Fulan's work 2009-2019

Page 1

Fulan Zhang Selected Works 2009-2019

To The Glory of Architecture


SEEKING ARCHITECTURE After a long time of working in architectural field, the word Architecture became vaguer and more paradoxical. It mired in the mundane tasks and efforts of catering to clients’ tastes and meeting deadlines and budgets. In retrospect, what values should architects bring to the work to balance between idealism and reality is a perpetuating question. The collection of my work contains my current work in DLR group, my studio work in University of Cincinnati, my internship work in the US and my past professional work in China. The earliest of my independent design work dated back to 2009. The broad scope of my job is ranging from urban design to Residential master plan, from conceptual design to construction documents focused on core and shell detailing. In DLR group I geared my direction to CD and CA phases to gain detailing skills to enhance my design ability. In graduate school, I was interested in parametric and historical architecture where brought most of my inspirations. Not only the beauty of design, the realization of materiality is even more intriguing. Detailing is the DNA code to convey the design from ideal to reality. Thus, I focused on manifestation of the beauty of architecture through bridging artistically inherited details.

CONTENTS M. Arch Applicant Spring 2016


1

CURRENT WORK (DLRgroup) Credit By Others

Note: Only renderings with this star symble on the upper left corner is not directly poduced by me. But I supervised the out coming. All the conceptual works, drawings, renderings without the star symble are produced by me. All the parts of CD works shown here is produced by me.

2

SCHOOL WORK

Chesterfield Center for the Arts (Revit/Detailing)

4

Jamestown Exhibit Settlement Refresh (CAD/Detailing)

6

Tampa Theater Renovation (Revit/3dMax Rendering)

8

Freeman Amphitheater (Revit/Detailing)

10

Maury Elementary School (Revit/Casework Design)

12

Catalyst of Art (Revit/Rhino/Grasshopper)

14

Tribune Tower Library (Revit/Rhino/Grasshopper 3dMAX) 20

3 4

INTERNSHIP WORK

PROFESSIONAL WORK IN CHINA

Cincinnati Transit Hub (Revit/Rhino/3dMAX)

30

Historical Theory ( Hand Sketch)

36

Historical Preservation Document (Revit/Detailing)

38

Integrated Technology (Revit/Detailing/Rendering)

40

KANN Partner Mount Airy Hospital Renovation (Revit)

42

RTKL Cairo Children’s Hospital (Revit)

44

SCB

46

Montrose High Residential Building (Revit)

Phoenix Island Urban Design (Leading designer)

48

Mentougou Residential Master Plan (Leading designer)

50

Xiamen Elite Residential Master Plan (Leading designer) 58 Wuqing Residential Sales Pavilion (Leading designer)

64

Baiguoshu Residential Sales Pavilion (Leading designer) 68


1

Credit By Others

Chesterfield Center for the Arts 2018-2019 A new performing arts center adjacent to an existing library with new parking expansion. The plan includes seating for 361, inclusive of loose seating in the orchestra pit. The design would allow a full range of performance types supported by a large multi-purpose space, green room and several dressing rooms.

3/8/2019 10:45:14 AM

Issued / Revised No. Date Description 1 11/6/2017 Schematic Design 2 9/14/2018 DD QAQC 3 9/28/2018 DESIGN DEVELOPMENT 4 3/08/2019 ISSUED FOR BID & PERMIT

10

8

2

6

18 A-402

4

A-301

1

3

A-202

2

A-302

1

Sheet Keynotes

1

1 AS-502

AS-502

05-014

2 8 A-501

Janitor Closet 106

C

110C

A4

2

2F

106

A4

Men's Restroom

A4

112

108

A3

L1

110

109

A4

A5

109

A4

A-514

Lobby

G

2

139

3

SLL A4

A

101

102

002

B

119

5 A-405

5

05-034

123

Star Dressing Room

UP

A

A

9

8

2 A-311

136

10C

A

C

135A

137

C

3

AV & Other

A

137

137A

IT

137B

M2

A-404

135

A

134A 134

C

A

4' - 0"

T / STAGEHOUSE CORNICE 50' - 0"

2

E

Multi-Purpose Room

135B

10-001

04-006

07-013

A-312

07-020 07-024

T/ ROOF SCREEN 23' - 10"

133B

B

AS-501

07-029

LOWER T/ LOBBY CATWALK PARAPET LEVEL 17' - 0"

13

05-014

4 C

32-002

C

1

Checked by:

2' - 4 11/16"

Checker

AS-501

7' - 2" 1' - 1"

3' - 6" 6" 3' - 4" 6" 3' - 6"

11' - 4"

2' - 8"

11' - 4"

2' - 8"

6"

7' - 4"

2' - 8"

7' - 4"

3' - 4"

6"

2' - 8" 4' - 4" 2' - 8"

4' - 0"

3' - 4"

11' - 4"

4' - 0"

3' - 0" 3' - 4"

2' - 8"

4' - 8"

07-012

133 14

2' - 8"

04-008 05-010 05-016 06-012

Gallery

1

7' - 4"

03-001 04-005

C8

4' - 0"

B

2' - 8"

131 C

K1

4' - 0"

4' - 0"

2' - 6"

133

C8

133A

C

1' - 6"

A

C8

135

4' - 0"

4' - 0"

Catering 134

05-010

A-203

A

10

C

A-201

3' - 4"

4' - 8"

3' - 4" 3' - 0"

25' - 4"

07-052 10-001 10-002 10-005 22-014

1 1 A-404

LOBBY LEVEL 0' - A-201 0" CROSS AISLE -2' - 6"

SEE 2/AS202 FOR TYPICAL KEYNOTE

Green Room 126

B M2 Issued / Revised No. Date Description 1 9/14/2018 DD QAQC 2 3/08/2019 ISSUED FOR BID & PERMIT A 138

A

05-016 07-052

144A

M1

145

M2

A

136

A-201

125

C

C

2

Star Restroom 1 A-411

Stair

146A

" -4

06-015

146

5

L

125

124

144 DN

146

' 11

6

SLL

A-407

L

A

146B

26-003 32-002

06-006

F

1 A-401

132 127

A

132

Sheet Keynotes C

E.7

H

Mens Chorus

Storage

A

C

126

127

E

128

BRICK LEDGE RECESSED BRICK PANEL 1" RECESS Bathroom RUNNING BOND 10-021 A2 FACE BRICK - SOLDIER COURSE 7 5/8" TALL; 128 LIPPED BRICK FACEClassroom BRICK - COMMON BOND METAL FIXED 131 LADDER, GALVANIZED PAINTED STEEL, C7 PAINTED METAL RAILINGS Womens 130 GLASS-FIBER-REINFORCED PLASTIC,

C6

Bathroom

COLUMN - TUSCAN PROFILE, TYP EXTERIOR INSULATION AND FINISH SYSTEMS, MIN. 3" RECESSED PANEL, TYP. EXTERIOR INSULATION AND FINISH SYSTEMS, PREFINISHED CORNICE ASPHALT SHINGLES SNOW BIRDS @36" O. C. EXTERIOR ARCHITECTURAL ARCHITECTURAL 118 FIBERGLASS TRIM

22-012

129 A2

129

Chorus

D 11

AS-501 12

130

7

H

AS-501

C

05-014

3

SHEET METAL FLASHING AND TRIM, B DN PREFINISHED ALUMINUM CORNICE TRIM SNOW GUARD, TYP. DISPLAY CASES - POSTER EXTERIOR PIN MOUNTED METAL SIGNAGE 10" TALL EXTERIOR PIN MOUNTED METAL SIGNAGE 5" TALL LAMBS TONGUE -SECONDARY (EMERGENCY) STORM SEWER OUTLET COVER WALL SCONCE LIGHT FIXTURE - SEE 1 ELECTRICAL A-302 CUSTOM-FABRICATED DECORATIVE STEEL GATE AUXILIARY ITEM, 1/8" STEEL PLATE, WELD TO PICKETS; GRIND WELD SMOOTH

5' - 0"

-4

" 5/8

3/8/2019 10:32:22 AM

C

A

07-024

18' - 2 1/4"

123

122

124

A-407

1'

-3

5

1A

7' - 4"

G

Star Restroom 122

3

A-514

4

"

' 13

4

1B

2' - 8"

AS-503

118

Star Dressing Room

C

6'-0" H. BRICK ON 4" BLOCK ENCLOSURE W/ SLOPING 4" STONE CAP (2) 3'-6" X 5'-0" GALV. MTL. DOORS W/ 3" UNDERCUT Patio 135B

06-004

4' - 0"

AS-503 2

Corridor

2

1

© DLR Group

B

Chesterfield Center for the Arts

AS-501

A

9

7/8"

B

A4

1

3

3

121

06-015

C

2

11-001 B

Storage

1 A-406

A-514

1 A-405

A4

101

1C

1

DN

B

B

A-406

18

12-006

Concession

A-203

DN

120

121

Stage

1E

23 A-402

H Em. Elect

B

119

B

M1

A-301

AS-502

B

120

1

4

144C

101A

A

102

117A

2 A-514 6

141

140

139A

1D

B

10-022

144

Audience Chamber

A-407

House Mix Position

139

102A

J

116A

Piano Storage

3 A-514

148

12-006 22-012

AS-502

EXTERIOR HANDRAIL- SEE FINISH SCHEDULE FOR FINISH 2' HIGH LUMENRAIL; 4' O.C. POSTS STAINED WOOD MILLWORK MAKE-UP STATION WOOD HANDRAIL VISUAL DISPLAY UNIT (8'-0"X4'-0") CORNER GUARDS DOCK BUMPERS MANUAL ROLLER SHADE (TYP @ ALL EXTERIOR WINDOWS) SOLID SURFACE COUNTERTOP SHOWER CONTROL AND SLIDE BAR - SEE PLUMBING

Docking/Receiving

6 A-514

Lift #1 E

139B

Box Office

143

144D

5 A-514

DN E1

A-407

12-002

009

7 A-514

100

A

C

25' - 3 7/8"

M1

35' - 0"

A A

2B 2A

116

M1

Lift #2

A

8 A-514

11

L

100

A-542

3

CLR.

B

117

147

C

G

115

117

SLL

A

103

16

114

5' - 0"

144B

A

2C

147

Vestibule 103

116

3' - 9 1/4"

1 A-407

D

113

1' - 0"

Electrical

B A

M1

110B

A-514

115

111

111 10

G

114

K

001

Office

A

A4

G

A

M

AV

L1

IT

A A

Corridor

Restroom

L

2D

113 H1

110A

H

A2

108

A4

A

112

K H

A3

Toilet A

105 10 A-403

A5

K

Office

Mechanical

A5

105

2E

A

107

107 A4

A4

C

Women's Restroom

A4

K

C

A5

A-202

05-034 06-004 06-006 06-015 10-021 10-022 11-001 12-002

21' - 0"

6

Commision #17PR0145 11810 Centre St, Chester, VA 23831

AS-501

03-001

2' - 8"

11' - 4"

419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004

2' - 6 7/8"

9

EXTERIOR ELEVATION - WEST

5

3

2

1

T 202.393.6445 WWW.DLRGROUP.COM

1/8" = 1'-0"

FIRST LEVEL

4'

8'

16'

FIRST FLOOR PLAN

05-010

1/8" = 1'-0"

3/8/2019 2:53:54 PM

1

07-013

07-012

Drawn by:

Author

0'

2F

2E

0' 10

2D

9

8

6

4'

8'

Issued / Revised No. Date 1 9/14/2018 DD QAQC 2 3/08/2019 ISSUED F

WD

16'

5

4

3

A-101

2

1

07-029

2A

07-012

T / STAGEHOUSE CORNICE 50' - 0"

26-003 04-005

07-013

04-006

07-012

07-020

07-020

04-005

07-052

04-008

T / STAGEHOUSE CORNICE 50' - 0"

07-020 07-021

10-003

10-002

Preliminary Not For Construction

07-024

04-007

07-029

07-021

07-035

22-014

T/ ROOF SCREEN 23' - 10"

T/ ROOF SCREEN 23' - 10"

T/ LOBBY PARAPET 17' - 0"

Checked by:

2

4' - 4"

3' - 0"

2' - 7"

1' - 0" 11"

Exterior Elevation South 1/8" = 1'-0"

1 0'

4'

8'

16'

EXTERIOR ELEVATION - EAST 1/8" = 1'-0"

419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004

2' - 8" 1' - 4"

9' - 0"

1' - 4" 2' - 8"

10' - 8"

2' - 8" 1' - 4"

9' - 0"

1' - 4" 2' - 8"2' - 8" 1' - 4" 4' - 4" 1' - 4" 2' - 8"

2' - 8" 2' - 8" 1' - 4" 4' - 4" 1' - 4" 2' - 8" 1' - 4"

8' - 4"

9' - 0"

1' - 4" 2' - 8"2' - 8" 4' - 4"

LOBBY LEVEL 0' - 0" STAGE LEVEL -2' - 6"

5' - 4"

3' - 9 1/4"

12' - 0" 2' - 4"

11800 Centre St. Chester, VA 23831

6' - 8"

LOBBY LEVEL 0' - 0"

2' - 4"

LOBBY LEVEL 0' - 0" STAGE CROSSLEVEL AISLE -2' - 6"

5' - 6 3/4"

03-001 11' - 0"

Commission #: 55-15003-10 2' - 4 3/4"

1' - 4"

8"

2' - 4 3/4"

2' - 4 3/4"

2' - 0"

Checker

03-001

15' - 3 1/4" 9' - 0"

2' - 8"

11' - 8"

2' - 8"

SEE 2/AS202 FOR TYPICAL KEYNOTE

T 202.393.6445 WWW.DLRGROUP.COM

0'

4'

8'

Author

EXTERIOR ELEVATIONS

Drawn by:

WD

1

08-001 10-002 10-003 22-014

Chesterfield Center for the Arts

22-014

2' - 8" 2' - 8" 4' - 4"

LOWER T/ LOBBY CATWALK PARAPET LEVEL 17' - 0"

© DLR Group

06-012

04-006 04-007 07-012

7 A-502

10-002

10-005

07-029

Sheet K 03-001 04-005

A-202 A

07-029

D

E

E.7

F

G

H

07-012

K

16'

BRICK LEDGE RECESSED BRIC RUNNING BOND FACE BRICK - SO LIPPED BRICK FACE BRICK - RO EXTERIOR INSUL MIN. 3" RECESSE ASPHALT SHINGL FABRICATED WA ROOF SCREEN W SHEATHING, 1" E SHEET METAL FL PREFINISHED AL MANUFACTURED DOWNSPOUTS HOLLOW METAL EXTERIOR PIN M TALL EXTERIOR PIN M TALL LAMBS TONGUE STORM SEWER O


3/8/2019 11:20:48 AM

07-033

C

2D

Issued / Revised No. Date Description 1 3/08/2019 ISSUED FOR BID & PERMIT

07-033

B

06-002 06-001 LOWER T/ LOBBY CATWALK PARAPET LEVEL 17' - 0"

T/ LOBBY PARAPET 17' - 0"

07-026 05-009

07-026 07-029

07-009 06-003

07-029

05-002

DRIP

Sheet Keynotes

05-003

04-001 04-003 04-005

07-007

04-006

07-007

04-007 04-008 04-015 05-002 06-012

06-001 06-003 06-008 06-009 07-001

07-001

07-005 07-007 07-015

04-008

1

A-312

07-018

WALL SECTION -THROUGH CANOPY

1" 04-005

1"

07-024

DASHED LINE INDICATE EXTENT OF MOCKUP WITH REQUIRED, INCLUDING TYP. CORNICE CONDITION, BOTTOM THROUGH WALL FLASHING CONDITION

07-026 07-029 07-030

MORTAR WASH, TYP.

07-032

BRICK COMMON BOND

07-018

07-033

2' - 3"

08-006

3 5/8"

06-008

3' - 4"

07-049 08-006 09-005 26-001

ROWLOCK

05-002

6"

3' - 4"

6"

07-001

04-006

5 1/4" WINDOW TRIM 12' - 0"

04-003 04-007

ACTURAL WINDOW SIZE 6' - 8"

07-032

WALL SECTION -THROUGH WINDOW HEAD @ LOBBY LEVEL

07-049

1 1/2" = 1'-0"

6"

6"

07-023

6"

6' - 8"

04-005 1"

BRICK RECESS RUNNING BOND

9' - 4"

3/8" 6"

05-002

2

07-032

BRICK SOLDIER COURSE 6"

04-006

7 5/8"

7 5/8"

04-006

A-311

07-017 07-018 07-023

1 1/2" = 1'-0"

07-001

MORTAR WASH, TYP.

4 1/4"

07-030 26-001

06-008

06-008

06-001

07-024

3/8" JOINT

04-015 4 1/4"

Lobby Level 0'-0"

07-032

Lobby Level 0'-0"

4 1/4" STONE SILL 1' - 4"

2' - 4 3/8"

07-049

07-030

2' - 5"

07-049

GROUTED SOLID MASONRY CAVITY HEAD JOINT WEEPS @ 16" O.C. RECESSED BRICK PANEL 1" RECESS RUNNING BOND FACE BRICK - SOLDIER COURSE 7 5/8" TALL; LIPPED BRICK FACE BRICK - ROWLOCK 3 5/8" TALL FACE BRICK - COMMON BOND CAST STONE STRUCTURAL STEEL (BM, COL, TUBE, PLATE, ANGLE, CHANNEL) -SEE STRUCT BLOCKING, FIRE TREATED 5/8" GLASS MAT EXTERIOR GYPSUM BD SHEATHING WOOD TRIM WOOD BASE CAVITY DRAINAGE MATERIAL (SIZE WIDTH TO CAVITY) 1.5" R-7.5 EXTRUDED POLYSTYRENE INSULATION (AT FOUNDATION PERIMETER) MINERAL FIBER BATT INSULATION SMART VAPOR RETARDER @FIBERGLASS BATT INSULATION VAPOR BARRIER (UNDER SLAB ON GRADE) FLUID APPLIED PERMEABLE BARRIER GLASS-FIBER-REINFORCED CEMENTITIOUS PANELS FIBER CEMENT TRIM AND PANEL EXTERIOR ARCHITECTURAL ARCHITECTURAL FIBERGLASS TRIM EPDM ROOF SHEET METAL FLASHING AND TRIM, PREFINISHED ALUMINUM CORNICE TRIM STAINLESS STEEL MASONRY FLASHING WITH FULL DRIP SELF ADHESIVE FLASHING, HOLD BACK 3/4" FROM FACE OF BRICK PREFINISHED ALUMINUM COPING WITH DRIP EDGE JOINT SEALANT AND BACKER ROD ALUMINUM WINDOW SYSTEM PAINTED GYPSUM WALL BOARD LIGHT FIXTURE - SEE ELECTRICAL

06-003 04-005

4' - 4"

1' - 4"

7' - 0"

Stage Level -2'-6"

07-005

4

07-007

A-312

WALL SECTION -THROUGH WINDOW HEAD @ STAGE LEVEL

1' - 4"

1 1/2" = 1'-0"

4' - 4"

1' - 4"

7' - 0"

07-018

@STAGE LEVEL

@ LOBBY LEVEL

04-008 07-049 09-005

6

07-032 04-015

Checker

VARIES, SEE ELEVATION

07-017

1/2" = 1'-0"

0'

04-003

04-005 07-015

1"

07-001

06-009

Author

4'

© DLR Group

04-008

STAGE CROSSLEVEL AISLE -2' - 6"

07-030

419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004

04-001 STAGE CROSSLEVEL AISLE -2' - 6"

T 202.393.6445 WWW.DLRGROUP.COM

03-003

Drawn by:

2'

Commision #17PR0145 11810 Centre St, Chester, VA 23831

07-018

07-032

1'

Chesterfield Center for the Arts

07-030

04-003

Checked by:

TYPICAL WINDOW ELEVATION DIAGRAM

EXTERIOR SECTION DETAILS

09-019

WD

3

A-311

WALL SECTION -THROUGH WINDOW SILL @ LOBBY LEVEL

5

A-312

1 1/2" = 1'-0"

A-503

WALL SECTION - THROUGH WINDOW SILL @ STAGE LEVEL 1 1/2" = 1'-0"

0'

1'

2'

3/8/2019 10:46:45 AM

Issued / Revised No. Date Description 1 9/28/2018 DESIGN DEVELOPMENT 2 3/08/2019 ISSUED FOR BID & PERMIT

1E

1D

1C

1B

10

8

6

4

3

2

1

BUILDING ENVELOPE NOTE: Roof R-25 continuous (~5” of polyiso to get to R-30)

1 A-502

Walls (Mass / EIFS) R-11.4 (~3” of EPS) Walls (Metal-Stud) R-13 batt + R-7.5 continuous (2” XPS and 6” batt) Below-Grade Wall - Orchestra Pit R-7.5 (~2" of EPS)

5 A-561

T / STAGEHOUSE CORNICE 50' - 0" T / STEEL STAGE 47' - 0"

Slab-on-Grade R-10 for 24” below (~2" of EPS)

GWB PANELING SEE A514 RAMP OUTSIDE AISLE BYOND

07-042

T / STEEL AUDIENCE CHAMBER 34' - 4"

2 A-312

TRANSVERSE CATWALK 25' - 6"

T/ ROOF SCREEN 23' - 10" FLY GALLERY STAGE LEFT 20' - 0"

T/ ROOF SCREEN 23' - 10"

Control Booth & AV Room 202

LOWER CATWALK LEVEL 17' - 0"

T / STEEL 15' - 0"

T / STEEL 15' - 0"

Vestibule

Lobby

103

100

House Mix Lift #1 Position 148

140

Audience Chamber

Stage

Corridor

Docking/Receiving

141

144

118

117

LOBBY LEVEL 0' - 0"

STAGE LEVEL -2' - 6"

ORCHESTRA PIT 000 ORCHESTRA PIT -12' - 4"

1

LONGITUDINAL BUILDING SECTION 1/8" = 1'-0"

0'

A

B

C

D

E

E.7

F

G

H

J

4'

8'

16'

K

1 A-311

T / STEEL AUDIENCE CHAMBER 34' - 4"

TRANSVERSE CATWALK 25' - 6" T/ ROOF SCREEN 23' - 10" FLY GALLERY STAGE LEFT 20' - 0" LOWER CATWALK LEVEL 17' - 0"

Catwalk Dimmer Room 203

205

Checker

T / STEEL 15' - 0"

Gallery

Catering

Corridor

Stair

133

134

138

145

Audience Chamber

Lift #2

Corridor

009

110

LAST ROW 3' - 5"

© DLR Group

Chesterfield Center for the Arts Commision #17PR0145 11810 Centre St, Chester, VA 23831

141

Checked by:

STAGE LEVEL -2' - 6"

419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004

ORCHESTRA PIT 000

ORCHESTRA PIT -12' - 4"

T 202.393.6445 WWW.DLRGROUP.COM

Drawn by:

Author

BUILDING SECTIONS 2

BUILDING SECTION 1/8" = 1'-0"

0'

4'

8'

16'

WD

A-301


Jamestown Settlement Refresh Renovation 2018-2019



Tampa Theater Renovation 2018-2019

C

D

D

E

E

F

F

G

A ISSUED / REVISED 1 2016-12-09 DESIGN DEVELOPMENT 2 2017-04-24 SEAT PROCUREMENT 3 2017-06-02 PR 001 95% ISSUE 4 2017-06-30 PR 001 5 2017-08-10 PR 001 SET A

G

10

REMOVABLE SEAT ON 8-WAY HAND TIED COILED SPRINGS

10

LOCKING CLEATS

29' - 11"

DN

14

10

14

10

6

3

8

NEW RAILING BEYOND, MATCH EXISTING BRASS CONSTRUCTION. MECHANICALLY ATTACH NEW METAL RAILING, FINISH WITH SAME LOW SHEEN METALLIC BRONZE HIGH PERFORMANCE COATING AS REFINISHED EXISTING RAILINGS

8

10 12.001

8

10 12.004

6

3

6

6

Key Value

05.002

ALIGN

06.012 12.001 12.003 12.004 12.006

0' - 6"

D.002 D.004 D.008

E.003 HEAD OF EXISTING TRANSOM WINDOW RO 9' - 11 1/4" HEAD OF EXISTING STOREFRONT WINDOW RO 7' - 5"

D.002

CLEAN AND REFINISH ALL EXISTING RAILINGS WITH LOW SHEEN METALLIC BRONZE HIGH-PERFORMANCE COATING. NEW GUARDRAIL TO MATCH EXISTING IN FORM AND FINISH CUSTOM BANQUETTE SEATING, UPHOLSTERY PER FINISH SCHEDULE THEATRICAL SEATING - FIXED THEATRICAL SEATING - FIXED, WITH INTEGRAL TABLE BETWEEN EVERY PAIR OF SEATS THEATRICAL SEATING - CUSTOM CAST IRON END STANDARD AND AISLE LIGHT TABLE, 12" DIA, ATTACHED TO FLOOR

D.030 D.031 E.001

CARPET

3

EXISTING STEP BEYOND

2' - 8"

2

6

NOT IN PERMIT SHOWN FOR REFERENCE ONLY

1/4" = 1'-0"

2' - 8"

NOT IN PERMIT SHOWN FOR REFERENCE ONLY

SECTION THROUGH ROW OVERBUILD, TYPICAL

4

1

1 1/2" = 1'-0"

2

AD-301

3

1

2

4

AD-301

D.012

E.003

E.003

5

AD-301

6

E.003

D.012

E.003

3 AD-301

D.012

7

E.003

1' - 0"

3

6

HEAD OF EXISTING TRANSOM WINDOW RO 9' - 11 1/4" HEAD OF EXISTING STOREFRONT WINDOW RO 7' - 5"

0' - 2"

3

3

0'

-

0 1/2

" TY

D.011

D.011

A

B

H

N i

P

D.009 D.009

D.009

D.009 D.009

D.009 D.009

D.009 D.009

E.004 E.004

AE-121 4

5

NOTES

D.004

REFINISH EXPOSED CONCRETE FLOOR AT AUDIENCE CHAMBER, EXPOSED VERTICAL RISER SURFACES, COLOR TO MATCH ARCHITECT SAMPLE

2

(MEZZANINE: FIXED SEATS 96 (BALCONY: FIXED SEATS 378 BANQUETTE SEATS 16)

D.004

D.010

D.010

E.001

E.001

D.004

D.010

D.010

E.001

D.010

E.001

D.004

SILL OF EXISTING STOREFRONT WINDOW RO 0' - 0" GREEN ROOM FLOOR LEVEL -1' - 3"

FLORIDA AVE STOREFRONT REPLACEMENT - ELEVATION DEMOLITION

4

TYP.

SEE PLANS

2

2

3

4

5

6

7

KEY PLAN 1" = 40'-0"

8

0 5'10' 20'

40'

3

END STANDARD: 32 MEZZANINE 40+28 BALCONY

iv

7

1/4" = 1'-0"

0' - 6"

TOTAL FIXED SEATS: 474 BANQUETTE SEATS: 16

3

D.011

TYP.

VERIFY IN FIELD

4

D.011

1' - 0"

1" x 2" TUBE WITH 2" DIA. WOOD CAP W/ EASED EDGES, SLOPE TO MATCH EXISTING RISER TO RISER SLOPE FINISH WITH SAME LOW SHEEN METALLIC BRONZE HIGHPERFORMANCE COATING AS REFINISHED EXISTING RAILINGS

4

3

2' - 10" TYP.

6

3

NEW HANDRAIL MOUNTED TO VERTICAL RISER, SEE DETAIL 3/AE 103.1 TYP

E.004

PARTIAL EXTERIOR ELEVATION - NORTH - DEMOLITION

ALIGN WITH EXISTING SLAB, FINISH AS SCHEDULED

6

3

12.003

E.003

Keynote Text NEW OPENING IN EXISTING PARTITION WALL REMOVE EXISTING DOOR, FRAME, TRIM AND HARDWARE REMOVE EXISTING WALL TO ENABLE INSTALLATION OF GENERATOR EQUIPMENT REMOVE EXISTING STOREFRONT PLATE GLASS REMOVE EXISTING STOREFRONT COPPER TRIM, CLEAN, REPAIR AND RE-INSTALL CLIPPED TO NEW STOREFRONT SYSTEM REMOVE EXISTING TRANSOM WINDOW ASSEMBLY REMOVE EXISTING WINDOW AC UNIT, PROTECT AND REINSTALL AS INDICATED IN ELEVATIONS REMOVE SECTION OF SLAB FOR NEW CHASE PARTIAL WALL REMOVAL FOR WINDOW INSTALL, PATCH AND REPAIR TO MATCH EXISTING WALL CUTTING HOLE TO INSTALL BEAMS AND PLATES, SEE STRUCTURAL REMOVE EXISTING BENCH EXISTING TERRA COTTA BASE AND PILASTER ASSEMBLY TO REMAIN, PROTECT DURING CONSTRUCTION EXISTING COPPER CORNICE TO BE CLEANED AND REPAIRED, NEW TREATED WOOD BLOCKING BENEATH EXISTING EXTERIOR DOORS TO REMAIN, RE-FINISH TO MATCH EXISTING

E.001

0' - 2"

6

D.015 D.029

SILL OF EXISTING STOREFRONT WINDOW RO 0' - 0" GREEN ROOM FLOOR LEVEL -1' - 3"

- 2"

6

D.011 D.012

D.009

0'

3

D.009 D.010

D.004

5

6

6

4

KEYNOTE LEGEND 1 AD-301

Keynote Text

5

6

A

Keynote Legend

05.001

SEE MEZZANINE PLAN FOR CONTINUATION OF NEW CARPET

05.001

ISSUED / REVISED 1 2017-02-16 SCHEMATIC DESIGN 2 2017-06-02 PR 001 95% ISSUE 3 2017-06-30 PR 001 4 2017-08-10 PR 001 SET B

CARPET, ARCHITECT TO CONFIRM PATTERN AND ORIENTATION

Key Value

10

16' - 9"

G

5/8" GWB

10

8

10

(2) LAYERS OF 3/4" FRT PLYWOOD OVER 2x4 STUD FRAMING @ 16" MAX, FINISH AS SCHEDULED

10

F

PLAN LEGEND

15# FELT BETWEEN PYLWOOD LAYERS

10

E

0' - 1 1/2"

WOOD BLOCKING

10

D

6

14

8

FITTINGS AND HORIZONTAL POST SPACING TO MATCH EXISTING

14 12.006 05.002

0' - 6"

2' - 2"

7

2 AE-103.1

06.012

C

BALCONY OVERBUILD, SEE 2/AE103.1

3/4" THICK V.C. PLYWOOD GUESSETS P.LAM BASE

14

B

8

UPHOLSTERY ON WALLS OF ARMREST TO MATCH SEAT CUSHION

10

14

1' - 8"

WOOD ARMREST TO MATCH SEATING ARMREST, BY OWNER

10

14

1' - 6"

DN

4

10

14

14

3' - 0 1/2"

10

0' - 4"

8

10

NO-SAG SPRINGS

1' - 0 1/2"

14

10

2

10

0' - 6"

14

10

8/14/2017 3:57:51 PM

B

C

7

8/15/2017 2:02:23 PM

A

B 1

MOUNT TO FACE OF CONCRETE RISER

DN

B D.008

UP BASIS OF DESIGN SEAT: ORIENTAL BY IRWIN SEATING COMPANY; 19", 20", AND 21" WIDTHS; CUSTOM CAST IRON END STANDARD, ARCHITECT TO CONFIRM FINISH AND FABRIC; COORDINATE AISLE LIGHTING WITH ELECTRICAL

6

i

711 N. FRANKLIN ST TAMPA, FL 33602 WRL COMMISSION #

16024.00 419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004

iv

T 202.393.6445 WWW.DLRGROUP.COM

6 4

4

1/4" = 1'-0" 0 6" 1'

2'

4'

KEY PLAN AE103.1 1" = 40'-0" 0 5'10' 20'

40'

AE-103.1

10

AD-301

D.029 D.009 D.030 D.010 D.004 D.029

5

AD-301

TYP.

D.009 D.030 D.010 D.004 D.030 2

6

AD-301

TYP.

D.031 D.009 D.030 D.010 D.004

D.031 D.010 D.004

711 N. FRANKLIN ST TAMPA, FL 33602 WRL COMMISSION #

16024.00 419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004

FIRST FLOOR DEMOLITION PARTIAL PLAN AND ELEVATIONS

D.031 D.030 D.010

1

D.004

1

AE-201

T 202.393.6445 WWW.DLRGROUP.COM

D.030 D.010

Author

7 BALCONY NEW WORK PLAN

D.010 D.015

A

Drawn by:

1

AE-122

AD-201

2

UP

BALCONY SEATING NEW WORK PLAN

3

Author

Checker

N

Checked by:

2

H B

Checked by:

Checker

3

1 1/2" = 1'-0"

2

1

Tampa Theatre

SEATING SECTION DIAGRAM, TYP.

A

8

Drawn by:

DN

Tampa Theatre 3

FIRST FLOOR PARTIAL PLAN - DEMOLITION

AD-201

NOT IN PERMIT SHOWN FOR REFERENCE ONLY

1/4" = 1'-0"

0 6" 1'

2'

4'

AD-201



Freemen Amphitheater 2018-2019

1/23/2018 4:29:22 PM

Issued / Revised No.

Date

1 2

Description

4/27/2017 SCHEMATIC DESIGN 01/23/2018 DESIGN DEVELOPMENT

1 AA-301

Keynote Legend KEY NOTE 03.008 03.012 05.005 05.007 06.008

CROSS AISLE

ADA SEATING

16' - 0"

11.001 12.001 12.002 32.004 32.007 32.008 32.015

05.005 EXTERIOR SEATING 11,050 SQFT

DN

ADA SEATING

32.019

14' - 2"

DESCRIPTION CAST IN PLACE CONCRETE, SEE STRUCTURAL CAST IN PLACE CONCRETE STAIRS - SEE STRUCTURAL 1 1/2" DIA. PIPE RAILING METAL LADDER, PAINTED 6" PVC PIPE CABLE PASS BELOW SLAB. SEE A/V FOR CABLE PASS LOCATIONS DOCK LEVELER FIXED STADIUM SEATING LOOSE STADIUM SEATING CHAIN LINK FENCING AND GATE PLANTING, SEE LANDSCAPE SECURITY FENCING AND GATE, SEE LANDSCAPE EXTERIOR RAILING WITH WOOD DRINK RAIL AND CABLE NETTING PANELS, SEE LANDSCAPE SYNTHETIC TURF, SEE LANDSCAPE

AA-201

13' - 8"

3 13' - 2"

12' - 8"

6 05.005

13

12' - 2"

2 05.005

1

11' - 8" CROSS AISLE

DN

32.019

ADA SEATING

11' - 2"

17

ADA SEATING

05.007

03.012

05.005

05.005 ADA SEATING

10' - 0"

18

05.005

MIX POSITION

DN

A-103

ADA SEATING

A

DN

B

12.001

1:12 PE SLO

SLOPE 1:20

OF BOX

FICE

TS & TOILE N ADMI

LAWN SEATING

1:20 PE SLO

PAVILION

1:2

0

BACK OF HOUSE

SL OP E

1:12 PE SLO

AA-201

& FOOD GE RA BEVE

KEYPLAN VIP LOOSE SEATING/DANCE TERRACE

PRELIMINARY

1 CANOPY ABOVE

12.002

NOT FOR CONSTRUCTION OR RECORDING

06.008 32.008

2

AA-201

3' - 2"

32.004

Client

12' - 8"

C

COASTAL ARTS PAVILION AT FREEMAN PARK

EXTENT OF STORAGE BELOW, 270SF

03.008 06.008

06.008 12' - 0"

7'

'-

P. TY

- 1"

45' - 0"

B5

Project No. 16078.00

STAGE WING WEST

STAGE WING EAST

STAGE

A-101

Checked by:

0"

Checker

31750 LAKE VIEW DRIVE, SELBYVILLE, DE. 19975

12

VIP TERRACE. SEE LANDSCAPE. 32.015

A-100

DLR Group

A-102 11.001

419 7TH STREET NW, 2ND FLOOR WASHINGTON, DC 20004 © 2017, DLR Group of D.C., P.C., a DC prof. corp., ALL RIGHTS RESERVED

2 AD-312

Author

AD-201

T: 202.296.4344 www.DLRgroup.com

1 / AD-101

6

D

PAVILION FLOOR PLAN

Drawn by:

E 19

1

We st l a ke Re e d Le skosky

20

21

22

1 AA-301

23

24

25

26

DD

STAGE & AUDIENCE SEATING 1/8" = 1'-0" 0 1' 2'

4'

8'

AA-101 Credit By Others


1/23/2018 4:30:47 PM

Issued / Revised No.

Date

1

BO.A1

BO.A

Description

01/23/2018 DESIGN DEVELOPMENT

BO.A

1' - 2"

07.004

07.004 06.004

06.004 07.004

07.034

07.034

06.004

06.010

06.010

07.034

06.011

07.041

5 AB-311

07.006

06.010

07.041

06.011

07.039

KEY NOTE 04.001 05.009 06.004 06.010 06.011 07.004

07.016

06.004

07.018

07.004 07.040

Keynote Legend

06.011

07.039

07.041

07.040

07.006 07.007 07.009

07.040 07.004

07.004

05.009 07.018

07.013 07.016 07.018

07.024 07.022 07.016

07.024

07.022 07.024 07.027 07.028 07.034 07.035 07.036 07.037 07.039 07.040 07.041

07.041 04.001 07.041

8

GUTTER DETAIL

5

1 1/2" = 1'-0"

GUTTER DETAIL

2 1/4" 07.036

1 1/2" = 1'-0"

100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"

DESCRIPTION 4" X 4" X 16" GROUND FACE CONCRETE MASONRY UNIT METAL PLATE SHEATHING SOFFIT VENT WOOD BLOCKING STANDING SEAM METAL ROOF, BOD FABRAL MICA COLORS BRIGHT SILVER FORMED ALUMINUM GUTTER CONCEALED STANDING SEAM METAL GUTTER POLYISOCYANURATE INSULATION; MIN. R-30CI. SLOPE TO DRAIN COMPOSITE CAVITY DRAINAGE INSULATION MATERIAL WEATHER BARRIER FIBER CEMENT VERTICAL SIDING W/ 2 1/2" BATTENS SPACED 8" O.C. ON Z-CLIP SUPPORT SYSTEM ALUMINUM DOWN SPOUT RIGID INSULATION; MIN. R-7CI DRAIN TILE INSULATION BOARD AND DRAINAGE PANEL VENTILATION AIR SPACES IN ROOF SHEATHING SYSTEM CAULK BETWEEN WEBS 1/2" COMPRESSIBLE FILLER FOUNDATION DRAIN TILE, GEOTILE, DRAINAGE FILL GUTTER SLOPES 1/8"/1'- 0" BRAKE METAL SOFFIT SEAM LOCK DRIP EDGE

07.037

9

07.016

BOX OFFICE SECTION 02 - Callout 1 - Callout 1

07.028

1 1/2" = 1'-0"

07.027

6 BO.A

BO.A1

BOX OFFICE WALL SECTION 1/2" = 1'-0"

BO.B

BO.A

9 AB-311

BO.1

BO.A

07.034 8 AB-311

07.004 07.004

06.004

06.004

07.035 07.013

07.034 07.004

05.009

06.004

07.013 05.004

07.024

07.034

07.018

07.009

04.006

07.007

06.004 06.004

07.034

07.004 07.004

PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING

Client

COASTAL ARTS PAVILION AT FREEMAN PARK 100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"

100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"

100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"

Checker

100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"

Checked by:

DLR Group

Author

7

Drawn by:

31750 LAKE VIEW DRIVE, SELBYVILLE, DE. 19975 Project No. 16078.00

100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"

BOX OFFICE SECTION 02 - Callout 1 1/2" = 1'-0"

4

BOX OFFICE WALL SECTION 2 1/2" = 1'-0"

3

BOX OFFICE WALL SECTION 1 1/2" = 1'-0"

2

BOX OFFICE WALL SECTION 1/2" = 1'-0"

1

BOX OFFICE WALL SECTION 1/2" = 1'-0"

We st l a ke Re e d Le skosky

419 7TH STREET NW, 2ND FLOOR WASHINGTON, DC 20004 © 2017, DLR Group of D.C., P.C., a DC prof. corp., ALL RIGHTS RESERVED T: 202.296.4344 www.DLRgroup.com

BOX OFFICE WALL SECTION

DD

AB-311

Credit By Others


IFC DOCUMENTS

CLEAT

1' - 2 1/4"

6"

LEGEND NOTES

LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET

ADJUSTABLE SHELVES ON PIN-TYPE SUPPORTS

4' - 2"

1' - 5 1/2"

ADJUSTABLE SHELVES ON PIN-TYPE SUPPORTS

1250 Constitution Ave. NE Washington, DC 20002

1/2" 8 1/2"

Maury Elementry Scool_Casework and Interior Elevations 2018 4 1/8" CARVED HANDLE

4 1/2"

R 1"

R 1"

7' - 2"

4 1/2"

6" x 20 GA. CONTINUOUS METAL REINFORCING PLATE (TYP.)

MELAMINE FINISH @ ALL INTERIOR SURFACES, TYP.

MELAMINE FINISH @ ALL INTERIOR SURFACES, TYP.

4"

6" x 20 GA. CONTINUOUS METAL REINFORCING PLATE

R 1"

4"

1"

R 1"

7' - 2"

R

CONT. SHEET MTL BLOCKING BACKING PL ON MTL STUD (TYP.)

R 1"

CARVED HANDLE BACK BOARD

1' - 2"

1' - 3 1/4"

1' - 3 1/4"

3" CUSION

1/2" BACKING PANEL

1/2" BACKING PANEL 0' - 1 1/2" 0' - 3"

8"

3/4" BOTTOM PANEL

9 A11.1

CUBBY 3D VIEW

SCALE:

10"

0' - 2"

3/4" BOTTOM PANEL

3 A11.1

SECTION - PRE K BOOKSHELF

SCALE: 1 1/2" = 1'-0"

PLYWOOD

THIRD FLOOR 116' - 5"

BLOCKING AS REQUIRED CASEWORK AND MILLWORK GENERAL NOTES

HARD WOOD

2' - 6"

A. B. C. D. E. F. G.

H. I. J.

6 A11.1

BEE HIVE 3D VIEW

7

SCALE:

A11.1

K.

BEE HIVE SECTION

L. M.

SCALE: 1 1/2" = 1'-0"

7' - 0"

N.

