FFY 2012 Annual Element

Page 1

TIP Annual Element for October 1, 2011 through September 30, 2012 NYS SYS

PIN

PROJECT DESCRIPTION

5B1201

STATE BRIDGE INSPECTIONS; FFY 11/12

ON

5B1202

LOCAL BRIDGE INSPECTIONS; CY 2012-2013

ON OFF OFF OFF

5T1534

501917

PMI-PAVT MAINT LET & VPP; SFY 13/14

RT 265 & I-190/POWER RESERVOIR; PHASE I

03/08/2012 FUND CODE

COST ($M)

OBLIG PLAN/ DATE ACTL

COUNTY

PHASE

CAT CHA ERI NIA

PRELIM DESIGN

B17

1.440

10/15/2011 PLND

CAT CHA ERI NIA

PRELIM DESIGN PRELIM DESIGN

B17 B19

0.059 4.144

11/7/2011 ACTL 11/7/2011 ACTL

PRELIM DESIGN PRELIM DESIGN

B17 B17

1.658 0.059

11/7/2011 ACTL 11/7/2011 ACTL

CAT CHA ERI NIA CAT CHA ERI NIA CAT CHA ERI NIA

ON ON

CAT CHA ERI NIA CAT CHA ERI NIA

PRELIM DESIGN DETAILED DESIGN

V11 V11

0.048 0.480

4/15/2012 PLND 6/15/2012 PLND

ON

NIA

PRELIM DESIGN

B17

0.070

11/1/2011 ACTL

ON

NIA

DETAILED DESIGN

PP1

0.225

6/10/2012 PLND

501922

RT 265 & I-190/POWER RESERVOIR; PHASE II

ON

NIA

DETAILED DESIGN

C42

0.160

9/6/2012 PLND

503498

RT 5 & 20/CATT CK & RTS 5/20/438 ROUNDABOUT

ON

CHA ERI

PRELIM DESIGN

B17

0.200

10/13/2011 ACTL

OFF

CHA ERI CHA ERI

DETAILED DESIGN

B17

0.230

2/21/2012 PLND

CHA ERI

PRELIM DESIGN ROW ACQU.

B17 B17

0.150 0.016

3/6/2012 ACTL 4/3/2012 PLND

CONST. INSP.

WW1

0.036

12/9/2011 ACTL

ON ON 503713

RT 31; LKPRT. WCL-WASHBURN ST & RT 78; LKPRT. SCL-RT 31

ON

NIA

504524

RT 104; ONTARIO ST-NIAGARA FALLS NCL

OFF

NIA

CONST. INSP.

C42

0.491

3/15/2012 PLND

OFF

NIA

CONSTRUCTION

C42

2.465

3/15/2012 PLND

505096

I-190/LASALLE EXPRESSWAY

ON

NIA

CONST. UTIL.

PP1

0.002

2/10/2012 ACTL

505108

I-190 BOND PHASE I; INFRASTRUCTURE IMPROVEMENTS

ON

NIA

CONSTRUCTION

C42

0.373

10/18/2011 ACTL

505110

I-190/BUFFALO AVE

ON

NIA NIA

PRELIM DESIGN

C42

0.072

10/1/2011 PLND

ON

DETAILED DESIGN

C42

0.168

11/8/2011 PLND

ON

ERI

PRELIM DESIGN

AA1

0.208

10/15/2011 PLND

ON ON

ERI

PRELIM DESIGN DETAILED DESIGN

V11 V11

0.016 0.016

10/15/2011 PLND 6/15/2012 PLND

ERI

DETAILED DESIGN ROW ACQU.

AA1 AA1

0.208 0.008

6/15/2012 PLND 7/5/2012 PLND

ON

CAT ERI

CONST. INSP.

B17

0.283

1/4/2012 ACTL

ON

CAT ERI

CONSTRUCTION

B17

2.839

1/4/2012 ACTL

508622

SHERIDAN DR EXT(RT 325) FROM RT 266 - RT 324

ON ON 510182

RT 219/CATTARAUGUS CREEK; BRIDGE REPAIRS

ERI ERI

512630

PMI-I-990; I-290-RT 263 (MILLERSPORT HWY) PHASE 3

ON

ERI

CONST. INSP.

PP1

0.075

11/9/2011 ACTL

513415

RT 5; LASALLE AV-KANE ST

ON

ERI

DETAILED DESIGN

WW1

0.002

1/25/2012 ACTL

526832

RT 240;GENESEE ST-YORKTOWN RD

ON

ERI

ROW ACQU.

V11

0.150

10/17/2011 ACTL

526848

RT 240; MINERAL SPRINGS RD-CLINTON ST

ON

ERI

PRELIM DESIGN

B17

0.246

12/2/2011 ACTL

530796

RT 62; CAYUGA- MILITARY RD

ON

NIA

CONSTRUCTION

WW1

0.429

12/1/2011 ACTL

541054

RT 957A (RMP) @ JOHN B DALY BLVD; SOUTHERN CBD GATEWAY

OFF

NIA

DETAILED DESIGN

C42

0.232

8/1/2012 PLND

546028

RT 384; VETERANS DRIVE - I-190 (PHASE I)

OFF

NIA NIA

CONST. INSP.

C42

1.600

1/17/2012 ACTL

CONSTRUCTION

C42

10.489

1/17/2012 ACTL

ERI ERI

PRELIM DESIGN

WW1

0.280

2/22/2012 PLND

ON

DETAILED DESIGN

WW1

0.200

8/23/2012 PLND

OFF 551244

RT 33; ELM/OAK - RT 240

ON

575386

RIDGE ROAD/ VARIOUS RR

OFF

ERI

CONSTRUCTION

B17

0.094

11/30/2011 ACTL

575519

WEHRLE DR; ELLICOTT CREEK - TRANSIT

OFF

ERI

CONST. INSP.

V07

0.274

3/15/2012 PLND

575525

SENECA ST/NORFOLK SOUTHERN

OFF OFF

ERI

ROW ACQU. DETAILED DESIGN

V07 V07

0.005 0.044

2/2/2012 ACTL 2/2/2012 ACTL

CONST. INSP. CONSTRUCTION

B19 B19

0.320 2.880

2/7/2012 ACTL 2/7/2012 ACTL

CON RR FRC ACCT

B19

0.240

2/8/2012 APRVD

OFF OFF OFF

ERI ERI ERI ERI


TIP Annual Element for October 1, 2011 through September 30, 2012 PIN

PROJECT DESCRIPTION

575543

E ROBINSON(N FRENCH);RT 62-RT 952T

575546

575628

ELMWOOD AVE; FOREST AVE - SCAJAQUADA

NIAGARA FALLS INTERNATIONAL RAIL STATION / INTERMODAL CENTER

NYS SYS

HARRIS HILL@WEHRLE & PLEASANTVIEW

FUND CODE

COST ($M)

OBLIG PLAN/ DATE ACTL

COUNTY

PHASE

OFF

ERI

DETAILED DESIGN

V07

0.370

4/1/2012 PLND

OFF OFF

ERI ERI

CONST. INSP. CONSTRUCTION

V07 V07

0.685 5.710

4/16/2012 PLND 4/16/2012 PLND

OFF

ERI

CONSTRUCTION

V07

1.614

12/7/2011 ACTL

OFF

ERI

CONST. INSP.

V07

0.146

12/7/2011 ACTL

OFF

NIA

CONST. INSP.

C23

0.365

4/6/2012 PLND

OFF

NIA NIA

CONSTRUCTION

C17

16.500

4/6/2012 PLND

CONSTRUCTION

C17

0.779

4/6/2012 PLND

CONSTRUCTION

AA1

1.636

4/12/2012 PLND

OFF

ERI ERI

CONST. INSP.

AA1

0.180

4/12/2012 PLND

OFF 575647

03/08/2012

OFF

575651

GRIDER ST; DELAVAN AVE-LEROY AVE

OFF

ERI

CONST. INSP.

V07

0.212

6/15/2012 PLND

575657

LEWISTON-QUEENSTON BORDER CROSSING

ON

NIA

CON RR FRC ACCT

PP1

0.004

12/2/2011 ACTL

575679

TIFFT STREET GREENWAY

OFF

ERI

ROW INCI.

AA1

0.008

3/6/2012 ACTL

575686

COLVIN BLVD & HIGHLAND AVE

OFF OFF

ERI ERI

CONST. INSP. CONSTRUCTION

AA1 AA1

0.048 0.512

1/5/2012 ACTL 1/5/2012 ACTL

575711

BUFFALO NIAGARA DEMAND MGMT & TRANSP ALTS PROGRAM

OFF

ERI NIA

SCOPING

AA1

0.040

6/15/2012 PLND

575712

REGIONAL SIGNAL COORDINATON FEASIBILITY STUDY

ON

ERI NIA

SCOPING

AA1

0.022

4/1/2012 PLND

575713

LINCOLN AVE CORRIDOR IMPROVEMENTS

OFF

NIA NIA

ROW INCI.

V07

0.108

11/21/2011 ACTL

OFF

ROW ACQU.

V07

0.349

11/21/2011 ACTL

575718

KENMORE AVE; STARIN AVE-RT 5 (MAIN ST)

OFF

ERI

DETAILED DESIGN

V07

0.400

4/1/2012 PLND

575719

ERIE CANAL HARBOR - PHASE III; COMMERCIAL STREET

OFF

ERI

PRELIM DESIGN

V07

0.023

3/15/2012 PLND

OFF

ERI

DETAILED DESIGN

V07

0.044

9/15/2012 PLND

OFF

NIA NIA

CONSTRUCTION

B19

1.520

4/27/2012 PLND

CONST. INSP.

B19

0.140

4/27/2012 PLND

ERI ERI

DETAILED DESIGN

B19

0.080

1/10/2012 PLND

OFF

PRELIM DESIGN

B19

0.100

1/10/2012 PLND

575727

TAYLOR DR/LITTLE RIVER

OFF 575728

CLARENCE CTR/GOTT CREEK

OFF

575729

SWIFT MILLS/MURDER CREEK

OFF OFF

ERI ERI

DETAILED DESIGN PRELIM DESIGN

B19 B19

0.080 0.080

5/8/2012 PLND 5/8/2012 PLND

575730

SAVAGE ROAD OVER DRY CREEK

OFF

ERI

DETAILED DESIGN

B19

0.060

3/15/2012 PLND

575752

MEADOW DR EXTENSION

OFF

NIA NIA

CONST. INSP.

C32

0.100

4/27/2012 PLND

OFF

CONSTRUCTION

C32

0.998

4/27/2012 PLND

575775

ECC TRANSPORTATION IMPROVEMENTS

OFF OFF

ERI ERI

CONST. INSP. CONSTRUCTION

C33 C33

0.086 0.642

4/2/2012 PLND 4/2/2012 PLND

575776

FILLMORE AVE; NORTH PARADE AVE. - EAST FERRY ST.

OFF

ERI

CONST. INSP.

C32

0.079

7/15/2012 PLND

OFF

ERI

CONSTRUCTION

C32

0.840

7/15/2012 PLND

ON

ERI

DETAILED DESIGN

C32

0.041

1/13/2012 ACTL

ON

ERI ERI

CONST. INSP.

C32

0.046

1/31/2012 ACTL

ON

CONSTRUCTION

C32

0.537

1/31/2012 ACTL

OFF

ERI

ROW ACQU.

C32

0.006

3/15/2012 PLND

OFF OFF

ERI ERI

CONST. INSP. CONSTRUCTION

C32 C32

0.024 0.240

7/16/2012 PLND 7/16/2012 PLND

OFF

ERI

ROW INCI.

V11

0.080

6/15/2012 PLND

OFF

ERI

PRELIM DESIGN

V11

0.201

6/15/2012 PLND

OFF

NIA

PRELIM DESIGN

WW1

0.560

4/15/2012 PLND

OFF

ERI

PRELIM DESIGN

C34

0.520

10/11/2011 PLND

OFF

ERI

ROW INCI.

C34

0.010

10/11/2011 PLND

575780

575784

575787

RT 277 UNION RD;CAZENOVIA CREEK TO RT 400 AURORA EXPY RAMPS

RT 5 (LAKESHORE RD) GATEWAY, HAMBURG

ELMWOOD AVE; KENMORE AVE-SHERIDAN DR

575791

NIAGARA RIVER GORGE - RMP NORTH FEASABILITY STUDY

575795

BNMC PHASE 3


TIP Annual Element for October 1, 2011 through September 30, 2012 PIN

PROJECT DESCRIPTION

575824

SOUTH PARK LOOP AT SOUTH PARK LAKE

575828

RT 265/CAYUGA CREEK

NYS SYS

575832 575834

575837

PINE AVE/GILL CREEK REHAB

WILSON BURT ROAD/18 MILE CREEK MILL RD/JOHNSON CREEK BRIDGE REMOVAL

FOREST DR/SMOKES CREEK

575840

REIN ROAD/ELLICOTT CREEK

LAKE AVENUE / SMOKES CREEK

COST ($M)

OBLIG PLAN/ DATE ACTL

COUNTY

PHASE

ERI

PRELIM DESIGN

B19

0.080

OFF

ERI

DETAILED DESIGN

B19

0.080

4/16/2012 PLND

OFF

NIA NIA

PRELIM DESIGN

V07

0.074

4/10/2012 PLND

DETAILED DESIGN ROW INCI.

