ET
R
AR
G
L
AE
H
IC
M
N
TE
ET
SL
ER
IV
UN SI TY OF AS
NS
KA |U IT
RS
VE
NI Y OF NE
M IN SO TA
DESIGN
PORTFOLIO PORTFOLIO 20 09 -2 01 5
UNDER
TABLE OF OF CONTENTS CONTENTS TABLE
GRADUATE
4 HGA WELLNESS INTERNSHIP
14KCAI RESIDANCE HALL
28FREE STATE OPERA HOUSE
40MARVIN HALL LECTURE HALL ADDITION
RGRA GRADUATE
46 VALPARIASO URBAN BIKE TOURS
56 MINNESOTA PARAMETRIC CABIN AND FURNITURE
60 MINNEAPOLIS LRT LINE URBAN DEVELOPMENT
66 FORM INTO ARCHITECTURE PAVILION DESIGN
70 MONTESSORI SCHOOL DESIGN
GRADUATE UNDERGRADUATE STUDIO A HG
AR
CH
ND
A TS EC IT
S ER NE GI EN
OL
4 01 -2
A OT ES
N IN
R TE ES
,M IS
EM LS
P EA
AL /F ER
N IN
M
-M
M SU
INTERNRNSHIP HGA HEALTH HEALTHCARE
C:\Users\ACbryanT\Documents\Revit Local Files\A14-SCH ETC Ph1-123409800_acbryant-PC6400.rvt
12/15/2014 11:52:47 AM
H.1
G.1
VV
EX
EX
EX
B E2
TAB LE
4
E2B 3
FILE CABINET
CABINET
E2 B
B E2
PRINTER
EX
SB E1
L
E2B
E2B
BL 1S
E2B
BL 1S
L
SB E2
L
XL
NC
EX
5.9
E2B
X
L
NC
6
1B
E1 SB
6.5
EX
EX
7
EX
EX
X
E2B
2SB
E2B
E2B
11
E2 SB
1B
1B
1B
1B
1B
1SB
1B
10
1B
X
1B
E2 SB
1B
1SB
1B
X
SS
X
1B
RR
E/8
9
1SB
X
X
SB E1
PP
TT
EX
9 1/4"
SB E1
EX
1SB
X
8
EX
X
X
NN
SB E1
EX
1SB
EX
EX
E1 SB
ALIGN
E2B
E2B
E2B
EX
SB E1
1B
EX
EX
E2B
X-RAY 'IN USE' SIGNAGE
1S BL
E2B
L
SB E1
E2 B
B E2
E2 SB
EX
5.2 5.3
E1SB
5
E1B
4.7 4.8
E2B
E2B
1B
4.1
EX
E2B
E1SB E1SB
SB E1
SB E1
<
FILE CABINET
<
EX
E2SB E1SB
4
EX
EX
EX X
1B
1B
E2B
X
1SB
1SB
ALIGN
E2B
1SB
E2SB
1SB
X
E2B
1B
1B
2B 2B
2B
E2B
12
13
A
UU
K
J.9
J
H
G
F.3
F
E
D
C
B
1234-098-00
DECEMBER 12, 2014
CONSTRUCTION DOCUMENTS
DATE:
HGA NO:
ISSUANCE HISTORY - THIS SHEET
REGISTRATION NUMBER: 27014
DATE: DECEMBER 12, 2014
NAME: STEVE CHRISTOFF
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA
St. Cloud Hospital Phase I ETC & Imaging Expansion
C COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.
• Physician demand results summarized under 50% and 100% market share capture scenarios •
2014 and 2019 supply and demand results summarized by specialty area − Supply information presents a snapshot; somewhat speculative due to unknown retirement/recruitment information
Physician Demand
Monticello
Supply
Melrose
Demand Variance Supply
Sauk Centre
Demand Variance
Supply
Demand Variance
Paynesville
Supply
Demand Varia
50% Market Share Capture 2014 PSA Primary Care Medical Subspecialties Surgical Subspecialties
30.6 1.5 2.6
20.7 5.8 8.1
10.0 (4.3) (5.5)
6.3 0.7 0.7
7.0 2.2 2.9
(0.7) (1.5) (2.2)
6.7 0.8 1.1
7.0 2.3 3.0
(0.3) (1.5) (2.0)
11.4 0.7 1.1
11.2 3.5 4.7
0. (2. (3.
2019 PSA Primary Care Medical Subspecialties Surgical Subspecialties
33.6 1.5 2.6
22.9 6.5 9.0
10.7 (5.0) (6.4)
8.4 0.9 0.9
7.4 2.3 3.1
0.9 (1.4) (2.2)
7.7 0.7 1.1
7.2 2.3 3.1
0.5 (1.7) (2.0)
11.4 0.7 1.1
11.5 3.7 4.9
(0. (3. (3.
100% Market Share Capture 2014 PSA Primary Care Medical Subspecialties Surgical Subspecialties
30.6 1.5 2.6
41.3 11.6 16.2
(10.7) (10.0) (13.5)
6.3 0.7 0.7
14.1 4.4 5.9
(7.8) (3.7) (5.2)
6.7 0.8 1.1
14.0 4.5 6.0
(7.3) (3.8) (5.0)
11.4 0.7 1.1
22.3 7.0 9.5
(10 (6. (8.
2019 PSA Primary Care Medical Subspecialties Surgical Subspecialties
33.6 1.5 2.6
45.8 12.9 18.0
(12.2) (11.4) (15.4)
8.4 0.9 0.9
14.8 4.6 6.2
(6.5) (3.8) (5.3)
7.7 0.7 1.1
14.3 4.7 6.2
(6.6) (4.0) (5.1)
11.4 0.7 1.1
23.0 7.3 9.8
(11 (6. (8.
www.wipfli
Date or subtitle
© Wipfli LLP
Melrose
Sauk Centre
Monticello
Paynesville
Emergency Room Improve room sizes, visibility, and overall flow of the department; address support space shortages and lack of patient amenities
Primary Care Clinic Address expansion needs to fulfill current and future recruitment plans
Emergency Room/EMS and Emergency Room Registration Improve room sizes and support space issues; improve visibility of ED registration area; move EMS off-site
Surgery and Endoscopy Expand central sterile capacity, relocate endoscopy services into more functional space, address support space shortages
Inpatient Beds Renovate or replace up to 16 beds to provide more contemporary design, private bathrooms, and adequate support space; maintain adjacency to ED for staffing
Specialty Clinic and Chemo/Infusion Bring down from second floor; improve visibility, accessibility, and capacity to grow
Imaging Address room size shortages, floorto-ceiling height issues, and lack of support space; allow for full transition to digital imaging
Primary Care Clinic Explore opportunities to regain/add exam room capacity by removing support space or other administrative functions currently in the clinic
Surgery Add a second OR of contemporary size; address support space issues; ensure adequate prep/recovery space
Imaging Explore options to add a fixed MRI
Respiratory Address room size shortages; provide adequate room for equipment and patient capacity
Specialty Care Clinic Re-gain/add exam room capacity by relocating GI lab and prep/recovery space; explore relocating infusion room to gain exam rooms
Cardiopulmonary Relocate to a more visible and accessible area; provide room for expansion
Hospital Registration Improve privacy or registration area
Primary Care/Specialty Clinic Provide expansion for primary care and specialty care clinic either on site or explore opportunities in an off-site location (outpatient center)
