P0561 102 futureform kazan assembly plant floor plan phase 2

Page 1

Notes:

ADDITIONAL STRUCTURAL LOADING TO BE CONSIDERED

STORAGE AREA AVAILABLE TBC

EXTENDED FACTORY UNIT

2

Short Term Under Cover Storage Area

A-A

A-A Roof Elevation 1 : 500

SITE BOUNDARY

Goods IN (Gate-1)

New Road Access

ORIGINAL FACTOY UNIT

New Road Access

Goods IN (Gate-2)

STEEL DELIVERIES LGS Coil Delivery Point 56778

Goods IN (Gate-3)

22372

121590

Phase 2 Roof Extent

Roll Former Control Station

1

Collection Trays

Collection Trays

1

Collection Trays

1

Roll Former No. 5

Roll Former Control Station

1

Roll Former No. 4

Roll Former Control Station

Roll Former No. 3

Roll Former Control Station

Roll Former No. 2

Collection Trays

Collection Trays

1

Roll Former Control Station

Roll Former No. 1

Fit-Out Materials & QA

LGS Steel Coil Store ROLL FORMERS Requirements TBC

STORES

STORES

Module Materials Stage 1 - 1st & 2nd Fix Stage 2 - 1st & 2nd Fix Stage 3 - Fixtures, Fittings and Finishing Materials

Fit-Out Furniture & QA

2

SAFT 8

SAFT 7

General Tools & Equipment

Sub-Assembly Completed Flatbed Tables Sub-Assemblies AFT-3 SAFT 6

Stage-6

Stage-7

Overhead Hoist Track

Revision Schedule

P/Line 7 Welding Transformers

Overhead Winch Track

- Rev

Overhead Hoist Track

PHASE 2

Cradle No. 3 Finishing & QA Area

Workstation Control Centre

P/Line 6

General Tools & Equipment

Welding Transformers

C C C C

1 2 3 4

Date 10-08-14 11-08-14 12-08-14 14-08-14

Description Areas Revised Area Changed Roof Elevation =Added Floor amended

by PG PG PG PG

Overhead Hoist Track

Rolling Tracks

P/Line 5

Overhead Winch Track

Overhead Hoist Track

Roller Shutters

Roller Shutters

Overhead Hoist Track

(Lifting Brackets are Fitted Here)

Rolling Tracks

FRAME ASSEMBLY

General Tools & Equipment

Welding Transformers

P/Line 3

Overhead Winch Track

Finishing & QA Area

SAFT 2

Overhead Hoist Track

Materials

Materials

Materials

Materials

Materials

Materials

Materials

Materials

Materials

Materials

P/Line 2 Overhead Hoist Track

P/Line 1

Overhead Winch Track Overhead Hoist Track

HEAVY WELDING SHOP Welding Bays

This drawing and the information contained within, is the property of the issuing company. It may not be used, transmitted or reproduced, in whole or in part, without prior written consent from the issuing company.

New Road Access

Sub-Assembly Completed Cradle No. 1 Flatbed Tables Sub-Assemblies Workstation AFT-1 Control Centre

Stage-7

Roller Shutter

Welding Transformers

Stage-6

Roller Shutter

General Tools & Equipment

Stage-5

Roller Shutter

Rolling Tracks

Stage-4

P/Line 4 Roller Shutters

(Lifting Brackets are Fitted Here)

Stage-3

47950

Finishing & QA Area

Workstation Control Centre

Stage-2

Roller Shutter

Stage-1

Cradle No. 2

Secure Area

LGS Indexed Steel Profile Holding Area

LGS Racks

Stage-5

Rolling Tracks

FRAME ASSEMBLY

SAFT 1

Stage-4

(Lifting Brackets are Fitted Here)

SAFT 5

SAFT 3

Stage-3

P/Line 8

FRAME ASSEMBLY

SAFT 4

Stage-2

Finishing & QA Area

Workstation Control Centre

FRAME ASSEMBLY

Sub-Assembly Completed Flatbed Tables Sub-Assemblies AFT-2

LGS Racks

Stage-1

(Lifting Brackets are Fitted Here)

Roller Shutters

24000

Cradle No. 4

Roller Shutters

LGS Indexed Steel Profile Holding Area

Existing Building

LGS Racks

LGS Racks

Sub-Assembly Completed Flatbed Tables Sub-Assemblies AFT-4

FUTUREFORM LIMITED Unit 1, The Malthouse Est, Brighton Road Shoreham-By-Sea, West Sussex BN43 6RJ UK. Tel: +44(0) 1273 592600 Fax: +44(0) 1273 593959 www.futureformltd.com

Fit-Out Materials & QA Stores

A-A

STORES

STORES

Module Materials Stage 1 - 1st & 2nd Fix Stage 2 - 1st & 2nd Fix Stage 3 - Fixtures, Fittings and Finishing Materials

Fit-Out Furniture & QA

Client

-

Project

FUTUREFORM / KAZAN Assembly Plant

Goods IN (Gate-5)

Goods IN (Gate-6)

Description

Futureform Avenue

Drawn by Ch'd by

74703

ROAD

1

00_Level 1 : 500

55887

Prj No.

0

5

10

15

20

25

30

35

40

45

50

NORTH

Scale

Status

ASSEMBLY PLANT LAYOUT PHASE-2 PG -

Date

08-08-14

App'd

-

P0561-102 A1@ 1 : 500

Rev

PROVISIONAL

C4

21/08/2014 14:39:04

Goods IN (Gate-4)

SITE BOUNDARY

EXISTING BUILDING