Portfolio of Works_Roesler Francesco

Page 1

Roesler M. Francesco Works of Portfolio

Portfolio of Works Francesco M. Roesler francesco.roesler@hotmail.it (+39) 3476508059 ITALY

1


Profile

Education and training 22/07/2016 Advanced Diploma in Professional Practice in Architecture POLITECNICO DI MILANO (equivalent to RIBA Part 3)

Francesco Maria Roesler Born in Milan 14 Sept. 1988

Contacts address: Via Giulietti 9 Novara (No) Italy email: francesco.roesler@hotmail.it phone: (+39) 347 6508059 LinkedIn: Francesco Roesler Skype: francesco.roesler

2

28/04/2014 MASTER’S DEGREE IN ARCHITECTURE POLITECNICO DI MILANO Thesis: Mapping Shrinkage Across Mediterranean Grade 105/110 28/09/2011 BACHELOR OF SCIENCE DEGREE IN ARCHITECTURE POLITECNICO DI MILANO Thesis: Light as Material in the projects of Francisco and Manuel Aires Mateus Grade 100/110 February 2011 - July 2011 ERASMUS PROGRAM at UNIVERSIDADE TECNICA DE LISBOA, LISBON - PORTUGAL 2007 HIGH SCHOOL DIPLOMA: Scientific at LICEO SCIENTIFICO ALESSANDRO ANTONELLI (NOVARA - ITALIA) Grade 87/100


introducing myself Graduated am

a

and at

in

Architecture

young

Architect

traveling.

Boeri

Stefano

that After

During

reached

in

Milano;

university design

place

work

Lisbon,

Politecnico

LAND

the

third

first

scholarship

at

Architetti

the

this

at

of keen

period

for

2014,

part

of

obtained Tecnica

months

the

team

in

the

I

reading

six

competition,

Universidade

the

April

photography,

being

I

in

worked

ARBO

the

experience at

on I

studio

for

Milan

2010. Erasmus

de

Lisboa.

In the Master degree period I joined the researchers team of Multiplicity Lab in Politecnico of Milan setting up the SP Calling exhibit, in Sao Paulo. My first experience in landscape architecture was in Sardinia, working with an international team realizing a number of on-site projects to underline the significance of the landscape and the natural and cultural heritage of Caprera Island. On April 2014 I graduated in Architecture at Politecnico with a thesis named “Mapping Shrinkage Across Mediterranean”; an essay on the use of eidetic operations to map processes of population loss in the Mediterranean Basin. From

october

2014

I’m

young

practice.

Here

I

experimented

definition

up

to

technical

infrastructures,

public

landscape

all

the

desig),

spaces,

sport

achitect

project scales

in

stages and

facilities,

LAND

(from

type

Milano

strategic

(masterplans,

private

gardens).

Working in this professional practice of 50 people improved my team working skills

and

technical

knowledge

of

landscape

project;

encreasing

also

the use of english because of the international teams we are involved.

3


Personal skills and competences ENGLISH USA: written test: Good speaking: Excellent 2011, TOEIC certificate, Grade 765 PROGRAMS: Adobe Suit InDesign Photoshop Illustrator Autocad Sketchup

PORTUGUESE: written test: Sufficient speaking: Good 2011, grade A2 OTHER SKILLS: Digital Photography Freehand drawing Maquette

Workshops May 2013 - June 2013 LandWorks Sardinia, Caprera Island - ITALY Area: Landscape installations realization of on-site projects to underline the significance of the landscape, the natural and cultural heritage of Caprera Island. March 2013 Un[Expected] Mate[Reality] Politecnico of Milan MILAN - ITALY Area: Exhibit Un[Expected] Mate[Reality] was a week-long intensive workshop to introduce to contemporary design strategies centered on the application of advanced software determining an augmented ability to conceptualize, develop and build innovative architecture.

4


Work experiences October 2014 - still working LAND Milan, MilaN - ITALY Area: Professional Practice - Landscape & Masterplanning Several landscape projects working with international practices all over the world, at all the scales. New Cassanese Highway, new AS Roma football stadium(with Daniel Libeskind, RTKL, Dan Meis Architets), urban renewal of San Berillo neighborhood in Catania (with Mario Cucinella) are some of the projects developed during the 1st year at LAND Milano. September 2011 - January Multiplicity.Lab Politecnico of Milan MILAN - ITALY

2012

Area: Research and Exhibit - informal settlements September 2010 - January Stefano Boeri Architetti MILAN - ITALY

2011

Area: Professional Practice - Building design and urban planning ARBO-International Competition for the new railway station in Bolzano and redevelopment of the ex-railway yard.

Reference check request Valeria Pagliaro: Director at LAND Milano s.r.l valeria.pagliaro@landsrl.com Lorenza Baroncelli: Scientific director of the Swiss pavilion curated by Hans Ulrich Obrist lorenza.baroncelli@gmail.com Elisa C. Cattaneo: Professor in Landscape and Urban Design at the Politecnico di Milano. Visiting Scholar-Post Doc at the School of Design, Harvard University. elisa.c.cattaneo@gmail.com

5


Contents

Works

Urban & Architectural Design _ARBO _AS Roma Stadium _San Berillo redevelopment _A R A - HOME 2 0 4 9 _Path of remembrance Landscape _Passante di Mezzo _TrackB - new Cassanese highway _LandWorks Sardinia _New Visions for Old Landscapes _Master Degree Thesis: “Mapping Shrinkage Across Mediterranean�

_Libyan Post-War Vision Temporary Installation

_Un[Expected] Mate[Reality] _SP Calling

6


Urban & Architectural Design ARBO As Roma Stadium San Berillo redevelopment A R A - HOME 2 0 4 9 Path of remembrance

7


A R B O

Areal Bolzano Railway Bolzano (Italy) Masterplanning: Stefano Boeri Architects Landscape Project: Battle & Roig

The aim of the competition was to restore all the area of the railway with a new station, new commercial and residential buildings and a big public space that could join the old and the new city. The proposal was to make Bolzano a “smart city�, a city that could grow up without consume new green field. First of all we moved the railway to the south in order to sew up the old and the new city. The salient points of this project are: -Centrality of the new railway station and his immediate connection with Walther plaza; -Creation of a new landmark; -Regulation of traffic in via Garibaldi; -Realization of a new public park; -Integration of the new public and privare uses.

8


Sviluppatasi nel corso del Novecento con funzioni connesse allaMentre lo slogan urbanistico è riassum presenza della stazione (inizialmente prevalentemente ferroviarie, sul costruito”, a livello architettonico s ma in seguito anche produttive, commerciali e residenziali), la zona energetico, il rapporto con il contesto dei Piani mostra oggi un carattere urbanisticamente disomogeneo e materiali costruttivi all’avanguardia le frutto di addizioni successive prive di una strategia e di un disegno nostra proposta progettuale. unitario, che ne fanno un ambito della città relativamente degradato Ad esclusione del manufatto, tripartit All alle location choicespotenzialità. contained in the masterplanadiacente tend toallastrengthen theferrovia rispetto sue intrinseche nuova stazione city’s relationship withforte thedello river and the surrounding mountains: roads, La proposta del nostro gruppo, spostamento del fascio simbolo e porta di the accesso alla città), squares and have been defined through the evaluation of optical dei binari verso sudopen (conspaces il conseguente trasferimento della stazione confrontano in maniera discreta e risp conesdiprivileged and on quelle the heights nei pressi piazza Verdi),Eisack oltre a garantire migliorie - consolidating geo cercando di architecturally inserirsi senza creare fratt foreshortening best. The new linear park, which incorporates the edilizie area of ​​ the e nelle tipologie esistenti: per original di beam tracks will urbanistico remember their presence with structures volumi, glilinear allineamenti, le tipologie e l’opportunità ricucire sottoand il profilo e architettonico in parti the digraphic design of the gardens, set within the existing of di cos dialvolta in volta, consystem l’obiettivo le due città attualmente separate dai binari, restituendo green corridors of Bolzano. integrates the grado network of linear parks con il dialogando, sistema delle relazioni fisiche e funzionaliItdi Bolzano aree estese che di integrarsi, located costituiscono along the rivers making the -system attualmente discontinuità delaccess tessutoto urbano, impedenwith its Renon cable car and park Virgolo eOltradige. The axis of the newla park returns finally fabbri done, di fatto, un adeguato ordinato sviluppo. parte also retrostante dell’attuale facing the grazie green allo districts of the historic center preservato of Dodiciville. Concretamente, spostamento della stazione ferroviaria, e messo in rete con gli altr la strategia urbanistica adottata si caratterizza per la sua chiarezza questa zona.

12

4

Concept

7

6 | Relazione Tecnico - illustrativa

9


The park is the green branche with three axes that pass through the new conurbations and draws a connection between ecological and environmental flows and new park Isarco: a wide tree-lined avenue that accompanies the railway viaduct, and two arched corridors that cross the isolates right and left of the viaduct, bringing together in one large green matrix big short inside the blocks themselves. These axes green bring the cycle-pedestrian mobility, but they are also designed as places equipped to meet. In residential neighborhoods are also expected gardens usable level condominium, with recreational facilities and social support to green neighborhood. Of water tanks, crossing from side to side the railway viaduct, make it even stronger rejoining of the two sides of the city created by this project. In addition, they integrate well into the concept of management and urban stormwater retention within the urban fabric. 01

Masterplan

ARBO

10

CONCORSO DI IDEE PER L’AREALE FERROVIARIO DI BOLZANO / IDEENWETTBEWERB BAHNHOFSAREAL BOZEN


residenza In tutta l’area di progettazione si sono evitate zonizzazioni monofunzionali terziario e si sono proposte zone miste in grado di garantire un elevato grado di po lifunzionalità e vivibilità continua nelle diverse ore del giorno e di restituire commerciale agli ambiti riqualificati una nuova forte identità ed autonomia urbana. artigianato/produttivo La zona sul parco è caratterizzata da residenze di alta qualità con - inseri

42,73 %

183.747,00 m³

13,25 %

292.126,00 m³

19,53 %

136.623,50 m³

9,85 %

203.014,00 m³

14,64 %

Program

mento puntuale di attività commerciali al piano terra. La struttura compatta servizi pubblici

592.821,00 m³

9 | Relazione Tecnico - illustrativa

Housing

Public spaces

Residenza

Commercial

Attrezzature pubbliche

Commercio

Tertiary

Teerziario

Artigianato Produttivo

manufacturing craftsmanship

Delimitation of the project area:

Total area of railway station:

a1. area of railway station: 28,0 ha

30,3 ha

a2. area of railway station: (North) 1,8 ha a3. area of railway station: (South) 0,5 ha

b1. areas directly affected by the displacement: 9.3 ha total project area: 39,6 ha

11


12


13

New buildings in ex-Areale_residential and commercial


14


15

New Railway Station and Public Park


As

Roma

Stadium

Rome (Italy) Masterplanning and Landscape Project: LAND Milan Architectural Project: MEIS, Daniel Libeskind, RTKL The new AS Roma Stadium is part of the landscape development project of the Tor di Valle area (100 hectares), located at South-East of Rome close to Tevere River. The project is part of a bigger strategic intervention whose aims are the development, activation and connection of undeveloped and abandoned suburbs. The Softscape is composed by the fluvial, agricultural and urban parks, with wide green spaces, shaded areas, cycle and pedestrian paths, sport facilities, playgrounds. The green amphitheater is the central core of the paths network that take to the relax and shaded areas. The Hardscape is composed by the plazas and the promenade related to the new buildings, the Stadium, the Roma Village area and the towers of the Business Park. Tor di Valle Masterplan is a great green infrastructure able to link urban plots, giving a new identity to an abandoned area through the creation of new public spaces, highly accessible.

16


Photo credits Parsitalia Real Estate srl

17


Strategies

18

and

Concept


19


Landscape

20

Masterplan


Sections

Section AA

Section BB

Section CC

S e c t i o n DD

21


San Berillo redevelopment

San Berillo Neighborhood Catania (Italy) Masterplanning: MCA Landscape Project: LAND Milan The masterplan of St. Berillo will redevelop and reinterpret the area around the old quarter of San Berillo, after more then 50 years of deterioration, as a new link between downtown and the waterfront. The intention is to restore an urban area to the city of Catania with new public and private functions. The masterplan is ispired by the hanging gardens of Babylon and by Catania’s culture of green space. the project’s involves the construction of a large urban garden acting as liaison between the city and the sea and with the function of mending between the two neighboring districts. Inside, green axis will emerge forming a new town Boulevard and new pedestrian plazas. Facing the Boulevard will be a series of low buildings, stepped with garden terraces, intended as shop and more urban scale functions.

22


Photo credit MCA Architects

23


24

Masterplan


Photo credit MCA Architects

25


Landscape interventions

26


27


A R A - HO M E 2 0 4 9

Competition for Future Living Solutions Lahti (Finland) The town of Lahti, located in Finland, is surrounded by a large natural environment called Salpausselkä, and by a small lake called Mytäjärvi. The area is affected by important connective systems and is bounded by many infrastructure such as railway to the south and Highway 12 to the north, and a low density residential area to the north-east. The goal was redevelop the area from a physical, social and cultural point of view.

28


Landscape

of

energy

NATURE

The town of Lahti is located within a complex system, 12 kilometers long,of industrial and brownfield sites that we intend to resume through this project, by using the rail infrastructure to put them in the energy distribution system of Finnish.

LAHTI

HELSINKI

INFRASTRUCTURE

SAN PIETROBURGO

new york high line 2 km

lahti energy network 12 km

Future brownfield sites and our project area will act as repeaters of energy that can travel in the future, we imagine, how the information via wifi. 400 Kv grid 220 Kv grid

LAHTI

WI-FI energy diffusion

HELSINKI

ENERGY

110 Kv grid

29


60°59′00″N

WEA

K M OBI

LIT

Y

wifi

NATURE_ENERGY_INFRASTRUCTURE

FIELD CONDITION

30

NATURE

HELSINKI

TECNO nature

E=MC


FIELD

LATHI

2050

C2

ATOMIC ENERGY

31


32

Masterplan


33

Model


SEZIONE ORIZZONTALE_quota 0,00m 1

A

B

The central building of the area is both the access at the town and the main public space for cultural manifestations.

‘The ‘Lanthern’

SEZIONE LONGITUDINALE_AA

34

2


7

8

9

10

11

12

13

14

15

+20,00m

+25,00m

Ground Floor

16

C

6

A

B

C

D

E

F

G A

H

B

C

The project is a requalification of an existent building made in tipical red brick. We set a covered path that joins the two existent buildigs making a new one that mantain the same character of the old ones.

Section A-A +25,00m

+11,50m

SEZIONE LONGITUDINALE_CC

5

D

4

D

3

+8,00m

+4,00m

+0,00m

-4,00m

-8,00m

Section B-B

35


Path of remembrance

Competition for the Neaples cemetery of Poggioreale Neaples (Italy) The aim is to re-link the different sites through the creation of new green lines in order to give an identity to the landscape, not only local, but also territorial. The important dialogue with the context is based on a stronger local identity by defining relations with the territory itself, creating an unbreakable link between new interventions and local landscape. It is proposed therefore, a memory path where “past - present - future� find the right balance and blend in harmony.