Dietary Create a separate staff/public dining area in the hospital to eliminate traffic traveling through med/surg unit to access dietary
Support Services Improve size/privacy of hospital registration area; add central supply capacity; add area for public/staff to more easily access food
Dietary Create covered walking area for nursing home staff walking to cafeteria
Heli-Pad Determine suitable area to relocate Heli-pad from its current location in parking lot
Debt Sustainability: $17M
Debt Sustainability: $14M
Debt Sustainability: $12M
• Cost guidelines were created by HGA Architects and provided project phase
• CentraCare Melrose Debt Sustainability was calculated at $17M Low Option Medium Option Patient Units Imaging ED Surgery Support
Key Drivers 14 med/surg; 2 OB 7 imaging rooms 4 exam rooms 2 OR + 1 procedure Remodel
Registration
Remodel
Dietary Admin Clinic Build O ut
Seating area renovation Relocates to clinic shell space 6 Exam Rooms
BGSF 11,000 5,136 2,411 5,800
$ $ $ $ $
Total 2,255,000 1,684,608 829,384 3,062,400 400,000
$
144,000
$ $ 2,900 $
604,000 175,000 362,500
$
9,516,892 1.3 12,371,960
Demo / Sitework
.2 .8) .6)
Construction Cost Project Cost Factor Project Cost
Patient Units Imaging ED Surgery
Key Drivers 14 med/surg; 2 OB 7 imaging rooms 4 exam rooms 2 OR + 1 procedure
Building Sub-Total Conditioned Cooridor Support Seating area renovation Dietary 6 Exam Rooms Clinic Build O ut Demo / Sitework
BGSF 13,200 7,560 3,600 8,640
Low $12.4M
Total
Patient Units Imaging ED Surgery Support
0.9) .3) .4)
Key Drivers 14 med/surg; 2 OB 7 imaging rooms 4 exam rooms 2 OR + 1 procedure Building Sub-Total
Dietary Clinic Build Out
1.6) .6) .7)
6
6 Exam Rooms
4
www.wipfli.com
BGSF 13,200 7,560 3,600 8,640 10,800
Sauk Centre
Monticello
Paynesville
Options
Options
Options
Options
Medium $16.7M
High $22.4
Kitchen Full Remodel = $2.1M
33,000 $ $ $ $ 2,900 $
10,725,000 350,000 800,000 604,000 362,500
$
12,841,500 1.3 16,693,950
Construction Cost Project Cost Factor Project Cost
Melrose
Other Potential Adds
Skilled Nursing Cosmetic Upgrades
High Option
.1) .0) .8)
Debt Sustainability: $2M
www.wipfli.com
ance
i.com
0
www.wipfli.com
Low $1.9M
High $8.7M
Other Potential Adds None Skilled Nursing Cosmetic Upgrades
Low $4.8M
High $10.5M
Other Potential Adds New Outpatient Building = $5.4M Skilled Nursing Cosmetic Upgrades
Low $1.5M Other Potential Adds None Skilled Nursing Cosmetic Upgrades
$1.9M
$1.3M
$2.6M
$3.5M
Infrastructure Upgrades
Infrastructure Upgrades
Infrastructure Upgrades
Infrastructure Upgrades
$303K
$1.2M
$312K
$905K
Debt Sustainability: $17M
Debt Sustainability: $14M
Debt Sustainability: $12M
Debt Sustainability: $2M
Total
Other Costs Key Drivers Infrastructure/ Code Fixes* See detail
Dietary
43,800 $
14,235,000
$ $
604,000 362,500
Demo / Sitework
$
2,018,000
Construction Cost Project Cost Factor Project Cost
$
17,219,500 1.3 22,385,350
$
Skilled Nursing
Kitchen full remodel Cosmetic upgrades (oldest unit)
BGSF $ $ 28,700 $
Total 302,500 2,100,000 1,865,500
Sub-Total $
4,268,000
*Only $2,500 deemed absolutely necessary
www.wipfli.com
11
www.wipfli.com
30
27
This document is created with the unregistered version of Document2PDF Pilot.
