M.
G
A
J G B
R
I
E
L
A
J
A
R
A R C H I T E C T U R E
R
I
N
J G GG M.
G A B R I E L A
J A R R I N
www.gabrielajarrin.com https://www.linkedin.com/in/gabriela-jarrin (814)-321-1952 Master of Architecture Savannah College of Art and Design 2018
T H E
CONTENTS
04
16
20
ENDWISE Winery
COALESCE Photography Center
LINK Tricentennial Plan for MLK Corridor
26
34
44
THE DISSECT Museum of Modern Art
46
ADDENDUM
NATURAE Urban Intervention
PAINTING Hybrid Media
Exterior Render - Outdoor Event Space
4
ENDWISE M A R K E D
T R E E
W I N E R Y
S T U D I O
VI
Flat Rock, NC Winter-Spring 2016 Winery Proposal Total Area: 30,000SF Professor Alice Guess
The Marked Tree Winery facility will provide production facilities with an estimated yield of about 21,000 gallons per
year
of
wine.It
includes
on-site
sterile
bottling
facility and on-site barrel storage. Expected water usage of up to 1350 gallons of water per day. Water needs to be met with on-site well and storage tank. Hospitality spaces will provide tasting and event spaces to accommodate visitor tastings of up to 60 guest, indoor events of up to 100 people and outdoor events of up to 200 guests. For conceptual design face many aspects including the site’s circulation, access roads, placement and orientation, and other elements were taken into account to develop the project conceptually. One of the most significant elements found within the site’ parameters was the reppetitive vertical elements produced by light and the natural elemnts.
5
Site Analysis
Views
Drainage
Acess
Wind
Site Plan
Ground Floor Plan
Pond
Fermentation Egress
Forest
Best Vines
Service Acess Road
Second Best Natural Drainage Second Best
6
Concept Models The contrast between terroir elements of light and climate is the major source of insipration in the project. It is
an
evolving transformation of the vertical repetition, possitive and negative spaces, and the repetitive rigidity of vineyard in plan that informs the building and program. These aspects are used as a primary element in the design. Topography and Tectonic
Light and Climate
s
ation
Bottling Loading
Light and Climate
Crush Pad
Hospitality
Structure
Fermentation
Barrel
Structure
Double Tee Precast Concrete Double Tee Precast Concrete
Sustainability Stategy Visitor Acess Road
Rain Water Collection Thermal Slab
Viewing Platform Hospitality
Solar Screening Louver system Hospitality
Fermen
Outd
Outdoor Plaza
Barrel
Outd
Egress Fire protected Glass Skylight
7
Egress Fire protected
Structure Double Tee Precast Concrete
PROCESS TRANSFORMATION RIGIDITY AND REPETITION IN PLAN
Ground Floor Plan
Topography and Tectonic
Light and Climate
Pond
Ground Floor Plan Fermentation Egress
Forest
Fermentation Egress
Bottling Loading
Bottling Loading
Service Acess Road
Visitor Acess Road
Natural Drainage Second Best
Service Acess Road
Underground Bottling & Barrel
MOVEMENT AND DIRECTION
8
cture
Visitor Acess Road
North Elevation
Sustainability Stategy Rain Water Collection
Viewing Platform
Grass
Earth/growi
Thermal Slab Hospitality
oldroyd Tp
Extra Drain
Solar Screening Fermentation Louver system
Sustainable Proof Membr
Outdoor Event Space Barrel
Outdoor Plaza
Egress Fire protected Glass Skylight
crete
Concrete Sl
Outdoor Plaza
1"=20' 0'
20'
50'
Structure Double Tee Precast Concrete
South Elevation Hospitality Fermentation Hospitality Outdoor Event Space
Barrel
Barrel
Outdoor Plaza
Bottleling
Barrel Egress FireCrush protected Pad Glass Skylight
Outdoor Plaza Outdoor Event Space
Fermentation
1"=20' 0'
20'
Egress Fire protected Glass Skylight
50'
Wall Detaile Precast Panel Inner and outer sealant on backerrod drained at vertical joints
North Elevation
Panel connection
Gypsum Board South Elevation Metal pin to connect pannels Steel stud cavity air and water layers without penetrating Board Insulation
9 South Elevation
Exterior Render - Outdoor Space
Exterior Render - Entrance
10
Exterior Render
11
16 Exterior Render - Entrance
COALESCE P H O T O G R A P H Y
C E N T E R
S T U D I O
II
Savannah, GA Winter 2015 Photography Center Proposal Total Area: 30,000SF Professor Scott Dietz
Coalesce photography center is located in downtown Savannah, GA. The whole project is based on the process of how a digital cameras capture pictures. It transforms the idea of how pixels within a picture are equal in size but each and every one of them separate from each other in content. With this concept in mind, Collaese is a geometric abstraction of these ideas resulting in a well rounded composition like form. They pieces work collectiveley creating unity, repetition, pattern, and intersection in design. The use of materiality is an essential element in the project because it defines each shape as individual and separates accordignly to the program.
17
Site Plan Process Diagrams
Equal
Program grid Circulation axis
Private
Public Retail Gallery Residential Educational
interlocking Geometry
18
Primary axis
Sun and glass pannels
Egress
Entry points
Outdoor spaces
Level 1
Level 2
Atrium and Indoor garden
Level 3
Artist Loft
19
20 Exterior Render - Boardwalk
THE LINK
T R I C E N N T E N I A L P L A N F O R T H E M L K C o r r i d o r G R A D
S T U D I O
I
Savannah, GA Fall 2017 Mixed Used Master Plan Proposal In Collaboration with Sebastian Fuentes Concept-DD Two Months
The Link is a class group project completed for the Urbanism based Graduate Studio I. It focusses on the redesign of the MLK corridor in downtown Savannah, GA. The objectives of the project include incorporating a transit Hub landmark while resurrecting the once existing “Union Station” to connect Savannah to the nation with rapid transit, encourage commercial diversity, stimulate economy, promote social interaction, and provide greater security. As a class, we were divided in four groups to complete the project. Within the LINK, we created a district called “Greenbelts to Art and Education” to incorporate landscaping and natural elements, integrate existing artistic venues to showcase creative work, stimulate economy, and encourage social interaction.
21
Site Analysis
LIGHT RAIL STOPS
CRIME
Religious Educational Restaurants Points of Interest Stops Pedestrian
VACANT SPACES
High Crime Areas
GREEN SPACES
Parks
UNIFIED PATH
ZONING
Victorian District 3-B Multifamily & Residential R-M25 Victorian District 3-R
22
Outdoor Plaza Adjacent to Light Rail Stop
Outdoor Plaza Adjacent to Light Rail Stop
Boardwalk Public Green Spaces
Restaurants Across Plaza & Hotel
Restaurants Across Plaza and Hotel
Storefronts Along MLK
Storefronts along MLK Yoga and Dance Center Public Parking Garage Double Tree Hotel Plaza/ Water Feature Local Supermarket Mixed Use: Apartments Commercial Parking
23
Plaza
24
Boardwalk
25
THE DISSECT M U S E U M G R A D
O F
M O D E R N
S T U D I O
A R T
II
Charleston, SC Winter-Spring 2017 Museum- Mixed Use Proposal Total Area: 80,000SF Concept-CD Five Months
The Dissect Museum of Modern Art is located in the heart of the historic district of Charleston, South Carolina. It is based on the idea of changing the typical museum typology by “Dissecting” contemporary art into separate buildings. The museum is a place for humans to connect and for local artists to meet new artists. Taking advantage of the surrounding water, the museum is pierced by a Per Art market that has the best view of the river. This is a space where all local and international artists sell their art while having one of the best views in the city. The museum serves as a modern landmark and it’s giant water feature extends the visitor’s infinity view of water. The main entrance is kept discrete and intimate to provide an element of surprise.
26
Exterior Rendering - Waterfront Park
27
“ Separate into pieces;
HYBRID STRUCTURE CAST IN PLACE CONCRETE COLUMMNS, STEEL BEAMS AND STEEL K SERIES WEB JOISTS
Analyse minutely part by part.”
Dissecting a typical museum
Slicing geometries
Connecting underground and ground level Dissecting individual geometries into attempt to avoid direct sunlight
ROOF GLAZING AND SHADING ELEMENTS
WALL AND INTERIORS
FLOORS - ENTRANCE 1ST 2ND 3RD 4TH
REFLECTIVE GLASS SKIN PANELS
SHADING ELEMENTS TERRACOTTA & ALLUCOBOND
STRUCTURAL RIBS
STRUCTURAL FRAMING, COLUMNS, FOUNDATIONS
28
29
Site Plan
AUDITORIUM
VIEWING PLATFORM ARTIST LOFTS
PHOTOVOLTAIC SOLAR PANELS
PERIMETER HYDRONIC INDIRECT RAINWATER RADIANT COOLING LIGHTING HARVESTING FLOOR AND CEILINGS SYSTEM
ORIENTATION SPECIFIC SOLAR SHADES
CROSS VENTILATION
WATER STORAGE TANK
30
Section Perspective
East Elevation
REFLECTING POOL RAMP ENTRY
SUNKEN PLAZA
31
Third Level Photography Museum 32. Workshops 33. Lounge Area Painting & Sculpture Museum 34. Multipurpose Room 35. Lounge Area Glass Museum 36. Workshops 37. Lounge Area 38. Restrooms 39. Mechanical 40. Strorage Second Level Photography Museum 27. Open Gallery Space Painting & Sculpture 28. Open Gallery Spaces Glass Museum 29. Open Gallery Space 30. Mechanical 31. Storage First Level Photography Museum 17. Commercial Space 18. Storage Painting& Sculpture 19. Starbucks/ Coffee Shop 20. Restrooms 21. Outdoor Plaza 22. Viewing Platform Glass Museum 23. Reception 24. Restaurant 25. Kicthechen and Storage 26. Mechanical Entrance Level 1. Sunken Plaza 2. Entry 3. Lobby 4. Intro Galleries 5. RestroomsGift Shop 6. Lounge Area 7. Artist Lofts 8. Administration Offices 9. Storage 10. Mechanical 11. Seating 12. Back Stage 13. Restroom 14. Changing Room 15. Rehearsal 16. Workshop
32
APPLE SMART CEILING SYSTEM WALL TO WALL LIGHTED CEILLING PANELS THAT OFFER FLEXIBLE DISPLAYS FOR LARGE OPEN SPACES. EACH PANEL CONSISTS OF THOUSANDS OD LED TINY LIGHTS ARRAYED HORIZONTALLY DIRECTED DOWNWARD THROUGH A PLASTIC DIFFUSER.
Sunken Plaza
Gallery
Cafe
Underwater Main Entrance Artist Studios & Viewing Platform
Restaurant& Bar
33
NATURAE P U B L I C G R A D
I N T E R V E N T I O N
T H E S I S
Guatemala City, Guatemala Fall-Winter 2018 Urban Intervention Proposal Professor Scott Singeisen Concept
By
Unravelling
the
interpretation
of
mental
disorders
and environmental psychology, we can develop an assessed prognosis
on
needs
indicidual
of
design
opportunities disorders,
that
support
adress
specific
positive
mental
health, and promote resiliance. The effect of environmental psychology and the impact of nature on mental health force a reconsideration of public spaces and design - primarily anxiety,
depression,
privatization
of
stress,
resources,
and
substance
services,
abuse.
The
facilities,
and
specialists accentuate the inequalities of mental healthcare services. The association of the common mental disorders with violence is the predominant cause of alcohol and drug abuse in the country. Using the human preference for nature and aversion of urban environments, the neighborhood people with mental disorders can engage open spaces adressing nature, midfulness, interaction, movement, temperatuture, and light. Resulting exploration and imagery is presented as it forms the future of public spaces and community environments in the city of Guatemala to bring people out of the shadows and raise awareness for mental health as a global issue.
34
‘Ruralization of Metropolitan areas’
35
36
37
38
39
40
41
42
+RESILIENCY
+NATURE
+MENTAL HEALTH
43
PAINTINGS S E G R E G A T I O N 18 X 18 IN. H Y B R I D
M E D I A
F L U I D I T Y 40 X 50 IN. ACRYLIC ON CANVAS
44
A B S T R A C T I O N 20 X 18 IN. ACRYLIC ON CANVAS
E S S E N C E 40 X 50 IN. ACRYLIC ON CANVAS
45
46
ADDENDUM
47
NAVICENT
Exterior Render
H O S P I T A L H K S
S U M M E R
I N T E R N
Macon,GA Summer 2017 Healthcare DD-CD Three Months - Designed and 3D Modeled everything in Level 03 Lobby including reception desk, pony walls, ceilling, etc. - Selected finishes, coordinated renderings with out of country venodr and edited postproduction using phtooshop. - 3D modeled furniture in Cafe including book shelf,counters etc.
50
Level 3 Lobby
Level 1 Cafe
Elevator Lobby Elevation A
Elevator Lobby Elevation B
Level 3 Lobby Area Plan
Level 3 Lobby Desk East
Level 3 Lobby Desk North
51
Bowling Lanes Photograph
C H E L S E A
P I E R S
EXPANSION/ RENOVATION
New York, NY Fall 2019 Retail DD,CD,CA
- I was the designer in charge for this project. Managed all timelines, coordinated all aspects of design with all consultants and the client. From design developent to construction administration. Drafted and modeled all drawings in this renovation. - I coordinated with expediters and the city the approval of drawings and revisions as well as administrated the construction with the general constractor.
52
Arcade Expansion Photograph
Life Safety Plan
53
J
Construction Documentation Example: New Offices
CLG 11' - 2" 1' - 3" 10" 11" 3"
CLG 11' - 2"
OPEN TO BEYOND W 1' - 2"
2' - 2"
A3 A-150.00
CLG 11' - 2"
OPEN TO BEYOND
MAIN LEVEL 1' - 8"
PT17
SALES OFFICE 129 - INTERIOR ELEVATION
D1
5' - 0" W
D2
1/4" = 1'-0"
PT17
1' - 2"
3' - 6"
EQ W
3' - 0"
EQ
2' - 6" 2' - 10"
6" EQ
MAIN LEVEL 1' - 8"
4"
6" EQ
2' - 10"
2' - 10"
2"
5' - 0"
I
5' - 0"
OPEN TO BEYOND
PT17
MAIN LEVEL 1' - 8"
SALES OFFICE 129 - INTERIOR ELEVATION
D3
1/4" = 1'-0"
SALES OFFICE 129 - INTERIOR ELEVATION 1/4" = 1'-0"
CLG 11' - 2" A3 A-150.00
MAIN LEVEL 1' - 8"
EQ
EQ
EQ
MAIN LEVEL 1' - 8"
EQ
SALES OFFICE 129 - INTERIOR ELEVATION
C2
1/4" = 1'-0"
6"
2"
6" EQ
6" EQ
EQ
6" EQ
EQ
EQ
2' - 10"
EQ
PT17 PT7 PT17 PT1
W
PT26
CLG 11' - 2"
MAIN LEVEL 1' - 8"
W WB01.2
SALES OFFICE 129 - INTERIOR ELEVATION
C3
1/4" = 1'-0"
W W W W
1' - 6" 1' - 6"
W WB01.2
EQ
2' - 6"
EQ
6"
6" EQ
4"
EQ
6" EQ
2' - 10"
1' - 6"
2' - 10"
3' - 0"
W
1' - 6"
2"
2" PT26
PT17 PT7 PT17
2' - 2"
2' - 2"
1' - 3" 10" 11" 3"
WC04 6"
6"
SALES OFFICE 129 - INTERIOR ELEVATION
C1
W W W
1' - 3" 10" 11" 3"
CLG 11' - 2"
PT17 PT7 PT17 PT1 PT26
2' - 6"
A3 A-150.00
5' - 11"
G
W W W W W
4"
10" 11" 3"
H
1/4" = 1'-0"
F
10' - 3 3/4"
9' - 2 7/8"
3 3/4"
5' - 8" W W W W
A2h
2' - 0"
A6c
CORRIDOR
5' - 0"
PT1 PT17 PT7 PT17
VINYL GRAPHIC TO BE PROVIDED BY OWNER'S SIGNAGE VENDOR. GC TO PROVIDE BLOCKING AS REQUIRED.
10" 11" 3" 1' - 3"
ALIGN
A2h
W W W
PT17 PT7 PT17
W
PT1
CLG 11' - 2"
129
128
C.45
A2h
C.50
BH015 C.62
BH015
BH016
BH016
BH016
129
5' - 11"
128
3 3/4"
A3 A-150.00
5' - 8 1/4"
E
BH015
A5c
A-150.00
MAIN LEVEL 1' - 8"
4" D3
A3 A-150.00
RC
ALIGN
5' - 0"
C.62
BH013
B1
C1
A-150.00
A2
D2
A2g
C.26
C
A2h
2' - 9 7/8"
B1
AF006
BH015
17' - 1 3/4"
A3 A-150.00
BH015
BH016
5' - 0"
C.62
BH016
C2
A2h
C3
A2h
C.45 C.50
A-150.00
3 3/4"
C.22 C.70
1/4" = 1'-0"
C.45 C.50
BH016
BH015
3 3/4"
5' - 0"
2' - 0"
A2h
C.45
SALES OFFICE 129 - INTERIOR ELEVATION
5' - 0"
BH015
C.79 C.78
W WB01.2 W PT26
W WB01.2 W PT26
A2h
A5d
3 3/4"
D
5' - 0" 2' - 0" BH016
D1
A2h
OFFICE 129
A2h
2" 5' - 0"
BH015
A2h
A2h
W WB01.2 W PT26
W PT26 W WB01.2
9' - 4"
A1
A
54
ENLARGED OFFICE PLAN 1/2" = 1'-0"
5 3/8"
4' - 2 3/4"
5' - 0"
3 3/4"
CLG 11' - 2"
2' - 8"
BH015
2' - 0"
2' - 6 1/8"
BH016
2"
BH016
BH015
9' - 11 3/4"
? ? PT17 PT1
BH015
C.62 BH016
5' - 0"
A3 A-150.00 BH016
2' - 8"
A2h
5' - 0"
B
? ? W W
PT17 PT7 PT17 PT1
5' - 8"
130
W W W W
C.62
9' - 7 3/4"
WALK-IN COOLER/FREEZER
A-150.00
3 3/4"
A5 A-601.00
5' - 0"
3 3/4"
5' - 0"
3 3/4"
5' - 8"
A2
SALES OFFICE 129 - INTERIOR ELEVATION 1/4" = 1'-0"
MAIN LEVEL 1' - 8"
Construction Documentation Example: New Exterior Elevations 1
2
3
1
2
4
3
5
4
6
5
7
6
8
7
9
8
10
9
10
J
W
PT7
W
PT8
W
PT2
W
PT1
J PT10
2
3
4
5
W
W
I
PT7
W
PT8
W
PT2
W
PT10
EQ
14' - 0 1/8" W
PT7
W
W
PT7
W
W
PT7
W
9
10
B C
Che 111 NEW
PT10
PT7
14' - 0 1/8"
4' - 0"
EQ
8
EQ
PT7
W
I
7
PT1
W
PT10
J
W
W
6
EQ
PT7
W
PT7
W
W
PT7
W
PT8
W
PT2
W
PT7
W
PT1
W
CRT
PT1
PT1
PT7 W
PT10 PT7
W
PT1
W
PT10
PT1
H
2' - 0"
4' - 0"
2' - 0"
W
2' - 0"
W
1
I
14' - 0 1/8"
EQ
1' - 4"
EQ
1' - 4" 1' - 4"
W
1' - 4" 1' - 4"
W
W
W
PT7
2' - 0"
PT7
W
1' - 4" 1' - 4" 1' - 4"
W
PT1
W
W
W
EX
PT2 PT2
PT7
19' - 7 7/8"
PT2
W
3' - 4"
3' - 0 1/8"
1' - 4"
1' - 4"
1' - 4"
1' - 4"
4' - 6"
1' - 2"
5' - 7"
PT7
EX
PT7
MAIN LEVEL 1' - 8"
3' - 4"
3' - 0 1/8"
1' - 4"
1' - 4"
1' - 4"
1' - 4"
4' - 6"
1' - 2"
5' - 7"
PRO
EXTERIOR EAST ELEVATION W PT2 1/2" = 1'-0"
W
PT7
W
BOW 111 NEW
MAIN LEVEL 1' - 8"
PT7
WPT8 PT7 2' - 3"
W
MAIN LEVEL 1' - 8"
EX
PT7
PT7
W
C1
9' - 10"
PT7 PT7
13' - 10"
W
9' - 10"
PT2 PT2
1/2" W = 1'-0" PT2
1' - 4"
F
PT1
2' - 0"
W
19' - 7 7/8"
G
W
EXTERIOR EAST ELEVATION
C1
F
PT7
PT2
1' - 4"
10' - 11 1/2"
W
2' - 0" W
W
1' - 4"
1' - 4"
W
1' - 4"
G
W
1' - 4" 1' - 4"
1' - 4"
H
PT7
PT7
13' - 10"
G
PT2
W
9' - 10"
4' - 0"
10' - 11 1/2"
H
PT7
13' - 10"
1' - 4"
W
10' - 11 1/2" 1' - 4" 1' - 4" 1' - 4" 1' - 4"
W
19' - 7 7/8"
3' - 4" W
3' - 0 1/8"
1' - 4"
1' - 4"
1' - 4"
1' - 4"
4' - 6"
1' - 2"
1/2" = 1'-0"
PT8
W
PT8
W
PT1
ARC
CAL 233 16T NEW
3' - 0 3/4" 2' - 3"
C1
5' - 7"
PT7
EXTERIOR EAST ELEVATION W
E
PT7
5' - 3 3/4"
W
CO PH EM
F 5' - 3 3/4" 11' - 11"
W
PT8
PT7
W
PT7
PT2
PT2
4' - 0"
PT1
W
PT2
4' - 0"
EXTERIOR NORTHEAST ELEVATION
B1
11' - 11"
4' - 6 1/4" 2' - 1" 4' - 6 1/4" 2' - 1"
ME
HNY 240 3RD NEW
MAIN LEVEL 1' - 8"
CON PHO EMA
13' - 3 1/4"
2' - 1"
W
3' - 0"
LAN
MAIN LEVEL 1' - 8"
1/2" = 1'-0"
4' - 0"
NEW SPANDREL INFILL PANELS PAINTED PT2
B1
3' - 0"
4' - 0"
EXTERIOR NORTHEAST ELEVATION
13' - 3 1/4"
1/2" = 1'-0"
C
W
PT7
W
5% GRAY TINT ON INDICATED GLAZING. GC TO PROVIDE TEMPERED GLASS ON INDICATED GLAZING PANELS.
