Fulan Zhang Selected Works 2009-2019
To The Glory of Architecture
SEEKING ARCHITECTURE After a long time of working in architectural field, the word Architecture became vaguer and more paradoxical. It mired in the mundane tasks and efforts of catering to clients’ tastes and meeting deadlines and budgets. In retrospect, what values should architects bring to the work to balance between idealism and reality is a perpetuating question. The collection of my work contains my current work in DLR group, my studio work in University of Cincinnati, my internship work in the US and my past professional work in China. The earliest of my independent design work dated back to 2009. The broad scope of my job is ranging from urban design to Residential master plan, from conceptual design to construction documents focused on core and shell detailing. In DLR group I geared my direction to CD and CA phases to gain detailing skills to enhance my design ability. In graduate school, I was interested in parametric and historical architecture where brought most of my inspirations. Not only the beauty of design, the realization of materiality is even more intriguing. Detailing is the DNA code to convey the design from ideal to reality. Thus, I focused on manifestation of the beauty of architecture through bridging artistically inherited details.
CONTENTS M. Arch Applicant Spring 2016
1
CURRENT WORK (DLRgroup) Credit By Others
Note: Only renderings with this star symble on the upper left corner is not directly poduced by me. But I supervised the out coming. All the conceptual works, drawings, renderings without the star symble are produced by me. All the parts of CD works shown here is produced by me.
2
SCHOOL WORK
Chesterfield Center for the Arts (Revit/Detailing)
4
Jamestown Exhibit Settlement Refresh (CAD/Detailing)
6
Tampa Theater Renovation (Revit/3dMax Rendering)
8
Freeman Amphitheater (Revit/Detailing)
10
Maury Elementary School (Revit/Casework Design)
12
Catalyst of Art (Revit/Rhino/Grasshopper)
14
Tribune Tower Library (Revit/Rhino/Grasshopper 3dMAX) 20
3 4
INTERNSHIP WORK
PROFESSIONAL WORK IN CHINA
Cincinnati Transit Hub (Revit/Rhino/3dMAX)
30
Historical Theory ( Hand Sketch)
36
Historical Preservation Document (Revit/Detailing)
38
Integrated Technology (Revit/Detailing/Rendering)
40
KANN Partner Mount Airy Hospital Renovation (Revit)
42
RTKL Cairo Children’s Hospital (Revit)
44
SCB
46
Montrose High Residential Building (Revit)
Phoenix Island Urban Design (Leading designer)
48
Mentougou Residential Master Plan (Leading designer)
50
Xiamen Elite Residential Master Plan (Leading designer) 58 Wuqing Residential Sales Pavilion (Leading designer)
64
Baiguoshu Residential Sales Pavilion (Leading designer) 68
1
Credit By Others
Chesterfield Center for the Arts 2018-2019 A new performing arts center adjacent to an existing library with new parking expansion. The plan includes seating for 361, inclusive of loose seating in the orchestra pit. The design would allow a full range of performance types supported by a large multi-purpose space, green room and several dressing rooms.
3/8/2019 10:45:14 AM
Issued / Revised No. Date Description 1 11/6/2017 Schematic Design 2 9/14/2018 DD QAQC 3 9/28/2018 DESIGN DEVELOPMENT 4 3/08/2019 ISSUED FOR BID & PERMIT
10
8
2
6
18 A-402
4
A-301
1
3
A-202
2
A-302
1
Sheet Keynotes
1
1 AS-502
AS-502
05-014
2 8 A-501
Janitor Closet 106
C
110C
A4
2
2F
106
A4
Men's Restroom
A4
112
108
A3
L1
110
109
A4
A5
109
A4
A-514
Lobby
G
2
139
3
SLL A4
A
101
102
002
B
119
5 A-405
5
05-034
123
Star Dressing Room
UP
A
A
9
8
2 A-311
136
10C
A
C
135A
137
C
3
AV & Other
A
137
137A
IT
137B
M2
A-404
135
A
134A 134
C
A
4' - 0"
T / STAGEHOUSE CORNICE 50' - 0"
2
E
Multi-Purpose Room
135B
10-001
04-006
07-013
A-312
07-020 07-024
T/ ROOF SCREEN 23' - 10"
133B
B
AS-501
07-029
LOWER T/ LOBBY CATWALK PARAPET LEVEL 17' - 0"
13
05-014
4 C
32-002
C
1
Checked by:
2' - 4 11/16"
Checker
AS-501
7' - 2" 1' - 1"
3' - 6" 6" 3' - 4" 6" 3' - 6"
11' - 4"
2' - 8"
11' - 4"
2' - 8"
6"
7' - 4"
2' - 8"
7' - 4"
3' - 4"
6"
2' - 8" 4' - 4" 2' - 8"
4' - 0"
3' - 4"
11' - 4"
4' - 0"
3' - 0" 3' - 4"
2' - 8"
4' - 8"
07-012
133 14
2' - 8"
04-008 05-010 05-016 06-012
Gallery
1
7' - 4"
03-001 04-005
C8
4' - 0"
B
2' - 8"
131 C
K1
4' - 0"
4' - 0"
2' - 6"
133
C8
133A
C
1' - 6"
A
C8
135
4' - 0"
4' - 0"
Catering 134
05-010
A-203
A
10
C
A-201
3' - 4"
4' - 8"
3' - 4" 3' - 0"
25' - 4"
07-052 10-001 10-002 10-005 22-014
1 1 A-404
LOBBY LEVEL 0' - A-201 0" CROSS AISLE -2' - 6"
SEE 2/AS202 FOR TYPICAL KEYNOTE
Green Room 126
B M2 Issued / Revised No. Date Description 1 9/14/2018 DD QAQC 2 3/08/2019 ISSUED FOR BID & PERMIT A 138
A
05-016 07-052
144A
M1
145
M2
A
136
A-201
125
C
C
2
Star Restroom 1 A-411
Stair
146A
" -4
06-015
146
5
L
125
124
144 DN
146
' 11
6
SLL
A-407
L
A
146B
26-003 32-002
06-006
F
1 A-401
132 127
A
132
Sheet Keynotes C
E.7
H
Mens Chorus
Storage
A
C
126
127
E
128
BRICK LEDGE RECESSED BRICK PANEL 1" RECESS Bathroom RUNNING BOND 10-021 A2 FACE BRICK - SOLDIER COURSE 7 5/8" TALL; 128 LIPPED BRICK FACEClassroom BRICK - COMMON BOND METAL FIXED 131 LADDER, GALVANIZED PAINTED STEEL, C7 PAINTED METAL RAILINGS Womens 130 GLASS-FIBER-REINFORCED PLASTIC,
C6
Bathroom
COLUMN - TUSCAN PROFILE, TYP EXTERIOR INSULATION AND FINISH SYSTEMS, MIN. 3" RECESSED PANEL, TYP. EXTERIOR INSULATION AND FINISH SYSTEMS, PREFINISHED CORNICE ASPHALT SHINGLES SNOW BIRDS @36" O. C. EXTERIOR ARCHITECTURAL ARCHITECTURAL 118 FIBERGLASS TRIM
22-012
129 A2
129
Chorus
D 11
AS-501 12
130
7
H
AS-501
C
05-014
3
SHEET METAL FLASHING AND TRIM, B DN PREFINISHED ALUMINUM CORNICE TRIM SNOW GUARD, TYP. DISPLAY CASES - POSTER EXTERIOR PIN MOUNTED METAL SIGNAGE 10" TALL EXTERIOR PIN MOUNTED METAL SIGNAGE 5" TALL LAMBS TONGUE -SECONDARY (EMERGENCY) STORM SEWER OUTLET COVER WALL SCONCE LIGHT FIXTURE - SEE 1 ELECTRICAL A-302 CUSTOM-FABRICATED DECORATIVE STEEL GATE AUXILIARY ITEM, 1/8" STEEL PLATE, WELD TO PICKETS; GRIND WELD SMOOTH
5' - 0"
-4
" 5/8
3/8/2019 10:32:22 AM
C
A
07-024
18' - 2 1/4"
123
122
124
A-407
1'
-3
5
1A
7' - 4"
G
Star Restroom 122
3
A-514
4
"
' 13
4
1B
2' - 8"
AS-503
118
Star Dressing Room
C
6'-0" H. BRICK ON 4" BLOCK ENCLOSURE W/ SLOPING 4" STONE CAP (2) 3'-6" X 5'-0" GALV. MTL. DOORS W/ 3" UNDERCUT Patio 135B
06-004
4' - 0"
AS-503 2
Corridor
2
1
© DLR Group
B
Chesterfield Center for the Arts
AS-501
A
9
7/8"
B
A4
1
3
3
121
06-015
C
2
11-001 B
Storage
1 A-406
A-514
1 A-405
A4
101
1C
1
DN
B
B
A-406
18
12-006
Concession
A-203
DN
120
121
Stage
1E
23 A-402
H Em. Elect
B
119
B
M1
A-301
AS-502
B
120
1
4
144C
101A
A
102
117A
2 A-514 6
141
140
139A
1D
B
10-022
144
Audience Chamber
A-407
House Mix Position
139
102A
J
116A
Piano Storage
3 A-514
148
12-006 22-012
AS-502
EXTERIOR HANDRAIL- SEE FINISH SCHEDULE FOR FINISH 2' HIGH LUMENRAIL; 4' O.C. POSTS STAINED WOOD MILLWORK MAKE-UP STATION WOOD HANDRAIL VISUAL DISPLAY UNIT (8'-0"X4'-0") CORNER GUARDS DOCK BUMPERS MANUAL ROLLER SHADE (TYP @ ALL EXTERIOR WINDOWS) SOLID SURFACE COUNTERTOP SHOWER CONTROL AND SLIDE BAR - SEE PLUMBING
Docking/Receiving
6 A-514
Lift #1 E
139B
Box Office
143
144D
5 A-514
DN E1
A-407
12-002
009
7 A-514
100
A
C
25' - 3 7/8"
M1
35' - 0"
A A
2B 2A
116
M1
Lift #2
A
8 A-514
11
L
100
A-542
3
CLR.
B
117
147
C
G
115
117
SLL
A
103
16
114
5' - 0"
144B
A
2C
147
Vestibule 103
116
3' - 9 1/4"
1 A-407
D
113
1' - 0"
Electrical
B A
M1
110B
A-514
115
111
111 10
G
114
K
001
Office
A
A4
G
A
M
AV
L1
IT
A A
Corridor
Restroom
L
2D
113 H1
110A
H
A2
108
A4
A
112
K H
A3
Toilet A
105 10 A-403
A5
K
Office
Mechanical
A5
105
2E
A
107
107 A4
A4
C
Women's Restroom
A4
K
C
A5
A-202
05-034 06-004 06-006 06-015 10-021 10-022 11-001 12-002
21' - 0"
6
Commision #17PR0145 11810 Centre St, Chester, VA 23831
AS-501
03-001
2' - 8"
11' - 4"
419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004
2' - 6 7/8"
9
EXTERIOR ELEVATION - WEST
5
3
2
1
T 202.393.6445 WWW.DLRGROUP.COM
1/8" = 1'-0"
FIRST LEVEL
4'
8'
16'
FIRST FLOOR PLAN
05-010
1/8" = 1'-0"
3/8/2019 2:53:54 PM
1
07-013
07-012
Drawn by:
Author
0'
2F
2E
0' 10
2D
9
8
6
4'
8'
Issued / Revised No. Date 1 9/14/2018 DD QAQC 2 3/08/2019 ISSUED F
WD
16'
5
4
3
A-101
2
1
07-029
2A
07-012
T / STAGEHOUSE CORNICE 50' - 0"
26-003 04-005
07-013
04-006
07-012
07-020
07-020
04-005
07-052
04-008
T / STAGEHOUSE CORNICE 50' - 0"
07-020 07-021
10-003
10-002
Preliminary Not For Construction
07-024
04-007
07-029
07-021
07-035
22-014
T/ ROOF SCREEN 23' - 10"
T/ ROOF SCREEN 23' - 10"
T/ LOBBY PARAPET 17' - 0"
Checked by:
2
4' - 4"
3' - 0"
2' - 7"
1' - 0" 11"
Exterior Elevation South 1/8" = 1'-0"
1 0'
4'
8'
16'
EXTERIOR ELEVATION - EAST 1/8" = 1'-0"
419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004
2' - 8" 1' - 4"
9' - 0"
1' - 4" 2' - 8"
10' - 8"
2' - 8" 1' - 4"
9' - 0"
1' - 4" 2' - 8"2' - 8" 1' - 4" 4' - 4" 1' - 4" 2' - 8"
2' - 8" 2' - 8" 1' - 4" 4' - 4" 1' - 4" 2' - 8" 1' - 4"
8' - 4"
9' - 0"
1' - 4" 2' - 8"2' - 8" 4' - 4"
LOBBY LEVEL 0' - 0" STAGE LEVEL -2' - 6"
5' - 4"
3' - 9 1/4"
12' - 0" 2' - 4"
11800 Centre St. Chester, VA 23831
6' - 8"
LOBBY LEVEL 0' - 0"
2' - 4"
LOBBY LEVEL 0' - 0" STAGE CROSSLEVEL AISLE -2' - 6"
5' - 6 3/4"
03-001 11' - 0"
Commission #: 55-15003-10 2' - 4 3/4"
1' - 4"
8"
2' - 4 3/4"
2' - 4 3/4"
2' - 0"
Checker
03-001
15' - 3 1/4" 9' - 0"
2' - 8"
11' - 8"
2' - 8"
SEE 2/AS202 FOR TYPICAL KEYNOTE
T 202.393.6445 WWW.DLRGROUP.COM
0'
4'
8'
Author
EXTERIOR ELEVATIONS
Drawn by:
WD
1
08-001 10-002 10-003 22-014
Chesterfield Center for the Arts
22-014
2' - 8" 2' - 8" 4' - 4"
LOWER T/ LOBBY CATWALK PARAPET LEVEL 17' - 0"
© DLR Group
06-012
04-006 04-007 07-012
7 A-502
10-002
10-005
07-029
Sheet K 03-001 04-005
A-202 A
07-029
D
E
E.7
F
G
H
07-012
K
16'
BRICK LEDGE RECESSED BRIC RUNNING BOND FACE BRICK - SO LIPPED BRICK FACE BRICK - RO EXTERIOR INSUL MIN. 3" RECESSE ASPHALT SHINGL FABRICATED WA ROOF SCREEN W SHEATHING, 1" E SHEET METAL FL PREFINISHED AL MANUFACTURED DOWNSPOUTS HOLLOW METAL EXTERIOR PIN M TALL EXTERIOR PIN M TALL LAMBS TONGUE STORM SEWER O
3/8/2019 11:20:48 AM
07-033
C
2D
Issued / Revised No. Date Description 1 3/08/2019 ISSUED FOR BID & PERMIT
07-033
B
06-002 06-001 LOWER T/ LOBBY CATWALK PARAPET LEVEL 17' - 0"
T/ LOBBY PARAPET 17' - 0"
07-026 05-009
07-026 07-029
07-009 06-003
07-029
05-002
DRIP
Sheet Keynotes
05-003
04-001 04-003 04-005
07-007
04-006
07-007
04-007 04-008 04-015 05-002 06-012
06-001 06-003 06-008 06-009 07-001
07-001
07-005 07-007 07-015
04-008
1
A-312
07-018
WALL SECTION -THROUGH CANOPY
1" 04-005
1"
07-024
DASHED LINE INDICATE EXTENT OF MOCKUP WITH REQUIRED, INCLUDING TYP. CORNICE CONDITION, BOTTOM THROUGH WALL FLASHING CONDITION
07-026 07-029 07-030
MORTAR WASH, TYP.
07-032
BRICK COMMON BOND
07-018
07-033
2' - 3"
08-006
3 5/8"
06-008
3' - 4"
07-049 08-006 09-005 26-001
ROWLOCK
05-002
6"
3' - 4"
6"
07-001
04-006
5 1/4" WINDOW TRIM 12' - 0"
04-003 04-007
ACTURAL WINDOW SIZE 6' - 8"
07-032
WALL SECTION -THROUGH WINDOW HEAD @ LOBBY LEVEL
07-049
1 1/2" = 1'-0"
6"
6"
07-023
6"
6' - 8"
04-005 1"
BRICK RECESS RUNNING BOND
9' - 4"
3/8" 6"
05-002
2
07-032
BRICK SOLDIER COURSE 6"
04-006
7 5/8"
7 5/8"
04-006
A-311
07-017 07-018 07-023
1 1/2" = 1'-0"
07-001
MORTAR WASH, TYP.
4 1/4"
07-030 26-001
06-008
06-008
06-001
07-024
3/8" JOINT
04-015 4 1/4"
Lobby Level 0'-0"
07-032
Lobby Level 0'-0"
4 1/4" STONE SILL 1' - 4"
2' - 4 3/8"
07-049
07-030
2' - 5"
07-049
GROUTED SOLID MASONRY CAVITY HEAD JOINT WEEPS @ 16" O.C. RECESSED BRICK PANEL 1" RECESS RUNNING BOND FACE BRICK - SOLDIER COURSE 7 5/8" TALL; LIPPED BRICK FACE BRICK - ROWLOCK 3 5/8" TALL FACE BRICK - COMMON BOND CAST STONE STRUCTURAL STEEL (BM, COL, TUBE, PLATE, ANGLE, CHANNEL) -SEE STRUCT BLOCKING, FIRE TREATED 5/8" GLASS MAT EXTERIOR GYPSUM BD SHEATHING WOOD TRIM WOOD BASE CAVITY DRAINAGE MATERIAL (SIZE WIDTH TO CAVITY) 1.5" R-7.5 EXTRUDED POLYSTYRENE INSULATION (AT FOUNDATION PERIMETER) MINERAL FIBER BATT INSULATION SMART VAPOR RETARDER @FIBERGLASS BATT INSULATION VAPOR BARRIER (UNDER SLAB ON GRADE) FLUID APPLIED PERMEABLE BARRIER GLASS-FIBER-REINFORCED CEMENTITIOUS PANELS FIBER CEMENT TRIM AND PANEL EXTERIOR ARCHITECTURAL ARCHITECTURAL FIBERGLASS TRIM EPDM ROOF SHEET METAL FLASHING AND TRIM, PREFINISHED ALUMINUM CORNICE TRIM STAINLESS STEEL MASONRY FLASHING WITH FULL DRIP SELF ADHESIVE FLASHING, HOLD BACK 3/4" FROM FACE OF BRICK PREFINISHED ALUMINUM COPING WITH DRIP EDGE JOINT SEALANT AND BACKER ROD ALUMINUM WINDOW SYSTEM PAINTED GYPSUM WALL BOARD LIGHT FIXTURE - SEE ELECTRICAL
06-003 04-005
4' - 4"
1' - 4"
7' - 0"
Stage Level -2'-6"
07-005
4
07-007
A-312
WALL SECTION -THROUGH WINDOW HEAD @ STAGE LEVEL
1' - 4"
1 1/2" = 1'-0"
4' - 4"
1' - 4"
7' - 0"
07-018
@STAGE LEVEL
@ LOBBY LEVEL
04-008 07-049 09-005
6
07-032 04-015
Checker
VARIES, SEE ELEVATION
07-017
1/2" = 1'-0"
0'
04-003
04-005 07-015
1"
07-001
06-009
Author
4'
© DLR Group
04-008
STAGE CROSSLEVEL AISLE -2' - 6"
07-030
419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004
04-001 STAGE CROSSLEVEL AISLE -2' - 6"
T 202.393.6445 WWW.DLRGROUP.COM
03-003
Drawn by:
2'
Commision #17PR0145 11810 Centre St, Chester, VA 23831
07-018
07-032
1'
Chesterfield Center for the Arts
07-030
04-003
Checked by:
TYPICAL WINDOW ELEVATION DIAGRAM
EXTERIOR SECTION DETAILS
09-019
WD
3
A-311
WALL SECTION -THROUGH WINDOW SILL @ LOBBY LEVEL
5
A-312
1 1/2" = 1'-0"
A-503
WALL SECTION - THROUGH WINDOW SILL @ STAGE LEVEL 1 1/2" = 1'-0"
0'
1'
2'
3/8/2019 10:46:45 AM
Issued / Revised No. Date Description 1 9/28/2018 DESIGN DEVELOPMENT 2 3/08/2019 ISSUED FOR BID & PERMIT
1E
1D
1C
1B
10
8
6
4
3
2
1
BUILDING ENVELOPE NOTE: Roof R-25 continuous (~5” of polyiso to get to R-30)
1 A-502
Walls (Mass / EIFS) R-11.4 (~3” of EPS) Walls (Metal-Stud) R-13 batt + R-7.5 continuous (2” XPS and 6” batt) Below-Grade Wall - Orchestra Pit R-7.5 (~2" of EPS)
5 A-561
T / STAGEHOUSE CORNICE 50' - 0" T / STEEL STAGE 47' - 0"
Slab-on-Grade R-10 for 24” below (~2" of EPS)
GWB PANELING SEE A514 RAMP OUTSIDE AISLE BYOND
07-042
T / STEEL AUDIENCE CHAMBER 34' - 4"
2 A-312
TRANSVERSE CATWALK 25' - 6"
T/ ROOF SCREEN 23' - 10" FLY GALLERY STAGE LEFT 20' - 0"
T/ ROOF SCREEN 23' - 10"
Control Booth & AV Room 202
LOWER CATWALK LEVEL 17' - 0"
T / STEEL 15' - 0"
T / STEEL 15' - 0"
Vestibule
Lobby
103
100
House Mix Lift #1 Position 148
140
Audience Chamber
Stage
Corridor
Docking/Receiving
141
144
118
117
LOBBY LEVEL 0' - 0"
STAGE LEVEL -2' - 6"
ORCHESTRA PIT 000 ORCHESTRA PIT -12' - 4"
1
LONGITUDINAL BUILDING SECTION 1/8" = 1'-0"
0'
A
B
C
D
E
E.7
F
G
H
J
4'
8'
16'
K
1 A-311
T / STEEL AUDIENCE CHAMBER 34' - 4"
TRANSVERSE CATWALK 25' - 6" T/ ROOF SCREEN 23' - 10" FLY GALLERY STAGE LEFT 20' - 0" LOWER CATWALK LEVEL 17' - 0"
Catwalk Dimmer Room 203
205
Checker
T / STEEL 15' - 0"
Gallery
Catering
Corridor
Stair
133
134
138
145
Audience Chamber
Lift #2
Corridor
009
110
LAST ROW 3' - 5"
© DLR Group
Chesterfield Center for the Arts Commision #17PR0145 11810 Centre St, Chester, VA 23831
141
Checked by:
STAGE LEVEL -2' - 6"
419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004
ORCHESTRA PIT 000
ORCHESTRA PIT -12' - 4"
T 202.393.6445 WWW.DLRGROUP.COM
Drawn by:
Author
BUILDING SECTIONS 2
BUILDING SECTION 1/8" = 1'-0"
0'
4'
8'
16'
WD
A-301
Jamestown Settlement Refresh Renovation 2018-2019
Tampa Theater Renovation 2018-2019
C
D
D
E
E
F
F
G
A ISSUED / REVISED 1 2016-12-09 DESIGN DEVELOPMENT 2 2017-04-24 SEAT PROCUREMENT 3 2017-06-02 PR 001 95% ISSUE 4 2017-06-30 PR 001 5 2017-08-10 PR 001 SET A
G
10
REMOVABLE SEAT ON 8-WAY HAND TIED COILED SPRINGS
10
LOCKING CLEATS
29' - 11"
DN
14
10
14
10
6
3
8
NEW RAILING BEYOND, MATCH EXISTING BRASS CONSTRUCTION. MECHANICALLY ATTACH NEW METAL RAILING, FINISH WITH SAME LOW SHEEN METALLIC BRONZE HIGH PERFORMANCE COATING AS REFINISHED EXISTING RAILINGS
8
10 12.001
8
10 12.004
6
3
6
6
Key Value
05.002
ALIGN
06.012 12.001 12.003 12.004 12.006
0' - 6"
D.002 D.004 D.008
E.003 HEAD OF EXISTING TRANSOM WINDOW RO 9' - 11 1/4" HEAD OF EXISTING STOREFRONT WINDOW RO 7' - 5"
D.002
CLEAN AND REFINISH ALL EXISTING RAILINGS WITH LOW SHEEN METALLIC BRONZE HIGH-PERFORMANCE COATING. NEW GUARDRAIL TO MATCH EXISTING IN FORM AND FINISH CUSTOM BANQUETTE SEATING, UPHOLSTERY PER FINISH SCHEDULE THEATRICAL SEATING - FIXED THEATRICAL SEATING - FIXED, WITH INTEGRAL TABLE BETWEEN EVERY PAIR OF SEATS THEATRICAL SEATING - CUSTOM CAST IRON END STANDARD AND AISLE LIGHT TABLE, 12" DIA, ATTACHED TO FLOOR
D.030 D.031 E.001
CARPET
3
EXISTING STEP BEYOND
2' - 8"
2
6
NOT IN PERMIT SHOWN FOR REFERENCE ONLY
1/4" = 1'-0"
2' - 8"
NOT IN PERMIT SHOWN FOR REFERENCE ONLY
SECTION THROUGH ROW OVERBUILD, TYPICAL
4
1
1 1/2" = 1'-0"
2
AD-301
3
1
2
4
AD-301
D.012
E.003
E.003
5
AD-301
6
E.003
D.012
E.003
3 AD-301
D.012
7
E.003
1' - 0"
3
6
HEAD OF EXISTING TRANSOM WINDOW RO 9' - 11 1/4" HEAD OF EXISTING STOREFRONT WINDOW RO 7' - 5"
0' - 2"
3
3
0'
-
0 1/2
" TY
D.011
D.011
A
B
H
N i
P
D.009 D.009
D.009
D.009 D.009
D.009 D.009
D.009 D.009
E.004 E.004
AE-121 4
5
NOTES
D.004
REFINISH EXPOSED CONCRETE FLOOR AT AUDIENCE CHAMBER, EXPOSED VERTICAL RISER SURFACES, COLOR TO MATCH ARCHITECT SAMPLE
2
(MEZZANINE: FIXED SEATS 96 (BALCONY: FIXED SEATS 378 BANQUETTE SEATS 16)
D.004
D.010
D.010
E.001
E.001
D.004
D.010
D.010
E.001
D.010
E.001
D.004
SILL OF EXISTING STOREFRONT WINDOW RO 0' - 0" GREEN ROOM FLOOR LEVEL -1' - 3"
FLORIDA AVE STOREFRONT REPLACEMENT - ELEVATION DEMOLITION
4
TYP.
SEE PLANS
2
2
3
4
5
6
7
KEY PLAN 1" = 40'-0"
8
0 5'10' 20'
40'
3
END STANDARD: 32 MEZZANINE 40+28 BALCONY
iv
7
1/4" = 1'-0"
0' - 6"
TOTAL FIXED SEATS: 474 BANQUETTE SEATS: 16
3
D.011
TYP.
VERIFY IN FIELD
4
D.011
1' - 0"
1" x 2" TUBE WITH 2" DIA. WOOD CAP W/ EASED EDGES, SLOPE TO MATCH EXISTING RISER TO RISER SLOPE FINISH WITH SAME LOW SHEEN METALLIC BRONZE HIGHPERFORMANCE COATING AS REFINISHED EXISTING RAILINGS
4
3
2' - 10" TYP.
6
3
NEW HANDRAIL MOUNTED TO VERTICAL RISER, SEE DETAIL 3/AE 103.1 TYP
E.004
PARTIAL EXTERIOR ELEVATION - NORTH - DEMOLITION
ALIGN WITH EXISTING SLAB, FINISH AS SCHEDULED
6
3
12.003
E.003
Keynote Text NEW OPENING IN EXISTING PARTITION WALL REMOVE EXISTING DOOR, FRAME, TRIM AND HARDWARE REMOVE EXISTING WALL TO ENABLE INSTALLATION OF GENERATOR EQUIPMENT REMOVE EXISTING STOREFRONT PLATE GLASS REMOVE EXISTING STOREFRONT COPPER TRIM, CLEAN, REPAIR AND RE-INSTALL CLIPPED TO NEW STOREFRONT SYSTEM REMOVE EXISTING TRANSOM WINDOW ASSEMBLY REMOVE EXISTING WINDOW AC UNIT, PROTECT AND REINSTALL AS INDICATED IN ELEVATIONS REMOVE SECTION OF SLAB FOR NEW CHASE PARTIAL WALL REMOVAL FOR WINDOW INSTALL, PATCH AND REPAIR TO MATCH EXISTING WALL CUTTING HOLE TO INSTALL BEAMS AND PLATES, SEE STRUCTURAL REMOVE EXISTING BENCH EXISTING TERRA COTTA BASE AND PILASTER ASSEMBLY TO REMAIN, PROTECT DURING CONSTRUCTION EXISTING COPPER CORNICE TO BE CLEANED AND REPAIRED, NEW TREATED WOOD BLOCKING BENEATH EXISTING EXTERIOR DOORS TO REMAIN, RE-FINISH TO MATCH EXISTING
E.001
0' - 2"
6
D.015 D.029
SILL OF EXISTING STOREFRONT WINDOW RO 0' - 0" GREEN ROOM FLOOR LEVEL -1' - 3"
- 2"
6
D.011 D.012
D.009
0'
3
D.009 D.010
D.004
5
6
6
4
KEYNOTE LEGEND 1 AD-301
Keynote Text
5
6
A
Keynote Legend
05.001
SEE MEZZANINE PLAN FOR CONTINUATION OF NEW CARPET
05.001
ISSUED / REVISED 1 2017-02-16 SCHEMATIC DESIGN 2 2017-06-02 PR 001 95% ISSUE 3 2017-06-30 PR 001 4 2017-08-10 PR 001 SET B
CARPET, ARCHITECT TO CONFIRM PATTERN AND ORIENTATION
Key Value
10
16' - 9"
G
5/8" GWB
10
8
10
(2) LAYERS OF 3/4" FRT PLYWOOD OVER 2x4 STUD FRAMING @ 16" MAX, FINISH AS SCHEDULED
10
F
PLAN LEGEND
15# FELT BETWEEN PYLWOOD LAYERS
10
E
0' - 1 1/2"
WOOD BLOCKING
10
D
6
14
8
FITTINGS AND HORIZONTAL POST SPACING TO MATCH EXISTING
14 12.006 05.002
0' - 6"
2' - 2"
7
2 AE-103.1
06.012
C
BALCONY OVERBUILD, SEE 2/AE103.1
3/4" THICK V.C. PLYWOOD GUESSETS P.LAM BASE
14
B
8
UPHOLSTERY ON WALLS OF ARMREST TO MATCH SEAT CUSHION
10
14
1' - 8"
WOOD ARMREST TO MATCH SEATING ARMREST, BY OWNER
10
14
1' - 6"
DN
4
10
14
14
3' - 0 1/2"
10
0' - 4"
8
10
NO-SAG SPRINGS
1' - 0 1/2"
14
10
2
10
0' - 6"
14
10
8/14/2017 3:57:51 PM
B
C
7
8/15/2017 2:02:23 PM
A
B 1
MOUNT TO FACE OF CONCRETE RISER
DN
B D.008
UP BASIS OF DESIGN SEAT: ORIENTAL BY IRWIN SEATING COMPANY; 19", 20", AND 21" WIDTHS; CUSTOM CAST IRON END STANDARD, ARCHITECT TO CONFIRM FINISH AND FABRIC; COORDINATE AISLE LIGHTING WITH ELECTRICAL
6
i
711 N. FRANKLIN ST TAMPA, FL 33602 WRL COMMISSION #
16024.00 419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004
iv
T 202.393.6445 WWW.DLRGROUP.COM
6 4
4
1/4" = 1'-0" 0 6" 1'
2'
4'
KEY PLAN AE103.1 1" = 40'-0" 0 5'10' 20'
40'
AE-103.1
10
AD-301
D.029 D.009 D.030 D.010 D.004 D.029
5
AD-301
TYP.
D.009 D.030 D.010 D.004 D.030 2
6
AD-301
TYP.
D.031 D.009 D.030 D.010 D.004
D.031 D.010 D.004
711 N. FRANKLIN ST TAMPA, FL 33602 WRL COMMISSION #
16024.00 419 7TH STREET NW 2ND FLOOR WASHINGTON, DC 20004
FIRST FLOOR DEMOLITION PARTIAL PLAN AND ELEVATIONS
D.031 D.030 D.010
1
D.004
1
AE-201
T 202.393.6445 WWW.DLRGROUP.COM
D.030 D.010
Author
7 BALCONY NEW WORK PLAN
D.010 D.015
A
Drawn by:
1
AE-122
AD-201
2
UP
BALCONY SEATING NEW WORK PLAN
3
Author
Checker
N
Checked by:
2
H B
Checked by:
Checker
3
1 1/2" = 1'-0"
2
1
Tampa Theatre
SEATING SECTION DIAGRAM, TYP.
A
8
Drawn by:
DN
Tampa Theatre 3
FIRST FLOOR PARTIAL PLAN - DEMOLITION
AD-201
NOT IN PERMIT SHOWN FOR REFERENCE ONLY
1/4" = 1'-0"
0 6" 1'
2'
4'
AD-201
Freemen Amphitheater 2018-2019
1/23/2018 4:29:22 PM
Issued / Revised No.
Date
1 2
Description
4/27/2017 SCHEMATIC DESIGN 01/23/2018 DESIGN DEVELOPMENT
1 AA-301
Keynote Legend KEY NOTE 03.008 03.012 05.005 05.007 06.008
CROSS AISLE
ADA SEATING
16' - 0"
11.001 12.001 12.002 32.004 32.007 32.008 32.015
05.005 EXTERIOR SEATING 11,050 SQFT
DN
ADA SEATING
32.019
14' - 2"
DESCRIPTION CAST IN PLACE CONCRETE, SEE STRUCTURAL CAST IN PLACE CONCRETE STAIRS - SEE STRUCTURAL 1 1/2" DIA. PIPE RAILING METAL LADDER, PAINTED 6" PVC PIPE CABLE PASS BELOW SLAB. SEE A/V FOR CABLE PASS LOCATIONS DOCK LEVELER FIXED STADIUM SEATING LOOSE STADIUM SEATING CHAIN LINK FENCING AND GATE PLANTING, SEE LANDSCAPE SECURITY FENCING AND GATE, SEE LANDSCAPE EXTERIOR RAILING WITH WOOD DRINK RAIL AND CABLE NETTING PANELS, SEE LANDSCAPE SYNTHETIC TURF, SEE LANDSCAPE
AA-201
13' - 8"
3 13' - 2"
12' - 8"
6 05.005
13
12' - 2"
2 05.005
1
11' - 8" CROSS AISLE
DN
32.019
ADA SEATING
11' - 2"
17
ADA SEATING
05.007
03.012
05.005
05.005 ADA SEATING
10' - 0"
18
05.005
MIX POSITION
DN
A-103
ADA SEATING
A
DN
B
12.001
1:12 PE SLO
SLOPE 1:20
OF BOX
FICE
TS & TOILE N ADMI
LAWN SEATING
1:20 PE SLO
PAVILION
1:2
0
BACK OF HOUSE
SL OP E
1:12 PE SLO
AA-201
& FOOD GE RA BEVE
KEYPLAN VIP LOOSE SEATING/DANCE TERRACE
PRELIMINARY
1 CANOPY ABOVE
12.002
NOT FOR CONSTRUCTION OR RECORDING
06.008 32.008
2
AA-201
3' - 2"
32.004
Client
12' - 8"
C
COASTAL ARTS PAVILION AT FREEMAN PARK
EXTENT OF STORAGE BELOW, 270SF
03.008 06.008
06.008 12' - 0"
7'
'-
P. TY
- 1"
45' - 0"
B5
Project No. 16078.00
STAGE WING WEST
STAGE WING EAST
STAGE
A-101
Checked by:
0"
Checker
31750 LAKE VIEW DRIVE, SELBYVILLE, DE. 19975
12
VIP TERRACE. SEE LANDSCAPE. 32.015
A-100
DLR Group
A-102 11.001
419 7TH STREET NW, 2ND FLOOR WASHINGTON, DC 20004 © 2017, DLR Group of D.C., P.C., a DC prof. corp., ALL RIGHTS RESERVED
2 AD-312
Author
AD-201
T: 202.296.4344 www.DLRgroup.com
1 / AD-101
6
D
PAVILION FLOOR PLAN
Drawn by:
E 19
1
We st l a ke Re e d Le skosky
20
21
22
1 AA-301
23
24
25
26
DD
STAGE & AUDIENCE SEATING 1/8" = 1'-0" 0 1' 2'
4'
8'
AA-101 Credit By Others
1/23/2018 4:30:47 PM
Issued / Revised No.
Date
1
BO.A1
BO.A
Description
01/23/2018 DESIGN DEVELOPMENT
BO.A
1' - 2"
07.004
07.004 06.004
06.004 07.004
07.034
07.034
06.004
06.010
06.010
07.034
06.011
07.041
5 AB-311
07.006
06.010
07.041
06.011
07.039
KEY NOTE 04.001 05.009 06.004 06.010 06.011 07.004
07.016
06.004
07.018
07.004 07.040
Keynote Legend
06.011
07.039
07.041
07.040
07.006 07.007 07.009
07.040 07.004
07.004
05.009 07.018
07.013 07.016 07.018
07.024 07.022 07.016
07.024
07.022 07.024 07.027 07.028 07.034 07.035 07.036 07.037 07.039 07.040 07.041
07.041 04.001 07.041
8
GUTTER DETAIL
5
1 1/2" = 1'-0"
GUTTER DETAIL
2 1/4" 07.036
1 1/2" = 1'-0"
100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"
DESCRIPTION 4" X 4" X 16" GROUND FACE CONCRETE MASONRY UNIT METAL PLATE SHEATHING SOFFIT VENT WOOD BLOCKING STANDING SEAM METAL ROOF, BOD FABRAL MICA COLORS BRIGHT SILVER FORMED ALUMINUM GUTTER CONCEALED STANDING SEAM METAL GUTTER POLYISOCYANURATE INSULATION; MIN. R-30CI. SLOPE TO DRAIN COMPOSITE CAVITY DRAINAGE INSULATION MATERIAL WEATHER BARRIER FIBER CEMENT VERTICAL SIDING W/ 2 1/2" BATTENS SPACED 8" O.C. ON Z-CLIP SUPPORT SYSTEM ALUMINUM DOWN SPOUT RIGID INSULATION; MIN. R-7CI DRAIN TILE INSULATION BOARD AND DRAINAGE PANEL VENTILATION AIR SPACES IN ROOF SHEATHING SYSTEM CAULK BETWEEN WEBS 1/2" COMPRESSIBLE FILLER FOUNDATION DRAIN TILE, GEOTILE, DRAINAGE FILL GUTTER SLOPES 1/8"/1'- 0" BRAKE METAL SOFFIT SEAM LOCK DRIP EDGE
07.037
9
07.016
BOX OFFICE SECTION 02 - Callout 1 - Callout 1
07.028
1 1/2" = 1'-0"
07.027
6 BO.A
BO.A1
BOX OFFICE WALL SECTION 1/2" = 1'-0"
BO.B
BO.A
9 AB-311
BO.1
BO.A
07.034 8 AB-311
07.004 07.004
06.004
06.004
07.035 07.013
07.034 07.004
05.009
06.004
07.013 05.004
07.024
07.034
07.018
07.009
04.006
07.007
06.004 06.004
07.034
07.004 07.004
PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING
Client
COASTAL ARTS PAVILION AT FREEMAN PARK 100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"
100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"
100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"
Checker
100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"
Checked by:
DLR Group
Author
7
Drawn by:
31750 LAKE VIEW DRIVE, SELBYVILLE, DE. 19975 Project No. 16078.00
100 YEAR FLOOR BOX OFFICE LEVEL 6' - 0"
BOX OFFICE SECTION 02 - Callout 1 1/2" = 1'-0"
4
BOX OFFICE WALL SECTION 2 1/2" = 1'-0"
3
BOX OFFICE WALL SECTION 1 1/2" = 1'-0"
2
BOX OFFICE WALL SECTION 1/2" = 1'-0"
1
BOX OFFICE WALL SECTION 1/2" = 1'-0"
We st l a ke Re e d Le skosky
419 7TH STREET NW, 2ND FLOOR WASHINGTON, DC 20004 © 2017, DLR Group of D.C., P.C., a DC prof. corp., ALL RIGHTS RESERVED T: 202.296.4344 www.DLRgroup.com
BOX OFFICE WALL SECTION
DD
AB-311
Credit By Others
IFC DOCUMENTS
CLEAT
1' - 2 1/4"
6"
LEGEND NOTES
LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET
ADJUSTABLE SHELVES ON PIN-TYPE SUPPORTS
4' - 2"
1' - 5 1/2"
ADJUSTABLE SHELVES ON PIN-TYPE SUPPORTS
1250 Constitution Ave. NE Washington, DC 20002
1/2" 8 1/2"
Maury Elementry Scool_Casework and Interior Elevations 2018 4 1/8" CARVED HANDLE
4 1/2"
R 1"
R 1"
7' - 2"
4 1/2"
6" x 20 GA. CONTINUOUS METAL REINFORCING PLATE (TYP.)
MELAMINE FINISH @ ALL INTERIOR SURFACES, TYP.
MELAMINE FINISH @ ALL INTERIOR SURFACES, TYP.
4"
6" x 20 GA. CONTINUOUS METAL REINFORCING PLATE
R 1"
4"
1"
R 1"
7' - 2"
R
CONT. SHEET MTL BLOCKING BACKING PL ON MTL STUD (TYP.)
R 1"
CARVED HANDLE BACK BOARD
1' - 2"
1' - 3 1/4"
1' - 3 1/4"
3" CUSION
1/2" BACKING PANEL
1/2" BACKING PANEL 0' - 1 1/2" 0' - 3"
8"
3/4" BOTTOM PANEL
9 A11.1
CUBBY 3D VIEW
SCALE:
10"
0' - 2"
3/4" BOTTOM PANEL
3 A11.1
SECTION - PRE K BOOKSHELF
SCALE: 1 1/2" = 1'-0"
PLYWOOD
THIRD FLOOR 116' - 5"
BLOCKING AS REQUIRED CASEWORK AND MILLWORK GENERAL NOTES
HARD WOOD
2' - 6"
A. B. C. D. E. F. G.
H. I. J.
6 A11.1
BEE HIVE 3D VIEW
7
SCALE:
A11.1
K.
BEE HIVE SECTION
L. M.
SCALE: 1 1/2" = 1'-0"
7' - 0"
N.
CASEWORK AND MILLWORK GENERAL NOTES APPLY TO ALL CASEWORK AND MILLWORK SHEETS. ELEVATIONS DENOTED AS MILLWORK ARE SPECIFIED UNDER DIVISION 06. OTHERS CONSIDERED CASEWORK SPECIFIED UNDER DIVISION 12, UNLESS NOTED OTHERWISE. BASE AND TALL STORAGE CABINETS: 24 INCHES DEEP, UNLESS NOTED OTHERWISE. WALL CABINETS: 14 INCHES DEEP, UNLESS NOTED OTHERWISE. TALL STORAGE UNITS TO BE 24 INCHES DEEP, UNLESS NOTED OTHERWISE. PROVIDE ADJUSTABLE SHELVING IN CASEWORK, UNLESS NOTED OTHERWISE. CATALOG NUMBERS SHOWN ON THE ELEVATIONS FOR CASEWORK ARE AWI REFERENCE NUMBERS, UNLESS NOTED OTHERWISE. (M) AFTER THE CATALOG NUMBER INDICATES THE CABINET IS SHOWN MODIFIED FROM STANDARD. __________ INDICATES CASEWORK TO BE BID AS AN ALTERNATE. SEE PROJECT MANUAL FOR ALTERNATE DESCRIPTIONS. WHERE ELECTRICAL DEVICES ARE LOCATED IN CASEWORK, CASEWORK CONTRACTOR SHALL PROVIDE FINISHED OPENINGS. COORDINATE LOCATION AND QUANTITY WITH ELECTRICAL CONTRACTOR. PROVIDE JOINT SEALANT AT PERIMETER JOINTS WHERE COUNTERTOPS, BACK AND SIDE SPLASHES, CASEWORK, AND MILLWORK ABUT WALLS. FIELD VERIFY DIMENSIONS OF CABINET LOCATIONS IN BUILDING PRIOR TO FABRICATION. PROVIDE LOCKS AT DOORS AND DRAWERS. PROVIDE FINISHED ENDS AT ALL EXPOSED ENDS OF CASEWORK AND MILLWORK. ALL EXPOSED SURFACES IN OPEN SHELVING SHALL BE PLASTIC LAMINATE COVERED.
MAURY ES
SECTION-PRE K CUBBY STORAGE
SCALE: 1 1/2" = 1'-0"
2' - 7 1/8"
1 A11.1
CASEWORK ELEVATIONS
FINISH FLR
2"
FINISH FLR
Revisions
2"
CUBBY FLOWER
SCALE: 3" = 1'-0"
BLOCKING, TYP.
0' - 8"
BLOCKING, TYP.
A11.1
K-105 05/25/2018
1 1/2"
3' - 0"
8 CARVED HANDLE BACK BOARD
A11.1
1' - 2"
HARD WOOD
PLYWOOD 0' - 1 1/2"
0' - 0 3/4"
FAUCET- SEE PLUMBING
4
2' - 7 1/8"
COUNTER SUPPORT BRACKET, FLUSH MOUNT INSTALLATION, B.O.D. RAKKS
0' - 6"
2' - 0"
1' - 6"
THIRD FLOOR 116' - 5"
Architecture Planning Interiors
0' - 5"
7 A11.1 COUNTERTOP AS SCHEDULED, EASED EDGES, SEE ELEVATIONS
FINISH FLR
SINK 3D VIEW
4
5
SCALE:
A11.1
A11.1
BEE HIVE ELEVATION
SCALE: 1/2" = 1'-0"
IFC DOCUMENTS
SECTION - PRE K SINK
SCALE: 1 1/2" = 1'-0"
INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O
3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS
1' - 0"
1/2" GYPSUM BOARD
2' - 1 7/8"
7 3/4" 8 1/4"
4 1/2"
1" 6 1/2" 2' - 9 3/4" 3/4" BOTTOM PANEL
0' - 2"
R 1' - 0"
R 3' - 0 1/4"
7 3/4"
2' - 8"
2' - 6 7/8" FIRST FLOOR 86' - 5"
4 A11.4
TYPE B CASEWORK ELEVATION
9
SCALE: 1/2" = 1'-0"
FINISH FLR
2' - 9 3/4"
10 "
2' - 9 3/8"
R 1' - 5 1/2"
R 1' - 3"
- 0"
R
10 1/4"
2' - 5 7/8"
7 1/2"
" 3/4
R 1'
2' - 2"
3/4"
" - 0 1/4
-4
R 2' - 1
R 2'
LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET
R 1'
1' - 3 3/4"
R
0" 1' -
LEGEND NOTES
1' - 0"
BLOCKING, TYP.
5 3/4" 4 1/8"
0' - 1 3/4" 0' - 8 3/4" 0' - 1 1/2"
5.2
1250 Constitution Ave. NE Washington, DC 20002
2 A11.1
© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED
0' - 8"
UNDERMOUNT SINK- SEE PLUMBING
BLOCKING AS REQUIRED
5/24/2018 3:31:47 PM
C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt
3
STEEL ANGLE
A11.4
TYPE C CASEWORK ELEVATION
SCALE: 1/2" = 1'-0"
1/2" GYPSUM BOARD
3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS
R 1' - 9"
INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O
- 3"
2' - 7"
TYPE D CASEWORK ELEVATION
3' - 0"
SCALE: 1/2" = 1'-0"
3' - 0" INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O
INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O
3/4" GYPSUM BOARD
3/4" GYPSUM BOARD
CASEWORK AND MILLWORK GENERAL NOTES
A. 3/4"
1' - 0"
1' - 0"
3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS
3/4"
3/4"
3/4"
3/4"
3/4"
3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS
B. C.
CARPET SURFACE
CARPET SURFACE
PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY 3/4"
PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY
3" 3/4"
D. E. F. G.
3" 3/4" H.
SURFACE OF DRY WALL
ALIGN
ALIGN
SURFACE OF DRY WALL
ALIGN
I.
ALIGN
5.6
J. K.
7 A11.4
L. M.
30.00°
N.
1 1/ 2"
30.00°
2" 1 1/
30.00°
1/2" LAMINATED GLASS
- 3"
3"
2"
SURFACE OF DRY WALL
3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS
3"
3' - 9"
1/2" LAMINATED GLASS
SURFACE OF DRY WALL
3"
R 2'
2"
1 1/2"
3/4"
A11.4
1 1/2" 3/4" PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY
3/4" HARD WOOD PLYWOOD. FASTEN & GLUE TO EACH LAYERS 3/4"
8
1 1/2" 3/4"
1 1/2"
WOOD BLOCKING WOOD BLOCKING
3/4" GYPSUM BOARD
TYPE G CASEWORK ELEVATION
3/4" GYPSUM BOARD
INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O
SCALE: 1/2" = 1'-0"
INTERIOR MTL. STUD FRAMING, 3 -5/8" @ 16" O.C. U.N.O FINISH FLR SECOND FLOOR SECOND FLOOR SECOND FLOOR 101' 5" 101' - --5" 101' 5"
SECOND FINISH FLOOR FLR 101' - 5" 5/24/2018 3:32:12 PM
C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt
PROVIDE GLAZING SEALANT & SPACERS AS NECESSARY 5 A11.4
SECOND FLOOR 101' - 5"
7 A11.4
SECTION - CLOCK 1
SCALE: 1 1/2" = 1'-0"
5 A11.4
SECTION-CAVE COLOCK
SCALE: 1 1/2" = 1'-0"
© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED
- 3"
Architecture Planning Interiors
2"
3" 2"
R 3'
CASEWORK AND MILLWORK GENERAL NOTES APPLY TO ALL CASEWORK AND MILLWORK SHEETS. ELEVATIONS DENOTED AS MILLWORK ARE SPECIFIED UNDER DIVISION 06. OTHERS CONSIDERED CASEWORK SPECIFIED UNDER DIVISION 12, UNLESS NOTED OTHERWISE. BASE AND TALL STORAGE CABINETS: 24 INCHES DEEP, UNLESS NOTED OTHERWISE. WALL CABINETS: 14 INCHES DEEP, UNLESS NOTED OTHERWISE. TALL STORAGE UNITS TO BE 24 INCHES DEEP, UNLESS NOTED OTHERWISE. PROVIDE ADJUSTABLE SHELVING IN CASEWORK, UNLESS NOTED OTHERWISE. CATALOG NUMBERS SHOWN ON THE ELEVATIONS FOR CASEWORK ARE AWI REFERENCE NUMBERS, UNLESS NOTED OTHERWISE. (M) AFTER THE CATALOG NUMBER INDICATES THE CABINET IS SHOWN MODIFIED FROM STANDARD. __________ INDICATES CASEWORK TO BE BID AS AN ALTERNATE. SEE PROJECT MANUAL FOR ALTERNATE DESCRIPTIONS. WHERE ELECTRICAL DEVICES ARE LOCATED IN CASEWORK, CASEWORK CONTRACTOR SHALL PROVIDE FINISHED OPENINGS. COORDINATE LOCATION AND QUANTITY WITH ELECTRICAL CONTRACTOR. PROVIDE JOINT SEALANT AT PERIMETER JOINTS WHERE COUNTERTOPS, BACK AND SIDE SPLASHES, CASEWORK, AND MILLWORK ABUT WALLS. FIELD VERIFY DIMENSIONS OF CABINET LOCATIONS IN BUILDING PRIOR TO FABRICATION. PROVIDE LOCKS AT DOORS AND DRAWERS. PROVIDE FINISHED ENDS AT ALL EXPOSED ENDS OF CASEWORK AND MILLWORK. ALL EXPOSED SURFACES IN OPEN SHELVING SHALL BE PLASTIC LAMINATE COVERED.
MAURY ES
SCALE: 1 1/2" = 1'-0"
A11.4 10 A11.4
Revisions
SECTION - WALL CAVE BEAN
2
CASEWORK DETAILS
FIRST FLOOR 86' - 5"
FIRST FLOOR 86' - 5"
K-105 05/25/2018
4' - 0"
A11.4
3' - 1"
R 1'
N
MATCH LINE
Q
IFC DOCUMENTS
M
FA DEVICE REFER TO FA SERIES
P
PT-3
ENVIRONMENTAL GRAPHIC "DESERT"
4'-0 MAX
PL-2
PL-1
PL-5
PL-2
OPEN TO DISC. COMMONS 227
TK-1
GPD
7' - 0"
TK-1
9' - 0"
GPD
LEGEND NOTES
LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET
PT-9
GL-1 MAGNETIC/WRITABLE GLASS PANEL GL-2 TEMPERED DECORATIVE GLAZING
ROOM SIGNAGE TYP. SECOND FLOOR - ACADEMIC CORRIDOR - WEST - PART 2
2
PL-1 WRITABLE LAMINATE PANEL
6' - 6"
DISCOVERY COMMONS
FEC TYP.
1250 Constitution Ave. NE Washington, DC 20002
PT-1
SCALE: 1/4" = 1'-0"
A12.6
TK-1 TACKABLE SURFACE
F
F.5
G
G.8
H
J
PT-1 PAINTED GYPBOARD
K
4 A8.2.2
GPD GLAZED DEMOUNTALBE PARTITION
TL-1 THIN BRICK TILE SEE A - - FOR TYP. TILE PATTERN
2 A11.2
CHILD'S NICHE W/ GL-2 BEYOND WOOD BENCH
PT-3
MATCH LINE
SEE RCP
PL-2
PL-4
PL-2
PL-1
OPEN TO DISC. COMMONS 221
TK-1
PL-7
GPD A-12
P-LAM KEY
PT-8
7' - 0"
TL-1
PT-1
8' - 0"
OPEN TO CORRIDOR 2-3
TL-1
PT-1 OPEN TO BATHROOM 215 PT-1
PL-7
6"
PT-1
SB-1 SMART BOARD PLM LAMINATED PLYWOOD
PT-1
PL-1: WHITE WRITER
A-11
PL-2: CHALKBOARD LAMINATE PL-3: GREEN LAMINATE PL-4: ORANGE LAMINATE
FINISH FLR
ROOM SIGNAGE TYP.