V07 V07

0.076 0.006

4/10/2012 PLND 4/10/2012 PLND

NIA

4/16/2012 PLND

OFF OFF

NIA NIA

DETAILED DESIGN PRELIM DESIGN

B19 B19

0.005 0.005

4/10/2012 PLND 4/10/2012 PLND

OFF

NIA

PRELIM DESIGN

V13

0.284

3/1/2012 PLND

OFF

NIA

CONSTRUCTION

B19

0.090

4/29/2012 PLND

OFF

NIA

CONST. INSP.

B19

0.012

4/29/2012 PLND

OFF OFF

ERI

DETAILED DESIGN ROW ACQU.

B19 B19

0.088 0.008

2/28/2012 PLND 6/20/2012 PLND

ERI

CONST. INSP. CONSTRUCTION

B19 B19

0.060 0.468

8/16/2012 PLND 8/16/2012 PLND

OFF

ERI

CONSTRUCTION

B19

0.640

8/16/2012 PLND

OFF

ERI

CONST. INSP.

B19

0.080

8/16/2012 PLND

OFF

ERI ERI

CONSTRUCTION

B19

0.685

4/19/2012 PLND

ERI

CONST. INSP. ROW ACQU.

B19 B19

0.086 0.042

4/19/2012 PLND 5/7/2012 PLND

OFF OFF 575838

FUND CODE

OFF

OFF OFF 575829

03/08/2012

OFF OFF

ERI ERI

575864

PROJECT DEVELOPMENT TECHNICAL MODELING SERVICES

OFF

ERI NIA

PRELIM DESIGN

WW1

0.380

6/15/2012 PLND

575866

NFTA BUS PURCHASE

OFF

ERI ERI

MISCELLANEOUS

AA1

0.800

12/15/2011 PLND

OFF

MISCELLANEOUS

AA1

0.800

4/15/2012 PLND

575874

ABBOTT RD / NEUMANN CREEK

OFF

ERI

DETAILED DESIGN

B19

0.060

1/4/2012 ACTL

580584

ITS MAINT; SFY 11/12 - 15/16

ON

ERI ERI

CONST. INSP.

WW1

0.024

4/1/2012 PLND

ON

MISCELLANEOUS

WW1

0.240

4/1/2012 PLND

CONST. INSP.

B17

0.150

10/13/2011 ACTL

580776

PMI-BRIDGE PAINTING; SFY 10/11

ON

CAT CHA ERI NIA

580777

PMI-BRIDGE PAINTING; SFY 11/12

ON

ERI NIA ERI NIA

ON ON ON 580784

PMI-BRIDGE CLEANING; SFY 11/12

ON ON ON

ERI NIA ERI NIA ERI NIA ERI NIA

ON

ERI NIA ERI NIA

CONSTRUCTION

B17

2.277

11/10/2011 ACTL

CONST. INSP. CONSTRUCTION

B17 B17

0.274 -0.093

11/10/2011 ACTL 2/15/2012 ACTL

CONST. INSP.

B17

0.030

2/15/2012 ACTL

CONSTRUCTION

B17

-0.180

12/19/2011 ACTL

CONST. INSP. CON RR FRC ACCT

B17 B17

-0.074 0.003

12/19/2011 ACTL 2/9/2012 ACTL

CON RR FRC ACCT

B17

0.018

2/15/2012 ACTL

580853

REGIONAL ARTERIAL MANAGEMENT SYSTEM , PHASE 1

ON

ERI NIA

CONSTRUCTION

V11

0.200

11/8/2011 ACTL

580908

BNRAMS; RTS 78, 277 & 33; PHASE 2

ON

ERI

DETAILED DESIGN

AA1

0.135

12/14/2011 PLND

580973

BNRAMS; RTS 324 & 62; PHASE 3

ON ON

ERI

PRELIM DESIGN DETAILED DESIGN

AA1 WW1

0.080 0.112

10/15/2011 PLND 4/16/2012 PLND

582195

BUFFALO INNER HARBOR REDEVELOPMENT PROJECT

582212

CARS ON MAIN STREET BUFFALO

ON

ERI ERI

DETAILED DESIGN

AA1

0.056

4/16/2012 PLND

TRN

ERI

DETAILED DESIGN

C03

0.123

4/15/2012 PLND

OFF

ERI ERI

DETAILED DESIGN

C32

1.191

4/1/2012 PLND

CONST. INSP. CONSTRUCTION

C34 V07

0.091 1.166

4/7/2012 PLND 4/7/2012 PLND

CONSTRUCTION CONSTRUCTION

C25 C32

0.890 1.893

4/7/2012 PLND 4/7/2012 PLND

CONST. INSP. CONSTRUCTION

C32 C34

0.516 1.721

4/7/2012 PLND 4/7/2012 PLND

OFF OFF OFF OFF OFF OFF

ERI ERI ERI ERI ERI

86.261

Unmatched Total