CASEWORK AND MILLWORK GENERAL NOTES APPLY TO ALL CASEWORK AND MILLWORK SHEETS. ELEVATIONS DENOTED AS MILLWORK ARE SPECIFIED UNDER DIVISION 06. OTHERS CONSIDERED CASEWORK SPECIFIED UNDER DIVISION 12, UNLESS NOTED OTHERWISE. BASE AND TALL STORAGE CABINETS: 24 INCHES DEEP, UNLESS NOTED OTHERWISE. WALL CABINETS: 14 INCHES DEEP, UNLESS NOTED OTHERWISE. TALL STORAGE UNITS TO BE 24 INCHES DEEP, UNLESS NOTED OTHERWISE. PROVIDE ADJUSTABLE SHELVING IN CASEWORK, UNLESS NOTED OTHERWISE. CATALOG NUMBERS SHOWN ON THE ELEVATIONS FOR CASEWORK ARE AWI REFERENCE NUMBERS, UNLESS NOTED OTHERWISE. (M) AFTER THE CATALOG NUMBER INDICATES THE CABINET IS SHOWN MODIFIED FROM STANDARD. __________ INDICATES CASEWORK TO BE BID AS AN ALTERNATE. SEE PROJECT MANUAL FOR ALTERNATE DESCRIPTIONS. WHERE ELECTRICAL DEVICES ARE LOCATED IN CASEWORK, CASEWORK CONTRACTOR SHALL PROVIDE FINISHED OPENINGS. COORDINATE LOCATION AND QUANTITY WITH ELECTRICAL CONTRACTOR. PROVIDE JOINT SEALANT AT PERIMETER JOINTS WHERE COUNTERTOPS, BACK AND SIDE SPLASHES, CASEWORK, AND MILLWORK ABUT WALLS. FIELD VERIFY DIMENSIONS OF CABINET LOCATIONS IN BUILDING PRIOR TO FABRICATION. PROVIDE LOCKS AT DOORS AND DRAWERS. PROVIDE FINISHED ENDS AT ALL EXPOSED ENDS OF CASEWORK AND MILLWORK. ALL EXPOSED SURFACES IN OPEN SHELVING SHALL BE PLASTIC LAMINATE COVERED.

MAURY ES

SECTION-PRE K CUBBY STORAGE

SCALE: 1 1/2" = 1'-0"

2' - 7 1/8"

1 A11.1

CASEWORK ELEVATIONS

FINISH FLR

2"

FINISH FLR

Revisions

2"

CUBBY FLOWER

SCALE: 3" = 1'-0"

BLOCKING, TYP.

0' - 8"

BLOCKING, TYP.

A11.1

K-105 05/25/2018

1 1/2"

3' - 0"

8 CARVED HANDLE BACK BOARD

A11.1

1' - 2"

HARD WOOD

PLYWOOD 0' - 1 1/2"

0' - 0 3/4"

FAUCET- SEE PLUMBING

4

2' - 7 1/8"

COUNTER SUPPORT BRACKET, FLUSH MOUNT INSTALLATION, B.O.D. RAKKS

0' - 6"

2' - 0"

1' - 6"

THIRD FLOOR 116' - 5"

Architecture Planning Interiors

0' - 5"

7 A11.1 COUNTERTOP AS SCHEDULED, EASED EDGES, SEE ELEVATIONS

FINISH FLR

SINK 3D VIEW

4

5

SCALE:

A11.1

A11.1

BEE HIVE ELEVATION

SCALE: 1/2" = 1'-0"

IFC DOCUMENTS

SECTION - PRE K SINK

SCALE: 1 1/2" = 1'-0"

INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O

3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS

1' - 0"

1/2" GYPSUM BOARD

2' - 1 7/8"

7 3/4" 8 1/4"

4 1/2"

1" 6 1/2" 2' - 9 3/4" 3/4" BOTTOM PANEL

0' - 2"

R 1' - 0"

R 3' - 0 1/4"

7 3/4"

2' - 8"

2' - 6 7/8" FIRST FLOOR 86' - 5"

4 A11.4

TYPE B CASEWORK ELEVATION

9

SCALE: 1/2" = 1'-0"

FINISH FLR

2' - 9 3/4"

10 "

2' - 9 3/8"

R 1' - 5 1/2"

R 1' - 3"

- 0"

R

10 1/4"

2' - 5 7/8"

7 1/2"

" 3/4

R 1'

2' - 2"

3/4"

" - 0 1/4

-4

R 2' - 1

R 2'

LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET

R 1'

1' - 3 3/4"

R

0" 1' -

LEGEND NOTES

1' - 0"

BLOCKING, TYP.

5 3/4" 4 1/8"

0' - 1 3/4" 0' - 8 3/4" 0' - 1 1/2"

5.2

1250 Constitution Ave. NE Washington, DC 20002

2 A11.1

© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED

0' - 8"

UNDERMOUNT SINK- SEE PLUMBING

BLOCKING AS REQUIRED

5/24/2018 3:31:47 PM

C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt

3

STEEL ANGLE

A11.4

TYPE C CASEWORK ELEVATION

SCALE: 1/2" = 1'-0"

1/2" GYPSUM BOARD

3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS

R 1' - 9"

INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O

- 3"

2' - 7"

TYPE D CASEWORK ELEVATION

3' - 0"

SCALE: 1/2" = 1'-0"

3' - 0" INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O

INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O

3/4" GYPSUM BOARD

3/4" GYPSUM BOARD

CASEWORK AND MILLWORK GENERAL NOTES

A. 3/4"

1' - 0"

1' - 0"

3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS

3/4"

3/4"

3/4"

3/4"

3/4"

3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS

B. C.

CARPET SURFACE

CARPET SURFACE

PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY 3/4"

PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY

3" 3/4"

D. E. F. G.

3" 3/4" H.

SURFACE OF DRY WALL

ALIGN

ALIGN

SURFACE OF DRY WALL

ALIGN

I.

ALIGN

5.6

J. K.

7 A11.4

L. M.

30.00°

N.

1 1/ 2"

30.00°

2" 1 1/

30.00°

1/2" LAMINATED GLASS

- 3"

3"

2"

SURFACE OF DRY WALL

3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS

3"

3' - 9"

1/2" LAMINATED GLASS

SURFACE OF DRY WALL

3"

R 2'

2"

1 1/2"

3/4"

A11.4

1 1/2" 3/4" PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY

3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS 3/4"

8

1 1/2" 3/4"

1 1/2"

WOOD BLOCKING WOOD BLOCKING

3/4" GYPSUM BOARD

TYPE G CASEWORK ELEVATION

3/4" GYPSUM BOARD

INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O

SCALE: 1/2" = 1'-0"

INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O FINISH FLR SECOND FLOOR SECOND FLOOR SECOND FLOOR 101' 5" 101' - --5" 101' 5"

SECOND FINISH FLOOR FLR 101' - 5" 5/24/2018 3:32:12 PM

C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt

PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY 5 A11.4

SECOND FLOOR 101' - 5"

7 A11.4

SECTION - CLOCK 1

SCALE: 1 1/2" = 1'-0"

5 A11.4

SECTION-CAVE COLOCK

SCALE: 1 1/2" = 1'-0"

© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED

- 3"

Architecture Planning Interiors

2"

3" 2"

R 3'

CASEWORK AND MILLWORK GENERAL NOTES APPLY TO ALL CASEWORK AND MILLWORK SHEETS. ELEVATIONS DENOTED AS MILLWORK ARE SPECIFIED UNDER DIVISION 06. OTHERS CONSIDERED CASEWORK SPECIFIED UNDER DIVISION 12, UNLESS NOTED OTHERWISE. BASE AND TALL STORAGE CABINETS: 24 INCHES DEEP, UNLESS NOTED OTHERWISE. WALL CABINETS: 14 INCHES DEEP, UNLESS NOTED OTHERWISE. TALL STORAGE UNITS TO BE 24 INCHES DEEP, UNLESS NOTED OTHERWISE. PROVIDE ADJUSTABLE SHELVING IN CASEWORK, UNLESS NOTED OTHERWISE. CATALOG NUMBERS SHOWN ON THE ELEVATIONS FOR CASEWORK ARE AWI REFERENCE NUMBERS, UNLESS NOTED OTHERWISE. (M) AFTER THE CATALOG NUMBER INDICATES THE CABINET IS SHOWN MODIFIED FROM STANDARD. __________ INDICATES CASEWORK TO BE BID AS AN ALTERNATE. SEE PROJECT MANUAL FOR ALTERNATE DESCRIPTIONS. WHERE ELECTRICAL DEVICES ARE LOCATED IN CASEWORK, CASEWORK CONTRACTOR SHALL PROVIDE FINISHED OPENINGS. COORDINATE LOCATION AND QUANTITY WITH ELECTRICAL CONTRACTOR. PROVIDE JOINT SEALANT AT PERIMETER JOINTS WHERE COUNTERTOPS, BACK AND SIDE SPLASHES, CASEWORK, AND MILLWORK ABUT WALLS. FIELD VERIFY DIMENSIONS OF CABINET LOCATIONS IN BUILDING PRIOR TO FABRICATION. PROVIDE LOCKS AT DOORS AND DRAWERS. PROVIDE FINISHED ENDS AT ALL EXPOSED ENDS OF CASEWORK AND MILLWORK. ALL EXPOSED SURFACES IN OPEN SHELVING SHALL BE PLASTIC LAMINATE COVERED.

MAURY ES

SCALE: 1 1/2" = 1'-0"

A11.4 10 A11.4

Revisions

SECTION - WALL CAVE BEAN

2

CASEWORK DETAILS

FIRST FLOOR 86' - 5"

FIRST FLOOR 86' - 5"

K-105 05/25/2018

4' - 0"

A11.4

3' - 1"

R 1'


N

MATCH LINE

Q

IFC DOCUMENTS

M

FA DEVICE REFER TO FA SERIES

P

PT-3

ENVIRONMENTAL GRAPHIC "DESERT"

4'-0 MAX

PL-2

PL-1

PL-5

PL-2

OPEN TO DISC. COMMONS 227

TK-1

GPD

7' - 0"

TK-1

9' - 0"

GPD

LEGEND NOTES

LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET

PT-9

GL-1 MAGNETIC/WRITABLE GLASS PANEL GL-2 TEMPERED DECORATIVE GLAZING

ROOM SIGNAGE TYP. SECOND FLOOR - ACADEMIC CORRIDOR - WEST - PART 2

2

PL-1 WRITABLE LAMINATE PANEL

6' - 6"

DISCOVERY COMMONS

FEC TYP.

1250 Constitution Ave. NE Washington, DC 20002

PT-1

SCALE: 1/4" = 1'-0"

A12.6

TK-1 TACKABLE SURFACE

F

F.5

G

G.8

H

J

PT-1 PAINTED GYPBOARD

K

4 A8.2.2

GPD GLAZED DEMOUNTALBE PARTITION

TL-1 THIN BRICK TILE SEE A - - FOR TYP. TILE PATTERN

2 A11.2

CHILD'S NICHE W/ GL-2 BEYOND WOOD BENCH

PT-3

MATCH LINE

SEE RCP

PL-2

PL-4

PL-2

PL-1

OPEN TO DISC. COMMONS 221

TK-1

PL-7

GPD A-12

P-LAM KEY

PT-8

7' - 0"

TL-1

PT-1

8' - 0"

OPEN TO CORRIDOR 2-3

TL-1

PT-1 OPEN TO BATHROOM 215 PT-1

PL-7

6"

PT-1

SB-1 SMART BOARD PLM LAMINATED PLYWOOD

PT-1

PL-1: WHITE WRITER

A-11

PL-2: CHALKBOARD LAMINATE PL-3: GREEN LAMINATE PL-4: ORANGE LAMINATE

FINISH FLR

ROOM SIGNAGE TYP.

ELEC. DEVICE SEE ELEC.

PL-5: YELLOW LAMINATE

WALL BASE REFER TO FINISH SCHEDULE

PL-6: BLUE LAMINATE

DISCOVERY COMMONS

PL-7: GRAY LAMINATE

SECOND FLOOR - ACADEMIC CORRIDOR - WEST - PART 1

1

PL-8: RED LAMINATE

SCALE: 1/4" = 1'-0"

A12.6

PL-9: CERULEAN LAMINATE 4TH GRADE PL-10: TURQUISE 5TH GRADE

PAINT KEY J

H

G.8

G

F

PT-1: TYP. WHITE/ BASE PT-3: PRE-K GREEN PT-4: K-1 ORANGE

2 A11.2

2 A11.2

PT-5: K-1 YELLOW

2 A11.2 TK-1

PT-6: BLUE PT-11: 5 CERULEAN

MAGNETIC DOOR HOLD

MATCH LINE

PT-8: TURQUOISE CORAL REEF PT-9: SALMON RED DESERT PT-10: OLIVE GREEN TEMPERATE PL-7

PL-7

PL-7

GPD A-8

A-7

A-6

PT-1

PANTRY 212 BEYOND

PT-1

A12.6

TL-1

K-105 05/25/2018

SECOND FLOOR - ACADEMICFEC. CORRIDOR - EAST - PART 2 TYP.

5

SCALE: 1/4" = 1'-0"

A12.6

P

Q

N

M

K

2 A11.2

2 A11.2 TK-1

COLUMN COVER SEE PLAN

FA DEVICE

ROOM SIGNAGE TYP.

RESIN PANEL GRAPHIC IDENTIFIER SEE ENVIRONMENTAL GRAPHIC DWGS

CORK STRIP @ 3', 6' TYP. OF 4 TYP.

CHILD'S NICHE W/ GL-2 BEYOND WOOD BENCH

MATCH LINE

TL-1

GPD

PL-7

PL-7 GPD

Architecture Planning Interiors

TL-1

GPD

TL-1 A-10

A-9

PT-9 FINISH FLR

WALL BASE REFER TO FINISH SCHEDULE TYP.

ELEC. DEVICE SEE ELECTRICAL

SECOND FLOOR - ACADEMIC CORRIDOR - EAST - PART 1

4

SCALE: 1/4" = 1'-0"

A12.6

IFC DOCUMENTS

5/24/2018 3:33:57 PM

C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt

SEE RCP

K K

7

6

5

COLUMN COVER SEE PLAN SEE RCP

SEE RCP

© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED

MAGNETIC DOOR HOLD OPEN

INTERIOR ELEVATIONS - CORRIDORS

FA DEVICE REFER TO FA SERIES

MAURY ES

EXIT SIGN SEE ELEC. TYP.

Revisions

COLUMN COVER

SEE RCP

PL-2

TK-1

4 A11.5

OPEN TO CORRIDOR 302

OPEN TO CORRIDOR 302

PL-1

PT-1

PT-1

PL-1

LEGEND NOTES

LEGEND NOTES GL-1ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET

MAGNETIC/WRITABLE GLASS PANEL GL-2 TEMPERED DECORATIVE GLAZING

PL-10

FINISH FLR

FINISH FLR

PL-1 WRITABLE LAMINATE PANEL

FINISH FLR

WALL BASE REFER TO FINISH SCHEDULE

WALL BASE REFER TO FINISH SCHEDULE TK-1 TACKABLE SURFACE

THIRD FLOOR COMMONS EAST ELEVATION

11

9

SCALE: 1/4" = 1'-0"

A12.8

A12.8

THIRD FLOOR COMMONS SOUTH ELEVATION

10

SCALE: 1/4" = 1'-0"

A12.8

1250 Constitution Ave. NE Washington, DC 20002

8' - 6"

PT-1

THIRD FLOOR COMMONS WEST ELEVATION

SCALE: 1/4" = 1'-0"

PT-1 PAINTED GYPBOARD GPD GLAZED DEMOUNTALBE PARTITION

TL-1 THIN BRICK TILE SEE A - - FOR TYP. TILE PATTERN

SB-1 SMART BOARD

F 5

6

PT-11

SEE RCP

PT-4 PT-4

OPEN TO CORRIDOR 201

TL-1

SEE RCP

TK-1

TK-1

OPEN TO CORRIDOR 201

TL-1

PL-1

SB-1

PT-1

PT-1

TK-1

P-LAM KEY

PL-2

PL-1: WHITE WRITER

OPEN TO CORRIDOR 302

PT-4

PL-2: CHALKBOARD LAMINATE PL-3: GREEN LAMINATE PL-4: ORANGE LAMINATE PL-5: YELLOW LAMINATE

PT-4 FINISH FLR

FINISH FLR

FINISH FLR

FINISH FLR

WALL BASE REFER TO FINISH SCHEDULE

PL-8: RED LAMINATE PL-9: CERULEAN LAMINATE 4TH GRADE 8

SCALE: 1/4" = 1'-0"

A12.8

2ND FLOOR SMALL GROUP 211 EAST ELEVATION

12

SCALE: 1/4" = 1'-0"

A12.8

THIRD FLOOR COMMONS NORTH ELEVATION

4

SCALE: 1/4" = 1'-0"

A12.8

2ND FLOOR COMMONS 221 WEST ELEVATION

SCALE: 1/4" = 1'-0"

PL-10: TURQUISE 5TH GRADE

PAINT KEY PT-1: TYP. WHITE/ BASE PT-3: PRE-K GREEN PT-4: K-1 ORANGE PT-5: K-1 YELLOW PT-6: BLUE PT-11: 5 CERULEAN

5 A11.4 6

PT-8: TURQUOISE CORAL REEF

COLUMN COVER SEE PLAN 7

8 A11.4

A11.4

SEE RCP

5

ALUMINUM STOREFRONT SYSTEM

ENV. GRAPHICS. SEE EG-DWG'S

4

4

FLOOR LOCATION

5

PT-9: SALMON RED DESERT

EXIT SIGN SEE ELEC.

6

PT-10: OLIVE GREEN TEMPERATE PT-1

SEE RCP

TL-1

PT-8

TL-1

WOOD PANEL PT-4 PT-8

PT-8

G

OPEN TO STAIR BEYOND

PT-8

TK-1

OPEN TO CORRIDOR 202

FINISH FLR

CALL BUTTON 6 A12.8

SECOND FLOOR ACADMEIC JOINT - NORTH

SCALE: 1/4" = 1'-0"

5 6

PT-1

FA DEVICE

5

FA DEVICE

6 H

PT-1 4' - 0"

SEE RCP PT-3

SEE RCP

PT-1

PT-3

PT-3

8' - 6"

OPEN TO CORRIDOR 202

PT-3

PL-2

SB-1

PL-2

TK-1

PT-1

PT-3

PL-1

OPEN TO CORRIDOR 2-2

OPEN TO CORRIDOR 2-2

PT-3

4 A11.5

TK-1

PL-2

PL-4

FINISH FLR

FINISH FLR

3 A11.3

1 A12.8

2ND FLOOR COMMONS 221 SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

SEE RCP

PT-1

PT-1

5/24/2018 3:34:29 PM

C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt

K-105 05/25/2018

PL-8

SECOND FLOOR - ACADEMIC JOINT - SOUTH

SCALE: 1/4" = 1'-0"

9' - 2"

5 A12.8

3 A12.8

2ND FLOOR COMMONS 221 NORTH ELEVATION

SCALE: 1/4" = 1'-0"

FINISH FLR

WALL BASE REFER TO FINISH SCHEDULE 2 A12.8

2ND FLOOR COMMONS 221 SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED

A12.8

FINISH FLR

Architecture Planning Interiors

A12.8

2ND FLOOR SMALL GROUP 211 WEST ELEVATON

Revisions

7

PL-6: BLUE LAMINATE PL-7: GRAY LAMINATE

WALL BASE REFER TO FINISH SCHEDULE

INTERIOR ELEVATIONS - CORRIDORS

SEE RCP

PLM LAMINATED PLYWOOD

ALUMINUM CURTAIN WALL SYSTEM

SEE RCP

MAURY ES

F


2

Catalyst of Art -GERMAN SCHOOL INFORMATION CENTER Expression of Tectonic and Materality Year 3: Thesis 2015-2016 The origin of the design started from the imaging shell, grow solid enclosure from the earth and bifurcate out its roof to embrace the ethereal spiritual space. The form of the building generated from the cross section of half vault of glue lam and sloped steel beam. Which create a timeline from ancient to modern, warm cozy and cold stringent contrast throughout the interior space. The opening of roof clearstory following the sun patch from the very north to south gradually closing the room. The small building is trying to express wood and steel structure in a contrasting way. The building is divided into the bookshelf and reading two areas which covered with two different structure types. The book shelf area is covered with a sloped roof supported by the steel frame. The reading area is enclosed with the wood frame structure. The steel frame structure represents an open public character, and the waved like roof further celebrated the tectonic of the steel structure. The wood frame structure is wrapped with two layers of skins. The outside of the skin is patina Cooper that gives the building a chameleon character responding to the ambient light; the interior surface is wood slats which give people a warm and palpable reading atmosphere.

14


15


16


17


18


19


TRIBUNE TOWER LIBRARY A new interpretation of Parametric Gothic Year 2: Spring 2015 The project’s site is adjacent to the famous Chicago Tribune Tower. The whole site located at the east-north corner intersection of North Michigan Ave and Chicago River. The site is sparking a series of iconic buildings from southwest to north-east. They are Marina City, Trump Tower, Wrigley Building and Tribune Tower. The site is looking east to Navy Pier, looking south to Millennium Park. The design of this building has three hierarchies. The first is from the urban scale that follows the line of iconic buildings cutting into the site. This cutting line generated the beamline of the building’s entrance. The height of the building tower is inherent from Marina City. The second design hierarchy is having a dialogue with Tribune Tower. My propose is to set the building back of Tribune Tower from North Michigan, giving Tribune Tower full exposure to North Michigan. Also considering Wrigley Building, Tribune Tower, and the new building as a similar style group, which gives the building a modern but a somewhat hint of Gothic style. The solution is to create a parametric screen system which bears both modern and traditional characters, emphasizing the Gothic style group. The third design level of the project is to explore the interior space of the building. The city library offers people both relaxing and meditation places. Therefore, two atriums were introduced into the library. The spiral ramp atrium gives the library cheered entertainment character while the solid well like atrium present an austere and meditation space. The entrance to the library is choreographed to the two counterpart atriums. People have to experience the two atriums before they get to other function parts of the library. The modular green roof system garden gives the library a third level gateway beside the two atriums.

1, The series of inconic buildings

20

2, The cutting line of the inconic buildings

1, Insert two atriums

3, The cutting line generated main surface of the building

2, Main solid, on

4, The height of building comes from Marina City


entrance and one ne open atriums

3, Choreogrphy the entrance to two atriiums

4, One ramp atrium one staircase atrium

5, The finished circulation of the library and the Tower

Spring Equinox

Summer Solstice

Winter Solstice

Based on soloar study, there are enough sun expoure hours to support the green roof.

5, Giving Tribune Tower full 6, The existing city plaza give expoure to N. Michigan Ave the prelude of the builing

7, The Gothic group style

8, Give Tribune tower North view to Navy Pier

21


22


The background image is the unrolled surface of library, gradation control pattern of library screen

The unrolled surface of tower, gradation control pattern of tower screen

The Grasshopper script of the screen system

The dome structure at the top of the ramp atrium

The roof Gardern based on mudular green roof system

The Grasshopper script of the dome structure

23


24


25


26


27


28


29


CINCINNATI TRANSIT HUB

A fluency character of movement Team: Fulan Zhang, Olga Block Year 2: Summer 2014 The site located in the south of the University of Cincinnati. The Calhoun St and W McMillan St which are one-way streets flanked the site on North and South. The Scioto St, which is also one-way street, is to the west of the site. The Vine St serves as a traffic spine of Cincinnati is on the east of the site. The cars’ driving direction of four streets around the location composed an anticlockwise circulation around the site. We adopted this street flow tendency as a movement circulation into our transit hub body. The ramp starts from W McMillan following the same street car direction and spirals into the transit hub. Given the 14 feet height difference between the Calhoun Street and W McMillan St, the ramp finally flows out at the upper level of the Calhoun Street. The form of the whole building interpreted the sky, the earth and the river in between. The Sky is the apartment building on the top of the transit hub; the irregular rigid facade pattern contrasts with the flowing lifted ground. Given the natural height of topography, we “lift” the surface from W McMillan Street. The motion generated the main vehicle entrance on W McMillan Street and the slop grass pedestrian entrance on the Vine Street. The building roof provides a pleasurable green roof by lifting the surface of the W McMillan. The river between the sky and earth is the ramp inside of the building and the pebble stone on the green surface. The pebble stone is the vertical structure combined with atrium skylight and column. The upper part of the structure is a bubble glass capped on the top of the spread column head. We exaggerated the column structure to express the beauty and the strength of the concrete structure. The roots of column grew from the underground and blossomed at the top of roof giving people a palpable feeling of the building.

30


Credit By Others

Calhoun St

Credit By Others

Vin e

St

W McMillan St

Credit By Others

Credit By Others

31


32


33


The Bubble Columns meet the Ground

The Bubble Columns

The Inerior Ramp

Facade elevation Pattern

34


35


HISTORICAL THEORY Burnet Wood Gate Designed with Classic Order Year 2: Spring 2015 This excise is to design a Gate at the Burnet Wood by using the classic order. I used Corinthian columns as my design element. According to Andrea Palladio’s Corinthian column proportion. The height of Corinthian column is ten times of its diameter. The height of the pedestal is two times of the column diameter. The height of the entablature is two times high of the column diameter. The drawing was finished by hand. Using ink pen for line work and charcoal pencil rendering shadows.

36


37


HISTORICAL PRESEVATION DOCUMENT YMCA building at the UC Campus is the only one Collegiate Gothic Style Building in on the Campus. The building opened March 8, 1930. Designed by Zettel and Rapp.The building features a Collegiate Gothic style of architecture of the Tudor period; it is made of rough textured brick of mellow browns, dull reds, and buff colors, Bedford limestone trimming, and roofed with rough variegated slate. The exterior is very picturesque and enhancing to the landscape, matching also with the gothic styling of Memorial Hall. The building is out of condition. Our work is to document the exterior structure of the building in Revit to provide working file for the further renovation work. My job is to document all the windows and doors according to the detail drawings and our measurement of the building.

38

Clifton Ave

Collegiate Gothic Style Building Team: Fulan Zhang, Brad King Year 2: Summer 2014

Calhoun St


39


INTEGRATED TECHNOLOGY Nasher Sculpture Museum Case Study Year 1: Fall 2013 Nasher Sculpture Museum The tectonic roof structure is the fundamental concept of Nasher Sculpture Museum. The layers of the ceiling structure and the cone shaped aluminum roof panels shows the master design of the building. By using Revit panel system, I successfully reinterpreted the tectonic roof structure.

40


41


3

MOUNT AIRY HOSPITAL RENOVAION KANN Partner Intership Work , Baltimore Year 2: Summer 2015 The concourse space design is the primary interior design of the renovation of the building. I contribute the major design to this space. The existing corner blocked the view of the entrance corridor to the inner concourse. And the sharp corner also gives the entrance a cramming and stagnant space. To solve the difficult problem, I introduced a circle wall as a focal point to smooth out the pointy corner space. Also by layering the cascade roof ceilings to corresponding the focal point the whole entrance area was cheerful up with a fluent and effective wayfinding.

Looking from the main entrance to the concourse (Before)

Looking out from the concourse to the main entrance (Before)

Looking out from the concourse to the main entrance (After)

42

Looking from the main entrance to the concourse (After)e


END OF CURB WALL FLUSH WITH FRAME WALL

CENTER POINT WALL MOUNT ACCESS LADDER

30X42 ACCESS HATCH ABOVE

CHANNEL GLASS WALL

13' HIGH CEILING - BULKHEAD TYPE #3

26' HIGH CEILING BULKHEAD TYPE #5 20' HIGH CEILING BULKHEAD TYPE #4

16' HIGH CEILING BULKHEAD TYPE #2

16' HIGH CEILING BULKHEAD TYPE #1

REAR MOUNTED SNAP-IN ACCESS PANELS FOR LIGHT MAINTENANCE ALONG ENTIRE CIRCUMFERENCE OF RADIUS WALL

RADIUS STEEL PLATE AND TUBE FOR CHANNEL GLASS AND RADIUS FRAME WALL

20'-0" CEILING

10'-0" CEILING

13'-0" CEILING

16'-0" CEILING

8" 9'-4"

U CHANNEL GLASS

10'-0"

3-5/8" Cold-Formed Steel Stud @ 16" O.C.

43


CAIRO CHILDREN’S HOSPITAL RTKL Associate Intership Work, DC Year 2: Fall 2014

Cairo Children's Hospital is an extension project of the existing hospital. The limited site area and the largely requested building area is the key to the success of the project. I Worked on predesign to schematic design, including master plan design, outpatient department configuration, research studies of cancer hospitals and Egyptian cultures.

Credit By Others

44


45


GREEN WATER HIGH RESIDENTIAL BUILDING SCB Architects intership Work , Chicago Year 1: Spring 2014

I was mainly working on the 6A’s drawing of the project in construction document phasing. I built cabinet and furniture in Revit and put the elevation in sheets of 6A’s drawings. I also worked exterior facade at the schematic design phase. By using Revit panel system which gives the project fast but accurate schematic facade study.

Credit By Others

46


Credit By Others

WINE RACKS OVER BASE CABINET

1/2" FIN. SIDE PANEL 3'-0"

A4.62

1'-6"

2'-0"

1'-10"

4"

U-PNT-01

2'-6"

U-CNTR-02

10"

4" 6"

4" 6"

1'-10"

U-PNT-01 2'-0"

U-CAB-03 9'-7" U-CAB-03 3'-10 3/4"

4C A6.63 4A

1'-6"

3'-2"

5'-11 3/8"

U-CAB-03 5'-10"

U-CNTR-02

U-CNTR-02

U-CAB-03 3'-0"

3'-0"

3'-0"

U-CAB-03

3'-0"

1'-6"

U-BS-01

1'-6"

1'-6"

1'-6"

U-BS-01

U-PNT-01

4B

U-CAB-04

2"

U-CAB-04

3'-5 1/8"

3'-6"

3'-6"

3'-6"

3'-6"

OPEN TO BEYOND

U-RB-01

3'-0"

2'-0"

2'-3"

1'-9"

2'-6"

1'-9"

3'-0 3/4"

1" FILLER

4C

1'-6"

3/4" FIN. SIDE PANEL

KITCHEN ELEVATION - UNIT B11a

4B

SCALE: 1/2" = 1'-0"

KITCHEN ELEVATION - UNIT B11a

4A

SCALE: 1/2" = 1'-0"

KITCHEN ELEVATION - UNIT B11a

1/2" FIN. SIDE PANEL 5/8" FILLER 2'-6"

KITCHEN PLAN - UNIT B11a SCALE: 1/2" = 1'-0"

1" FILLER

1'-6"

3'-0"

1'-6"

U-CNTR-02

4"

6"

4" 6"

1'-6"

6"

4

SCALE: 1/2" = 1'-0"

2'-1 3/8"

2'-3"

U-PNT-01

2'-2"

2'-0"

U-PNT-01

U-CAB-03

5'-6"

3'-2 1/8"

1'-6"

3B

U-CAB-04

4'-0 7/8"

3A

4'-6"

2"

U-CAB-03

A6.63 3C

OPEN TO BEYOND 8'-4"

8'-4"

9'-7"

2'-1 1/4"

5'-10"

U-CNTR-02

5'-10"

U-CNTR-02

3'-0"

3'-0"

U-CAB-03

SEE BUILDING ELEVATIONS

2'-9 1/8"

3'-0"

1'-11 7/8"

1/8" FILLER

1'-9"

KITCHEN ELEVATION

T/ FIN FLR

SEE BUILDING ELEVATIONS

SEE BUILDING ELEVATIONS

1'-6"

2'-6"

1'-6"

3'-1 5/8"

1'-6"

1/2" FIN. SIDE PANEL

3B

SCALE: 1/2" = 1'-0"

T/ FIN FLR

KITCHEN ELEVATION

3A

SCALE: 1/2" = 1'-0"

KITCHEN ELEVATION

3

SCALE: 1/2" = 1'-0"

1" FILLER 1'-3"

1/2" FIN.SIDE PANEL 3'-0" 1'-6"

2'-6"

KITCHEN PLAN - UNIT B2 SCALE: 1/2" = 1'-0"

1'-6" 2'-0"

5'-6"

2'-0"

3'-6"

U-CAB-04

U-CAB-03

2B 2A

2"

6'-2"

3'-6" 5'-4"

4'-4 5/8"

4" 6"

4"

4"

4" 6"

2'-0"

