Delivery Program 2022-2026 Operational Plan 2023-2024
Acknowledgement of Traditional Owners
Georges River Council acknowledges that the Bidjigal people of the Eora Nation are the traditional inhabitants and custodians of all land and water in which the Georges River region is situated.
Council recognises Aboriginal and Torres Strait Islander people as integral to the Georges River community and highly values their social and cultural contributions. Georges River Council pays respect to Elders past, present and emerging.
Georges River Council is committed to showing respect for Aboriginal people as Australia’s first peoples. Council has adopted the practice of acknowledging the Traditional Custodians of Country at events, ceremonies, meetings and functions.
2 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
3 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 3
4 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 Contents 2 Acknowledgement of Traditional Owners 5 Our vision, mission and values 6 Message from the Mayor 7 Message from the General Manager 8 Organisational structure 8 Key functions and responsibilities 9 Your Councillors 10 About Georges River 11 Georges River at a glance 12 About this strategy 15 Pillar 1 Our community 15 4 Year Deliverables 16 Operational Plan 20 Performance measures 21 2023/24 Budget 23 Pillar 2 Our green environment 23 4 Year Deliverables 24 Operational Plan 26 Performance measures 26 2023/24 Budget 29 Pillar 3 Our economy 29 4 Year Deliverables 30 Operational Plan 32 Performance measures 32 2023/24 Budget 35 Pillar 4 Our built environment 35 4 Year Deliverables 36 Operational Plan 40 Performance measures 41 2023/24 Budget 43 Pillar 5 Our place in Sydney 43 4 Year Deliverables 44 Operational Plan 45 Performance measures 46 2023/24 Budget 49 Pillar 6 Our governance 49 4 Year Deliverables 50 Operational Plan 56 Performance measures 58 2023/24 Budget 60 Financial estimates 60 About the 2023/24 Budget 68 Rating and Revenue Policies 71 Debt Management and Hardship policy 72 Rating Classification Maps 76 Waste management charges 79 2023/24 Schedule of Fees and Charges
Our vision, mission and values
Our vision
Naturally connected to place, community and Country.
Our mission
A leading, people-focused organisation delivering outstanding results for our community and city.
Our values
United
We will work collaboratively as one team with common purpose and respect
Professional
We will act with integrity and seek opportunities to learn and grow
Honest
We will be open and truthful with each other and our community
Accountable
We will own our decisions and actions as we strive for excellence
5 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 5
Message from the Mayor
I am proud to present Georges River Council’s Delivery Program 2022-2026 and Operational Plan 2023/2024 and Budget for the 2023/2024 financial year.
This document sets out the goals, strategies and actions for the year to come.
The COVID-19 pandemic and natural disasters affecting our area have had a significant impact on the entire Georges River area and have presented many challenges. However, our residents and businesses have demonstrated a resilience and willingness to maintain a strong sense of community.
The Georges River Local Government Area is not only important to our local lifestyle, but our strategic centres of Hurstville and Kogarah make us vital to Sydney’s future. Our area has proven highly liveable and our growing green canopy has ensured that the ‘heat island effect’ is not extreme in our area. Our transport corridors have proven to be adequate when people are using a combination of working from home and going to their place of work but need better connections to working hubs such as Parramatta in the future. Transport projects are a major part of our advocacy agenda.
Our Delivery Program includes a mix of economic, social and environmental programs whilst ensuring responsible corporate governance and financial management.
I look forward to implementing these actions for the future of our community.
Councillor Nick Katris Mayor
6 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Message from the General Manager
I am pleased to present Georges River Council’s Delivery Program 2022-2026 and Operational Plan 2023/2024. This document has been created to support our Community Strategic Plan (CSP) which identifies the community’s main priorities and aspirations over the next ten years.
The Georges River area is one of the most beautiful areas within Greater Sydney. Its unique location presents the community with a wonderful array of opportunities which was reflected in feedback provided during the development of our CSP. The community wants more trees planted and to see more greening of our local areas, including our town centres. Our community appreciates and want more upgraded open space, parks, safe cycling and walkability options. Protection of the Georges River area heritage and history, activating our town centres and providing local jobs was also important to many residents.
As a result of the COVID-19 pandemic, more residents are working from home and Council
anticipates this will be ongoing. The community wants to continue using our local parks and being able to shop locally which signals an opportunity for renaissance for our local centres and continued high use of our parks and open space.
Maintaining services is a key focus of Council during 2023/24. We will continue to work to ensure all public parks and open spaces are accessible, well maintained and managed to meet the recreational needs of current and future residents.
Despite resource constraints within Council, a challenging external environment and an increase in service expectations, Council remains committed to its long-term financial sustainability.
The 2023/24 Budget will be the second year Council is forecast to achieve a surplus and difficult prioritisation of valued services, projects and programs will be essential to achieve financial sustainability and compliance with our legislative obligations.
In addition to the funding received from the Commonwealth Financial Assistance Grants (FAG) and the NSW Government Stronger Communities Fund (SCF), Council successfully applied for a number of Federal and State Government grants in 2021/22 to assist with provision of facilities and services to the community. Council received over $11 million in grant funding for operational projects and over $6 million in grant funds were awarded for a variety of capital projects. These grants are critical to sustaining and improving our local infrastructure and community events.
Council remains on track with its financial strategy despite the extensive challenges in recent years from the COVID-19 pandemic and natural disasters, and coupled with the ongoing economic challenges today, Council still remains in a strong position to deliver the services our community values.
David Tuxford General Manager
7 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Organisational Structure
Office of the General Manager Chief Audit Executive
Manager Office of the General Manager
Acting Manager City Life
Acting Manager Cultural Engagement and Library Services
General Counsel Legal Services Head of Strategic Property
Acting Manager Community and Early Learning Centres Chief People Officer Chief Information Officer
Executive Manager City Futures Head of Corporate Governance and Risk
Key functions and responsibilities
Community and Culture
City Life, Cultural Engagement, Library Services, Museum and Gallery, Community and Early Learning Centres
Business and Corporate Services
People and Culture, Information Management and Technology,
and Strategic Property
Environment and Planning
City
Office of the General Manager Executive Services, Integrated Planning and Reporting,
Audit, City Futures and Legal Services
8 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Business
Directorate
Community and Culture Directorate
and Corporate Services
Director Community and Culture
Chief Financial Officer
Director Business
Environment and Planning Directorate Assets and Infrastructure Directorate Director Environment and Planning Director Assets and Infrastructure Manager Development and Building Manager Strategic Planning Manager Environment, Health and Regulatory Services Manager City Operational Services Manager Premium Facilities Manager Strategic Placemaking Manager City Technical Services
Acting
and Corporate Services
General Manager
Financial Management, Governance and Risk
Building, Strategic Planning, Environmental Health
Development and
and Regulatory Services
Assets and Infrastructure
Operations, Premium Facilities, Strategic Placemaking, City Technical Services
Internal
Your Councillors
Councillor Sam Elmir selmir@georgesriver.nsw.gov.au
M: 0410 654 310
Councillor Colleen Symington csymington@georgesriver.nsw.gov.au
M: 0409 546 202
Mayor, Nick Katris nkatris@georgesriver.nsw.gov.au
M: 0419 402 191
Councillor Nick Smerdely nsmerdely@georgesriver.nsw.gov.au
M: 0431 646 321
Veronica Ficarra vficarra@georgesriver.nsw.gov.au
M: 0403 557 562
Councillor Natalie Mort nmort@georgesriver.nsw.gov.au
M: 0499 522 200
Councillor Nancy Liu nliu@georgesriver.nsw.gov.au M: 0400 681 188
Councillor Elise Borg eborg@georgesriver.nsw.gov.au M: 0477 222 089
Councillor Ashvini Ambihaipahar aambihaipahar@georgesriver.nsw.gov.au M: 0434 494 231
Councillor Lou Konjarski lkonjarski@georgesriver.nsw.gov.au M: 0421 188 896
Deputy Mayor, Kathryn Landsberry klandsberry@georgesriver.nsw.gov.au
M:0419 984 934
Councillor Benjamin Wang bwang@georgesriver.nsw.gov.au
M: 0499 366 888
Councillor Sam Stratikopoulos sstratikopoulos@georgesriver.nsw.gov.au
M: 0438 750 355
Councillor Christina Jamieson cjamieson@georgesriver.nsw.gov.au
M: 0431 833 609
Councillor Peter Mahoney pmahoney@georgesriver.nsw.gov.au
M: 0419 374 727
9 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Blakehurst Ward
Hurstville Ward
Kogarah Bay Ward
Mortdale Ward
Peakhurst Ward
About Georges River
Georges River Local Government Area is 17 kilometres from Sydney CBD and covers 38 square kilometres. It is close to Sydney Airport and the M5 Motorway, as well as the foreshores of Botany Bay and the Georges River.
10 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Georges
11 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
estimated resident population 38 Years median age 0.7% Indigenous residents make up our of population 46% Population born overseas 53% Residents speak a language other than English at home 36% Couples with children 10% Older couples without children 20% Lone person households $1,968 Median weekly household income 49% Medium and high density dwellings Households renting 32% median weekly rent $450 Households with a mortgage 30% median weekly repayment $570 31% Residents use public transport to get to work
River at a glance Our population 152,703 ABS
About this strategy
The Delivery Program and Operational Plan set out how we will deliver the goals and strategies of our Community Strategic Plan.
These documents sit within the Integrated Planning and Reporting Framework that requires us to plan for and report on our ambitions, in consultation with our community (see figure below). While the Community Strategic Plan is a longer-term representation of the community’s aspirations for the Georges River area, this document brings together:
• the Delivery Program, a four-year program that covers the term of the Council. To create the Program, we reviewed the Community Strategic Plan to ascertain what we could achieve over the next four years to meet the aspirational needs of the community. Although this is a four-year program, with the postponement of the 2020 local government elections, this Delivery Program will need to be reviewed after three years in line with the local government election cycle.
• the Operational Plan is in the second year of the Delivery Program 2022-2026 and outlines the actions that will be undertaken, measures for each action, accountable business units and a reference to the Community Strategic Plan strategies to which the action is contributing.
Progress of actions identified in the Operational Plan are reported to council every six months. An annual report is also prepared that reflects and reports on Council’s overall performance for the financial year.
RESOURCING STRATEGY
Contains the Workforce Management Plan, Digital Resource Management Plan, Asset Management Plan and Long Term Financial Plan
12 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
DELIVERY PROGRAM 4 YEARS OPERATIONAL PLAN 1 YEAR ANNUAL REPORT PERPETUAL MONITORING AND REVIEW
COMMUNITY ENGAGEMENT COMMUNITY STRATEGIC
10 +
PLAN
YEARS
13 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
14 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Pillar 1
Our community
Goal 1.1 Our community is socially and culturally connected and we strive for social equity.
Goal 1.2 Diverse, vibrant community hubs and facilities are connected, well maintained and have equitable access.
Goal 1.3 The community is safe and healthy.
Goal 1.4 Georges River area heritage and history is protected.
4 Year Deliverables
Pillar 1 deliverables for 2022-2026 are:
1.1.1A Implement an annual program of Council run and Council supported events.
1.1.1B Develop and implement the Georges River Council Event Strategy 2022-2027.
1.1.1C Maximise the utility of Netstrata Jubilee as a venue for Council’s major events.
1.1.2A Provide a range of programs such as the Georges River Art Prize and the Artist in Residence Program.
1.1.3A Develop and Implement social justice strategies to build the social strengths of the Georges River community.
1.1.3B Develop and implement the Georges River Council Disability and Inclusion Action Plan 2022-2026.
1.1.4A Implement the 2021-2031 Early Learning Services Strategy to meet the educational and care needs of children and their families.
1.2.1A Implement the 2030 Library Strategy to improve service delivery, technology, collections, information services, community engagement and programs.
1.2.2A Provide a range of affordable and accessible facilities for community based activities.
1.2.2B Create community spaces to deliver enhanced programs and experiences for community members.
1.2.3A Implement the Create Georges River Cultural Strategy to support our community’s cultural activities and initiatives.
1.3.1A Increase community and road safety in Georges River Local Government Area.
1.3.1B Investigate systems to improve public safety and accessibility.
1.3.2A Adopt and implement a Fire Safety Program that maintains buildings with essential fire services to safeguard the community.
1.3.2B Liaise with the NSW Government and relevant stakeholders to keep up-to-date with legislative changes around regulatory functions.
1.3.2C Implement programs relating to food premises, skin penetration premises and regulated systems.
1.4.1A Promote the retention and conservation of heritage items within the Georges River Local Government Area.
15 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Operational Plan
We will deliver the following by June 2024
Strategy 1.1.1: Initiate, facilitate and support inclusive and accessible events that meet community aspirations and connect people, communities and diverse groups.
1.1.1A Implement an annual program of Council run and Council supported events.
1.1.1Ai Implement an annual calendar of
and localised events.
1.1.1B Develop and implement the Georges River Council Event Strategy 2022 – 2027. 1.1.1Bi Implement the Georges River Council Event Strategy 2022 – 2027.
1.1.1Bii Develop and deliver workshops to build capacity within the community on Council’s Event Guidelines.
1.1.1C Maximise the utility of Netstrata Jubilee as a venue for Council’s major events.
1.1.1Ci Commission drafting of POM and consequently engage planning consultant to initiate DA to extend the event program at Netstrata Jubilee Stadium to include entertainment, cultural and community events.
1.1.1Cii Procure major events other than sport for Netstrata Jubilee Stadium.
1.1.1Ciii Promote Netstrata Jubilee Stadium as a venue for nonsporting group events.
Strategy 1.1.2: Foster and support programs and installations such as Art Trails and Public Art that celebrate diversity, our multicultural community, supports innovation and creativity and contributes to the creative economy.
1.1.2A Provide a range of programs such as the Georges River Art Prize and the Artist in Residence Program.
1.1.2Ai Deliver Georges River Art Prize and Artist in Residence Program. Manager Cultural Engagement and Library Services
1.1.2Aii Deliver a range of public art and cultural programs. Manager
and
16 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
destination
Manager City Life 1.1.1
Life 1.1.1
Manager City
Manager
Life 1.1.1
City
Manager Premium Facilities 1.1.1
Manager Premium Facilities 1.1.1
Manager Premium Facilities 1.1.1
Code Deliverables/Actions Accountable CSP reference
1.1.2
Engagement
Library Services 1.1.2
Cultural
Strategy 1.1.3: Develop, support and promote programs, services and activities that foster social support, participation and wellbeing for our diverse community regardless of age, gender, physical or mental ability, sexual orientation or cultural or religious background.
1.1.3A Develop and Implement social justice strategies to build the social strengths of the Georges River community.
1.1.3Ai Develop an action plan for the Georges River Council’s Social Justice Charter.
1.1.3Aii Consult with the community to deliver Council’s Antiracism campaign “Better Together”.
1.1.3Aiii Develop and implement the Aboriginal and Torres Strait Islander Strategy.
1.1.3Aiv Implement the Aboriginal and Torres Strait Islander Strategy Action Plan.
and
and
1.1.3B Develop and implement the Georges River Council Disability and Inclusion Action Plan 2022-2026.
1.1.3Bi Implement the Georges River Council Disability and Inclusion Action Plan 2022-2026.
Strategy 1.1.4: Provide high quality, affordable education, care and protection for children across Council’s Early Learning Centres.
1.1.4A Implement the 2021-2031 Early Learning Services Strategy to meet the educational and care needs of children and their families. 1.1.4Ai
1.1.4Aiii Implement the Early Learning Services Reconciliation Action Plan.
1.1.4Aiv Review demand for an additional needs early learning centre.
17 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Community and Early Learning Services 1.1.3
Manager Community
Learning Services 1.1.3
Early
Manager Community
Early Learning Services 1.1.3
Manager Community and Early Learning Services 1.1.3
Manager Community
1.1.3
and Early Learning Services
Code Deliverables/Actions Accountable CSP reference
Review
implement Child
Staff Wellbeing Action Plan. Manager Community and Early Learning Services 1.1.4
Manager Community
Early Learning Services 1.1.4
and
and
1.1.4Aii Implement Council's Child Protection Action Plan.
and
Manager Community
1.1.4
and Early Learning Services
Manager Community and Early Learning Services 1.1.4
Strategy 1.2.1: Develop our library services to provide for inclusive hubs, spaces and services, collections, programs and facilities
1.2.1A Implement the 2030 Library Strategy to improve service delivery, technology, collections, information services, community engagement and programs.
1.2.1Ai Investigate innovative ways to provide library services to the western half of the Georges River Local Government Area.
1.2.1Aii Activate the reading and sensory garden at Hurstville Library through programs and other community engagement.
1.2.1Aiv Undertake consultation to assess the current libraries at Oatley, Penshurst and South Hurstville for their suitability and community use.
1.2.1Av Continue
and
and
Georges River
Strategy 1.2.2: Provide a range of affordable and accessible facilities and community hubs for communitybased activities.
1.2.2A Provide a range of affordable and accessible facilities for community based activities.
1.2.2Ai Maintain and provide for hire community properties across the Georges River Local Government Area.
1.2.2Aii
1.2.2B Create community spaces to deliver enhanced programs and experiences for community members. 1.2.2Bi Create a multi-functional, accessible and flexible programming space.
1.2.2Bii Provide opportunities for the community to engage with the Library and Hurstville Museum & Gallery outside Council buildings through outreach, online and delivery services.
18 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code
Accountable CSP reference
Deliverables/Actions
Manager Cultural Engagement
Library Services 1.2.1
Manager Cultural Engagement
Library Services 1.2.1
Manager Cultural Engagement
Library Services 1.2.1
and
to
Manager Cultural Engagement and Library Services 1.2.1
implement the
Library Debt Recovery and Management Plan.
Code
Accountable CSP reference
Deliverables/Actions
Manager City Life 1.2.2
Deliver actions identified in the Venue and Facilities Management Review. Manager City Life 1.2.2 1.2.2Aiii Deliver actions identified in an Open Space Expansion Plan. Manager City Life 1.2.2
Manager Cultural Engagement
1.2.2
and Library Services
Manager Cultural Engagement
Library Services 1.2.2
and
Strategy 1.2.3: Encourage and promote the arts and creativity through Council’s cultural facilities including Hurstville Museum & Gallery, Hurstville Entertainment Centre and Carss Park Artists Cottage.
1.2.3A Implement the Create Georges River Cultural Strategy to support our community’s cultural activities and initiatives.
1.2.3Ai Implement the Create Georges River Cultural Strategy to support and strengthen our community’s cultural activities and initiatives.
1.2.3Aii Increase the profile of Hurstville Museum & Gallery through the implementation of a comprehensive and diverse program of exhibitions and events.
1.2.3Aiii Establish and increase the profile of the Edgbaston Artist Studio.
and
1.3.1A Increase community and road safety in Georges River Local Government Area. 1.3.1Ai Deliver the 2023/24 Road Safety
1.3.1B Investigate systems to improve
1.3.1Bi
Strategy 1.3.2: Conduct regulatory functions in accordance with legislative requirements.
1.3.2A Adopt and implement a Fire Safety Program that maintains buildings with essential fire services to safeguard the community.
1.3.2Ai Implement actions to ensure compliance with the directions set by the NSW State Government relating to external combustible cladding and Council's Fire Safety Audit.
1.3.2B Liaise with the NSW Government and relevant stakeholders to keep up-to-date with legislative changes around regulatory functions.
1.3.2Bi Implement the 2023/24 regulatory programs to ensure compliance with the relevant legislation and to address community safety concerns.
1.3.2C Implement programs relating to food premises, skin penetration premises and regulated systems.
1.3.2Ci Implement the Get The Site Right Program to manage development site condition compliance.
19 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code
Accountable CSP reference
Deliverables/Actions
Manager Cultural Engagement
Library Services 1.2.3
Manager Cultural Engagement
Services 1.2.3
and Library
Manager Cultural Engagement and Library Services 1.2.3
actions to maintain
promote the community safety of our area. Code Deliverables/Actions Accountable CSP reference
Strategy 1.3.1: Implement
and
Program, focused on traffic facilities,
Spot Funding and other safety initiatives. Manager Strategic Placemaking 1.3.1 1.3.1Aii Deliver a pilot Community Safety Program. Manager Community and Early Learning Services 1.3.1
Black
public safety and accessibility.
Develop annual program to upgrade council's security
systems to improve public safety and accessibility. Chief Information Officer 1.3.1
Code Deliverables/Actions Accountable CSP reference
and CCTV
Manager Environment, Health and Regulatory Services 1.3.2
Manager Environment, Health
Regulatory Services 1.3.2
and
Manager Environment, Health and Regulatory Services 1.3.2
Strategy 1.4.1: Encourage and promote heritage and history through collections, programs, heritage trails and protection policies
1.4.1A Promote the retention and conservation of heritage items within the Georges River Local Government Area.
1.4.1Ai
*This project will not be undertaken in 2023/24 due to the project not being funded in 2023/24
Performance measures
20 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Conduct a
Heritage Building
Program.* Manager Strategic Planning 1.4.1 1.4.1Aii Conduct a heritage information session for owners of heritage listed properties.* Manager Strategic Planning 1.4.1
2023/24
Grants
Measures Target Responsibility Utilisation of Council’s Early Learning Services > 90% Manager Community and Early Learning Services Customer satisfaction with Early Learning Services ≥ 80% Manager Community and Early Learning Services
venues ≥ 80% Manager City Life
satisfaction
≥ 80% Manager Cultural Engagement and Library Services
satisfaction
≥ 80% Manager Cultural Engagement
Services
≥ 80% Manager City Life
Customer satisfaction with community centres and performance
Customer
with Museum and Gallery
Customer
with Library Services
and Library
Customer satisfaction with Events
2023/24 Budget
21 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual ChargesUser Charges and Fees 5,753 Interest IncomeOther Operating Revenues 5,850 Operating Grants and Contributions 5,381 Profit on Sale of AssetsTotal Operating Revenue 16,984 Operating Expenditure Employee Costs 19,090 Interest ChargesMaterials and Services 7,612 Depreciation and Amortisation 2,414 Other Operating Expenses 687 Total Expenditure 29,802 Capital Grants and ContributionsOperating Result before Capital Revenues - Surplus/(Deficit) (12,818) User Charges and Fees Other Revenues from Ordinary Activities Operating Grants and Contributions Employee Costs Depreciation Other expenses Material and Services
Income Expenditure
22 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Pillar 2
Our green environment
Goal 2.1 Our environmentally sustainable practices inspire us all to protect and nurture the natural environment.
