2 minute read

Historic and Seismic Recovery of Villa

Renovation of 16th-century villa into high school Palidano di Gonzaga, Mantova

2017-2018

Advertisement

102.490 mq

Ruolo: Architectural Assistant, BIM Coordinator, BIM specialist, Specialista in restauro, Specialista in Paesaggio, 3D Visualizer

Restoration specialist, Specialista in Paesaggio, 3D Visualizer

Final and executive design for architecture, structures, facilities, safety coordination during design phase with historic and seismic recovery and restoration of historic villa of the 16th century to high school destination. The design also involves the recovery of the historic park of the villa with extensive study of greenery and essences.I coordinated and supervised the team in BIM modeling, made graphical and presentation improvements of the boards, personally followed the design of degradation survey and study of restuaro interventions. I personally elaborated the study and design of the greenery of the historic park and outdoor areas, and made presentations and audits at the Authorities and the Client with excellent results and appreciation of the work done.

INPUT_Shared core file setting, coordinate setting, template, Building Permission specific Normative Report for all disciplines (ARC,STR,MEP) and Architectural Barrier Abatement Normative Report.

SETUP_Document encoding, Naming of objects, Processing of project-specific shared parameters, Processing of detail elements, tags, legends and graphic visibility, Processing of in-place and type families, MODEL_Miscellaneous modeling on Architectural and MEP model.

COORDINATION_Various corrections to Landscape , Architectural and MEP models. Created models for typological rooms, Coord. of graphics and project control of models.

OUTPUT_Scheduling of project components, window and quantity schedules. Tagging and annotation management, Management and coordination of tables (legends,graphic quality and cartouche with respected coding)

Comment

The ability to manage a project, follow a team through all phases of design, the establishment of real and viable timelines, and the ability to withstand periods of pressure to achieve results are all skills acquired over the years.

The decades of experience faced even before university studies, allowed me to absorb all aspects that are on the contours of a project.

Later on, my undergraduate and specialized studies and my aptitude for promoting my ideas to corporate figures, allowed me to hold management job roles, coordinate projects and teams, and manage coordination on the construction site.

The trust I have always established in the locations where I have worked has also been important in handling client and authority contact.

SKILLS

• Drawing

• Modelling

• Coordination

• Report

• Sheet

• Rendering

• Presentations

2.1 RESTORATION AND FUNCTIONAL RECOVERY

• Q-REHAB, MIPIM 2020

• RENOVATION COMPLEX OBSERVANCE FOR UNIVERSITY RESIDENCES,, BO

• WINE CELLARSFABBRI

• LEGNAGO RAILWAY STATION, FERROVIE DELLO STATO ITALIA GROUP

• RECOVERY OF RESIDENTIAL COMPLEX OF HISTORICAL VALUE, MOGLIA (MN)

2.2 PROJECT&SAFE MANAGER

• WURTH

• FERRARI SPA

• CGIL, Confederazione Generale Italiana del Lavoro

• CYCLING LAZISE

• RESIDENTIAL

2.3 URBAN PLANNING

• Cemetery Plan of Carpi city

• Cemetery Plan of Castel D’Ario city

• Territorial Government Plan City of Erba

• Territorial Government Plan City of Acquadredda

1.1 Q-REHAB, MIPIM 2020

1.2 SCHOOL TENDER IN BAGNO DI ROMAGNA

1.3 WURTH RETAIL, FERRARI SPA, CGIL

1.4 CEMETERY PLAN

1.5 PRENOVATION COMPLEX OBSERVANCE FOR UNIVERSITY RESIDENCES,

This article is from: