Surface Tension: Bank case study

Page 1

Alan Baxter INTEGRATED DESIGN

Future of London – Surface Tension Bank Station Capacity Upgrade Case Study Daniel Zwetsloot & William Filmer-Sankey 26 November 2014










Farringdon Pedestrian Footfall Forecast TUBE 22,000 passing through (morning peak)

THAMESLINK 44,000 passing through (morning peak)

CROSSRAIL 56,700 passing through (morning peak)



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.