Goal 2.2 Our waterways are healthy and accessible.
Goal 2.3 Greening, canopy cover and bushland and biodiversity preservation are maximised.
4 Year Deliverables
Pillar 2 deliverables for 2022-2026 are:
2.1.1A Implement the Resilience Action Plan 2022- 2040 for Council services.
2.1.1B
Undertake programs and activities to educate the community on reducing energy consumption, protecting waterways, reducing waste and taking other action to improve the environment, with a focus on climate change projects.
2.1.2A Implement the Waste Strategy 2021-2040.
2.1.2B Deliver community education initiatives to support environmentally sustainable waste disposal and recycling practices.
2.1.3A Maintain and implement the Georges River Local Emergency Management Plan in collaboration with the Local Emergency Management Committee (LEMC).
2.2.1A Represent Council's ambitions for the Georges River through the GRCCC.
2.2.2A Implement the recommendations of the Foreshore Scenic Character Review into the Georges River Local Environmental Plan.
2.2.2B Maintain Council's marine and foreshore assets to be functional and safe.
2.3.1A Provide appropriate and responsive management of current and future tree assets within the Georges River Local Government Area.
2.3.2A Implement Council’s Bush Regeneration Program to protect, conserve and enhance the natural environment.
23 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Operational Plan
We will deliver the following by June 2024
Strategy 2.1.1: Prepare the Georges River area to be resilient in addressing climate change and reducing energy and water usage.
2.1.1A Implement the Resilience Action Plan 2022- 2040 for Council services.
2.1.1Ai Report on the implementation progress of the Resilience Action Plan 2022 - 2040*.
2.1.1B Undertake programs and activities to educate the community on reducing energy consumption, protecting waterways, reducing waste and taking other action to improve the environment, with a focus on climate change projects.
2.1.1Bi Implement activities to educate the community on reducing energy consumption and protecting the environment.
Strategy 2.1.2: Ensure waste is managed as a resource with minimal impacts from its disposal.
2.1.2A Implement the Waste Strategy 2021-2040.
2.1.2Ai
2.1.2B Deliver community education initiatives to support
Strategy 2.1.3: Prepare for natural disasters such as bushfires and extreme weather events.
2.1.3A Maintain and implement the Georges River Local Emergency Management Plan in collaboration with the Local Emergency Management Committee (LEMC).
2.1.3Ai Provide support to the State Emergency Service within the Georges River Local Government Area.
2.1.3Aii Achieve endorsement of Georges River Local Emergency Management Plan 2021 and facilitate quarterly LEMC meetings attended by all combat agencies.
Services
Strategy 2.2.1: Protect the Georges River and waterways to be clean and naturalised.
2.2.1A Represent Council's ambitions for the Georges River through the GRCCC.
2.2.1Ai Support the GRCCC with the development of a Foreshore Management Plan.
*The Energy Management Plan (Gas) project will not be undertaken in 2023/24 due to the project not being funded in 2023/24.
24 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Environment, Health and Regulatory Services 2.1.1
Manager Environment, Health and Regulatory Services 2.1.1
Code Deliverables/Actions Accountable CSP reference
Manager Environment, Health and Regulatory Services 2.1.2
environmentally sustainable waste disposal and recycling practices.
Implement the annual Waste Education Program. Manager Environment, Health and Regulatory Services 2.1.2
Report on the implementation progress of the Waste Strategy 2021-2040.
2.1.2Bi
Code Deliverables/Actions Accountable CSP reference
Manager
Operational
2.1.3
City
Manager City Operational Services 2.1.3
Code Deliverables/Actions Accountable CSP Reference
Manager
2.2.1
Environment, Health and Regulatory Services
Strategy 2.2.2: Maintain and implement strategies to provide access to our waterways.
2.2.2A Implement the recommendations of the Foreshore Scenic Character Review into the Georges River Local Environmental Plan.
2.2.2Ai Report the results of the preliminary community consultation on the proposed implementation of the Biodiversity Study and Foreshore Scenic Character Study.
2.2.2B Maintain Council's marine and foreshore assets to be functional and safe.
2.2.2Bi Undertake programmed and reactive maintenance works of marine and foreshore assets.
Strategy 2.3.1: Increase and promote our tree canopy, shrubs and bushland coverage.
2.3.1A Provide appropriate and responsive management of current and future tree assets within the Georges River Local Government Area.
2.3.1Ai
2.3.1Aii Continue expanding urban tree canopy to work towards Council’s target of 40% urban canopy by 2039 with a focus on areas on high urban heat.
2.3.1Aiii
Strategy 2.3.2: Protect and reinstate our biodiversity, including endemic flora and fauna.
2.3.2A Implement Council's Bush Regeneration Program to protect, conserve and enhance the natural environment.
2.3.2Ai
2.3.2Aii Implement the high priority recommendations of the Biodiversity Study 2021 including preparing a Biodiversity Strategy.*
*Aspects of this project may not be undertaken in 2023/24 due to the project not being funded in 2023/24.
25 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 2.2.2
Manager City Operational Services 2.2.2
Code Deliverables/Actions Accountable CSP reference
Implement Council's Tree Management Policy. Manager City Operational Services 2.3.1
Manager City Operational
2.3.1
Services
Manager Environment, Health and Regulatory Services 2.3.1
Develop a significant tree register for the LGA.
Code Deliverables/Actions Accountable CSP reference
2.3.2
Implement the 2023/24 Bush Regeneration Program. Manager City Technical Services
2.3.2
Manager Environment, Health and Regulatory Services
Performance measures
Number of hectares of active bush regeneration activities.
Number of native plants including trees, shrubs and ground covers planted to improve habitat, biodiversity and bushland structure (or other community tree planting) activities.
Number of volunteer hours associated with Bushcare activities.
20
2,000
3,000
Number of street trees planted each year. = ≥ 160 Manager City Operational Services
Percentage of environmental pollution complaints responded to within two business days. > 75%
Percentage of waste customer requests responded to within 48 hours. > 98%
Percentage of food premises inspected annually. = 100%
2023/24 Budget
Manager Environment, Health and Regulatory Services
Manager Environment, Health and Regulatory Services
Manager Environment, Health and Regulatory Services
26 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual Charges 31,970 User Charges and Fees 1,295 Interest Income 335 Other Operating Revenues 222 Operating Grants and Contributions 310 Profit on Sale of AssetsTotal Operating Revenue 34,133 Operating Expenditure Employee Costs 10,273 Interest ChargesMaterials and Services 31,187 Depreciation and Amortisation 289 Other Operating Expenses 170 Total Expenditure 41,919 Capital Grants and Contributions 1,750 Operating Result before Capital Revenues - Surplus/(Deficit) (7,786)
Measures Annual Target Responsibility
≥
Manager City Technical Services
≥
Manager City Technical
Services
Manager
≥
City Technical Services
Income Expenditure
Rates and Annual Charges
User Charges and Fees
Interest Income
Other Revenues from Ordinary Activites
Operating Grants and Contributions
Materials and Services
Employee Costs
Depreciation
Other Expenses
27 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
28 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Pillar 3 Our economy
Goal 3.1 Local jobs and local businesses are supported to grow.
Goal 3.2 Our town centres are green, clean, vibrant and activated and have good amenities.
Goal 3.3 Georges River is a 30 minute city.
4 Year Deliverables
Pillar 3 deliverables for 2022-2026 are:
3.1.1A Promote effective economic development initiatives that benefit the Georges River Local Government Area.
3.1.2A Deliver programs to activate and increase the night time economy in town centres.
3.1.3A Actively participate with State agencies and Bayside Council to achieve the ambitions for the Kogarah Health and Research Hub Collaboration Area.
3.1.3B Prepare and implement an action plan to market the Georges River Local Government Area's investment opportunities.
3.1.3C Maximise the potential of the Kogarah Health and Research Hub.
3.1.3D Build the cultural identity of Hurstville CBD as the Heart of the City.
3.1.3E Implement initiatives in key economic sectors in response to the Economic Development Strategy.
3.2.1A Maintain Council's green open space and town centres to be functional and safe.
3.2.2A Work with other directorates and teams to implement, promote and market long-term place-based initiatives.
3.2.3A Assist and promote the greening and creation of open space in our town centres.
3.2.4A Implement the recommendations of the Commercial Centres Strategy.
3.3.1A Advancement of the ‘River Rail’ through the identification of and protection of infrastructure corridors with Transport for NSW.
3.3.1B Influence the next iteration of district and metropolitan planning, with recognition of the untapped potential of the Southern Aerotropolis.
29 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Operational Plan
We will deliver the following by June 2024
Strategy 3.1.1: Support local businesses to help protect jobs and create employment opportunities.
3.1.1A Implement initiatives in key economic sectors in response to the Economic Development Strategy.
3.1.1Ai Perpare a strategic business case for the 'River Rail'(Kogarah to Parramatta rail link) in partnership with key stakeholders.
Strategy 3.1.2: Encourage the Night Time Economy, particularly in Hurstville, Beverly Hills and Kogarah, to grow.
3.1.2A Deliver programs to activate and increase the night time economy in town centres.
3.1.2Ai Seek programs and partnerships to activate and increase the night time economy in Hurstville and Kogarah.
Strategy 3.1.3: Target economic development in key locations and sectors within the local government area
3.1.3A Actively participate with State agencies and Bayside Council to achieve the ambitions for the Kogarah Health and Research Hub Collaboration Area.
3.1.3Ai
3.1.3B Prepare and implement an action plan to market the Georges River Local Government Area’s investment opportunities.
3.1.3Bi
3.1.3C Maximise the potential of the Kogarah Health and Research Hub.
3.1.3Ci Implement, promote and market the Kogarah Investment Attraction Strategy to grow the Kogarah Health and Education Precinct.
3.1.3D Build the cultural identity of Hurstville CBD as the Heart of the City.
3.1.3Di
to build and promote the identity of Hurstville as the 'Heart of the City'.
3.2.1: Provide regular maintenance and cleansing of town centres and public toilets.
3.2.1A Maintain Council's green open space and town centres to be functional and safe.
3.2.1Ai Undertake programmed and reactive cleansing, sportsfield and park maintenance works of Council's green open spaces and town centres.
30 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 3.1.3
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 3.1.2
Code Deliverables/Actions Accountable CSP reference
Place Strategy
Executive Manager City Futures 3.1.3
Lead the Kogarah Collaboration Area
Governance Group.
Implement the action plan to market the City. Executive Manager City Futures 3.1.3
Executive Manager City
3.1.3
Futures
Executive Manager City Futures 3.1.3 Strategy
Code Deliverables/Actions Accountable CSP reference
Continue
Manager City Operational Services 3.2.1
Strategy 3.2.2: Encourage and support targeted, place-based events and activities to activate town centres.
3.2.2A Work with other directorates and teams to implement, promote and market long-term place-based initiatives.
3.2.2Ai Continue to implement place-based public domain initiatives across the Georges River Local Government Area.
Strategy 3.2.3: Implement greening and planting strategies in town centres.
3.2.3A Assist and promote the greening and creation of open space in our town centres.
3.2.3Ai Continue to drive increased greening and creation/ improvement of open space in our town centres.
Strategic Placemaking
Strategy 3.2.4: Protect employment growth and services during land rezoning processes.
3.2.4A Implement the recommendations of the Commercial Centres Strategy.
3.2.4Ai Continue the work of the Commercial Centres Strategy for all centres within the Georges River Local Government Area.*
Strategy 3.3.1: Advocate to the NSW Government to support Georges River as a 30 minute city.
3.3.1A Advancement of the ‘River Rail’ through the identification of and protection of infrastructure corridors with Transport for NSW.
3.3.1Ai Prepare a business case for the ‘River Rail’ (Kogarah to Parramatta rail link).
Futures
3.3.1B Influence the next iteration of district and metropolitan planning, with recognition of the untapped potential of the Southern Aerotropolis.
3.3.1Bi Advocate for the acknowledgement of and investment in the Southern Aerotropolis through a NSW Government- led vision and plan in collaboration with local councils and key stakeholders.
*This project will not be undertaken in 2023/24 due to the project not being funded in 2023/24
31 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 3.2.2
Code Deliverables/Actions Accountable CSP reference
Manager
3.2.3
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 3.2.4
Code
Accountable CSP reference
Deliverables/Actions
Executive Manager City
3.3.1
Executive Manager City Futures 3.3.1
Performance measures
2023/24 Budget
32 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual ChargesUser Charges and Fees 773 Interest Income 2,440 Other Operating Revenues 6,235 Operating Grants and ContributionsProfit on Sale of AssetsTotal Operating Revenue 9,448 Operating Expenditure Employee Costs 5,744 Interest ChargesMaterials and Services 1,568 Depreciation and AmortisationOther Operating Expenses 331 Total Expenditure 7,643 Capital Grants and Contributions 10,480 Operating Result before Capital Revenues - Surplus/(Deficit) 1,805
Measures Annual Target Responsibility The percentage of reported graffiti removed within 5 days. > 80% Manager City Operational Services Kilometres of roads swept > 30,000 Manager City Operational Services Percentage of engineering operations service requests actioned against works scheduled. ≥ 80% Manager City Operational Services All 24 commercial centres cleaned daily. = 100% Manager City Operational Services
Income Expenditure
Capital Grants and Contributions
Other Operating Revenues
Interest Income
User Chargers and Fees
Employee costs
Materials and Services
Other Expenses
33 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
34 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Pillar 4
Our built environment
Goal 4.1: New development should make Georges River more liveable, vibrant and sustainable.
Goal 4.2: Affordable and quality housing options are available.
Goal 4.3: There are a range of transport options and increased walkability and cycling to connect people, goods and businesses.
Goal 4.4: Everyone has access to quality parks and open space and active and passive recreation facilities.
Goal 4.5: Council-led development and assets provide quality, long term benefits to everyone.
4 Year Deliverables
Pillar 4 deliverables for 2022-2026 are:
4.1.1A Complete a Master Plan for Beverly Hills and Mortdale Local Centre that will revitalise the centre and respond to the community's ideas and aspirations for the future of the centre.
4.1.1B Prepare a Master Plan for the Riverwood Local Centre in association with the Riverwood community and Canterbury-Bankstown Council.
4.1.1C Include the Hurstville Civic Centre site in the Georges River Local Environmental Plan 2021.
4.1.1D Develop and implement planning controls to protect the scenic character of the foreshore.
4.1.2A Monitor and standardise DA assessment reports and templates.
4.1.2B Provide ongoing education to the community about controls to the development and building approval processes.
4.2.1A Develop and implement an Affordable Rental Housing Scheme.
4.2.1B Provide affordable housing in one of Council's redevelopments.
4.3.1A Pursue State Government priority for express trains on the T4 line stop at Kogarah and T8 line to the CBD, the River Rail and Hurstville (or Kogarah) to Macquarie Park via Rhodes (through Burwood or Strathfield) rail line.
4.3.2A Maintain Council's footpath network to be functional and safe.
4.3.2B Continue to maintain Council’s walkways and cycleways to be functional and safe.
4.4.1A Maintain Council's buildings and open space to be functional and safe.
4.4.1B Incorporate design principles for parks and open spaces that promote resilience.
4.4.1C Implement the GRC Open Space, Recreation and Community Facilities Strategy.
4.4.2A Research and plan for active and passive recreation opportunities within the Georges River Local Government Area.
4.4.2B Progress construction of a new aquatic facility in the LGA.
4.4.3A Ensure our parks and reserves have updated Plans of Management and Master Plans.
4.5.1A Plan for and implement a purchasing program for property requiring compulsory acquisition in the comprehensive LEP.
4.5.1B Achieve service delivery outcomes through a 10 year Capital Works Program driven by Council Strategies.
4.5.1C Deliver Asset Management Plans for each Asset Class (Roads, Buildings, Open Space and Stormwater) which plan for the long term sustainability of Council’s Infrastructure assets.
4.5.1D Provide new and updated community assets such as new library services to the western part of our LGA.
35 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Operational Plan
We will deliver the following by June 2024 *This project will not be undertaken in 2023/24 due to the project not being funded in 2023/24
Strategy 4.1.1: Prepare Development Control Plans and Master Plans to guide liveable development and amenity.
4.1.1A Complete a Master Plan for Beverly Hills and Mortdale Local Centre that will revitalise the centre and respond to the community’s ideas and aspirations for the future of the centre.
4.1.1Ai Finalise the Master Plan for Beverly Hills and Mortdale Local Centre.
4.1.1B Prepare a Master Plan for the Riverwood Local Centre in association with the Riverwood community and Canterbury-Bankstown Council.
4.1.1Bi Commence consultation on a Master Plan for the Riverwood Local Centre.*
Strategic Planning
4.1.1C Include the Hurstville Civic Centre site in the Georges River Local Environmental Plan 2021.
4.1.1Ci Finalise the rezoning of the Hurstville Civic Centre site.
4.1.1D Develop and implement planning controls to protect the scenic character of the foreshore.
4.1.1Di Report the results of the preliminary community consultation on the proposed implementation of the Biodiversity Study and Foreshore Scenic Character Study.
4.1.1Dii
Strategy 4.1.2: Undertake rigorous assessment of development applications (DAs) by Council staff, local planning panel and Sydney South Planning Panel.
4.1.2A Monitor and standardise DA assessment reports and templates.
4.1.2Ai
4.1.2B Provide ongoing education to the community about controls to the development and building approval processes.
4.1.2Bi Implement community information session on planning development and building sessions.
4.1.2Bii Provide up to date self-help information on Council's website.
Development and Building
and
36 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Manager Strategic Planning 4.1.1
Manager
4.1.1
Manager Strategic Planning 4.1.1
Manager Strategic Planning 4.1.1
Manager Strategic Planning 4.1.1
Prepare a set of biodiversity, scenic character and foreshore controls for community consultation.
Accountable CSP reference
Code Deliverables/Actions
report templates to reflect current planning controls. Manager Development and Building 4.1.2
Update
up
date
changes. Manager Development and Building 4.1.2
4.1.2Aii Ensure templates are
to
and reflect any legislative
Manager
4.1.2
Manager
4.1.2
Development
Building
4.2.1: Develop policies that encourage a greater supply of housing diversity and choice.
4.2.1A Develop and implement an Affordable Rental Housing Scheme.
4.2.1Ai Develop an Affordable Rental Housing Scheme that applies to precincts within the LGA.
4.2.1B Provide affordable housing in one of Council's redevelopments. 4.2.1Bi
Select a Council owned site or investigate the acquisition of residential property for the provision of affordable housing.
Strategy 4.3.1: Provide expert advice and lobby the State Government to provide and improve public transport options such as train and bus services.
4.3.1A Pursue State Government priority for express trains on the T4 line stop at Kogarah. and T8 line to the CBD, the River Rail and Hurstville (or Kogarah) to Macquarie Park via Rhodes (through Burwood or Strathfield) rail line.
4.3.1Ai Continue to lobby Transport for NSW and the Minister for Transport for improved public transport options.
4.3.1Aii
4.3.2A Maintain Council's footpath network to be
4.3.2Ai Undertake programmed and reactive maintenance works of Council's footpath assets.
and
4.3.2B Continue to maintain Council’s walkways and cycleways to be functional and safe.
4.3.2Bi
37 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Strategy
Manager Strategic Planning 4.2.1
site
provision of affordable housing. Manager Strategic Planning/ Head of Strategic Property 4.2.1 4.2.1Bii
Head of Strategic Property 4.2.1
Code Deliverables/Actions Accountable CSP reference
Select a Council owned
for the
Executive Manager City
4.3.1
Futures
Executive Manager City Futures 4.3.1 Strategy 4.3.2: Plan for, improve and maintain safe and connected footpaths and cycleways. Code Deliverables/Actions Accountable CSP reference
Conduct economic modelling to explore the viablility of reinstating train services to Kogarah in peak periods.
Manager City Operational Services 4.3.2
functional
safe.
Manager Strategic Placemaking 4.3.2
Commence investigation and design for key cycle routes within the LGA.
Strategy 4.4.1: Ensure public parks, open space and Council buildings are accessible, well maintained and managed.
4.4.1A Maintain Council's buildings and open space to be functional and safe.
4.4.1Ai Undertake programmed and reactive maintenance works of Council's buildings, open spaces.
4.4.1B Incorporate design principles for parks and open spaces that promote resilience.
4.4.1Bi Ensure that design principles that promote resilience are incorporated into plans for open space.
4.4.1C Implement the GRC Open Space, Recreation and Community Facilities Strategy.
4.4.1Ci Identify open space and recreation priorities based on the findings of the GRC Open Space, Recreation and Community Facilities Strategy.
4.4.1Cii Accelerate the feasibility study, concept plans and business case for a new aquatic centre in the LGA to allow Council to pursue funding sources
4.4.1Ciii Implement the 2023/24 Recreational and Open Space Capital Works Program
Strategy 4.4.2: Plan and provide active and passive recreation including skate parks, aquatic facilities and off road biking opportunities.