NEW EXTRUDED ALUMINIUM STOREFRONT TO MATCH ADJACENT WITH TEMPERED GLAZING PANELS
WALL BEYOND TO BE PAINTED PT2
EXISTING DOOOR AND TRANSOM TO RELOCATE 4' - 6 1/4"
D
CON PHO EMA
4' - 6 1/4"
NEW SPANDREL INFILL PT8 PANELS PAINTED PT2
W
4' - 6 1/4"
E
5' - 3 3/4"
W
D
PT1
3' - 0 3/4"
W
2' - 3"
NEW SPANDREL INFILL PANELS PAINTED PT2
4' - 6 1/4"
W
BOW 222 NEW
11' - 11"
PT8
2' - 1" 3' - 0 3/4" 2' - 1"
W W
2' - 1"
E
SIG
TEN
PT7
MAIN LEVEL 1' - 8"
D
3' - 0"
4' - 0"
PT7
W
PT7
5' - 3 3/4"
4' - 0"
W
5% GRAY TINT ON INDICATED GLAZING. GC TO PROVIDE TEMPERED GLASS ON INDICATED GLAZING PANELS.
NEW EXTRUDED ALUMINIUM STOREFRONT TO MATCH ADJACENT WITH TEMPERED GLAZING PANELS
WALL BEYOND TO BE PAINTED PT2
EXISTING DOOOR AND TRANSOM TO RELOCATE 13' - 3 1/4"
C
EXTERIOR NORTHEAST ELEVATION
W
PT8
B1
EXISTING DOOOR AND TRANSOM TO RELOCATE
PT1 5' - 3 3/4"
W
PT7
B W
PT8
6' - 6"
3' - 0"
6' - 6"
14' - 4 1/4"
PAINT OVER SPANDREL PANELS AS SCHEDULED A
PT1
A1
1/2" = 1'-0"
B
6' - 6"
A1
A
3' - 0"
6' - 6"
14' - 4 1/4"
103
EX
PT2
PAINT OVER SPANDREL PANELS AS SCHEDULED
NEW SPANDREL INFILL PANELS PAINTED PT2
EXTERIOR NORTH ELEVATION
4' - 6 1/4"
W
1/2" = 1'-0"
BIM 360://CRTKL-NA BowlmorAMF_2017/Bowlmor_ChelseaPiersNY_R17.rvt
6' - 6"
3' - 0"
6' - 6"
A1
EXTERIOR NORTH ELEVATION
MAIN LEVEL 1' - 8"
6/24/2019 4:20:44 PM
© 2017 CallisonRTK
14' - 4 1/4"
PAINT OVER SPANDREL PANELS AS SCHEDULED A
MAIN LEVEL 1' - 8"
NEW SPANDREL INFILL PANELS PAINTED PT2
EXTERIOR NORTH ELEVATION
2' - 1"
W
NEW THIS APPLI TO BE IN AC
Issu
103
EX
PT2
MAIN LEVEL 1' - 8"
4' - 6 1/4"
W
NEW IT IS UNDE ANY I A DOC ALTER NOTIF DATE ALTER
103
EX
PT2
W
11' - 11"
W
PT7
11' - 11"
C
W
5% GRAY TINT ON INDICATED GLAZING. GC TO PROVIDE TEMPERED GLASS ON INDICATED GLAZING PANELS.
NEW EXTRUDED ALUMINIUM STOREFRONT TO MATCH ADJACENT WITH TEMPERED GLAZING PANELS
WALL BEYOND TO BE PAINTED PT2
2' - 1"
PT1 PT8
4' - 6 1/4" 2' - 1"
W W
B
5' - 3 3/4" 11' - 11"
1/2" = 1'-0"
NEW SPANDREL INFILL PANELS PAINTED PT2 BIM 360://CRTKL-NA BowlmorAMF_2017/Bowlmor_ChelseaPiersNY_R17.rvt
6/24/2019 4:20:44 PM
© 2017 CallisonR
1/2" = 1'-0"
ISS
EX
BIM 360://CRTKL-NA BowlmorAMF_2017/Bowlmor_ChelseaPiersNY_R17.rvt
6/24/2019 4:20:44 PM
55
© 2017 CallisonRTKL Inc.
A
LIGHT FIXTURE AS PER SCHEDULE. REFER TO RCP AND ELECTRICAL DWGS. TYP.
J
Back Bar Elevation
RENOVATIONS
A2 A-901
WD08
3' - 5"
0' - 8"
1' - 3"
PL06
0' - 0 1/8"
3' - 6" W
PL06
1' - 6 3/8"
2' - 1 3/8"
2' - 10" W
A-155
0' - 8"
0' - 10"
14' - 0" W
3' - 4"
I
D1
3' - 5"
WD08
3' - 6"
BELLEVILLE, NJ MONTEBELLO, CA DANIA BEACH, FL
A1 A-901
A3 A-901
WD08
0' - 8"
6' - 6"
BOWLERO
2' - 9"
2' - 0" PL06
BAR ELEVATION
D2 A-158
SCALE: 1/2" = 1'-0"
H
BAR ELEVATION SCALE: 1/2" = 1'-0" LIGHT FIXTURE AS PER SCHEDULE. REFER TO RCP AND ELECTRICAL DWGS. TYP.
LIGHT FIXTURE AS PER SCHEDULE. REFER TO RCP AND ELECTRICAL DWGS. TYP.
3' - 0"
Front Bar Elevation A2 A-901
A1 A-901
G
3' - 3"
WD08
PL06
2' - 5"
New York, NY Fall 2019
3' - 0"
0' - 8"
3' - 6 3/8"
4' - 8 3/4"
6' - 6"
W
OPEN TO BEHIND
0' - 8" W
W
PL06
F
A-155
BAR ELEVATION
C2 A-158
SCALE: 1/2" = 1'-0"
- Bellville, NJ : I was the designer in charge for this project. Managed all timelines, coordinated all aspects of design with all consultants. From design developent to construction documentation. Drafted and modeled all drawings in this set.
A-158
BAR ELEVATION
C
SCALE: 1/2" = 1'-0"
A-158
C3
C3 3' - 11"
E
3' - 3"
3' - 11"
D1 A-901
D1 A-901 3' - 3"
2' - 10"
L6.1 TAPE LIGHT
ZA6h
ZA6h
ZA6h
L6.1 TAPE LIGHT
2' - 1"
ZA6h
1' - 6"
2' - 10"
B1 A-901
B1 A-901 A3 A-901
A3 A-901
ZA6h
C.006
5' - 7 1/2"
C.001
D
6' - 6"
C1
2' - 1"
DD,CD,CA
2' - 6"
C.015
5' - 0"
Retail
PL06
C.103
L6.1 TAPE LIGHT
L6.1 TAPE LIGHT
C.107 C.108
L7.1 LED STRIP LIGHT
- Montebello,CA : I was the designer in charge for this project. Managed all timelines, coordinated all aspects of design with all consultants. From design developent to construction documentation. Drafted and modeled all drawings in this set.
