SUB-BUNG-OWF-T™ Topside Grouting Bungs SUB-BUNG-OWF-T™ Topside Grouting Bungs are utilised during the offshore wind transition piece (TP) to monopile (MP) grouting operations. The annular gap between the two structures is bottom filled injected with a grouting mixture. PO-1712-SES-002-001
To ensure the grouting mixture level fills to the top of the annular gap, air must be vented to prevent a pneumatic lock. SUB-BUNG OWF-T™ Topside Grouting Bungs comprise of a snorkel guided vertically into the top annular air-pocket. Once the grouting bungs have been activated and sealing the 03-off or 04-off grouting vent holes, the grout mixture level
PO-987-SES-002-020
fills to the top of the annular air-pocket ensuring grouting joint integrity.
KEY FEATURES •
Light weight & hand held
•
Field proven design & track record
•
Rapid installation, activation & removal
PO-375-SES-005-002
PO-1712-SES-003-008
11
PO-375-SES-003-001
www.subenesol.co.uk