1 minute read

SUB-BUNG-OWF-T™ Topside Grouting Bungs

Next Article
General Services

General Services

Advertisement

SUB-BUNG-OWF-T™ Topside Grouting Bungs are utilised during the offshore wind transition piece (TP) to monopile (MP) grouting operations.

The annular gap between the two structures is bottom filled injected with a grouting mixture.

To ensure the grouting mixture level fills to the top of the annular gap, air must be vented to prevent a pneumatic lock.

SUB-BUNG OWF-T™ Topside Grouting Bungs comprise of a snorkel guided vertically into the top annular air-pocket.

Once the grouting bungs have been activated and sealing the 03-off or 04-off grouting vent holes, the grout mixture level fills to the top of the annular air-pocket ensuring grouting joint integrity.

KEY FEATURES • Light weight & hand held • Field proven design & track record • Rapid installation, activation & removal

PO-987-SES-002-020

PO-375-SES-005-002 PO-1712-SES-003-008 PO-1712-SES-002-001

PO-375-SES-003-001

This article is from: