Sel ect edAcademi cPr oj ect s 20152020
Fl eurFr ancescaVar el He l l o!i a ma nE nt hus i a scGr a dua t eAr c hi t e c t , L ook i ngt ode v e l opone s e l fi nt heE v ol v i ngfie l dofDe s i g n. T hef ol l owi ngi sac ur a t e dc ol l e conofmya c a de mi ca r c hi t e t c ur a l de i s g n a ndpe r s ona l wor kt ha tr e fle c tmypa s s i onf orc r e aona nda mbiont o c onv e r tt ha tpa s s i oni nt ome a ni ng f ul c ont e nt
Per sonalI nf o
E ngl i s h, Hi ndi andMar at hi
Mul undWe s t , Mumbai -80
Ext r aCur r i cul ar s
Educat i on
Mumbai , Mahar as h t r a
20152020
Mumbai , Mahar as h t r a
2014
Mumbai , Mahar as h t r a
2013
De s i gnI n t e r v e n onsf orRhi no , Gr as s hoppe r , May aandK e y s hot . T heI n t r oducont oUr banDe s i gnP r ogr ambyAUDA Gr aphi cDe s i gnCour s ebyK aar wan
Dr . Bal i r amHi r ayCol l e geofAr c hi t e c t ur e ’ sI n t r aCol l e geMur al De s i gnCompe on P ane l wor kandDoc ume n t a onofCol l e geT ourt oP ar i s , Ams t e r damandBr us s e l s
Wor kExper i ence
Andhe r i , Mahar as h t r a
Mar c h2020
Vi k r ol i , Mahar as h t r a
May2019
T hane, Mahar as h t r a
Mar c h2019
Di gi t alKnowl edgeSet
Sof t Ski l lSet
Tabl eOfCont ent s
01
Aut oCad Sket chup&Vr ay Lumi on Phot os hop
TheRol eOfTheModernChurchi nt heLi f eofa21stCent uryBel i ever THEPURPOSEOFTHISTHESISPROJECT WASTO INVESTIGATEWHICH CRUCIALROLETHECHURCH CAN PLAYSIN COMMUNITY AND THEPURPOSEOFTHESTUDY WASTO UNDERSTAND UPLI FTI NG THESTANDARD OFLI VI NG FOR THECOMMUNI TY WI THI NI TSVI CI NI TY. THERELATI ONSHI PTHECHURCH HASWI TH I TSFOLLOWERS. SFOCUSAREA I N COMMUNI TY THEFINDINGSMANIFEST THAT THECHURCH’ HEALTH,SPIRITUALWELLSOCIALAND FAMILY LIFEAND COMMUNITY DEVELOPMENT. DEVELOPMENT AREE DUCATI ON, BEI NG,
THECHOICEOFSUBJECT WASFIRST DUETO THEFASCINATION WITH THEARCHITECTUREPOWER TO CREATEPLACESWITH IDENTITY AND ENVIRONMENTSABLETO AWAKETHESENSESAND I EMOTI ONS, TRI GGERI NG EXPERI ENCES. FTHELI TURGI CALSPACEAI MSTO PROVI DEA RELI GI OUSEXPERI ENCE, I TI STHEARCHI TECTURERESPONSI BI LI TY TO ANSWER THAT DEMAND, ESTABLI SHI NG I TSELFASA MEDI UM –RI SI NG SPACETO REACH THEDI VI NE.
