Notes:
ADDITIONAL STRUCTURAL LOADING TO BE CONSIDERED
STORAGE AREA AVAILABLE TBC
EXTENDED FACTORY UNIT
2
Short Term Under Cover Storage Area
A-A
A-A Roof Elevation 1 : 500
SITE BOUNDARY
Goods IN (Gate-1)
New Road Access
ORIGINAL FACTOY UNIT
New Road Access
Goods IN (Gate-2)
STEEL DELIVERIES LGS Coil Delivery Point 56778
Goods IN (Gate-3)
22372
121590
Phase 2 Roof Extent
Roll Former Control Station
1
Collection Trays
Collection Trays
1
Collection Trays
1
Roll Former No. 5
Roll Former Control Station
1
Roll Former No. 4
Roll Former Control Station
Roll Former No. 3
Roll Former Control Station
Roll Former No. 2
Collection Trays
Collection Trays
1
Roll Former Control Station
Roll Former No. 1
Fit-Out Materials & QA
LGS Steel Coil Store ROLL FORMERS Requirements TBC
STORES
STORES
Module Materials Stage 1 - 1st & 2nd Fix Stage 2 - 1st & 2nd Fix Stage 3 - Fixtures, Fittings and Finishing Materials
Fit-Out Furniture & QA
2
SAFT 8
SAFT 7
General Tools & Equipment
Sub-Assembly Completed Flatbed Tables Sub-Assemblies AFT-3 SAFT 6
Stage-6
Stage-7
Overhead Hoist Track
Revision Schedule
P/Line 7 Welding Transformers
Overhead Winch Track
- Rev
Overhead Hoist Track
PHASE 2
Cradle No. 3 Finishing & QA Area
Workstation Control Centre
P/Line 6
General Tools & Equipment
Welding Transformers
C C C C
1 2 3 4
Date 10-08-14 11-08-14 12-08-14 14-08-14
Description Areas Revised Area Changed Roof Elevation =Added Floor amended
by PG PG PG PG
Overhead Hoist Track
Rolling Tracks
P/Line 5
Overhead Winch Track
Overhead Hoist Track
Roller Shutters
Roller Shutters
Overhead Hoist Track
(Lifting Brackets are Fitted Here)
Rolling Tracks
FRAME ASSEMBLY
General Tools & Equipment
Welding Transformers
P/Line 3
Overhead Winch Track
Finishing & QA Area
SAFT 2
Overhead Hoist Track
Materials
Materials
Materials
Materials
Materials
Materials
Materials
Materials
Materials
Materials
P/Line 2 Overhead Hoist Track
P/Line 1
Overhead Winch Track Overhead Hoist Track
HEAVY WELDING SHOP Welding Bays
This drawing and the information contained within, is the property of the issuing company. It may not be used, transmitted or reproduced, in whole or in part, without prior written consent from the issuing company.
New Road Access
Sub-Assembly Completed Cradle No. 1 Flatbed Tables Sub-Assemblies Workstation AFT-1 Control Centre
Stage-7
Roller Shutter
Welding Transformers
Stage-6
Roller Shutter
General Tools & Equipment
Stage-5
Roller Shutter
Rolling Tracks
Stage-4
P/Line 4 Roller Shutters
(Lifting Brackets are Fitted Here)
Stage-3
47950
Finishing & QA Area
Workstation Control Centre
Stage-2
Roller Shutter
Stage-1
Cradle No. 2
Secure Area
LGS Indexed Steel Profile Holding Area
LGS Racks
Stage-5
Rolling Tracks
FRAME ASSEMBLY
SAFT 1
Stage-4
(Lifting Brackets are Fitted Here)
SAFT 5
SAFT 3
Stage-3
P/Line 8
FRAME ASSEMBLY
SAFT 4
Stage-2
Finishing & QA Area
Workstation Control Centre
FRAME ASSEMBLY
Sub-Assembly Completed Flatbed Tables Sub-Assemblies AFT-2
LGS Racks
Stage-1
(Lifting Brackets are Fitted Here)
Roller Shutters
24000
Cradle No. 4
Roller Shutters
LGS Indexed Steel Profile Holding Area
Existing Building
LGS Racks
LGS Racks
Sub-Assembly Completed Flatbed Tables Sub-Assemblies AFT-4
FUTUREFORM LIMITED Unit 1, The Malthouse Est, Brighton Road Shoreham-By-Sea, West Sussex BN43 6RJ UK. Tel: +44(0) 1273 592600 Fax: +44(0) 1273 593959 www.futureformltd.com
Fit-Out Materials & QA Stores
A-A
STORES
STORES
Module Materials Stage 1 - 1st & 2nd Fix Stage 2 - 1st & 2nd Fix Stage 3 - Fixtures, Fittings and Finishing Materials
Fit-Out Furniture & QA
Client
-
Project
FUTUREFORM / KAZAN Assembly Plant
Goods IN (Gate-5)
Goods IN (Gate-6)
Description
Futureform Avenue
Drawn by Ch'd by
74703
ROAD
1
00_Level 1 : 500
55887
Prj No.
0
5
10
15
20
25
30
35
40
45
50
NORTH
Scale
Status
ASSEMBLY PLANT LAYOUT PHASE-2 PG -
Date
08-08-14
App'd
-
P0561-102 A1@ 1 : 500
Rev
PROVISIONAL
C4
21/08/2014 14:39:04
Goods IN (Gate-4)
SITE BOUNDARY
EXISTING BUILDING