P0561 101 futureform kazan assembly plant floor plan phase 1

Page 1

Notes: STEEL DELIVERIES

New Road Access

Goods IN (Gate-1)

Goods IN (Gate-2)

LGS Coil Delivery Point

Hot Rolled Steel Delivery Point

Goods IN (Gate-3)

SITE BOUNDARY

Goods IN (Gate-4)

Fit-Out Materials

ADDITIONAL STRUCTURAL LOADING TO BE CONSIDERED

New Road Access

Furniture

EXTENDED FACTORY UNIT

A-A

2

17860

18106

LGS Steel Coil Store

Hot Rolled Steel Store

Fit-Out Materials & QA

STORAGE AREA

Roller Shutters

General Tools & Equipment

Welding Transformers

Sub-Assembly Completed Cradle No. 1 Flatbed Tables Sub-Assemblies Workstation AFT-1 Control Centre

FRAME ASSEMBLY

SAFT 1

General Tools & Equipment

Welding Transformers

Stage-6

Stage-7

Overhead Hoist Track P/Line 3 Overhead Hoist Track

(Lifting Brackets are Fitted Here)

SAFT 2

Stage-5

P/Line 4

Overhead Winch Track

Finishing & QA Area

Stage-4

Rolling Tracks

Materials

Materials

Materials

Materials

Materials

Materials

Materials

Materials

Materials

New Road Access

Rolling Tracks

Stage-3

47950

(Lifting Brackets are Fitted Here)

Stage-2

Roller Shutter

Cradle No. 2 Finishing & QA Area

Workstation Control Centre

FRAME ASSEMBLY

SAFT 3

PHASE 1

Roller Shutter

Completed Sub-Assemblies AFT-1

1 : 500

Roller Shutters

Stage-1

Roller Shutters

SAFT 4

STORES Furniture

121590

Materials Roller Shutter

LGS Racks

LGS Racks

Sub-Assembly Flatbed Tables

LGS Indexed Steel Profile Holding Area

Module Materials Stage 1 - 1st & 2nd Fix Stage 2 - 1st & 2nd Fix Stage 3 - Fixtures, Fittings and Finishing Materials

Hot Rolled Steel Sub-Assemblies

Roller Shutters

24000

STORES

8339

Secure Area

Roll Former Control Station

Collection Trays

1

Collection Trays

Existing Building

2 1

Roll Former Control Station

Roll Former No. 1

Roll Former No. 2

Fit-Out Furniture & QA

P/Line 2 Roller Shutters

ROLL FORMERS Requirements TBC

18105

A-A Roof Elevation

Revision Schedule - Rev C C C C

Overhead Hoist Track Roller Shutter

Hot Rolled Steel Welding Bays

16740

Expansion or Office Space etc.

Phase 1 Roof Extent

ORIGINAL FACTOY UNIT

P/Line 1

Overhead Winch Track

1 2 3 4

Date 10-08-14 11-08-14 12-08-14 14-08-14

Description Areas Revised Area Changed Roof Elevation =Added Floor amended

by PG PG PG PG

Overhead Hoist Track

74703

55887

EXISTING FACTORY UNIT = Area 6768m2 = Area 10230m2

PHASE 2 - EXPANSION TBC

= Area 9558m2

SITE BOUNDARY

EXISTING BUILDING

PHASE 1 - PROPOSED EXTENSION

A-A

0

ROAD

EXISTING BUILDING

EXISTING BUILDING

5

10

15

20

EXISTING BUILDING

25

30

35

40

45

50

This drawing and the information contained within, is the property of the issuing company. It may not be used, transmitted or reproduced, in whole or in part, without prior written consent from the issuing company.

NORTH

FUTUREFORM LIMITED Unit 1, The Malthouse Est, Brighton Road Shoreham-By-Sea, West Sussex BN43 6RJ UK. Tel: +44(0) 1273 592600 Fax: +44(0) 1273 593959 www.futureformltd.com Client

-

Project

FUTUREFORM / KAZAN Assembly Plant

Drawn by Ch'd by Prj No.

1

00_Level 1 : 500

Scale

Status

ASSEMBLY PLANT LAYOUT PHASE-1 PG -

Date

08-08-14

App'd

-

P0561-101 A1@ 1 : 500

Rev

PROVISIONAL