MAPOFSI TE:
SI TEDEVELOPMENT
STPI USXCHURCH,MULUND
STPI USXCHURCH,MULUND
1 SE A PH
SI TE
2 SE A PH
SI TEMAPPI NG :
STPI USXCHURCH,MULUND
3 SE A PH
SI TE
4 SE A PH
THE DESIGN OFTHE RELIGIOUSBUILDING WAS
APPROACHED BY DI VI DI NG I TSFUNCTI ONSI NTO 4GROUPS
1-COMMUNITY FUNCTION 2-MAIN PRAYER FUNCTIO 3-RESIDENTIALFUNCTION 4-ADMINSTRATIVEFUNCTION
THE DESIGN OFTHE COMMUNITY BUILDING WAS
APPROACHED BY DI VI DI NG I TSFUNCTI ONSI NTO 3GROUPS
NDOOR ACTI VI TI ES3 1-OUTDOOR ACTIVITIES2-I -AUDITORIUM
THE DESIGN OFTHE EDUCATION BUILDING WAS
APPROACHED BY DI VI DI NG I TSFUNCTI ONSI NTO 4GROUPS
1-ADMINISTRATION 2-MAIN CLASSROOMS3-CO-CIRRICULAR ROOMS4-SERVICES
MAI N SI TEPLAN
STPI USXCHURCH,MULUND
STREETVI EW:
STPI USXCHURCH -NORTH SI DE
RELI GI OUSBUI LDI NG: FLOORPLANS
GROUND FLOORPLAN: SCALE:1: 150
I SOMETERI C VI EW:
PRE-AND POSTSTRESSED CONCRETE, THEUSEOFTEXTURED FORMS, PRECASTI NG, DEFLECTABLEAND REUSABLEFORMS, TI LTUPAND LI FTSLAB, NEW CONCRETE AGGREGATESURFACES—THESEARESOMEOFTHEDE• VELOPMENTSI N CONCRETETHAT AREI NFLUENCI NG THEDESI GN OFOUR CHURCHES. BLOCKSHAVENOW BEEN PUT OUT WI TH NEW DESI GNSTHAT MAKETHEM A DESI RABLEBUI LDI NG MATERI AL. WITH THERISING COSTSIN CONSTRUCTION, ARCHITECTSARECREATING MANY CONCRETEI SNO LONGER VENEERED OVER NOW THAT WEHAVENEW FI NI SHESAND WATERPROOFI NG TECHNI QUES. NEW TEXTURESAND PATTERNSWI TH BRI CK MASONRY.
STPI USXCHURCH,MULUND
FI RSTFLOORPLAN: SCALE:1: 150
RELI GI OUSBUI LDI NG:
Manyt ypesofnat ur als t onear eexcel l ent cl addi ngmat er i al s .Thes ecanbebr oadl y di vi dedi nt ot hr eegeol ogi calgr oups : s edi ment ar yr ockss uchasl i mes t oneand s ands t one,met amor phi cr ockss uchas s l at eandmar bl eandl as t l y,i gneousr ocks s uchasgr ani t e.I ns el ect i ngt hebes tt ype ofs t one,ar chi t ect smus tcons i deranumber off act or si ncl udi ngappear ance,i nt ended us e,s i zeoft hepr oj ect ,andmos ti mpor t ant l y, t hecompos i t et hatwi l lpr ovi de MAI N PRAYERHALL adequat es t r engt h TERRACELEVEL anddur abi l i t y.
CONSTRUCTI ON DRAWI NGS
NORTH SI DEELEVATI ON:
BELLTOWER STAI RCASEBLOCK
SCALE-1: 150
SKYLI GHT MAI N STAI RCASE BLOCK
WESTSI DEELEVATI ON: SCALE-1: 150
RESI DENTI AL TERRACELEVEL
EASTSI DEELEVATI ON: SCALE-1: 150
PUBLI CSPACE NORTH LI GHTTRUSS
BACKENTRY TO RESI DENTI ALSPACE
I NTERI ORVI EWS
ENTRY1 TO PRAYERHALL
MAI N ENTRANCE TO PUBLI CSPACE
SECTI ON THROUGH PRAYERHALL: SCALE-1: 150
EDUCATI ON BUI LDI NG: NORTH SI DEVI EW
EDUCATI ON BUI LDI NG: FLOORPLANSVI EW
EDUCATI ON BUI LDI NG: EXPLODED VI EW
Four t hf l oor
H T R U FO R O O FL
Thi r df l oor
D IR H T R O O FL D N O C SE
Secondf l oor
R O O FL
EDUCATI ON BUI LDI NG: WESTSI DEVI EW
ST R FI R O O FL
Fi r s tf l oor
D N U O R G R O O FL
Gr oundf l oor
EDUCATI ON BUI LDI NG:
EDUCATI ON BUI LDI NG:
CONSTRUCTI ON DRAWI NGS
