RIYADH BOOK

Page 1

GAD GLOBAL ARCHITECTURE DEVELOPMENT



GAD


AL HOKAIR GROUP HEADQUARTER & SELAMLIQUE


GAD


AH AYD BUR

AM

DAMM

M

EKK

A

ALK

HA

RJ


RIYADH KING KHALID INTERNATIONAL AIRPORT

FINANCIAL CENTER OF RIYADH

SALBOUKH

RIYADH

GAD

OLD TOWN OF RIYADH


INSPIRATIONS

‘To them, I said, the truth would be literally nothing but the shadows of the images.’ - Plato, The Republic

Shadow art is a unique form of sculptural art where the 2D shadows cast by a 3D sculpture are essential for the artistic effect. We introduce computational tools for the creation of shadow art and propose a design process where the user can directly specify the desired shadows by providing a set of binary images and corresponding projection information. Since multiple shadow images often contradict each other, we present a geometric optimization that computes a 3D shadow volume whose shadows best approximate the provided input images.


GAD


EXPERIMENT + TECHNICAL DEVELOPMENT

THE IDEA OF MODERNIZATION OF THE ORIENTAL ARABIC GEOMETRIC SHAPES CONDUCTED US TO DESIGN A 3D OBJECT WHICH WILL CREATE GEOMETRIC SHADOWS UNDER LIGHT. THE COMBINATION OF TODAY’S 3D TECHNOLOGIES, ABSTRACT STRUCTURAL OBJECTS AND TRADITIONAL GEOMETRIC SHAPES ARE DESIGNED TO SURPRISE VISITORS.


GAD


INTERIOR VIEW. EXPERIMENTAL SHADOWS These abstract art object that we designed have random appearances. They can be used inside or outside of the building, hanged below a light source which will allow the projection of the hidden 8-faces star.


GAD


FENCES / MOIRÉ PATTERNS

A MOIRÉ PATTERN IS A SECONDARY AND VISUALLY EVIDENT SUPERIMPOSED PATTERN CREATED, FOR EXAMPLE, WHEN TWO IDENTICAL (USUALLY TRANSPARENT) PATTERNS ON A FLAT OR CURVED SURFACE (SUCH AS CLOSELY SPACED STRAIGHT LINES DRAWN RADIATING FROM A POINT OR TAKING THE FORM OF A GRID) ARE OVERLAID WHILE DISPLACED OR ROTATED A SMALL AMOUNT FROM ONE ANOTHER. IT OFFERS A LOT OF ARTISTIC POSSIBILITIES TO BE USED IN ARCHITECTURAL MESHES, EITHER INSIDE AND OUTSIDE OF THE PROJECT. COULD BE USED TO REDUCE SUN EXPOSURE WHILE SIGHTS AND VENTILATION ARE ALLOWED.


LANDSCAPE / FACADE-FENCE-FLORA VIEW FROM STREET

FACADE

FLORA FENCE

GAD


FENCES / WAVE EFFECTS

SAND WAVE


GAD


LOCAL WATER SOURCES AND USAGE

Total municipal water use in Saudi Arabia has been estimated at 2.1 cubic kilometers per year in 2004, or 9% of total water use. Agriculture accounts for 88% of water use and industry for only 3%. Demand has been growing at the rate of 4.3% per annum (average for the period 1999-2004), in tandem with urban population growth (around 3%). Water supply is usually not metered, neither at the source nor the distribution point. It is tentatively estimated that average water consumption for those connected to the network is about 235 liters per capita per day, a level lower than in the United States. [2] Water Usage

Historical Water Drainage

Water Usage / Landscape

Agricultural Water Usage


LOCAL FLORA / TREES AND BUSHES

IT EXISTS MANY NATIVE TREE VARIETIES IN SAUDI ARABIA. THE SHADE-GIVING ACACIAS, OLIVE AND ALMOND TREES ARE JUST SOME OF THEM THAT WE CHOSEN. ALSO, THE TALL TAMARISKS (MUSH LIKE A PINE) THAT SEEM ALWAYS TO LOOK DUST-POWDERED AND ARE CHOSEN FOR THEIR QUALITIES AGAINST BLOWING SAND.

OLIVE TREE (Olea Europaea Cuspidata)

ACACIA (Acacia Nilotica)

ALMOND TREE (Prunus Dulcis)

GAD

TAMARISK (Tamarix Aphylla)


TOPOLOGY AND LAND USE

WADI

HA-HA


POOL CONCEPT PROJECTS CREATES AN INTERESTING LANDSCAPE WITH SEVERAL WATER SURFACES AT DIFFERENT GROUND LEVELS. STARTING FROM A HORIZONTAL PLANE, RE-SHAPING THE “WATER VOLUMES” UP AND DOWN GENERATE A NEW ORDER TO ORGANIZE THE SURROUNDINGS OF THE BUILDINGS.

MANDARIN ORIENTAL BODRUM, TURKEY

CRYSTAL LAGOONS TECHNOLOGY MOHAMMED BIN RASHID CITY. DUBAI

GAD

WHITE STONES IN THE GROUND OF THE POOL REDUCE EVAPORATION


HEADQUARTER


GAD



GAD



GAD


GAD


ARCHITECTURAL LAYOUTS


GENERAL LAYOUT


GROUND FLOOR PLAN ±0.00


1ST FLOOR PLAN +5.00


ROOF PLAN

+4.90, +5.70, +7.10, +7.20, +7.70, +8.20, +9.70, +9.80, +10.20


BASEMENET PLAN

400

400

400

100 300

4600 400

500

400

500

400

300

H

G

100

1150

400

F

D

E

-4.10

700

1000

700

5200 400

700

1000

700

2800 1200

800

700

800

2400 800

1000 3600

800

GROUND FLOOR FOOTPRINT

400

A

300

1000

400 2500

3475

GROUND FLOOR FOOTPRINT

400 400

600 6430 300 450

600

350 300

GROUND FLOOR FOOTPRINT

800

400

LIFT

1000

400

3000 800

C

400

C

LIFT

400

800

400

800

400

B

750

B

500

500

535

250

600

540

580

A

800

800 1000

800

1

7 7

73

400

400

400

400 7600

400

400

400

400

400

400

400

200

600

800

800

1200

400

538

524 2400

538

800

1200 4400

800

400

1127 1200

400

1000

400

800

1000

400

800

GROUND FLOOR FOOTPRINT

400

1200

1300

400

800

6800

800

600

400

450

GROUND FLOOR FOOTPRINT

400

800

600

400

1

435

800

850

800

800 675

620

G 620

620

F

E

D

675

H

800 675


PLAN ORGANISATION


AREA CHART



SECTIONS


SECTIONS


SECTIONS



ELEVATIONS



1/200 ARCHITECTURAL LAYOUTS


BASEMENT FLOOR PLAN

date

revisions

775

1563

1950

control

-

1 2

-

confirmation sign

-

320

1617

800 1000

240

240

240

160

1060

795

795

585

LIFT

1485

675 1485

675

LIFT

800

760

760

1

7

7

1

600

800

6800

N

Q

800

1200 4400

800

3

800

A

1

2

H

B

H

I

800

D

C

J

1200

800

800

1000

800

1000

1200

1162

800

800

375

GROUND FLOOR FOOTPRINT

800

180

3370

372

J

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


A,B,C,D BLOCKS GROUND FLOOR PLAN 400

400

400

400

4600 400

100 300

500

400

500

400

300

100

1150

1300

1145

2400 800

800

175

800

210

1

575

210

700

210

575

130

1058

555

1677 1310

-

400

315

640

555

130

confirmation sign

400

1340

300 600

435

-

1040

190 135

control

-

1 2

902

700 350

475

date

revisions

435

400

200

6430 300

1685

FIREPLACE

CONTROL

200

180 200

580

825

700

365

424

375

375

220

207

467

250

8

300

209

TRANSLATOR

400

2500

FIREPLACE

435

400

1300

500

500

200

600

130

712

410

443

310

220

115

517

298

518

450

130

201

1

435

915

400

423

1

956

400

600

400

1146

185

565

150

2110

3000 800

310

400

2692

176

400

318

800

1441

1146

400

LIFT

7

185

750

2700

538

375

400

198

380

440

380

450

2110

Q

400

N

400

400

400

400

400

400

400

400 7600

400

400

400

400

400

400

400

200

600

2

H

538

524 2400

538

400

H

D

J

WATER RESERVOIR

400

B C

J

400

1300

400

A

1

I

3

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


C BLOCK 1ST FLOOR PLAN 400

400

400

100 300

4600 400

500

400

500

400

300

100

1150

400

date

revisions

control

-

-

confirmation sign

-

700

1 2

2400 800

800

500

500

250

600

580

300

400

450

2500

400

6430 300

400

600

400

300

350

800

553

400

3000 800

400

1575

400

800

975

1246

400

375

LIFT

400

750

400

24

13

450

600

400

1246

575

Q

400

N

400

400

400

400

400

400

400

400 7600

400

400

400

400

400

400

400

200

600

2

400

538

524 2400

538

400

H

B

H

D

C

J

400

1300

400

A

1

I

3

J

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


F BLOCK GROUND FLOOR PLAN

date

revisions 710

confirmation sign

-

800

152

-

1800

333

772

772

LIFT

control

-

1 2

215

1115

710

8

1

1000

957

957

LIFT

1

9

1700

1

720

8

800

13

754

754

24

13

375

327

1110

355

24

328

355

1105

800

800

1200

800

800

700

1

600

6

LIFT

1200

3500

1000

1746

800

6800

2700

155

155

540

753

800

215

220

1000

532

155

775

800

800

543

1340

1200 4400

800

800

554

Q

N

A

1

B

H

D

C

J

2

H

I

3

J

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


F BLOCK 1ST FLOOR PLAN

date

revisions 375

511

517

483

1530

1100

375 413

145

1000 800

746

730

145 34

LIFT

1200

1100

342

976

546

600

344

158

1527

500

TEMPORARY WALL 1192

6800

1196

1000

1992

1000

746

1196

746 1192

792

800

1200 4400

800

396

800

N

3

A

1

2

H

B

H

I

800

792

D

C

J

396

Q

800

483

500

800

517

746

511

1992

1200

355

746

800

1100

992

900 412

1142

900

200

920 782

725 467

170 235

343

-

157

157

1142

145

782 178 240

900

LIFT

900 245

1246

800

44

54 54

367

confirmation sign

1

44

1100

-

LIFT 746

525 170 245

1246

30

control

-

1 2

1530

800

1100

800

168

168

800

367 235

1100

J

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


E,G BLOCKS GROUND FLOOR PLAN

date

revisions

700

1000

5200 400

700

700

1000

700

2800 1200

800

900

control

-

1 2

-

confirmation sign

-

800

800

1000

890 233

900

900

900

190

1000

800

720 120

720

415

190

300

920

637

1000 210

N

3

A

1

2

H

B

H

I

365

D

C

J

300

Q

1110

800

1600

207

473

207

102

210

349

300

217

2673

316

700

102

540

473

535

300

480

473

168

102

168

317

167

217

480

349

168

102 480

472

285

290

8

285

600

230

230

263

378

3600

200

3475

390

945

1103

158

390

380

1805

1103

200

1671

920

637 1

J

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


G BLOCK 1ST FLOOR PLAN

date

revisions

700 800

2800 1200

800

792

1192

792

-

396

1992

1992

3600

1000

746

746

800

396

1000

1000 1196

N

A

1

2

H

B

H

I

3

D

C

J

1192

Q

1196

800

746

746

1000

800

700

3475

5200 400

confirmation sign

600

700

-

540

1000

535

700

control

-

1 2

J

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant

GAD GAD ÜLKER MÜHENDİSLİK VENTA MÜHENDİSLİK PROTA ELEKTRİK ERIMCO -

tel: +90 212 327 51 25 tel: +90 212 327 51 25 tel: +90 216 368 75 41 tel: +90 212 451 62 68 tel: +90 212 216 58 18 tel: +90 212 202 66 78 tel: tel:

Architectural Design INC . NEW YORK ISTANBUL


FACADE STUDIES


SURFACE-LIGHT INTERACTION

THE FAÇADE DESIGN BLOCKS THE DIRECT SUN RAYS WHILE IT ALLOWS EXTERIOR VIEWS, WHICH IS A FACT INCREASING INSIDE COMFORT OF THE BUILDING. IT ALSO REDUCES COOLING REQUIREMENTS.

GAD


FACADE STUDIES

1

2

3


1

2

3

GAD



GAD



GAD



GAD


MODEL PHOTOS


GAD



GAD



GAD


INTERIORS


CONFERENCE HALLWAY

GAD


OFFICE (MANAGER ROOM)


OFFICE

GAD


MEETING ROOM


MULTIPURPOSE AREA

GAD


PRESIDENT’S OFFICE


PRESIDENT’S LOUNGE

GAD


INTERIOR PLANS AND FURNITURES


PRESIDENT’S LOUNGE ALTERNATIVE 1

project code: PL-01 product: SOFA (OUTDOOR) manufactory: B&B ITALIA product name: RAVEL material: POLYETHYLENE colour: BROWN website: www.bebitalia.com

project code: PL-05 product: SMALL TABLE manufactory: B&B ITALIA product name: CANASTA product code: TCN15 material: STEEL-PORCELAIN colour: BLACK-WHITE website: www.bebitalia.com project code: PL-06 product: COFFEE TABLE manufactory: MINOTTI product name: PARRISH product code: 40CM material: GLOSSY LACQUERED colour: BLACK website: www.minotti.com

project code: PL-02 product: ARMCHAIR (OUTDOOR) manufactory: B&B ITALIA product name: GRANDE PAPILIO OUTDOOR material: POLYETHYLENE colour: BROWN website: www.bebitalia.com

project code: PL-07 product: OUTDOOR LIGHTING manufactory: FLOS product name: SUPERARCHIMOON product code: F6367022 material: ALUMINIUM-PVC colour: PANAMA website: www.flos.com

project code: PL-04 product: CANDLE manufactory: B&B ITALIA product name: OVERSCALE FRAMES product code: 01&02 material: FIBREGLASS colour: BLACK website: www.bebitalia.com

project code: PL-03 product: POUF (OUTDOOR) manufactory: B&B ITALIA product name: GRANDE PAPILIO OUTDOOR material: POLYETHYLENE colour: BROWN website: www.bebitalia.com

GAD


PRESIDENT’S LOUNGE ALTERNATIVE 2

project code: PL-02 product: SOFA(OUTDOOR) manufactory: RODA product name: NETWORK product code: 101 material: TEAK colour: GREY website: www.rodaonline.com

project code: PL-01 product: SOFA(OUTDOOR) manufactory: RODA product name: NETWORK product code: 130 material: TEAK colour: GREY website: www.rodaonline.com

project code: PL-03 product: RUG manufactory: PAOLA LENTI product name:MAT product code:YMAN09 material: POLYOLEFIN colour:07GRIGIO website: www.paolalenti.it

project code: PL-05 product:SMALL TABLE manufactory:PAOLA LENTI product name: SUNSET product code: B40C material: VARNISHED METALSASSAFRASS colour: METALLO-WOOD website: www.paolalenti.com

project code: PL- 04 product: CANDLE manufactory: B&B ITALIA product name:OVERSCALE FRAMES product code: 01&02 material: FIBREGLASS colour: WHITE website: www.bebitali.com

project code: PL- 08 product: OUTDOOR LIGHTING manufactory: FLOS product name: KTRIBE F3 product code: F6367041 material: ALUMINIUM-PVC colour: GREEN WALL website: www.flos.com

project code: PL-06 product: COFFEE TABLE manufactory: B&B ITALIA product name: CANASTA product code: TCN3-TCN4 material: STEEL-PORCELAIN colour: BLACK-TURQUISE website: www.bebitalia.com

project code: PL-07 product: COFFEE TABLE manufactory: MINOTTI product name: CESAR OUTDOOR product code: MODA-MODB material: GLOSSY LACQUERED colour: SAND-CELADON website: www.minotti.com


LOUNGE

project code: L-01 product: SOFA (OUTDOOR) manufactory: PAOLA LENTI product name: WABI product code: B35B material: WATERPROOF POLYESTER colour: CEMENTO website: www.paolalenti.it

project code: L-04 product: POUFFE manufactory: PAOLA LENTI product name: TIDE product code: B51AE material: POLYOLEFIN colour: 17 ANTRACITE website: www.paolalenti.it

project code: L-05 product: SMALL TABLE manufactory: PAOLA LENTI product name: GIRO product code: B58D,B58B,B58C material: VARNISHED METAL-CONCRETE colour: METALLO-GRAFITE website: www.paolalenti.it

project code: L-02 product: SOFA (OUTDOOR) manufactory: PAOLA LENTI product name: AMI product code: B32GE material: WATERPROOF POLYESTER colour: T117 ANTRACITE website: www.paolalenti.it

project code: L-06 product: COFFEE TABLE manufactory: PAOLA LENTI product name: STRAP product code: B83B,B83A material: ALUMINIUM colour: METALLO-GRAFITE website: www.paolalenti.it

project code: L-07 product: OUTDOOR LIGHTING manufactory: FLOS product name: KTRIBE F3 product code: F6367041 material: ALUMINIUM-PVC colour: GREEN WALL website: www.flos.com

project code: L-03 product: RUG manufactory: PAOLA LENTI product name: WIND product code: TAWI05 material: POLYOLEFIN colour: 17 ANTRACITE website: www.paolalenti.it

GAD


CONFERENCE HALLWAY

project code: CH-01 product: SOFA manufactory: B&B ITALIA product name: GEORGE product code: GS243 material: LEATHER website: www.bebitalia.com project code: CH-03 product: COFFEE TABLE manufactory: VITRA product name: ELIPTICAL TABLE - ETR product code: material: CHROME-PLYWOOD colour: BLACK website: www.vitra.com project code: CH-05 product: LIGHTING manufactory: DELIGHTFULL product name: COLTRANE product code: SUSPENSION material: STEEL-BRASS colour: BLACK-GOLD website: www.delightfull.eu

project code: CH-04 product: COFFEE TABLE manufactory: MAXALTO product name: LIHOS product code: SMTT3BM material: VARNISHED METAL-MARBLE colour: PORTORO BLACK MARBLE website: www.bebitalia.com

project code: CH-02 product: ARMCHAIR manufactory: FLEXYFORM product name: FEEL GOOD material: LEATHER website: www.flexyform.it


BOARD CONFERENCE ROOM

project code: BC-02 product: MEETING TABLE manufactory: WALTER KNOLL product name: CEOO product code: 570*140 CM material: OCEANIC NUTWOOD website: www.walterknoll.de project code: BC-03 product: LIGHTING manufactory: FOSCARINI product name: TROAG product code: BIG material: PLYWOOD colour: NATURAL-BLACK website: www.foscarini.com project code: BC-01 product: CHAIR manufactory: VITRA product name: ALUMINIUM CHAIR EA116 product code: EA116 material: CHROME-LEATHER colour: 73/70 CLAY/STONE website: www.vitra.com

GAD


MEETING ROOM

project code: MR-04 product: CHAIR manufactory: VITRA product name: ALUMINIUM CHAIR EA116 product code: EA116 material: CHROME-LEATHER colour: 66 NERO website: www.vitra.com

project code: MR-05 product: MEETING TABLE manufactory: VITRA product name: EAMES SEGMENTED TABLE product code: 427*137 CM material: CHROME-12 WHITE (SMOOTH) colour: 12 WHITE (SMOOTH) website: www.vitra.com

project code: MR-06 product: LIGHTING manufactory: MODULAR LIGHTING product name: SL75RM product code: TL5 material: ALUMINIUM colour: WHITE website: www.supermodular.com

project code: MR-01 product: CHAIR manufactory: VITRA product name: ALUMINIUM CHAIR EA116 product code: EA116 material: CHROME-LEATHER colour: 73/70 CLAY/STONE website: www.vitra.com

project code: MR-02 product: MEETING TABLE manufactory: WALTER KNOLL product name: SCALE MEDIA product code: 530*150 CM material: OCEANIC NUTWOOD website: www.walterknoll.de

project code: BC-03 product: LIGHTING manufactory: FOSCARINI product name: TROAG product code: BIG material: PLYWOOD colour: NATURAL-BLACK website: www.foscarini.com


MANAGER’S OFFICE

project code: MO-01 product: CHAIR manufactory: VITRA product name: AC4 material: ALUMINIUM-LEATHER colour: 03 ALUMINIUM-71 SAND website: www.vitra.com

project code: MO-02 product: TABLE manufactory: VITRA product name: AD HOC EXECUTIVE product code: 220*110 CM material: OAK-ALUMINIUM-LEATHER colour: OAK-BROWN website: www.vitra.com

project code: MO-03 product: SIDEBOARD manufactory: VITRA product name: LOW1600 product code: 220*110 CM material: OAK-ALUMINIUM colour: OAK website: www.vitra.com

project code: MO-04 product: ARMCHAIR manufactory: MINOTTI product name: MARTIN product code: BASE FISSA material: LEATHER website: www.minotti.com

project code: MO-05 product: COFFEE TABLE manufactory: MINOTTI product name: NORMAN product code: 110 CM material: WALNUT website: www.minotti.com

project code: MO-06 product: LIGHTING manufactory: MODULAR LIGHTING product name:SL MINI NAKED product code: RM TL5 SLS material: ALUMINIUM colour: BLACK-GOLD website: www.supermodular.com

GAD


PRESIDENTIAL LOUNGE project code: PLO-02 product: ARMCHAIR manufactory: MAXALTO product name: AMOENUS product code: AC64P material: LEATHER website: www.bebitalia.com

project code: PLO-03 product: SIDE TABLE manufactory: B&B ITALIA product name: MERA product code: MTR39A-MTL material: MARBLE-STEEL colour: STATUARIETTO MARBLEBRIGHT CHROME STEEL website: www.bebitalia.com

project code: PLO-05 product: LIGHTING manufactory: DELIGHTFULL product name: IKE product code: SUSPENSION material: STEEL-BRASS colour: BLACK-GOLD website: www.delightfull.eu

project code: PLO-01 product: SOFA manufactory: B&B ITALIA product name: HARRY product code: H250 material: LEATHER website: www.bebitalia.com

project code: PLO-04 product: COFFEE TABLE manufactory: MINOTTI product name: SULLIVAN material: WALNUT-LAQUERED website: www.minotti.com


LOBBY

project code: ZO-01 product: SOFA manufactory: B&B ITALIA product name: LOUIS product code: 9L288 material: LEATHER colour: ALFA website: www.bebitalia.com

project code: ZO-02 product: ARMCHAIR manufactory: B&B ITALIA product name: PICCOLA PAPILIO product code: PPA material: FABRIC colour: SERRA255-SERRA701-BELLANO403 website: www.bebitalia.com

project code: ZO-04 product: COFFEE TABLE manufactory: B&B ITALIA product name: FAT FAT product code: TFF92-TFF62-TFF42 material: VARNISHED METAL colour: BLACK website: www.bebitalia.com

project code: ZO-03 product: POUF manufactory: B&B ITALIA product name: GRANDE PAPILIO product code: GB material: FABRIC colour: SERRA255-SERRA701-BELLANO403 website: www.bebitalia.com

project code: ZO-05 product: SIDE TABLE manufactory: B&B ITALIA product name: AWA product code: TA material: CRISTALPLANT colour: WHITE website: www.bebitalia.com

project code: ZO-06 product: LIGHTING manufactory: FOSCARINI product name: TWIGGY product code: 260-280 CM material: FIBRE BASE,PMMA,POLYCARBONATE colour: BLACK website: www.foscarini.com

GAD


EXECUTIVE OFFICE

project code: EO-04 product: CHAIR manufactory: VITRA product name: SKAPE product code: HIGHBACK material: ALUMINIUM-LEATHER website: www.vitra.com

project code: EO-03 product: STORAGE UNIT manufactory: B&B ITALIA product name: AC EXECUTIVE product code: ACE5 material: LEATHER website: www.bebitalia.com

project code: EO-06 product: ARMCHAIR manufactory: MINOTTI product name: PORTOFINO product code: SWIVEL BASE VERSION material: LEATHER website: www.minotti.com

project code: EO-07 product: SIDE TABLE manufactory: MINOTTI product name: DIVO material: METAL BLACK-NICKEL website: www.minotti.com

project code: EO-05 product: SOFA manufactory: B&B ITALIA product name: FRANK product code: 9F256 material: LEATHER website: www.bebitalia.com project code: EO-01 product: TABLE manufactory: MAXALTO product name: MAX product code: SMTR30 material: BRIGHT CHROMED STEEL-OAK colour: SMOKED OAK website: www.bebitalia.com project code: EO-02 product: STORAGE UNIT manufactory: MAXALTO product name: MIDA product code: ACCR1 material: OAK colour: SMOKED OAK website: www.bebitalia.com project code: EO-08 product: COFFEE TABLE manufactory: MINOTTI product name: CALDER product code: 180*120 CM material: IRON-OAK colour: MOKA website: www.minotti.com project code: EO-09 product: LIGHTING manufactory: FLOS product name: ROMEO SOFT product code: FLOOR material: FABRIC website: www.flos.com


PRESIDENT’S OFFICE

project code: PO-06 product: ARMCHAIR manufactory: FLEXYFORM product name: A.B.C.D. product code: 21501 material: LEATHER website: www.flexyform.it

project code: PO-05 product: SOFA manufactory: MAXALTO product name: SIMPLEX product code: 8SMD272-1 material: LEATHER website: www.bebitalia.com project code: PO-03 product: BOOKCASES manufactory: MINOTTI product name: DALTON product code: 360 CM material: ALUMINIUM-PALISANDER colour: GLOSSY POLYSTER website: www.minotti.com

project code: PO-04 product: STORAGE UNIT manufactory: B&B ITALIA product name: AC EXECUTIVE product code: ACE17 material: LEATHER website: www.bebitalia.com

project code: PO-01 product: TABLE manufactory: WALTER KNOLLproduct name: CEOO product code: 9075C material: VENEER-LEATHER website: www.walterknoll.de

project code: PO-02 product: CHAIR manufactory: VITRA product name: SKAPE product code: HIGHBACK material: ALUMINIUM-LEATHER website: www.vitra.com

project code: PO-07 product: POUF manufactory: FLEXYFORM product name: MAGI product code: 21050 material: LEATHER website: www.flexyform.it

project code: PO-11 product: LIGHTING manufactory: FLEXYFORM product name: 2014 SUN product code: 21460-21461 material: METAL-FABRIC website: www.flexyform.it

project code: PO-10 product: COFFEE TABLE manufactory: FLEXYFORM product name: OCEAN product code: 12I71 material: GLASS-WOOD website: www.flexyform.it

project code: PLO-09 product: SIDE TABLE manufactory: MAXALTO product name: ELIOS product code: SMTT3B material: MARBLE-STEEL colour: BRONZED NICKEL PAINTED website: www.bebitalia.com

project code: PO-08 product: SIDE TABLE manufactory: MAXALTO product name: LOTO product code: SM40T material: SMOKED OAK website: www.bebitalia.com

GAD


PRESIDENTIAL LOBBY

project code: PRL-04 product: COFFEE TABLE manufactory: FLEXYFORM product name: VIENNA material: SOLID WOOD website: www.flexyform.it

project code: PRL-02 product: ARMCHAIR manufactory: MAXALTO product name:IMPRIMATUR product code: 9861 material: LEATHER website: www.bebitalia.com project code: PRL-05 product: LIGHTING manufactory: DELIGHTFULL product name: STARDUST product code: FLOOR material: STEEL-BRASS colour: BLACK-GOLD website: www.delightfull.eu

project code: PRL-01 product: SOFA manufactory: B&B ITALIA product name: RAY product code: RY232DN material: LEATHER website: www.bebitalia.com

project code: PRL-03 product: COFFEE TABLE manufactory: B&B ITALIA product name:VITO material: METAL-MARBLE website: www.bebitalia.com