36


VIA DON BOSCO NUOVA DEL CAMPO

HIGHWAY

RAILWAY

37


Strategies

and

Concept

DIS C OV E R

R E C ONN E C T

R E US E

The path

38

of

remembrance


39


40

Visual

01


41

Visual

02


42

Visual

03


43


44


Landscape Passante di Mezzo TrackB - new Cassanese highway LandWorks Sardinia New Visions for Old Landscapes Master’s degree Thesis: Mapping Shrinkage Across Mediterranean

45


Passante

di

Mezzo

Landscape Masterplan Bologna (Italy) Highway Project: Autostrade Landscape Project: LAND Milan The project development results from the interaction of different specialist disciplines such as structural engineering, landscape architecture, spatial planning and road network, useful to get the best result in both functional terms, so from a technical and management aspect, both in landscape and environmental terms, enhancing the scenic quality and the ecological value of the local landscapes. Visual 1

46


Visual 2

47


A e r ial

View

Plan

Kmap

48


Aerial Views

49


TrackB new Cassanese

highway

Milan (Italy) Highway Project: Errevia Landscape Project: LAND Milan LandWorks Sardinia 2013 was the third edition in regarding and reconsidering the unique landscapes Punta Rossa military fort in Caprera Island. We realized a number of on-site projects to underline the significance of the landscape and the natural and cultural heritage of Caprera Island, in collaboration with Parco of La Maddalena, Agenzia del Demanio della Sardegna, Assessorato all’Ambiente della Regione Sardegna, Comune di La Maddalena, and other partners. The aim was to open new perspectives and opportunities for future development. Together with local actors under the guidance of internationally renown guests we built temporary and permanent installations just using what we found on the site.

50


51


Landscape Masterplan

Plan 01

52

Plan 02


Public Park - Plan 01

Public Park - Plan 02

Landscape elemets Plants and shrubs

53


LandWorks

Sardinia

La Maddalena Natural Reserve Caprera Island (Italy) LandWorks Sardinia 2013 was the third edition in regarding and reconsidering the unique landscapes Punta Rossa military fort in Caprera Island. We realized a number of on-site projects to underline the significance of the landscape and the natural and cultural heritage of Caprera Island, in collaboration with Parco of La Maddalena, Agenzia del Demanio della Sardegna, Assessorato all’Ambiente della Regione Sardegna, Comune di La Maddalena, and other partners. The aim was to open new perspectives and opportunities for future development. Together with local actors under the guidance of internationally renown guests we built temporary and permanent installations just using what we found on the site.

54


55

Tasting the landscape


56

N e t Scape


57

O r a nge

Chairs


New Old

Visions for Landscapes

Working an Old Land to produce New Landscapes The Gargano’s Italy

Promontory

The Gargano is a mountainous promontory that extends into the northern part of Puglia. It is entirely surrounded by the Adriatic Sea, except to the west where it borders on the ‘Tavoliere’. The formation of the Gargano promontory dates back to the Jurassic period at a latitude that caused very different climatic conditions and typically tropical landscapes. The aim of this project is to extend the seaside (currently compressed between the coast and the sea) using sea platfoms that also contribute to reduce the erosion process of the sea. Moreover, several local projects will be set to reuse many abandoned areas across the coast.

58


59

Second Shallow

First Shallow

Beach

Calenella Field

Open Sea

Town of Rodi

Coast

Wood

The Sea Platforms

Widespread Gardens

Air-Balloon Field


Widespread Gardens Old, abandoned boats are scattered across all the seaside; they become, in the yars, part of this landscape. The idea is to reuse them as small gardens in order to sensitise tourists and local people about the variety and the importance of the Gargano’s vegetation, known as ‘Macchia Mediterranea’.

60


61

Empty

fields

are

used

as

platform for Air-balloons


Mapping Shrinkage Across Mediterranean

Survey on the phenomena of shrinkage in the Mediterranean Basin through the mapping and overlay of processes Politecnico (Italy)

of

Milan

Two opposite tendencies are characterizing the world demographic trend from 1950s: the growth and the shrinkage. Since the former is the general and positive drive of cities development (above all in the developing countries), the latter is the effect of the urban emptying that is afflicting especially the cities that are shifting from an industrial to a post-industrial economy. Is more and more difficult to locate inside the general growth pattern the opposite trends and understand them not as exceptions but as part of it.

62


The essay The aim of this survey is to map the pehnomenon of shrinkage in the Mediterranean Basin, using the addition of different processes as investigation method.

A liquid continent According to the definition of the Multiplicity Lab, in this survey, the Mediterranean is contemplated as “[...] a large Continent interposed between Europe, Asia Minor and Africa [...], a liquid continentcut to differing depths by impenetrable corridors and subdivided by high barriers in which specialized enclosures and vast, uninhabited plains alternate. Its borders are perforated by funnels of entry and exit that ingreasingly respond to the logic of exclusion and separation. It is a new continent, the map of which we are still unfamiliar with”. Multiplicity Lab Around a Solid Sea

Eidetic operations To build the geography of shrinkage in the Mediterranean basin have been used the eidetic images, that are: “[...] sensible formas, which (according to Aristotele) emanate from objects and imprint themselves on the wax-like receptacles of our senses like a signet ring; the fantasmata, which are revived versions of those impressions called up by the imagination in the absence of the objects that originally stimulated them; thos appearances which intrude between ourselves and reality” W.J.T Mitchel Iconology: Image, Text, Ideology

63


Country a growing Morocco, Two different

64

consequences

of

Mediterranean

Migration

Process


65

Syrian

crisis


The final step was to work on two prime examples using the method of addition of processes in order to produce the eidetic images of shrinkage phenomenon in Mediterranan.

Libyan Landscape

66

of

Infrastructure


The first is the Libyan case; divided in two processes: the one of growth (map 1), after the built of the Man Made River Projet that brings water across the desert up to the costal cities allowing the irrigation of the crop fields in the desert and the use of drinkable water in the cities; and the one of shrinkage (map 2), after the war and the collapse of the whole Country.

Libyan

Landscape

of

War

67


The second case is the one of Gioia Tauro, in the South of Italy. This plain hosts one of the biggest transhipment port of the whole Mediterranean (map 3) that, in spite of the huge number of TEUs that every year transit from here, is totally disconnected from the hinterland’s infrastructure, that is extremely weak compared with the port. This disconnection prevent the economical growth of the Region that is unable to draw people to work here who, in reverse, leave every year the plain of Gioia Tauro.

Gioia Tauro_Landscape

68

of

Connections

and

Infrastructure


The port is not the only economical tool not properly used. Even the agriculture is an incredible potentiality. But the total controlo of it, by criminality, and the use of illegal immigrant workers doesn’t allow the legal local farmers to develope their business.

Gioia

Tauro_Landscape

of

Agricultural

Illegacy

69


Libyan Vision

Post-War

Visions of the post-war Libyan landscape Libya Libya is facing today one of the most bloody conflict of North Africa. Even though the Colonnel Gheddafi’s regime is fall, this country is still fighting. What i tried to do, producing collage images, is to suppose a post-war Libyan performative landscape that could be usefull to prevent future conflicts. The main idea is the one of setting several ecological corridors across the country, connecting the Libyan hot spots, that operate both as green fields (crops or grazing lands) and phisical barriers against heavy militar vehicles.

70


71


Tawargha, once a vibrant city of 30,000 inhabitants, today, the “green island” in the Amazigh language – is just a ghost town in the middle of the Libyan desert. The Economist

One NTC fighter described the centre of Bali Walid (80.000 inhabitant) as a "ghost town", adding that 500 families were seen leaving in the last two days. BBC News

NATO has admitted that its jets attacked the Brega’s pipe factory on 22 July, claiming in justification that it was used as a military storage facility and rockets were launched from there. he water pipe infrastructure is probably the most essential civilian infrastructure in Libya. Key to its continued function, particularly in time of war, is the Brega pipe factory which enables leaks and breaks in the system to be repaired. Human rights investigations

Jalo Oasis is an oasis in Cyrenaica, Libya, located west of the Great Sand Sea and about 250 km south-east of the Gulf of Sidra. Quite large, 19 kilometres (12 mi) long and up to 11 kilometres (7 mi) wide,[1] it supports a number of settlements, the largest of which is the town of Jalu. Because of its location and as a source of water, it had strategic importance during the North African Campaign in World War II and changed hands several times between Allied and Axis forces. Wikipedia

Kufra is the starting point of the world’s largest engineering endeavour: a national pipeline network transporting groundwater from under the oasis to Libya’s arid northern cities. The Man Made River Project

72


73


74


75


76


Temporary Installation Un[Expected] Mate[Reality] SP Calling

77


Un[Expected] Mate[Reality]

From Form Finding to Architecture Politecnico of Milan (Italy) The workshop was intended in a holistic learn-by-design approach where advanced design methodologies and techniques were introduced directly with fabrication and construction of a 1:1 installation. The aim was to experience collaboratively a challenging design experience ranging from FormFinding theory to real construction of a temporary pavilion based on a parametric strategies. We develop a design scheme for a temporary pavilion with digital tools and production of test-models. The final design version will be then geometrically optimized for production. Parametric design information was transferred to construction nested drawings ready for digital fabrication. We experienced CNC-based fabrication of pleated components and collaborated to the construction of the final pavilion.

78


79

The Form

Finding


80


81

From

Model

to

Architecture


SP

Calling

Jornada da Habitação São Paulo (Brasil) The idea of the SP Calling is to highlight the importance of projects for the so-called informal city, not as being out of the ordinary but rather as a new relationship that politicians and technicians ought to establish with the population living in the less privileged districts and expecting creative solutions in accordance with the demands of the city of the 21st century. In order to spread and enlarge the debates about the future of the informal cities in this 21st century are invited six cities to participate on the São Paulo Calling. Each one of them will explore its local slum upgrading solutions and social housing practices, which will be the chain between these cities and São Paulo interventions. The ideas presented here have as a common objective the transformation of the contemporary city in a space where opposed values could coexist and be confronted countering the conservative ideas of isolated communities. The city that permits the democratic communal living that is related to the extension of access to opportunities to all its inhabitant.

82


Artisanal Market Artisanal Market Capoeira Samba

Brasilian Restourant Brasilian Restourant

DISCUSSIONS RING DISCUSSIONS RING

EXHIBITION EXHIBITION CONTAINERSCONTAINERS Rome

International Guests International Guests

Rome Nairobi

International Contributors International Contributors Inhabitants

Capoeira Samba

Inhabitants

Brasilian Contributors Brasilian Contributors

Nairobi

Medellin

Medellin

Mumbai

Mumbai

Moscow

Brasilian Guests Brasilian Guests

Baghdad

STREET MARKET STREET MARKET

Moscow Baghdad

FAVELAS LEAGUES FAVELAS LEAGUES

Best Practice Market Best Practice Market

Football

Football

Food Market Food Market Artisanal Market Artisanal Market Capoeira

Capoeira Brasilian Restourant Brasilian Restourant

EXHIBITION EXHIBITION CONTAINERSCONTAINERS Rome

Inhabitants

Inhabitants

Brasilian Contributors Brasilian Contributors Brasilian Guests Brasilian Guests

Nairobi

Medellin

Medellin

Mumbai

Mumbai

Moscow Baghdad

Moscow Baghdad

exhibit

International Contributors International Contributors

Nairobi

diffused

Rome International Guests International Guests

T h e

DISCUSSIONS RING DISCUSSIONS RING

Samba

Samba

83


84


85

The

Cultural

center

exhibit


francesco.roesler@hotmail.it +39-3476508059

86


T h a n k Yo u

87


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.