4.4.2A Research and plan for active and passive recreation opportunities within the Georges River Local Government Area.
4.4.2Ai
4.4.2Aii Plan for increased cycling opportunities across the Georges River Local Government Area.
Strategic Placemaking
4.4.2B Progress the construction of a new aquatic facility in the LGA.
4.4.2Bi Undertake investigations and business cases to progress the construction of an aquatic facility at Carss Park
4.4.2Bii Seek funding to progress construction of a new aquatic facility in the LGA.
38 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP Reference
Manager City Operational Services 4.4.1
Manager City Technical Services 4.4.1
Manager City Technical Services 4.4.1
Manager City Technical Services 4.4.1
Manager
4.4.1
City Technical Services
Code Deliverables/Actions Accountable CSP reference
design
facility
Park. Manager City Technical Services 4.4.2
Undertake detailed
for a skate and BMX
at Olds
Manager
4.4.2
Manager City Technical Services 4.4.2
Manager City Technical Services 4.4.2
4.4.3A
4.4.3Ai
4.5.1A
4.5.1Ai
4.5.1Bii
4.5.1Biii
4.5.1C
4.5.1D Provide new and upgraded community assets such as new library services to the western part of our LGA.
4.5.1Di
39 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 Strategy
government area. Code Deliverables/Actions Accountable CSP reference
4.4.3: Review Plans of Management for all open space in the local
Ensure our parks and reserves have updated Plans of Management and Master Plans.
Manager Strategic Planning 4.4.3
Finalise the Plan of Management for Sans Souci Park. Manager Strategic Planning 4.4.3 4.4.3Aiii Finalise the Master Plan for Sans Souci Park. Manager Strategic Planning 4.4.3 Strategy
Code Deliverables/Actions Accountable CSP reference
Continue the Plans of Management for Crown Lands in accordance with the Crown Land Management Act.
4.4.3Aii
4.5.1: Provide new and upgraded community assets and services to the LGA.
Plan for and implement a purchasing program for property requiring compulsory acquisition in the comprehensive LEP.
Acquire land for open space purposes as identified in the Local Environmental Plan. Head of Strategic Property 4.5.1
Achieve service delivery
year Capital
driven by Council
Implement the 2023/24 Sportsfield Renovation Program. Manager City Operational Services 4.5.1
4.5.1B
outcomes through a 10
Works Program
Strategies. 4.5.1Bi
Deliver
2023/24 Critical Safety and Asset Renewal Program. Manager City Technical Services 4.5.1
the
Deliver the 2022/23 Road Resheeting Program. Manager City Technical Services 4.5.1
Deliver Asset Management Plans for
Asset
Buildings, Open Space
term sustainability
Infrastructure assets.
Manager Strategic
4.5.1
each
Class (Roads,
and Stormwater) which plan for the long
of Council’s
4.5.1Ci Develop asset class based 10 year Asset Management Plans.
Placemaking
Manager Strategic Placemaking 4.5.1
Review options to provide new library services to the western part of our LGA.
Performance measures
Measures
Percentage of pothole requests made safe and scheduled for repair within 48 hours.
Civil design for private works completed within timeframe
Maintain the Asset Renewal Ration at the Industry Benchmark
Percentage of utility restorations completed within timeframe advised.
Percentage of occupancy across Council-owned commercial properties.
Mean gross assessment times (in days) on DAs, modifications, DA reviews.
Percentage of Construction Certificates determined in 21 days.
Percentage of planning proposals meeting Gateway determination timeframes.
Number of DAs determined.
100%
90%
100%
80%
90%
90
90%
85%
800
Executive Manager City Operational Services
Manager City Technical Services
Manager Strategic Placemaking
Executive Manager City Operational Services
Head of Strategic Property
Manager Development and Building
Manager Development and Building
Manager Development and Building
Manager Development and Building
40 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Annual Target Responsibility
=
>
=
≥
>
<
>
>
>
2023/24 Budget
41 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual ChargesUser Charges and Fees 2,033 Interest IncomeOther Operating Revenues 10 Operating Grants and ContributionsProfit on Sale of AssetsTotal Operating Revenue 2,043 Operating Expenditure Employee Costs 4,928 Interest ChargesMaterials and Services 335 Depreciation and AmortisationOther Operating ExpensesTotal Expenditure 5,262 Capital Grants and ContributionsOperating Result before Capital Revenues - Surplus/(Deficit) (3,219) User Charges and Fees Other Revenues from Ordinary Activities Employee Costs Materials and Services Income Expenditure
42 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Pillar 5
Our place in Sydney
Goal 5.1: Leadership focuses on innovation and improving the customer experience.
Goal 5.2: The three spheres of government work together to improve services and facilities in our area.
Goal 5.3: Georges River is known for being environmentally and culturally rich and enhances its metropolitan position as a destination for people and business.
4 Year Deliverables
Pillar 5 deliverables for 2022-2026 are:
5.1.1A Explore the viability of a university precinct in Georges River Local Government Area and new investment from government and private enterprise to increase the region’s competitiveness as a place for investment and innovation.
5.1.2A Improve consistency and reliability of service across all customer contact channels.
5.2.1A Develop an advocacy strategy that identifies how Georges River Council can influence government policy and secure government investment in the Georges River Local Government Area.
5.2.1B Work with neighbouring councils to facilitate major projects with long-term delivery timeframes.
5.2.2A Develop an engagement program for services and facilities where regional collaboration would assist in their delivery, including those identified in the GRC Open Space, Recreation and Community Facilities Strategy.
5.3.1A Develop and build a brand and identity for the Georges River Local Government Area.
43 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Operational Plan
We will deliver the following by June 2024
Strategy 5.1.1: Promote Georges River as a place for innovation and collaboration and a desirable location for government and private investment.
5.1.1A Explore the viability of a university precinct in Georges River Local Government Area and new investment from government and private enterprise to increase the region’s competitiveness as a place for investment and innovation.
5.1.1Ai Develop an investment prospectus for the whole Georges River Local Government Area.
5.1.1Aii Continue to support medtech startups establishing in Kogarah.
5.1.1Aiii Implement grant projects that improve place, especially in key employment centres.
Strategy 5.1.2: Provide positive experiences across all customer interactions for our community and visitors.
5.1.2A Improve consistency and reliability of service across all customer contact channels.
5.1.2Ai Develop and implement the Georges River Council Customer Experience Strategy 2022 - 2027.
5.1.2Aii Establish a new baseline for Georges River website engagement and accessability utilising new and existing analytics tools.
Strategy 5.2.1: Advocate to all levels of government to ensure critical infrastructure accompanies residential and employment growth.
5.2.1A Develop an advocacy strategy that identifies how Georges River Council can influence government policy and secure government investment in the local government area.
5.2.1Ai Implement an Advocacy Program to raise Council's reputation/profile and ultimately influence government policy to secure government investment in the Georges River Local Government Area.
5.2.1B Work with neighbouring councils to facilitate major projects with long-term delivery timeframes.
5.2.1Bi Develop strategic partnerships to influence key government policy and bring investment to the Georges Local Government Area.
5.2.1Bii Deliver an engagement program for city and council advocacy.
City Futures
44 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 5.1.1
Executive Manager City Futures 5.1.1
Executive Manager City Futures 5.1.1
Code Deliverables/Actions Accountable CSP reference
Manager City Life 5.1.2
Manager City Life 5.1.2
Code Deliverables/Actions Accountable CSP reference
Executive Manager City Futures 5.2.2
Executive Manager City Futures 5.2.2
Executive Manager
5.2.2
Strategy 5.2.2: Investigate the opportunities for government land and shared facilities being used for open space and other uses e.g. schools and health.
Code Deliverables/Actions
5.2.2A Develop an engagement program for services and facilities where regional collaboration would assist in their delivery, including those identified in the GRC Open Space, Recreation and Community Facilities Strategy.
5.2.2Ai Continue with shared and joint use program with Department of Education.
Strategy 5.3.1: Demonstrate our environmental and cultural riches through policies, programs and projects to showcase and immerse our residents and visitors in our lifestyle.
Code Deliverables/Actions
5.3.1A Develop and build a brand and identity for the local government area.
5.3.1Ai Continue to develop and build a brand and identity for the Georges River Local Government Area.
Performance measures
Level of 'place satisfaction' for key and emerging centres.
Percentage of customers satisfied with the overall experience with their customer requests to Council. ≥ 80% Manager City Life
Customer satisfaction with face-to-face interaction at Council operated facilities. ≥ 80% Manager City Life
Council’s overall Customer Experience Rating. ≥ 65% Manager City Life
45 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Accountable CSP reference
Executive Manager City Futures 5.2.2
Accountable CSP reference
Executive Manager City
5.3.1
Futures
Measures Annual Target Responsibility
Level of satisfaction increases Manager Strategic Placemaking
2023/24 Budget
46 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual Charges 1,250 User Charges and Fees 6,302 Interest Income 30 Other Operating Revenues 695 Operating Grants and Contributions 1,465 Profit on Sale of Assets 487 Total Operating Revenue 10,228 Operating Expenditure Employee Costs 12,145 Interest ChargesMaterials and Services 12,229 Depreciation and Amortisation 23,322 Other Operating ExpensesTotal Expenditure 47,695 Capital Grants and Contributions 6,539 Operating Result before Capital Revenues - Surplus/(Deficit) (37,467) User Fees and Charges Other Revenues from Ordinary Activities Operating Grants and Contributions Rates and Annual Charges Depreciation Employee Costs Materials and Services Net Gain on Disposal of Assets
Income Expenditure
47 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
48 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Pillar 6
Our governance
Goal 6.1: Our community’s voice is considered in planning the area’s future.
Goal 6.2: Our decisions are based on evidence which consider financial impacts, the environment and impacts on future generations.
Goal 6.3: Our community knows why and how decisions are made.
Goal 6.4: The workforce is inspiring, diverse and engaged.
4 Year Deliverables
Pillar 6 deliverables for 2022-2026 are:
6.1.1A Embed a culture of continuous improvement where we use the feedback provided by the community to improve our programs and services.
6.1.1B Develop a service delivery review program of Council’s services.
6.1.1C Embed Council's Engagement Strategy as an overarching process for all Council engagement activity.
6.1.1D Refer a broad range of Council and community issues for engagement to Council’s Your Say platform.
6.1.1E Develop comprehensive engagement and communication plans for Council’s community engagements.
6.1.1F Develop an Annual Community Consultation Progress report.
6.1.1G Provide opportunities for the community to engage with their ward Councillors.
6.1.2A Deliver and report on Council's financial assistance program.
6.2.1A Facilitate the Audit, Risk and Improvement Committee (ARIC) to fulfil its responsibilities under the Local Government Act and ARIC Charter.
6.2.1B Promote and assist in creating an ethical organisational environment with emphasis on internal controls, efficiency, effectiveness and good governance.
6.2.1C Implement a Councillor training program to improve decision making, facilitate better communication with the local community and assist Councillors to acquire and maintain the skills needed to perform their role.
6.2.2A Ensure financial decisions address the key financial sustainability risks to secure Council's immediate and long-term future.
6.2.2B Ensure the Long-Term Financial Plan incorporates strategic priorities and risks.
6.2.2C Ensure financial policy and process improvements focus on the integrity of controls, improved data for business decisions and customer experience.
6.2.3A Annually review Council’s enterprise and operational risks.
6.2.4A Review procurement policy and practice through the Local Government Procurement Program.
6.2.5A Implement the Digital Resourcing Management Plan.
6.3.1A Maintain online public registers as required under the Government Information (Public Access) Act 2009 (GIPA) and Designated Persons disclosure returns (section 4.21-4.27 of Council's Code of Conduct).
49 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
6.3.1B Report to the Office of Local Government and the NSW Ombudsman on Code of Conduct and Public Interest Disclosure matters in accordance with statutory reporting requirements.
6.3.1C Comply with all requirements of Integrated Planning and Reporting legislation, including progress reports for the Community Strategic Plan, Delivery Program and Operational Plan.
6.3.1D Provide live webcasting of all Council and Committee meetings.
6.3.1E Maintain online records of Council and Committee papers and minutes.
6.4.1A Implement a Workplace Health and Safety System to support a well and safe workplace.
6.4.1B Implement the 2022-2026 Workforce Management Plan.
Operational Plan
We will deliver the following by June 2024
Strategy 6.1.1: Commit to consult and engage the community on projects, initiative and issues which have an impact on their lives.
Code Deliverables/Actions
6.1.1A Embed a culture of continuous improvement where we use the feedback provided by the community to improve our programs and services.
6.1.1Ai Undertake the biannual community satisfaction survey and provide results to managers and the Executive team for action.
6.1.1B Develop a service delivery review program of Council’s services.
6.1.1Bi Redesign the process to enable faster, simpler reviews, focussed on building organisational capability and impact, and incorporating service reviews outcomes into business as usual.
6.1.1Bii Conduct an organisation wide review of Council services including commercial property, paid parking and premium facilities.
6.1.1C Embed Council's Engagement Strategy as an overarching process for all Council engagement activity.
6.1.1Ci Re-establish the Your Say panel and undertake an ongoing survey to continue to improve the Your Say platform and Council’s approach to engaging with the community.
6.1.1Cii Develop an intranet suite of resources to support all Council staff to create more opportunities for community engagement.
50 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Accountable CSP reference
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
Executive Manager City Futures 6.1.1
6.1.1D Refer a broad range of Council and community issues for engagement to Council’s Your Say platform.
6.1.1Di Use a broad range of tools in community engagements.
6.1.1E Develop comprehensive engagement and communication plans for Council’s community engagements.
6.1.1Ei Create and implement Engagement and Communications Plans for major projects where Council is seeking community engagement utilising Council's communications channels.
6.1.1Eii Maintain on Your Say a community facing dashboard on engagement activity.
6.1.1F Develop an Annual Community Consultation Progress report.
6.1.1Fi Develop a comprehensive community engagement report for Council's annual report.
6.1.1G Provide opportunities for the community to engage with their ward Councillors.
6.1.1Gi Provide a Meet Your Ward Councillor session for each ward annually.
6.1.2A Deliver and report on Council's financial assistance program.
6.1.2Ai Provide reports on Council's financial assistance program, including community grants, microgrants, venue hire program, heritage grants, heritage publication grants, and donations program.
51 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Executive
6.1.1
Manager City Futures
Executive Manager City Futures 6.1.1
Executive
6.1.1
Manager City Futures
Executive Manager City Futures 6.1.1
Manager Office of the General Manager 6.1.1
managed effectively. Code Deliverables/Actions Accountable CSP reference
Strategy 6.1.2: Ensure Council’s financial assistance and grants programs are
Manager Community and Early Learning Services 6.1.2
Strategy 6.2.1: Ensure the behaviour and decisions of councillors and staff is professional and ethical.
6.2.1A Facilitate the Audit, Risk and Improvement Committee (ARIC) to fulfil its responsibilities under the Local Government Act and ARIC Charter.
6.2.1Ai Facilitate ARIC reports to Council on activities and functions, including an Annual Report from the ARIC Chair.
6.2.1Aii Facilitate replacement of ARIC Chair in June 2022. Recruit 1 new ARIC member to the Committee to replace outgoing/retiring Chair.
6.2.1Aiii Prepare an annual ARIC Responsibility Calendar reflecting Local Government and ARIC Charter requirements to be completed throughout the year.
6.2.1B Promote and assist in creating an ethical organisational environment with emphasis on internal controls, efficiency, effectiveness and good governance.
6.2.1Bi Complete the 2022/23 Audit Program.
6.2.1Bii Implement any mandatory internal audit guidelines issued by the OLG.
6.2.1Biii Continue to roll out education programs, provide good governance to the organisation and implement effective safeguards in order to provide assurance that Council is delivering a high standard of ethical behaviour.
6.2.1C Implement and deliver a Councillor induction and professional development program to ensure the Mayor and Councillors are aware of the knowledge, skills and personal attributes expected of them in their civic roles under the Local Government Act 1993, and of the support Council should be providing to ensure they are able to effectively fulfil their roles.
6.2.1Ci Provide ample training and development opportunities (offered both externally and internally) to ensure diversity of choice and availability.
6.2.1Cii Provide opportunities for a recommended minimum of 12 hours of skill and/or development training to be achieved by each Councillor annually.
52 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Chief Audit Executive 6.2.1
Head of Governance
6.2.1
and Risk
Manager
the General Manager 6.2.1
Office of
Manager Office of the General Manager 6.2.1
Strategy 6.2.2: Maintain a sustainably strong financial position balanced with demand for essential services and new projects and having regard for Section 8(b)(d)(ii) of the Local Government Act (the current generation funds the cost of its services).
6.2.2A Ensure financial decisions address the key financial sustainability risks to secure Council's immediate and long-term future.
6.2.2Ai Align the annual budget strategy to incorporate proposed new projects and programs and to facilitate financially sustainable decisions.
6.2.2B Ensure the Long-Term Financial Plan incorporates strategic priorities and risks.
6.2.2Bi Ensure the annual Long Term Financial Plan adequately highlights emerging risks and outlined actions to remediate.
6.2.2C Ensure financial policy and process improvements focus on the integrity of controls, improved data for business decisions and customer experience.
6.2.2Ci Expand payment channels and self-service online access for financial processes.
6.2.3A Annually review Council’s enterprise and operational risks.
6.2.3Ai
53 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Chief Financial Officer 6.2.2
Chief Financial Officer 6.2.2
Chief Financial Officer 6.2.2 Strategy 6.2.3: Undertake effective risk management to manage risks that may arise. Code Deliverables/Actions Accountable CSP reference
Head of Governance and Risk 6.2.3
Review and report on the Governance and Risk Frameworks status to the Audit, Risk and Improvement Committee. Head of Governance and Risk 6.2.3 Strategy 6.2.4: Ensure procurement policies and practices demonstrate best practice in probity assurance and legislative compliance. Code Deliverables/Actions Accountable CSP reference
Maintain the focus on education, awareness and mitigation with respect to risk management and fraud control.
6.2.3Aii
6.2.4A Review procurement policy and practice through the Local Government Procurement Program.
training,
Chief Financial Officer 6.2.4
6.2.4Ai Focus on procurement and contracts governance strategies and practices via continued
reporting and awareness.
Strategy 6.2.5: Undertake effective management of council’s digital framework to enable responsive and timely services and information.
6.2.5A Implement the Digital Resourcing Management Plan.
6.2.5Ai Continue to implement digital transformation initiatives that improve our e-planning, regulatory and asset management services.
6.2.5Aii Engineering Trust through the implementation of the independent information security audit program, to build business resilience and safeguard Council's information.
6.2.5Aiii Implement Annual program of funded initiatives for organisational plans of Council: - Customer and Digital Experience Program - Cultural Program - 2030 Library Strategy - 2021-2031 Early Learning Services Strategy.
6.2.5Aiv Review Council’s Enterprise architecture to future proof and enable secure, scalable information services.
Strategy 6.3.1: The community is informed, has access to information and Council reports and reports from other levels of government, institutions and organisations pertaining to Georges River are made public.
6.3.1A Maintain online public registers as required under the Government Information (Public Access) Act 2009 (GIPA) and Designated Persons disclosure returns (section 4.21-4.27 of Council's Code of Conduct).
6.3.1Ai Continue to maintain online public registers as required including gifts and benefits and Councillor disclosures of interest returns.
6.3.1B Report to the Office of Local Government and the NSW Ombudsman on Code of Conduct and Public Interest Disclosure matters in accordance with statutory reporting requirements.
6.3.1Bi Continue reporting statistics to the Office of Local Government, NSW Ombudsman and the Information Privacy Commission under provisions of related Acts and Council's Procedures for the Administration of the Code of Conduct in accordance with statutory reporting requirements.
54 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Code Deliverables/Actions Accountable CSP reference
Chief Information Officer 6.2.5
Chief Information Officer 6.2.5
Chief Information Officer 6.2.5
Chief Information Officer 6.2.5
Code Deliverables/Actions Accountable CSP reference
Head of Governance and Risk 6.3.1
Head of Governance
Risk 6.3.1
and
6.3.1C Comply with all requirements of Integrated Planning and Reporting legislation, including progress reports for the Community Strategic Plan, Delivery Program and Operational Plan.
6.3.1Ci Communicate Council’s progress against the Community Strategic Plan, Delivery Program and Operational Plan.
6.3.1D Provide live webcasting of all Council and Committee meetings.
6.3.1Di Recordings of all Council and Committee meetings to be available on Council's website for a period of four years (from 2021 onwards).
6.3.1E Maintain online records of Council and Committee papers and minutes.
6.3.1Ei Ensure the unconfirmed minutes of each meeting of Council are published on Council's website within five business days.
6.4.1A Implement a Workplace Health and Safety System to support a well and safe workplace.
6.4.1Ai Evaluate Work, Health and Safety (WH&S) procedures and implement effective controls to manage WH&S risks.
6.4.1B Implement the 2022-2026 Workforce Management Plan.
6.4.1Bi Design and Implement Council’s Performance Excellence Program to achieve leading practices in reviewing, managing and recognising performance, fostering an environment where employees are engaged, aligned and motivated to excel in their roles.
6.4.1Bii Deliver a Leadership Program to unite leaders of the organisation and drive a thriving culture where leaders inspire staff and teams to achieve our operational and strategic goals to provide quality outcomes for our community.
6.4.1Biii Implement Council’s wellness and belonging program to drive a healthier, happier and more productive and engaged workforce, and promote Council as an employer of choice.
55 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Manager Office of the General Manager 6.3.1
Manager Office of the General Manager 6.3.1
Manager Office of the General Manager 6.3.1 Strategy 6.4.1:
people practices to create a high performing, capable and resilient workforce. Code Deliverables/Actions Accountable CSP reference
Implement leading
Manager People and Culture 6.4.1
Manager People and Culture 6.4.1
Manager People and Culture 6.4.1
Manager People and Culture 6.4.1
Performance measures
Actual year-to date income is no more than +/- 5% from the year-to-date approved budget.
Actual year-to-date expenditure is no more than +/- 5% from the year-to-date approved budget.
Investment portfolio returns for the past 12 months exceeding industry benchmark as disclosed by CPG.
Rates and annual charges outstanding
Percentage compliance with statutory and legislative reporting requirements (Office of Local Government Compliance Calendar).
Percentage of WHS Incident Management Corrective Actions finalised within agreed times
Percentage of Cyber Threats blocked
Cyber Threat Preparedness
Percentage of Critical devices on Council's network fully patched
Percentage of correspondence responded to within 14 days.
Percentage of complaints completed within agreed times.
Percentage of customers satisfied with the overall experience with their customer requests to Council.
Customer satisfaction with face-to-face interaction at Council operated facilities.
Council's overall Customer Experience rating
Percentage of customer requests completed within agreed times.
Percentage of legal cases determined in accordance with Council’s corporate and strategic objectives including successful prosecutions (convictions) and/or fines for major environment offences, including tree breaches.
Attempted resolution of Class 1 merit appeals by way of alternative dispute resolution such as s34 conciliation wherever possible and appropriate.
under budget
under budget
Exceeded
100%
60%
80%
80%
80%
90%
80%
80%
65%
80%
75%
of Governance and Risk
People and Culture
Information Officer
Information Officer
Information Officer
City Life
City Life
City Life
City Life
City Life
City Life
Legal Services
100%
Legal Services
Council decisions made at meetings closed to the public. < 10% Manager Office of the General Manager
Council Meeting business papers to be publicly available on Council's website at least three days prior to each meeting.
Percentage of Committee Meeting business papers publicly available on Council's website at least three days prior to each meeting.
3
Manager Office of the General Manager
Manager Office of the General Manager
56 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Annual Target Responsibility
Measures
-5%
Chief Financial Officer
-5%
Chief Financial Officer
Benchmark
Chief Financial Officer
<5% Chief Financial Officer
=
Head
≥
Manager
Chief
=100%
≥
Chief
≥
Chief
>
Manager
≥
Manager
≥
Manager
≥
Manager
≥
Manager
≥
Manager
>
Manager
=
Manager
≥
=100%
Measures
Annual Target Responsibility
Number of registered speakers at Council Meetings. > 5
Number of registered speakers at Committee Meetings. > 0
Manager Office of the General Manager
Manager Office of the General Manager
2023/24 Budget
Income Expenditure
58 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budget 2023/24 $,000 Operating Revenue Rates and Annual Charges 83,323 User Charges and Fees 176 Interest Income 2,595 Other Operating Revenues 1,052 Operating Grants and Contributions 5,090 Profit on Sale of Assets 136 Total Operating Revenue 92,372 Operating Expenditure Employee Costs 12,077 Interest ChargesMaterials and Services 12,189 Depreciation and Amortisation 1,587 Other Operating Expenses 3,315 Total Expenditure 29,168 Capital Grants and ContributionsOperating Result before Capital Revenues - Surplus/(Deficit) 63,204 Rates and Annual Charges Interest Other Revenues from Ordinary Activities Operating Grants and Contributions Employee Costs Other Expenses Materials and Services Depreciation
59 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Financial Estimates
About the 2023/24 Budget
The annual budget adopted by Council forms our Long-Term Financial Plan (LTFP) which is an essential tool for securing sustainability.
As per the relevant legislation, financial decision making is to give due consideration to promoting the financial sustainability of Council through:
• the progressive elimination of operating deficits;
• the establishment of a clear revenue path for all rates linked to specific expenditure proposals;
• ensuring that any proposed increase in services and/or assets is within the financial means of Council including or pursue a Special Rate Variation;
• ensuring the adequate funding of infrastructure maintenance and renewal;
• the use of borrowing is appropriate and financially responsible; and
• the fair and equitable distribution of the rate burden across all ratepayers.
The 2023/24 Budget has been developed based on the 2023/24 Budget Strategy and the Independent Pricing and Regulatory Tribunal (IPART) approval for a Special Rate Variation. A requirement of our approved Special Rate Variation from IPART is to identify $12 million in permanent cost containment and efficiencies over the period of 2022/23 to 2024/25.
The 2023/24 Budget will be the second year Council is forecast to achieve a surplus and difficult prioritisation of valued services, projects and programs will be essential in achieving financial sustainability and compliance with Council legislative obligations.
After a number of years with constraints to Council’s cash contribution to funding capital projects, the 2023/24 draft budget includes increased Council contribution to critical asset classes, such as roads, footpaths and buildings. This increase in Council’s contribution is attributed to adopted budget surplus in 2022/23. Other capital projects have been prioritised to focus on grant and contribution funded projects along with high priority critical classification.
In order to achieve the surplus target, the budget has been prepared on the following strategy:
• Objective of achieving an operating surplus with future years projection as per the adopted LTFP
• Application of the approved Special Rate Variation of 5.8%
• Prepared in accordance with the IPART approval to identify $12 million in permanent cost containment and efficiencies over the period of 2022/23 to 2024/25 (i.e. these cuts to expenditure cannot be reintroduced in future years)
• Cost reduction strategy applied to both employee costs and materials and services, with an aim of $6 million
• Service levels have been capped to align with constrained resources and achieve the operating surplus adopted in the LTFP
• Award increase is 4.5% ($2.5 million), plus Superannuation increase 0.5% ($270,000 annually)
• The employee costs reduction strategy has been amended to be based on a natural vacancy rate of 6% and a 16-week recruitment trend, rather than enforced holds
• Two-week Christmas shutdown that includes the provision of three grant days
• Historically high CPI increase of 7.8% has been applied across a broad range of materials, services and expenses (note: current trends are indicating large increases in labour, materials, fuel costs etc.)
• Income projections are based on business as usual
• Subsidies are proposed to be applied to Council’s premium facilities, commercial, community facilities
• Investment interest income has been projected to increase based on an assumed improvement in rate of return
• Domestic waste charges have increased in line with the CPI increase of 7.8%
• The mandatory (legislated) pensioner rebate has been maintained at $1 million
• Depreciation is forecast to increase by $1.9 million due to asset condition deterioration and the rising cost of replacement
60 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
• Eligible Fees and Charges have been set at a 7.8% increase to ensure cost recovery of the material cost increases
• Council’s rates default level has been assumed to stay within benchmark parameters of less than 5%.
• A Councillor Discretionary Ward fund has been included as part of the budget strategy
• Minimal disposal of underperforming/end of life assets (plant)
• Insurance premiums have been set to increase based on natural disaster, cost of replacement, etc
• Community and sporting group rental subsidies remain unchanged ($1.5 million in forgone income)
• Venue hire program remains unchanged ($420,000 in forgone income)
• Childcare fees have been set to comply with the Childcare Policy of cost neutral operating budget
• Strategic land acquisitions have been included as per the gazetted LEP
• Budget bids have been selected and prioritised based on legislative, strategic and safety drivers with over $9 million in additional operational projects, bids or other costs deferred/removed/reduced in 2023/24
• The multiyear Capital Program Budget has increased from $64.6 million to $102.1 million, which is an increase of $37.5 million, with forecast cash expenditure to be occurring across the years 2022/23 and 2025/26
• The capital program has been formulated based on the following criteria:
a. Ensure program aligns to the Long-Term Financial Plan ($35 million per year)
b. Have an eligible funding source
c. Aligns to strategic asset management principles
d. Link to a Masterplan and/or adopted Strategic Plan
e. Consideration of environmental factors
• Over $400 million in capital projects continue to have been deferred.
Based on this approach, the adopted surplus of $3.4 million remains on track to deliver future year surpluses in the medium term. The final years of the Long-Term Financial Plan (LTFP) indicate a deficit position will occur in the last 2 years (shown as Model 1 in the Resourcing Strategy), and will need to be addressed in coming years.
Full details of Council’s 10 years LTFP, which includes the budget result, are outlined in the Resourcing Strategy.
Capital Program
The revised program has been developed by established clear priorities. All projects included in the 2023/24 Capital Program:
• Align to the Resourcing Strategy 2022/23 and LongTerm Financial Plan
• Have an identified eligible funding source(s)
• Adhere to strategic asset management principles and practices
• Link to a Plan of Management (POM), Master Plan, Council Strategy/Plan and/or Stakeholder Plan
• Support Council’s recently adopted Environmental Resilience Action Plan 2022-2040.
Funding for the 2023/24 program is predominantly based on grant funding, developer contributions and external reserves, with use of general revenue focused on roads and critical safety program items and capitalised salaries. The following new projects have been proposed:
• Plant and Light Vehicle Fleet Replacement
• Road Re-sheeting Program
• Community Asset Critical Safety Program
• Footpath Critical Safety Program
• Buildings Asset Critical Safety and Renewal Program
• Recreation Asset Critical Safety and Renewal Program
• Traffic Facilities Construction and Upgrade Program
• Stormwater Drainage Critical Investigation and Renewal Program
• Annual Information Management and Technology and Library Resource Renewal
• Land acquisitions for open space
• Information Management and Technology (Cyber Security, computer/device hardware and software implementation).
The following projects will continue into 2023/24:
• Gannons Park Works – Final Stage
• Hurstville Oval Cricket Pavillion
• Olds Park Recreational and Sporting Hardscape Precinct
• Hardiman Reserve (former Oatley Bowling Club site) Master Plan Works
• Hurstville Revitalisation Program
• Kogarah War Memorial Pool Site Remediation
• Dairy Creek Stormwater Works
• Open Space Acquisition Program
61 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Budgeted Income Statement
62 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2027/28 Estimate $'000$'000$'000$'000$'000 Operating Revenue Rates and Annual Charges 116,543122,092127,939130,499133,111 User Charges and Fees 16,33316,90417,49617,91418,326 Interest and Investment Revenue 5,4003,4203,4743,5623,651 Other Revenues 14,06314,42214,92615,28515,636 Operating Grants and Contributions 12,24611,78512,19712,48912,776 Profit on Sale of Assets 623 560 560 560560 Total Operating Revenue 165,208169,183176,592180,309184,060 Operating Expenditure Employee Costs 64,25666,15868,41371,21672,581 Interest Charges 0 5 6 7 7 Materials and Services 65,48366,58570,01771,07072,195 Depreciation and Amortisation 27,61125,74727,69128,88630,074 Other Operating Expenses 4,5034,2604,4094,5144,618 Total Expenditure 161,853162,755170,536175,693179,475 Operating Result before Capital Revenue 3,3556,4286,0564,6164,585 Capital Grants and Contributions18,97610,84711,22711,49611,761
Budgeted Statement of Financial Position
Reserve 255,035255,035255,035255,035255,035
1,707,8351,725,1101,742,3931,758,5051,774,851
63 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2027/28 Estimate $'000$'000$'000$'000$'000
Assets Cash, Cash Equivalents and Investments 206,044211,640216,877222,851228,913 Receivables 9,8418,4888,8449,0389,232 Inventories 154 159 165 169 173 Other 550 550 550 550 550 Non-current Assets Property, Plant and Equipment1,512,4851,526,4171,538,4651,549,3831,559,173 Investment Property 27,95327,95327,95327,95327,953 Intangible Assets 1,1071,4481,7291,950 2,111 Right of Use Assets 159 99 229 164 99 Total Assets 1,758,2931,776,7541,794,8121,812,0581,828,204 LIABILITIES Current Liabilities Payables (26,429)(27,192)(27,267)(27,756)(27,265) Lease Liabilities (41) (40) (39) (39) (40) Borrowings 0 0 0 0 0 Unexpended Operating Grants (2,000)(2,000)(2,000)(2,000)(2,000) Unexpended Capital Grants (6,000)(6,000)(6,000)(6,000)(6,000) Accruals
Non-Current Liabilities Borrowings 0 0 0 0 0 Lease Liabilities (144) (99)(244)(198)(151) Provisions 0 0 0 0 0 Total Liabilities (50,458)(51,644)(52,419)(53,553)(53,353) EQUITY Accumulated surplus
Revaluation
Total
ASSETS Current
and Provisions (15,844)(16,313)(16,869)(17,560)(17,897)
1,452,8001,470,0751,487,3581,503,4701,519,816
Equity
Budgeted Statement of Cash Flows
64 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2027/28 Estimate $'000$'000$'000$'000$'000 OPERATING ACTIVITIES Receipts Rates and Annual Charges 116,180123,202127,762130,422133,032 User Charges and Fees 16,49116,82517,41517,85718,270 Grants and Contributions 12,09511,79612,15212,45712,745 Cash received, not recognised as Revenue 275500500500500 Cash received in Previous year, recognised as Income in Current (575)(500)(500)(500)(500) Other 13,84014,32814,82915,21715,568 Payments Employee Benefits and On-Costs (63,855)(65,689)(67,857)(70,525)(72,244) Materials and Services (63,786)(66,273)(70,417)(70,916)(73,018) Other (4,392)(3,754)(3,886)(4,128)(4,234) Borrowing Costs (0)(5)(6)(7)(7) Net Cash Provided from Operating Activities 26,27330,43029,99230,37730,112 INVESTING ACTIVITIES Receipts Investment & Interest Revenue Received 4,7523,7733,4643,5473,635 Capital Grants & Contributions 18,97610,84711,22711,49611,761 Cash received, not recognised as Revenue 2,1002,1002,1002,1002,100 Cash received in Previous year, recognised as Income in Current (5,794)(2,100)(2,100)(2,100)(2,100) Proceeds from Sale of Assets 1,2631,2001,2001,2001,200 Payments Capital Works and Purchase of Fixed Assets (44,837)(40,608)(40,600)(40,600)(40,600) Lease Payment (Principal) on Right of Use Assets (46)(46)(46)(46)(46) Net Cash Provided from Investing Activities (23,586)(24,834)(24,755)(24,403)(24,050) FINANCING ACTIVITIES Receipts Proceeds from Borrowings 0 0 0 0 0 Payments Loan Principal Payment 0 0 0 0 0 Net Cash Provided from Financing Activities 0 0 0 0 0 Net/Increases/Decreases in Cash, Cash Equivalents and Investments 2,6875,5965,2375,9746,062 Opening Cash Balance – Beginning of the Year203,357206,044211,640216,877222,851 Total Cash, Cash Equivalents and Investments 206,044211,640216,877222,851228,913
Projected Restricted Cash Reserves Balances
65 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2019/2020 Actual 2020/2021 Actual 2021/2022 Actual 2022/23 Revised Q2 Budget 2023/24 Budget $'000 $'000 $'000$'000 Externally Restricted Closing Balances Developer Contributions 75,054 73,720 82,27079,96589,493 Specific Purpose Unexpended Grants 1,636 3,701 8,1438,1438,143 Domestic Waste Management Reserve 21,609 20,336 20,91313,67811,448 Stormwater Management 513 1,263 1,8041,4471,778 Environmental Levy 93 93 93 9393 Town Improvement Levy Funds 2,932 3,402 2,2342,1262,150 Infrastructure Plus 176 1,203 519 203203 Total Externally Restricted Balances 102,013 103,718 115,976105,654113,309 Internally Restricted Closing Balances Employee Leave Entitlements 6,561 6,126 6,1266,1266,126 Plant and Vehicle Replacement 4,158 6,877 7,8843,8842,071 Election 1,273 1,623 1,8231,2651,465 Childcare Equipment 1,209 1,014 956 956566 Hurstville Golf Course 127 82 112 112112 Financial Assistance Grant 2,290 2,350 3,6143,6143,614 Bonds and Damage Deposits 4,240 4,240 4,2404,2404,240 Merger Initiatives Allocation 2,767 1,388 1,388 218418 Stronger Communities Fund 4,593 3,672 1,790 117117 Assets, Roads and Infrastructure Management 6,365 3,702 6,51414,98414,734 Commercial Property 1,959 11,505 20,27916,15515,404 Strategic Centres 5,742 5,743 5,7435,7435,743 Revolving Energy 44 32 69 105141 Tree Preservation 452 535 606 666666 Aquatic Facilities 1,312 115 115 115115 Outdoor Synthetic Sports Fields Reserve 24 124 114 114114 Heritage Building Grants Program Reserve 0 77 67 1717 Street Lighting Project Reserve 0 152 179 179179 Passenger Sustainable Fleet Reserve 0 031 3131 Waste Strategy Implementation Reserve 0 0168 1682,550 Net Zero Emissions Reserve 77 Pooling Contributions Reserve 0 0 0 010,600 Total Internally Restricted Balances 43,116 49,357 61,81858,81669,030 Total Restricted Cash Reserve Balances 145,129 153,075 177,794164,471182,339 Unrestricted Cash Balance 287,21710,00032,00723,703
Key Performance Indicators
Operating Performance Ratio
(Measures the extent of Council's Revenue (net of Capital Grants) coverage of Expenditure)
Debtor Collection Rate - Other Debtors (net of Rates)
useful Life of Assets
as a % of Gross Cost of Assets)
66 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Benchmark 2023/24 Estimate 2024/25 Estimate 2025/26 Estimate 2026/27 Estimate 2027/28 Estimate
0% 2.1% 3.5% 3.1% 2.3% 2.2% Own
dependence
> 80% 87.2% 87.4% 87.5% 87.5% 87.4% Unrestricted
Ratio (Measures Council's liquidity) > 1.5x 1.8 1.8 1.8 1.9 1.9 Debt
capacity to
> 2.0x No Debt No Debt No Debt No Debt No Debt
> 1.1x 0.8 0.8 0.8 0.7 0.7 Own Source Revenue Growth (Measures Council's increase of own source revenue) > 0% 9% 3% 4% 2% 2% Debtor Days Outstanding - Rates < 30 15.0 11.0 11.0 11.0 11.0 Debtor Days OutstandingOther Debtors (net of Rates) (Measures Council's management of Debtors) < 30 45.0 44.0 44.0 44.0 44.0 Debtor Collection Rate - Rates = > 100% 99.7% 100.9% 99.9% 99.9% 99.9%
Source Revenue Generated (w/o Grant income) (Measures Council's
on Grants income)
Current
Service Cover Ratio (Measures Council's
service debt)
Capital Works & Asset renewals (Measures Council's expenditure on renewal of assets in relation to the annual Depreciation charge)
of
= > 100% 99.4% 100.3% 99.6% 99.7% 99.7% Cash Coverage Ratio (Measures Council's Cash coverage of Expenditure) > 3 Mths 7.4 7.4 7.3 7.3 7.4 Remaining
> 60% 67.4% 66.6% 65.7% 64.8% 63.8% Repairs
% of WDV of Assets 1% 0.5% 0.5% 0.5% 0.5% 0.5%
(Measures Council's Collection Rate
Debtors)
(Expressed
& Maintenance as a
Budgeted 2023/24 Capital Program
67 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Capital Program by Asset Class Q3 Review Adopted Budget Capital Program Expenditure Forecast Total Program $'000 2022/23 $'000 2023/24 $'000 2022/23 $'000 2023/24 $'000 2024/25 $'000 New Assets Build Non Specialised 14,441 10,110 6,421 13,030 5,100 24,551 Build Specialised 485 - 485 - 485 Footpaths 2,127 505 2,127 505 - 2,632 Furniture and Fittings 24 - 24 - - 24 Open Space/Recreational 4,180 1,190 1,365 1,850 2,155 5,370 Operational Land Council Owned - - - -Other Structures 6,401 725 4,007 3,119 - 7,126 Plant and Equipment - - - -Roads 1,652 1,027 807 1,872 - 2,679 Software Licenses and System Development - - - -Stormwater - - - -Various Plant and Equipment Other 375 - 375 - - 375 Sub-Total 29,685 13,557 15,126 20,861 7,255 43,242 Renewal of Assets Buildings - Non Specialised 35 2,290 - 2,325 - 2,325 Building Specialised - - - - -Footpaths 1,436 961 974 1,423 - 2,397 Furniture and Fittings - - - -Library Collections 410 442 410 442 - 852 Office Equipment 160 420 160 420 - 580 Other Space/Recreational 14,442 5,570 1,924 15,123 2,965 20,012 Other Structures 622 525 155 992 - 1,147 P&E 4,072 2,300 2,372 4,000 - 6,372 Plant and Equipment 10,114 8,250 10,114 8,250 - 18,364 Stormwater 1,749 1,591 1,480 1,860 - 3,340 Various Plant and Equipment Other 350 - 281 69 - 350 Sub-Total 33,390 22,349 17,870 34,904 2,965 55,739 Capitalised Project Salaries 1,502 1,600 1,502 1,600 - 3,102 Total 64,577 37,506 34,498 57,365 10,220 102,083 *Allocated to specific projections during the financial year.
Rating and Revenue Policies
Rating Structure
Council’s rate revenue is regulated by the NSW Government and this arrangement is known as rate pegging. Rate pegging limits the amount that Council can increase its total annual rate revenue from one year to the next. Any increases above the rate peg, require approval by the Independent Pricing and Regulatory Tribunal (IPART) and are known as a Special Rate Variation.
Following extensive consultation with the community over a number of years and Council received formal approval from IPART on its New Rates application in May 2021. The New Rates application included:
• Retaining the expiring former Hurstville City Council’s Special Rate Variation;
• Increasing Council’s total rate income over the next five years to maintain service standards (5.8% per year for five years);
• A single, fair, equitable and consistent rating system for the entire Georges River Area; and
• Identifying $12 million in ongoing savings over the three year period from 2022/23 to 2024/25 ($4 million per year).
Alternatives to the New Rates application were explored with the community and Council. There was no support for a larger increase, a reduction in services and/or reduction of staff levels. The rate increase was the only feasible option to maintain existing levels of service. As without the rate increase, Council’s financial position was significantly challenged. Any new/expanded services, a larger capital works program or additional staffing level would require an additional Special Rate Variation, or corresponding reduction to the current service portfolio/levels to offset.
Land Values
Each year, the annual rate revenue distribution is calculated based on a property’s latest valuation received from the NSW Valuer-General. Council cannot make and levy a rate in respect of a parcel of land unless furnished with a valuation of that land under the Valuation Land Act 1916.
Every three years, the NSW Valuer General provides new land values for Council to use in calculating and distributing rates. For 2023/24 rating year, Council will be applying the new land values undertaken on 1 July 2022.
Changes to land valuations will impact on the distribution of rates payable by individual households or businesses. Though, increases/decreases in land values do not necessarily lead to similar increases/ decreases in rates, as land values are used to fairly distribute and calculate Council's annual rate revenue across ratepayers.
Categorisation of land for the purposes of ordinary rates Council determines rating categories for rating purposes in accordance with Sections 514 -529 of the LG Act and Local Government (General) Regulation 2005 (the Regulations).
Non-rateability
Council deems land to be non-rateable strictly in accordance with Sections 555 and 556 of the LG Act. Residential and business categories
The LG Act only allows four available categories for rateable land, including farmland and mining, which are not applicable within the Georges River Council LGA. All rateable land within this LGA are categorised as either residential or business. As noted within Section 518 of the LG Act, land that does not satisfy the criteria to be deemed residential, farmland or mining will be categorised and rated as business. The business category applies to land that is used for industrial and commercial operations and can also include car spaces and storage lots.
Council will use the plans approved under a development application or building application as a bases for determining the initial categorisation of a property, unless other more relevant information is available. The ratepayer will be advised through the issue of an annual or supplementary rate notice.
68 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Mixed development
There are instances where a property is used for both residential and business purposes. If applications are submitted to and approved by the Valuer General NSW, Council will be advised of the residential and business rate portions to enable a mixed rate to be levied.
Change of category for rating purpose
A review of the categorisation of land for rating purposes may arise in response to a ratepayer request (application), Or because Council elects to review one or a number of parcels of land or because it believes that the current categorisation may be incorrect.
Council may request further information and or access to inspect the property to assist with making this determination.
Applications for a change in categorisation of land for rating purposes must be made on the approved form that can be found on Council’s website.
The ratepayer will be formally advised in writing of the outcome and where applicable, will receive an annual or supplementary rate notice.
Ratepayers with a property that is used for both a business and residential purpose should also make an application for a change in categorisation of land for rating purposes on the approved form if they wish to change from one category to mixed use rating.
Rating new parcels of land
Council will, upon registration of a new strata plan or deposited plan re-rate the property(s) from the first day of the subsequent financial quarter in which the subdivision or consolidation was registered. Conversely, rates will be reversed off the original (parent property/s) from the last day of the financial quarter in which the plan was registered.
The application of pro-rata rates and charges is consistent with quarterly instalment billing as per Section 562 of the LG Act. The Council will issue a notice for the new parcel/s for the current rating year.
Postponement of rates
Where a property is used as a single dwelling but, due to zoning or permitted use has a land value that reflects the potential use rather than the actual use, we will provide a postponement of rates in accordance with Section 591 of the LG Act. These postponed rates, together with the accrued interest, are abandoned after five years unless the use of the property changes; at that point the rates become payable
Aggregation of land parcels (lots) for the purposes of ordinary rates – rating of car spaces and storage lots Where a lot for a strata unit includes part lots for car and/or storage lots, only one rateable valuation exists and therefore only one rate is calculated on the total value of the unit, car and storage lots.
Where car and/or storage lots are separately titled, they attract their own unit entitlement and rateable value separate from the strata unit. In this circumstance, Council may allow the rateable values to be aggregated and a single rate to be levied on the combined rateable value in accordance with Section 548A of the LG Act, subject to the limitations below.
• All lots are used in conjunction by the occupier of the unit (the Lots are not leased out separately);
• The ownership of each lot is exactly the same on the certificate of title;
• The lots are within the same strata plan;
The levying of rates on the combined rateable value will commence from the subsequent financial quarter following receipt of the application and payment of the applicable fee.
Refund of additional payments
Refunds may be made on request for overpayments. Refunds for payments made in advance for instalments may be subject to a refund fee.
69 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Rate Structure Summary
The following table provides a summary of the 2023/24 rates structure. It shows the number of rateable properties within each of the rating categories (and subcategory), listed according to those to be rated at the minimum amount, and the rate in the dollar applicable to the category.
70 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2022/23 Rate Structure Rate in $ No. of Properties Residential Georges River Council - Ordinary Ad-valorem 0.0011298 24,521 Georges River Council - Ordinary Minimum 1,047.00 30,396 Subtotal Residential 54,917 Business Business General - Ordinary Ad-valorem 0.0026168 318 Business General - Ordinary Minimum 1,193.00 160 Business Industrial - Ordinary Ad-valorem 0.0032111 539 Business Industrial - Ordinary Minimum 1,193.00 368 Business Local - Ordinary Ad-valorem 0.0035193 652 Business Local - Ordinary Minimum 1,193.00 157 Business Major Shopping Complex - Ordinary Ad-valorem 0.0111165 8 Business Major Shopping Complex - Ordinary Minimum 1,627.00 0 Business Strategic Centres - Ordinary Ad-valorem 0.0035903 466 Business Strategic Centres - Ordinary Minimum 1,627.00 930 Subtotal Business 3,598 Total 58,515
Debt Management and Hardship policy
Pensioner rebate policy
Holders of a Pensioner Concession Card who own and occupy a rateable property are eligible for a pensioner concession. The Local Government Act provides for a pension rebate of up to 50 per cent of the aggregated ordinary rates and domestic waste management service charges, to a maximum of $250.
Under the State's mandatory Pensioner Concession Scheme, the State Government reimburses Council 55% of the rates and charges written off and Council funds the remaining 45%.
Interest on Overdue Rates
Council must set the interest payable on overdue rates and charges for 2023/24 in accordance with Section 566(3) of the LG Act. Council will apply the maximum rate (9%) as set by the Minister for Local Government, for interest payable on overdue rates and charges. Interest accrues daily on rates and charges that remain unpaid after they become due and payable.
Hardship Assistance
Council recognises that the current economic crisis is causing financial hardship to many residents and businesses within our community and there are cases of genuine financial hardship requiring respect and compassion in special circumstances. Council has a Debt Management and Hardship Policy to support the community during these situations.
The following assistance options can be sought through an application to Council.
• Extension of due date and interest free periods
• Development of a payment plan, instalment plans or deferral plans
• Waiving or reducing accrued interest
Businesses renting the property and seeking rates relief will require their landlord to apply to Council for hardship assistance.
71 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Rating Classification Maps
Business Sub-Category – Industrial
72 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Georges River Council // Delivery Program 2022 – 2026 // Operational Plan 2023/2024 65 B u s i n e s s S u b - C a t e g o r y – S t r a t e g i c C e n t r e s
B u s i n e s s S u b - C a t e g o r y – M a j o r S h o p p i n g C o m p l e x
Hurstville CBD Kogarah CBD
Beverly Hills Carlton
Kingsgrove Peakhurst
Business Sub-Category – Local
73 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Blakehurst
Penshurst (Bridge St)
Penshurst (Forest Rd)
South Hurstville
Kogarah (Gray Lane)
South Hurstville
Oatley
Kogarah (local)
Ramsgate
74 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024 Georges River Council // Delivery Program 2022 – 2026 // Operational Plan 2023/2024 67
Riverwood
Kyle Bay
Penshurst
San Souci
Mortdale
Blakehurst
Allawah Carlton
Beverley Park Narwee
75 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
River Council // Delivery Program 2022 – 2026 // Operational Plan 2023/2024 68
Georges
Carss Park Kingsgrove
Beverly Hills
Waste management charges
During 2023/24, Council will continue to levy a charge for residential waste management services, to recover the actual cost of the services. In accordance with Section 496 of the LG Act, a charge will be levied on each residential ratable property for which the service is available, even if the service is not used. Council also levies a charge for commercial waste services. The yield for the domestic waste management service will enable costs for the service to be fully recovered. Services acquired part way through the year will have their charges levied on a pro-rata basis.
waste management charges are listed below:
Stormwater management charge
The Stormwater management service charge for 2023/24 is levied under Section 496A of the LG Act (as amended). The annual charges have been set in accordance with the Local Government Amendment (Stormwater) Bill 2005 and are as follows:
Non Strata - per 350 square metres of land area, or part thereof to a maximum of $1,500 per rateable property
Strata Lot - $25.00 per 350 square metres (or part thereof) of land area that would apply to the land subject to the strata scheme divided on a pro-rata basis between the lots, not less than $5.00 for any individual lot
$5.00
76 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
All
Waste Services Charges Description 2023/24 charge per annum Domestic Waste Management Services Domestic Waste Management Charge Service (1 x 120L general waste bin, 1 x 240L recycling bin + 1 x 240L garden organics bin) $511.00 Additional Volume Domestic Waste Management Charge $664.00 Extra general waste bin service (120L) $163.00 Extra general waste bin service (240L) $326.00 Special additional waste service (4 or more children or medical) $133.00 Extra recycling bin service (240L) $115.00 Extra garden organics bin service (240L) $153.00 Availability charge (dwelling with private domestic waste contractor) $70.00 Availability charge (dwelling with cancelled bin service) $70.00 Commercial Waste Services (other than domestic) Commercial general waste bin service (240L) $615.00 Commercial general waste bin service (1,100L) $2,560.00 Commercial recycling waste bin service (240L) $310.00
Stormwater Services Charges Description 2023/24 charge per annum Residential Non Strata - per rateable property $25.00 Strata – per rateable property $12.50 Business
Loan borrowing
Council will become debt free in the 2022/23 Financial Year, with the final payment on the 10 year loan for the Jubilee Mortdale Community Centre. Council does not currently plan to borrow additional funds during the 2023/24 financial year.
Schedule of business or commercial activity
Council undertakes activities of a commercial nature for which we receive a return, including leasing agreements for golf clubs and rental properties. However, these activities have not been identified as either Category One or Category Two businesses under competitive neutrality guidelines.
Pricing goods and services
Each fee that we charge is in accordance with the following principles and revised each year by the Executive and the elected Council.
The following factors are considered by Council when setting fees and charges:
• Pricing principles (outlined below)
• Reasonable percentage increase in-line with costs increases
• Cash handling and rounding of amounts
• Cost of the service and operations
• Other revenue sources that may fund this service
• Laws and regulations
• Ability of the people using the service to pay
• Benefit to the community (possible subsidy)
• Benchmarking with like services
The pricing principles currently applied include:
Cost Recovery Includes the recovery of employee and material costs directly related to the provision of the service
External Cost Price is determined by an external party carrying out the service or works
Subsidised (Partial Cost) Pricing Council elects to recover only a portion of the costs of providing the service
Rate of Return Pricing
Prices are set to recover a surplus that can be directed into capital improvements or other services
Market Pricing Prices are set at a similar amount to like services within the community
Legislated Pricing Prices are set to comply with legislation
77 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
78 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
2023/24
79 GEORGES RIVER COUNCIL Delivery Program 2022 – 2026 // Operational Plan 2023/2024
Fees
Schedule of
and Charges
Page2of74 TableOfContents GeorgesRiverCouncil.............................................................................................................................................................................10 Assets&Infrastructure.........................................................................................................................................................................10 PrivatelyOperatedRecreationFacilities..........................................................................................................................................10 ParksideDriveTennisCourts 10 CourtHire.....................................................................................................................................................................................10 QuarryReserveTennisCourts......................................................................................................................................................10 CourtHire 10 KenRosewellTennisCentre ........................................................................................................................................................10 CourtRates 10 CoachingServices......................................................................................................................................................................10 Clubhouse....................................................................................................................................................................................10 HurstvilleAquaticLeisureCentre 10 Aquatics..........................................................................................................................................................................................10 Vouchers(swim/spa/steam) 11 AquaticMemberships.....................................................................................................................................................................11 Other 11 SwimmingLessons.........................................................................................................................................................................11 Squad 11 Schools............................................................................................................................................................................................11 KidsClub 11 Health&FitnessMembership.......................................................................................................................................................12 CasualFitness 12 Vouchers(Gym&FitnessClass)..................................................................................................................................................12 Crèche.............................................................................................................................................................................................12 Stadium...........................................................................................................................................................................................12 StadiumHire(aslistedbelow)......................................................................................................................................................13 SansSouciLeisureCentre................................................................................................................................................................13 Aquatics-Swimentry....................................................................................................................................................................13 SwimPasses...................................................................................................................................................................................14 SwimmingLessons........................................................................................................................................................................14 AquaticMemberships....................................................................................................................................................................14 CasualFitnessandPasses...........................................................................................................................................................14 Health&FitnessMembership 14 NormO'NeillCricketTrainingFacility..............................................................................................................................................14 OffPeak 15 Peak.................................................................................................................................................................................................15 OtherFacilityFees 15 EngineeringFloodInformation.........................................................................................................................................................15 EngineeringSupervision 15 InstallationofTrafficandDirectionalSignage................................................................................................................................15 IlluminatedStreetSigns....................................................................................................................................................................16 PlansofManagement 16 TrafficInformation..............................................................................................................................................................................16 TreeManagement 16 StreetTreeRemoval.......................................................................................................................................................................16 TreeManagementInspections(privateland) 16 TreeRemoval,replacementandpruning.....................................................................................................................................16 continuedonnextpage...
Page3of74
Contents [continued] BeverleyParkWaterReclamation....................................................................................................................................................16 GolfCourses 17 HurstvilleGolfCourse...................................................................................................................................................................17 CasualUsers 17 CartHire(CasualUsers&Members).........................................................................................................................................17 HGCMembers..............................................................................................................................................................................17 BeverleyParkGolfCourse 18 Public&VisitorFees...................................................................................................................................................................18 StadiumHire 18 SportsfieldHire-SummerandWinterSeasonalCharges.............................................................................................................18 HurstvilleOval 18 PremiumSportingFields-HaroldFraserOval,HurstvilleOvalandOldsParkOval..............................................................18 SchoolBookings 19 NetballCourts.................................................................................................................................................................................19 SyntheticFields-PeakhurstPark;PoultonPark 19 VanessaStreetMulti-PurposeCourts..........................................................................................................................................19 CoachingClinicsandCasualHire(excludesPremiumsportingfieldsandSynthetics) 19 SchoolHolidayClinics(excludesPremiumsportsfields&Synthetics)..................................................................................20 KeyCharges 20 Bonds..............................................................................................................................................................................................20 Breachofgroundandfacilityuse................................................................................................................................................20 PersonalTrainers...........................................................................................................................................................................20 AnnualCharge.............................................................................................................................................................................20 Half-YearlyPermit 20 CasualParkHire-NonSport(Wedding,Filming,Community).................................................................................................20 OatleyParkCastle 21 PenshurstSportingHub................................................................................................................................................................21 WorkZone/ConstructionZone 21 CarShareParking..............................................................................................................................................................................21 Filming–Footpath&RoadsApplicationFee(perday) 21 DrivewayLineMarking......................................................................................................................................................................22 OccupancyofRoadRelatedArea 22 EngineeringDAInspectionFee........................................................................................................................................................22 MiscellaneousServices.....................................................................................................................................................................22 Depositsfordamageduringconstruction 22 ApplicationforDrivewayCrossingandAssociatedWorks(underSection138RoadsAct)......................................................23 CouncilDesigned(includesoneinspection) 23 Assessmentfeeforself-designMultiUnitand/orCommercial/IndustrialDevelopmentInfrastructure................................23 FeesAssociatedtoIssueofHeavyVehiclesPermit 23 RestorationCharges..........................................................................................................................................................................24 RoadOpeningChargesforRestorationsforQuantitiesUnder10sq.m 25 Roads...........................................................................................................................................................................................25 Footpaths 25 Kerb&Gutter...............................................................................................................................................................................25 RoadOpeningChargesforReinstatementforQuantitiesover10m2or10lin.M...................................................................25 Roads 25 Footpaths.....................................................................................................................................................................................25 continuedonnextpage...
TableOf
Page4of74 TableOfContents [continued] Kerb&Gutter...............................................................................................................................................................................26 HoistingActivities 26 Bushcare.............................................................................................................................................................................................26 Planning&Development 26 PlanningProposals............................................................................................................................................................................26 ExternalUrbanDesignReferralFee.................................................................................................................................................27 DevelopmentControlPlanPreparation 28 PlanningAgreementsContributions/PublicPurposes.................................................................................................................28 Section7.11and7.12Contributions(formerlyS94/S94A) 28 Section7.12(formerlyS94A)DevelopmentContributions............................................................................................................28 Strategic,PlanningandDevelopmentAdvice 29 Council'sDevelopmentControlPlans,Studies&DevelopmentContributionPlans..................................................................29 LocalEnvironmentalPlans(LEPs)...............................................................................................................................................29 DevelopmentControlPlans(DCPs).............................................................................................................................................29 Section7.11&Section7.12Plans ...............................................................................................................................................29 OtherDocuments...........................................................................................................................................................................29 Section10.7(formerlySection149)PlanningCertificate 30 DevelopmentandBuilding-DevelopmentAdvisoryService........................................................................................................30 Single Dwellings, Dual Occupancies, Secondary Dwellings, Commercial Fit Outs (New alterations & additions, demolitionandancillarydevelopment) 31 AllOtherDevelopmenttypesthatdonotfallintoanyotherPreDevelopmentadvisorycategory.......................................31 OtherAdvice 31 Pre-ComplyingDevelopmentCertificateAdvice.............................................................................................................................31 UrbanDesignReview(additionaltoPreDAfee) 31 ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice.............................................................32 DevelopmentandBuilding-DevelopmentApplication(DA)Fees 32 DA'sforDwellingHouses..............................................................................................................................................................32 DA'sforAdvertisements(Signage) 32 DA'sforChangeofUse(Only)......................................................................................................................................................32 DA'sfortheSubdivisionofLand(otherthanstrata) 32 DA'sforStrata/StratumSubdivision............................................................................................................................................33 AllotherDA'sincludingerectionofabuilding,carryingoutofwork,demolitionofbuildingorwork(basedonestimated costs)...............................................................................................................................................................................................33 DA'sforDesignatedDevelopment................................................................................................................................................34 DevelopmentandBuilding-ModificationofDevelopmentConsentApplication ......................................................................34 ModificationofDevelopmentConsentApplication(Courtapproved/S4.55(2)).........................................................................34 ReviewofDeterminationDevelopmentApplicationorModificationtoDevelopmentConsent 35 .........................................................................................................................................................................................................35 36 ReviewofDecisiontoRejectDevelopmentApplication ...........................................................................................................36 Notified&Re-notifiedApplications 36 AdvertisedandRe-advertisedApplications(inadditiontonotificationfees).............................................................................37 OtherApplicationFees-DevelopmentAssessment 37 Electronic File Management (Development applications, Modifications to Development Consents & Reviews of Determination)................................................................................................................................................................................37 LapsedConsents...........................................................................................................................................................................37 ExtensionofConsentApplication................................................................................................................................................37 ReviewofDocumentationsubmittedtoConsentConditions...................................................................................................37 continuedonnextpage...
Page5of74 TableOfContents [continued] ApplicationFeeRefunds/FeeWaiver.............................................................................................................................................38 ApplicationsthatFeeWaiversApply 38 SiteCompatibilityCertificateandsiteverificationcertificatesunderSEPPs..............................................................................38 DesignReviewPanelFee(notrequiredifadviceprovidedatPreDevelopmentstage) 38 FeetoCouncilforDevelopmentApplicationsforIntegratedDevelopment................................................................................38 LongServiceLevy(AllDevelopmentTypes)...................................................................................................................................39 DevelopmentandBuilding-BuildingAssessmentandDevelopmentEngineering 39 BuildingInformationCertificateApplications.............................................................................................................................39 BuildingInformationCertificatePublicNotification&Re-notificationFees 39 ElectronicFileManagement..........................................................................................................................................................39 AmendedPlans/Documentation 40 LodgementofPrivatePCAIssuedCertificatesforRecordspurposes.....................................................................................40 OutsideofStandardHoursWorkPermitapplicationfees 40 Swimmingpools(PrivateSwimmingPool)..................................................................................................................................40 FireSafety 40 AnnualFireSafetyStatementAFSS..........................................................................................................................................40 FireSafetyCompliance...............................................................................................................................................................41 Hoardings 41 PublicRoads(LicenceFee)...........................................................................................................................................................41 CouncilLandOther(LeasingFee) 41 DamageDepositsandInspectionFeesAgainstdamagetoCouncilproperty............................................................................41 Footpath/AssetInspectionFees 42 DemolitionInspectionFees...............................................................................................................................................................42 Section88GCertificate 42 ActivityApplicationsunderSection68,LocalGovernmentAct,1993.........................................................................................42 Informationrequest............................................................................................................................................................................42 ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice 43 BuildingCertification.........................................................................................................................................................................43 PrincipalCertifyingServiceFee(IncludesoneOccupationCertificatefee)-Alldevelopmenttypes 43 2.17aWhereCouncilisappointedasthereplacementPrincipalCertifier...............................................................................43 ConstructionCertificateApplicationFeesforNationalConstructionCodeBuildingClasses1and10–basedonestimated costofworks-(InadditiontoPCAfee)...........................................................................................................................................44 Construction Certificate Application Fees for National Construction Code Building Classes 2 to 9 – based on estimated costofworks 44 AmendedConstructionorComplyingDevelopmentCertificates.................................................................................................44 ComplyingDevelopmentCertificateApplicationFeesforNationalConstructionCodeBuildingClasses1and10–based onestimatedcostofworks 45 ComplyingDevelopmentCertificateApplicationFeesforNationalConstructionCodeBuildingClasses2to9–basedon estimatedcostofworks 45 ComplyingDevelopmentCertificate.................................................................................................................................................46 PCAInspections(Mandatoryoradditional).....................................................................................................................................46 OccupationCertificate. 46 SubdivisionCertificate......................................................................................................................................................................46 LinenPlan(certification) 46 EndorsementofInstrumentundertheConveyancingActwhereCounciliscitedintheinstrument.......................................46 ComplyingDevelopmentCertificateprivatecertifierstormwaterassessmentreferralfee......................................................46 ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice 46 ActivityApplicationunders.68oftheLocalGovernmentActand/ors.138oftheRoadsAct(Stormwater)............................47 continuedonnextpage...
