4 minute read

Classifieds

CLASSIFIED ADVERTISING RATES - Classified ads are $20 per line for a 60 character line (including spaces and punctuation), $60 minimum. The price includes publication in both the magazine and our Web site. Short positions wanted ads are run one time for no charge and are subject to editing. ads@fwrj.com

POSITIONS AVAILABLE

CITY OF WINTER GARDEN – POSITIONS AVAILABLE

The City of Winter Garden is currently accepting applications for the following positions:

EXPERIENCED & TRAINEES/LABORERS • Collection Field Tech – I, II, & III • Distribution Field Tech – I, II, & III • Public Service Worker II – Stormwater • Superintendent – Collections, Wastewater, & Stormwater • Wastewater Plant Operator – Class C

Please visit our website at www.cwgdn.com for complete job descriptions and to apply. Applications may be submitted online, in person or faxed to 407-877-2795.

UTILITY DESIGN ENGINEER

Assists in directing the operations of Water and Sewer Department as it relates to engineering and regulatory work; and performs related duties as assigned. Requires a Bachelor’s degree in Civil Engineering or closely related field and 4 years related experience. Possession of an active Engineer In Training (EIT) certification is required. APPLY: Online at www.covb.org and review complete job description. City of Vero Beach, FL 772 978-4900 EOE/DFWP

Coral Springs Improvement District

Wastewater Plant A Operator Applicants must have a valid Class C Wastewater Treatment license or greater. Operates sewage treatment, sludge processing, and disposal equipment in a wastewater (sewage) treatment plant to control flow and processing of sewage. This employee is responsible for keeping within permit discharge limits and routinely monitors the flow of wastewater and chemical levels. Salary range for this position if $47,800 - $74,880. Salary to commensurate relative to years of experience in this position.

Excellent compensation including defined benefit and matching 457 pension plan. Applications may be obtained by visiting our website at www.csidfl.org/resources/employment.html and fax resume to 954-753-6328, attention Jan Zilmer, Director of Human Resources. The Department of Environmental & Engineering Services (DEES) is currently accepting job applications at: https://www.margatefl.com/207/Job-Opportunities

Water Treatment Plant Operators

The Water Treatment Plant at Village of Wellington is currently accepting applications for a full-time Water Operator. Apply online. Job postings and application are available on our website:

https://wellingtonfl.munisselfservice.com/ employees/EmploymentOpportunities/JobDetail. aspx?req=20&sreq=5&form=WTO3&desc=OPERATOR III, WATER TREATMENT PLANT

We are located in Palm Beach County, Florida. The Village of Wellington offers great benefits. For further information, call Human Resources at (561) 753-2585.

Engineering Support Services Manager/Engineering: $81,353.07 - $130,164.91/annually Field Service and Advanced Metering Infrastructure (AMI) Administrator $76,030.91 - $121,649.46/annually Project Manager: $70,835.55 - $113,336.89/annually Public Utilities Asset Manager: $81,353.07 - $130,164.91/annually Public Utilities Manager (Wastewater Treatment Plant): $81,353.07 - $130,164.91/annually Utilities Instrumentation and Control Systems Specialist: $56,114.71 - $85,294.61/annually

For More Info and to Apply go to: http://agency.governmentjobs.com/hollywoodfl/default.cfm EOE M/F/D/V

City of Titusville - Multiple Positions Available Water Reclamation Superintendent, Plant Operator Trainee, Utility Asset Program Manager, Meter Technician, Maintenance Mechanic. Apply at www.titusville.com

Wastewater Treatment Plant Operator “C” Salary Range: $52,645.98 - $84,011.20 The Florida Keys Aqueduct Authority’s WASTEWATER DIVISION IS GROWING, and we need (2) WWTP Operators with a Florida “C” license or higher. You will perform skilled/ technical work involving the operation and maintenance of a wastewater treatment plant. This requires technical knowledge and independent judgment to make treatment process adjustments and perform maintenance on plant equipment, machinery, and related control apparatus in accordance with established standards a nd procedures. Benefit package is extremely competitive! Location: Duck Key, FL. Must complete on-line application at www.fkaa.com EEO, VPE, ADA

Miccosukee Tribe of Indians

Water Plant Operator Full-time 40 hours per week, Day shift with one weekend day, ability to work flexible schedule & holidays as necessary. Performs work involving operation and maintenance of small water plant. Operator must possess a “C” License from State of Florida or equivalent and a minimum of two years of experience, lime softening preferred. Clean Criminal Background. Salary 52,000 per year. Email resume to: crystalm@miccosukeetribe.com or fax (305) 894- 2350. Work Location is 20 Miles west of Krome Ave on Tamiami Trail, Miami

LOOKING FOR A JOB?

The FWPCOA Job Placement Committee Can Help!

Contact Joan E. Stokes at 407-293-9465 or fax 407-293-9943 for more information.

Continued from page 63

Funding for the project is provided in the St. Johns River and Keystone Heights Lake Region Projects legislative appropriations and totals more than $48 million, of which $43.4 million is put aside to the Black Creek project. Clay County Utility Authority, Gainesville Regional Utilities, St. Johns County Utilities, and JEA contributed an additional $19.2 million.

R

The City of Tampa is launching a major project to repair dozens of miles of underground pipe and roadways in four neighborhoods. The city is targeting aging underground pipes in Forest Hills, East Tampa, MacFarlane Park, and Virginia Park in a project that will span three and a half years and cost the city $200 million.

“It will help with water pressure and water quality. We will be reducing water main breaks and reducing the number of cave-ins on sanitary sewer sites,” said Brad Baird, infrastructure administrator for the City of Tampa.

The project will have three planned phases: • Phase 1 includes the repair and relining of around 27 miles of underground pipes. • Phase 2 will target the removal and replacement of at least 18 miles of pipes. • Phase 3 will address roadway and driving surface improvements in all four neighborhoods. S

This article is from: