkreisverteiler FT Fertigteil feuerhemmende Tür T30 Medien Medienverteiler rauchdichte Tü VK Vorderkante T30RS feuerhemmende, IK Innenkanteund selbstschließend RS rauchdicht AK Aussenkante LEGENDE ALLGEMEIN UK Unterkante UZ Unterzug BRH Brüstungshöhe AhD Abhangdecke Rohbau ab OKF GLH Geländerhöhe Absturzsicherung LK Lichtkuppel maßgeblicher betretbarer Fläc BD Bodendurchbruch (b/t) KH Kämpferhöhe ab OKFF DD Deckendurchbruch (b/t) WU-Beton RD KBZ-D/B/W Rohdecke Kernbohrzone - Decke/Boden/W FT Fertigteil Stahlbeton / geschützter WD Wanddurchbruch (b/h) Bereich VK Vorderkante WA Wandaussparung (b/t/h) Beton unbewehrt IK Innenkante BT Bodentank (leer) AK Aussenkante HKV Heizkreisverteiler Betonfertigteil UK Unterkante ELT Stromkreisverteiler UZ Unterzug Medien Medienverteiler Mauerwerk tragend / geschützte AhD Abhangdecke LK Lichtkuppel nichttragend Mauerwerk BD Bodendurchbruch (b/t) Metallständerwand Gipskarton DD Deckendurchbruch /(b/t) KBZ-D/B/W Kernbohrzone - Decke/Boden/W INDEXLISTE WD Wanddurchbruch (b/h) WA Wandaussparung (b/t/h) Datum Index (leer) Änderungen BT Bodentank WU-Beton HKV Heizkreisverteiler ELT Stromkreisverteiler Stahlbeton / geschützter Bereich Medien Medienverteiler

BRH Brüstungshöhe Rohbau ab OKF GLH Geländerhöhe Absturzsicherung LEGENDE BRANDSCHUTZ maßgeblicher betretbarer Fläc

F

ng

0034

Metalldecke

2

4 1

LEGENDE ALLGEMEIN

OKRD -0,17

10

ha

EG-Treppenlauf D 5 Stg. 15,6 / 28,0

Einfügepunkt Licht

L:1,5m

75

3

OK Auflager +0,675

OK Auflager

Ab

L:1,00m

DE02

288

AUFZUG Metalldecke

4

1,91

5 1 2,3

57

15 21

L:1,00m

W036

1,56

21°

DE01

1,22

21

1,10

E

10 7 3

5

4

10

EG-Treppenlauf 5 Stg. 15,6 / 28,0

Fliesenspiegel

5 1

57

Startpunkt

AUFZUG

Einfügepunkt Licht

LEGENDE BRANDSCHUTZ OK Gelände 0,910m BW Brandwand BBW Bauart Brandwand F90 feuerbeständige Wand feuerhemmende Wand F30 StTr Steigleitung trocken T90 feuerbeständige Tür feuerhemmende Tür T30 T30RS feuerhemmende, rauchdichte Tü RS rauchdicht und selbstschließend

OKRD +0,13

Metalldecke

E

DE01

ke

23 8

D 0034

1,11

D 3159

C

E

X

2,5% Gefälle

F

ng

F AUFZUG

OK Gelände 0,910m

Lieferung Hochbau, Montage durch Landschaftsbau

OKRD -0,17

E

VK RD

2,5% Gefälle

PVC DN 70 Gitterrost Anschluss an die Längsstabrost in Edelstahl Entwässerungsebene TG 1,20 x 1,00m, mit Auffangwanne aus Außenanlagen gem. Planung GLP Edelstahl 80mm, Bodenablauf DN 70, Rost 2 geteilt, Begleitheizung z.B. K60 Gitterrostsysteme

1,20 OKRD +0,13

T

Lieferung Hochbau, Montage durch Landschaftsbau

PVC DN 70 Anschluss an die Entwässerungsebene TG Außenanlagen gem. Planung GLP

F

E

de 1,91 c

OKRD -0,17

T

OK Gelände 0,910m

Gitterrost Längsstabrost in Edelstahl 1,20 x 1,00m, mit Auffangwanne aus Edelstahl 80mm, Bodenablauf DN 70, Rost 2 geteilt, Begleitheizung z.B. K60 Gitterrostsysteme

Bodenaufbau siehe Detail DE_XX_5022

E

L:1,5m

ha

Bodenaufbau siehe Detail DE_XX_5009

1,20

60

PVC DN 70 Anschluss an die Entwässerungsebene TG Außenanlagen gem. Planung GLP

OKRD +0,13

F

Bodenaufbau siehe Detail DE_XX_5022 Abstreifmatte Emco Dimplomat Typ RG (Rips-/Gummieinlage) schwarz o. glw. gefasst in Edelstahl-Einbaurahmen

54

Lieferung Hochbau, Montage durch Landschaftsbau

10

2,32 5

15

1,10 21°

2,3

(+34,82 ü NHN) +0,12

Fliesenspiegel

Ab

10

28 7

288

Startpunkt

23 8

E

56

15

1,91

DE01

BA 3A

1,10

E

e

ck

DE01

de ng

ha

56

D

Fliesenspiegel

5 1

1,11

Ab

D 3159

20

Planebene ±0,00

Startpunkt

23 8

2,3

e

ck

DE01

de

ng

3,42 5

ha

BA 3A

D

OKRD +0,71

Planebene ±0,00

D

1,56

56

1,11

3,21 5

EG-Treppenlauf 5 Stg. 15,6 / 28,0

40

Ab

F

3,42 5

3,21 5

20

e

D 3159

L:2,5m

C

3,21 5

10

Einfügepunkt Licht

1,20

L:2,5m

40

F

streifmatte CO Diplomat Typ 527 RG (Rips/ mmi) asst in Edelstahl-Einbaurahmen

183

1,20

ck

C

05 15 8

13°

DE01

Einfügepunkt Licht

streifmatte CO Diplomat Typ 527 RG (Rips/ mmi) asst in Edelstahl-Einbaurahmen

7 8 15 8

1,05 1,03

OKFF +0,93

D

1,56 40

10

1,63 5

40

183

de

1,63 5

Einfügepunkt Licht

05 15 8

90

17

13°

7 8 15 8

90

1,05 1,03

ng

59

20

ha

25

20

1,20

Ab

77 40

59

17

40

183

1,09

1,63 5

17

2,32 5

28 28 28

DE02 25

80

77

59

59

rbeschlag Innen m. Farb- und Materialkonzept

05 15 8

1,05 1,03

(+34,82 ü NHN) +0,12 2,32 5

BA 3A

17

13°

Bodenaufbau siehe Detail DE_XX_5009

L:1,5m

TRH 2

17

20

3,42 5

TRH 2

25 59

Lauf: T 1.0 5 Stg. 15,6 / 28,0

DE01

Löschwassereinspeiseeinrichtung Löschwassereinspeiseeinrichtung Löschwassereinspeiseeinrichtung - 1 Einspeisearmaturen für Steigleitungen - 1 Einspeisearmaturen "trocken" für Steigleitungen - 1 "trocken" Einspeisearmaturen für Steigleitungen "trocken" nach DIN 14461-4 nach DIN 14461-4 nach DIN 14461-4 - B- Festkupplung der Einspeisearmatur - B- Festkupplung mind. der Einspeisearmatur- mind. B- Festkupplung der Einspeisearmatur mind. 600mm über Geländeoberfläche 600mm über Geländeoberfläche 600mm über Geländeoberfläche - UK gemäß Statik - UK gemäß Statik - UK gemäß Statik

17

D 3159

7 8 15 8

90

L:2,5m

TRH 2

77

E

OKRD +0,71

D

D 3159

C

Abstreifmatte Emco Dimplomat Typ RG (Rips-/Gummieinlage) schwarz o. glw. gefasst in Edelstahl-Einbaurahmen

OKFF +0,93

Planebene ±0,00

OKRD -0,015

C

59

3A.T2.E0_W034_01

D

Bodenaufbau siehe Detail DE_XX_5021

OKFF +0,15

1,20

2,5% Gefälle

92

16 5 16 5

D 3159

C

Bodenaufbau siehe Detail DE_XX_5022

OK Brüstung üOKRD +1,205

Lauf: T 1.0 5 Stg. 15,6 / 28,0

Kone MonoSpace Kone 500 MonoSpace 500 Kone MonoSpace 500 Kabine 110 x 210 Kabine 110 x 210 Kabine 110 x 210 Schacht 160 x Schacht 271 160 x 271 Schacht 160 x 271

183

OKRD -0,015

2

1,03

C 59

20

Bodenaufbau siehe Detail DE_XX_5021

OKFF +0,15

OKFF +0,12

1,34 4

1,50

OKRD -0,015

Bodenaufbau siehe Detail DE_XX_5009

OK Brüstung üOKRD +1,205

OKRD +0,71

Rückhol-Taster +1,345m üOKFF

2

05 158

OKRD -0,045

OKFF +0,93

EG

1,61

20

RWA-Taster +1,50m üOKFF

2

1,05

28

EG-Treppenlauf 18 Stg. 17,97 / 26,28

Lauf: 28 28 T 1.028 Rückhol-Taster 5 Stg. +1,345m üOKFF 15,6 / 28,0

2,62

Bodenaufbau siehe Detail DE_XX_5021

OKFF +0,15

3,80

16 5 16 5 3,43

59

3,07

1,61

2,62

Planung Hochbau

Planung Landschaftsbau

1,03

Planung Hochbau

Planung Landschaftsbau

OKFF +0,12

1,05

C

20

92 40

183

40

59 Unterste Einwurfsöffnung +1,04m 59 üOKFF

Abstreifmatte Emco Dimplomat Typ RG (Rips-/Gummieinlage) schwarz o. glw. gefasst in Edelstahl-Einbaurahmen

