Surface Tension: Planning

Page 1

Surface Tension – a London 2050 Event

Break-out session:

Planning Chair:

Joanna Rowelle, Associate Director, Planning, Policy & Economics, Arup

Panel:

Jamie Eagles, Strategic Project Manager, Nine Elms on the South Bank Tim Chapman, Director, Infrastructure Design Group, Arup Duncan Brown, Strategic Project Manager, Whitechapel Vision Delivery Team, London Borough of Tower Hamlets


Jamie Eagles – Strategic Project Manager 26th November 2014



Overview

12

25

thousand new jobs

6.5m

27

schemes on site

3

sqft of commercial space with planning approval

in growth for ÂŁ7.9b London and UK

tube stations

sites with planning permission granted

2

town centres

Total development ÂŁ15b+ value

3k

Affordable homes



Phasing of development NORTHERN LINE EXTENSION

180,000

3,500

160,000

3,000

140,000

100,000

2,000

80,000

1,500

60,000 1,000 40,000 500

20,000

35.00

34.00

33.00

32.00

31.00

30.00

29.00

28.00

27.00

26.00

25.00

24.00

23.00

22.00

21.00

20.00

19.00

18.00

17.00

16.00

15.00

14.00

13.00

12.00

11.00

9.00

10.00

8.00

7.00

6.00

5.00

4.00

3.00

2.00

-

1.00

-

Timescales in years (first 2 years in 6 month periods) Replacement CGM floorspace

Commercial (net of CGM, US Embassy and BP)

US Embassy

BPS commercial

Hotel (20 sq m per room)

All residential (Pvt, Aff, Student & Extra Care)

Aff resi

Private resi

Residential units

floorspace in sq m

2,500 120,000


OAPF and DIFs


Utilities Masterplan GAS

Upgrades Required

New gas pressure reducing station. No pipe work upgrades to meet demands required. Planned maintenance in 2016

Capital Investment required

£6m est. (not linked to developments)

Developer cost

SPV contribution

£0

Manage & coordinate works to minimise disruption

WATER

ELECTRICITY

DRAINAGE

TELECOM

New primary substation, EHV and local HV cabling. Upgrade at super grid connection point Wimbledon.

Separation of surface water from combined system. Installation of new tunnelled system, pumped to Thames

£21.5m for primary + land cost.

£16.5m surface water drains and pumping station + land cost

£2.7m divided proportionally to each developer on requested capacity

£21.5m for primary + land cost. IDNO indicatively advised a £11m investment is available

£13.2m for surface water system and pumping station. + land cost

£0 presumed competition will permit investment.

Manage & coordinate works to minimise disruption to public and developers

Manage & coordinate works. Procure primary, take advantage of competitive market, agree site location.

Challenge advised upgrades. Develop Nine Elms Drainage strategy. Manage & coordinate works.

Make application for upgrade works. Bid to all available operators. Manage and coordinate works

Off site mains + Battersea pumping upgrade.

£13.3m

Installation of Openreach ducts and alternative providers ductwork.

£2m est.


Utilities Masterplan UN-COORDINATED PRIMARY INFRASTRUCTURE UPGRADE PERIOD UPGRADE WORKS TIMELINE

2013

2014

2015

2016

2017

2018

2019

2020

PRIMARY SUBSTATION

ELECTRICITY

PROCUREMENT AND

UKPN

PLANNING

INSTALLATION PERIOD

DEVELOPMENT OF VNEB ELECTRICITY NETWORK

NINE ELMS MP MAINS REPLACEMENT PLANNING AND DESIGN

INSTALLATION PERIOD

GAS NATIONAL

NEW NETWORK CONNECTIONS TO DEVELOPMENTS

PRESSURE REDUCTION STATION

GRID

CONSTRUCTION

PLANNING AND

AND

DESIGN

INSTALLATION

NEW DUCTS FROM EXCHANGE POINTS

TELECOMS OPENREACH

PLANNING AND

INSTALLATION PERIOD

EXTENSION OF NETWORK TO NEW DEVELOPMENTS

PROCUREMENT

OFFSITE REINFORCEMENT WORKS

POTABLE WATER

2021

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q

PLANNING, DESIGN AND

CONSTRUCTION

CONSULTATION

PERIOD

THAMES WATER

EXTENSION OF NETWORK TO NEW DEVELOPMENTS

REPLACEMENT OF BATTERSEA SHAFT PUMPS Planning and Design

CONSTRUCTION PERIOD

SURFACE WATER SEWER AND PUMPING STATION

DRAINAGE

PLANNING, DESIGN AND

THAMES WATER

CONSULTATION

CONSTRUCTION AND INSTALLATION

EXTENSION OF NETWORK TO NEW DEVELOPMENTS


Construction Impact


Taking it forward Strategic Project Manager

Governance Special Purpose Vehicle Arup


District Heating Drainage Telecoms Electricity supply


Key challenges Defining accumulative demand and phasing Strategic land & way leaves Regulatory barriers Investment ahead of need Collaborative working


Conclusions

Plan early Clear vision and seeking added value

Governance

Early engagement with utilities

Management of data and unified platform


Nineelmslondon.com info@nineelmsonthesouthbank.com Twitter @NineElmsTeam


Surface Tension: Planning

The Crossrail Experience in Whitechapel Duncan Brown

Strategic Project Manager, Whitechapel Vision Delivery Team LB Tower Hamlets
















Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.