Page6of74 TableOfContents [continued] TemporaryRoad,LaneorFootpathClosure...................................................................................................................................47 UseofFootway 47 OutdoorDining/Restaurants.........................................................................................................................................................47 LicenceFee 47 DisplayofGoods(adjacenttobusinesspremises)....................................................................................................................47 LicenceFee 47 A-FrameAdvertisingSignage.......................................................................................................................................................48 UseofPublicSpace(non-roadreserve)..........................................................................................................................................48 OutdoorDining/Restaurants-KogarahTownSquareDecking.................................................................................................48 ActivityApplicationDetermination...................................................................................................................................................48 Section68LGAApprovals(12monthsmaximum).........................................................................................................................48 CommercialUseofPublicFootways 48 SkipBinFees-Sec68LGActManagementofWaste...................................................................................................................48 PublicHealth 48 PublicHealth-NoticesandOrders..............................................................................................................................................49 DomesticWasteManagementServices 49 CommercialWasteManagementServices......................................................................................................................................50 OtherWasteManagementServices.................................................................................................................................................50 CommunityGardens..........................................................................................................................................................................50 CompanionAnimalFees-Lifetimeregistration-microchipping................................................................................................50 AnnualSpecifiedAnimalPermitFees 51 Dangerous/RestricedDogEnclosure...............................................................................................................................................51 AnimalImpoundingandEuthanasiaFees 52 FoodPremisesRetailandhomebusiness......................................................................................................................................52 TemporaryFoodPremises(TFP)(includingmobilefoodvendingvehiclesandtemporaryfoodstalls)..................................53 Food-Notices 53 ImpoundingCharges.........................................................................................................................................................................53 Abandonedvehicles 53 ProtectionoftheEnvironmentOperationLegislation....................................................................................................................53 LocalGovernmentLegislation 54 Community&Culture...........................................................................................................................................................................54 LibraryDeliveryorcollectionfee......................................................................................................................................................54 ReplacementoflostLibrarycards 54 Photocopying,printingandscanning..............................................................................................................................................54 LostandDamagedLibraryItems 55 OtherItems.........................................................................................................................................................................................56 Inter-LibraryLoans.............................................................................................................................................................................56 LibraryOutreachPrograms 56 HirefeeforLibraryRooms................................................................................................................................................................56 HireFeeforLibraryExhibitionVenues(forfunctionsandprograms) 56 Researchfee.......................................................................................................................................................................................56 Servicefeeforreproductionofphotographs..................................................................................................................................56 LibraryProgramsEvents,ClassesandWorkshops 57 HurstvilleLibraryMediaLab.............................................................................................................................................................57 HurstvilleMuseum&Gallery 57 OrganisedTours.............................................................................................................................................................................57 continuedonnextpage...
Page7of74
[continued] EducationPrograms......................................................................................................................................................................57 CommunityProgramsEvents,Classes&Workshops-Museum&Gallery 58 GeorgesRiverArtPrize.................................................................................................................................................................58 HiringFeeforExhibitionVenues(forfunctionsandprograms)................................................................................................58 Dragon'sLairGallery.....................................................................................................................................................................58 MervLynchReserveArtistStudio................................................................................................................................................58 Policy,planningorotherdocuments 58 ChildCareFees..................................................................................................................................................................................58 ChildCare-OtherCharges...............................................................................................................................................................59 CommunityKeys 59 CommunityCentres...........................................................................................................................................................................60 CarssParkLifeSavingHall 60 CasualBookings.........................................................................................................................................................................60 RegularBookings 60 CarssParkStrawBaleShed.........................................................................................................................................................60 CasualBookings.........................................................................................................................................................................60 RegularBookings 60 DragonRoom..................................................................................................................................................................................60 RiverRoom 60 HurstvilleSeniorCitizensCentre..................................................................................................................................................60 CasualBookings 60 RegularBookings........................................................................................................................................................................60 KingsgroveCommunityCentre....................................................................................................................................................61 CasualBookings 61 RegularBookings........................................................................................................................................................................61 KogarahSchoolofArts.................................................................................................................................................................61 CasualBookings.........................................................................................................................................................................61 RegularBookings........................................................................................................................................................................61 MortdaleCommunityCentre 61 CasualBookings.........................................................................................................................................................................61 RegularBookings 61 OatleyCommunityHall 61 CasualBookings.........................................................................................................................................................................61 RegularBookings 62 OatleyCommunityHall-meetingrooms1&2...........................................................................................................................62 CasualBookings 62 RegularBookings........................................................................................................................................................................62 PJFerryReserveCommunityHall................................................................................................................................................62 CasualBookings 62 RegularBookings........................................................................................................................................................................62 StGeorgeCommunityCentre.......................................................................................................................................................62 CasualBookings.........................................................................................................................................................................62 RegularBookings........................................................................................................................................................................62 CommunityCentreWaste-ExtraItemsifRequired 62 WaratahRoom................................................................................................................................................................................63 BanksiaRoom 63 HurstvilleOval-PavilionRoom....................................................................................................................................................63 CasualBookings 63 continuedonnextpage...
TableOfContents
Page8of74 TableOfContents [continued] RegularBookings........................................................................................................................................................................63 MaranaAuditoriumandHurstvilleSeniorCitizensCentrePackage 63 MaranaAuditorium,CivicTheatreandHurstvilleSeniorCitizensCentrePackage................................................................63 Performancevenues..........................................................................................................................................................................63 MaranaAuditorium.........................................................................................................................................................................63 CivicTheatre..................................................................................................................................................................................64 MaranaAuditoriumandCivicTheatrePackage..........................................................................................................................64 PublicHolidaysurcharge..............................................................................................................................................................64 Additionalcharges.........................................................................................................................................................................64 StagingandEquipment..............................................................................................................................................................65 KogarahTownSquare,HurstvillePlazaorCivicForecourtArea 65 CharityEventFees ........................................................................................................................................................................65 PrivateEvent 65 CommercialFilmingonCouncilProperty........................................................................................................................................66 UseofPublicSpaces 66 CommercialActivitiesondesignatedCouncilfootways,publicplazas,orsquares..............................................................66 IndependentFestivalsorEventsinParksandTownCentres 66 EventManagement.............................................................................................................................................................................67 StreetstallfeeatmajorCouncilevents.......................................................................................................................................67 ExtraEventManagementProvisions........................................................................................................................................67 StreetstallfeeatotherCouncilevents 67 Events,performances,shows,cinemasandactivities..................................................................................................................67 Advertising 67 PromotionalBanners.........................................................................................................................................................................67 OtherUses..........................................................................................................................................................................................67 Corporate 68 MapProduction..................................................................................................................................................................................68 CouncilPlans 68 ElectronicMediaOutput....................................................................................................................................................................68 AddressReviewService 68 LegalProceedings.............................................................................................................................................................................68 ReimbursementofStaffInPrivateCourtActions.......................................................................................................................68 CostsinLegalProceedings 68 Subpoenas..........................................................................................................................................................................................68 SaleofContract,TenderandSimilarDocuments 69 CouncilDocuments............................................................................................................................................................................69 GovernmentInformationPublicAccess(GIPA) 69 NatureofApplication.....................................................................................................................................................................69 (a)Accesstorecordsbynaturalpersonabouttheirpersonalaffairs-Applicationfee 69 (b)AllotherGIPAApplications..................................................................................................................................................69 Internalreview 69 CreditCardservicefee......................................................................................................................................................................69 AmericanExpress 69 Visa/MasterCard.............................................................................................................................................................................69 AccrualofInterestonRates&Charges 69 ChargesonOtherCarriers................................................................................................................................................................70 RateEnquiryFees 70 continuedonnextpage...
Page9of74 TableOfContents [continued] UnpaidSundryDebtorAccounts......................................................................................................................................................70 DishonouredCheque 70 DishonouredDirectDebit..................................................................................................................................................................70 InformationResearchFee 70 StormwaterManagementServiceCharge.......................................................................................................................................71 Leases/Licenses/Occupation/Easements of Council Community Properties Subject to Council's Community Lease Policy 71 New/Renewals................................................................................................................................................................................71 Leases/Licences/EasementsofCouncilPropertyandStatutoryPropertyMatters 71 NewAgreements............................................................................................................................................................................71 Renewals(includingOptions)orAssignments 71 GroundAnchorsaffectingCouncilLand.....................................................................................................................................72 Keys-Leases/Licences 72 Carparking.........................................................................................................................................................................................72 KogarahTownSquare-DerbyStreet...........................................................................................................................................72 AccessControlledParking–GreenbankStreet..........................................................................................................................73 AccessControlledParking–TheAvenue 73 AccessControlledParking–EmpressLane...............................................................................................................................73 MeteredParking-TreacyStreet 73 MeteredParking-GloucesterRoad.............................................................................................................................................74 MeteredParking-Patrick/MacMahonSt.CarPark 74 Replacementcard-PermanentParkingPermit..............................................................................................................................74 EmergencyAfterHoursBoomGateorCarParkOpeningCharges 74 ParkingPermit....................................................................................................................................................................................74 CommunityGroup-DirectionalSign...............................................................................................................................................74
GeorgesRiverCouncil
Assets&Infrastructure
PrivatelyOperatedRecreationFacilities
ParksideDriveTennisCourts
CourtHire
QuarryReserveTennisCourts
CourtHire
KenRosewellTennisCentre
Court
CoachingServices
Group Classes – Children (per hour, group of 6)
Group Classes – Adults (per hour)
HurstvilleAquaticLeisureCentre
forgroupof6participants
Page10of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
DayRate(perhour) $20.00 $2.00 $22.00 NightRate(perhour,from5pm) $22.73 $2.27 $25.00
DayRate(perhour) $16.36 $1.64 $18.00 NightRate(perhour,from5pm) $18.18 $1.82 $20.00
CasualBookings $20perhour
Rates
$20
$25
person
participants
Lessons(Adults
$80perhour SquadClasses $28foroneandahalfhours
per
for4
Private
andJuniors)
weeks.
Functions/Parties $300fora4hourbooking Additionalhoursat$50perhour
Intensivesquadtrainingforourelitejuniorsusing2courtsand2coachesformost
4-6studentspercoach Clubhouse
Aquatics Slide $2.27 $0.23 $2.50 Adult(swimonly) $9.82 $0.98 $10.80 Child/(swimonly)(5+years) $7.91 $0.79 $8.70 Concession(swimonly) $7.91 $0.79 $8.70 Adult(swim/spa/steam) $13.63 $1.36 $15.00 Concession(swim/spa/steam) $10.00 $1.00 $11.00 Nonswimmer $2.27 $0.23 $2.50 continuedonnextpage...
Aquatics [continued]
(swim/spa/steam)
AquaticMemberships
Other
SwimmingLessons
Schools
Services
Kids
Page11of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Family(MedicareCard) $24.27 $2.43 $26.70 Children under 5 are free Vouchers
Adult(20visits) $238.64 $23.86 $262.50 Adult (20 Visits – Swim Only) $171.82 $17.18 $189.00 Concession(20visits) $175.00 $17.50 $192.50
Adult-MembershipCouncilOnly(DD)-perweek $13.18 $1.32 $14.50 Membership-AllAccess-1Month $195.45 $19.55 $215.00 Membership-AllAccess-3Months $390.91 $39.09 $430.00 MembershipWorkcover-3Months $390.91 $39.09 $430.00 AquaticMembership12months $727.27 $72.73 $800.00 AquaticMembership12months(Fortnightlydirect debit) $32.73 $3.27 $36.00 AquaticMembership6months $440.91 $44.09 $485.00 AquaticMembership6months(Fortnightlydirect debit) $38.18 $3.82 $42.00
LaneHire(perhour) $31.82 $3.18 $35.00 BirthdayPartiesHosted(perchild) $26.36 $2.64 $29.00 Foradurationof2hours
Program-PrivateLearntoSwim(Child) $94.00 $0.00 $94.00 Pre-school&Schoolage $23.50 $0.00 $23.50 Adults $23.50 $0.00 $23.50 Squad JuniorDevelopmentsquad(perfortnight) $52.73 $5.27 $58.00
include:SchoolLaneHire,Independent SchoolUse,SchoolCarnival,SchoolFunDay includingStadiumandinflatable,WaterSportsand Gym/Aerobics Feesdependentonnumberof students,days,etc-pleasecontact Management
Club BlueFitSwishBasketballProgram(fortnightlydirect debit) $32.64 $3.26 $35.90 continuedonnextpage...
KidsClub [continued]
Health&FitnessMembership
Crèche
Page12of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
BluefitStrikeSoccerProgram(fortnightlydirectdebit) $32.64 $3.26 $35.90 BlueFitGymnasticsProgram(fortnightlydirectdebit) $32.64 $3.26 $35.90
VisitPass-AquaSenior-10visits $143.18 $14.32 $157.50 12monthsAdult-AllAccess(one-offupfront) $1,281.82 $128.18 $1,410.00 12monthsStudent&Concession-AllAccess(one-off upfront) $1,072.73 $107.27 $1,180.00 6monthsAdult-AllAccess(one-offupfront) $736.36 $73.64 $810.00 FortnightlyDirectDebit(Adult12months) $44.55 $4.45 $49.00 FortnightlyDirectDebit(Student&Concession12 months) $37.27 $3.73 $41.00 FortnightlyDirectDebit(Adultnocontract) $48.18 $4.82 $53.00 FortnightlyDirectDebit(Student&Concessionno contract) $42.73 $4.27 $47.00 JoiningFee12months $71.82 $7.18 $79.00 JoiningFeenocontract $90.00 $9.00 $99.00
CasualGymEntry $21.64 $2.16 $23.80 CasualGymEntry(Student/Concession) $15.91 $1.59 $17.50 AquaAerobics $21.64 $2.16 $23.80 AquaAerobics(Student/Concession) $15.91 $1.59 $17.50 CasualAdultGroupFitness $21.64 $2.16 $23.80 CasualConcessionGroupFitness $15.91 $1.59 $17.50
ReformerPilates(1HourClassMembers) $10.00 $1.00 $11.00 ReformerPilates(1HourClassNon-Members) $39.09 $3.91 $43.00
CasualFitness
Vouchers(Gym&FitnessClass)
CrecheFamilyMembership(DD)-perweek $15.09 $1.51 $16.60 CrecheMembership(DD)-perweek $7.54 $0.75 $8.29 Non-member(perhourperchild) $8.64 $0.86 $9.50 Member(perhourperchild) $5.00 $0.50 $5.50
HalfCourtHire-PerHour $39.09 $3.91 $43.00 Badminton – per hour (peak) $29.36 $2.94 $32.30 Badminton – per hour (off peak) $24.00 $2.40 $26.40 Court Hire – per hour $78.18 $7.82 $86.00 continuedonnextpage...
Stadium
Stadium [continued]
StadiumHire(aslistedbelow)
GeneralInformation
-Schoolchargesarecostedbasedonnumberofstudents/numberofhours/numberofstaffrequiredtorunactivities requested.
-Newregulationssay1:50ratiowithschoolchildrendoingunstructuredactivities.
StadiumHire(59orless)
StadiumHire(60ormore)
Stadium – Event Hire
Stadium – Staff Hire
Stadium – Catering Hire
ConsultationRoomHire
SansSouciLeisureCentre
-Theseswimmingpoolsareoperatedunderleaseagreement.
Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges
Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges
Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges
Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges
Feesdependentondayandtime, pleasecontactManagementfor tailoredcharges
Feesdependentonlease arrangementapprovedbyCouncil
-Aspartoftheseagreements,Councilmayfromtimetotime,setthemaximumchargesapplicableforadmissionfees.
Aquatics-Swimentry
Page13of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
CasualEntryAdult $8.91 $0.89 $9.80 CasualEntryChild $6.91 $0.69 $7.60 Soccer (senior) – per team/game $73.45 $7.35 $80.80
Adult(swimonly) $8.64 $0.86 $9.50 Child(swimonly,5&over) $6.73 $0.67 $7.40
Concession/Student/Senior(swimonly) $6.73 $0.67 $7.40 FacilityFee(Spectator) $2.91 $0.29 $3.20 FamilyPass(2adults,2kids) $24.36 $2.44 $26.80 Swim/GymCasualAdultvisit $17.73 $1.77 $19.50 Swim/GymCasualStudent/Senior(Concession)visit $14.09 $1.41 $15.50 LaneHire(perhour) $72.73 $7.27 $80.00
Children under 5 are free
Passes
SwimmingLessons
AquaticMemberships
Health&FitnessMembership
NormO'NeillCricketTrainingFacility
Page14of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
SwimPass-20sessions-Adult $151.14 $15.11 $166.25 SwimPass-20sessions-Concession(Student/ Senior) $117.73 $11.77 $129.50
Swim
AllSwimpassesvalidfor4monthsonly
Child $23.50 $0.00 $23.50 Adult $21.00 $0.00 $21.00 Privatelesson-child $84.00 $0.00 $84.00
MembershipWorkcover-3Months(DD) $381.82 $38.18 $420.00
CasualGym/GroupClass/AquaAerobics-Adult $17.73 $1.77 $19.50 AquaPassAdult10sessions $159.55 $15.95 $175.50 CasualGym/GroupClass/AquaAerobicsConcession $14.09 $1.41 $15.50 AquaPassStudent/Senior10sessions $126.82 $12.68 $139.50 AquaPass-Adult-20Sessions $310.23 $31.02 $341.25 AquaPass-Student/Senior-20Sessions $246.59 $24.66 $271.25
Adult-1month-nocontract-fortnightlydirectdebit $47.27 $4.73 $52.00 Adult-12monthcontract-fortnightlydirectdebit $43.64 $4.36 $48.00 Concession-1month-nocontract-fortnightlydirect debit $41.82 $4.18 $46.00 Concession-12monthcontract-fortnightlydirect debit $36.36 $3.64 $40.00 JoiningFee-withcontract $62.73 $6.27 $69.00 JoiningFee-nocontract $90.00 $9.00 $99.00
CasualFitnessandPasses
Feesareperhour,basedon1lane LongtermcommercialarrangementsmaybenegotiatedwithCouncilviaexpressionofinterest CoachesNetHire20.00 $20.00 $2.00 $22.00 CoachesNetHire25.00 $25.00 $2.50 $27.50 CricketProgram $49.09 $4.91 $54.00 IndividualCoaching30minutes $45.45 $4.55 $50.00 IndividualCoaching60minutes $78.64 $7.86 $86.50 Level3Individual30Minutes $49.09 $4.91 $54.00 continuedonnextpage...
NormO'NeillCricketTrainingFacility [continued]
Leniencycanbeshownbetweenthehoursof3pm-4pmforschoolfinishingtimesdependginonwhetherthereis anotherbookingat3pmontheday
MondaytoFriday3pmonwards; Saturday andSunday
InstallationofTrafficandDirectionalSignage
Page15of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Level3Individual60Minutes $84.09 $8.41 $92.50 NetHirewithMachine $49.09 $4.91 $54.00 SundayCricketSquads $29.55 $2.95 $32.50 OffPeak Mondayto
3pm CoachesNetHire-OffPeak $200.00 $20.00 $220.00 TurfNetHire-OffPeak $49.09 $4.91 $54.00 Schools Free
Friday8amto
Community $15.00 $1.50 $16.50 Peak
NetHire
Peak $25.00 $2.50 $27.50 NetHire-Peak $39.09 $3.91 $43.00 TurfNetHire-Peak $59.09 $5.91 $65.00 CricketClinics AsperOffPeakRates Schools $20.00 $2.00 $22.00 Community $20.00 $2.00 $22.00 OtherFacilityFees HolidayClinic1Day $49.09 $4.91 $54.00 HolidayClinic2Days $119.55 $11.96 $131.51 EngineeringFloodInformation FloodInformationReport $245.00 $0.00 $245.00 EngineeringSupervision Feeformiscellaneousapplicationswhichneed considerationbyEngineeringServices(perhour) $220.00 $0.00 $220.00
Coaches
-
Installationoftrafficanddirectionalsignageforprivate developments Costofworks AdministrationFee 21%ofcostofworksasdetermined byCouncil
IlluminatedStreetSigns
Erection
PlansofManagement
BeverleyParkWaterReclamation
Page16of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
of
illuminated
namesign Asdeterminedbyagreement RoadsAct1993
Section138
anduse
an
street
|
CopyofPlansofManagementforaPark/Reserve (peritem) $45.00 $0.00 $45.00 CopyofGenericPlansofManagement(peritem) $29.50 $0.00 $29.50 CopyofLandscapeMasterplan(peritem) $35.50 $0.00 $35.50 Traffic
AADT – Mid block count – Hourly count $36.36 $3.64 $40.00 AADT – Mid block daily volume – weekly count $72.27 $7.23 $79.50 Speedcountatmidblock $49.09 $4.91 $54.00 Peak hours turning volumes – cost per intersection $90.45 $9.05 $99.50 TreeManagement StreetTreeRemoval ReplacementStreetTreeFee $1,000.00 $0.00 $1,000.00 StreetTreeRemovalFee Costofworksasdeterminedby Council TreeManagementInspections(privateland) ApplicationFee1-3trees(perapplication) $165.00 $0.00 $165.00 Application Fee 4 – 6 trees (per application) $250.00 $0.00 $250.00 ApplicationFeepertree>6treesinadditionto (ApplicationFee4-6trees) $27.00 $0.00 $27.00 ReviewofTreeRemovalandPruningApplicationon PrivateLand-Stage1Review $97.50 $0.00 $97.50 ReviewofTreeRemovalandPruningApplicationon PrivateLand-Stage2Review $175.00 $0.00 $175.00 TreeRemoval,replacement
pruning
FeeforTreeReplacement(pertree)fortrees onprivateland AsvaluedbyThyer(2011) Tree ValuationMethod(fee rangebetween $1,000and $10,000)
Information
and
Offset
Price(perkilo/litre) $1.80 $0.00 $1.80 FixedAnnualCharge Asperseparateagreementwith customer
GolfCourses
HurstvilleGolfCourse
-Tee-offfor9holeroundsmaybepermittedupuntil7:30amwhereplayerstee-offfromthetenthtee.