U-PT-01

U-CAB-03

U-PNT-01

A6.63

2C

U-CAB-03

T/ FIN FLR

3C

U-CAB-03

U-BS-01

U-CNTR-02

U-CNTR-02

OPEN TO BEYOND

EXTERIOR WINDOW. SEE A3 SERIES

U-CAB-03

3'-1 1/2"

5'-10"

U-CNTR-02

1'-6"

1'-6"

U-BS-01

U-CAB-03 1'-3"

3'-0"

3'-0"

3'-0"

3'-0"

" 3/4

FIN.END PANEL

3 1'-

3'-6 3/4"

FIN. END PANEL U-CAB-03

T/ FIN FLR SEE BUILDING ELEVATIONS

T/ FIN FLR

T/ FIN FLR 2'-0 1/2"

3'-0"

SEE BUILDING ELEVATIONS

2'-6"

2'-0"

SEE BUILDING ELEVATIONS

5 1/8"

1'-3"

3'-1"

1'-6"

2'-6"

1'-6"

1/2" FIN. SIDE PANEL

2C

KITCHEN ELEVATION - UNIT B1

2B

SCALE: 1/2" = 1'-0"

KITCHEN ELEVATION - UNIT B1

2A

SCALE: 1/2" = 1'-0"

KITCHEN ELEVATION - UNIT B1

2

SCALE: 1/2" = 1'-0"

KITCHEN PLAN - UNIT B1 3

02.28.2014 ISSUED FOR 100% CONSTRUCTION DOCUMENTS 12.11.2013 PERMIT COMMENT REVISIONS 11.15.2013 FINAL GMP/95% CONSTRUCTION DOCUMENTS 08.30.2013 ISSUED FOR PERMIT 08.09.2013 ISSUED FOR CONCRETE FRAME PACKAGE AND 40% CONSTRUCTION DOCUMENTS NO. DATE DESCRIPTION

SCALE: 1/2" = 1'-0"

1

2'-8"

1/2" FILLER 3'-0"

1'-0"

2'-6"

1'-6"

1'-1 1/4"

GREEN WATER U-PNT-01

3'-10"

2'-0"

U-CAB-04

2'-0"

5'-11 1/2"

2'-0"

3'-1"

OPEN TO BEYOND

1A

1C

A6.63

6 1/2"

U-CNTR-02

3'-0"

U-CAB-03 3'-0"

Austin, Texas © 2013 Solomon Cordwell Buenz

3'-1 1/2"

U-CAB-03

6'-2 7/8"

1'-6"

U-CNTR-02

1'-6"

1B

1'-6"

U-BS-01 U-BS-01

5'-10"

Mixed-use Development 1A

3'-6"

U-CAB-03 U-CAB-04

3'-0"

2"

5'-4" 3'-10"

2'-0"

2'-0"

4"

U-PNT-01

6"

3/4"

4"

3'-0"

U-CNTR-02

T/ FIN FLR T/ FIN FLR

SEE BUILDING ELEVATIONS

T/ FIN FLR SEE BUILDING ELEVATIONS

3'-0 3/4"

3'-0 1/4"

1" FILLER

2'-1 3/8"

1'-6"

2'-6"

1'-6"

2'-0"

7 1/4"

SEE BUILDING ELEVATIONS

5'-3 3/8" 1'-0"

3'-0"

2'-0"

3"

2'-4 7/8"

1 1/2"

1/2" FIN. SIDE PANEL

1C

KITCHEN ELEVATION - UNIT A21 SCALE: 1/2" = 1'-0"

1B

KITCHEN ELEVATION - UNIT A21 SCALE: 1/2" = 1'-0"

1A

KITCHEN ELEVATION - UNIT A21 SCALE: 1/2" = 1'-0"

ENLARGED UNIT KITCHEN PLANS & ELEVATIONS

1

KITCHEN PLAN - UNIT A21 A16, A19, A20, A24 SIM. SCALE: 1/2" = 1'-0"

Drawn By: RC Checked By: JY Project Number:

2011041

Sheet Number:

A6.63

47


4

QINHUANGDAO PHOENIX ISLAN URBAN DESIGN

Credit By Others

UDT Architects Work, Beijing,China, 2013 This is an urban design project; we created the whole city area near Qinhuangdao and focusing on two manmade islands of the area. My work is to compose groups of architectural forms filing into the Phoenix Island. Thus, giving the client a dream image about what is the island looks like when it is fully developed. To combine different forms of building to create a stunning skyline is the primary goal in this design. The design also provides an architectural guideline to architects working on the further architectural design.

Credit By Others

48


Credit By Others

Credit By Others

49


MENTOUGOU BEIJING RESIDENTIAL MASTER PLAN GBBN Architects Work, Beijing,China, 2012 programming tabulation Plot name

2 Plot area M

B1 B2 B3 B4

10248 3343 6584 10201

6141 2593 4898 5544

0.6 0.78 0.74 0.75

30 15 29 43

C1 C2 C3 C4 C7 C8 C9 C10 C11 C12

35036 1851 2062 3750 1815 1399 2940 23874 882 8186

16289 1140

0.46 0.62 0.37 0.31 0.56 0.55 0.57 0.75 0.52 0.67

81 6

SUM

122,244

63,274

Residential floor area

767 1145 1010 766 1684 17905 461 5498

The hilly site located in the Mentougou, the suburb of Beijing. The whole site can be divided into two main areas, and one contains existing villages’ residence which our design strategy is to maintain the yard of the house but demolish the dilapidated old building in the yard and infill new buildings inside. The other areas are a totally new site which our design strategy is to arrange the plan according to the natural contour and get the similar texture from the existing village clusters. My contributions to this project are acting as a chief designer and project manager. Personal responsibilities including designing the master plan and leading a team to finish the whole schematic design. The 3D overviews of the newly designed areas which the design concept is based on respecting to the existing hilly topography and simulating the yard cluster from the existing yard texture. 50

Commercial floor area

10,186

FAR

0.6

Units Number

2

105

338


51


52


The 3D overviews of the newly designed areas which the design concept is based on respecting to the exsiting hilly topography and simulating the yard cluster from the existing yard texture.

53


The design strategy is to maintain the yard cluster of the residence but demolish the old building and infill new buidings in the yard.

The 3D overviews of the infilled new buildings in the existing yard areas which gives people a sense of preserved historical context of the untouched yard space and a new life style of the infilled new building.

54


55


56


57


XIAMEN ELITE RESIDENTIAL MASTER PLAN GBBN Architects Work, Beijing,China, 2010

Profile of buildi 58


Credit By Others

A design proposal was requested by the client that satisfies the requirements of the new resident of the new satellite town. Emptiness lies between Zhangzhou city and Xiamen city. The site of 45 hectares is in the southwest of the Xiamen and southeast, east Zhangzhou. It sits against South Taiwu Mountain and face to the sea coat surrounded by a chain of famous sightseeing and cultural tourism. This arrangement provides lucrative opportunities for development and regeneration. The 45 hectares areas serve as a tourist resort, commercial business center, and a relaxation living areas. Extracting inspiration from this relationship, the design proposal seeks to iterate these natural circumstances into an internally autonomous urban system that liberates a central space of activity as rings of program centrally radiate out to establish zones while maintains its perimeter. Circulation progresses along the coastal central business areas that finally meet at the cultural center. With integrated, functional design concept, we provide people whom in all kinds of age, profession and background excellent resorts. My personal contribute to this project is acting as a chief designer for the master planning and the convention center. Individual responsibilities including designing the masterplan, doing the mass research by using grasshopper and developing the convention center, doing the massing study from the physical clay model and the go into grasshopper to build up the perfect terrace on the sculptural massing shape.

ings 59


The convention center is a building compromised of landscape and exhibition center. The building’s uncommon exterior form works in harmony with the natural surroundings, thanks to a kind of artificial camouflage of the green landscape. Part of the fun of reviewing misinterpreted as a landscape, despite its real function as a two story building with exhibition rooms. Stretched out along the circular square on the south to get more sunshine, the terraced tail of the building serves as an amphitheater to the people. Threaded between the lake and the water landscape is a path that leads to layers of stairs on the outside curve of the house. These stairways provide an external access to the parabolic roof garden. Landscaped with brush and plants, the roof garden in conjunction with the grassy inner courtyard of the pool area- forms what I call architectural nature. This central recreational area creates a vital link between the lake and the building cluster.

60


61


The modern Chinese city is dominated by a single housing typology: the compound. It consists of some cloned apartment towers on a leveled piece of land with a landscape theme garden at the center bordered by a fence, a wall or a row of shops. Based on Chinese standard the sunshine hour is strictly required and the north-south orientation always has the priority to other directions. In this project, all the residence type are arranged according to the principal of maximizing the value the site and the idea of generating dynamic landscape. The hierarchy of the site divided into three ranks. They are the lakeside view, Mountain View, and center scene. All the buildings are arranged to use best of these three levels of the scene. The best view is the lakeside which we put the best quality and lowest of residence type such as villa on the first row of the lakeside, and we put multiple homes in the second row and third row so that part of this house can still have the lake views. But we also interpose some high-rise residence building near the lakeside to generating a dynamic skyline and also give an axis vies of the landscape. 62


Total floor area 683,070 square meters Total plot area 341,86 square meters Total FAR 2 Plot 1 Floor area 206,920 square meters Plot area 82,607 square meters FAR 2.51 Plot 2 Floor area 136,280 square meters Plot area 65,062 square meters FAR 2.1 Plot 3 Floor area 33,9870 square meters Plot area 19,419 square meters FAR 1.75

High rise tower floor area 458,050 square Credit By meters Others Proportion 67% Sub-high rise tower floor area 124,470 square meters Proportion 18% Multiple layers building floor area 65,739 square meters Proportion 10% Townhous floor area 34,799 square meters Proportion 5%

63


TIANJIN WUQING RESIDENTIAL SALES PAVILION GBBN Architects Work, Beijing,China, 2011

This is my first design building that was built. I was excited to visit the site. The client wanted the sales pavilion to have both Art-deco style and the modern amorphous style which gives a fresh view by contrast two different styles. My personal contribute to this project is act as a chief designer and project manager included designing the building, finishing Revit drawings and cooperating with construction company while constructing the building.

64


65


66


67


QINGDAO BAIGUOSHU RESIDENTIAL SALES PAVILION GBBN Architects Work, Beijing,China, 2009

The Baiguoshu project is an extensive residence planning and architectural design. My personal contribution to this project is acting as a chief designer included developing the master plan and the central commercial buildings which have one sales pavilion, and a string of commercial buildings. The theme of the buildings are the new Renaissance classic styles. To give the commercial buildings and sale pavilion an abundance elevation view, I used Cascade roof to building the mass, first I apply the biggest roof to dominate the central spaces of the building, and then I insert sub roof around the main roofs to get a hierarchy of the shape. I also did the Sketchup model and the final SketchUp renderings.

68


69


70


71


DRAWINGS AND HOBBIES

72





To Be Continued Thank you!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.