Quick Start Card
in.xm2-ce™ European version 1- Connect all outputs & keypads L1 - Light connector
CO - Communication link
Power box display and buttons Installation brackets
General I/O connector (IR receiver) C - Main and aux. keypad connectors
Fuses
OUT8 - Connector for direct 230 V AC output
Main power entry connection
OUT7 OUT6 OUT5
Main power cable input entry
Mounting feet
OUT4 OUT3
OUT2
OUT1
RH - Output connectors for in.therm™ remote heating system (230 vac)
2- Connect the main power
3- Select spa configuration (see chart next page)
For 230 VAC Correct wiring of the electrical service box, RCD, and pack terminal block is essential. Call an electrician if necessary.
First, the led display will show "LL" and "01" continuously. Press Change button to choose the appropriate configuration for your spa. Press Select button to confirm. (The pack will now reset and reboot)
LIN
E1
LIN
E1
LIN
Note: To re-enter the configuration selection menu, press Select button and hold for 5 seconds.
E2
NEU
NEU
TRA
GR
L
TRA
OU
GR
ND
1 x 230 VAC Single-phase
L
OU
ND
2 x 230 VAC Dual-phase
LIN
LIN
E1
E1
LIN
E2 LIN
E2
LIN
E3
NEU
LIN
TRA
GR
E3
L
GR
OU
ND
3 x 230 VAC Three-phase
OU
ND
3 x 230 VAC Three-phase (Delta)
For more information, see our website: www.geckoalliance.com
4- Select breaker current Make sure all accessories are linked to the bonding connector and connected to pack. Make sure the spa pack door is closed. Turn on the breaker.
4.b- Selecting breaker current (Br) Press Change button to choose the breaker current value. Press Select button to confirm. (The pack will now reset and reboot.) Br values displayed by the system correspond to the maximum amperage capacity of the RCD.
Bonding lug 4.a- Selecting number of phase (Ph) Ph 1 = 1 phase Ph 2 = 2 phases Ph 3 = 3 phases
Ph 1P 2P 3P
Br (RCD) 40 A max. 20 A max. 16 A max.
Press Change button to choose the phase. Press Select button to confirm. For more information, see our website: www.geckoalliance.com