ELEC. DEVICE SEE ELEC.
PL-5: YELLOW LAMINATE
WALL BASE REFER TO FINISH SCHEDULE
PL-6: BLUE LAMINATE
DISCOVERY COMMONS
PL-7: GRAY LAMINATE
SECOND FLOOR - ACADEMIC CORRIDOR - WEST - PART 1
1
PL-8: RED LAMINATE
SCALE: 1/4" = 1'-0"
A12.6
PL-9: CERULEAN LAMINATE 4TH GRADE PL-10: TURQUISE 5TH GRADE
PAINT KEY J
H
G.8
G
F
PT-1: TYP. WHITE/ BASE PT-3: PRE-K GREEN PT-4: K-1 ORANGE
2 A11.2
2 A11.2
PT-5: K-1 YELLOW
2 A11.2 TK-1
PT-6: BLUE PT-11: 5 CERULEAN
MAGNETIC DOOR HOLD
MATCH LINE
PT-8: TURQUOISE CORAL REEF PT-9: SALMON RED DESERT PT-10: OLIVE GREEN TEMPERATE PL-7
PL-7
PL-7
GPD A-8
A-7
A-6
PT-1
PANTRY 212 BEYOND
PT-1
A12.6
TL-1
K-105 05/25/2018
SECOND FLOOR - ACADEMICFEC. CORRIDOR - EAST - PART 2 TYP.
5
SCALE: 1/4" = 1'-0"
A12.6
P
Q
N
M
K
2 A11.2
2 A11.2 TK-1
COLUMN COVER SEE PLAN
FA DEVICE
ROOM SIGNAGE TYP.
RESIN PANEL GRAPHIC IDENTIFIER SEE ENVIRONMENTAL GRAPHIC DWGS
CORK STRIP @ 3', 6' TYP. OF 4 TYP.
CHILD'S NICHE W/ GL-2 BEYOND WOOD BENCH
MATCH LINE
TL-1
GPD
PL-7
PL-7 GPD
Architecture Planning Interiors
TL-1
GPD
TL-1 A-10
A-9
PT-9 FINISH FLR
WALL BASE REFER TO FINISH SCHEDULE TYP.
ELEC. DEVICE SEE ELECTRICAL
SECOND FLOOR - ACADEMIC CORRIDOR - EAST - PART 1
4
SCALE: 1/4" = 1'-0"
A12.6
IFC DOCUMENTS
5/24/2018 3:33:57 PM
C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt
SEE RCP
K K
7
6
5
COLUMN COVER SEE PLAN SEE RCP
SEE RCP
© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED
MAGNETIC DOOR HOLD OPEN
INTERIOR ELEVATIONS - CORRIDORS
FA DEVICE REFER TO FA SERIES
MAURY ES
EXIT SIGN SEE ELEC. TYP.
Revisions
COLUMN COVER
SEE RCP
PL-2
TK-1
4 A11.5
OPEN TO CORRIDOR 302
OPEN TO CORRIDOR 302
PL-1
PT-1
PT-1
PL-1
LEGEND NOTES
LEGEND NOTES GL-1ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET
MAGNETIC/WRITABLE GLASS PANEL GL-2 TEMPERED DECORATIVE GLAZING
PL-10
FINISH FLR
FINISH FLR
PL-1 WRITABLE LAMINATE PANEL
FINISH FLR
WALL BASE REFER TO FINISH SCHEDULE
WALL BASE REFER TO FINISH SCHEDULE TK-1 TACKABLE SURFACE
THIRD FLOOR COMMONS EAST ELEVATION
11
9
SCALE: 1/4" = 1'-0"
A12.8
A12.8
THIRD FLOOR COMMONS SOUTH ELEVATION
10
SCALE: 1/4" = 1'-0"
A12.8
1250 Constitution Ave. NE Washington, DC 20002
8' - 6"
PT-1
THIRD FLOOR COMMONS WEST ELEVATION
SCALE: 1/4" = 1'-0"
PT-1 PAINTED GYPBOARD GPD GLAZED DEMOUNTALBE PARTITION
TL-1 THIN BRICK TILE SEE A - - FOR TYP. TILE PATTERN
SB-1 SMART BOARD
F 5
6
PT-11
SEE RCP
PT-4 PT-4
OPEN TO CORRIDOR 201
TL-1
SEE RCP
TK-1
TK-1
OPEN TO CORRIDOR 201
TL-1
PL-1
SB-1
PT-1
PT-1
TK-1
P-LAM KEY
PL-2
PL-1: WHITE WRITER
OPEN TO CORRIDOR 302
PT-4
PL-2: CHALKBOARD LAMINATE PL-3: GREEN LAMINATE PL-4: ORANGE LAMINATE PL-5: YELLOW LAMINATE
PT-4 FINISH FLR
FINISH FLR
FINISH FLR
FINISH FLR
WALL BASE REFER TO FINISH SCHEDULE
PL-8: RED LAMINATE PL-9: CERULEAN LAMINATE 4TH GRADE 8
SCALE: 1/4" = 1'-0"
A12.8
2ND FLOOR SMALL GROUP 211 EAST ELEVATION
12
SCALE: 1/4" = 1'-0"
A12.8
THIRD FLOOR COMMONS NORTH ELEVATION
4
SCALE: 1/4" = 1'-0"
A12.8
2ND FLOOR COMMONS 221 WEST ELEVATION
SCALE: 1/4" = 1'-0"
PL-10: TURQUISE 5TH GRADE
PAINT KEY PT-1: TYP. WHITE/ BASE PT-3: PRE-K GREEN PT-4: K-1 ORANGE PT-5: K-1 YELLOW PT-6: BLUE PT-11: 5 CERULEAN
5 A11.4 6
PT-8: TURQUOISE CORAL REEF
COLUMN COVER SEE PLAN 7
8 A11.4
A11.4
SEE RCP
5
ALUMINUM STOREFRONT SYSTEM
ENV. GRAPHICS. SEE EG-DWG'S
4
4
FLOOR LOCATION
5
PT-9: SALMON RED DESERT
EXIT SIGN SEE ELEC.
6
PT-10: OLIVE GREEN TEMPERATE PT-1
SEE RCP
TL-1
PT-8
TL-1
WOOD PANEL PT-4 PT-8
PT-8
G
OPEN TO STAIR BEYOND
PT-8
TK-1
OPEN TO CORRIDOR 202
FINISH FLR
CALL BUTTON 6 A12.8
SECOND FLOOR ACADMEIC JOINT - NORTH
SCALE: 1/4" = 1'-0"
5 6
PT-1
FA DEVICE
5
FA DEVICE
6 H
PT-1 4' - 0"
SEE RCP PT-3
SEE RCP
PT-1
PT-3
PT-3
8' - 6"
OPEN TO CORRIDOR 202
PT-3
PL-2
SB-1
PL-2
TK-1
PT-1
PT-3
PL-1
OPEN TO CORRIDOR 2-2
OPEN TO CORRIDOR 2-2
PT-3
4 A11.5
TK-1
PL-2
PL-4
FINISH FLR
FINISH FLR
3 A11.3
1 A12.8
2ND FLOOR COMMONS 221 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
SEE RCP
PT-1
PT-1
5/24/2018 3:34:29 PM
C:\Revit\MAURY ARCH - NEW CENTRAL_fzhang@dlrgroup.com.rvt
K-105 05/25/2018
PL-8
SECOND FLOOR - ACADEMIC JOINT - SOUTH
SCALE: 1/4" = 1'-0"
9' - 2"
5 A12.8
3 A12.8
2ND FLOOR COMMONS 221 NORTH ELEVATION
SCALE: 1/4" = 1'-0"
FINISH FLR
WALL BASE REFER TO FINISH SCHEDULE 2 A12.8
2ND FLOOR COMMONS 221 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
© 2017 , DLR Group of DC, P.C., a District of Columbia corporation, ALL RIGHTS RESERVED
A12.8
FINISH FLR
Architecture Planning Interiors
A12.8
2ND FLOOR SMALL GROUP 211 WEST ELEVATON
Revisions
7
PL-6: BLUE LAMINATE PL-7: GRAY LAMINATE
WALL BASE REFER TO FINISH SCHEDULE
INTERIOR ELEVATIONS - CORRIDORS
SEE RCP
PLM LAMINATED PLYWOOD
ALUMINUM CURTAIN WALL SYSTEM
SEE RCP
MAURY ES
F
2
Catalyst of Art -GERMAN SCHOOL INFORMATION CENTER Expression of Tectonic and Materality Year 3: Thesis 2015-2016 The origin of the design started from the imaging shell, grow solid enclosure from the earth and bifurcate out its roof to embrace the ethereal spiritual space. The form of the building generated from the cross section of half vault of glue lam and sloped steel beam. Which create a timeline from ancient to modern, warm cozy and cold stringent contrast throughout the interior space. The opening of roof clearstory following the sun patch from the very north to south gradually closing the room. The small building is trying to express wood and steel structure in a contrasting way. The building is divided into the bookshelf and reading two areas which covered with two different structure types. The book shelf area is covered with a sloped roof supported by the steel frame. The reading area is enclosed with the wood frame structure. The steel frame structure represents an open public character, and the waved like roof further celebrated the tectonic of the steel structure. The wood frame structure is wrapped with two layers of skins. The outside of the skin is patina Cooper that gives the building a chameleon character responding to the ambient light; the interior surface is wood slats which give people a warm and palpable reading atmosphere.
14
15
16
17
18
19
TRIBUNE TOWER LIBRARY A new interpretation of Parametric Gothic Year 2: Spring 2015 The project’s site is adjacent to the famous Chicago Tribune Tower. The whole site located at the east-north corner intersection of North Michigan Ave and Chicago River. The site is sparking a series of iconic buildings from southwest to north-east. They are Marina City, Trump Tower, Wrigley Building and Tribune Tower. The site is looking east to Navy Pier, looking south to Millennium Park. The design of this building has three hierarchies. The first is from the urban scale that follows the line of iconic buildings cutting into the site. This cutting line generated the beamline of the building’s entrance. The height of the building tower is inherent from Marina City. The second design hierarchy is having a dialogue with Tribune Tower. My propose is to set the building back of Tribune Tower from North Michigan, giving Tribune Tower full exposure to North Michigan. Also considering Wrigley Building, Tribune Tower, and the new building as a similar style group, which gives the building a modern but a somewhat hint of Gothic style. The solution is to create a parametric screen system which bears both modern and traditional characters, emphasizing the Gothic style group. The third design level of the project is to explore the interior space of the building. The city library offers people both relaxing and meditation places. Therefore, two atriums were introduced into the library. The spiral ramp atrium gives the library cheered entertainment character while the solid well like atrium present an austere and meditation space. The entrance to the library is choreographed to the two counterpart atriums. People have to experience the two atriums before they get to other function parts of the library. The modular green roof system garden gives the library a third level gateway beside the two atriums.
1, The series of inconic buildings
20
2, The cutting line of the inconic buildings
1, Insert two atriums
3, The cutting line generated main surface of the building
2, Main solid, on
4, The height of building comes from Marina City
entrance and one ne open atriums
3, Choreogrphy the entrance to two atriiums
4, One ramp atrium one staircase atrium
5, The finished circulation of the library and the Tower
Spring Equinox
Summer Solstice
Winter Solstice
Based on soloar study, there are enough sun expoure hours to support the green roof.
5, Giving Tribune Tower full 6, The existing city plaza give expoure to N. Michigan Ave the prelude of the builing
7, The Gothic group style
8, Give Tribune tower North view to Navy Pier
21
22
The background image is the unrolled surface of library, gradation control pattern of library screen
The unrolled surface of tower, gradation control pattern of tower screen
The Grasshopper script of the screen system
The dome structure at the top of the ramp atrium
The roof Gardern based on mudular green roof system
The Grasshopper script of the dome structure
23
24
25
26
27
28
29
CINCINNATI TRANSIT HUB
A fluency character of movement Team: Fulan Zhang, Olga Block Year 2: Summer 2014 The site located in the south of the University of Cincinnati. The Calhoun St and W McMillan St which are one-way streets flanked the site on North and South. The Scioto St, which is also one-way street, is to the west of the site. The Vine St serves as a traffic spine of Cincinnati is on the east of the site. The cars’ driving direction of four streets around the location composed an anticlockwise circulation around the site. We adopted this street flow tendency as a movement circulation into our transit hub body. The ramp starts from W McMillan following the same street car direction and spirals into the transit hub. Given the 14 feet height difference between the Calhoun Street and W McMillan St, the ramp finally flows out at the upper level of the Calhoun Street. The form of the whole building interpreted the sky, the earth and the river in between. The Sky is the apartment building on the top of the transit hub; the irregular rigid facade pattern contrasts with the flowing lifted ground. Given the natural height of topography, we “lift” the surface from W McMillan Street. The motion generated the main vehicle entrance on W McMillan Street and the slop grass pedestrian entrance on the Vine Street. The building roof provides a pleasurable green roof by lifting the surface of the W McMillan. The river between the sky and earth is the ramp inside of the building and the pebble stone on the green surface. The pebble stone is the vertical structure combined with atrium skylight and column. The upper part of the structure is a bubble glass capped on the top of the spread column head. We exaggerated the column structure to express the beauty and the strength of the concrete structure. The roots of column grew from the underground and blossomed at the top of roof giving people a palpable feeling of the building.
30
Credit By Others
Calhoun St
Credit By Others
Vin e
St
W McMillan St
Credit By Others
Credit By Others
31
32
33
The Bubble Columns meet the Ground
The Bubble Columns
The Inerior Ramp
Facade elevation Pattern
34
35
HISTORICAL THEORY Burnet Wood Gate Designed with Classic Order Year 2: Spring 2015 This excise is to design a Gate at the Burnet Wood by using the classic order. I used Corinthian columns as my design element. According to Andrea Palladio’s Corinthian column proportion. The height of Corinthian column is ten times of its diameter. The height of the pedestal is two times of the column diameter. The height of the entablature is two times high of the column diameter. The drawing was finished by hand. Using ink pen for line work and charcoal pencil rendering shadows.
36
37
HISTORICAL PRESEVATION DOCUMENT YMCA building at the UC Campus is the only one Collegiate Gothic Style Building in on the Campus. The building opened March 8, 1930. Designed by Zettel and Rapp.The building features a Collegiate Gothic style of architecture of the Tudor period; it is made of rough textured brick of mellow browns, dull reds, and buff colors, Bedford limestone trimming, and roofed with rough variegated slate. The exterior is very picturesque and enhancing to the landscape, matching also with the gothic styling of Memorial Hall. The building is out of condition. Our work is to document the exterior structure of the building in Revit to provide working file for the further renovation work. My job is to document all the windows and doors according to the detail drawings and our measurement of the building.
38
Clifton Ave
Collegiate Gothic Style Building Team: Fulan Zhang, Brad King Year 2: Summer 2014
Calhoun St
39
INTEGRATED TECHNOLOGY Nasher Sculpture Museum Case Study Year 1: Fall 2013 Nasher Sculpture Museum The tectonic roof structure is the fundamental concept of Nasher Sculpture Museum. The layers of the ceiling structure and the cone shaped aluminum roof panels shows the master design of the building. By using Revit panel system, I successfully reinterpreted the tectonic roof structure.
40
41
3
MOUNT AIRY HOSPITAL RENOVAION KANN Partner Intership Work , Baltimore Year 2: Summer 2015 The concourse space design is the primary interior design of the renovation of the building. I contribute the major design to this space. The existing corner blocked the view of the entrance corridor to the inner concourse. And the sharp corner also gives the entrance a cramming and stagnant space. To solve the difficult problem, I introduced a circle wall as a focal point to smooth out the pointy corner space. Also by layering the cascade roof ceilings to corresponding the focal point the whole entrance area was cheerful up with a fluent and effective wayfinding.
Looking from the main entrance to the concourse (Before)
Looking out from the concourse to the main entrance (Before)
Looking out from the concourse to the main entrance (After)
42
Looking from the main entrance to the concourse (After)e
END OF CURB WALL FLUSH WITH FRAME WALL
CENTER POINT WALL MOUNT ACCESS LADDER
30X42 ACCESS HATCH ABOVE
CHANNEL GLASS WALL
13' HIGH CEILING - BULKHEAD TYPE #3
26' HIGH CEILING BULKHEAD TYPE #5 20' HIGH CEILING BULKHEAD TYPE #4
16' HIGH CEILING BULKHEAD TYPE #2
16' HIGH CEILING BULKHEAD TYPE #1
REAR MOUNTED SNAP-IN ACCESS PANELS FOR LIGHT MAINTENANCE ALONG ENTIRE CIRCUMFERENCE OF RADIUS WALL
RADIUS STEEL PLATE AND TUBE FOR CHANNEL GLASS AND RADIUS FRAME WALL
20'-0" CEILING
10'-0" CEILING
13'-0" CEILING
16'-0" CEILING
8" 9'-4"
U CHANNEL GLASS
10'-0"
3-5/8" Cold-Formed Steel Stud @ 16" O.C.
43
CAIRO CHILDREN’S HOSPITAL RTKL Associate Intership Work, DC Year 2: Fall 2014
Cairo Children's Hospital is an extension project of the existing hospital. The limited site area and the largely requested building area is the key to the success of the project. I Worked on predesign to schematic design, including master plan design, outpatient department configuration, research studies of cancer hospitals and Egyptian cultures.
Credit By Others
44
45
GREEN WATER HIGH RESIDENTIAL BUILDING SCB Architects intership Work , Chicago Year 1: Spring 2014
I was mainly working on the 6A’s drawing of the project in construction document phasing. I built cabinet and furniture in Revit and put the elevation in sheets of 6A’s drawings. I also worked exterior facade at the schematic design phase. By using Revit panel system which gives the project fast but accurate schematic facade study.
Credit By Others
46
Credit By Others
WINE RACKS OVER BASE CABINET
1/2" FIN. SIDE PANEL 3'-0"
A4.62
1'-6"
2'-0"
1'-10"
4"
U-PNT-01
2'-6"
U-CNTR-02
10"
4" 6"
4" 6"
1'-10"
U-PNT-01 2'-0"
U-CAB-03 9'-7" U-CAB-03 3'-10 3/4"
4C A6.63 4A
1'-6"
3'-2"
5'-11 3/8"
U-CAB-03 5'-10"
U-CNTR-02
U-CNTR-02
U-CAB-03 3'-0"
3'-0"
3'-0"
U-CAB-03
3'-0"
1'-6"
U-BS-01
1'-6"
1'-6"
1'-6"
U-BS-01
U-PNT-01
4B
U-CAB-04
2"
U-CAB-04
3'-5 1/8"
3'-6"
3'-6"
3'-6"
3'-6"
OPEN TO BEYOND
U-RB-01
3'-0"
2'-0"
2'-3"
1'-9"
2'-6"
1'-9"
3'-0 3/4"
1" FILLER
4C
1'-6"
3/4" FIN. SIDE PANEL
KITCHEN ELEVATION - UNIT B11a
4B
SCALE: 1/2" = 1'-0"
KITCHEN ELEVATION - UNIT B11a
4A
SCALE: 1/2" = 1'-0"
KITCHEN ELEVATION - UNIT B11a
1/2" FIN. SIDE PANEL 5/8" FILLER 2'-6"
KITCHEN PLAN - UNIT B11a SCALE: 1/2" = 1'-0"
1" FILLER
1'-6"
3'-0"
1'-6"
U-CNTR-02
4"
6"
4" 6"
1'-6"
6"
4
SCALE: 1/2" = 1'-0"
2'-1 3/8"
2'-3"
U-PNT-01
2'-2"
2'-0"
U-PNT-01
U-CAB-03
5'-6"
3'-2 1/8"
1'-6"
3B
U-CAB-04
4'-0 7/8"
3A
4'-6"
2"
U-CAB-03
A6.63 3C
OPEN TO BEYOND 8'-4"
8'-4"
9'-7"
2'-1 1/4"
5'-10"
U-CNTR-02
5'-10"
U-CNTR-02
3'-0"
3'-0"
U-CAB-03
SEE BUILDING ELEVATIONS
2'-9 1/8"
3'-0"
1'-11 7/8"
1/8" FILLER
1'-9"
KITCHEN ELEVATION
T/ FIN FLR
SEE BUILDING ELEVATIONS
SEE BUILDING ELEVATIONS
1'-6"
2'-6"
1'-6"
3'-1 5/8"
1'-6"
1/2" FIN. SIDE PANEL
3B
SCALE: 1/2" = 1'-0"
T/ FIN FLR
KITCHEN ELEVATION
3A
SCALE: 1/2" = 1'-0"
KITCHEN ELEVATION
3
SCALE: 1/2" = 1'-0"
1" FILLER 1'-3"
1/2" FIN.SIDE PANEL 3'-0" 1'-6"
2'-6"
KITCHEN PLAN - UNIT B2 SCALE: 1/2" = 1'-0"
1'-6" 2'-0"
5'-6"
2'-0"
3'-6"
U-CAB-04
U-CAB-03
2B 2A
2"
6'-2"
3'-6" 5'-4"
4'-4 5/8"
4" 6"
4"
4"
4" 6"
2'-0"
U-PT-01
U-CAB-03
U-PNT-01
A6.63
2C
U-CAB-03
T/ FIN FLR
3C
U-CAB-03
U-BS-01
U-CNTR-02
U-CNTR-02
OPEN TO BEYOND
EXTERIOR WINDOW. SEE A3 SERIES
U-CAB-03
3'-1 1/2"
5'-10"
U-CNTR-02
1'-6"
1'-6"
U-BS-01
U-CAB-03 1'-3"
3'-0"
3'-0"
3'-0"
3'-0"
" 3/4
FIN.END PANEL
3 1'-
3'-6 3/4"
FIN. END PANEL U-CAB-03
T/ FIN FLR SEE BUILDING ELEVATIONS
T/ FIN FLR
T/ FIN FLR 2'-0 1/2"
3'-0"
SEE BUILDING ELEVATIONS
2'-6"
2'-0"
SEE BUILDING ELEVATIONS
5 1/8"
1'-3"
3'-1"
1'-6"
2'-6"
1'-6"
1/2" FIN. SIDE PANEL
2C
KITCHEN ELEVATION - UNIT B1
2B
SCALE: 1/2" = 1'-0"
KITCHEN ELEVATION - UNIT B1
2A
SCALE: 1/2" = 1'-0"
KITCHEN ELEVATION - UNIT B1
2