The Toyota Way 14 Management Principles from the World s Greatest Manufacturer
Date : _______________ Time : _______________ Project Name : _______________ Commission Number : _______________ Meeting Organizer : _______________ Scribe : _______________
Architecture
Jeffrey K. Liker McGraw-Hill Copyright Š 2004 by McGraw-Hill. All rights reserved. Printed in the United States of America. Except as permitted under the United States Copyright Act of 1976, no part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without the prior written permission of the publisher.
1 2 3 4 5 6 7 8 9 0 AGM/AGM 0 9 8 7 6 5 4 3 ISBN 0-07-139231-9
|
Engineering
|
Planning
Internal Meeting Record (IMR) Who Name ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________
Attended [] [] [] [] [] [] [] [] [] [] [] [] []
Name ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________
Attended [] [] [] [] [] [] [] [] [] [] [] [] []
Editorial and production services provided by CWL Publishing Enterprises, Inc., Madison, WI, www.cwlpub.com. This publication is designed to provide accurate and authoritative information in regard to the subject matter covered. It is sold with the understanding that neither the author nor the publisher is engaged in rendering legal, accounting, or other professional service. If legal advice or other expert assistance is required, the services of a competent professional person should be sought.
From a Declaration of Principles jointly adopted by a Committee of the American Bar Association and a Committee of Publishers McGraw-Hill books are available at special quantity discounts to use as premiums and sales promotions, or for use in corporate training programs. For more information, please write to the Director of Special Sales, McGraw-Hill, Two Penn Plaza, New York, NY 10121-2298. Or contact your local bookstore.
This book is printed on recycled, acid-free paper containing a minimum of 50% recycled de-inked fiber.
Problem Statement ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ Agenda/Discussion 1. ___________________________________________________________________________ 2. ___________________________________________________________________________ 3. ___________________________________________________________________________ 4. ___________________________________________________________________________ 5. ___________________________________________________________________________ 6. ___________________________________________________________________________ 7. ___________________________________________________________________________ 8. ___________________________________________________________________________ 9. ___________________________________________________________________________ 10. ___________________________________________________________________________
GRADUA PROJECTE STUDIO STUDIO 708
TY SI ER IV UN OF AS NS
KA -L K E,
NC RE AW AN
G IN
S SA
R SP M SE R TE ES 4
01
-2
KANSAS S CITY
INSTITUTE UTE OF ART VILLA
NORMAL BUILDING FLOOR PLATE
TYPICAL DORM ARCHEATYPE: LINEAR WITH CORRIDOR DOWN MIDDLE
IN TYPICAL DORM, VERTICAL CIRCULATION IS LOCATED ON ENDS OF BUILDING
COMMON AREAS FOLLOW SUIT BY BEING AT THE END OF THE BUILDING
STACKED FLOORS CAN’T BE VERY LONG SO RESUTL IS HIGH TOWER LIKE DORMS
DUE TO TOPOGRAPHY, THERE IS AN OVERHANG WHICH IS OPPORTUNITY FOR COMMERCIAL SPACE
NOW LIVING UNITS ABOVE COMMERCIAL AND MUSEUM PATH
CLASSIC “DORM” LINEAR SPLIT
CIRCULATION GOES IN MIDDLE OF BUILDING INSTEAD OF AT ENDS
COMMUNITY AREAS ARE IN AREAS OF EASY ACCESS FOR EVERYONE, NOT AT JUST THE ENDS
TO CREATE CIRCULATION ON EACH FLOOR, ROOM ARE BULGED OUT FROM MIDDLE TO ALLOW FOR MOVEMENT ON THE FLOORS
LONG BUILDING SITE ALLOWS FOR LESS FLOORS
SINEC MIDDLE OF BUILDING HAS COMMON AREAS, DAYLIGHT IS NEED SO A LIGHT TOWER IS BUILT INTO THE CENTER OF THE CIRCULATION
DISCONNECT BETWEEN NELSON ATKINS AND TENNIS CLUB
PATH UNDERNEATH APARTMENTS CONNECTING THE 2 BUILDINGS
Level 5 130' - 0"
Level 4 115' - 0"
Level 3 100' - 0"
Level 2 85' - 0"
Level 1 70' - 0"
Level B1 55' - 0"
Level 5 130' - 0"
Level 4 115' - 0"
Level 3 100' - 0"
Level 2 85' - 0"
Level 1 70' - 0"
Level B1 55' - 0"
17
13
08
WH
FLOOR LOUNGE
DINING AREA
22 04 FLOOR LAUNDRY
27 STUDY AREA
WH
WH
WH
WH
MAILBOXES
W W W W
29
28 W
15 WH
27 WOMENS BR
MENS BR
LARGE STUDY ROOM
35’
STORAGE
CONFERENCE
RESIDANT ENTRANCE AND LOBBY
OFFICES
JANITORS CLOSET
GARBAGE / RECYCLING
1 PLAN
35’
THEATRE ROOM
06
FULL KITCHEN 2
20 DATA
02
DINING AREA
18 ELECTRICAL
24
FULL KITCHEN 1
23
FLOOR REC AREA
21
35’
35’
26 N-S
1
29 01
01 30
25 26
02
25 03
03 WH
24 04
28
W WH
23 05
1 DWREF. REF.DW
05 WH
06
19 07
09
WH WH
16 10
11
14 12
14 22
WH
07 21
WH
WH
20 08
19
09
18
10
DWREF.REF.DW WH
17 11
30
WH
16 12
15 13
1 N-S
26
01
29 30
26 01 25
02
25 02 24
23
03
24
03
04
28
27
23
22 04
21
05
05
06
20
WEST BUILDING ENTRANCE VIA N.A.M.
22
21
06 07
19
20
07
08
EXTERIOR COURTYARD
YOGA STUDIO
CARDIO
18
19
08
09 EAST ENTRANCE VIA N.A.M. SATELLITE YOGA STUDIO
18
RESISTANCE TRAINING
09
17
10 SPIN STUDIO
GYM ENTRANCE
WOMENS LOCKEROOM MENS LOCKEROOM
17
10 16
MAIN ENTRANCE
11 RECIEVING DOCK MAINTENANCE CORRIDOR
29 MENS BR
30