EG

1,61

1,34 4

1,50

EG-Foyer

05 158

8 05 15Griff +1,05m üOKFF 183

28

T 54 60 Gitterrost Längsstabrost in Edelstahl 1,20 x 1,00m, mit Auffangwanne aus Edelstahl 80mm, Bodenablauf DN 70, Rost 2 geteilt, Begleitheizung z.B. K60 Gitterrostsysteme

D 3160

28

3,07

20 2,62 56 6

3,80

32 28 RWA-Taster +1,50m üOKFF

Griff +1,05m üOKFF OKRD -0,045

PVC DN 70 Ableitung in Sickerrigole Ablauf mit Begleitheizung

useingangstür Straßenseite s Aluminium Pfosten-Riegel-Fassade, ch innen öffnend, -Wert 1,4 W/m2K (Rahmen + Verglasung), streifmatte verbeschichtet gem. Farb- und CO Diplomat Typ 527 RG (Rips/ terialkonzept rbeschlag Innen mmi) cherheitstür, Widerstandsklasse RC 2N, m. Farb- und Materialkonzept asst in Edelstahl-Einbaurahmen elektromotorischem herheitsschloss und Panikfunktion

28

20

3A.T2.E0_W034_01

3,43

Planung Hochbau

Planung Landschaftsbau

1,05

Unterste Einwurfsöffnung Oberste Einwurföffnung OKFF +1,04m üOKFF +0,12 +1,70m üOKFF

OKRD +3,78

D 3160

28

F

D 3160

28

1,72

Oberste Einwurföffnung +1,70m üOKFF

1,03

1,10

Bewegungsmelder DA01

2,65 3,80

19 6

20

56

32 40

59

1,61

EG-Foyer

Griff +1,05m üOKFF

59

E

3A.T2.E0_W034_01

OK Brüstung üOKRD +1,205

1,10

UKF +3,58

DE02

VK Fassade

1,72 Rückhol-Taster +1,345m üOKFF

RWA-Taster +1,50m üOKFF

OKRD +3,78

20

-Wert 1,4 W/m2K (Rahmen + Verglasung), verbeschichtet gem. Farb- und terialkonzept ockenbauwand cherheitstür, Widerstandsklasse RC 2N, erfläche Malerflies, Anstrich gem. elektromotorischem b- und Materialkonzept herheitsschloss und Panikfunktion

EG

OKRD +3,78

1,05

D

1,64

Unterste Einwurfsöffnung +1,04m üOKFF

OKRD -0,045

useingangstür Straßenseite rbeschlag Innen s Aluminium Pfosten-Riegel-Fassade, m. Farb- und Materialkonzept ch innen öffnend,

1,61

UKF +3,58

3,43

Einfügepunkt

71

+34,30m ü NHN

28

EG-Foyer

Oberste Einwurföffnung Licht +1,70m üOKFF

VK Fassade

PVC DN 70 Ableitung in Sickerrigole Ablauf mit Begleitheizung +34,30m ü NHN

ockenbauwand erfläche Malerflies, Anstrich gem. hangdecke b- und Materialkonzept he Detail: _XX_4019 useingangstür Straßenseite s Aluminium Pfosten-Riegel-Fassade, ch innen öffnend, -Wert 1,4 W/m2K (Rahmen + Verglasung), verbeschichtet gem. Farb- und terialkonzept cherheitstür, Widerstandsklasse RC 2N, elektromotorischem hangdecke herheitsschloss und Panikfunktion he Detail: _XX_4019 ockenbauwand erfläche Malerflies, Anstrich gem. b- und Materialkonzept

28

1,64

VK Fassadenband

ion tation omfort Türstation ch reversible Blindpaneel für tivem Multi-Touch-Display o.glw. glichen einbau von Klingeln. (AußenmaßPVC DN 70 maß 5mm)179x179x65mm Ableitung in Sickerrigole ß 195x195x4mm Ablauf mit Begleitheizung und links an der Türstation ost ens 5 cm Platz (Abstand zu tabrost in Edelstahl en Bauteilen, z.B. Türrahmenprofil) 1,635 m mit Auffangwanne nTürseitenteil elstahl 80mm, Begleitheizung, +34,30m ü NHN ufbau DN70, Rost 2 geteilt 0tation Gitterrostsysteme ch reversible Blindpaneel für glichen einbau von Klingeln. (Außenmaß 5mm)

hangdecke he Detail: _XX_4019

28

22

28

20

20

28

OKRD +3,78

DE02 71

messung des Auftragnehmers chlag Aussen ion breite 15 mm Farb- Mindestmaß und Materialkonzept omfort Türstation sichtbarer Aufhängung, hinterlüftet tivem Multi-Touch-Display o.glw. eitige179x179x65mm Antidröhnbeschichtung maß als Blende aus Metallblech beschichtet gem. Farbkonzept ßaneel 195x195x4mm rgrierter Hausnummer und linkshinterleuchteter an der Türstation ergrierter Farbezu gemäß ens 5 cmTürstation, Platz (Abstand deckenleuchte ndBauteilen, Materialkonzept aumdownlight zumTürrahmenprofil) Einbau in Metalldecke, en z.B. rb- und Materialkonzept nTürseitenteil stenanlage nz, RENZ PLAN, putzbündig, echt, (BxHxT) chlag Aussen tation30x16,5x38cm um pulverbeschichtet, Farbund Materialkonzept ch reversible Blindpaneel für gemäßeinbau Farb- und glichen von Materialkonzept, Klingeln. (Außenmaß h statischer Erforderniss 5mm) aneel als Blende aus Metallblech ion rgrierter hinterleuchteter Hausnummer omfort TüTürstation, rstation ergrierter Farbe gemäß ost tivem Multi-Touch-Display o.glw. nd Materialkonzept tabrost in Edelstahl maß 179x179x65mm 1,635 m mit Auffangwanne ßelstahl 195x195x4mm stenanlage 80mm, Begleitheizung, und links an der Tü nz, RENZ PLAN, putzbündig, ufbau DN70, Rost 2rstation geteilt ens 530x16,5x38cm cm Platz (Abstand zu (BxHxT) 0echt, Gitterrostsysteme en z.B. Türrahmenprofil) umBauteilen, pulverbeschichtet, nTürseitenteil gemäß Farb- und Materialkonzept, h statischer Erforderniss

ost tabrost in Edelstahl 1,635 m mit Auffangwanne elstahl 80mm, Begleitheizung, ufbau DN70, Rost 2 geteilt 0 Gitterrostsysteme

32

3,07

C

chlag Aussen gdecke Farbund Materialkonzept ium-Kassettenbleche 3mm onstruktion wie bei Fassadenaufbau atischen aneel alsErfordernissen Blende aus Metallblech messung des Auftragnehmers rgrierter hinterleuchteter Hausnummer breite Mindestmaß mm gemäß ergrierter Türstation,15 Farbe sichtbarer Aufhängung, hinterlüftet nd Materialkonzept eitige Antidröhnbeschichtung beschichtet gem. Farbkonzept stenanlage nz, RENZ PLAN, putzbündig, deckenleuchte echt, 30x16,5x38cm (BxHxT) gdecke aumdownlight zum Einbau in Metalldecke, um pulverbeschichtet, ium-Kassettenbleche 3mm rbund Materialkonzept gemäß Farb- und Materialkonzept, onstruktion wie bei Fassadenaufbau h statischer Erforderniss atischen Erfordernissen

Einfügepunkt Licht

19

VK Fassadenband

20 6

VK Fassade

deckenleuchte aumdownlight zum Einbau in Metalldecke, rb- und Materialkonzept

PVC DN 70 Ableitung in Sickerrigole Ablauf mit Begleitheizung +34,30m ü NHN Sickerrigole 30x30x100

Bauherr PLANPHASE Instone Real Estate Developm Chausseestraße 111 10115 Berlin PLANINHALT Tel: +49 (0)30 / 610 9102 0

AUSF

Einga

C PVC DN 70 Ableitung in Sickerrigole Ablauf mit Begleitheizung

PLANNUMMER

3a_AR

Datum: 05.07.2019 PLANPHASE

AUSF

PLANINHALT

Einga

PLANNUMMER

3a_AR

Bauteil

Verfa

Sickerrigole 30x30x100

C

Bauteil

Datum: 05.07.2019

Verfa


BRAUERSTRAßE BERLIN, DEUTHSCHLAND

Killinger & Westermann Architekten 08.2017 _ 12.2017 Ausführungsplanung

Brauerstrasse 2 and 3 are two housing projects by the Italian architect Franco Stella and by the berliner office Nalbach Architekten. An apartment building and a single-family villa in the courtyard overlooking the river. Our office deals with the construction, from the design phase forward. We had the opportunity to work with a number of outstanding experts, with whom we discussed the study of all the constructive details of the complex. Construction works began in the spring 2016 and is expected to be completed in the summer 2018.


B

R

A

U

E

R

S

T

R

A

ß

E

LIMAS

TRAßE


10

10 1,20

1,30

1,20

+14,30

+13,20

30

25

5

+13,00

+12,70 +12,60

+12,29

3,14

3,14

3,44

+12,185

+9,56

30

25

5

+9,56

+9,26 515

+9,16

+8,85

15,60

2,625

3,14

3,44

+8,745

CAFÈ

CAFÈ

2

2

LADEN

LADEN

+6,12

30

25

5

+6,12

+5,82 515

+5,72

+5,41

2,625

3,14

3,44

+5,305

Anschlussblech Titanzink Oberfläche gem. Farbkonzept

Parkett 10mm + 1mm = 11 mm Heizestrich 70mm; CT-C30-F5 Faserbewehrt Rohrüberdeckung ≥ 45mm Trittschalldämmplatte Mineralfaser 25/30 dyn.Steifigkeit s' ≤ 10 MN/m3 z.b. Isover Akustic EP1 Warmedämmung 40mm; EPS DEO 035 (150 kPa) 10 mm Bautoleranz

Flüssigkunstoffabdichtung im Fensteranschluss

48

+2,28

78/80

3

30

25

+2,38

45

Kerndämmung wasserabweisende Mineralwolle DIN 4108-10 A1 WLG 035

8

+2,68

5

+2,68

65

5 2

Naturstein 14

3,20

25

3,68

2

3,98

55

3

16

10

12

6

14

7

105

5

1

8

+40,52 +6,12

78/100

5

+1,98 +1,90

±0,00

345

24

8

+40,22 +5,82 Kellenschnitt Konsole gem. Stat. Nachweis Halfen HK4 - UT 3,5 - 270 0100.03S

125

25

275 115

16

9 8

14

55 31

+39,81 +5,41

5 30

Abdichtung Kaltsebstklebende Elastomer-bitumen Dichtungsbahn

Fensterabschluß innen dampfdicht außer diffusionsoffen Abdeckleiste Eiche wie Fenster

78/100

78/80

125

GSPublisherVersion 0.0.100.100

05

35

6

+39,705 +5,305

Gewebe Anputzleiste als 2-teiliges Profil mit integriertem Fugendichtband und Gewebestreifen

22

10

115

1

05

8

115

25

25

22

05

105

25

13 7

Abfangung Halfen HK4 - UV 3,5 - 250, v = 60 0100.02S gem. Nachweis Halfen

125

2

Kerndämmung vlieskaschiert und wasserabweisend DIN 4108-10 MW 16cm WLG 035 A1

+40,12 +5,72 Stb gem. Statik

8

54

-1,70

35

-1,30

84

-1,30


BRAUERSTRASSE 2

BRAUERSTRASSE 2

BRAUERSTRASSE 2

Brauerstrasse 2 14467 Potsdam

Brauerstrasse 2 14467 Potsdam

Brauerstrasse 2 14467 Potsdam

FE

VORABZUG

28

22

24 50 1,38

8 24 25

24

3

28

24

24

48

1,16

1,58

2,03

2,28

1,60

41

1,18

32

8 16

8 8

16

16

24

24

24

24

16

16 24

24

24 25

28

3 50

Lelbach Immobilien Gm Marzahner Straße 34 13053 Berlin

36

21

22

1,67 1,87 3,13

Index:

24

86

173

24

3

24

3

Index Datum:

24

3 Plan Nr.

24

12

12 17

12 17

12

12 17

Datum:

FE Index Datum:

Index:

45 3

45 87 90

Auftragnehmers bleibt unberührt. Höhenangaben für Wanddurchbrüche

24 24

+1,20

75

45

bezogen auf OK

auf OKFF bezog

entsprechend ver

+0,00 = 34,4 Bauherr

FRANCO STELLA mit

15

+0,90 +0,77

FRANCO STELLA

Lelbach Imm Marzahner 13053 Berli

+1,10

20

74

Architekt

Architekt

FRANCO ST

5

mit

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

32

Torstrasse 94 10119 Berlin Telefon 030 Telefax 030

75

14

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

±0,00

brauerstrasse@

8

brauerstrasse@fs-kwa.de

16

8

ARGE Franc Architetto - K Westermann

+0,46

40

90

+0,46

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

32

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

16

Plantitel

Bad 4.OG_B 24

20

24

20

24

EL 1:20

Masstab:

Zeichnung:

Datum:

Index Datum:

24 FE 24

20 20

315

1,30

BRA2_5_AR_SH_XX_WA_024_0644_V0 Format:

53

77

54

76

Index:

2,44

15 845 935

1,815

42

DIN A3

345

8

5 9

Plantitel

Bad 4.OG_C

24

16

Höhenangaben f

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

13

2,61

+1,08

24

24

24

24

24

Auftragnehmers

+1,20

Bauherr

+1,10

8 8

16

16

16 24

24

24

24

nur mit Genehmig

+0,00 = 34,40 m. ü. NN

mit

Plan Nr.

Ausführungszeich Architekten. Die

bezogen auf OKFF. Die Höhenlagen sind

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

24 24

Fachingenieure s Sonderfachleute

+1,85

25 5

Auftragnehmers bleibt unberührt. Höhenangaben für Wanddurchbrüche

8 32

1,08

1,10 46

13 3,13

EL

13 8 13

2,10

allein der Auftrag

Ausführungszeichnungen von Firmen gelten nur mit Genehmigungsvermerk des Architekten. Die Koordinierungspflicht des

97

2,13 10 69

Format:

DIN A3

Architekten zu kl führung sind die

Fachingenieure so wie die Angaben der Sonderfachleute zu beachten. Details und

5

90

1,30

1,35 2,45

2,61

2,45

2,61

10 1,08

1,80 Zeichnung:

Maßunstimmigke

allein der Auftragnehmer. Bei der Bauausführung sind die Planung der

nur mit Genehmigungsvermerk des

brauerstrasse@fs-kwa.de

16

14 2

16 Masstab:

1:20

24

24 98

BRA2_5_AR_SH_XX_WA_024_0643_V0

125

Alle Maße sind a

+2,45

Maßunstimmigkeiten sind sofort mit dem

50

37

17

12 17

17

12

12

12

17

12

12

17

Brauerstrasse 14467 Potsdam

Architekten. Die Koordinierungspflicht des

+0,00 = 34,40 m. ü. NN

Bad 4.O

425 425 425 425 425

FE Index Datum:

2 AUSFÜHRUNGSPLA

Änderungen

Fachingenieure so wie die Angaben der

bezogen auf OKFF. Die Höhenlagen sind

Zeichnung:

1:20

Index Datum

Sonderfachleute zu beachten. Details und

Bauherr

61

16

1,12 22 Plan Nr.

125

Masstab:

Datum:

Architekten zu klären. Für Maßfehler haftet

allein der Auftragnehmer. Bei der Bauaus-

Plantitel

125

BRA2_5_AR_SH_XX_WA_0

VORABZUG BRAUE

Alle Maße sind am Bau zu prüfen.

+2,45

Architekten zu klären. Für Maßfehler haftet

Architekt

125

Plan Nr.

125 125

Brauerstrasse 2 14467 Potsdam

Änderungen

Index Datum

auf OKFF bezogen. Abweichungen sind

24

1,135

16.08.17

entsprechend vermerkt.

Bad 4.OG_A

1,09

125 3,13

VORABZUG BRAUERSTRASSE 2AUSFÜHRUNGSPLANUNG

auf OKFF bezogen. Abweichungen sind

+0,61

1,62 1,87

Gäste Bad 2.OG

125 2 2

5

Index:

12

12

17

Index Datum:

125 2 2

5

16.08.17

17

12

17

FE

Datum:

17

12

17

Zeichnung:

1:20

24

entsprechend vermerkt.

+1,08

22

24

24Format: DIN A3

17

Masstab:

24

17

12

17 37

45

90

24

3 3

5

BRA2_5_AR_SH_XX_WA_024_0640_V0

24 435

auf OKFF bezogen. Abweichungen sind

brauerstrasse@fs-kwa.de ±0,00

24

93

2,59

entsprechend vermerkt.

2,00

33 13 45

93

125 2,155

Ausführungszeichnungen von Firmen gelten

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

77

93

125

12 79

1,535

führung sind die Planung der

Bauherr

61

1,32 53

31

Alle Maße sind am Bau zu prüfen.

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

2,61

2,45

21

215

11

31

Maßunstimmigkeiten sind sofort mit dem

+2,08

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

24

11 11

20

5

Brauerstrasse 2 14467 Potsdam

17

12

12

12

17

12

12

17

17

17

17

12 17

1,35 2,15

1,84

1,55

20 20

EL

Änderungen

+0,00 = 34,40 m. ü. NN

30

32

Index:

5

2

Architekt

16

DIN A3

AUSFÜHRUNGSPLANUNG BRAUERSTRASSE

Auftragnehmers bleibt unberührt.

24

Format:

BRAUERSTRASSE 2 AUSFÜHRUNGSPLANUNG

Index Datum

16 8

16 24

FE

Datum:

16.08.17

VORABZUG

FRANCO STELLA

24

16

16 24

Zeichnung:

1:20

Plantitel

Gäste Bad 2.OG_C

BRA2_5_AR_SH_XX_WA_024_0639_V0 Masstab:

brauerstrasse@fs-kwa.de

Plantitel

Plan Nr.