SCALE: 1/2" = 1'-0"
KITCHEN PLAN - UNIT B1 3
02.28.2014 ISSUED FOR 100% CONSTRUCTION DOCUMENTS 12.11.2013 PERMIT COMMENT REVISIONS 11.15.2013 FINAL GMP/95% CONSTRUCTION DOCUMENTS 08.30.2013 ISSUED FOR PERMIT 08.09.2013 ISSUED FOR CONCRETE FRAME PACKAGE AND 40% CONSTRUCTION DOCUMENTS NO. DATE DESCRIPTION
SCALE: 1/2" = 1'-0"
1
2'-8"
1/2" FILLER 3'-0"
1'-0"
2'-6"
1'-6"
1'-1 1/4"
GREEN WATER U-PNT-01
3'-10"
2'-0"
U-CAB-04
2'-0"
5'-11 1/2"
2'-0"
3'-1"
OPEN TO BEYOND
1A
1C
A6.63
6 1/2"
U-CNTR-02
3'-0"
U-CAB-03 3'-0"
Austin, Texas © 2013 Solomon Cordwell Buenz
3'-1 1/2"
U-CAB-03
6'-2 7/8"
1'-6"
U-CNTR-02
1'-6"
1B
1'-6"
U-BS-01 U-BS-01
5'-10"
Mixed-use Development 1A
3'-6"
U-CAB-03 U-CAB-04
3'-0"
2"
5'-4" 3'-10"
2'-0"
2'-0"
4"
U-PNT-01
6"
3/4"
4"
3'-0"
U-CNTR-02
T/ FIN FLR T/ FIN FLR
SEE BUILDING ELEVATIONS
T/ FIN FLR SEE BUILDING ELEVATIONS
3'-0 3/4"
3'-0 1/4"
1" FILLER
2'-1 3/8"
1'-6"
2'-6"
1'-6"
2'-0"
7 1/4"
SEE BUILDING ELEVATIONS
5'-3 3/8" 1'-0"
3'-0"
2'-0"
3"
2'-4 7/8"
1 1/2"
1/2" FIN. SIDE PANEL
1C
KITCHEN ELEVATION - UNIT A21 SCALE: 1/2" = 1'-0"
1B
KITCHEN ELEVATION - UNIT A21 SCALE: 1/2" = 1'-0"
1A
KITCHEN ELEVATION - UNIT A21 SCALE: 1/2" = 1'-0"
ENLARGED UNIT KITCHEN PLANS & ELEVATIONS
1
KITCHEN PLAN - UNIT A21 A16, A19, A20, A24 SIM. SCALE: 1/2" = 1'-0"
Drawn By: RC Checked By: JY Project Number:
2011041
Sheet Number:
A6.63
47
4
QINHUANGDAO PHOENIX ISLAN URBAN DESIGN
Credit By Others
UDT Architects Work, Beijing,China, 2013 This is an urban design project; we created the whole city area near Qinhuangdao and focusing on two manmade islands of the area. My work is to compose groups of architectural forms filing into the Phoenix Island. Thus, giving the client a dream image about what is the island looks like when it is fully developed. To combine different forms of building to create a stunning skyline is the primary goal in this design. The design also provides an architectural guideline to architects working on the further architectural design.
Credit By Others
48
Credit By Others
Credit By Others
49
MENTOUGOU BEIJING RESIDENTIAL MASTER PLAN GBBN Architects Work, Beijing,China, 2012 programming tabulation Plot name
2 Plot area M
B1 B2 B3 B4
10248 3343 6584 10201
6141 2593 4898 5544
0.6 0.78 0.74 0.75
30 15 29 43
C1 C2 C3 C4 C7 C8 C9 C10 C11 C12
35036 1851 2062 3750 1815 1399 2940 23874 882 8186
16289 1140
0.46 0.62 0.37 0.31 0.56 0.55 0.57 0.75 0.52 0.67
81 6
SUM
122,244
63,274
Residential floor area
767 1145 1010 766 1684 17905 461 5498
The hilly site located in the Mentougou, the suburb of Beijing. The whole site can be divided into two main areas, and one contains existing villages’ residence which our design strategy is to maintain the yard of the house but demolish the dilapidated old building in the yard and infill new buildings inside. The other areas are a totally new site which our design strategy is to arrange the plan according to the natural contour and get the similar texture from the existing village clusters. My contributions to this project are acting as a chief designer and project manager. Personal responsibilities including designing the master plan and leading a team to finish the whole schematic design. The 3D overviews of the newly designed areas which the design concept is based on respecting to the existing hilly topography and simulating the yard cluster from the existing yard texture. 50
Commercial floor area
10,186
FAR
0.6
Units Number
2
105
338
51
52
The 3D overviews of the newly designed areas which the design concept is based on respecting to the exsiting hilly topography and simulating the yard cluster from the existing yard texture.
53
The design strategy is to maintain the yard cluster of the residence but demolish the old building and infill new buidings in the yard.
The 3D overviews of the infilled new buildings in the existing yard areas which gives people a sense of preserved historical context of the untouched yard space and a new life style of the infilled new building.
54
55
56
57
XIAMEN ELITE RESIDENTIAL MASTER PLAN GBBN Architects Work, Beijing,China, 2010
Profile of buildi 58
Credit By Others
A design proposal was requested by the client that satisfies the requirements of the new resident of the new satellite town. Emptiness lies between Zhangzhou city and Xiamen city. The site of 45 hectares is in the southwest of the Xiamen and southeast, east Zhangzhou. It sits against South Taiwu Mountain and face to the sea coat surrounded by a chain of famous sightseeing and cultural tourism. This arrangement provides lucrative opportunities for development and regeneration. The 45 hectares areas serve as a tourist resort, commercial business center, and a relaxation living areas. Extracting inspiration from this relationship, the design proposal seeks to iterate these natural circumstances into an internally autonomous urban system that liberates a central space of activity as rings of program centrally radiate out to establish zones while maintains its perimeter. Circulation progresses along the coastal central business areas that finally meet at the cultural center. With integrated, functional design concept, we provide people whom in all kinds of age, profession and background excellent resorts. My personal contribute to this project is acting as a chief designer for the master planning and the convention center. Individual responsibilities including designing the masterplan, doing the mass research by using grasshopper and developing the convention center, doing the massing study from the physical clay model and the go into grasshopper to build up the perfect terrace on the sculptural massing shape.
ings 59
The convention center is a building compromised of landscape and exhibition center. The building’s uncommon exterior form works in harmony with the natural surroundings, thanks to a kind of artificial camouflage of the green landscape. Part of the fun of reviewing misinterpreted as a landscape, despite its real function as a two story building with exhibition rooms. Stretched out along the circular square on the south to get more sunshine, the terraced tail of the building serves as an amphitheater to the people. Threaded between the lake and the water landscape is a path that leads to layers of stairs on the outside curve of the house. These stairways provide an external access to the parabolic roof garden. Landscaped with brush and plants, the roof garden in conjunction with the grassy inner courtyard of the pool area- forms what I call architectural nature. This central recreational area creates a vital link between the lake and the building cluster.
60
61
The modern Chinese city is dominated by a single housing typology: the compound. It consists of some cloned apartment towers on a leveled piece of land with a landscape theme garden at the center bordered by a fence, a wall or a row of shops. Based on Chinese standard the sunshine hour is strictly required and the north-south orientation always has the priority to other directions. In this project, all the residence type are arranged according to the principal of maximizing the value the site and the idea of generating dynamic landscape. The hierarchy of the site divided into three ranks. They are the lakeside view, Mountain View, and center scene. All the buildings are arranged to use best of these three levels of the scene. The best view is the lakeside which we put the best quality and lowest of residence type such as villa on the first row of the lakeside, and we put multiple homes in the second row and third row so that part of this house can still have the lake views. But we also interpose some high-rise residence building near the lakeside to generating a dynamic skyline and also give an axis vies of the landscape. 62
Total floor area 683,070 square meters Total plot area 341,86 square meters Total FAR 2 Plot 1 Floor area 206,920 square meters Plot area 82,607 square meters FAR 2.51 Plot 2 Floor area 136,280 square meters Plot area 65,062 square meters FAR 2.1 Plot 3 Floor area 33,9870 square meters Plot area 19,419 square meters FAR 1.75
High rise tower floor area 458,050 square Credit By meters Others Proportion 67% Sub-high rise tower floor area 124,470 square meters Proportion 18% Multiple layers building floor area 65,739 square meters Proportion 10% Townhous floor area 34,799 square meters Proportion 5%
63
TIANJIN WUQING RESIDENTIAL SALES PAVILION GBBN Architects Work, Beijing,China, 2011
This is my first design building that was built. I was excited to visit the site. The client wanted the sales pavilion to have both Art-deco style and the modern amorphous style which gives a fresh view by contrast two different styles. My personal contribute to this project is act as a chief designer and project manager included designing the building, finishing Revit drawings and cooperating with construction company while constructing the building.
64
65
66
67
QINGDAO BAIGUOSHU RESIDENTIAL SALES PAVILION GBBN Architects Work, Beijing,China, 2009
The Baiguoshu project is an extensive residence planning and architectural design. My personal contribution to this project is acting as a chief designer included developing the master plan and the central commercial buildings which have one sales pavilion, and a string of commercial buildings. The theme of the buildings are the new Renaissance classic styles. To give the commercial buildings and sale pavilion an abundance elevation view, I used Cascade roof to building the mass, first I apply the biggest roof to dominate the central spaces of the building, and then I insert sub roof around the main roofs to get a hierarchy of the shape. I also did the Sketchup model and the final SketchUp renderings.
68
69
70
71
DRAWINGS AND HOBBIES
72
To Be Continued Thank you!