EXECUTIVE LOBBY

project code: EL-02 product: ARMCHAIR manufactory: FLEXYFORM product name: GUSCIO product code: 15V11 material: METAL-LEATHER website: www.flexyform.it

project code: EL-01 product: SOFA manufactory: B&B ITALIA product name: GEORGE product code: GS243 material: LEATHER website: www.bebitalia.com project code: EL-03 product: COFFEE TABLE manufactory: B&B ITALIA product name: SURFACE product code: TSF150A material: SMOKED OAK website: www.bebitalia.com

project code: EL-04 product: COFFEE TABLE manufactory: FLEXYFORM product name: GIPSY product code: 40*40CM material: LACQUERED WOOD website: www.flexyform.it

project code: EL-05 product: LIGHTING manufactory: DELIGHTFULL product name: COLTRANE product code: FLOOR material: STEEL-BRASS colour: BLACK-GOLD website: www.delightfull.eu

GAD


OFFICE 6 MEETING ROOM ON FOOT

project code: MOF-01 product: HIGH TABLE manufactory: VITRA product name: AD HOC HIGH WORK product code: 480*166 CM website: www.vitra.com

project code: MOF-03 product: STORAGE manufactory: VITRA product name: STORAGE website: www.vitra.com

project code: MOF-02 product: HIGH CHAIR manufactory: VITRA product name: PIVOT website: www.vitra.com


OPEN OFFICE

project code: OO-01 product: WORKSTATION manufactory: VITRA product name: JOYN website: www.vitra.com

project code: OO-02 product: HIGH CHAIR manufactory: VITRA product name: PIVOT website: www.vitra.com

project code: OO-03 product: SEPARATOR manufactory: VITRA product name: HUT website: www.vitra.com

project code: OO-04 product: STORAGE manufactory: VITRA product name: STORAGE website: www.vitra.com

GAD


SYSTEM SECTIONS


technical section technical section

20 60 20 20 60 20

TO GENERATE A MORE COMFORTABLE OFFICE THE CLEARANCE TO GENERATE A MORE COMFORTABLE OFFICE THE CLEARANCE HEIGHT IS 4 METERS. HEIGHT IS 4 METERS. ALL THE INSTALLATIONS ARE HIDDEN BELOW THE TECHNICAL ALL THE INSTALLATIONS HIDDEN BELOW OR THEABOVE TECHNICAL FLOOR (ELECTRICITY AND ARE NETWORK CABLES) THE FLOOR (ELECTRICITY AND NETWORK CABLES) OR ABOVE THE SUSPENDED CEILING (AIR-CONDITIONING, FIRE EXTINGUISHSUSPENDED CEILING (AIR-CONDITIONING, FIRE EXTINGUISHING SYSTEM, SOUND SYSTEM AND LIGHTING) ING SYSTEM, SOUND SYSTEM AND LIGHTING)

20 30 20 30

400 400

oFFice sPace oFFice sPace

DinninG hall DinninG hall


TYPICAL OFFICE SYSTEM SECTION TWO FLOOR


EXECUTIVE OFFICE SYSTEM SECTION


LOBBY SYSTEM SECTION



MULTIPURPOSE AREA SYSTEM SECTION


TYPICAL OFFICE SYSTEM SECTION GROUND FLOOR ALTERNATIVE


ROOMBOOK


BASEMENT FLOOR BF‐01 BF‐02 BF‐03 BF‐04 BF‐05 BF‐06 BF‐07 BF‐08 BF‐09 BF‐10

STAIRS STORAGE EXECUTIVE HALL STORAGE STAIRS STORAGE STORAGE ELECTRICAL AREA EXECUTIVE STORAGE VIP STORAGE CLEANING ROOM FLOOR TOTAL AREA GROUND FLOOR

GA‐01 GA‐02 GA‐03 GA‐04 GA‐05 GA‐06 GA‐07 GA‐08 GA‐09 GA‐10 GA‐11 GA‐12 GA‐13 GA‐14 GA‐15 GA‐16 GA‐17 GB‐01 GB‐02 GB‐03 GB‐04 GB‐05 GB‐06 GB‐07 GB‐08 GB‐09 GC‐01 GC‐02 GC‐03 GC‐04 GC‐05 GC‐06 GC‐07 GD‐01 GE‐01 GE‐02 GE‐03 GE‐04 GE‐05 GE‐06 GE‐07 GE‐08 GE‐09 GE‐10 GE‐11 GE‐12 GE‐13 GE‐14 GE‐15 GE‐16 GE‐17 GE‐18 GE‐19 GE‐20 GE‐21 GE‐22 GE‐23 GE‐24 GE‐25 GF‐01

PRESIDENTIAL LOUNGE CIRCULATION WC MANAGERS OFFICE HEAD MANAGER PRESIDENTIAL LOBBY WC PANTRY P. MEETING PRESIDENT'S OFFICE RECREATION WC MANAGERS OFFICE MANAGERS OFFICE ELECTRICAL R. MECHANIC R. CIRCULATION CIRCULATION WC WC MEETING ROOM CONFERENCE HALLWAY BOARD CONFERENCE CIRCULATION PANTRY TECHNICAL R. FOYER CLOAKROOM WC WC WC MULTIPURPOSE AREA STAIRS LOBBY CIRCULATION WC EXECUTIVE LOBBY MANAGERS OFFICE PANTRY WC RECREATION ROOM EXECUTIVE OFFICE P. MEETING ROOM MANAGERS OFFICE MANAGERS OFFICE TECHNICAL R. CIRCULATION TECHNICAL R. MANAGERS OFFICE MANAGERS OFFICE EXECUTIVE LOBBY MEETING ROOM EXECUTIVE OFFICE RECREATION ROOM WC PANTRY MANAGERS OFFICE WC HEAD MANAGERS OFFICE RECEPTION LOBBY

Floor Area (m²) 29 221 500 28 199 128 124 149 59 37 1474 Floor Area (m²) 366 31 17 31 33 272 2 5 55 171 45 18 33 31 7 6 5 8 15 24 103 145 107 16 17 17 109 17 28 6 37 378 28 364 10 11 119 34 10 17 32 94 52 16 34 13 10 13 34 16 119 52 94 32 17 10 34 11 43 288

Wall Area (m²) 85,66 718,61 416,99 83,99 228,66 183,34 179,27 224,59 130,24 91,02

Wall Area (m²) 129,46 59,47 135,97 100,63 139,78 676,45 51,88 77,61 342,38 235,35 312,08 173,06 139,78 106,43 58,80 56,28 60,76 157,27 74,48 208,03 135,78 435,69 177,76 131,28 121,41 121,41 158,69 75,12 172,08 47,57 236,75 434,24 131,33 47,91 49,95 100,97 426,82 118,03 71,96 141,96 146,86 133,12 173,36 81,78 118,03 81,09 49,95 81,09 118,03 81,78 426,82 173,36 133,12 146,86 141,96 71,96 118,03 100,97 150,22 160,80

Ceiling Area (m²) Glazing Area (m²) 29,00 221,00 500,00 28,00 199,00 128,00 124,00 149,00 59,00 37,00

0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Ceiling Area (m²) Glazing Area (m²)

Facade Windows Area (m²)

72,21 28,56 0,00 0,00 0,00 76,36 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 14,20 0,00 0,00 41,20 68,26 0,00 0,00 0,00 20,16 0,00 0,00 0,00 0,00 0,00 0,00 0,00 24,30 0,00 45,24 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 24,30 0,00 0,00 0,00 45,24 0,00 0,00 0,00 0,00 0,00 0,00 0,00 17,40 88,32

Aluminium Skirting

Natural Stone Skirting

Anti‐Slip Ceramic Skirting

Ceramic‐ Granite Skirting

Wooden and/or MDF

Skirting

Paint

Suspended Metal Lath Ceiling

Suspended Gypsum Board Ceiling

Decorative Paint

Ceiling Finishes

Paint

Wood Veneer Wall Cladding

Wallpaper

Ceramic‐ Granite Tile

Natural Stone

Rolled Carpet

Carpet Tile

Raised Floor

Wooden Deck

Wooden Parquet

Natural Stone

Wall Finishes

Facade Windows Area (m²)

0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

366,00 31,00 17,00 31,00 33,00 272,00 2,00 5,00 55,00 171,00 45,00 18,00 33,00 31,00 7,00 6,00 5,00 8,00 15,00 24,00 103,00 145,00 107,00 16,00 17,00 17,00 109,00 17,00 28,00 6,00 0,00 378,00 28,00 364,00 10,00 11,00 119,00 34,00 10,00 17,00 32,00 94,00 52,00 16,00 34,00 13,00 10,00 13,00 34,00 16,00 119,00 52,00 94,00 32,00 17,00 10,00 34,00 11,00 43,00 288,00

Anti‐Static, FireProof Tile

Ceramic‐ Granite Tile

AL HOKAIR GROUP HEADQUARTER'S OFFICE ROOMBOOK

Anti‐Slip Ceramic Tile

Floor Finishes

608,22 89,60 0,00 44,08 9,28 51,46 0,00 0,00 15,77 191,58 15,77 0,00 9,28 44,08 0,00 0,00 0,00 11,36 0,00 0,00 172,28 170,12 177,76 0,00 0,00 0,00 43,92 0,00 0,00 0,00 0,00 211,20 0,00 383,15 0,00 0,00 34,14 35,96 0,00 0,00 20,30 175,50 29,00 23,49 35,96 0,00 0,00 0,00 35,96 23,49 34,14 29,00 175,50 20,30 0,00 0,00 35,96 0,00 17,40 106,56

     

         

   

 

  

      

  

 

         

    

    

      

     

     

             

  

 

 

 

     

  

   

 

     

    

   

   

  

 

       

 

  

  

  

 

        

     

 

 

 

    

 

 

    

    

     

     

      

      

   

   

        

  

           

 

   

 

    

    

 

 

 

 

   

 

   

   

                                         

  

 

                   

  

      

  

  

        

 

     

              

             


1ST FLOOR 1C‐01 1C‐02 1C‐03 1F‐01 1F‐02 1F‐03 1F‐04 1F‐05 1F‐06 1F‐07 1F‐08 1F‐09 1F‐10 1F‐11 1F‐12 1F‐13 1F‐14 1F‐15 1F‐16 1F‐17 1F‐18 1F‐19 1F‐20 1F‐21 1F‐22 1F‐23 1F‐24 1F‐25 1F‐26 1F‐27 1F‐28 1F‐29 1F‐30

CIRCULATION TECHNICAL R. TECHNICAL R. OFFICE LOBBY STAIRS OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE PANTRY MEETING ROOM WC SECRETARY MANAGER ROOM WC DRESSING MANAGER ROOM DRESSING WC WC OFFICE LOBBY TECHNICAL R. WC SECRETARY MEETING ROOM FAST MEETING OFFICE MANAGER ROOM WC TECHNICAL R.

Floor Area (m²) 83 67 90 239 26 179 39 40 37 37 40 39 20 57 17 78 141 12 10 141 10 12 26 614 16 9 40 72 40 151 113 9 15

Wall Area (m²) 156,17 103,04 127,31 126,40 97,20 60,03 69,57 0,00 18,00 18,00 0,00 69,57 81,00 32,93 112,50 78,48 61,88 55,04 61,88 61,88 61,88 55,04 146,39 288,19 71,10 72,23 39,78 46,71 8,64 38,70 59,18 72,23 70,88

150,00 25,00 29,00 150,00 358,00 11,00 13,00 10,00 123,00 26,00 115,00 711,00 41,00 23,00 31,00 60,00 0,00 36,00 148,00 80,00 12,00 16,00 16,00 316,00 88,00 140,00 76,00 128,00 110,00 647,00 34,00 6,00 20,00 19,00 20,00 100,00 21,00 4,00 6,00 20,00

49,78 0,00 0,00 49,78 45,00 0,00 0,00 0,00 0,00 0,00 30,53 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 28,80 28,80 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 798,43

126,10 0,00 0,00 126,10 218,85 0,00 0,00 0,00 110,40 0,00 158,40 313,58 0,00 0,00 0,00 16,47 0,00 0,00 0,00 82,52 0,00 0,00 0,00 22,27 32,20 336,00 243,60 322,00 317,23 1368,62 17,73 0,00 17,73 0,00 10,56 0,00 34,27 0,00 0,00 17,73 6973,92

Ceiling Area (m²) Glazing Area (m²)

Facade Windows Area (m²)

83,00 67,00 90,00 239,00 26,00 179,00 39,00 40,00 37,00 37,00 40,00 39,00 20,00 57,00 17,00 78,00 141,00 12,00 10,00 141,00 10,00 12,00 26,00 614,00 16,00 9,00 40,00 72,00 40,00 151,00 113,00 9,00 15,00

0,00 0,00 0,00 64,00 0,00 127,80 35,19 70,38 0,00 0,00 70,38 35,19 0,00 0,00 0,00 40,50 50,18 0,00 0,00 0,00 0,00 0,00 0,00 96,48 0,00 0,00 40,50 72,99 20,07 60,53 0,00 0,00 0,00

13,02 0,00 0,00 35,20 0,00 31,50 18,50 23,27 50,85 50,85 23,27 18,50 0,00 35,20 0,00 0,00 101,07 14,94 0,00 101,07 0,00 14,94 0,00 151,04 0,00 0,00 0,00 39,42 58,14 44,64 78,57 0,00 0,00

  

 

   

  

 

    

      

   

    

     

     

    

 

   

  

 

 

 

 

   

 

 

   

       

      

      

      

      

         

          

 

  

 

 

  

 

 

       

     

 

Aluminium Skirting

Natural Stone Skirting

Anti‐Slip Ceramic Skirting

Ceramic‐ Granite Skirting

Wooden and/or MDF

         

      

   

  

  

    

   

   

  

  

 

 

 

  

 

 

 

    

  

 

   

 

                

  

 

  

  

  

   

Skirting

Paint

Suspended Metal Lath Ceiling

  

  

Paint

Wood Veneer Wall Cladding

Wallpaper

Ceramic‐ Granite Tile

Natural Stone

Rolled Carpet

Wooden Deck

Wooden Parquet

Natural Stone

Anti‐Static, FireProof Tile

 

Suspended Gypsum Board Ceiling

147,12 98,44 105,80 147,12 176,00 76,59 106,72 79,81 80,74 98,90 85,82 295,41 0,00 158,93 218,50 126,13 139,20 116,15 0,00 166,01 64,17 115,00 115,00 391,30 143,06 0,00 0,00 0,00 0,00 0,00 56,70 32,64 41,18 55,97 55,97 12,80 25,50 25,22 32,64 41,22

Ceiling Finishes Decorative Paint

150 25 29 150 358 11 13 10 123 26 115 711 41 23 31 60 47 36 148 80 12 16 16 316 88 140 76 128 110 647 34 6 20 19 20 100 21 4 6 20 7748

Carpet Tile

OFFICE STAIRS TECHNICAL R. OFFICE LOBBY CIRCULATION WC WC OFFICE STAIRS CIRCULATION DINING HALL BUFFET WC WC STORAGE PREPARATION KITCHEN DINING HALL CIRCULATION TECHNICAL R. WC WC PRAYER AREA ABLUTION AREA LOUNGE BUILDING PRESIDENT'S LOUNGE LOUNGE PRESIDENTIAL HALL MAIN HALLWAY GUARD HOUSE WC GUARD HOUSE WC GUARD HOUSE AC‐ELECTRICITY CENTRAL PRESIDENTIAL GUARD HOUSE WC WC GUARD HOUSE FLOOR TOTAL AREA

Wall Finishes Raised Floor

GF‐02 GF‐03 GF‐04 GF‐05 GF‐06 GF‐07 GF‐08 GF‐09 GF‐10 GF‐11 GF‐12 GF‐13 GF‐14 GF‐15 GF‐16 GF‐17 GF‐18 GF‐19 GF‐20 GG‐01 GG‐02 GG‐03 GG‐04 GG‐05 GG‐06 GH‐01 GH‐02 GH‐03 GI‐01 GI‐02 GJ‐01 GJ‐02 GJ‐03 GJ‐04 GJ‐05 GJ‐06 GJ‐07 GJ‐08 GJ‐09 GJ‐10

Ceramic‐ Granite Tile

AL HOKAIR GROUP HEADQUARTER'S OFFICE ROOMBOOK

Anti‐Slip Ceramic Tile

Floor Finishes

      

                                

                                


9 175 40 174 26 94 89 713 29 59 89 59 29 89 100 89 713 29 59 89 59 29 89 27 5476

GENERAL TOTALS:

14698

71,78 80,64 0,00 80,51 96,75 16,56 36,00 141,12 6,21 12,47 12,42 12,47 6,21 31,55 16,70 36,00 141,12 6,21 12,47 12,42 12,47 6,21 31,55 99,90

9,00 175,00 40,00 174,00 26,00 94,00 89,00 713,00 29,00 59,00 89,00 59,00 29,00 89,00 100,00 89,00 713,00 29,00 59,00 89,00 59,00 29,00 89,00 27,00

0,00 68,85 78,57 0,00 0,00 112,50 47,25 191,25 31,50 31,50 31,50 31,50 31,50 0,00 112,50 47,25 191,25 31,50 31,50 31,50 31,50 31,50 0,00 0,00 1948,60

0,00 111,24 40,14 111,15 0,00 0,00 49,32 179,28 49,32 31,50 49,50 31,50 49,32 68,63 0,00 49,32 179,28 49,32 31,50 49,50 31,50 49,32 68,63 0,00 2183,23

2747,03

9157,15

  

 

   

            

                 

         

                 

                  

                  

                       

                       

Aluminium Skirting

Natural Stone Skirting

Anti‐Slip Ceramic Skirting

Ceramic‐ Granite Skirting

Wooden and/or MDF

Skirting

Paint

Suspended Metal Lath Ceiling

Suspended Gypsum Board Ceiling

Decorative Paint

Ceiling Finishes

Paint

Wood Veneer Wall Cladding

Wallpaper

Rolled Carpet

Carpet Tile

Raised Floor

Wooden Deck

Wooden Parquet

Natural Stone

Anti‐Static, FireProof Tile

Ceramic‐ Granite Tile

WC OFFICE CIRCULATION OFFICE STAIRS SECRETARY MANAGER ROOM OFFICE FAST MEETING OFFICE MEETING ROOM OFFICE FAST MEETING MANAGER ROOM SECRETARY MANAGER ROOM OFFICE FAST MEETING OFFICE MEETING ROOM OFFICE FAST MEETING MANAGER ROOM STAIRS FLOOR TOTAL AREA

Wall Finishes Natural Stone

1F‐31 1F‐32 1F‐33 1F‐34 1F‐35 1F‐36 1F‐37 1F‐38 1F‐39 1F‐40 1F‐41 1F‐42 1F‐43 1F‐44 1G‐01 1G‐02 1G‐03 1G‐04 1G‐05 1G‐06 1G‐07 1G‐08 1G‐09 RF‐01

Ceramic‐ Granite Tile

AL HOKAIR GROUP HEADQUARTER'S OFFICE ROOMBOOK

Anti‐Slip Ceramic Tile

Floor Finishes


LIGHTNING ROD / SINGLE UNIT 6M


LIGHTNING ROD / FARADAY CAGE 35 CM

GAD


STEEL ANALYSIS STUDY

STEEL STRUCTURE ANALYSIS STUDY

Steel Roof Trusses 1 – PRESIDENTS OFFICE Z‐22 between grid line 1‐6 and Z‐U

2 – LOBBY Z‐02 between grid line 11‐14 and L‐E


Space Frame System

3 – EXECUTIVE OFFICE Z‐42 & Z‐57 between grid line 14‐27 and Y‐U

1 – MULTIPURPOSE AREA Z‐35 between grid line 6’‐10’ and E’‐K


EXCAVATION PLAN


BB SECTION

B

+673.92

A

A A

B

B

A

AA SECTION


SHAFTS PANEL LAYOUTS CABLE ROUTES PLANS


GROUND FLOOR ELECTRICAL PLAN

SYMBOL

EXPLANATION

X

revisions

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

13

1600

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

22

400

300

23

500

24

H

G

F

D

E

1 2

25

500

300

26

400

27

28

800

29

800

30

800

31

1200

32

800

800

33

Z

1200

1200

Z

Y

300 200

800 400

4

500

5

700

6

7

1600

400

8

9

800

11

800

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

H

G

F 10

800

25

300

26

400

27

28

800

800

29

800

30

31

1200

32

800

800

33

Z

500 600 400

L

TP-3

ELK. SHAFT 2

TP-12

J

H

400

400 600 ELK.SHAFT 2

TP-6

I

G

C

E'

J

I

600

400

F

B

K

F

H

600

400

600

G

J

I

200

C

200

400

I

L

K

400

400 12200

400

ELK. SHAFT 1

600

400

TP-1 MCC

J

K

B

400

ELK. SHAFT 1

ELK. SHAFT

K ELK. SHAFT

600

600

L 400

B

L

M

M 600

600

M

B

TP-2

N 400

N

A

O

N

A

O

400 12200

M

TP-4

P

P

400

ELK. ROOM

R

R

400

S

400 8400

O

T

400

P

200 200

R

V U

400

400

A

200 200

TP-7

S

TP-9

N

600

1200 300 200

800

800 300 200

TP-8

T

S Y

500

T

V U

500

3

600

V U

400 8400

O

500

1200

600

P

2

Y

TP-10

200 200

A

700

Z

S

R

E

D 1 FIREPLACE

500

T

FIREPLACE

200 200

V U

300 200

800

Y

E

E

8'

9

10'

11

12

400

13

E

10

1600

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

TP-5

F 400

1000 1000 800

400 14800

11

1600

12

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

H

800

400

10'

D

D

1000

400

10

E

MP

C

C

1000

400

9'

33

B

B 800

400

9

A

A 800

28

800

29

30

1200 4400

H

400

8'

800

32

800

400

8

800

31

1000

400

7

1200 4400

3600

400

6'

30

1000

1200

6

800

29

800

700

5

G

500

4

F

400

3

E

500

2

D

700

1

2

800

800

A 28

E

C

G

F

B

B

A

E'

H

C

1000

600

C

WATER RESERVOIR

D

D

1000

G

9'

400 14800

600

8

400

400

3600

H

400

400

200

7

400

400

600

6'

6

400

600

5

400

1200

800

4

700

D

3

500

G

2

1

400

200

C

500

F

600

700

800

TP-11

800

31

800

32

33

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant


1ST FLOOR ELECTRICAL PLAN

SYMBOL

EXPLANATION

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

H

G

F

D

E

X

25

500

300

26

400

27

28

800

29

800

30

800

revisions

1 2

31

1200

32

800

33

800

1200

Z

1200

Z

800

800 300 200 500

V U T

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

H 600

G 13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

25

300

26

400

27

28

800

800

29

800

30

31

1200

TP-4

P O

800 ELK. ROOM

TP-12

I

ELK. SHAFT 2

G

400

1200

6'

400

7

400

400

8

8'

400

400

9

9'

400

400

10

400 14800

10'

11

1600

12

E

D

6

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

D

1000

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

1000

500

16

B

B 800

300

15

800

400

14

TP-5

D

D800

A 800

28

800

29

30

1200 4400

31

C

C

B

B

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

A 800

32

H

400

13

1000

1600

12

1000

400 14800

11

800

400

10'

1000

400

10

800

400

9'

H

400

9

800

400

8'

1000

400

8

3600

400

7

1000

400

6'

2

C

E

800

1200

6

G

700

5

F

500

4

E

400

3

D

500

3600

C

E

2

TP-5

D

E'

700

600

F

800

700

5

1000

500

4

600

400

3

G

500

2

1

F

700

F

E

800

E

C

G

F

600

600

E'

H

600

200

600

C

H

F

1

500 400

600

200

G

J

I

400

G

200

H

H

400

C

600

600

I

C

B

K

400

J

600 600

L

MCC

400

I

J ELK. SHAFT 1

400

K

A

O

N

M

TP-3 ELK. SHAFT

P

400

ELK. SHAFT 2

TP-12

L 400

400

B

600

M

J

R

400

400 12200

400

400

MCC

TP-4

K

N

S

200 200

ELK. SHAFT 1

400 8400

O

K

B

L

TP-3

400 12200

P

T

600

400

R

400

A

ELK. SHAFT

V U

400

600

S

L

300 200

400

M

500

600

T

Z

Y

600

U

33

A

N 800

400

V

M

800

400

1200

ELK. ROOM

32

800

R

1200

4

200 200

400

F

D 3

Y

N

B

500

Z

400 8400

O

2

300 200

P

700

200 200

R

200 200

1

A

E

S 600

S

200

T

300 200

V U

Y

500

Y

33

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant


BASEMENT ELECTRICAL PLAN

SYMBOL

EXPLANATION

X

revisions

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

20

400

21

400

400

22

300

23

24

500

500

H

G

F

D

E

1 2

25

300

26

27

400

28

800

29

800

30

800

31

1200

32

800

33

800

1200

Z

1200

Z

800 4

500

5

700

6

7

1600

400

8

9

800

11

800

400

12

13

1600

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

T

H

F 10

800

G

300 200 400

25

300

26

400

27

28

800

800

29

800

30

1200

31

32

800

800

33

S 1200

600

800

400

300 200

800

200 200

O

400

21

22

23

24

25

200 200

26

27

28

29

30

31

WE DEMAND BIGGER ELECTRICAL ROOM

TP-4

32

200

I

I

600

600 400 12200

I

J

400

G

I

2

400

400

J

600

H

200

400

C

6'

400

7

400

400

8

8'

400

400

9

400

400

10

10'

400 14800

11

1600

400

12

13

E

D

9'

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

TP-5

D

600

1000

26

27

26'

28

29

30

B

E

31

32

10'

11

12

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

28

400

26

27

800

29

30

1200 4400

800

31

800

32

H

1600

33

D

D

C

1000

10

400 14800

C

1000

9'

400

B

B 800

9

400

A

A 800

28

800

29

30

1200 4400

H

8'

400

800

8

400

1000

7

400

3600

6'

400

1000

6

400

800

5

400

G

4

1200

F

3

700

E

2

500

D

1

400

B

E

A 800

500

800

31

2

800

25

600

24

800

23

800

400

22

E'

C

D

C

F

1000

F

G

3600

C

F

H

800

400

1200

6

1000

700

5

1000

500

E

200

H

4

G

800

400

3

G

500

2

F

700

1

700

C

G

600

600

600

E

600

G

E'

200

H

H

F 400

F

C

J

600

ELK. SHAFT 2

TP-12

ADP (MAİN DISTRIBUTION PANEL)

B

K

K

MCC

I

J

L 400

ELK. SHAFT 1

J

400

L TP-3

600

400

K

ELECTRICAL ROOM (HIGH CURRENT)

400

IT ROOM (LOW CURRENT)

ELK. SHAFT

ELK. SHAFT 1

400 12200

600

L

K

K

B

M

L

400

400

B

A

O

N

M

L

P

400

ELK. ROOM

R

400

N

600

600

600

400

26'

400 8400

O

T

S

M

200 200

P

V U

500

N

600

400

A

M

A

Y

P

S

R

Z

R

500

T

300 200

V U

N

B

3

Y

400 8400

O

500

1200

600

P

2

V U

Z

200 200

R

700

500

1

S

A

E

D

500

T

800

V U

Y

300 200

Y

800

32

33

A

Architectural Int Design Structure Mechanic Electrical Infrastructure Landscape Fire consultant


GROUND FLOOR COOLING PLAN 1 ST LEVEL

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

12

400

13

1600

400

14

15

16

400 300 20000

500

17

500

18

300

19

400

20

400

21

22

400

300

23

24

500

500

25

300

26

400

27

28

800

29

800

30

800

31

1200

94m² 34m² 18m² 8m² 29m² 11m² 20m² 124m² 20m² 9m² 29m² 39m² 8m²

140m² 30m² 6m² 15m² 35m² 9m² 99m² 5m² 35m² 82m² 100m² 16m²

12m² 364m² 667m² 128m² 5m² 9m² 37m² 152m² 103m² 103m² 110m² 352m² 12m² 20m² 20m² 6m² 6m² 28m² 34m² 800 18m² 45m² 171m² 56m² 4m² 2m² 34m² 28m² 19m² 268m² 79m² 4m² 41m² 21m² 34m² 359m² 25m² 20m² 12m² 27m² 17m² 54m² 94m² 34m² 18m² 8m² 29m² 11m² 20m² 124m² 20m² 9m² 29m² 39m² 8m²

32

800

Z

Z-22 PRESIDENTIAL OFFICE 26°C Qtc:-- W Qsc:-- W

Y

Z-21 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-24 PANTRY 26°C Qtc:-- W Qsc:-- W

V

Z-23 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

Z-25 WC 26°C Qtc:-- W

U T

Z-11 FIREPLACE PRESIDENT'S LOUNGE 26°C Qtc:-- W

Z-22 HEAD MANAGERS 26°C Qtc:-- W Qsc:-- W

Z-29 PRESIDENTIAL LOBBY 26°C Qtc:-- W Qsc:-- W

Z-19 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

Z-42 EXECUTIVE OFFICE 26°C Qtc:-- W Qsc:-- W

FIREPLACE

Z-56 RECREATION ROOM 26°C

Z-43 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-08 CONFERENCE 26°C Qtc:-- W Qsc:-- W

Z-09 BOARD CONFERENCE ROOM 26°C Qtc:-- W Qsc:-- W

Z-10 MEETING ROOM 26°C Qtc:-- W Qsc:-- W

Z-49 EXECUTIVE LOBBY 26°C Qtc:-- W Qsc:-- W

Z-41 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

26°C Z-44 Qtc:-- W W.C.W Qsc:--

Z-72 PRAYER AREA 26°C

S Z-45 PANTRY 26°C Qtc:-- W Qsc:-- W

Z-40 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

A

Z-17 ELECTRICAL 26°C Qtc:-- W Qsc:-- W

Z-18 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

R

Z-28 WC 26°C Qtc:-- W

Z-07 W.C.

1

N

Z

700

2

500

3

400

4

500

Z-52 MANAGERS OFFICE 26°C

5

700

6

Z-04 LOUNGE 26°C Qtc:-- W Qsc:-- W

Z-60 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

Z-61 TECHNICAL 26°C Z-51 W.C.

7

1600

400

8

9

800

10

800

11

800

400

12

13

1600

400

14

Z-48 OFFICE 26°C Qtc:-- W Qsc:-- W

15

400 300 20000

16

500

500

18

300

19

400

20

400

21

400

22

300

23

500

24

25

500

300

26

400

27

800

28

800

29

30

800

31

1200

32

800

800

A PARKING

O

33

Z

N

M

Z-75 EXECUTIVE ENTRANCE

Y

Z-21 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-12 PRESIDENTIAL LOUNGE 26°C Qtc:-- W Qsc:-- W

Z-25 WC 26°C Qtc:-- W

U Z-32 CLOAKROOM 26°C Qtc:-- W

Z-23 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

Z-24 PANTRY 26°C Qtc:-- W Qsc:-- W

V Z-36 STAIRS 26°C Qtc:-- W

V

Z-42 EXECUTIVE OFFICE 26°C Qtc:-- W Qsc:-- W

FIREPLACE

B

Z-11 FIREPLACE PRESIDENT'S LOUNGE 26°C Qtc:-- W

Z-22 HEAD MANAGERS 26°C Qtc:-- W Qsc:-- W

Z-29 PRESIDENTIAL LOBBY 26°C Qtc:-- W Qsc:-- W

Z-19 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

Z-70 LOBBY DESK 26°C Qtc:-- W

Z-08 CONFERENCE 26°C Qtc:-- W Qsc:-- W

Z-09 BOARD CONFERENCE ROOM 26°C Qtc:-- W Qsc:-- W

Z-49 EXECUTIVE LOBBY 26°C Qtc:-- W Qsc:-- W

Z-41 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

Z-81 LOBBY DESK

Z-56 RECREATION ROOM 26°C

Z-43 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-65 LIFTS 26°C Qtc:-- W

Z-10 MEETING ROOM 26°C Qtc:-- W Qsc:-- W

T

26°C Z-44 Qtc:-- W W.C.W Qsc:--

Z-72 PRAYER AREA 26°C

Z-33 W.C. 26°C Qtc:-- W

A I

Z-45 PANTRY 26°C Qtc:-- W Qsc:-- W

Z-40 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

Z-02 LOBBY 26°C Qtc:-- W

Z-17 ELECTRICAL 26°C Qtc:-- W Qsc:-- W

Z-18 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

R

Z-28 WC 26°C Qtc:-- W

Z-59 MANAGERS OFFICE 26°C

J

Z-63 EXECUTIVE LOBBY 26°C

Z-39 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W Z-101 TRANSL 26°C Qtc:-- W Qsc:-- W

Z-52 MANAGERS OFFICE 26°C

Z-60 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

Z-61 TECHNICAL 26°C Z-51 W.C.

Z-47 W.C. 26°C Qtc:-- W

P Z-76 RECEPTION LOBBY 26°C

Z-07 W.C.

Z-05 TECH.

Z-37 OFFICE 26°C Qtc:-- W Qsc:-- W

Z-04 LOUNGE 26°C Qtc:-- W Qsc:-- W

N

O Z-78 OFFICE 26°C

Z-48 OFFICE 26°C Qtc:-- W Qsc:-- W

G

B

N

Z-75 EXECUTIVE ENTRANCE

Z-68 TECHNICAL 26°C Qtc:-- W

K

Z-36 STAIRS 26°C Qtc:-- W

C

Z-67 STAIRS 26°C Qtc:-- W

Z-81 LOBBY DESK

Z-65 LIFTS 26°C Qtc:-- W

Z-70 LOBBY DESK 26°C Qtc:-- W

Z-33 W.C. 26°C Qtc:-- W

Raw Water Tank Area:33 m² Height:3 m Volume:100 m³

700

1

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

11

F Domestic Water Tank Area:33 m² Height:3 m Volume:100 m³

12

1600

400

13

Raw Water Tank Area:33 m² Height:3 m Volume:100 m³

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

1

400

14

700 WATER RESERVOIR

I

Z-78 OFFICE 26°C

500

2

15

400

3

300

16

500

4

500

17

700

5

500

18 400

1200

6

300

6'

400

19 400

7

400

20 400

400

8

8'

F

C

H G

Z-68 TECHNICAL 26°C Qtc:-- W

E

E'

21 400

400

9

400

9'

300

22 400

400

10

10'

C

J

Z-35 MULTIPURPOSE AREA 26°C Qtc:-- W

G

B

K

Z-79 STAIRS 26°C Qtc:-- W

Z-02 LOBBY 26°C Qtc:-- W

Z-76 RECEPTION LOBBY 26°C

H

G

Z-77 LIFT

Z-32 CLOAKROOM 26°C Qtc:-- W Z-30 FOYER 26°C Qtc:-- W

I

E'

H L

Z-12 PRESIDENTIAL LOUNGE 26°C Qtc:-- W Qsc:-- W

J

F

M

Z-03 MAIN HALLWAY 26°C

L

A I

Z-74 TECHNICAL

M Z-35 MULTIPURPOSE AREA 26°C Qtc:-- W

K

S

R

Z-27 MANAGERS 26°C Qtc:-- W Qsc:-- W

P O

H

L

U

Z-77 LIFT

T

Z-30 FOYER 26°C Qtc:-- W

PARKING

Z-74 TECHNICAL

Z-22 PRESIDENTIAL OFFICE 26°C Qtc:-- W Qsc:-- W

L

1 2

7939m²

P 17

Y

J

Pump Room Area:100 m²

T

S

S

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

V U

Z-03 MAIN HALLWAY 26°C

K

WATER RESERVOIR

Y

revisions

Z-59 MANAGERS OFFICE 26°C

Z-47 W.C. 26°C Qtc:-- W

Z-37 OFFICE 26°C Qtc:-- W Qsc:-- W

M

Domestic Water Tank Area:33 m² Height:3 m Volume:100 m³

Z

7939m²

Z-63 EXECUTIVE LOBBY 26°C

Z-39 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W Z-101 TRANSL 26°C Qtc:-- W Qsc:-- W

Z-05 TECH.

C

33

R

Z-27 MANAGERS 26°C Qtc:-- W Qsc:-- W

P O

B

16m² 34m² 94m² 54m² 17m² 27m² 12m² 20m² 124m² 308m² 16m² 123m² 19m² 18m² 123m² 25m² 174m² 435m² 63m² 28m² 8m² 309m² 159m² 18m² 36m² 25m² 58m² 572m² 148m² 20m² 14m² 20m² 37m² 59m² 74m² 34m² 34m² 34m² 4m² 21m² 4m² 140m² 30m² 6m² 15m² 35m² 9m² 99m² 5m² 35m² 82m² 100m² 16m²

500

23 400 14800

11

500

24

300

25

1600

12

400

14

Z-79 STAIRS 26°C Qtc:-- W

27 300

15

500

16

E

F

400

26

400

13

Z-67 STAIRS 26°C Qtc:-- W

500

17

300

D 18

400

19

400

20

400

21

300

22

500

23

500

300

24

25

E

E

D

D

400

26

D

27

Pump Room Area:100 m²

Z-82 BUFFET 26°C

Z-82 BUFFET 26°C

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

Z-83 DINING HALL 26°C

C

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

Z-83 DINING HALL 26°C Z-89 KITCHEN 26°C

C

C

Z-84 DINING HALL2 26°C

Z-90 PREPERATION 26°C

C

Z-84 DINING HALL2 26°C

Z-89 KITCHEN 26°C

B

Z-90 PREPERATION 26°C

B Z-87 W.C

Z-85 W.C

Z-88 STORAGE

A

A 800

B

28 Z-87 W.C

800

29

30

1200 4400

800

31

800

32

33

B

Z-85 W.C

Z-88 STORAGE

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

Architectur Int Design Structure Mechanic Electrical Infrastructu Landscape Fire consul


342m² 454m² 633m² 18m² 8m² 385m² 26m² 13m² 1204m² 26m² 13m² 1204m²

1ST FLOOR COOLING PLAN 1 ST LEVEL

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

13

1600

400

14

15

400 300 20000

16

17

500

500

18

300

19

400

20

400

21

400

22

300

23

500

24

25

500

300

26

400

27

28

800

29

800

30

800

31

1200

800

Z

Y

V AHU-10 PRESIDENTIAL OFFICE VENTILATION UNIT

U T

S

AHU-08 EXEC. OFFICE VENTILATION UNIT

AHU-09 CONFERENCE VENTILATION UNIT

33

800

Z

Y

V U T

S

R

R

P

P

O

1

SC-06 SOLAR COLLECTOR

N

AHU-11 PRESIDENTIAL LOUNGE AIR HANDLING UNIT

700

2

500

3

400

4

500

5

6

700

7

1600

400

16m² 34m² 94m² 54m² 17m² 27m² 12m² 20m² 124m² 308m² 16m² 123m² 19m² 18m² 123m² 25m² 174m² 435m² 63m² 28m² 8m² 309m² 159m² 18m² 36m² 25m² 58m² 572m² 148m² 20m² 14m² 20m² 37m² 59m² 74m² 34m² 34m² 34m² 4m² 21m² 4m² 140m² 30m² 6m² 15m² 35m² 9m² 99m² 5m² 35m² 82m² 100m² 16m²

revisions

1 2

7939m²

SC-04 SOLAR COLLECTOR

SC-05 SOLAR COLLECTOR

SC-07 SOLAR COLLECTOR

A

01-21 OFFICE 26°C

AHU-07 EXEC. OFFICE VENTILATION UNIT

5442m²

12m² 364m² 667m² 128m² 5m² 9m² 37m² 152m² 103m² 103m² 110m² 352m² 12m² 20m² 20m² 6m² 6m² 32 28m² 34m² 18m² 45m² 171m² 56m² 4m² 2m² 34m² 28m² 19m² 268m² 79m² 4m² 41m² 21m² 34m² 359m² 25m² 20m² 12m² 27m² 17m² 54m² 94m² 34m² 18m² 8m² 29m² 11m² 20m² 124m² 20m² 9m² 29m² 39m² 8m²

8

9

800

10

800

11

800

400

12

13

1600

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

25

500

300

26

400

27

800

28

800

29

30

800

1200

Z

31

32

800

01-20 TECHNICAL

800

O

33

PARKING

N

Z

01-19 W.C.

A

M

M Z-22 PRESIDENTIAL OFFICE 26°C Qtc:-- W Qsc:-- W

B

Y

Y

L

Z-21 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

01-03 ELEVATOR 26°C Qtc:-- W

Z-24 PANTRY 26°C Qtc:-- W Qsc:-- W

V

L

Z-25 WC 26°C Qtc:-- W

U

K

Z-23 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

FIREPLACE

01-01 TECHNICAL 26°C Qtc:-- W

J

Z-11 FIREPLACE PRESIDENT'S LOUNGE 26°C Qtc:-- W

Z-22 HEAD MANAGERS 26°C Qtc:-- W Qsc:-- W

Z-29 PRESIDENTIAL LOBBY 26°C Qtc:-- W Qsc:-- W

Z-19 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

Z-10 MEETING ROOM 26°C Qtc:-- W Qsc:-- W

Z-72 PRAYER AREA 26°C

Z-45 PANTRY 26°C Qtc:-- W Qsc:-- W

Z-40 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

A

Z-17 ELECTRICAL 26°C Qtc:-- W Qsc:-- W

Z-18 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

R

Z-28 WC 26°C Qtc:-- W

01-10 OFFICE 2 26°C

Z-27 MANAGERS 26°C Qtc:-- W Qsc:-- W

P O

S

01-11 OFFICE 1 26°C

Z-52 MANAGERS OFFICE 26°C

R Z-60 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

Z-61 TECHNICAL 26°C

Z-51 W.C.

Z-47 W.C. 26°C Qtc:-- W

P

Z-37 OFFICE 26°C Qtc:-- W Qsc:-- W

01-04 OFFICE 1 26°C

Z-04 LOUNGE 26°C Qtc:-- W Qsc:-- W

01-15 OFFICE 2 26°C

Z-48 OFFICE 26°C Qtc:-- W Qsc:-- W

B

G

N

Z-75 EXECUTIVE ENTRANCE

L

Z-12 PRESIDENTIAL LOUNGE 26°C Qtc:-- W Qsc:-- W

01-08 W.C.

Z-36 STAIRS 26°C Qtc:-- W

Z-32 CLOAKROOM 26°C Qtc:-- W

K

01-07 STAIRS

Z-33 W.C. 26°C Qtc:-- W

Z-81 LOBBY DESK

C

700

1

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

Domestic Water Tank Area:33 m² Height:3 m Volume:100 m³

11

F

12

H

1600

400

E'

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

WATER RESERVOIR Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

1

500

2

400

3

500

4

700

5

400

1200

6

6'

400

7

400

400

8

8'

400

400

9

9'

400

400

10

10'

400 14800

25

11

1600

12

400

13

400

14

26 300

15

Z-67 STAIRS 26°C Qtc:-- W

Z-79 STAIRS 26°C Qtc:-- W

400

27

500

16

500

17

E

D

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

E

E 01-17 TECHNICAL

400

26

C

F

01-16 01-16 26°C Qtc:-- W

Raw Water Tank Area:33 m² Height:3 m Volume:100 m³

700

G

E

Z-68 TECHNICAL 26°C Qtc:-- W

F

I

Z-78 OFFICE 26°C

Z-35 MULTIPURPOSE AREA 26°C Qtc:-- W

G

C

G

K

Z-76 RECEPTION LOBBY 26°C

H

H

J

Z-02 LOBBY 26°C Qtc:-- W

I

E'

B

Z-77 LIFT

01-13 STAIRS

Z-65 LIFTS 26°C Qtc:-- W

Z-70 LOBBY DESK 26°C Qtc:-- W

Z-30 FOYER 26°C Qtc:-- W

J

F

M

Z-03 MAIN HALLWAY 26°C

L

I

Z-74 TECHNICAL

M

H

A

O

Z-07 W.C.

Z-05 TECH.

N

J

Z-59 MANAGERS OFFICE 26°C Z-63 EXECUTIVE LOBBY 26°C

Z-39 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

01-05 OFFICE LOBBY 26°C

Z-101 TRANSL 26°C Qtc:-- W Qsc:-- W

K

T

26°C Z-44 Qtc:-- W W.C.W Qsc:--

S

I

C

Z-49 EXECUTIVE LOBBY 26°C Qtc:-- W Qsc:-- W

Z-41 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

U

Z-56 RECREATION ROOM 26°C

Z-43 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-08 CONFERENCE 26°C Qtc:-- W Qsc:-- W

Z-09 BOARD CONFERENCE ROOM 26°C Qtc:-- W Qsc:-- W

B

V

01-12 OFFICE LOBBY 26°C

01-06 LIFTS

T 01-02 TECHNICAL 26°C Qtc:-- W

Z-42 EXECUTIVE OFFICE 26°C Qtc:-- W Qsc:-- W

D

27

Pump Room Area:100 m²

D

D

Z-82 BUFFET 26°C

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

Z-83 DINING HALL 26°C

01-18 OFFICE 26°C

C

C

Z-84 DINING HALL2 26°C

C

Z-89 KITCHEN 26°C

C

Z-90 PREPERATION 26°C

B

B Z-87 W.C

Z-85 W.C

Z-88 STORAGE

A

A 800

B

28

800

29

30

1200 4400

800

31

800

32

B

33

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

Architectur Int Design Structure Mechanic Electrical Infrastructu Landscape Fire consul


171m² 535m² 19m² 34m² 16m² 117m² 12m² 21m²

BASEMENT COOLING PLAN

1402m²

1 ST LEVEL

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

13

14

400

15

400 300 20000

16

17

500

18

500

300

19

20

400

400

21

400

22

300

23

500

24

500

25

300

26

400

27

28

800

29

800

30

800

31

1200

12m² 364m² 667m² 128m² 5m² 9m² 37m² 800 152m² 103m² 103m² 110m² 352m² 12m² 20m² 20m² 6m² 6m² 28m² 34m² 18m² 45m² 171m² 56m² 4m² 2m² 34m² 28m² 19m² 268m² 79m² 4m² 41m² 21m² 34m² 359m² 25m² 20m² 12m² 27m² 17m² 54m² 94m² 34m² 18m² 8m² 29m² 11m² 20m² 124m² 20m² 9m² 29m² 39m² 8m²

32

800

Z

Y

V U T

S

A

R P O

16m² 34m² 94m² 54m² 17m² 27m² 12m² 20m² 124m² 308m² 16m² 123m² 19m² 18m² 123m² 25m² 174m² 435m² 63m² 28m² 8m² 309m² 159m² 18m² 36m² 25m² 58m² 572m² 148m² 20m² 14m² 20m² 37m² 59m² 74m² 34m² 34m² 34m² 4m² 21m² 4m² 140m² 30m² 6m² 15m² 35m² 9m² 99m² 5m² 35m² 82m² 100m² 16m²

33

Z

Y

V U T

S

A

R P O

revisions

1 2

7939m²

N

N

M

M 26'

B

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

L

10

21800

11

22 800 23

400

12

24

1600

13

25

14

26

400

PARKING 15

16

27

400 300 20000

500

17

500

18

300

19

28400

20

400

21

400

22

23

29

300

500

24

500

25

300

26

30 400

27

800

28

800

29

30

31800

1200

32

31

32

800

800

L

L Z

Z

K

B-08 LIFTS

K

B-09 EXECUTIVE STORAGE

Z-21 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-24 PANTRY 26°C Qtc:-- W Qsc:-- W

V

Z-23 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

I

Z-25 WC 26°C Qtc:-- W

U

PRESIDENT'S LOUNGE 26°C Qtc:-- W

Z-22 HEAD MANAGERS 26°C Qtc:-- W Qsc:-- W

Z-29 PRESIDENTIAL LOBBY 26°C Qtc:-- W Qsc:-- W

Z-10 MEETING ROOM 26°C Qtc:-- W Qsc:-- W

B-05 STORAGE

Z-17 ELECTRICAL 26°C Qtc:-- W Qsc:-- W

Z-18 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

R

N

22

700

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

11

400

J

I

C

23

24

P

Z-36 STAIRS 26°C Qtc:-- W

Z-74 TECHNICAL

F

26

27

28

29

30

31

32

Z-75 EXECUTIVE ENTRANCE

400

300

500

500

300

400

400

400

300

500

500

Z-33 W.C. 26°C Qtc:-- W

13

14

15

16

17

18

19

20

21

22

300

400

K

J

Z-02 LOBBY 26°C Qtc:-- W

23

24

25

26

27

Z-76 RECEPTION LOBBY 26°C

I

Z-78 OFFICE 26°C

D H

Z-35 MULTIPURPOSE AREA 26°C Qtc:-- W

C

G

Z-68 TECHNICAL 26°C Qtc:-- W Z-67 STAIRS 26°C Qtc:-- W

Z-79 STAIRS 26°C Qtc:-- W

F

F

E'

Raw Water Tank Area:33 m² Height:3 m Volume:100 m³

700 WATER RESERVOIR Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

B

E

Z-77 LIFT Z-81 LOBBY DESK

Z-65 LIFTS 26°C Qtc:-- W

Z-70 LOBBY DESK 26°C Qtc:-- W

D H G

Domestic Water Tank Area:33 m² Height:3 m Volume:100 m³

M

L

E

Z-32 CLOAKROOM 26°C Qtc:-- W Z-30 FOYER 26°C Qtc:-- W

A

O

N

25

26'

Z-12 PRESIDENTIAL LOUNGE 26°C Qtc:-- W Qsc:-- W

1600

12

Z-60 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

Z-61 TECHNICAL 26°C Z-51 W.C.

Z-48 OFFICE 26°C Qtc:-- W Qsc:-- W

Z-03 MAIN HALLWAY 26°C

L

K

1

Z-52 MANAGERS OFFICE 26°C Z-47 W.C. 26°C Qtc:-- W

Z-04 LOUNGE 26°C Qtc:-- W Qsc:-- W

F

M

B

G

Z-07 W.C.

Z-37 OFFICE 26°C Qtc:-- W Qsc:-- W

C

H

S

Z-59

OFFICE B-04 MANAGERS 26°C STAIRS

Z-63 EXECUTIVE LOBBY 26°C

Z-39 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W Z-101 TRANSL 26°C Qtc:-- W Qsc:-- W

Z-05 TECH.

E'

Z-72 PRAYER AREA 26°C

Z-45 PANTRY 26°C Qtc:-- W Qsc:-- W

R

Z-27 MANAGERS 26°C Qtc:-- W Qsc:-- W

P O

F

T

26°C Z-44 Qtc:-- W W.C.W Qsc:--

Z-40 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

B-06 STAIRS

G

Z-28 WC 26°C Qtc:-- W

Z-49 EXECUTIVE LOBBY 26°C Qtc:-- W Qsc:-- W

Z-41 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

H

G

Z-56 RECREATION ROOM 26°C

Z-43 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-08 CONFERENCE 26°C Qtc:-- W Qsc:-- W

Z-09 BOARD CONFERENCE ROOM 26°C Qtc:-- W Qsc:-- W

S

A

U

B-07 STORAGE

Z-11 FIREPLACE

Z-19 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

H

I

V

Z-42 EXECUTIVE OFFICE 26°C Qtc:-- W Qsc:-- W

FIREPLACE

T

C

JY

J

Y

I

K

B-02 ELECTRICAL AREA

Z-22 PRESIDENTIAL OFFICE 26°C Qtc:-- W Qsc:-- W

J

B

33

1

500

2

400

3

500

4

700

5

400

1200

6

6'

400

7

400

400

8

8'

400

400

9

9'

400

400

10

10'

400 14800

11

1600

12

400

13

400

14

300

15

500

16

E

C 500 17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

E

C

400

26

Pump Room Area:100 m²

27 D

D

Z-82 BUFFET 26°C

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

Z-83 DINING HALL 26°C

C

B

C

Z-84 DINING HALL2 26°C

Z-89 KITCHEN 26°C

B

Z-90 PREPERATION 26°C

B

B Z-87 W.C

Z-85 W.C

Z-88 STORAGE

A 800

28

A

800

29

30

A

1200 4400 28

800

800

29

31

800 30

A

800 800

1200 4400

32

31

800

32

33

33

Architectur Int Design Structure Mechanic Electrical Infrastructu Landscape Fire consul


ROOF COOLING PLAN 1 ST LEVEL

1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

13

1600

400

14

15

400 300 20000

16

17

500

18

500

300

19

400

20

21

400

400

22

300

23

500

24

25

500

300

26

400

27

28

800

29

800

30

800

12m² 364m² 667m²

31

1200

32128m²

5m² 9m² 37m² 152m² 103m² 103m² 110m² 352m² 12m² 20m² 20m² 6m² 6m² 28m² 34m² 18m² 45m² 171m² 56m² 4m² 2m² 34m² 28m² 19m² 268m² 79m² 4m² 41m² 21m² 34m² 359m² 25m² 20m² 12m² 27m² 17m² 54m² 94m² 34m² 18m² 8m² 29m² 11m² 20m² 124m² 20m² 9m² 29m² 39m² 8m²

800

Z

Y

V U T

S AHU-06 MOSQUE AIR HANDLING UNIT

SC-02 SOLAR COLLECTOR

A

R P O TEF-03 TOILET EXHAUST FAN

N

800

Z

Y

V U T

S

R P

N

revisions

1 2

7939m²

M

L

1

K

700

2

500

3

400

4

500

5

6

700

7

1600

400

8

9

800

10

800

11

800

400

12

13

AHU-13 LOBBY VENTILATION UNIT

1600

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

21

22

CH-01 400AIR COOLED 400 CHILLER

300

23

500

24

CH-02 AIR COOLED CHILLER

25

26

CH-03

CHILLER 400 500 AIR COOLED 300

27

800

28

800

29

30

800

31

1200

32

800

800

L

33

Z

J

Z

AHU-12 MULTI PURPOSE AIR HANDLING UNIT

Z-22 PRESIDENTIAL OFFICE 26°C Qtc:-- W Qsc:-- W

B

PARKING

K

J

AHU-14 STORAGE VENTILATION UNIT

AHU-03 OFFICE&LOBBY VENTILATION UNIT

Y

Y

I

I SC-03 SOLAR COLLECTOR

Z-21 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-24 PANTRY 26°C Qtc:-- W Qsc:-- W

V

C

A

O

M

B

16m² 34m² 94m² 54m² 17m² 27m² 12m² 20m² 124m² 308m² 16m² 123m² 19m² 18m² 123m² 25m² 174m² 435m² 63m² 28m² 8m² 309m² 159m² 18m² 36m² 25m² 58m² 572m² 148m² 20m² 14m² 20m² 37m² 59m² 74m² 34m² 34m² 34m² 4m² 21m² 4m² 140m² 30m² 6m² 15m² 35m² 9m² 99m² 5m² 35m² 82m² 100m² 16m²

33

AHU-04 OFFICE&LOBBY VENTILATION UNIT

Z-25 WC 26°C Qtc:-- W

U

H

Z-23 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

FIREPLACE

T

G

Z-11 FIREPLACE PRESIDENT'S LOUNGE 26°C Qtc:-- W

Z-22 HEAD MANAGERS 26°C Qtc:-- W Qsc:-- W

Z-29 PRESIDENTIAL LOBBY 26°C Qtc:-- W Qsc:-- W

Z-19 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

U Z-56 RECREATION ROOM 26°C

Z-43 RECREATION ROOM 26°C Qtc:-- W Qsc:-- W

Z-08 CONFERENCE 26°C Qtc:-- W Qsc:-- W

Z-09 BOARD CONFERENCE ROOM 26°C Qtc:-- W Qsc:-- W

V

Z-42 EXECUTIVE OFFICE 26°C Qtc:-- W Qsc:-- W

Z-10 MEETING ROOM 26°C Qtc:-- W Qsc:-- W

Z-49 EXECUTIVE LOBBY 26°C Qtc:-- W Qsc:-- W

Z-41 PRIVATE MEETING ROOM 26°C Qtc:-- W Qsc:-- W

T

26°C Z-44 Qtc:-- W W.C.W Qsc:--

Z-72 PRAYER AREA 26°C

S Z-45 PANTRY 26°C Qtc:-- W Qsc:-- W

Z-40 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

A F

Z-17 ELECTRICAL 26°C Qtc:-- W Qsc:-- W

Z-18 MANAGERS OFFİCE 26°C Qtc:-- W Qsc:-- W

R

Z-28 WC 26°C Qtc:-- W

Z-39 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

P

Z-101 TRANSL 26°C Qtc:-- W Qsc:-- W

Z-60 MANAGERS OFFICE 26°C Qtc:-- W Qsc:-- W

Z-61 TECHNICAL 26°C Z-51 W.C.

