TIP Annual Element for October 1, 2011 through September 30, 2012 NYS SYS
PIN
PROJECT DESCRIPTION
5B1201
STATE BRIDGE INSPECTIONS; FFY 11/12
ON
5B1202
LOCAL BRIDGE INSPECTIONS; CY 2012-2013
ON OFF OFF OFF
5T1534
501917
PMI-PAVT MAINT LET & VPP; SFY 13/14
RT 265 & I-190/POWER RESERVOIR; PHASE I
03/08/2012 FUND CODE
COST ($M)
OBLIG PLAN/ DATE ACTL
COUNTY
PHASE
CAT CHA ERI NIA
PRELIM DESIGN
B17
1.440
10/15/2011 PLND
CAT CHA ERI NIA
PRELIM DESIGN PRELIM DESIGN
B17 B19
0.059 4.144
11/7/2011 ACTL 11/7/2011 ACTL
PRELIM DESIGN PRELIM DESIGN
B17 B17
1.658 0.059
11/7/2011 ACTL 11/7/2011 ACTL
CAT CHA ERI NIA CAT CHA ERI NIA CAT CHA ERI NIA
ON ON
CAT CHA ERI NIA CAT CHA ERI NIA
PRELIM DESIGN DETAILED DESIGN
V11 V11
0.048 0.480
4/15/2012 PLND 6/15/2012 PLND
ON
NIA
PRELIM DESIGN
B17
0.070
11/1/2011 ACTL
ON
NIA
DETAILED DESIGN
PP1
0.225
6/10/2012 PLND
501922
RT 265 & I-190/POWER RESERVOIR; PHASE II
ON
NIA
DETAILED DESIGN
C42
0.160
9/6/2012 PLND
503498
RT 5 & 20/CATT CK & RTS 5/20/438 ROUNDABOUT
ON
CHA ERI
PRELIM DESIGN
B17
0.200
10/13/2011 ACTL
OFF
CHA ERI CHA ERI
DETAILED DESIGN
B17
0.230
2/21/2012 PLND
CHA ERI
PRELIM DESIGN ROW ACQU.
B17 B17
0.150 0.016
3/6/2012 ACTL 4/3/2012 PLND
CONST. INSP.
WW1
0.036
12/9/2011 ACTL
ON ON 503713
RT 31; LKPRT. WCL-WASHBURN ST & RT 78; LKPRT. SCL-RT 31
ON
NIA
504524
RT 104; ONTARIO ST-NIAGARA FALLS NCL
OFF
NIA
CONST. INSP.
C42
0.491
3/15/2012 PLND
OFF
NIA
CONSTRUCTION
C42
2.465
3/15/2012 PLND
505096
I-190/LASALLE EXPRESSWAY
ON
NIA
CONST. UTIL.
PP1
0.002
2/10/2012 ACTL
505108
I-190 BOND PHASE I; INFRASTRUCTURE IMPROVEMENTS
ON
NIA
CONSTRUCTION
C42
0.373
10/18/2011 ACTL
505110
I-190/BUFFALO AVE
ON
NIA NIA
PRELIM DESIGN
C42
0.072
10/1/2011 PLND
ON
DETAILED DESIGN
C42
0.168
11/8/2011 PLND
ON
ERI
PRELIM DESIGN
AA1
0.208
10/15/2011 PLND
ON ON
ERI
PRELIM DESIGN DETAILED DESIGN
V11 V11
0.016 0.016
10/15/2011 PLND 6/15/2012 PLND
ERI
DETAILED DESIGN ROW ACQU.
AA1 AA1
0.208 0.008
6/15/2012 PLND 7/5/2012 PLND
ON
CAT ERI
CONST. INSP.
B17
0.283
1/4/2012 ACTL
ON
CAT ERI
CONSTRUCTION
B17
2.839
1/4/2012 ACTL
508622
SHERIDAN DR EXT(RT 325) FROM RT 266 - RT 324
ON ON 510182
RT 219/CATTARAUGUS CREEK; BRIDGE REPAIRS
ERI ERI
512630
PMI-I-990; I-290-RT 263 (MILLERSPORT HWY) PHASE 3
ON
ERI
CONST. INSP.
PP1
0.075
11/9/2011 ACTL
513415
RT 5; LASALLE AV-KANE ST
ON
ERI
DETAILED DESIGN
WW1
0.002
1/25/2012 ACTL
526832
RT 240;GENESEE ST-YORKTOWN RD
ON
ERI
ROW ACQU.
V11
0.150
10/17/2011 ACTL
526848
RT 240; MINERAL SPRINGS RD-CLINTON ST
ON
ERI
PRELIM DESIGN
B17
0.246
12/2/2011 ACTL
530796
RT 62; CAYUGA- MILITARY RD
ON
NIA
CONSTRUCTION
WW1
0.429
12/1/2011 ACTL
541054
RT 957A (RMP) @ JOHN B DALY BLVD; SOUTHERN CBD GATEWAY
OFF
NIA
DETAILED DESIGN
C42
0.232
8/1/2012 PLND
546028
RT 384; VETERANS DRIVE - I-190 (PHASE I)
OFF
NIA NIA
CONST. INSP.
C42
1.600
1/17/2012 ACTL
CONSTRUCTION
C42
10.489
1/17/2012 ACTL
ERI ERI
PRELIM DESIGN
WW1
0.280
2/22/2012 PLND
ON
DETAILED DESIGN
WW1
0.200
8/23/2012 PLND
OFF 551244
RT 33; ELM/OAK - RT 240
ON
575386
RIDGE ROAD/ VARIOUS RR
OFF
ERI
CONSTRUCTION
B17
0.094
11/30/2011 ACTL
575519
WEHRLE DR; ELLICOTT CREEK - TRANSIT
OFF
ERI
CONST. INSP.
V07
0.274
3/15/2012 PLND
575525
SENECA ST/NORFOLK SOUTHERN
OFF OFF
ERI
ROW ACQU. DETAILED DESIGN
V07 V07
0.005 0.044
2/2/2012 ACTL 2/2/2012 ACTL
CONST. INSP. CONSTRUCTION
B19 B19
0.320 2.880
2/7/2012 ACTL 2/7/2012 ACTL
CON RR FRC ACCT
B19
0.240
2/8/2012 APRVD
OFF OFF OFF
ERI ERI ERI ERI
TIP Annual Element for October 1, 2011 through September 30, 2012 PIN
PROJECT DESCRIPTION
575543
E ROBINSON(N FRENCH);RT 62-RT 952T
575546
575628
ELMWOOD AVE; FOREST AVE - SCAJAQUADA
NIAGARA FALLS INTERNATIONAL RAIL STATION / INTERMODAL CENTER
NYS SYS
HARRIS HILL@WEHRLE & PLEASANTVIEW
FUND CODE
COST ($M)
OBLIG PLAN/ DATE ACTL
COUNTY
PHASE
OFF
ERI
DETAILED DESIGN
V07
0.370
4/1/2012 PLND
OFF OFF
ERI ERI
CONST. INSP. CONSTRUCTION
V07 V07
0.685 5.710
4/16/2012 PLND 4/16/2012 PLND
OFF
ERI
CONSTRUCTION
V07
1.614
12/7/2011 ACTL
OFF
ERI
CONST. INSP.
V07
0.146
12/7/2011 ACTL
OFF
NIA
CONST. INSP.
C23
0.365
4/6/2012 PLND
OFF
NIA NIA
CONSTRUCTION
C17
16.500
4/6/2012 PLND
CONSTRUCTION
C17
0.779
4/6/2012 PLND
CONSTRUCTION
AA1
1.636
4/12/2012 PLND
OFF
ERI ERI
CONST. INSP.
AA1
0.180
4/12/2012 PLND
OFF 575647
03/08/2012
OFF
575651
GRIDER ST; DELAVAN AVE-LEROY AVE
OFF
ERI
CONST. INSP.
V07
0.212
6/15/2012 PLND
575657
LEWISTON-QUEENSTON BORDER CROSSING
ON
NIA
CON RR FRC ACCT
PP1
0.004
12/2/2011 ACTL
575679
TIFFT STREET GREENWAY
OFF
ERI
ROW INCI.
AA1
0.008
3/6/2012 ACTL
575686
COLVIN BLVD & HIGHLAND AVE
OFF OFF
ERI ERI
CONST. INSP. CONSTRUCTION
AA1 AA1
0.048 0.512
1/5/2012 ACTL 1/5/2012 ACTL
575711
BUFFALO NIAGARA DEMAND MGMT & TRANSP ALTS PROGRAM
OFF
ERI NIA
SCOPING
AA1
0.040
6/15/2012 PLND
575712
REGIONAL SIGNAL COORDINATON FEASIBILITY STUDY
ON
ERI NIA
SCOPING
AA1
0.022
4/1/2012 PLND
575713
LINCOLN AVE CORRIDOR IMPROVEMENTS
OFF
NIA NIA
ROW INCI.
V07
0.108
11/21/2011 ACTL
OFF
ROW ACQU.
V07
0.349
11/21/2011 ACTL
575718
KENMORE AVE; STARIN AVE-RT 5 (MAIN ST)
OFF
ERI
DETAILED DESIGN
V07
0.400
4/1/2012 PLND
575719
ERIE CANAL HARBOR - PHASE III; COMMERCIAL STREET
OFF
ERI
PRELIM DESIGN
V07
0.023
3/15/2012 PLND
OFF
ERI
DETAILED DESIGN
V07
0.044
9/15/2012 PLND
OFF
NIA NIA
CONSTRUCTION
B19
1.520
4/27/2012 PLND
CONST. INSP.
B19
0.140
4/27/2012 PLND
ERI ERI
DETAILED DESIGN
B19
0.080
1/10/2012 PLND
OFF
PRELIM DESIGN
B19
0.100
1/10/2012 PLND
575727
TAYLOR DR/LITTLE RIVER
OFF 575728
CLARENCE CTR/GOTT CREEK
OFF
575729
SWIFT MILLS/MURDER CREEK
OFF OFF
ERI ERI
DETAILED DESIGN PRELIM DESIGN
B19 B19
0.080 0.080
5/8/2012 PLND 5/8/2012 PLND
575730
SAVAGE ROAD OVER DRY CREEK
OFF
ERI
DETAILED DESIGN
B19
0.060
3/15/2012 PLND
575752
MEADOW DR EXTENSION
OFF
NIA NIA
CONST. INSP.
C32
0.100
4/27/2012 PLND
OFF
CONSTRUCTION
C32
0.998
4/27/2012 PLND
575775
ECC TRANSPORTATION IMPROVEMENTS
OFF OFF
ERI ERI
CONST. INSP. CONSTRUCTION
C33 C33
0.086 0.642
4/2/2012 PLND 4/2/2012 PLND
575776
FILLMORE AVE; NORTH PARADE AVE. - EAST FERRY ST.
OFF
ERI
CONST. INSP.
C32
0.079
7/15/2012 PLND
OFF
ERI
CONSTRUCTION
C32
0.840
7/15/2012 PLND
ON
ERI
DETAILED DESIGN
C32
0.041
1/13/2012 ACTL
ON
ERI ERI
CONST. INSP.
C32
0.046
1/31/2012 ACTL
ON
CONSTRUCTION
C32
0.537
1/31/2012 ACTL
OFF
ERI
ROW ACQU.
C32
0.006
3/15/2012 PLND
OFF OFF
ERI ERI
CONST. INSP. CONSTRUCTION
C32 C32
0.024 0.240
7/16/2012 PLND 7/16/2012 PLND
OFF
ERI
ROW INCI.
V11
0.080
6/15/2012 PLND
OFF
ERI
PRELIM DESIGN
V11
0.201
6/15/2012 PLND
OFF
NIA
PRELIM DESIGN
WW1
0.560
4/15/2012 PLND
OFF
ERI
PRELIM DESIGN
C34
0.520
10/11/2011 PLND
OFF
ERI
ROW INCI.
C34
0.010
10/11/2011 PLND
575780
575784
575787
RT 277 UNION RD;CAZENOVIA CREEK TO RT 400 AURORA EXPY RAMPS
RT 5 (LAKESHORE RD) GATEWAY, HAMBURG
ELMWOOD AVE; KENMORE AVE-SHERIDAN DR
575791
NIAGARA RIVER GORGE - RMP NORTH FEASABILITY STUDY
575795
BNMC PHASE 3
TIP Annual Element for October 1, 2011 through September 30, 2012 PIN
PROJECT DESCRIPTION
575824
SOUTH PARK LOOP AT SOUTH PARK LAKE
575828
RT 265/CAYUGA CREEK
NYS SYS
575832 575834
575837
PINE AVE/GILL CREEK REHAB
WILSON BURT ROAD/18 MILE CREEK MILL RD/JOHNSON CREEK BRIDGE REMOVAL
FOREST DR/SMOKES CREEK
575840
REIN ROAD/ELLICOTT CREEK
LAKE AVENUE / SMOKES CREEK
COST ($M)
OBLIG PLAN/ DATE ACTL
COUNTY
PHASE
ERI
PRELIM DESIGN
B19
0.080
OFF
ERI
DETAILED DESIGN
B19
0.080
4/16/2012 PLND
OFF
NIA NIA
PRELIM DESIGN
V07
0.074
4/10/2012 PLND
DETAILED DESIGN ROW INCI.
V07 V07
0.076 0.006
4/10/2012 PLND 4/10/2012 PLND
NIA
4/16/2012 PLND
OFF OFF
NIA NIA
DETAILED DESIGN PRELIM DESIGN
B19 B19
0.005 0.005
4/10/2012 PLND 4/10/2012 PLND
OFF
NIA
PRELIM DESIGN
V13
0.284
3/1/2012 PLND
OFF
NIA
CONSTRUCTION
B19
0.090
4/29/2012 PLND
OFF
NIA
CONST. INSP.
B19
0.012
4/29/2012 PLND
OFF OFF
ERI
DETAILED DESIGN ROW ACQU.
B19 B19
0.088 0.008
2/28/2012 PLND 6/20/2012 PLND
ERI
CONST. INSP. CONSTRUCTION
B19 B19
0.060 0.468
8/16/2012 PLND 8/16/2012 PLND
OFF
ERI
CONSTRUCTION
B19
0.640
8/16/2012 PLND
OFF
ERI
CONST. INSP.
B19
0.080
8/16/2012 PLND
OFF
ERI ERI
CONSTRUCTION
B19
0.685
4/19/2012 PLND
ERI
CONST. INSP. ROW ACQU.
B19 B19
0.086 0.042
4/19/2012 PLND 5/7/2012 PLND
OFF OFF 575838
FUND CODE
OFF
OFF OFF 575829
03/08/2012
OFF OFF
ERI ERI
575864
PROJECT DEVELOPMENT TECHNICAL MODELING SERVICES
OFF
ERI NIA
PRELIM DESIGN
WW1
0.380
6/15/2012 PLND
575866
NFTA BUS PURCHASE
OFF
ERI ERI
MISCELLANEOUS
AA1
0.800
12/15/2011 PLND
OFF
MISCELLANEOUS
AA1
0.800
4/15/2012 PLND
575874
ABBOTT RD / NEUMANN CREEK
OFF
ERI
DETAILED DESIGN
B19
0.060
1/4/2012 ACTL
580584
ITS MAINT; SFY 11/12 - 15/16
ON
ERI ERI
CONST. INSP.
WW1
0.024
4/1/2012 PLND
ON
MISCELLANEOUS
WW1
0.240
4/1/2012 PLND
CONST. INSP.
B17
0.150
10/13/2011 ACTL
580776
PMI-BRIDGE PAINTING; SFY 10/11
ON
CAT CHA ERI NIA
580777
PMI-BRIDGE PAINTING; SFY 11/12
ON
ERI NIA ERI NIA
ON ON ON 580784
PMI-BRIDGE CLEANING; SFY 11/12
ON ON ON
ERI NIA ERI NIA ERI NIA ERI NIA
ON
ERI NIA ERI NIA
CONSTRUCTION
B17
2.277
11/10/2011 ACTL
CONST. INSP. CONSTRUCTION
B17 B17
0.274 -0.093
11/10/2011 ACTL 2/15/2012 ACTL
CONST. INSP.
B17
0.030
2/15/2012 ACTL
CONSTRUCTION
B17
-0.180
12/19/2011 ACTL
CONST. INSP. CON RR FRC ACCT
B17 B17
-0.074 0.003
12/19/2011 ACTL 2/9/2012 ACTL
CON RR FRC ACCT
B17
0.018
2/15/2012 ACTL
580853
REGIONAL ARTERIAL MANAGEMENT SYSTEM , PHASE 1
ON
ERI NIA
CONSTRUCTION
V11
0.200
11/8/2011 ACTL
580908
BNRAMS; RTS 78, 277 & 33; PHASE 2
ON
ERI
DETAILED DESIGN
AA1
0.135
12/14/2011 PLND
580973
BNRAMS; RTS 324 & 62; PHASE 3
ON ON
ERI
PRELIM DESIGN DETAILED DESIGN
AA1 WW1
0.080 0.112
10/15/2011 PLND 4/16/2012 PLND
582195
BUFFALO INNER HARBOR REDEVELOPMENT PROJECT
582212
CARS ON MAIN STREET BUFFALO
ON
ERI ERI
DETAILED DESIGN
AA1
0.056
4/16/2012 PLND
TRN
ERI
DETAILED DESIGN
C03
0.123
4/15/2012 PLND
OFF
ERI ERI
DETAILED DESIGN
C32
1.191
4/1/2012 PLND
CONST. INSP. CONSTRUCTION
C34 V07
0.091 1.166
4/7/2012 PLND 4/7/2012 PLND
CONSTRUCTION CONSTRUCTION
C25 C32
0.890 1.893
4/7/2012 PLND 4/7/2012 PLND
CONST. INSP. CONSTRUCTION
C32 C34
0.516 1.721
4/7/2012 PLND 4/7/2012 PLND
OFF OFF OFF OFF OFF OFF
ERI ERI ERI ERI ERI
86.261
Unmatched Total