FACADEDESI GN APPROACH
NORTH SI DEELEVATI ON: SCALE-1: 150
E D A C A F E D I S H T R NO
SOUTH SI DEELEVATI ON: SCALE-1: 150
WESTSI DEELEVATI ON: SCALE-1: 150
EASTSI DEELEVATI ON: SCALE-1: 150
E D A C A F E D I S H T U SO VI EW OFOUTDOORACTI VI TI ES: MI NIFOOTBALLCOURT
VI EW OFOUTDOORACTI VI TI ES: AUDI TORI UM
COMMUNI TYBUI LDI NGS:
CONSTRUCTI ON DETAI LS:
SPORTSCLUB-VI EWS
DETAI LDRAWI NGS
Pr essur e-equal i zat i on r esul t si nr educed i nci dent alwat eri ngr ess t hr oughcl addi ng, col l ect edatdr ai nagepl ane andr et ur nedt oext er i or
wi nd-dr i venr ai n
dr ai nagecavi t y dr ai nagepl ane
openj oi nt sorvent sat t opandbot t om ofcavi t ycombi nedwi t h compar t ment al i zat i onr educepr essur edi f f er ence acr osscal ddi ng
SPORTSCLUB: RECEPTI ON
SPORTSCLUB:
secondar ydr ai nage bygr avi t yf l ow-f r ee f l owai dedbycapi l l ar ybr eak
backvent i ngofcl addi ng al l owsdr yi ngbymeans ofai rmovementand vapourdi f f usi on
f l ashi ngwi t h dr i pedge
CONSTRUCTI ON DETAI LS:
COMMON MEETI NGROOM
RAI NSCREEN PRI NCI PAL-TYPE2
sheat hi ng
pr i mar ydr ai nage bygr avi t yf l ow
i nsul at i on
condensat i on weephol es
i nsul at edt emper edgl ass
f r ami ng cl addi ng
ext r udedal umi ni um r et ai nercapf r ame
wal l boar d
EXTERI OR
vi nylgl azi ngt ape
cur b
neopr eneset t i ngbl ock backadher ed r ubberdr af tseal assembl yscr ew
I NTERI OR
r i gi dvi nyl t her malbr eak cont .seal r oofmembr ane
r oofmembr ane
f ast ener
CONSTRUCTI ON DETAI LS: RAI NSCREEN PRI NCI PAL-TYPE1
CONSTRUCTI ON DETAI LS: SKYLI GHT
SPORTSCLUB: CHESSCLUB
SPORTSCLUB:
s t eel beam
POOLTABLECLUB
s ar naf i l r oofmembr ane
t her mal i ns ul at i on60mm t her mal i ns ul at i on100mm phot ov ol t ai quemembr ane
openi ng
gl az i ng s t eel t r ay
FI XI NGS
l i ght i ng ac ous t i cabs por pt i on 80mm mw met al pur l i n
SPORTSCLUB: EXTERI ORVI EW
pi nebat t ens40mm x20mm
SPORTSCLUB: EXTERI ORVI EW
CONSTRUCTI ON DETAI LS: NORTH LI GHTTRUSSDETAI L
gut t er
02
Aut oCad Sket chup&Vr ay Lumi on Phot os hop
THESITEISSITUATED IN THEISMAILYUSURF CAMPUSWHICH HASA HILLY TOPOGRAFICALPROFILETO WARDSTHESOUTHERN EASTERN END. THESI TEI SSURROUNDED BY DENSEVEGETATI ON ON THESOUTHERN AND EASTERN SI DE. DUETO THESHADE PROVI DED BY THEDENSETRESSTHETEMPERATURENEAR THECAMPUSI SSOOTHI NG ASCOMPARED TO THESURROUNDI NG SI TE.
THESITEISAT A PRIMELOCATION WITH JOGESHWARIRAILWAY STATION OFTHEWESTERN LINERIGHT NEXT TO IT.THEREISA PROPOSED SKYWALK WHICH WILLHELPIN IMPROVING THE PEDESTRATI AN FOOTFALLVI SI TI NG THELI BRARY. THESI TEI SSI TUATED I N A VERY CROWDED LOCALI TY AND I TI SOBVI OUSTO DRAW I N A LARGENUMBER OFFOOTFALL. THESI TEI S SURROUNDED BY RESI DENTAI L, COMMERI CALAND SHOPPI NG COMPLEXS. THELI BRARY ALSO PROVI DESFOR THESECONDARY SCHOOLWHI CH I SLOCATED 5MI NSAWAY .
