Subsea Energy Solutions Brochure

Page 11

SUB-BUNG-OWF-T™ Topside Grouting Bungs SUB-BUNG-OWF-T™ Topside Grouting Bungs are utilised during the offshore wind transition piece (TP) to monopile (MP) grouting operations. The annular gap between the two structures is bottom filled injected with a grouting mixture. PO-1712-SES-002-001

To ensure the grouting mixture level fills to the top of the annular gap, air must be vented to prevent a pneumatic lock. SUB-BUNG OWF-T™ Topside Grouting Bungs comprise of a snorkel guided vertically into the top annular air-pocket. Once the grouting bungs have been activated and sealing the 03-off or 04-off grouting vent holes, the grout mixture level

PO-987-SES-002-020

fills to the top of the annular air-pocket ensuring grouting joint integrity.

KEY FEATURES •

Light weight & hand held

Field proven design & track record

Rapid installation, activation & removal

PO-375-SES-005-002

PO-1712-SES-003-008

11

PO-375-SES-003-001

www.subenesol.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.