WOMENS BR
N.A.M. SATELLITE ART GALLERY
16
11
12
RESTAURANT
15
15
12
13 RESTAURANT PATIO
14
LECTURE HALL / ASSEMBLY ROOM
13
14 28
27
Level 5 130' - 0" 3” LIGHT WEIGHT CONCRETE ON 2” METAL DECK W10-19 WIDE FLANGE STRUCTURAL BEAM INTUMESCENT FIRE COATING (BLACK) RIGID INSULATION
3” LIGHT WEIGHT CONCRETE ON 2” METAL DECK
WATERPROOFING MEMBRANE PEA GRAVEL ROOF TOP METAL SOFFIT AND TIE
W10-19 WIDE FLANGE STRUCTURAL BEAM INTUMESCENT FIRE COATING (BLACK)
Level 4 115' - 0" 3” LIGHT WEIGHT CONCRETE ON 2” METAL DECK W10-19 WIDE FLANGE STRUCTURAL BEAM INTUMESCENT FIRE COATING (BLACK)
1/8 SILL FINISH HARDWOOD PLYWOOD GRADE A LIVING SPACE
MEP CHASE
CORRIDOR AND COMMON AREAS
HORIZONTAL SHELF STRUCTURE FRAMING (MEMBER SIZE VARIES) 1/2” PLYWOOD GRADE A 2/4 SECONDARY STUD SYSTEM Level 3 100' - 0"
1/2” PLYWOOD GRADE B/BB
3” LIGHT WEIGHT CONCRETE ON 2” METAL DECK W10-19 WIDE FLANGE STRUCTURAL BEAM INTUMESCENT FIRE COATING (BLACK)
METAL STRAP METAL STUD RIGID WALL INSULATION SLIDING DOOR POCKET DOOR: WOOD 10126 ROTATING MURPHY STYLE UNIT WITH HARDWARE MATTRESS (39”X80”) Level 2 85' - 0"
MURPHY BED BASE METAL STRUCTURAL ANGLE
3” LIGHT WEIGHT CONCRETE ON 2” METAL DECK W10-19 WIDE FLANGE STRUCTURAL BEAM INTUMESCENT FIRE COATING (BLACK)
1/8 SILL FINISH HARDWOOD PLYWOOD GRADE A HORIZONTAL SHELF STRUCTURE FRAMING (MEMBER SIZE VARIES) 1/2” PLYWOOD GRADE A BARD 1-TON WALL HUNG VAV UNIT VAV SYSTEM HVAC INTAKE
2/4 SECONDARY STUD SYSTEM
VAV SYSTEM HVAC OUTPUT
1/2” PLYWOOD GRADE B/BB METAL STRAP
1/2” 2 HOUR GYPSUM BOARD 1/8 FINISHED HARDWOOD SHELF CABINET WALL SHELF ANGLE
METAL STUD RIGID WALL INSULATION
3’ R12 BATT INSULATION MEP CHASE
SLIDING DOOR POCKET DOOR: WOOD 10126 ROTATING MURPHY STYLE UNIT WITH HARDWARE CABINET WALL HINGE
MATTRESS (39”X80”)
CABLE ELECTRICAL OUTLET TELEVISION TELEVISION WALL MOUNT FRAME
MURPHY BED BASE METAL STRUCTURAL ANGLE
PILKINGTON K-41 SERIES CURTAIN WALL SYSTEM (FROSTED)
SILICONE SEALANT ROTATING MURPHY BED SUPPORT ARM
981-2 VINYL INSERT GLASS SHIM FASTENER WITH RUBBER WASHER
Level 1 60' - 0"
950WA FRAME USED FOR HEAD SHIM, BACKER ROD, AND SILICONE SEALANT 980-2 VINYL INSERT GLASS SHIM SILICONE SEALANT VENTILATION TUBE
PILKINGTON K-41 SERIES CURTAIN WALL SYSTEM (FROSTED)
SILICONE SEALANT YOGA STUDIO
981-2 VINYL INSERT
CARDIO/RT AREA
GLASS SHIM DRAINAGE PIPE VAPOR BARRIER
FASTENER WITH RUBBER WASHER
4” CONCRETE SLAB ON GRADE 1” RIGID FOAM COMPACTED GRAVEL COMPACTED RETAINING BARRIER FINISH GRADE WATERPROOFING MEMBRANE CONCRETE ANCHOR REBAR CONCRETE FOOTING
Level B1 55' - 0"
950WA FRAME USED FOR HEAD SHIM, BACKER ROD, AND SILICONE SEALANT 980-2 VINYL INSERT GLASS SHIM SILICONE SEALANT VENTILATION TUBE
Level 2 85' - 0"
BARD 1-TON WALL HUNG VAV UNIT VAV SYSTEM HVAC INTAKE VAV SYSTEM HVAC OUTPUT
1/2” 2 HOUR GYPSUM BOARD 1/8 FINISHED HARDWOOD SHELF CABINET WALL SHELF ANGLE
3’ R12 BATT INSULATION MEP CHASE
CABINET WALL HINGE CABLE ELECTRICAL OUTLET TELEVISION TELEVISION WALL MOUNT FRAME
ROTATING MURPHY BED SUPPORT ARM
Level 1 60' - 0"
GRADUA PROJECTE STUDIO STUDIO 608
TY SI ER IV UN OF AS NS
KA -L K E,
NC RE AW AN
EM LS
S SA
L FA R TE ES 3
01
-2
FREE STATE
OPERA HOUSE
TE
SI
:M AS
SA CH US
ET
TS S
TR EE
NT OW
OW
T, D
N
RE
LA W
S
NC E, K
36
48
5
7
6
8
37
38
49
16
23
23
49
5
41
7
8
42
39
43
40
49
7
48
5
8
15
9
14 24
26
3
13
16
12
17
9 18
19
UP
UP
2
25
11
25
8 UP
4
7
6 1
5
20
10
48
48
48
UP
UP
7
7
5
27
8
21
8
22
48
28
7
8
23
DN
UP
DN
DN
DN
DN
DN
DN DN UP
UP
7 5
8
LEVEL 8 - 104’-0”
LEVEL 7 - 84’-0”
LEVEL 6 - 70’-0”
LEVEL 5 - 56’-0”
LEVEL 4 - 42’-0”
LEVEL 3 - 28’-0”
LEVEL 2 - 14’-0”
LEVEL 1 / G1 - 0’-0”
LEVEL G2 - 28’-0”
LEVEL G3 - 14’-0”
LEVEL G4 - 0’-0”
LEVEL 1 - 00’-0”
LEVEL 2 - 14’-0”
LEVEL 2.5 - 14’-0”
LEVEL 3 - 28’-0”
LEVEL 4 - 42’-0”
LEVEL 4.5 - 14’-0”
LEVEL 5 - 56’-0”
LEVEL 6 - 70’-0”
LEVEL 7 - 84’-0”
LEVEL 8 - 104’-0”
G3 - 00’-0”
G2 - 00’-0”
G2 - 00’-0”
LEVEL 1 / G1 - 00’-0”
LEVEL 2 - 14’-0”
LEVEL 2.5 - 14’-0”
LEVEL 3 - 28’-0”
LEVEL 4 - 42’-0”
LEVEL 4.5 - 14’-0”
LEVEL 5 - 56’-0”
LEVEL 6 - 70’-0”
LEVEL 7 - 84’-0”
LEVEL 8 - 104’-0”
GRADUA PROJECTE SUMMER SUMMER STUDIO
TY SI ER IV UN OF AS NS
KA -L K E,
NC RE AW AN
M
S SA
M SU ER N
IO SS SE 3
01
-2
MARMARVIN
LECT HRE HALL
A/C
A/C
SW ITC GEAR H
CONC. PAD
BROKEN WALL
SWITCH A/C TOWER
UP
UP UP
DO
WN
DO
WN
UP
CT-2
TRAN
S TRAN
S
TRAN
S
A/C
A/C
A/C
UP
DN
DN
UP
UNDERGRADUATE STUDIO TY SI ER IV UN
OF
M
A OT ES
N IN
-M
OL
P EA
N IN
,M IS
G IN R SP
R TE ES
A OT ES
N IN
M SE
3 01 -2
VALPARAIARAISO BIKE TOURS CITY CITY OF OF
Sites for Development Main Bike Route Artery Restaurants, Clubs, Shops Tourist Destinations
Scenic Overlook and End
Elevator
Rest-Stop
Actual Bike Tour Through City
N
UNDERGRADUATE UNDERGRADUATE STUDIO TY SI ER IV UN OF M A OT ES
N IN -M OL
P EA
N IN
R TE ES
A OT ES
M SE
N IN
G IN
,M IS
R SP 2
01
-2
PARAMETRIC AMETRIC CABIN/ IN/CHAIR
UNDERGRADUATE UNDERGRADUATE STUDIO TY SI ER IV UN
OF
M
A OT ES
N IN
e ak
Bl
n
Oa
n io at St n ns tio ta kS
i pk
io at St
Ho
2 01 -2
y ad Sh
R TE ES
A OT ES
N IN
EM LS
,M IS
a
OL
P EA
N IN
si ui Lo
-M
L FA
n io n on at io ti St at ta le St st S ng us We ia n Op ty w n Tr n Ci To tio e ld rie ta ai r S on Go Pr te tati n en Ce st S Ed e hw n ut tio So ta ll S M
he
itc
MINNEAPEAPOLIS LRT C ORRIDOR CITY CITY OF OF
Ta W rge N are t F I-35W BRT Station Go icol hou ield l Do ver et M se Sta Bloomington Station n w m al Dis tio nt e l S tr n W ow nt ta ict es n Pla tio Sta tB Ea za n ti an on st S k Ea / M ta S st ta et tion t B ro St ank ion do ad S m iu ta Pr e m tio os St Vi n at pe l W l io a ct es g n e Pa tg St rk at Ra a e tio St ym St at n at on i on io d n Av Fa e irv nu e Sn iew St el Av at lin e io Ha g nu n A m e lin ven St Le e a xin Av ue S tion Vi gto enu tati ct n o or Pa e St n i Da a S rk ati le tre wa on W Stre et S y St es e a t tat tio t Ca ern Stat ion n pi Av io to en n R l/ u 10 ob Ri e S t e ce ta Ce h S rt St tio Un ntr tree Stre re n et io al S t S et n ta ta St St De ti ti at at io po on on ion n tS ta tio n
Nicollet Station
Lyndale Station
Hennepin Station
Calhoun Beach Station
oo W
n tio ta n lS io ya at Ro St te n hi io W at n n St o i Va nn at n St Pe io et at re St St ke st a n 21 io tL at es St W e in n ltl io at Be St e n al tio dd ta aS an
Minneapolis
Cedar Riverside Station Franklin Avenue Station
Lake Street / Midtown Station
38th Street Station
46th Street Station 50th Street / Minnehaha Park Station VA Medical Center Station Fort Snelling Station
Airport Terminal 1 - Lindbergh Station
Terminal 2 - Humphrey Station
American Boulevard Station Bloomington Central Station 28th Avenue Station Mall of America Station
St. Paul
Airport
-1
Hiawatha 55
#2
ge
1/8 Mile Transit Shed
1/4 Mile Transit Shed
Chicago Ave
35W
St a
Ye ars 0 -1 #3
St ag e
Sta ge
Lyndale Ave
Ye a
r 1/4 Mile
#1
Ye ar s 1/8 Mile
-5
Hennepin Ave 1/16 Mile
1/2 Mile Transit Shed
28th
Midtown Greenway
West Lake St
North Side Top Street
South Side Top Street 1A
Paths of Biking, walking, and street car
important for all people to access the greenway
PLANTER BOXES WITH SEATING
GREEN LEISURE AREA
OPEN PLAZA OPEN AIR MARKET SPACE
OPEN AIR MARKET SPACE
CHICAGO AVENUE
1A
BIKE PATHS
STREET CAR RAIL
UNDERGRADUATE UNDERGRADUATE STUDIO TY SI ER IV UN
OF
M
A OT ES
N IN
-M
OL
P EA
N IN
R TE ES
A OT ES
N IN
EM LS
,M IS
L FA
1 01 -2
MATERIAL ERIAL TO SPACE PACE
UNDERGRADUATE UNDERGRADUATE STUDIO TY SI ER IV UN
OF
M
A OT ES
N IN
-M
OL
P EA
N IN
,M IS
G IN R SP
R TE ES
A OT ES
N IN
M SE
2 01 -2
MONTES TESSORI SCHOOL OOL
R ST ATE 94
INT E
Near - North
St. Anthony West
Mississippi River
SITE
Nicollet Island East Bank Sumner Glenwood
G
TO
N
A
VE
N
IN GT ON
AV
ES
WA SH
ES
E
IN
AV
PO
5T H
AV
Downtown West
D
TN
AV
S
AVE
SH
ES
N
10TH ST N
Harrison
IN
WA
7T H
GLENWOO D
ST
SH
4T H
7T H
W A
RT LA N
North Loop
GT ON
AV
ES
10
P