ZA6h C2
A-158 B3
C1 A-158 D1
L7.1 LED STRIP LIGHT
A3 A-158
A1 A-901
L7.1 LED STRIP LIGHT
C2
A-158 B3
C1 A-158 D1
D2
A3 A-158
A1 A-901
B
D2
COUNTERTOP ABOVE
C
25' - 7 1/2"
24' - 7 1/2"
COUNTERTOP ABOVE A2 A-901
A2 A-901
L6.1 TAPE LIGHT
C.113
C.017
L6.1 TAPE LIGHT
C.011 C.401 C.301
L6.1 TAPE LIGHT
A2 A-901
C.102 C.020
A2 A-901 18' - 6 1/2"
L6.1 TAPE LIGHT
18' - 1"
- Dania Beach, FL - I assisted the client and project architect to design the entrance escalators. Selected finishes, creted designs and selected color pantones,
L7.1 LED STRIP LIGHT
B
A1 A-901
A1 A-901
A 7' - 9"
56
A1 A-401
ENLARGED BAR PLAN Bar Low-Cut SCALE: 1/2" = 1'-0"
Enlarged Plan
11' - 1"
A2 A-101
ENLARGED PLAN SECTION Plan Bar BAR Enlarged SCALE: 1/2" = 1'-0"
A
STROOM
C.611
133E
THREE-UNIT TION, E PARTITION AS
Belleville, NJ - Construction Plan
BOW 128
COOLER
STORAGE 129
GM OFFICE
A1 A-152
MEN'S RESTROOM
EX127
126
EX126 EX125
125
122
123
STORAGE
STORAGE
WOMEN'S RESTROOM
EX129
124
123 EX124
C.012
153
122
B1
C.012
C1 A-702
KITCHEN STORAGE
121
C.007
EXISTING FREEZER
C.019
A3d
EX121C2 A-702
EXISTING FREEZER
C.013
MM
EXISTING FREEZER
C.006
NEW FRYER
EXISTING PREP TABLE
NEW GAS GRIDDLE AND STAND
EXISTING COOLER AND WORKTOP
JANITOR'S HALLWAY 120 CLOSET
EXISTING SINK
EXISTING MICROWAVE
C.304
NEW STORAGE RACK
EX118
C.401
EXISTING ICE MACHINE
EX119
POS
EXISTING WARMER EXISTING ADA COUNTER POPCORN MACHINE
FEC
C.304
C.019
NEW PIZZA OVENS
NEW STORAGE RACK
EXISTING SINK EXISTING SODA DISPENSER
EXISTING PREP TABLE
EXISTING COOLER
EXISTING WORKTOP COOLER
153
132
132
A1
118
C.018
A3d
C.013
119
PROSHOP
C.306
C.013
SALES OFFICE
KITCHEN
B1 A-150
WORKSHOP
EX130
EX128
127
A1 A-153
130
FE
IT/AV
STAIR B 116
116
C.304
C.611
C.401
C.019
C5 A-410
A1 A-700
CONCOURSE SEATING
C.006
C1
CONCOURSE SEATING
103
C.006
A-700
106
BAR SEATING
A2 A-158
154
C.018
PINSETTERS
BAR
115
150
3' - 6 1/2"
BOWLING LANES
LANE SEATING
105
C.015
BOWLING LANES
PINSETTERS
MECHANIC'S OFFICE
108
104
114
LANE SEATING
3' - 3"
109
FE
107
PROJECT INFORMA
BOWLERO BELLEVIL 681-689 WASHINGTO BELLEVILLE, NJ 0710
EX114
FE C.610
SHOE DESK
3' - 10"
GROSS AREA - 28,80
MECHANIC'S STORAGE
151
EX111 FE
112
EX112
ARCHITECT
CallisonRTKL New Jer 901 S. BOND STREET BALTIMORE, MD 2123
MECHANIC'S HALL 111
EX110
A1 A-155
CONTACT - GABRIEL PHONE - 212.354.924 EMAIL - BOWLERO@
SIGNING PRINCIPAL FE
C.018
TENANT
MECHANIC'S WORKSHOP
C.006 A-700
A-700
B1
D1
C.019
C.401
C.016 C.016 C.304
C.008
2 4
ARCADE 102
101
C.019
DN
101
100
DN
STAIR A 100
HENDERSON ENGIN 8345 LENEXA DR SUITE 300 LENEXA, KS 66214
B
A1 A-156
A-150
CONTACT - MATT KO PHONE - 913.742.568 EMAIL - MATT.KOLINS
GENERAL C.001 C.002 C.007 C.013
A
A G-121
SCALE: 1/8"=1'-0"
A1
MEP ENGINEER
K
VESTIBULE
6 C.008 C.006 C.304 C.019
101A
CONTACT - ALLAN PR PHONE - 410.967.689 EMAIL - APRICE@BO
FS VT PS
5 A-701
A10p
1 A-701 3
C.304
C.006
7
FEC
BOWLERO CORP 222 W 44TH STREET NEW YORK, NY 1003 CITY, STATE
110
0
4
8
IT IS A VIOLATION OF LAW FOR A UNDER THE DIRECTION OF A LICE ALTER AN ITEM IN ANY WAY ON T (DOCUMENT). IF A DOCUMENT BE ALTERED THE ALTERING ARCHITE SEAL AND THE NOTIFICATION "AL SIGNATURE AND THE DATE OF SU DESCRIPTION OF THE ALTERATIO
16
CONSTRUCTION PLAN - MAIN LEVEL
Issue Drawing Log
05.10.2019 ISS
SCALE: 1/8" = 1'-0"
KEY NOTES C.001 C.002 C.006 C.007 C.008
NOTE: ALL SYMBOLS IN THE DRAWING NOT DESCRIBED ABOVE CAN BE FOUND IN THE SYMBOL LEGEND ON G-001
C.012 C.013 C.015 C.016 C.018 C.019 C.020 C.107 C.113
PARTITION TYPE STUD SIZE = FINISH HEIGHTS NSULATION
C.304 C.306 C.312 C.401
10 FOR
C.610 C.611 C.612
ALL WORK TO BE IN CONTRACT AREA ONLY. ALL ADJACENT AREAS TO BE PROTECTED DURING ALL PHASES OF CONSTRUCTION. PROTECT EXISTING BOWLING LANES, PINSETTER, LANES, AND APPROACH DURING ALL PHASES OF CONSTRUCTION. PATCH AND REPAIR EXISTING FLOOR SLAB AS REQUIRED DUE TO DEMOLITION/CONSTRUCTION PRIOR TO INSTALLING NEW FINISH FLOOR. PROVIDE NEW WALL AS INDICATED. SEE G-110 FOR PARTITION SCHEDULE. ARCADE GAMES TO BE BY OWNER'S VENDOR. COORDINATE ARCADE LAYOUT AND DELIVERIES WITH OWNER. COORDINATE POWER AND DATA WITH POWER AND DATA PLAN, ENGINEER DWG AND, OWNER PRIOR TO INSTALL. PROVIDE NEW INFILL IN OPENING DUE TO REMOVAL OF EXISTING DOOR. INFILL CONSTRUCTION TO MATCH AND ADJACENT WALL FOR CONSTRUCTION TYPE AS WELL AS THERMAL AND ACOUSTICAL INSULATION OTHERWISE NOTED. PROVIDE NEW DOOR(S). DOOR WITHOUT LOCATION DIMENSIONS TO BE INSTALLED IN EXISTING OPENING. ALL NEW DOORS DIMENSIONED TO CENTERLINE. COORDINATE WITH INTERIOR ELEVATIONS AND DOOR SCHEDULE. PROVIDE NEW PARTIAL HEIGHT DIE-WALL. SEE A-110 FOR WALL TYPE AND G120 FOR PARTITION DETAILS. PROVIDE NEW INFILL IN OPENING DUE TO REMOVAL OF EXISTING WINDOW. INFILL CONSTRUCTION TO MATCH AND ADJACENT WALL FOR CONSTRUCTION TYPE AS WELL AS THERMAL AND ACOUSTICAL INSULATION OTHERWISE NOTED. GC TO FLASH PATCH/LEVEL EXISTING CONCRETE SLAB AS REQUIRED TO ACCEPT NEW SCHEDULED FLOOR FINISH. PREP EXISTING WALLS AS REQUIRED FOR NEW WALL PAINT, COORDINATE WITH FINISH PLAN. GC TO PITCH FLOOR 1/8" : 1'-0" TO DRAWIN SINK AS REQUIRED. GC TO PROVIDE FORMWORK AS REQUIRED FOR ALL FLOOR DRAINS/SINKS. REFER TO ENGINEERING FOR LOCATIONS. TRENCH FLOOR AS REQUIRED FOR NEW DRAINS AND PIPES. PATCH AND REPAIR FLOORING AS REQUIRED FOR NEW SCHEDULED FINISH. REFER TO PLUMBING DRAWINGS. PATCH AND REPAIR EXISTING WALL AS REQUIRED TO PREP FOR NEW FINISH COORDINATE WITH ELEVATION. PROVIDE WATERPROOFING MEMBRANE/ FLOOR FINISH AS REQUIRED DUE TO INSTALLATION OF NEW PLUMBING ROUGHING AND FLOOR SINKS. PROVIDE SCHLUTER COVE BASE TRIM WITHIN NEW RESTROOM, TYP. SEE DETAIL B3/A-602. MANUF: SCHLUTER, MODEL: DILES-AHK COVE, FINISH: BRUSHED NICKEL. REFER TO MATERIAL SCHEDULE. TYP. ILLUMINATED SIGNAGE BY OWNER'S SIGNAGE VENDOR. GC TO COORDINATE INSTALLATION WITH OWNER'S VENDOR. REFER TO POWER AND DATA PLAN AND ENGINEER DWG FOR POWER REQUIREMENTS. TRENCH FLOOR AS REQUIRED FOR NEW POWER AND DATA. REPLACE EXISTING LOCKSET WITH HARDWARE SET "P". DOOR AND ALL OTHER HARDWARE TO REMAIN. REPLACE EXISTING DOOR HARDWARE SET "C". DOOR AND OTHER HARDWARE TO REMAIN.
ISSUE FOR PER
CONSTRUCTIO BASEMENT
A-101 BIM 360://CRTKL-NA BowlmorAMF_2017/Bowlero_Belleville_R17.rvt
Bar Detail at POS: A1
Bar Detail at ADA: A3
5/9/2019 4:17:50 PM
© 2017 CallisonRTKL Inc.
57
3
4
5
6
7
8
9
10
B B
120 MO
STO
CRT
Montebello, CA Reflected Ceiling Plan 01
EX-L
EX
EX
EX CCTV
PINSETTER
CCTV
CCTV
133
STORAGE 134
EX EX
RESTROOM
TO PROJECTOR SCREEN
135
EX
E.T.R. 9' - 2"
EX
EX
EX
EX
clg1
EX
EX
EX
clg1
EX
EX
EX
clg1
EX
EX
EX
clg1
EX
EX
EX
clg1
EX
EX
clg1
EX
EX
SIDE WALL LIGHTING DIMENSIONS TYPICAL ON BOTH SIDES
EX
clg1
STORAGE 136
EX
EX
EX
clg1
R.001
EX
EX
EX
clg1
R.002
R.005
R.007
EX
EX
clg1
R.008
R.009
EX
EX
EX
clg1
R.010
R.012
EX
EX
EX
clg1
R.013
R.026
EX
EX
EX
clg1
EX
EX
clg1
EX
EX
EX
clg1
EX
EX
EX
clg1
EX
EX
EX
clg1
EX
clg1
R.034
E.T.R. 9' - 2"
STORAGE EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
L01
EX
EX
137
EX EX
EX L01
BOWLING LANES (36)
E.T.R. 9' - 2"
L02
132
L01
EX
EX
L21.1
EX
EX
EX
L21.1
2 clg 1 clg
2 clg
EX
L21.1
EX
EX
2 clg
2 clg
EX
EX
EX
EX-CCTV
EX-CCTV
L21.1
L21.1
2 clg
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
L21.1
L21.1
L21.1
L21.1
2 clg
2 clg 1 clg
EX
EX
EX
L21.1
L21.1
2 clg
2 clg
L21.1
2 clg
L21.1
L21.1
2 clg
2 clg
L21.1
EX
L21.1
EX
L21.1
EX
L16
L16
L16
L16
L16
L16
L16
J
J
J
J
J
J
J
J
TYP
TYP
R.019
EQ EQ
5' - 11"
EQ
EQ
3' - 7"
EQ
L21.1
L21.1
L31.1
L21.1
L21.1
L21.1
L21.1
L21.1
J
122 GY/ PT07 10' - 3"
6' - 10"
J
EX 6' - 10"
L6.1
EQ
R.028
L15
L37
LEX01.1
3' -
0"
4' -
6' - 10"
EQ
8' - 1"
L38
6
EQ
L10
10' - 1"
10' - 1"
WOMEN'S RESTROOM
ETR PT02 10' - 10 7/8"
3' - 9"
J J
11
L10
L10
L05
L21.1
L21.2 L21.2
L21.2
L10
EX
11' - 5"
EX
EX 10' - 6"
EX
L40
L40
L40
L40
118
L21.1 L21.1
L21.1 L21.1
POOL HALL
ETR/ PT07 7' - 10 7/8"
EX
110
EX-CCTV
R
GYP|PT07 9' - 0"
EX
DRY STORAGE
EX
EX
EX
L21.2
112
R L21.2
L21.2 L21.2
L40
109
ETR 9' - 0"
EX
EX
L21.1 L21.1
L21.1 L21.1 EX
L21.2 L21.2
L21.2
L21.2
R
L21.2 L21.2
NOT IN SCOPE
EX
EX
EX
EX
EX
EX
L21.2
R.002 R.013
R
R CCTV EX-RELOCATE
EX
FLAT TOP
R
R
R
R
EX
STORAGE
EX
EX
GIL SUI 725 LOS
L21.2
L21.2 L21.2
EX
CCTV
EX
R
L21.2 L21.2
EX
L21.1 L21.1
STR
CON PHO EMA
L21.2
L40
CCTV
EX
L21.1 L21.1
L21.1 L21.1
CON PHO EMA
L40 CCTV
12' - 10"
L21.1 L21.1
HEN 834 SUI LEN
ARCADE
R
EX
L10
ETR PT02 11' - 0"
SP04
R
L21.2 L21.2 L21.2
EX-CCTV
9' - 8"
GYP/ PT02 14' - 10"
L21.2
L21.2 L21.2
R.019
MECHANICAL
GYP|PT07 8' - 0"
L10
MEP
R
L21.2 L21.2
L21.2
CCTV
17' - 2"
ETR/ PT07 7' - 10 7/8"
CON PHO EMA
2' - 0"
FLAT TOP
ETR PT02 15' - 1 1/8"
BOW 222 NEW
105
111
R.003
OW
8' - 1"
L21.2 L21.2
4' - 0"
MEN'S RESTROOM
1 clg
EX
L40
2' - 10"
" '-8
L17
EX
EX
7' - 3" 4' - 4"
L17
L17
1"
8' - 1"
L21.2 L21.2
L21.1
L21.1
8' - 3" L17
B2 A-210
L10
L21.2 L21.2
7' - 3"
1' 1" 4' 0" 4' 2"
4' -
L15
EQ
L10 R.019
IT/ELEC
L15
R.003
EX5
RT
L10
6' - 1"
L05
B1 A-210
GYP/PT01 9' - 10"
L10
L10
115
L38
R
L21.1
R
LIQUOR STORAGE
EQ
L10
L15
EX-CCTV
EQ
L21.1
L21.1
EX8
L21.1
L17
SIG
ETR|PT02 14' - 10"
R
2' - 4"
L10
L15 L10
L21.1
EQ
STOR.
120
L10
NOT IN SCOPE
L21.1
EQ
2' - 0"
L21.1
L17
L15 RT L15
L21.1 L21.1
L21.1
ACT2.2 7' - 6"
L10
1"
119
OFFICE
EQ
L10 L10
4' - 6"
EQ
L10
4' -
L21.1 45.0 °
1"
EX19
L10
CO PH EM
138
L21.1 L21.1
L10
L21.1
113
L10
CAL 233 16T NEW
STORAGE
L21.1
EQ
L21.1 L21.1
J
BAR SEATING
R.008
ARC
L16 J
clg2
clg2
EQ
L10
R.019
L15
117
L21.1
L21.1 L21.1
1 clg
L10
L10 LEX01.1
L15
L10
4' -
9' - 9"
121
114
1 clg
STO GRO
EX
EQ
SP04
EQ
L21.1 L21.1
L10 L21.1 L21.1
3' 2" RT
EX - CCTV
BAR
BEER COOLER
L21.1
L21.1
D5
11"
L21.1 L21.1
EQ
GY/ PT07 10' - 3"
EX
4' -
L21.1
EQ
EQ
123
L51
L21.1
EX
EQ
104
L10
J
R.008
07
MANAGER'S SUITE
CCTV
L10
09
45.0 L21.1 ° L21.1
L21.1
EQ L31.1
STORAGE
L10
STORAGE
9' - 2"
5' - 6"
L31.1
L31.1
2' - 5"
L10 ACT2.2 7' - 6"
R
L31.1
EX
L10
L21.1
4' - 4"
5' - 6"
L31.1
08
3"
L31.1 L21.1
L10
CCTV
11' - 1" 1 clg
CONCOURSE SEATING
R.019 RT
R.028
R.029
L13.2
7' - 3"
L10
L21.1
EQ
L21.1 L21.1
L10
L21.1
EQ 11' - 2"
L21.1 L21.1
1' -
7' - 3"
EX6
L6
L10
L13.2
L21.1
EQ
126
EX
RT
clg2
L34
L21.1
EQ
8' - 3"
L34
4' - 3"
L21.1
L21.1
E.T.R. 9' - 10 1/2"
L10 J
L10
1 clg L10
L21.1
clg2
clg2 L21.1
L10
8' - 7"
L13.2
L6.1
15' - 7"
GYP PT02 10' - 3"
L21.1
EX
L16
4' - 4"
L21.1
L21.1
EX
6' - 7"
L21.1
EX
12' - 5"
L10
2' - 6"
EQEQ
EQ
L21.1
EQ L10
L10
EX11
L21.1
EQ
L10
GYP/PT02 8' - 11"
L21.1 EQ EQ
EX
L21.1
L21.1 EQ
EQ
L21.1 L21.1
127
L10
125
131
clg2 L21.1
EQ
1 clg
POOL AREA
L13.2 L21.1
124
L21.1
EX
R.015
6' - 7"
J
L21.1
9' - 10"
PROSHOP
BOW 120 MO
2 clg
2 clg
6' - 7"
L16
J
L21.1
EQ EQ
LEX01.1
L21.1
128
PRO
6' - 7"
L16
J
L21.1
EX
5"
L21.1
EQ
L10
L10
RESTROOM
EX
L21.1
RT
EX
L21.1
L21.1
L10
EX
6' - 7"
L16
RT
EQ
L10
EX12
EQUIPMENT ROOM
LANE SEATING
J
RT
L10
129
L21.1 RT
2' - 0"
11' - 1"
L10
OFFICE
EX
L16
L10
R.003
CCTV
L21.1
EX
J
L21.1 L21.1 B3 A-210
EX-CCTV
RT
L21.1
EX
2' - 4"
L21.1
EQ
L38
EX
L21.1
EX
L16 J
clg2
EQ
EX
EX
L21.1
2 clg 1 clg
L16
L45 1' - 8"
130
EX
EQ
J
2 clg
STORAGE
EX
EX
clg2
L16
J
L21.1
EX
4' - 3"
5' - 0"
L16
L21.1
EX
5' - 10"
TYP
L21.1
EQ
TYP
EX
EQ EQ
EQ
L01
EX
CENTERED OVER BALL RETURNS
L21.1
EX
EQ
J
J
EX
EX
EX- CCTV
2 clg
2 clg
clg2
7' - 3"
L16
STORAGE
EX
EX
E.T.R. 8' - 2 1/4"
TYP. L21.1
EX
7' - 6"
EX
EX
CENTERED OVER BALL RETURNS
EX
SP04
EX
EX
6' - 7"
2 clg
EX
EX
SP3.1
SB01
EQ
L21.1
EX
EX
SP3.1
SB01
clg2
EX
EX
EQ
10' - 10"
L21.1
EX
EX
SP3.1
SB01
107
MECHANICAL
J
EX
EX
SP3.1
SB01
clg2
EX
EX
SP3.1
SB01
clg2
EX
EX
EX
SP3.1
SB01
clg2
EX
SP3.1
SB01
clg2
EX EX
SP3.1
SB01
clg2
SP3.1
clg2
17' - 0"
E.T.R. 8' - 4 1/2"
106
IT IS UNDE ALTER (DOCU ALTER SEAL SIGNA DESCR
EX3
L6.1
EX
L6.1
L6.1
EX
L6.1
L6.1
EX
L6.1
L6.1
GENERAL
EX R.001
J
R.002
R.028
Issu
L6.1
B
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN LEGEND TAG
58
ACT02
DESCRIPTION 2'x2' LAY-IN CEILING TILE + GRID, WHITE
ACT4.1
2'x4' LAY-IN CEILING TILE + GRID, WHITE
ACT05
2'x4' LAY-IN CEILING TILE + GRID, WHITE (KITCHEN)
ACT4.2
2'x4' LAY-IN CEILING TILE + GRID, BLACK (ARCADE)
ACT07
2'x4' LAY-IN CEILING TILE + GRID, BLACK
GYP-PT2
GYPSUM CEILING TO BE PAINTED PT2
GYP-PT7
GYPSUM CEILING TO BE PAINTED PT7
LETTER DESIGNATION & SYMBOLS CHANGE OF CEILING HEIGHT AND/OR MATERIAL AS SCHEDULED
EXIT SIGNS -
TO BE STANPRO EDGELIT SERIES USE XE OR EQUAL (OR MATCH BUILDING) 6"H LETTERS WITH BLACK FINISH TRIM PLATES LIGHT SWITCH LOCATION SPRINKLER HEADS - REFER TO MEP DRAWINGS SECURITY CAMERA EMERGENCY BATTERY BACK MFG# EMERGI-LITE JC SERIES OR EQUAL
NOTE: REFER TO MATERIAL SCHEDULE ON A-600 LETTER DESIGNATION & SYMBOLS
XX'-XX" AFF
CEILING HEIGHT
0
4
8
16
KEY NOTES R.001 R.002 R.003 R.005 R.007 R.008 R.009 R.010 R.012 R.013 R.015 R.019 R.026
ALL WORK TO BE IN AREA OF CONTRACT ONLY. ALL ADJACENT AREAS TO BE PROTECTED DURING ALL PHASES OF CONSTRUCTION. PATCH AND REPAIR CEILING AFFECTED DURING DEMOLITION. MATCH ADJACENT CEILING AND FIRE RATED ASSEMBLY WHERE PARTITIONS WERE DEMOLISHED. FINISH AS INDICATED. PATCH AND REPAIR GYP HEADER AFFECTED DURING DEMOLITION. FINISH AS INDICATED. PAINT GYP CEILING AND FASCIA AS INDICATED. GC TO REPLACE ANY MISSING OR DAMAGED CEILING TILES IN AREAS WHERE CEILING IS EXISTING TO REMAIN. FINISH AS INDICTED TO MATCH ADJACENT TILES. PAINT ALL NEW AND EXISTING CEILING TILES AND GRID AS INDICATED. ALL EGRESS ILLUMINATION SHALL COMPLY WITH THE LOCAL JURISDICTION REQUIREMENTS. ALL ILLUMINATED EXIT SIGNS SHALL COMPLY WITH THE LOCAL JURISDICTION REQUIREMENTS. GC TO PROVIDE REPLACEMENT LAMPS AND REPAIR BALLASTS AS REQUIRED FOR ALL EXISTING TO REMAIN LIGHT FIXTURES SO THAT ALL LIGHTS ARE IN WORKING CONDITION. LIGHT FIXTURE MOUNTING HEIGHTS TO BE DETERMINED BY MOUNTING HEIGHT SCHEDULE UNLESS OTHERWISE NOTED ON RCP. NEW LIGHT FIXTURE TO BE ALIGNED WITH CENTER OF BALL RETURN, TYP. NEW ILLUMINATED SIGNAGE BY OWNER'S SIGNAGE VENDOR. PROVIDE BLOCKING/BRACING AS REQUIRED BY OWNER'S SIGNAGE VENDOR. GC TO COORDINATE POWER AND DATA WITH POWER DATA PLAN. GC TO VERIFY LOCATION OF PROJECTORS PRIOR TO INSTALLATION.