Z-47 W.C. 26°C Qtc:-- W

Z-37 OFFICE 26°C Qtc:-- W Qsc:-- W

Z-04 LOUNGE 26°C Qtc:-- W Qsc:-- W

N

P O

Z-48 OFFICE 26°C Qtc:-- W Qsc:-- W

700

1

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

11

Z-12 PRESIDENTIAL LOUNGE 26°C Qtc:-- W Qsc:-- W

1600

400

400

300

500

500

300

Z-36 STAIRS 26°C Qtc:-- W

400

400

K

12

13

J

14

15

16

17

18

300

Z-32 CLOAKROOM 26°C Qtc:-- W

Z-30 FOYER 26°C Qtc:-- W

19

20

21

22

500

23

Z-33 W.C. 26°C Qtc:-- W

500

300

24

25

26

27

Z-65 LIFTS 26°C Qtc:-- W

Z-70 LOBBY DESK 26°C Qtc:-- W

K

J

Z-02 LOBBY 26°C Qtc:-- W

Z-76 RECEPTION LOBBY 26°C

I

Z-78 OFFICE 26°C

H

D

C

G

Z-68 TECHNICAL 26°C Qtc:-- W Z-67 STAIRS 26°C Qtc:-- W

AHU-02 OFFICE VENTILATION UNIT

Z-79 STAIRS 26°C Qtc:-- W

F Domestic Water Tank Area:33 m² Height:3 m Volume:100 m³

B

Z-77 LIFT

Z-35 MULTIPURPOSE AREA 26°C Qtc:-- W

G

E

L TEF-02 TOILET EXHAUST FAN Z-81 LOBBY DESK

D

H

M

SC-01 SOLAR COLLECTOR

400

I

C

Z-75 EXECUTIVE ENTRANCE

E

400

F

N

Z-03 MAIN HALLWAY 26°C

L

A

Z-74 TECHNICAL

M

B

C

G

CP-02 SECONDARY COOLING PUMPS

Z-63 EXECUTIVE LOBBY 26°C

Z-52 MANAGERS OFFICE 26°C

Z-07 W.C.

Z-05 TECH.

H

Z-59 MANAGERS OFFICE 26°C

CP-01 PRIMARY COOLING PUMPS

R

Z-27 MANAGERS 26°C Qtc:-- W Qsc:-- W

O

E'

S

F

C

E'

C

AHU-01 DINING ROOM VENTILATION UNIT

E

E

Raw Water Tank Area:33 m² Height:3 m Volume:100 m³

700 WATER RESERVOIR Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

Fire Water Tank Area:68 m² Height:3 m Volume:200 m³

1

500

2

400

3

500

4

700

5

400

1200

6

6'

400

7

400

400

8

8'

400

400

9

9'

400

400

10

10'

400 14800

11

1600

12

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

Pump Room Area:100 m²

27 D

KEF-01 KITCHEN EXHAUST FAN

TEF-01 TOILET EXHAUST FAN

D

B

B

Z-82 BUFFET 26°C

Z-83 DINING HALL 26°C

C

C

Z-84 DINING HALL2 26°C

KEF-02 KITCHEN EXHAUST FAN

Z-89 KITCHEN 26°C

Z-90 PREPERATION 26°C

B

A

B Z-87 W.C

800

28

800

29

1200 4400

A 30

800

28

Z-85 W.C

Z-88 STORAGE

800

31

800

29

30

1200 4400

800

32 800

31

33

800

32

33

A

A

Architectur Int Design Structure Mechanic Electrical Infrastructu Landscape Fire consul


SPRINKLER PLANS


11m² 20m² 124m² 20m² 9m² 29m² 39m² 8m²

GROUND FLOOR SPRINKLER PLAN

9m² 99m 5m² 35m 82m 100m 16m

7939m

PARKING 1

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

25

300

26

400

27

800

28

800

29

30

800

1200

31

32

800

800

33

Z

Z

Z-22 Presidential Office S.I.T.:26°C Qt:-- W

Y

Y

Z-23 PRIVATE MEETING ROOM S.I.T.:26°C QT:-- W

Z-21 RECREATION ROOM S.I.T.:26°C Qt:-- W

Z-24 PANTRY S.I.T.:26°C QT:-- W

V

U

FIREPLACE

T

Z-11 FIREPLACE PRESIDENT'S LOUNGE S.I.T.:26°C Qt:-- W

Z-22 HEAD MANAGERS S.I.T.:26°C Qt:-- W

Z-29 PRESIDENTIAL LOBY S.I.T.:26°C Qt:-- W

Z-19 MANAGERS OFFİCE S.I.T.:26°C Qt:-- W

V

Z-42 EXECUTIVE OFFICE S.I.T.:26°C Qt:-- W

Z-25 WC S.I.T.:26°C QT:-- W

U

Z-56 RECREATION ROOM S.I.T.:26°C Qt:-- W

Z-43 RECREATION ROOM S.I.T.:26°C Qt:-- W

Z-08 CONFERENCE S.I.T.:26°C Qt:-- W

Z-09 BOARD CONFERENCE ROOM S.I.T.:26°C Qt:-- W

Z-10 MEETING ROOM S.I.T.:26°C Qt:-- W

Z-49 EXECUTIVE LOBBY S.I.T.:26°C Qt:-- W

Z-41 PRIVATE MEETING ROOM S.I.T.:26°C Qt:-- W

T

Z-44 W.C. S.I.T.:26°C Qt:-- W

Z-72 PRAYER AREA S.I.T.:26°C Qt:-- W

S

A

Z-17 ELECTRICAL S.I.T.:26°C Qt:-- W

Z-18 MANAGERS OFFİCE S.I.T.:26°C Qt:-- W

R

Z-28 WC S.I.T.:26°C Qt:-- W

Z-63 EXECUTIVE LOBBY S.I.T.:26°C Qt:-- W

Z-45 PANTRY S.I.T.:26°C Qt:-- W

Z-40 MANAGERS OFFICE S.I.T.:26°C Qt:-- W

S

Z-59 MANAGERS OFFICE S.I.T.:26°C Qt:-- W

R

Z-27 MANAGERS S.I.T.:26°C Qt:-- W

Z-39 MANAGERS OFFICE S.I.T.:26°C Qt:-- W

P

Z-101 TRANSL S.I.T.:26°C Qt:-- W

O

Z-52 MANAGERS OFFICE S.I.T.:26°C Qt:-- W

Z-47 W.C. S.I.T.:26°C Qt:-- W

Z-07 W.C. S.I.T.:26°C Qt:-- W

Z-05 TECH. S.I.T.:26°C Qt:-- W

N

P

Z-74 TECHNICAL S.I.T.:26°C Qt:-- W

N

M

B

Z-75 EXECUTIVE ENTRANCE S.I.T.:26°C Qt:-- W

L

Z-12 PRESIDENTIAL LOUNGE S.I.T.:26°C Qt:-- W

Z-36 STAIRS S.I.T.:26°C Qt:-- W

Z-32 CLOAKROOM S.I.T.:26°C Qt:-- W

K

Z-33 W.C. S.I.T.:26°C Qt:-- W

Z-77 LIFT S.I.T.:26°C Qt:-- W

Z-81 LOBBY DESK S.I.T.:26°C Qt:-- W

Z-65 LIFTS S.I.T.:26°C Qt:-- W

Z-70 LOBBY DESK S.I.T.:26°C Qt:-- W

Z-30 FOYER S.I.T.:26°C Qt:-- W

J

J

Z-76 RECEPTION LOBBY S.I.T.:26°C Qt:-- W

H

I

Z-78 OFFICE S.I.T.:26°C Qt:-- W

H

Z-35 MULTIPURPOSE AREA S.I.T.:26°C Qt:-- W

G

G

Z-68 TECHNICAL S.I.T.:26°C Qt:-- W Z-67 STAIRS S.I.T.:26°C Qt:-- W

Z-79 STAIRS S.I.T.:26°C Qt:-- W

F

F

E'

700 WATER RESERVOIR

1

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

11

1600

12

B

K

Z-02 LOBBY S.I.T.:26°C Qt:-- W

I

C

M

Z-03 MAIN HALLWAY S.I.T.:26°C Qt:-- W

L

A

O

Z-48 OFFICE S.I.T.:26°C Qt:-- W

Z-37 OFFICE S.I.T.:26°C Qt:-- W

Z-04 LOUNGE S.I.T.:26°C Qt:-- W

Z-60 MANAGERS OFFICE S.I.T.:26°C Qt:-- W

Z-61 TECHNICAL S.I.T.:26°C Qt:-- W

Z-51 W.C. S.I.T.:26°C Qt:-- W

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

E

E

D

D

400

26

27

Z-82 BUFFET S.I.T.:26°C Qt:-- W Z-83 DINING HALL S.I.T.:26°C Qt:-- W

C

C

Z-84 DINING HALL2 S.I.T.:26°C Qt:-- W

Z-89 KITCHEN S.I.T.:26°C Qt:-- W

Z-90 PREPERATION S.I.T.:26°C Qt:-- W

B

B Z-87 W.C S.I.T.:26°C Qt:-- W

Z-85 W.C S.I.T.:26°C Qt:-- W

Z-88 STORAGE S.I.T.:26°C Qt:-- W

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

C


13m² 1204m² 26m² 13m² 1204m²

1ST FLOOR SPRINKLER PLAN

1

700

2

500

3

400

4

500

5

5442m²

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

25

300

26

400

27

800

28

800

29

30

800

31

800

32

800

33

Z

Z

Y

Y

V

V

U

U

T

T

01-21 OFFICE S.I.T.:26°C Qt:-- W

S

A

1200

S

R

R

P

P

O

A

O 01-20 TECHNICAL S.I.T.:26°C Qt:-- W

N

N

01-19 W.C. S.I.T.:26°C Qt:-- W

M

M DFDFD

B

L

L

B

01-03 ELEVATOR S.I.T.:26°C Qt:-- W

01-06 LIFTS S.I.T.:26°C Qt:-- W

K 01-02 TECHNICAL S.I.T.:26°C Qt:-- W

J

J 01-10 OFFICE 2 S.I.T.:26°C Qt:-- W

I

C

K

01-01 TECHNICAL S.I.T.:26°C Qt:-- W

01-05 OFFICE LOBBY S.I.T.:26°C Qt:-- W

01-04 OFFICE 1 S.I.T.:26°C Qt:-- W

I

01-12 OFFICE LOBBY S.I.T.:26°C Qt:-- W

01-11 OFFICE 1 S.I.T.:26°C Qt:-- W

01-15 OFFICE 2 S.I.T.:26°C Qt:-- W

H

H

G

G 01-08 W.C. S.I.T.:26°C Qt:-- W

01-13 STAIRS S.I.T.:26°C Qt:-- W

01-07 STAIRS S.I.T.:26°C Qt:-- W

F

F

E' E 700

1

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

11

1600

12

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

E

400

26

01-16 W.C. S.I.T.:26°C Qt:-- W

27 D

D

01-18 OFFICE S.I.T.:26°C Qt:-- W

C

C

B

B

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

C


171m² 535m² 19m² 34m² 16m² 117m² 12m² 21m²

BASEMENT SPRINKLER PLAN

1402m²

1

A

700

2

500

3

400

4

500

5

700

6

7

1600

400

8

9

800

10

800

11

800

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

25

300

26

400

27

800

28

800

29

800

30

1200

31

800

32

800

33

Z

Z

Y

Y

V

V

U

U

T

T

S

S

R

R

P

P

O

O

N

N

M

A

M 26'

B

C

21

22

23

24

25

26

27

28

29

30

31

32

L

L

L

K

K

K

J

J

J

I

I

I

H

H

H

G

G

G

F

F

F 22

E'

23

24

25

26

27

26' 700

1

500

2

400

3

500

4

700

5

1200

6

400

6'

400

7

400

8

400

8'

400

9

400

9'

400

10

400

10'

400 14800

11

1600

12

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

28

29

30

31

32

E

E

D

D

C

C

B

B

400

26

27

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

B

C


GROUND FLOOR SCHEMATIC FORMWORK

date

revisions

-

1

700

2

500

3

400

4

500

5

700

6

1600

7

400

8

800

9

800

10

800

11

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

H

G

F

D

E

1 2

25

300

26

400

27

28

800

800

29

800

30

1200

31

800

32

800

33

1200

Z

1200

Z

800

800 300 200 500

T

300 200

V U

Y

500

Y

600 200 200

O

400

P

200 200 8000

R

400

A

400 600

400

400 400 12200

K

B

K

J

400

400

J

200

200

600

600

600

I 600

I

G

A

O

L

400

L

H

P

M 600

M

H

C

G

F 600

F

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

E 800

12

400

D

D

C

1000

11

1600

C

1000

10

400 14800

B

B 800

9

800

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

H

8

800

1000

7

800

3600

6

400

1000

5

1600

800

4

700

G

3

500

F

2

400

E

1

500

800

E 700

D

C

R

N 400

N

B

T

S 600

S

V U

3 2


1ST FLOOR SCHEMATIC FORMWORK

date

revisions

-

1

700

2

500

3

400

4

500

5

700

6

1600

7

400

8

800

9

800

10

800

11

400

12

1600

13

400

14

15

300 400 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

H

G

F

D

E

1 2

25

300

26

400

27

28

800

800

29

800

30

1200

31

800

32

800

33

1200

Z

1200

Z

800

800 300 200 500

T

300 200

V U

Y

500

Y

600 200 200

O

400

P

200 200 8000

R

400

A

400 600

400

400 400 12200

K

B

K

J

400

400

J

200

200

600

600

600

I 600

I

G

A

O

L

400

L

H

P

M 600

M

H

C

G

F 600

F

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

E 800

12

400

D

D

C

1000

11

1600

C

1000

10

400 14800

B

B 800

9

800

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

H

8

800

1000

7

800

3600

6

400

1000

5

1600

800

4

700

G

3

500

F

2

400

E

1

500

800

E 700

D

C

R

N 400

N

B

T

S 600

S

V U

3 2


BASEMENT SCHEMATIC FORMWORK

date

revisions

-

1

700

2

500

3

400

4

500

5

700

6

1600

7

400

8

800

9

800

10

800

11

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

H

G

F

D

E

1 2

25

300

26

400

27

28

800

800

29

800

30

1200

31

800

32

800

33

1200

Z

1200

Z

800

800 300 200 500

T

300 200

V U

Y

500

Y

600 200 200

O

400

600

P

200 200 8000

R

400

A

400 600

400

400 400 12200

K

B

K

J

400

400

J

200

200

600

600

600

I 600

I

G

A

O

L

400

L

H

P

M 600

M

H

C

G

F 600

F

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

E 800

12

400

D

D

C

1000

11

1600

C

1000

10

400 14800

B

B 800

9

800

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

H

8

800

1000

7

800

3600

6

400

1000

5

1600

800

4

700

G

3

500

F

2

400

E

1

500

800

E 700

D

C

R

N 400

N

B

T

S

25

S

V U

3 2

Architectural

GAD

tel: +90


ROOF SCHEMATIC FORMWORK

date

revisions

-

1

700

2

500

3

400

4

500

5

700

6

1600

7

400

8

800

9

800

10

800

11

400

12

1600

13

400

14

15

400 300 20000

16

500

17

500

18

300

19

400

20

400

21

400

22

300

23

500

24

500

H

G

F

D

E

1 2

25

300

26

400

27

28

800

800

29

800

30

1200

31

800

32

800

33

1200

Z

1200

Z

800

800 300 200 500

T

300 200

V U

Y

500

Y

600 200 200

O

400

P

200 200 8000

R

400

A

400 600 400

B

K

400

400 12200

46

K

J

400

400

J

200

200

600

600

600

I 600

I

G

A

O

L 400

L

H

P

M 600

M

H

C

G

F 600

F

7

800

8

800

9

800

10

400 14800

11

1600

12

400

13

400

14

300

15

500

16

500

17

300

18

400

19

400

20

400

21

300

22

500

23

500

24

300

25

400

26

27

E

D

D

1000

C

1000

C

3600

1000

6

400

800

5

1600

1000

4

700

G

B

A

A 800

28

800

29

30

1200 4400

800

31

800

32

33

H

SPACE FRAME SYSTEM HEIGHT: 2 METERS

800

B 800

3

500

F

2

400

E

1

500

800

E 700

D

C

R

N 400

N

B

T

S 600

S

V U

3 2


SELAMLIQUE PROJECTS MASTERPLAN ALTERNATIVES


MASTERPLAN 1

GAD


MASTERPLAN2


MASTERPLAN3

GAD


FATHER’S SELAMLIQUE


GAD



GAD



GAD



GAD



GAD



GAD



GAD


ELEVATIONS



FLOOR PLAN


PLAN ORGANIZATION

CARDS LOUNGE

OPEN POOL RETREAT LIBRARY

WEALTH AREA

Entrance Lounge Main Lounge Lounge II Cards Lounge Cigar Lounge

100 m2 160 m2 80 m2 80 m2 110 m2

Entrance Reception Storage Waiting Area Changing Room Sauna Room Steam Room Hamam Fitness Buffet Closed Pool

Total Area

530 m2

Total Area

Library Tv Lounge

75 m 75 m2

Total Area

150 m2

2

LOUNGE AREAS

BANQUET AREA All Day Buffet Restaurant Open Restaurant Main Kitchen Preparation Kitchen

115 m 165 m2 195 m2 115 m2 170 m2

Total Area

760 m2

2

ENTRANCE / LOBBY Main Lobby Main Hall

145 m2 200 m2

Total Area

345 m2

100 m 20 m2 25 m2 40 m2 30 m2 20 m2 10 m2 30 m2 80 m2 55 m2 370 m2 780 m2

2

FITNESS RECEPTION /STORAGE

CIGAR LOUNGE

MAIN LOUNGE

CLOSED POOL

Staff Area Kitchenette Storage Room Staff Rooms

30 m2 40 m2 15 m2 120 m2

Total Area

205 m2

NET AREA

2930 m2

OPEN RESTAURANT

MAIN LOUNGE

RESTAURANT

ENTRANCE LOUNGE PREPARATION KITCHEN

PREPARATION KITCHEN ALL DAY BUFFET

ENTRANCE

STEAM ROOM BUFFET WC CHANGING SAUNA WAITING ROOM ROOM AREA TECHNICAL ROOM

ENTRANCE

WC TECHNICAL ROOM

PARKING

TV ROOM

PARKING

PARKING

Total Area

STORAGE COLD ROOM MAIN KITCHEN

TECHNICAL AREAS - W.C. Technical Areas W.C.

PREPARATION KITCHEN

COOL ROOM

HAMAM LIBRARY

STAFF AREA

LOUNGE 覺覺

80 m2 80 m2

STAFF STORAGE ROOM

160 m2

STAFF AREA

GUARD HOUSE

PARKING

STAFF ROOM STAFF ROOM STAFF ROOM


SECTIONS


SECTIONS


ROOMBOOK


Aluminium Skirting

   

Natural Stone Skirting

   

Anti‐Slip Ceramic Skirting

   

Ceramic‐ Granite Skirting

  

Suspended Metal Lath Ceiling

Paint

Wood Veneer Wall Cladding

Wallpaper

  

Ceramic‐ Granite Tile

Wooden Deck

Wooden Parquet

Natural Stone

Anti‐Static, FireProof Tile

    

Wooden and/or MDF

3330

161,00 188,00 26,00 72,00 44,00 44,00 26,00 18,00 71,00 19,00 8,00 104,00 155,00 170,00 10,00 28,00 155,00 88,00 87,00 89,00 155,00 28,00 144,00 12,00 85,00 168,00 193,00 76,00 28,00 15,00 7,00 21,00 59,00 30,00 55,00 29,00 44,00 44,00 71,00 27,00 10,00 32,00 130,00 15,00 9,00 23,00 32,00 19,00 19,00 19,00 19,00 19,00 107,00 23,00

Skirting

Paint

GENERAL TOTALS:

106,11 119,35 144,18 127,60 144,77 111,46 67,36 98,82 196,45 100,76 64,15 113,78 134,46 88,02 16,90 133,16 305,10 38,34 13,68 32,94 172,31 125,60 0,00 60,88 52,33 62,72 118,14 110,85 68,82 24,27 60,59 103,41 266,33 95,47 162,65 129,92 111,46 144,77 134,03 161,08 47,85 80,50 194,25 55,79 46,83 48,37 27,06 51,21 51,21 51,21 51,21 51,21 263,13 70,70

Suspended Gypsum Board Ceiling

161 188 26 72 44 44 26 18 71 19 8 104 155 170 10 28 155 88 87 89 155 28 144 12 85 168 193 76 28 15 7 21 59 30 55 29 44 44 71 27 10 32 130 15 9 23 32 19 19 19 19 19 107 23 3330

Glazing Area (m²)

Ceiling Finishes Decorative Paint

Entrance Main Hall Circulation TV Area Technical Room WC Circulation Preparation Kitchen Preparation Cool Room All Day Buffet Restaurant Open Restaurant Circulation Pantry Main Lounge Lounge II Cigar Lounge Cards Lounge Main Lounge Pantry Entrance Lounge Circulation Entrance Closed Pool Open Pool Fitness Storage Reception Steam Room Sauna Room Waiting Area Buffet Hamam Changing Room WC Technical Room Library Circulation Storage Cold Room Main Kitchen Storage Circulation Kitchenette Staff Area Staff Room Staff Room Staff Room Staff Room Staff Room Guard House Staff Room FLOOR TOTAL AREA

Wall Area (m²) Ceiling Area (m²)

Natural Stone

Z‐01 Z‐02 Z‐03 Z‐04 Z‐05 Z‐06 Z‐07 Z‐08 Z‐09 Z‐10 Z‐11 Z‐12 Z‐13 Z‐14 Z‐15 Z‐16 Z‐17 Z‐18 Z‐19 Z‐20 Z‐21 Z‐22 Z‐23 Z‐24 Z‐25 Z‐26 Z‐27 Z‐28 Z‐29 Z‐30 Z‐31 Z‐32 Z‐33 Z‐34 Z‐35 Z‐36 Z‐37 Z‐38 Z‐39 Z‐40 Z‐41 Z‐42 Z‐43 Z‐44 Z‐45 Z‐46 Z‐47 Z‐48 Z‐49 Z‐50 Z‐51 Z‐52 Z‐53 Z‐54

Floor Area (m²)

Wall Finishes Raised Floor

GROUND FLOOR

Ceramic‐ Granite Tile

AL HOKAIR GROUP FATHER'S SELAMLIQUE ROOMBOOK

Anti‐Slip Ceramic Tile

Floor Finishes

Facade Windows Area (m²)

28,80 24,18 10,53 0,00 0,00 0,00 16,59 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4,34 7,83 0,00 0,00 0,00 0,00 7,83 7,56 0,00 0,00 0,00 0,00 0,00 0,00 12,09 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 119,75

295,81 115,07 0,00 50,76 0,00 33,59 0,00 0,00 0,00 0,00 0,00 30,78 99,90 116,64 13,18 0,00 192,40 118,80 129,20 172,80 76,36 0,00 151,71 0,00 35,65 223,36 60,42 106,88 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 33,59 0,00 50,76 0,00 0,00 0,00 23,59 0,00 0,00 0,00 31,89 11,90 11,90 11,90 11,90 11,90 37,66 0,00 2260,28

119,75

2260,28

      

   

   

     

    

 

 

    

 

 

         

         

    

 

           

  

 

 

 

 

 

         

 

  

 

  

    

   

   

  

  

 

   

   

 

 

       

 

       

       

         

               

          

        

      


2ND GENERATION SELAMLIQUE


GAD



GAD


ELEVATIONS



SITE PLAN


PLAN ORGANIZATION

2nd GENERATION RETREAT ENTRANCE / LOBBY Entrance

65 m2

Total Area

65 m2

LOUNGE AREAS Lounge I Lounge II Outdoor Lounge

100 m2 100 m2 65 m2

Total Area

265 m2

LOUNGE I

OPEN POOL

LOUNGE II

BANQUET AREA All Day Buffet Restaurant Kitchen

40 m2 100 m2 70 m2

Total Area

210 m2

LOUNGE I

CLOSED POOL

ENTRANCE LOUNGE

LOUNGE II RESTAURANT

W.C. W.C.

105 m2

WC

Total Area

105 m2

STEAM ROOM

BUFFET

SAUNA ROOM

WAITING AREA

WEALTH AREA Waiting Area Changing Room Sauna Room Steam Room Hamam Buffet Closed Pool Open Pool Storage

40 m2 15 m2 15 m2 15 m2 35 m2 30 m2 220 m2 300 m2 15 m2

Total Area

685 m2

STAFF AREA Guard House

30 m2

Total Area

30 m2

NET AREA

1360 m2

CHANGING ROOM

WC

ENTRANCE

WC

MAIN KITCHEN

STORAGE

HAMAM PARKING

PARKING GUARD HOUSE


SECTIONS


SECTIONS


SKETCHES



TEAM

GOKHAN AVCIOGLU

CAN BUYUKCELEN GOKHAN CATIKKAS

JOHN YOUNG

ONUR OZDEMIR

EDA DEMIREL

DERYA UZAL

CEYDA TEKIN

AYSU AYSOY

CEMAL EROL

SERGIO TEJERO

JONAS KIRSCH


GAD Global Architectural Development has been a leader in research and concept design in Europe since 1994. The firm is headed by design principle Gokhan Avcioglu who works with a dedicated international staff of architects and collaborators. GAD believes that current architecture and urbanism are influenced by media, culture, technological innovations, consumer habits and how these factors affect the builded environment at different scales. GAD’s success lies in its methodical research of our client’s programmatic requirements, its iterative process of digital and physical modeling and meticulous process innovation. GAD believes that architecture as a practice relies on understanding historical architecture movements as well as research and experimentation. GAD is continuously finding new ways to combine these issues in compelling and thought-provoking ways.

Istanbul

New York

Bodrum

Tesvikiye Cad. Gunes Apt. No:3B D:2 Tesvikiye Istanbul 34367 Turkey P: +90 212 327 5125 F: +90 212 258 1663 E: gad(at)gadarchitecture.com

29 Broadway Suite 1506 New York NY 10006 USA P: +1 917 338 1395 E: gadny(at)gadarchitecture.com

Neyzen Teyfik Caddesi Batı Apt. 158/4 Bodrum Muğla Turkey P: +90 252 316 00 25 F: +90 252 316 00 49 E: gad(at)gadarchitecture.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.