International Home - Student Project

Page 1

International Home Toronto, Canada

Gabrielle Pauwels Jillissa Moorman Residential Design II 04/24/2019



Prliminary Documents



Location


Clients • I have worked with them in the past • Current residence is in Kenora, Canada and Hampton, IL

• Looking to move to a one story home but don’t want to lose the square footage they have now • Love tall ceilings • Must be close to a lake and private



Inspiration Images


Time Management

• Preliminary Design

7 Hours

• Tour and Research

6 Hours

• SketchUp

25 Hours

• Lumion

10 Hours

• Construction Documents

5 Hours

• Furnishing selections

4 Hours

• Booklet and Branding

5 Hours

• Finalizing Design

10 Hours Total- 72 Hours


Furniture Design



Preliminary 3D drawings for the piece


Sanding down the drawers to prep them for paint.


Went dumpster diving for a tarp to paint on (Pictured is the current house that my grandparents are building from a plan I drew for them)


I had to place a board over the inside of the drawers because I didn’t want them to be painted. Pictured is a sage green and clear coat paint. The paint was then applied in multiple layers.


I then had to refinish the top we used for the desk.


While everything took time to dry I cut the boards for the frame to attach the drawers.


We then clamped and screwed in the wood to the metal base.


Because I refurbished old drawers I had to clean the brass handles to give them a new look.


We then attached the drawers by drilling holes into the top so we could fit a tool down into the drawer to fasting It to the base.


Last of all we glued and clamped the top to the drawers and let it dry over the weekend.



Construction Documents









FFE Documents














Renderings














Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.