3

24

Torstrasse 94 10119 Berlin Telefon 030 / 240 835 Telefax 030 / 240 835

brauerstrasse@fs-kwa.de

24

16 24

3

ARGE Franco Stella Architetto - Killinger & Westermann Architekte

24

16 24

24

24

mit

+0,08

1,55

27

5

Höhenangaben für Wanddurchbrüche

EL

+0,08

45

60

225 5

Architekt

60

20

125

12

DIN A3

24

24

Bauherr

FRANCO STELLA

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

8 125

1,135

395

75

Architekten. Die Koordinierungspflicht des

24

+0,46

32

46 20

1,135

48

bezogen auf OKFF. Die Höhenlagen sind

16

16

16 2,75

24

24 27

+0,00 = 34,40 m. ü. NN

Architekt

FRANCO STELLA

24

1,08

32

Format:

20

24

auf OKFF bezogen. Abweichu entsprechend vermerkt.

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

16

125

5

20

24

Höhenangaben für Wanddurc

bezogen auf OKFF. Die Höhen

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

Gäste Bad 2.OG_B

Plantitel

15

nur mit Genehmigungsvermerk

Architekten. Die Koordinierung

Auftragnehmers bleibt unberü

Bauherr

8

72

43 90 16 24

16

16 24

24

125

FE

Index Datum:

35 95 3 5 5

1,13

EL 125

Zeichnung:

mit

15

Sonderfachleute zu beachten. Ausführungszeichnungen von

auf OKFF bezogen. Abweichungen sind entsprechend vermerkt.

mit

16.08.17

+0,61

15

allein der Auftragnehmer. Bei führung sind die Planung der

Fachingenieure so wie die Ang

Höhenangaben für Wanddurchbrüche bezogen auf OKFF. Die Höhenlagen sind

Plantitel

Alle Maße sind am Bau zu prüfen.

275

Maßunstimmigkeiten sind sofo

Architekten zu klären. Für Ma

Architekten. Die Koordinierungspflicht des

+1,195

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

Maßunstimmigkeiten sind sofort mit dem +2,45

55

24

24

3

1,58

1,58

3,04

3,20

43

1,00 90 24

24

24

1,115

5

Architekten zu klären. Für Maßfehler haftet

515

+1,195

brauerstrasse@fs-kwa.de

12 12

66

I

Auftragnehmers bleibt unberührt.

ARGE Franco Stella Architetto - Killinger & +0,60 Westermann Architekten

+0,46

Gäste Bad 2.OG_A 5

Datum:

+0,90

60

BRAUERSTRA 2

Alle Maße sind am Bau zu prü

+4,94 +2,26

+0,00 = 34,40 m. ü. NN

Lelbach Immobilien GmbH Marzahner Straße 34 +1,18 13053 Berlin

brauerstrasse@fs-kwa.de

1:20

1,64

Index:

Sonderfachleute zu beachten. Details und

mit

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

Masstab:

97

DIN A3

Ausführungszeichnungen von Firmen gelten

Architekt

BRA2_5_AR_SH_XX_WA_024_0638_V0

+1,10

2,60

Format:

Brauerstrasse 2 14467 Potsdam

3,20

1,96

1,58

2,01

Bauherr

+0,90

+2,27

1,885

FE Index Datum:

Änderungen

nur mit Genehmigungsvermerk des

+0,00 = 34,40 m. ü. NN

Ausführungszeichnungen von Firmen gelten

79

Zeichnung:

16.08.17

Index Datum

24 3

47 1,68

1,58

1,86 2,76

+1,195

nur mit Genehmigungsvermerk des

1,435

Datum:

+2,76

auf OKFF bezogen. Abweichungen sind

Fachingenieure so wie die Angaben der

15

1:20

AUSFÜHRUNGSPLANUNG

allein der Auftragnehmer. Bei der Bauaus-

nur mit Genehmigungsvermerk des

Sonderfachleute zu beachten. Details und

535

Masstab:

125

VORABZUG

führung sind die Planung der

entsprechend vermerkt.

allein der Auftragnehmer. Bei der Bauaus5

29

Plan Nr.

BRA2_5_AR_SH_XX_WA_024_0632_V0

125

Fachingenieure so wie die Angaben der

Höhenangaben für Wanddurchbrüche

führung sind die Planung der

27

125

Maßunstimmigkeiten sind sofort mit dem

bezogen auf OKFF. Die Höhenlagen sind

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

+2,45

27

125

225

Architekten zu klären. Für Maßfehler haftet

Architekten. Die Koordinierungspflicht des

Bauherr

+15,30

27

125

225

Alle Maße sind am Bau zu prüfen.

Auftragnehmers bleibt unberührt.

Brauerstrasse 2 14467 Potsdam

27

1,91

+2,76

+2,28

Sonderfachleute zu beachten. Details und

Änderungen

27

225

615 5

+3,04

Ausführungszeichnungen von Firmen gelten

VORABZUG

EL

54 57

1,30

5

VORABZUG BRAUERSTRASSE 2 AUSFÜHRUNGSPLANUNG

allein der Auftragnehmer. Bei der Bauaus-

+0,00 = 34,40 m. ü. NN

Plan Nr.

20

±0,00

12

6

1,69

125

+3,04

führung sind die Planung der

entsprechend vermerkt.

20

31

+13,20

EL

Index:

Maßunstimmigkeiten sind sofort mit dem

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

31

+0,77

72 78

125

DIN A3

16.08.17

Fachingenieure so wie die Angaben der

mit

31

+1,64

FE Index Datum:

6

125 34

Format:

Zeichnung:

1:20

Architekten zu klären. Für Maßfehler haftet

EL

11

215

16

Masstab:

Alle Maße sind am Bau zu prüfen.

+2,28

allein der Auftragnehmer. Bei der Bauausführung sind die Planung der Fachingenieure so wie die Angaben der

auf OKFF bezogen. Abweichungen sind

2,76 11

215

21

1,535

125 31

BRA2_5_AR_SH_XX_WA_024_0631_V0

125

Index Datum

25

24

24

24

24

28

25 3

+2,76

Höhenangaben für Wanddurchbrüche

3,20

50 47

1,32

16

Plan Nr.

125

Datum:

24

24

24

24

24

24 28

+3,04

bezogen auf OKFF. Die Höhenlagen sind

3,20 2,29

1,58 6

85

24

125

1,03 1,695

Änderungen

Index Datum

24

24

24

24

28

24

28

28

25 3

28 25

28

3

Änderungen

Sonderfachleute zu beachten. Details und

8 68

2,59

42 46

60

3,13

Gäste Bad 1.OG_D

Brauerstrasse 2 14467 Potsdam

nur mit Genehmigungsvermerk des

1,18 125

24 28

65

brauerstrasse@fs-kwa.de

Plantitel

FRANCO STELLA

75 6 125 125

25

24

2,76

795 885

Brauerstrasse 2 AUSFÜHRUNGSPLANUNG 14467 Potsdam

Architekten. Die Koordinierungspflicht des

16 95

74

93

1,86 15

1,18

9 75

Index:

BRAUERSTRASSE 2

Auftragnehmers bleibt unberührt.

16 24 16 24 16 24

16 68

93

24

30

24 75

475

24 24

DIN A3

Index Datum:

Ausführungszeichnungen von Firmen gelten

EL 24

24 6 95

24

28

28

50 3,04

2,76

Format:

Zeichnung:

1:20 Datum:

8

6 24 24

16 24

24

475

24

Masstab:

Plantitel

24

16

16

3,04 16

16

8 8

Gäste Bad 1.OG_C

24

8 8

16

Gäste Bad 1.OG_B 24

Plantitel

Architekt

5

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

Plantitel

FRANCO STELLA

65 125 6 2

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

brauerstrasse@fs-kwa.de

BRA2_5_AR_SH_XX_WA_024_0630_V0

125

+4,94

5

FRANCO STELLA mit

+0,46

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

+0,30

Plan Nr.

125

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin Architekt

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

125

29

445

Bauherr

+0,90

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

Maßunstimmigkeiten sind sofort mit dem

+0,90

24

24

68

+1,08

FRANCO STELLA

Architekten zu klären. Für Maßfehler haftet

+0,90

entsprechend vermerkt.

+0,00 = 34,40 m. ü. NN

+1,195

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

mit

Alle Maße sind am Bau zu prüfen.

+1,185

bezogen auf OKFF. Die Höhenlagen sind auf OKFF bezogen. Abweichungen sind

Bauherr

Änderungen

+1,60

Architekten. Die Koordinierungspflicht des Auftragnehmers bleibt unberührt. Höhenangaben für Wanddurchbrüche

entsprechend vermerkt.

Brauerstrasse 2 14467 Potsdam

15

Ausführungszeichnungen von Firmen gelten nur mit Genehmigungsvermerk des

+1,60

+0,00 = 34,40 m. ü. NN

FRANCO STELLA

16.08.17

+2,28

führung sind die Planung der Fachingenieure so wie die Angaben der Sonderfachleute zu beachten. Details und

EL

1 15

BRAUERSTRASSE AUSFÜHRUNGSPLANUNG 2

+2,76

24

24

24

24

24 3

60 305 1,915

VORABZUG

+3,04

Architekten zu klären. Für Maßfehler haftet

15

Höhenangaben für Wanddurchbrüche

10

555 79

Index Datum

allein der Auftragnehmer. Bei der Bauaus-

Architekten. Die Koordinierungspflicht des Auftragnehmers bleibt unberührt.

+1,64

8

235

Index:

Alle Maße sind am Bau zu prüfen.

2,76

3

16

16

16

16

48 225

Format:

DIN A3

Maßunstimmigkeiten sind sofort mit dem

+2,26

Ausführungszeichnungen von Firmen gelten nur mit Genehmigungsvermerk des

mit

16 225

125

Index:

FE Index Datum:

Änderungen

Architekt

24

125

125

DIN A3

Zeichnung:

Datum:

16.08.17

2,18

FE Index Datum:

Masstab:

1:20

24 24

+2,76

Fachingenieure so wie die Angaben der

bezogen auf OKFF. Die Höhenlagen sind

16 24

24

24

24

16

16

16 24

Format:

Zeichnung:

BRA2_5_AR_SH_XX_WA_024_0628_V0

24

Sonderfachleute zu beachten. Details und

16

24

Datum:

Plan Nr.

24

+3,04

allein der Auftragnehmer. Bei der Bauaus-

brauerstrasse@fs-kwa.de

16.08.17

24

Index Datum

führung sind die Planung der

16

3,13

Masstab:

1:20

95

125

1,19 2,615

Architekten zu klären. Für Maßfehler haftet

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

BRA2_5_AR_SH_XX_WA_024_0629_V0

6

885

1,425

Brauerstrasse 2 14467 Potsdam

24

3

825

6

1,075

53

Alle Maße sind am Bau zu prüfen.

2,28

2,28 1,08

425

+0,46

1,105

47

2,84

auf OKFF bezogen. Abweichungen sind

+0,90

Plan Nr.

3

173

24

225

bezogen auf OKFF. Die Höhenlagen sind

3,04

90 10

+1,08

3

24

225

24

Brauerstrasse 2 14467 Potsdam

24

24

225

24

2,45

24

475

475

225

24

VORABZUG BRAUERSTRASSE 2 AUSFÜHRUNGSPLANUNG

16

475

475

24

BRAUERSTRASSE

24

75

75

Index:

Maßunstimmigkeiten sind sofort mit dem

+2,26

8 125

75

9 5

75

DIN A3

24

+2,00

+2,08

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

325

46

8

885

FE Index Datum:

auf OKFF bezogen. Abweichungen sind

Bauherr

+1,18

44

1,18

755

1,73

EL

Format:

Zeichnung:

Datum:

+2,28

Auftragnehmers bleibt unberührt.

2,76 16

16 795

245

36

24

24

27

1,695

Masstab:

1:20

Architekten. Die Koordinierungspflicht des

2,01

3,04

43 32 16 24

24

24

28

48

68

2,14

1,10

2,01

90 10 1,08

16 6 8 2

16

16

EL

425

75 60 785

Plan Nr.

BRA2_5_AR_SH_XX_WA_024_0625_V0

24

1,58 1,30 3,04 2,76

2,28 8

1,18

1,00

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

Gäste Bad 1.OG_A 52

3

Architekt

Plantitel

22

3

Änderungen

Höhenangaben für Wanddurchbrüche

+1,195

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

brauerstrasse@fs-kwa.de

7

3

entsprechend vermerkt.

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

125

3

17

+2,76

Ausführungszeichnungen von Firmen gelten

FRANCO STELLA

16

24

nur mit Genehmigungsvermerk des

mit

16

24

+0,00 = 34,40 m. ü. NN

+0,90

125

24

+3,04

Fachingenieure so wie die Angaben der

bezogen auf OKFF. Die Höhenlagen sind auf OKFF bezogen. Abweichungen sind

125

24

2 AUSFÜHRUNGSPLANUNG

Sonderfachleute zu beachten. Details und

Auftragnehmers bleibt unberührt.

125

125

VORABZUG

Architekten zu klären. Für Maßfehler haftet

Höhenangaben für Wanddurchbrüche

EL

12

75 75

allein der Auftragnehmer. Bei der Bauaus-

Architekt

24

495 1,20

1,935

16.08.17

Maßunstimmigkeiten sind sofort mit dem

+2,08

+0,00 = 34,40 m. ü. NN

24

16 24

24 3

25

24

48

68

+2,28

+2,00

Ausführungszeichnungen von Firmen gelten nur mit Genehmigungsvermerk des

entsprechend vermerkt.

24

705

1,115

führung sind die Planung der

Fachingenieure so wie die Angaben der Sonderfachleute zu beachten. Details und

Architekten. Die Koordinierungspflicht des

24

85

60

3,05

205

Alle Maße sind am Bau zu prüfen.

+2,28

allein der Auftragnehmer. Bei der Bauaus-

+0,46

EL

Index Datum

+2,76

führung sind die Planung der

+1,08

24

Änderungen

28

24 28

24

24 28

24

24

28

24

24

24

25 3

24

24

24

24

25 3

28

28

28

28 38

48

Alle Maße sind am Bau zu prüfen.

Bauherr

Index:

1,65

205

DIN A3

VORABZUG BRAUERSTRASSE 2 AUSFÜHRUNGSPLANUNG

+3,04

Maßunstimmigkeiten sind sofort mit dem

+1,195

FE Index Datum:

28

24

Index Datum

Architekten zu klären. Für Maßfehler haftet

+2,08

Format:

Zeichnung:

Datum:

16.08.17

Brauerstrasse 2 14467 Potsdam

+2,76

+2,28

24

Masstab:

1:20

24

965

205

BRA2_5_AR_SH_XX_WA_024_0626_V0

24

2,84

205

Plan Nr.

24

28

24

90

24

24

Änderungen

+3,04

+2,00

16

8 755

15

1,80 1,925

Brauerstrasse 2 14467 Potsdam

24

28

34

30 15

1,005

2 125

24

24 855

2

455

915

24

Index:

VORABZUG BRAUERSTRASSE 2 AUSFÜHRUNGSPLANUNG

+2,26

16

16

8 8

24

24

DIN A3

Index Datum:

455

915

24

FE

15

455

Format:

Zeichnung:

Datum:

16.08.17

205

+2,28

47

1,08

1,08

58 16

16

16

16

16

24

Masstab:

1:20

205

3,05

31

24 BRA2_5_AR_SH_XX_WA_024_0627_V0 205

205

Bad 1.OG_D

24

EL

24

24 Plan Nr.

205 10

40

brauerstrasse@fs-kwa.de

Plantitel

Bad 1.OG_A

24

25

15

25

60 90 15

24

205

55

27

2,55

5

90

36

1,85

1,08

75 275

1,55

24

85 80

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

Plantitel

28

405

-0,16

EL

75

Bad 1.OG_B

24

75

425

Plantitel

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

+0,30

brauerstrasse@fs-kwa.de

2,76

75

425

24

24

16 75

425

24

24

24 75

425

24

FRANCO STELLA mit

+0,46

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

+0,08

8 16 24

425

24

2,26

1,30

10

20

1,18

58

28 16 24

16

16

16

16 24

24

24

24

EL

24

Architekt

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

brauerstrasse@fs-kwa.de

Bad 1.OG_C

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

mit

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

Plantitel

Bauherr

+0,90

FRANCO STELLA

Wandschlitz 5x10 Anbindung HK

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

brauerstrasse@fs-kwa.de

+0,00 = 34,40 m. ü. NN 5

Architekt

FRANCO STELLA

Torstrasse 94 10119 Berlin Telefon 030 / 240 83540! Telefax 030 / 240 83541

KW

auf OKFF bezogen. Abweichungen sind

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

+1,08

mit

+0,61

+0,58

ARGE Franco Stella Architetto - Killinger & Westermann Architekten

+0,46

EL

28

24

24

24

24

25 1,12

2,28

FRANCO STELLA mit

+0,58

Architekt

Auftragnehmers bleibt unberührt. Höhenangaben für Wanddurchbrüche bezogen auf OKFF. Die Höhenlagen sind entsprechend vermerkt.

+1,19

Bauherr

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

+0,78

nur mit Genehmigungsvermerk des

auf OKFF bezogen. Abweichungen sind entsprechend vermerkt.

+0,00 = 34,40 m. ü. NN

Bauherr

+1,08

Architekt

46

3

24

2,46

3,04

+0,00 = 34,40 m. ü. NN

10

2,28

30 42

+1,195

Lelbach Immobilien GmbH Marzahner Straße 34 13053 Berlin

+0,90

47

auf OKFF bezogen. Abweichungen sind

Architekten. Die Koordinierungspflicht des

+1,60

Höhenangaben für Wanddurchbrüche bezogen auf OKFF. Die Höhenlagen sind

entsprechend vermerkt.

2,76

Bauherr

Sonderfachleute zu beachten. Details und Ausführungszeichnungen von Firmen gelten

15

Auftragnehmers bleibt unberührt.

+1,64

90

90

3,04

1,70

2,76

3,04 2,76 8 8 17

48

3 215

58

25

Auftragnehmers bleibt unberührt. Höhenangaben für Wanddurchbrüche bezogen auf OKFF. Die Höhenlagen sind

+0,00 = 34,40 m. ü. NN

+0,78

23

56 12

12

1,98

nur mit Genehmigungsvermerk des Architekten. Die Koordinierungspflicht des

auf OKFF bezogen. Abweichungen sind

führung sind die Planung der Fachingenieure so wie die Angaben der

nur mit Genehmigungsvermerk des Architekten. Die Koordinierungspflicht des

entsprechend vermerkt.

allein der Auftragnehmer. Bei der Bauaus-

+2,26

Fachingenieure so wie die Angaben der Sonderfachleute zu beachten. Details und Ausführungszeichnungen von Firmen gelten

nur mit Genehmigungsvermerk des Auftragnehmers bleibt unberührt.

WW

Maßunstimmigkeiten sind sofort mit dem Architekten zu klären. Für Maßfehler haftet

allein der Auftragnehmer. Bei der Bauaus-

+2,10

Architekten. Die Koordinierungspflicht des Höhenangaben für Wanddurchbrüche

+0,61

Alle Maße sind am Bau zu prüfen.

Maßunstimmigkeiten sind sofort mit dem

führung sind die Planung der

Sonderfachleute zu beachten. Details und Ausführungszeichnungen von Firmen gelten

bezogen auf OKFF. Die Höhenlagen sind

+1,195

+2,76

Architekten zu klären. Für Maßfehler haftet

+2,26

Fachingenieure so wie die Angaben der

1,58

1,58 2,01

1,68 1,98

+4,94

allein der Auftragnehmer. Bei der Bauausführung sind die Planung der

+2,10

Index Datum

+3,04

Alle Maße sind am Bau zu prüfen.

+2,28

Maßunstimmigkeiten sind sofort mit dem

Fachingenieure so wie die Angaben der Sonderfachleute zu beachten. Details und Ausführungszeichnungen von Firmen gelten

Änderungen

Index Datum

+2,76

Architekten zu klären. Für Maßfehler haftet

allein der Auftragnehmer. Bei der Bauaus-

3

+3,04

1,58

Architekten zu klären. Für Maßfehler haftet führung sind die Planung der

3

Brauerstrasse 2 14467 Potsdam

Änderungen

Index Datum

Alle Maße sind am Bau zu prüfen.

+2,28

Maßunstimmigkeiten sind sofort mit dem

+4,94 +2,26

3

24

Alle Maße sind am Bau zu prüfen.

+2,28

28

28

48

+2,76

56

48

48

+2,76

28

24

24

24

24

24

+3,04

25

24

24

Änderungen

Index Datum

3

28

28

28

28

28

24

24

24

24

24

+3,04

28

28

28

28

28

24

Änderungen

BRAUERSTRASSE 2

24

Plan Nr.

BRA2_5_AR_SH_XX_WA_024_0645_V0

24

Masstab:

1:20 Datum:

Zeichnung:

FE Index Datum:

Format:

ELDIN A324 EL

Index:

24

45 27

45 36

13 27

90

13

55 25

1,00 60

13

40

55 60

125

125

1,00 1,96

125 25

2,10

1,58

55 1,17

125 125

Plan Nr.

BRA2_5_AR_SH Masstab:

Z

1:20 Datum:

In

16.08.17

16.08.17

16.08.17

VORABZUG

VORABZUG

VORABZUG

VORABZU

AUSFÜHRUNGSPLANUNG

AUSFÜHRUNGSPLANUNG

AUSFÜHRUNGSPLANUNG

AUSFÜHRU

24

3,13

12

5

16.08.17


LIMASTRAßE

BERLIN, DEUTHSCHLAND Killinger & Westermann Architekten 04.2016 _ 12.2016 Renovierung

Renovation of an old villa in Zehlendorf. A fine example of German nineteenth-century architecture characterized by generous environments, stucco ceilings and friezes on the facade. The renovation took place in three phases. Analysis of the original state of the building with color study, reorganization of spaces and construction.


LIM

AS

TR

E


LIMASTR. 16 Umbau und Sanierung eines Denkmales Limastraße 16 14163 Berlin-Zehlendorf

Bauherr

Lima Gbr Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

Architekt

Killinger & Westermann Architekten Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541 buero@killingerwestermann.de Friedrich Killinger AKBERLIN Nr. 10025

LIMASTR. 16 Plantitel

Grundriss OG

Plan Nr.

LIMA_OG_100_DMA

Index Datum

Datum:

DIN A3

FK

1:100

Format:

CAD Tech.:

Maßtab:

Index:

A

24.10.17

Denkmalrechtlicher Antrag


24 20

Index Datum

67

5

3,48

1,445

1,89

Änderungen

0,92

0,88

0,84

0,87

0,84

91

1,59

0,81

Legende Materialien 0,12

25

315

0,00

0,00

25

315

0,12

0,12

0,00

735

665

735 735

47 47 455

18

25

545

96

665 66

835

545

96 2,17 66

25

47

66

9

835 835 25

4,47

9 9

66

43 425

25

25

47

695 705

1,43 1,435 66

3,74

66

25

1,385 1,435

66

25

9

66

8 25

13,08

40

89 91

66

615

8

86

5

695

43 40

25

LIMASTR. 16

4,91

66

25

615

85

1,755 3,205 66

25

295

8

695

59

25

59

27

47

295 265 57

47 47 455

18

3,87

47

Alle Maße sind am Bau zu prüfen.

47

Maßunstimmigkeiten sind sofort mit dem Architekten zu klären. Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauaus-führung sind die Planung

Umbau und Sanierung eines Denkmales 2

1

5

3

5

Limastraße 16 14163 Berlin-Zehlendorf

0

der Fachingenieuresowie die Angaben der Sonderfachleutezu beachten. Details und Ausführungszeichnungen

5

0

5

3

15

2

2

35

05

05

3

15

2

2

35

05

05

3

2

2

0

2

Limastraße 16 14163 Berlin-Zehlendorf

0

Killinger & Westermann Architekten Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541 buero@killingerwestermann.de Friedrich Killinger AKBERLIN Nr. 10025

12

4

05

3

15

2

2

4

05

3

15

2

2

4

05

3

1

05

1

1

05

CAD Tech.:

Format:

1:2, 1:1 FE

DIN A3

Datum:

Index:

19.10.17

5

3 2

Architekt

Killinger & Westermann Architekten Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541

buero@killingerwestermann.de

buero@killingerwestermann.de

Friedrich Killinger AKBERLIN Nr. 10025

Friedrich Killinger AKBERLIN Nr. 10025

Index Datum

A

AUSFÜHRUNGSPLANUNG

1

Umbau und Sanierung eines Denkmalgeschützten Mehrfamilienhauses Limasur 16 14163 Berlin

35 4

35 4 Maßtab:

Killinger & Westermann Architekten 0 1 1 Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541

1,425

Architekt

Killinger & Westermann Architekten Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541

Index/Name

LIMASTR. 16 Plantitel

Plantitel

DET_EG_Heizkorperve 05 15 rkleidung 2

05

DET_EG_Heizkorperve 05 15 rkleidung 22 Plan Nr.

07.3

Architekt

15 215 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 2 15 3 45 45 3 2

Lima Gbr Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

15 2

LIMASTR. 16

05

15 2

2

05

4

05 15

0

LIMASTR 16 35 4

67 865

Lima Gbr Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

905

67

905

875 4 12

sind entsprechend vermerkt.

15

05

05

15 2

0

Plantitel

2

DET_EG_Heizkorperve rkleidung 2

Plan Nr.

Plan Nr.

07.3

07.3 Format:

Maßtab:

1:2, 1:1 FE

DIN A3

1:2, 1:1 FE

DIN A3

Datum:

Index:

Datum:

Index:

Maßtab:

CAD Tech.:

Index Datum

A

19.10.17

AUSFÜHRUNGSPLANUNG

19.10.17

DET_EG_Heizkorperverklei Vorabzug dung Ansichten

Plannummer

420 CAD Tech.:

Index Datum

Format:

A

AUSFÜHRUNGSPLANUNG

Maßstab 1:20

Format: DIN A1

Datum / Index 19.10.17

AUSFÜHRUNGSPLANUNG

Lima Gbr Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

KILLINGER & WESTERMANN ARCHITEKTEN

buero@killingerwestermann.de

Torstrasse 94 10119 Berlin Fon: (030) 240 83 540 Fax: (030) 240 83 541 e-mail: buero@killingerwestermann.de

Friedrich Killinger AKBERLIN Nr. 10025

Friedrich Killinger AK BERLIN Nr. 10025

LIMASTR. 16 Umbau und Sanierung eines Denkmales Limastraße 16 14163 Berlin-Zehlendorf

Umbau und Sanierung eines Denkmales

20

Limastraße 16 14163 Berlin-Zehlendorf

20

Limastraße 16 14163 Berlin-Zehlendorf

24

24

24 20

24 34

LIMASTR. 16 3,48

43

24

24

20

24

20

24

LIMASTR. 16 Umbau und Sanierung eines Denkmales

LIMASTR. 16 2,86

1,34

1,78

1,54

1,78

5

3,48

1,54

1,34

3,48

07.2 Maßtab: CAD Tech.: 1:10, 1:5, 1:2 FE

DIN A3 Index:

A

AUSFÜHRUNGSPLANUNG

99

1,04

99

Index Datum

Datum:

19.10.17

05 1 1

Format:

2,25

2,18

KS

Plan Nr.