Dania Beach, FL - Entrance Surf Boards
Color Palette
Front Escalator
Surfboard A
Surfboard B
59
BROOKLYN PARAMOUNT
Main Theater Rendering
LIVE NATION, BROOKLYN, NY
New York, NY Fall 2019 Retail DD,CD,CA
- Worked with the design team to develop the design of all bars and restrooms at Brooklyn Paramount. - Helped select finishes, 3D modeled all millwork, moldings and equipment, and produced construction documents for all bars and restrooms including elevations, plans and details.
Main Lobby & Bar
60
5
INTERIOR CALLOUT ELEVATION
T07
SCALE: 1/2" = 1'-0"
5' - 0"
Restroom’s Enlarged Plan
INTERIOR CALLOUT ELEVATION
5' - 0"
SCALE: 1/2" = 1'-0"
OPEN TO BEYOND
20' - 10" 3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
TA-02 PF-10
PF-10
PF-10
PF-10
PF-10
PF-10
2' - 7" EQ
2' - 7" EQ
PF-10
PF-10
2' - 7"
EQ
PF-09
R6
PF-10
3' - 6"
PF-10
5' - 1 1/2"
1' - 10 1/2"
EQ
EQ
2' - 7" EQ
2' - 7"
EQ
EQ
2' - 7"
EQ
EQ
2' - 7"
EQ
EQ
2' - 7" EQ
EQ
EQ
EQ
0' - 2"
3' - 0 1/2"
PF-09
PF-09
TA-09.1
PF-09
TA-09.1
PF-09
TA-09.1
PF-09
PF-09
3' - 6"
3' - 0 1/2"
0' - 2"
2' - 1"
TA-09.1
TA-09.1
PF-09
TA-09.1
R6
TA-09.1
R8 11
4
A-427
R2 9
A-427 8
T08 CELLAR FLOOR - MEN'S RESTROOM SOUTH
CELLAR FLOOR - MEN'S RESTROOM EAST
8
22' - 3"
T T
WB03
5 22' - 2 1/2"
10 INTERIOR CALLOUT ELEVATION
INTERIOR CALLOUT ELEVATION 10
SCALE: 1/2" = 1'-0"
TA-01.1
TA-01.1
SCALE: 1/2" = 1'-0"
12
13
P3
8' - 1"
10
13' - 3"
3
0' - 4"
2
0' - 4"
P3
TA-01 11
PF-10
PF-10
PF-10
PF-10
PF-10
PF-10
PF-10 TA-01.1
TA-01.1
T07
TA-01.1
5' - 1"
TA-01.1
7
P3 PF-03
PT05
PF-03
PF-03
PF-03
H3
TYP
1' - 6" 3' - 0"
EQ
EQ
EQ
EQ
EQ
EQ
OPENED TO BEYOND
TYP
3' - 0"
3' - 0"
3' - 0"
CELLAR FLOOR - MEN'S RESTROOM
EQ
1' - 6"
3' - 0"
5' - 4"
T11
T11 T10
T09 CELLAR FLOOR - LAVATORIES ENTRANCE EAST
INTERIOR CALLOUT ELEVATION
BIM 360:/
T09
WB03 T08
7
Lavatories Elevation 2
SCALE: 1/2" = 1'-0"
MT01 MI02
C W
I
S
T07
0' - 4"
0' - 4"
3' - 2"
6
0' - 4"
0' - 0 1/2"
Restroom
3' - 6"
5' - 2"
5' - 0"
WB04 WB04
SECOND FLOOR - VIP WC 2 NORTH
7
INTERIOR CALLOUT ELEVATION
SCALE: 1/2" = 1'-0"
2
INTERIOR CALLOUT ELEVATION
WB03 T08
SCALE: 1/2" = 1'-0"
CELLAR FLOOR - LAVATORIES WEST
5
INTERIOR CALLOUT ELEVATION SCALE: 1/2" = 1'-0"
VIP Restroom Plan
VIP Restroom
Front Elevation
PF-03
3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
0' - 0 1/2"
2' - 1"
3' - 0 1/2"
2' - 7 1/2" 3' - 0 1/2"
3' - 0 1/2"
3' - 0 1/2"
T11
3' - 0 1/2"
0' - 0 1/2"
PF-05 PF-06
4' - 5 1/2"
4' - 5 1/2"
PT05
3' - 0 1/2"
1' - 10 1/2"
T09
3 2
PF-10
PF-10
PF-10
TA-02
PF-10
PF-10
PF-10
PF-10
3' - 2"
A-415
3' - 2"
5
PF-10
PF-10
PF-10
0' - 4"
0' - 4"
4
PT05
VIP WC 1 206
WB04
2
4' - 6"
4' - 6"
206.1
3
SECOND FLOOR - VIP WC 2 EAST
6
4
A-427
INTERIOR CALLOUT ELEVATION 5
SCALE: 1/2" = 1'-0"
4' - 2 1/2"
R8 P3
7
22' - 2 1/2"
PT05
SECOND FLOOR - VIP WC 2 NORTH
INTERIOR CALLOUT ELEVATION SCALE: 1/2" = 1'-0"
22' - 3"
P3
PF-10
PF-10
PF-10
PF-10
PF-10
T09
PF-10
2' - 7 1/2"
T09
PT05
WB04
PF-05 PF-06
R0
4' - 6"
A-427
R3
6
R3
PF-01
T11 T09
H3
H3
3' - 2"
R3
WB04
CELLAR FLOOR - MEN'S RESTROOM
0' - 4"
6
8
1' - 0 1/2"
A-415
3' - 0"
7 9
7
4' - 6"
3' - 2"
VIP WC 2 207
4' - 2 1/2"
PF-10
207.1
WB04
3' - 0"
T09
0' - 4"
1' - 0 1/2"
T11
2' - 5 1/2"
6
SECOND FLOOR - VIP WC 2 EAST
2' - 5 1/2"
SCALE: 1/2" = 1'-0"
EQ
3' - 2"
ENLARGED PLAN
PT05
PF-03.1 R6
1' - 6"
H3
PF-03
R3
8' - 8"
R3
6
R3
0' - 0 1/2"
R0
4' - 5 1/2"
R3
4' - 5 1/2"
A-427
61
C
I
S
Theater Bar A Elevation
Theater Bar
Lobby Bar Elevation
Lobby Bar
WC04
1' - 3"
MT01 MI01 Sim
7
1' - 8 1/2"
6 A-824.00
A-824.00
3' - 6"
ST05
5
Central Bar
CENTRAL THEATER BAR - FRONT EQUIP. SCALE: 1/2" = 1'-0"
4
Central Bar Elevation
CENTRAL THEATER BAR - BACK BAR SCALE: 1/2" = 1'-0"
WC04 1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 9"
1' - 3"
MT01
1' - 8 1/2"
MI01 5
Sim
A-824.00
Sim
5 A-824.00
3' - 2"
ST05
ST06
2' - 4"
ST05
0' - 4"
3' - 6"
ST05
1
CENTRAL THEATER BAR - FRONT SCALE: 1/2" = 1'-0"
62
10 STORAGE 114 - WEST SCALE: 1/2" = 1'-0"
Sim
Central Bar Enlarged Plan
Venue Floor Bar
Venue Bar Elevation
VIP BAR Elevation VIP Bar
63