EXTERI ORVI EW :
PROPOSED LI BRARYENTRANCE
MAI N SI TEPLAN :
PROPOSED LI BRARYATJ OGESHWARIEAST
EXTERI ORVI EWS:
FLOORPLANS :
PROPOSED LI BRARYATJ OGESHWARIEAST
PROPOSED LI BRARYATJ OGESHWARIEAST
FLOORPLANS :
BASMENTPLAN -SCALE-1: 200
FLOORPLANS :
GROUND FLOORPLAN -SCALE-1: 200
EXTERI ORVI EWS:
PROPOSED LI BRARYATJ OGESHWARIEAST
FLOORPLANS :
FI RSTFLOORPLAN -SCALE-1: 200
FLOORPLANS :
THI RD FLOOR PLAN -SCALE-1: 200
FLOORPLANS :
SECOND FLOOR PLAN -SCALE-1: 200
FLOORPLANS :
FOURTH FLOORPLAN -SCALE-1: 200
ELEVATI ONS:
PROPOSED LI BRARYATJ OGESHWARIEAST
ELEVATI ONS:
PROPOSED LI BRARYATJ OGESHWARIEAST
EASTSI DEELEVATI ON :
NORTH SI DEELEVATI ON :
SCALE-1: 200
SCALE-1: 200
WESTSI DEELEVATI ON :
SOUTH SI DEELEVATI ON :
SCALE-1: 200
SCALE-1: 200
EXTERI ORVI EW :
PROPOSED LI BRARYATJ OGESHWARIEAST
ELEVATI ONS :
PROPOSED LI BRARYATJ OGESHWARIEAST
EASTSI DEELEVATI ON : SCALE-1:200
WESTSI DEELEVATI ON : SCALE-1:200
ELEVATI ONS :
PROPOSED LI BRARYATJ OGESHWARIEAST
EASTSI DEELEVATI ON : SCALE-1:200
WESTSI DEELEVATI ON : SCALE-1:200
EXTERI ORVI EW :
PROPOSED LI BRARYATJ OGESHWARIEAST
EXTERI ORVI EWS:
PROPOSED LI BRARYATJ OGESHWARIEAST
SECTI ONS:
PROPOSED LI BRARYATJ OGESHWARIEAST
EXTERI ORVI EWS:
PROPOSED LI BRARYATJ OGESHWARIEAST
03
Gr as s hoper Rhi no&Vr ay Lumi on Phot os hop
THISPROJECT GIVESFURTHER INSIGHT INTO COMPULATIONALDESIGN AND ITSINSTANTANEOUSEFFECTS.THEPROPOSED ART MUSEM ISON THE BANK OFRI VER ADYAR I N CHENNAI. THEFORM OFTHESTRUCTUREUSDERI VED FROM AN I NFI NI TY LOOP. THESTRUCTUREI SAN UNDULATI NG AND CONTI NUOUSGALLERY WHI CH STARTSAT THERECEPTI ON AREA. SLOPI NG BRI DGESMOVETOWARDSTHERI VER SI DEAND BRI NGSTHEUSERS BACK TO THERECEPTI ON . I N TURN , THESTRUCTUREALLOWSONETO EXPERI ENCEA STORYLI NETHROUGH THEDI SPLAYED ART PI ECES.
THEFORM OFTHEMUSEUM ISDERIVED FROM AN INFINITY LOOP.TO ACHIEVECONTINUOUSCIRCULATION THROUGH THEGALLERY THISFORM WASCHOOSEN.THEDIFERENT LEEVLSOFTHE LOOPARECONNECTED BY A SLOPEASWELLASLI FT CARESWHI CH AREULTI MATELY CONNECTED TO THEGROUND LEVEL. THECENTRALCOURTYARDSTHAT AREFORMED BY THELOOPI NG OFTHEGALLERY HOUSESAN AMPHI THEATREAND A MULTI PURPOSEAREA WHI CH I SCOVERED WI YTH A PARAMETRI C CANOPY . SHADI NG DEVI CESTHAT COVER THEWI NDOWSAND SKLI GHTS OFTHESTRUCTUREAREMADEOFA TENSI LEMATERI AL. THI SSYSTEM, I N A CI TY LI KECHENNAIDOESREDUCETHETOTALHEAT GAI N OFTHESTRCTURE.
EXTERI ORVI EW :
FORM DEVELOPMENT:
ARTMUSEUM
AXOMETRI CDRAWI NGS
ST AG EO NE
ST AG ET WO
ST AG ET HR EE
STA GE FOU R
FORM DEVELOPMENT: AXOMETRI CDRAWI NGS
CANOPY
SHADI NGDEVI CE
EXTERI ORVI EW :
BOTTOM WAFFLESLAB
ARTMUSEUM
MAI N STRUCTURE
AXO MET RI C
DI AGR AM
EXTERI ORVI EW : ARTMUSEUM
ELEVATI ONS: ARTMUSEUM
EASTSI DEELEVATI ON : ARTMUSEUM
WESTSI DEELEVATI ON : EXTERI ORVI EW :
ARTMUSEUM
ARTMUSEUM
SOUTH SI DEELEVATI ON : ARTMUSEUM
NORTH SI DEELEVATI ON : ARTMUSEUM
EXTERI ORVI EW : ARTMUSEUM
SECTI ONS: ARTMUSEUM
SECTI ON AA’: ARTMUSEUM
EXTERI ORVI EW : ARTMUSEUM
SECTI ON BB’: ARTMUSEUM
04
05
06
07
08
09