5

3 2

15 05 4 3 2

3,48 2,23

1,70

DET_EG_Heizkorperve rkleidung 1

2,25

2,82

3,48

3

5 1,04

Lima Gbr Dubrowstrasse 34 1,33 14129 Berlin 1,425 vertreten durch Jan P. Wuppermann Stephanie Salbach

99

5

3,48

2

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 35 1 15 215 35 35 35 35 35 35 3Bauherr 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 5 3 4 4 3 2 5

1,04

99

15 0 5 4 3 2

1,04

1,78

1,54

1,34

1,78

1,54

1,34

Plantitel

2

Bauherr

Lima Gbr Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

Bauherr

Food Lima Gbr Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

1,70

1,70 Estrich Platte

geglühter Sand

1,185 11

11

60

60

82

10 6

Friedrich Killinger AKBERLIN Nr. 10025

75

32

22

32

16

12

16 32

10 6

Promat 6 cm

30

32

75

Zementestrich

70 1,30 1,57

47

1,075

47

1,075

47

3,72

47

Friedrich Killinger AKBERLIN Nr. 10025

buero@killingerwestermann.de

4 10

OSB

30 155

22

4 10

25

1,075

60

60

60

10 15 10 75

60

60 10 6

16 32

32

22

32

60

60 16

75

32

75

1,075

11

37 52

37 47

20

45

10

55 30

50

2,00

20

1,46 25

74

1,50

70

2,08 2

40

60

60

1,68

255

255

2,03

3,04

2

845

99

275

41

81

1,02

26

41

1,40

41

LIMASTR. 16 Plantitel

6,47

Plantitel

DET_EG_Kaminzimmer _06

DET_EG_Kaminzimmer _06

44

Plantitel

44

LIMASTR. 16

44

LIMASTR. 16

30

30

55 25

Plan Nr.

401 Maßtab:

CAD Tech.:

1,07

10 6

1,70

1,23

11

Format:

15

25

1,30

22

4 10

11

45 55 30

Plan Nr.

Zementestrich

20 10

401

geglühter Sand

47

Maßtab:

11

37

1,13

4 10

Naturstein

-8,005

buero@killingerwestermann.de

10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541

0,12

0,055

U - Stahl 100

37

47 47

Killinger & Westermann Architekten Torstrasse 94 Flaschen

U - Stahl 100

47 47

Killinger & Westermann Architekten Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541 Friedrich Killinger AKBERLIN Nr. 10025

Killinger & Westermann Architekten Torstrasse 94 10119 Berlin Telefon 030 / 240 83540 Telefax 030 / 240 83541

TK Architekt

OSB

1,70

Architekt

0,82

Architekt

buero@killingerwestermann.de

nur

Die Höhenlagen sind auf OKFF bezogen. Abweichungen

Bauherr

Bauherr

Lima Gbr 5 Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

Lima Gbr5 Dubrowstrasse 34 14129 Berlin vertreten durch Jan P. Wuppermann Stephanie Salbach

Bauherr

2

12

gelten

Höhenangaben für Wanddurchbrüche bezogen auf OKFF.

2

4 2

4 2 05

15 2

LIMASTR. 16

1,09

Limastraße 16 14163 Berlin-Zehlendorf

4

15

15 35

05

Architekt

12

Limastraße 16 14163 Berlin-Zehlendorf

OKFF EG = +0,00

Bauherr

2 3

Firmen

Koordinierungspflicht des Auftragnehmers bleibt unberührt.

Umbau und Sanierung eines Denkmales

05

von

mitGenehmigungsvermerk des Arc hitekten. Die

Umbau und Sanierung eines Denkmales

2

5

4

05 5 4

3

4

05

05 3

25

1

2

Umbau und Sanierung eines Denkmales

5

LIMASTR. 16

LIMASTR. 16 25

LIMASTR. 16 25

5

CAD Tech.:

Format:

41

DET_EG_Küche_Ansich t_01 (C) Plan Nr.

415 Maßtab:

CAD Tech.:

Format:

1:25

FE

DIN A3

Datum:

Index Datum

Index:

19.10.17

A


CHAUSSEESTRAßE BERLIN, DEUTHSCHLAND

Julian Breinersdorfer Architekten 09.2015 _ 02.2016 Designing project

This project is a renovation of a building of the second half of the XX century. During the analysis our client gave us the opportunity to expand the entire complex with the construction of two new buildings on the adjacent lot. Immediately it became very interesting not only to focus our attention on the design of new buildings, but above all to create a relationship between them.

ARCHITEKTEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN


IN

VA

LI

N DE

ST

RA

ßE

C H A U S S E E S T R A ß E


1 Büroeinheit

1

2

4

3

A

5

6

7

8

C

9

11

10

12

B

D F

F 39.65 üNN

E 1,19

0,07 0,9 0,07

0,2

0,07 0,62

0,2 0,13

SCHACHT-A

OKRF

37.725

E

SCHACHT-C

OKFF

R: 1.TH.A TREPPENHAUS 17,57 qm 0,28

39.55 üNN

20 STG 17.5/28

39.55 üNN OKRF

AUFZUG-A

0,33 0,07

0,62

TH-A

0,1

0,95

0,07

R: 1.01.02.02 WC DAMEN 4,28 qm 2

0,1

0

R: 1.01.02.01 WC HERREN 4,28 qm 2

0,2 0,62

0,07

0,62

0,07

1,03

0,95

1,19

BRH=0.8

0,33

AUFZUG-C

OKFF

39.65 üNN OKFF

22 STG 17.5/28

R: 1.TH.C

37.725

22 STG 17.5/28

TREPPENHAUS 24,31 qm

LAGER

OKFF BRH=0.8

20 STG 17.5/28

TH-C

0

D

Meeting 12qm BRH=0.80

0

C 1

BRH=0.80

BRH=0.8

F

RAUM 2.01.04 MEETINGRAUM xxx qm

TECHKÜCHE/ INSTALLATION

D

BRH=0.8 0

BRH=0.8 0

C

BRH=0.8 0

BRH=0.8

38.60 FOKF 22 STG 17.5/28

MEETING

MEETING

BÜROEIHEIT 1.02 ( BESTAND)

0

337,45 qm AUFZUG-B

BRH=0.8

20 STG 17.5/28

B1 0

39.65 üNN

TELEFON BOX

OKFF BRH=0.8

OKRF

0

Meeting 12qm

B

TELEFON BOX

BRH=0.8

R: 1.01.03.01

R: 1.01.03.02 WC_DAMEN 3,01 qm

R: 1.01.03.03

RAUM 1.02.03

TEE-KÜCHE

LAGER xxx qm

3,65 qm

MEETING 39.65 üNN OKFF RAUM 2.01.05

39.55 üNN

MEETINGRAUM xxx qm

OKRF

TELEFON BOX

SCHACH T-B

TH-B

WC_HERREN 5,23 qm

315, 97 qm

TELEFON BOX

39.55 üNN OKRF

23,70 qm

B1

RAUM 1.02.01 BÜROFLÄCHE

39.65 üNN OKFF

R: 1.TH.B TREPPENHAUS

39.55 üNN

B

TH-B

R: 1.01.04.01

R: 1.01.04.02

WC_HERREN 4,97 qm

WC_DAMEN 4,63 qm

R: 1.02.02.01

R: 1.02.02.03

R: 1.02.02.02

TEE-KÜCHE

WC_DAMEN

WC_HERREN 4,97 qm

3,41 qm

4,63 qm

RAUM 2.02.03

LAGER

LAGER xxx qm

COPY

0

E

C 1

VORDACH EG/ HOF 209,39 qm

Meeting 12qm

C

F

COPY

TEEKÜCHE INSTALLATION

TEEKÜCHE INSTALLATION

TERRASSE 16,94 qm

RAUM 2.01.04 MEETINGRAUM xxx qm

E

A

A A

B

C

1

D

1.OG 2

3

4

5

6

7

8

9

10

11

ARCHITEKTEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

Dach Terrasse

Coworking Space

12


PROJEKT Invalidenstraße 113 / Chausseestraße 20

BAUHERR Ritter - Unternehmensgruppe / Mauerkircherstraße 8 / 81679 München

ARCHITEKT Julian Breinersdorfer und Löscher & Böckmann Architekten

INVALIDENSTRAßE 19.68 0.65

5.78

6

6.44

7

8

6.45

1.84

4.52 9

6.37

6.48

5.21 1.45

1.06

5 6 7 8 9

6.65

1.20

B

2.05

1.20

IV

0.50

C

2.84

6.46

81.9 197.2

81.9 197.2

1.38

94.4 197.2

Server

0.60

0.33

Teeküche

D

1.40

Stütze d = 40 cm

BGF: 38.0 m² Terrasse

7

7.25

6.18

BGF: 30.2 m² Terrasse

1.40 1.40

Abströmöffnung mit Brandf. St. l.Öffnungsmass > 1.2m²

E

E Stütze d = 40 cm

Stütze d = 40 cm

1.40 1.40

T30 RS 106.9 209.7

H

H

T30 RS 106.9

81.9 197.2

Stütze d = 40 cm

Stütze d = 40 cm

Stütze d = 40 cm

11

18

12

13

15

17

16

14

10

6.36

1.40

209.7

2.10

AßE

1.40

17,59 / 28,00

Aufzug

9 Stufen

Teeküche

14.68

R SEEST CHAUS

6.13

5.99

7.33

1.40

5

4

3

10.62

1.40

6

G

Stütze d = 40 cm

14.24

4

Stütze d = 40 cm

Abströmöffnung mit Brandf. St. l.Öffnungsmass > 1.2m²

D

BGF: 281.84 m² Großraumbüro

2.24

3

19.69

2

Aufzug

2.10 Stütze d = 40 cm

F

CHA 20

81.9 197.2

1.20

8

94.4 197.2

17,59 / 28,00

1.40

9 Stufen

9

Server

1

8

5

6

7

3

2

4

9

I

0.33

I

15 14 13 12 11 10

209.7

BGF: 75.6 m² Terrasse

G

1

T30 RS 106.9

Überbauung CHA 21, eventuell Überdämmung, muss durch Stichprobe ermittelt werden

4.58

F

18 17 16 17,59 / 28,00

1.06

Stütze d = 40 cm

6.69

1.22

3.74

209.7

Stütze d = 40 cm

9 Stufen

3.20

I

4.58

T30 RS 106.9

C

11.11

2

13.95

A

Stütze d = 40 cm

17,59 / 28,00

21

7.07

1

Stütze d = 40 cm

BGF: 356.33 m² Großraumbüro

9 Stufen

e eestraß Chauss

INV 113

Invalidenstraße 114

B

Invalidenstraße 112

V+I

5.45

A

Vermessung stimmt nicht mit Augenschein überein

3.31

1.62

3.31

2.24 5.06

1.20

2.05

0.80

2.85

Chausseestraße 19 1

2

3.12

1.26

1.22

5.66

4.98

VI

1.22

7.00 45.09

2.00

1.33

VII

5.66

5.66

PLAN # -

STAND LPH 3 ÄNDERUNGEN DURCH BAUGENEHMIGUNGSVERFAHREN VORBEHALTEN

5.66

4.84

4

3

INDEX 0

MAßSTAB 1/200

5

DATUM 09.02.2016

FORMAT A3

INV1.OG

GEZ. MP

ARCHITEKTEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

Lobby

Hof


TEMPELHOFER UFER BERLIN, DEUTHSCHLAND

Julian Breinersdorfer Architekten 02 .2015 _ 12.2015 Interior design

The restoration of the building was made by Julian Breinersdorfer Architekt in 2013/14. The RELAYR company now demanded a change of the working spaces, asking us to make them more flexible but at the same time very compartmentalized. Our idea from the beginning was to create multifunctional moveble walls, so that at the same time you can divide and satisfy every office basic function.


TEMPELHOFER UFER


BAUHERR Berlin

PROJEKT RELAYR GmbH, Tempelhofer Ufer 17, 10963 Berlin

ARCHITEKT ARGE Julian Breinersdorfer mit Löscher und Böckmann

PROJEKT RELAYR GmbH, Tempelhofer Ufer 17, 10963 Berlin

1 1

2

4

3

5

6

7

8

9

10

2

4

3

BAUHERR Berlin

5

ARCHITEKT ARGE Julian Breinersdorfer mit Löscher und Böckmann

6

7

8

9

10

11

11

A

A

A

A BEGRÜNUNG BESTANDSDACH

RÜCKBAU BESTANDSDACH

BEGRÜNUNG BESTANDSDACH

ca.51 m²

ca.50 m²

MEETING ROOMS: - Cortaine - Floor noise reduction

SUPER MEETING ROOM: - Welcome Area - Relaxing Area - Meeting Room - Big Screen

LAB: - Floor noise reduction - Paint Walls

WORKING SPACE: - Division Walls - Phone call Boxes - Photo Boxes - Lockers

LAB: - Floor noise reduction - Wall

WORKING SPACE: - Division Walls - Phone call Boxes - Photo Boxes - Containers

B

B B

B

PERSONAL CONTAINERS/LOCKERS

CURTAIN

CURTAIN

SMALL KITCHEN

PERSONAL CONTAINERS/LOCKERS ACOUSTIN PANELS

CURTAIN SOUND ISOLATION WALLS

BÜROEINHEIT 01.01 FLÄCHE 492,35 m²

SOUND ISOLATION WALLS

Wall and floor projection same material

DIVIDERS SHELVES

STORAGE

0.50

ACOUSTIN PANELS

1.05

ACOUSTIN PANELS

T_1.OG_03 T30 / RS LDH 2.00 LDB ca.1.10

ALLE TÜRMAßE SI ND NACH AUFMASS AM BESTAND ABZUSTI MMEN UND ERST NACH RÜCKSPRACHE MIT DEN ARCHITEKTEN AUSZUFÜHREN

T_1.OG_05 T30 / RS LDH 2.00 LDB ca. noch unklar

PILLOWS

PHONE BOX/ PHOTO BOX

C

C

T_3.OG_04a T30 / RS LDH 2.00 LDB ca. 0.71 ALLE TÜRMAßE SI ND NACH AUFMASS AM BESTAND ABZUSTIMMEN UND ERST NACH RÜCKSPRACHE MI T DEN ARCHITEKTEN AUSZUFÜHREN

C

T_3.OG_05 T30 / RS LDH 2.00 LDB ca. 0.62

TABLES

Keep free Passage to the Lab

T_3.OG_03 T30 / RS LDH 2.00 LDB ca.1.10

ALLEN BESTEHENDEN ÖFFUNGEN IN DER BRANDWAND SIND NACH BRANDSCHUTZKONZEPT ZU SCHLIESSEN,

C MULTIFUNCTIONAL WALL

SITTING

0.50

PHONE BOXES

LAGER 5.5 m²

BÜROEINHEIT 03.01 FLÄCHE 492,71 m²

RELAXING AREA I NNEN: Feuerbeständige WAND mit T90 -TÜR oder AUSSEN F90 FENSTER

DIVIDERS SOUNDPROOF

TREPPENRAUM 2 23.5 m²

TREPPENRAUM 2 23.5 m² T_3.OG_01 T30/ RS LDH 2.20 LDB ca.1.10

D D

D

MAUERWERK F90

17.4 m²

FLURGRUNDSTÜCK 3268

T_1.OG_01 dts LDH 2.20 LDB ca.1.10

TREPPENRAUM 1

FLURGRUNDSTÜCK 3269

FLURGRUNDSTÜCK 3268

TREPPENRAUM 1 17.4 m²

T_2.OG_01 dts LDH 2.20 LDB ca.1.10

BÜROEINHEIT 01.02 FLÄCHE 98,45 m²

FLURGRUNDSTÜCK 3269

D

BÜROEINHEIT 03.02 FLÄCHE 100,8 m²

E

E

E

E

1 1

2

3

4

5

6

7

8

9

10

2

3

4

5

6

7

8

INDEX A

MAßSTAB 1/150

DATUM 17.12.2015

9

10

11

11

r elayr 1.OG PLAN # TU_Relayr_01.OG

FORMAT A3

r elayr 3.OG PLAN # TU_Relayr_03.OG

Organization of work spaces

INDEX A

MAßSTAB 1/150

DATUM 18.12.2015

FORMAT A3


Prototype multifunction Wall


ADMIRALPALAST BERLIN, DEUTHSCHLAND

Julian Breinersdorfer Architekten 07.2015 _ 08.2015 Brief analysis design

ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

A D M I R A L S PA L A S T

Friedrichstrasse Schaufenster

NUTZUNGSSTUDIE 22.07.2015

This project was commissioned us as a challenge: reorganizing the space and programming of the entire complex. The Admiral Palast is one of the most important historical buildings in Friedrichstrsse, and this meant we had to preserve its historical memory. The main points of the project are the permeability of the entrance, the theater, and the large open space on the top floor.


FRIEDR

ICHSTR

AßE


ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

A D M I R A L S PA L A S T Variante 2

ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

Programs reorganizationv NUTZUNGSSTUDIE 22.07.2015

ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

A D M I R A L S PA L A S T Hoffassade Kaufhaus

A D M I R A L S PA L A S T Variante 2

NUTZUNGSSTUDIE 22.07.2015

NUTZUNGSSTUDIE 22.07.2015


ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

A D M I R A L S PA L A S T Variante 2

NUTZUNGSSTUDIE 22.07.2015

ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

A D M I R A L S PA L A S T Variante 2

NUTZUNGSSTUDIE 22.07.2015

Study of the volumes

ARCHITEK TEN: JULIAN BREINERSDORFER UND LÖSCHER & BÖCKMANN

A D M I R A L S PA L A S T

4.OG / 5.OG / 6.OG Eventfläche

NUTZUNGSSTUDIE 22.07.2015


MARCONI CAPRI, ITALY

Architetto Massimo Esposito 06.2009 _ 08.2009 Interior design

The experience gained in the studio in Capri was very different, here I could deal with a new working method and the study of the restoration. The church of Santa Sofia in Anacapri is the main church of the town. It was built in the second half of the ‘500, as a good example of Neapolitan Baroque.


Details of the design



Julian Breinersdorfer Architekten /

Adalbertstraße 15

/ 10997 Berlin / julianbreinersdorfer.com

To whom it may concern,

Francesca Esposito worked in my office from January 2015 to March 2016. She started working here in a phase of highly intensive workload and very limited capacities, so she didn't really get any time to adapt to our working routines. Since she is a fast thinker with an exceptional intuition for good design and a great knowledge about the technical and organisational aspects of architecture, and also a nice person, she didn't need it. Francesca has worked on many projects here, from overseeing the construction process of a pavillion house in Berlin – Neukölln, designing and organising a 5000m² office development in Berlin Mitte while simultaniously designing and handling the interior buildouts for tenants like Nokia, to the development of a 80.000m² historic industrial site masterplan in Berlin -Tempelhof. Without Francescas great communication skills, design competence and reliability we would have lost control over all of these projects. Working on her projects was very convenient for me, since she translated her brilliant ideas with great maturity into a professional development context, so every presentation or meeting was always perfectly prepared.

I hope that does not convince you, so we can welcome her here again very soon. Sincerly, Julian Breinersdorfer




esposito.francesca@hotmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.