-Theeveningrateapplieswhentee-offoccursafter3pmnormaltimeor4pm Daylight Savingstime.
- For all Members Competition on Tuesday, Thursday, Friday and Saturday, as additional fee of $4.00 is imposed by DirectorGolfServicestocoverprizes.
-ClubMembershipfeessetbyClub,andarepayableonaproratabasis for newmembers.
Page17of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Adults 18holes $34.55 $3.45 $38.00 9holes $24.09 $2.41 $26.50 18holesweekend $39.09 $3.91 $43.00 9holesweekend $29.55 $2.95 $32.50 EveningRate $14.55 $1.45 $16.00 Concession
Pensioner/Student 9holes $20.00 $2.00 $22.00 18holes $29.55 $2.95 $32.50 School block booking – 18 holes (Weekdays only) $13.18 $1.32 $14.50 Cart
Users
ElectricCartHire-9holes $25.00 $2.50 $27.50 Electric Carts – Adults $35.36 $3.54 $38.90 Electric Carts – Concession (Pensioner / Student) $30.55 $3.05 $33.60 Electric Carts – Deposit $0.00 $0.00 $0.00 Buggy – Cart $5.00 $0.50 $5.50 Buggy – Deposit $0.00 $0.00 $0.00 HGCMembers Full 18holeseveryday $25.00 $2.50 $27.50 9holes $20.00 $2.00 $22.00 Pensioner18holes/9holes Weekdays $17.27 $1.73 $19.00 Weekendsandholidays $24.09 $2.41 $26.50 Junior18holes/9holes Weekendsandholidays $17.27 $1.73 $19.00
CasualUsers
-
Hire(Casual
&Members)
BeverleyParkGolfCourse Public&VisitorFees
Monday to Friday (excl Public Holidays) – 18 holes
Monday to Friday (excl Public Holidays) – 9 holes
holes
Twilight(Monday-Fridayafter3pm)
Pensioner/SeniorCardHoldersMondaytoFriday (excl Public Holidays) from 11am – 9/18 holes
Pensioner/SeniorCardHoldersMondaytoFriday (excl Public Holidays) before 11am – 18 holes
Pensioner/SeniorCardHoldersMondaytoFriday (excl Public Holidays) before 11am – 9 holes
StadiumHire
JubileeStadium SetbyCouncil,dependentonthe requirementsoftheevent
SportsfieldHire-SummerandWinterSeasonalCharges
-AppliestoallfieldswithinLGAapartfromlocationslistedbelow -Excludesseparatelynegotiatedlicenceaggreements
HurstvilleOval
PremiumSportingFields-HaroldFraserOval,HurstvilleOvalandOldsParkOval
Page18of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$36.36 $3.64 $40.00
$22.73 $2.27 $25.00
$40.91 $4.09 $45.00 Saturday, Sunday and Public Holidays (pm) – 18
$40.91 $4.09 $45.00
$22.73 $2.27 $25.00
Saturday, Sunday and Public Holidays (am) – 18 holes
Saturday, Sunday and Public Holidays – 9 holes
$16.36 $1.64 $18.00 Twilight
$18.18 $1.82 $20.00
(Saturday,Sundayafter3pm)
$17.27 $1.73 $19.00
$24.55 $2.45 $27.00
$16.36 $1.64 $18.00 Cart Hire – 18 holes $40.91 $4.09 $45.00 Cart Hire – 9 holes $22.73 $2.27 $25.00 PullBuggyHire $4.55 $0.45 $5.00 Club Hire – 18 holes $22.73 $2.27 $25.00 Club Hire – 9 holes $13.64 $1.36 $15.00
Fullsizedsportfield $1,354.55 $135.45 $1,490.00 Midsizedsportsfield $786.36 $78.64 $865.00 Touch/oztag $790.91 $79.09 $870.00 Minisizedsportsfield $281.82 $28.18 $310.00 Floodlightfee-perfield(non-metered) $336.36 $33.64 $370.00
SeasonalVelodromehire(cycling) $2,509.09 $250.91 $2,760.00 CasualVelodromehireperday(cycling) $445.45 $44.55 $490.00
SeasonalRateseniors $2,454.55 $245.45 $2,700.00 SeasonalRatejuniors $1,336.36 $133.64 $1,470.00 continuedonnextpage...
PremiumSportingFields-HaroldFraserOval,HurstvilleOvalandOldsParkOval [continued]
SchoolBookings
NetballCourts
SyntheticFields-PeakhurstPark;PoultonPark
Rates
Synthetic
Peak - Monday to Friday 3pm to close and All day weekends
VanessaStreetMulti-PurposeCourts
CoachingClinicsandCasualHire(excludes
Page19of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Dayrate $454.55 $45.45 $500.00 Hourlyrate $113.64 $11.36 $125.00
Canteen/Glasshouse $118.18 $11.82 $130.00 Linemarkingforathleticsfield $295.45 $29.55 $325.00 OvalhireforAthleticsCarnival $409.09 $40.91 $450.00 Refundablecleaningbond-Premiumsportsfields $200.00 $0.00 $200.00
Seasonalcourthire $112.73 $11.27 $124.00 NightTrainingperseason/court $95.45 $9.55 $105.00
areper
field,perhour
FeesandChargesasperContract
ManagementAgreement/Licence SeasonalClubhire $39.09 $3.91 $43.00 CasualCommunityHire $68.18 $6.82 $75.00 SchoolHire Free Commercial Hire – Peak $222.73 $22.27 $245.00
Commercial Hire – Off-Peak $113.64 $11.36 $125.00 OffPeak-MondaytoFriday7amto3pm FloodLighting-SyntheticFields $13.64 $1.36 $15.00
/
Schoolsinarea-Free Free Schoolsoutofarea-perhour $9.09 $0.91 $10.00 Hourlyrate $39.09 $3.91 $43.00 Hourlyratewithlights $53.18 $5.32 $58.50 Seasonalrateperhour(min2hrsperweekx20 weeks) $22.27 $2.23 $24.50 Seasonalratewithlightsperhour(min2hrsperweek
20weeks) $39.09 $3.91 $43.00
x
sportingfields
Privateclinics/training(per10weeksschoolterm) $5,972.73 $597.27 $6,570.00 Privateclinics/training(perweek) $663.64 $66.36 $730.00 Privateclinics/training(perday) $177.27 $17.73 $195.00 Non Commercial – Clubs or Association (per week) $490.91 $49.09 $540.00 Non Commercial – Clubs or Association (per day) $159.09 $15.91 $175.00 continuedonnextpage...
Premium
andSynthetics)
Page20of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
sporting
CommercialHire(perfieldperday) $281.82 $28.18 $310.00 Casualhire(perhour) $54.55 $5.45 $60.00 FloodlightFee(pernight) $18.18 $1.82 $20.00
Premiumsportsfields&Synthetics) Privateclinicsperweek $1,236.36 $123.64 $1,360.00 Privateclinicsperday $340.91 $34.09 $375.00 Key
Initialkeyissuetosportsclub Free Keybondforreturnatendofseason $250.00 $0.00 $250.00 AdditionalorreplacementforlostKey $81.82 $8.18 $90.00 Bonds Parkdamagebond-upto2fields $1,000.00 $0.00 $1,000.00 Parkdamagebond-3ormorefields $4,000.00 $0.00 $4,000.00 Temporaryparkvehicleaccess $1,000.00 $0.00 $1,000.00 Breachofgroundandfacilityuse 1stoffence $227.27 $22.73 $250.00 2ndoffence $454.55 $45.45 $500.00 3rdandsubsequentoffence $681.82 $68.18 $750.00 Operatingcommercialoperationwithoutapermit $227.27 $22.73 $250.00 PersonalTrainers IDcard $27.27 $2.73 $30.00 ReplacementIDCard $36.36 $3.64 $40.00 AnnualCharge
$1,100.00 $110.00 $1,210.00 3 – 5 persons $550.00 $55.00 $605.00 2personsorless $277.27 $27.73 $305.00 Half-YearlyPermit 6 – 18 persons $663.64 $66.36 $730.00 3 – 5 persons $336.36 $33.64 $370.00 2personsorless $168.18 $16.82 $185.00 CasualParkHire-NonSport(Wedding,Filming,Community) Wedding Ceremony – Park hire and Photography Permit(2hr) $265.91 $26.59 $292.50 continuedonnextpage...
CoachingClinicsandCasualHire(excludesPremium
fieldsandSynthetics) [continued]
SchoolHolidayClinics(excludes
Charges
6 – 18 persons
CasualParkHire-NonSport(Wedding,Filming,Community) [continued]
OatleyParkCastle
PenshurstSportingHub
All
CarShare
Page21of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Photographypermit $70.45 $7.05 $77.50 CommunityGroupEvent<50people(perday) $154.55 $15.45 $170.00 Community Group Event ≥ 50 people (per day) SetbyCouncil,dependentonthe requirementsoftheevent Filming in Parks – < 5 crew (per day) $150.00 $15.00 $165.00 Cancellationfee $30.45 $3.05 $33.50
Venuehireweekendandpublicholidays $509.09 $50.91 $560.00 Mid-weekhire(exclpublicholidays) $266.37 $26.64 $293.00 Refundablecleaningbond $269.50 $0.00 $269.50
hour.
CommercialHire-PenshurstPark-OFFPEAK-MonFri7am-3pm $109.09 $10.91 $120.00 CommercialHire-PenshurstPark-PEAK-Mon-Fri 3pmto10pm+Weekends $245.45 $24.55 $270.00 SportsfieldHire-PenshurstPark-Lights(perhour) $14.68 $1.47 $16.15 SportsfieldHire-PenshurstPark-MatchDay $168.18 $16.82 $185.00 SportsfieldHire-PenshurstPark-SchoolHire FREE SportsfieldHire-PenshurstPark-Training $83.64 $8.36 $92.00 WorkZone/ConstructionZone ApplicationFee(nonrefundable) $225.00 $0.00 $225.00 WorkZone(perLin.mperweek)Landusezone(R2, R3,B1,IN2,SP2) $34.50 $0.00 $34.50 WorkZone(perLin.mperweek)Landusezone (R4,B2,B3,B4,B6) $69.00 $0.00 $69.00 Installandremove"WorkZones"regulatorysignsand stems-peritem $235.00 $0.00 $235.00
listedfeesareper
AnnualandlongtermcommercialarrangementsmaybenegotiatedwithCouncil.
Carsharespaceinmeteredparkingarea(perspace peryear) $975.00 $0.00 $975.00 Installationofnewcarshareparkingspace $1,620.00 $0.00 $1,620.00 Filming
&
ApplicationFee(perday) High impact – 50+ crew, 10+ trucks, significant equipment $630.00 $0.00 $630.00 continuedonnextpage...
Parking
–Footpath
Roads
Filming–Footpath&RoadsApplicationFee(perday) [continued]
Medium impact – 26-50 crew, 10< trucks, some equipment
Low impact – 11-25 crew, minimal equipment
UltraLowimpact-10<crew,1camera,soundandno vehicles
On-street parking when filming on private property – unitbase/parkingplan
Majorrevisionoffilmingapplication
DrivewayLineMarking
LineMarking
OccupancyofRoadRelatedArea
EngineeringDAInspectionFee
MiscellaneousServices
Depositsfordamageduringconstruction
DamagebondforlargeDA's-MediumDensity/ Commercial Refertochargesunder
Securityagainstdamageforconstructionwithin3 metresofCouncilStormwaterInfrastructure DeterminedbyCouncilbasedon costsofworkstoreplacestormwater infrastructure
SecurityagainstaccessdamagetoCouncilparksor reserves DeterminedbyCouncil,basedon works-cappedat$10,000excl.GST
Securityagainstcompliancewithtreepreservation requirements/conditions(StreetTree) As
Page22of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$390.00 $0.00 $390.00
$205.00 $0.00 $205.00
FREE
$220.00 $0.00 $220.00
75%ofapplicationfee
Driveway
$355.00 $0.00 $355.00
ApplicationFee $180.00 $0.00 $180.00 RoadOccupancyCommercialParkingZoneweddingandfuneralvehicles $6.00 $0.00 $6.00 per
Installandremoveregulatorysignsandstems $210.00 $0.00 $210.00
Lin.mperweek(minimumduration6months)
EngineeringDAInspectionFee $150.00 $0.00 $150.00
takenon
feeforservicebasisperhour,perofficer,
other
FirstHour $205.00 $0.00 $205.00 PerhourorpartthereofafterFirstHour $205.00 $0.00 $205.00
Activitiesnotcoveredbytheabovefeeschedulewillbe
a
plus
costsincurredinprovidingtheservices
Development
Security
Damage
Inspection
AgainstdamagetoCouncil property DamageDepositDA/CDCResidentialDwelling $2,000.00 $0.00 $2,000.00 DamagedepositfordrivewaywithoutDA $900.00 $0.00 $900.00
heading Planning&
|
-
Depositsand
Fees
Method
range between$1,000
$10,000) continuedonnextpage...
valuedbyThyer(2011)Tree Valuation
(deposit
and
Depositsfordamageduringconstruction [continued]
Damagebondforpublicdomainworks DeterminedbyCouncilbasedon works
ApplicationforDrivewayCrossingandAssociatedWorks(underSection138RoadsAct)
CouncilDesigned(includesoneinspection)
DrivewayAsphaltRestoration-perdriveway
UpgradeExistingDriveway/FootpathWorks(without DA)
Driveway / Footpath Works – single residential dwellingDA/CDCwithboundarylevelissue
Driveway / Footpath Works – medium density / commercialDA/CDCwithboundarylevelissue
Driveway / Footpath Modification – sketch only (excludeslevelissue)
Assessmentfeeforself-designMultiUnitand/orCommercial/IndustrialDevelopmentInfrastructure
Assessmentofdesignssubmittedbydevelopersfor vehicularcrossingandinfrastructureupgradeworks (PublicDomainWorks)
FeesAssociatedtoIssueofHeavyVehiclesPermit
Page23of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$1,210.00 $0.00 $1,210.00
$522.73 $52.27 $575.00
$763.64 $76.36 $840.00
$1,118.18 $111.82 $1,230.00
$218.18 $21.82 $240.00 Additional
(where
are permitted
approved) $390.91 $39.09 $430.00 Additional
$185.00 $0.00 $185.00
Driveway
2ormoredriveways
/
InspectionFeeperhourorpartthereof afterfirsthour
$1,790.00 $0.00 $1,790.00
IssueofpermitforClass1&3vehiclesusinglocal roads $93.00 $0.00 $93.00
RestorationCharges
GeneralInformation
-RoadOpeningPermitapplicationfeeisnon-refundableandmustbechargedperapplication.
-AdministrationFeeiscalculatedtocovertheCouncilcostoftheRestorationsOfficerat16%and5%sinkingfunds.
-Footpathtoberestoredatfullslabwidth.Drivewayfromjointtojoint.
-Minimumareais1msquaredforjobslessthan1msquaredperitem.Minimum1mforkerbandgutter.
-Asphaltrestorationsshallbeminimum1.5morfulllanewidth.TheextenttobedeterminedbyCouncil.
-Ifroadopeningiswithin1mofthelipofagutterorwherenokerbexists,therestorationistoextendtothelipofthe gutteroredgeofthebitumen.
-Whereanypartoftheroadopeningiswithin1mofanexistingroadrestoration,thenewrestorationistoextendtothe farsideoftheexistingrestoration.
-TheminimumwidthforpaverrestorationwillbedeterminedbyCouncil.
-Damaged/missingpaverswillbereplacedandchargedatcostplusadministrationfee.
-Wherethetypeofworkisnotcoveredintheschedule,ortheworkscomprisecapitalisedworkswheretheutilityhasthe righttocompletetheirownrestoration,thecostwillbesubjecttocostplusadministration,andtheextenttobedetermined byCouncil.
-AllpermanentreinstatementtobecarriedoutbyGeorgesRiverCouncilunlessapprovedbyCouncil.
-AllrestorationsforPublicUtilityworksare GST exempt.
concretegullypitupto1.5mdeepincludingsupplyoflintel(upto3.6m
andgalvanisedgratewhere required.
Page24of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
AdditionalInspectionforDamagedCouncilAsset $163.64 $16.36 $180.00 MakeSafeCharge/EmergencySafetyWorks(Other) Tobedetermineduponcompletion MakeSafeCharge/EmergencySafetyWorks (Standard) $181.82 $18.18 $200.00 RestorationScopeandSignOffFee(persite) $272.73 $27.27 $300.00 TrafficControl(1person) $718.18 $71.82 $790.00 TrafficControl(2ormorepeople) $1,854.55 $185.45 $2,040.00 ApplicationFee $136.36 $13.64 $150.00 AdministrationFee 21%ofcostofworksasdetermined byCouncil ConcretePlantOpeningfeefornightworks(per night) $2,563.64 $256.36 $2,820.00 StormwaterPitlid $227.27 $22.73 $250.00 StormwaterPitReconstruction $5,900orcostofworksasdetermined byCouncil,whicheverisgreater
SupplyandinstallStormwaterPitLintel(perM opening) $1,363.64 $136.36 $1,500.00 Nightworksurcharge 25%ofcostofworksasdetermined byCouncil
Standard
opening)
RoadOpeningChargesforRestorationsforQuantitiesUnder10sq.m Roads
Footpaths
Concreteindustrialdriveways(150mmreinforced) (5-10m2persq.m)
Kerb&Gutter
RoadOpeningChargesforReinstatementforQuantitiesover10m2or10lin.M Roads
Footpaths
Page25of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Asphalticconcretewithflexiblepavement(persq.m) $309.09 $30.91 $340.00 Cementconcrete(persq.m.) $590.91 $59.09 $650.00
Concretepersq.m(<5sq.m;minimumcharge1 sq.m) $295.45 $29.55 $325.00 Concretepersq.m.(5-10sq.m) $272.73 $27.27 $300.00 Brickorblockpavers(persq.m) $386.36 $38.64 $425.00 Brick or Block Pavers – on concrete base (per sq.m) $463.64 $46.36 $510.00 Asphalticconcreteonflexiblepavement(persq.m) $290.91 $29.09 $320.00 Formedorgrassarea(persq.m) $118.18 $11.82 $130.00 Concreteresidentialdriveways(130mmreinforced) (Under5sq.m) $331.82 $33.18 $365.00
residentialdriveways
persq.m) $331.82 $33.18 $365.00 Concrete
$340.91 $34.09 $375.00
Concrete
(130mmreinforced) (5-10m2
industrialdriveways(150mmreinforced) (Under5sq.m)
$345.45 $34.55 $380.00
Concretekerband
$390.91 $39.09 $430.00 Laybackandgutter(perm.) $390.91 $39.09 $430.00 Sawcutting(perm.) $25.91 $2.59 $28.50 Concretekerbramp(each) $2,081.82 $208.18 $2,290.00 Stormwateroutletreconnection90mm.dia.(per metre) $263.64 $26.36 $290.00
gutter(perm.)
Asphalticconcretewithflexiblepavement(11-50 sq.m) $250.00 $25.00 $275.00 Asphalticconcretewithflexiblepavement(51+sq.m) $236.36 $23.64 $260.00 Cementconcrete(11-50sq.m.) $372.73 $37.27 $410.00 Cementconcrete(51+sq.m.) $318.18 $31.82 $350.00
Concretepersq.m.(11-50sq.m) $209.09 $20.91 $230.00 Concretepersq.m.(51+sq.m) $172.73 $17.27 $190.00 Brickorblockpavers(11-50sq.m) $345.45 $34.55 $380.00 Brickorblockpavers(51+sq.m) $304.55 $30.45 $335.00 continuedonnextpage...
Footpaths [continued]
Kerb&Gutter
HoistingActivities
HoistingActivitiesoverroadwayfromsiteinstalleddevicesegTowerCranes
Planning&Development PlanningProposals
Page26of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Brick
course
$82.27 $8.23 $90.50 Asphaltic
onflexiblepavement(11-50sq.m) $259.09 $25.91 $285.00 Asphaltic
onflexiblepavement(51+sq.m) $168.18 $16.82 $185.00 Formedorgrassarea(11-50sq.m) $85.91 $8.59 $94.50 Formedorgrassarea(51+sq.m) $71.82 $7.18 $79.00 Concrete
reinforced)
$300.00 $30.00 $330.00
$213.64 $21.36 $235.00 Concreteindustrialdriveways(150mmreinforced) (11-50sq.m) $309.09 $30.91 $340.00 Concreteindustrialdriveways(150mmreinforced) (51+sq.m) $222.73 $22.27 $245.00
orblockpaversconcretebase
(per sq.m)
concrete
concrete
residentialdriveways(130mm
(11-50sq.m)
Concreteresidentialdriveways(130mmreinforced) (51+sq.m)
kerbandgutter(11-50m.) $318.18 $31.82 $350.00 Concretekerbandgutter(51+m.) $290.91 $29.09 $320.00 Laybackandgutter(11-50m.) $318.18 $31.82 $350.00 Laybackandgutter(51+m.) $290.91 $29.09 $320.00
Concrete
ApplicationFee $180.00 $0.00 $180.00 OccupancyFee $200.00 $0.00 $200.00 perweek(minimumcharge12weeks) Bushcare CorporateVolunteerProgram-Bushcare $72.73 $7.27 $80.00 perpersonpersession/event
Pre-Lodgement Consultation (initial) – Minor (cost will bedeductedfromlodgementfee) $2,145.45 $214.55 $2,360.00 Pre-Lodgement Consultation (initial) – Major nonComplex(costwillbedeductedfromlodgementfee) $4,236.36 $423.64 $4,660.00 continuedonnextpage...
PlanningProposals
[continued]
Pre-Lodgement Consultation (initial) – Major CBD or Complex(costwillbedeductedfromlodgementfee)
Note:
Minor - Planning Proposal with no map change ie no zone, FSR or height change; Majornon-Complex-OutsideKogarah&HurstvilleCBD's; MajorCBDorComplex-withinKogarah&HurstvilleCBD'siezonedMU1andE2ordeferredmatter
Review and Finalisation – Major CBD or Complex
AssessmentofAdditionaland/orAmendedStudies from applicant – Minor (per study)
AssessmentofAdditionaland/orAmendedStudies from applicant – Major non-Complex (per study)
AssessmentofAdditionaland/orAmendedStudies from applicant – Major CBD or Complex (per study)
NotificationPerLetter
Advertising(peradvertisement,asrequiredby Counciland/ortheGatewayDetermination)
Additionalstudies(requiredbyandcommissionedby council)
HoldingPublicHearing(e.g.reclassificationofland) andassessmentofhearingreport
Companysearch(includingadministrationfee)
oratcost,whicheveristhe greater Titlesearch(includingadministrationfee)
ExternalUrbanDesignReferralFee ExternalUrbanDesignReferralFee
Page27of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$7,045.45 $704.55 $7,750.00
Pre-Lodgement Consultation (subsequent) – Minor $1,427.27 $142.73 $1,570.00
non-Complex $2,118.18 $211.82 $2,330.00 Pre-Lodgement Consultation (subsequent) – Major CBDorComplex $3,527.27 $352.73 $3,880.00 Assessment of Proposal – Minor $19,300.00 $0.00 $19,300.00 Assessment of Proposal – Major non-Complex $38,500.00 $0.00 $38,500.00 Assessment of Proposal – Major CBD or Complex $51,400.00 $0.00 $51,400.00 Consultation – Minor $7,690.00 $0.00 $7,690.00 Consultation – Major non-Complex $15,500.00 $0.00 $15,500.00 Consultation – Major CBD or Complex $20,600.00 $0.00 $20,600.00 Review and Finalisation – Minor $11,600.00 $0.00 $11,600.00 Review and Finalisation – Major non-Complex $23,100.00 $0.00 $23,100.00
Pre-Lodgement Consultation (subsequent) – Major
$30,800.00 $0.00 $30,800.00
$3,850.00 $0.00 $3,850.00
$7,690.00 $0.00 $7,690.00
$10,300.00 $0.00 $10,300.00
$4.00 $0.00 $4.00
$3,300.00 $0.00 $3,300.00
Fullcost
required
Councilcosts Costof
preparationat
cost
recovery DeedofAgreement
topay
Deed
proponents
Fullcostrecovery
$40.00
$20.00 $0.00 $20.00
$5,420.00 $0.00 $5,420.00
DevelopmentControlPlanPreparation
DCP Preparation or Amendment – Minor (accompaniesminorplanningproposals)
DCP Preparation or Amendment – Major (accompaniesmajorplanningproposals)
Note:feebreakdown-Assessment60%;Consultation20%andReviewandFinalisation20%
(perpropertynotified)
fee(peradvertisement)
Note:ifre-exhibitionoftheplanningproposalisrequired,thenanadditionalnotificationfeewillbechargedconsistent withtheabove
Preparationofadditionalstudiesasrequiredby CounciltosupporttheDCPpreparation
PlanningAgreementsContributions/PublicPurposes
Planning Agreement – negotiation, preparation, exhibitionandexecution,ordeedofvariation,ordeed ofnovationincludingindependentassessmentof reportsandvaluationsprovidedaspartof negotiations
Planning Agreement – monitoring, enforcing and administeringtheplanningagreement.
Fullcostrecoveryorasspecifiedin executedPlanningAgreement
Fullcostrecoveryorasspecifiedin executedPlanningAgreement
PlanningAgreementContributions/PublicPurpose AsspecifiedintheexecutedPlanning Agreement
Section7.11and7.12Contributions(formerlyS94/S94A)
Section7.11Contributions(FormerHurstvilleCity CouncilLGA)
Section7.11and7.12DevelopmentContributions
Pleaserefertothe"GeorgesRiver CouncilLocalInfrastructure ContributionsPlan2021(s7.11and s7.12)"forinformationoncontribution rates
Section7.11Contributions(FormerKogarahCity CouncilLGA)
Section7.12(formerlyS94A)DevelopmentContributions
Development (including complying development) that is not subject to a section 94 contribution under any other contributionsplanthatisinforceundertheEP&AAct,andtheproposedcostofcarryingoutthedevelopmentis:
Totalcostsamount$100,000orless
Total costs amount between $100,001 – $200,000
Totalcostsamountis$200,001ormore
Page28of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$6,420.00 $0.00 $6,420.00
$19,300.00 $0.00 $19,300.00
Notificationfee
$4.00 $0.00 $4.00 Advertising
$3,300.00 $0.00 $3,300.00
Fullcostrecovery
$1,620.00 $0.00 $1,620.00
PreliminaryAssessment
Strategic,PlanningandDevelopmentAdvice
Council'sDevelopmentControlPlans,Studies&DevelopmentContributionPlans
LocalEnvironmentalPlans
(LEPs)
(each)
DevelopmentControlPlans(DCPs)
Section7.11&Section7.12Plans
OtherDocuments
Page29of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$220.00 $0.00 $220.00
Generalstrategicplanningwrittenadvicerequiring researchand/orsiteinspection(perhourorpart thereof)
copyofGeorgesRiverLEPInstrumentonly
$57.50 $0.00 $57.50 Environmental Planningand Assessment Regulation2021 Hardcopy(A3)ofGeorgesRivermaponly(each) $10.80 $0.00 $10.80 Environmental Planningand Assessment Regulation2021 HardcopyofHurstville/KogarahLEPInstrumentonly (each) $57.50 $0.00 $57.50 Environmental Planningand Assessment Regulation2021
Hurstville
KogarahLEPmaponly
$10.80 $0.00 $10.80 Environmental Planningand Assessment Regulation2021 Hardcopy(A3)ofHurstville/KogarahLEPmaponly
$10.00 $0.00 $10.00
Hard
Hardcopy(A3)of
/
(each)
(each)
Hard
of1
$93.00 $0.00 $93.00 Hard
only) $31.00 $0.00 $31.00 Hard
of
$98.50 $0.00 $98.50 hardcopyofHurstville/KogarahDCP(sectiononly) $33.00 $0.00 $33.00
copyofGeorgesRiverDCP(Fullcopy
DCP)
copyofGeorgesRiverDCP(section
copyofHurstville/KogarahDCP(FullCopy
1 DCP)
$35.50 $0.00 $35.50 Environmental Planningand Assessment Regulation2021
HardcopyofSection7.11orSection7.12Plan(1Full Copy)
Hardcopy
HurstvilleCityCentreUrbanDesign Strategy $124.50 $0.00 $124.50 HardcopyofKogarahNorthUrbanDesignStrategy $124.50 $0.00 $124.50 VoluntaryPlanningAgreementPolicy(each) $40.00 $0.00 $40.00 continuedonnextpage...
of
OtherDocuments [continued]
Page30of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
HardcopyofStrategicPlanningReports/Documents (each) $54.00 $0.00 $54.00 Environmental Planningand Assessment Regulation2021 Certifieddocuments(each) $62.00 $0.00 Environmental Planningand Assessment Regulation2021 HardcopyofLocalEnvironmentalStudies(each) $54.00 $0.00 $54.00 Environmental Planningand Assessment Regulation2021 HardcopyofHurstvillePublicDomainPlan $160.00 $0.00 $160.00 HardcopyofHurstvilleCommunityBasedHeritage StudyReview2013(TwoVolumes) $145.00 $0.00 $145.00 HardcopyofEmploymentlandsStudy $135.00 $0.00 $135.00 HardcopyofGeorgesRiverIndustrialLandReview $135.00 $0.00 $135.00 HardcopyofKogarahNorthPublicDomainPlan $135.00 $0.00 $135.00 HardcopyofHurstvilleCityCentreTransport ManagementandAccessibilityPlan(TMAP) $135.00 $0.00 $135.00 HardcopyofGeorgesRiverTidalInundationStudy $49.50 $0.00 $49.50 HardcopyofStage1CentresAnalysis $135.00 $0.00 $135.00 Hard copy of Georges River Evidence Base $49.50 $0.00 $49.50 HardcopyofLocalHousingStrategy $135.00 $0.00 $135.00 HardcopyofInclusiveHousingStrategyandDelivery Plan $135.00 $0.00 $135.00 HardcopyofGeorgesRiverLocalStrategicplanning Statement $135.00 $0.00 $135.00 HardcopyofGeorgesRiverCouncilCarParking Strategy/PositionPaper $135.00 $0.00 $135.00 HardcopyofForeshoreScenicCharacterStudy $124.50 $0.00 $124.50 CD-ROM/USBofabovePlans(perplan) $20.00 $0.00 $20.00 Section10.7(formerlySection149)PlanningCertificate Section10.7(2)(includespostage) $62.00 $0.00 $62.00 Environmental Planningand Assessment Regulation2021 Section10.7(2)&(5)(includespostage) $156.00 $0.00 $156.00 Environmental Planningand Assessment Regulation2021 Section10.7UrgencyFee(includingfaxfee) $150.00 $0.00 $150.00 DevelopmentandBuilding-DevelopmentAdvisoryService Pre-DevelopmentApplicationAdvice $62.00
SingleDwellings,DualOccupancies,SecondaryDwellings,CommercialFitOuts(Newalterations& additions,demolitionandancillarydevelopment)
PreDAAdviceforworksvaluedbetween$0-100,000 –Advice only & no meeting
PreDAAdviceforworks
between$0-$200,000 –Advice & meeting
PreDAAdviceforworksvaluedbetween$200,001$500,000 – Advice & meeting
PreDAAdviceforworksvaluedbetween$500,001$1,000,000 – Advice & meeting
PreDAAdvicefor
$1,000,000-Advice&
FollowupPreDAapplication-Considerationof additionalinformation/amendeddesign 50%oftheoriginalPreDAfee
AllOtherDevelopmenttypesthatdonotfallintoanyotherPreDevelopmentadvisorycategory
Pre DA Advice for works valued between $0 – 100,000 – Advice only no meeting
PreDAAdviceforworksvaluedbetween$0$1,000,000 – Advice & meeting
$3,000,000 – Advice & meeting
Pre
$10,000,000 – Advice & meeting
PreDAAdviceforworksvaluedgreaterthan $10,000,000 – Advice & meeting
FollowupPreDAapplication/considerationof additionalinformation/amendeddesign
OtherAdvice
Pre-ComplyingDevelopmentCertificateAdvice
Adviceaswhetheraproposalwouldconstitutea CDC,perproposal(IfapplicationlodgedwithCouncil, feetobecreditedfromCDCapplicationfee)
UrbanDesignReview(additionaltoPreDAfee) EstimatedCostofConstruction<$10Million(per review)
$5,030.00 EstimatedCostofConstruction>$10Million(per review)
Page31of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$263.64 $26.36 $290.00
$359.09 $35.91 $395.00
valued
$463.64 $46.36 $510.00
$868.18 $86.82 $955.00
worksvaluedgreater
$1,536.36 $153.64 $1,690.00
than
meeting
$463.64 $46.36 $510.00
$1,536.36 $153.64 $1,690.00
$2,036.36 $203.64 $2,240.00
PreDAAdviceforworksvaluedbetween$1,000,001-
DAAdvice
worksvalued
$3,054.55 $305.45 $3,360.00
$5,081.82 $508.18 $5,590.00
for
between$3,000,001-
50%
fee
oftheoriginalPreDA
Singleissueonly-perhour $309.09 $30.91 $340.00 Additionalhours $272.73 $27.27 $300.00 Confirmationinwritingthatdevelopmentisexempt $272.73 $27.27 $300.00 Generalresearch&interpretationadvice(perhour) $272.73 $27.27 $300.00
$363.64 $36.36 $400.00
$0.00
$5,030.00 $0.00
$6,700.00
$6,700.00
ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice
ProfessionalExternalConsultancyServicesFeefor ApplicationAssessment(e.g.acoustics,fire engineering,geotechnical,flood,bushfire,heritage, ecology, traffic, landscape assessment etc.) – Peer review,Reportandoradvice.WhereCouncilhasto engagetheservicesofanoutsideconsultancyfor specialistconsultancyadviceorpeerreview,thecost ofthisservicewillbeforwardedtothepartycausing theneedfortheinspection,report,peerreviewandor advice. In accordance with Council’s Procurement PolicyandPractices.
‘As invoiced’ plus 10% for Council AdministrationofConsultant Engagement andContractManagement
DevelopmentandBuilding-DevelopmentApplication(DA)Fees
20%discountonDevelopmentApplicationFeewhenlodgedtogetherwithacouncilassessedConstructionCertificate
DA'sforDwellingHouses
Developmentapplicationsforadwellinghousewith anestimatedcostof$100,000orless
DA'sforAdvertisements(Signage)
FeemustnotexceedthefeebasedonthefeesscheduleforDA's
DA'sforChangeofUse(Only)
Developmentapplicationnotinvolvingerectionofa building,carryingoutofwork,thesubdivisionofland ordemolitionofabuildingorwork
DA'sfortheSubdivisionofLand(otherthanstrata)
Page32of74 FeeName Year
Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
23/24
$532 00 $0.00 $532 00 Environmental Planningand Assessment Regulation2021
Base $333 00 $0.00 $333.00 Environmental Planningand Assessment Regulation2021 plusperadvertisement $93.00 $0.00 $93.00 Environmental Planningand Assessment Regulation2021
$333 00 $0.00 $333 00 Environmental Planningand Assessment Regulation2021
Opening of Public Road – base $777.00 $0.00 $777.00 Environmental Planningand Assessment Regulation2021 plusperadditionallot $65.00 $0.00 $65.00 Environmental Planningand Assessment Regulation2021 continuedonnextpage...
DA'sfortheSubdivisionofLand(otherthanstrata) [continued]
DA'sforStrata/StratumSubdivision
AllotherDA'sincludingerectionofabuilding,carryingoutofwork,demolitionofbuildingorwork (basedonestimatedcosts)
Page33of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
No Opening of Public Road – base $386 00 $0.00 $386 00 Environmental Planningand Assessment Regulation2021 plusperadditionallot $53.00 $0.00 $53.00 Environmental Planningand Assessment Regulation2021
Strata/Stratum – base $386 00 $0.00 $386 00 Environmental Planningand Assessment Regulation2021 plusperlot $65.00 $0.00 $65.00 Environmental Planningand Assessment Regulation2021
Up
$129.00 $0.00 $129.00 Environmental Planningand Assessment Regulation2021 Base fee – $5,001 – $50,000 $198.00 $0.00 $198.00 Environmental Planningand Assessment Regulation2021 plusanadditionalamountforeach$1,000(orpartof $1,000)oftheestimatedcostofthedevelopment $3.00 $0.00 $3.00 Environmental Planningand Assessment Regulation2021 Base fee – $50,001 – $250,000 $412.00 $0.00 $412.00 Environmental Planningand Assessment Regulation2021 plusanadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds$50,000 $3.64 $0.00 $3.64 Environmental Planningand Assessment Regulation2021 Base fee – $250,001 – $500,000 $1,356.00 $0.00 $1,356.00 Environmental Planningand Assessment Regulation2021 plusanadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds $250,000 $2.34 $0.00 $2.34 Environmental Planningand Assessment Regulation2021 continuedonnextpage...
to$5,000
AllotherDA'sincludingerectionofabuilding,carryingoutofwork,demolitionofbuildingorwork (basedonestimatedcosts) [continued]
plusanadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds $500,000
plusanadditionalamountforeach$1,000(orpartof $1,000)bywhichtheestimatedcostexceeds $1,000,000
(orpartof $1,000)bywhichtheestimatedcostexceeds $10,000,000
DA'sforDesignatedDevelopment
DevelopmentandBuilding-ModificationofDevelopmentConsentApplication
ModificationofDevelopmentConsentApplication(Courtapproved/S4.55(2))
Original
Page34of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Base fee – $500,001 – $1,000,000 $2,041 00 $0.00 $2,041.00 Environmental Planningand Assessment Regulation2021
$1.64 $0.00 $1.64 Environmental Planningand Assessment Regulation2021 Base fee – $1,000,001 – $10,000,000 $3,008.00 $0.00 $3,008.00 Environmental Planningand Assessment Regulation
$1.44 $0.00 $1.44 Environmental Planningand Assessment Regulation
Morethan$10,000,000 $18,565.00 $0.00 $18,565.00 Environmental Planningand Assessment Regulation
$1.19 $0.00 $1.19 Environmental Planning
2021
2021
2021 plusanadditionalamountforeach$1,000
and Assessment Regulation2021
DesignatedDevelopment-AdditionalFee $1,076.00 $0.00 $1,076.00 Environmental Planningand Assessment Regulation2021
Modification(Minorerror,mis-descriptionor miscalculation) $83.00 $0.00 $83.00 Environmental Planningand Assessment Regulation2021 Modification
754.00
whicheveristhelesser Environmental Planning
Assessment
(MinimalEnvironmentalImpact) $
or50%oftheoriginalfee,
and
Regulation2021
50%oftheoriginalapplicationfee Environmental Planning
continuedonnextpage...
feelessthan$100
and Assessment Regulation2021
ModificationofDevelopmentConsentApplication(Courtapproved/S4.55(2)) [continued]
Original fee $100 or more – for development that doesnotinvolvetheerectionofabuilding,the carryingoutofaworkorthedemolitionofaworkor building
Fordevelopmentthatinvolvestheerectionofa dwelling-housewithanestimatedcostofconstruction of$100,000orless
For other development – Based on the original cost of constructionUpto$5,000
$5,001 – $250,000 $99.00 plusanadditional$1.50for each$1,000(orpartthereof)ofthe estimatedcost
$250,001 – $500,000
585.00 plusanadditional$0.85for each$1,000(orpartthereof)by whichtheestimatedcostexceeds $250,000
Planningand Assessment Regulation2021
Planningand Assessment Regulation2021
Planningand Assessment Regulation2021
$500,001 – $1,000,000
Planningand Assessment Regulation2021 $1,000,001 – $10,000,000
Planningand Assessment Regulation2021 Morethan$10,000,000
,540.00 plusanadditional$0.27for each$1,000(orpartthereof)by whichtheestimatedcostexceeds $10,000,000
Planningand Assessment Regulation2021
ReviewofDeterminationDevelopmentApplicationorModificationtoDevelopmentConsent
developmentthatinvolvestheerectionofa dwelling-housewithanestimatedcostofconstruction of$100,000orless
Page35of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
50%oftheoriginalapplicationfee Environmental
Planningand Assessment Regulation2021
$222.00 $0.00 $222.00 Environmental Planning
and Assessment Regulation2021
$6
$0.00 $64.00 Environmental
4.00
Environmental
$
Environmental
$8
Environmental
$1
Environmental
DesignVerificationAssessmentfee(Modification Applications) $958.34 $0.00 $958.34 Environmental Planningand Assessment Regulation2021
33.00 plusanadditional$0.50for each$1,000(orpartthereof)by whichtheestimatedcostexceeds $500,000
,154.00 plusanadditional$0.40for each$1,000(orpartthereof)by whichtheestimatedcostexceeds $1,000,000
$5
Environmental
For
building 50%
originalfee Environmental Planningand Assessment Regulation2021
$2
$0.00 $2
Environmental
Up
$6
$0.00 $64.00 Environmental Planning
continuedonnextpage...
developmentthatdoesnotinvolvetheerectionof abuilding,thecarryingoutofaworkorthedemolition ofa
of
For
22.00
22.00
Planningand Assessment Regulation2021
to$5,000
4.00
and Assessment Regulation2021
[continued]
Base fee $5,001 – $250,000 $100.00 plusanadditional$1.50for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe basefee Environmental Planningand Assessment Regulation2021
Base fee $250,001 – $500,000 $585.00 plusanadditional$0.85for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe basefee
Planningand Assessment Regulation2021 Base fee $500,001 – $1,000,000
33.00 plusanadditional$0.50for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe basefee
Base fee $1,000,001 – $10,000,000
Notified&Re-notifiedApplications
plusanadditional$0.27for each$1,000(orpartthereof)by whichthe
Planningand Assessment Regulation2021
Planningand Assessment Regulation2021
Page36of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Environmental
Environmental
$8
$1,154.00
Environmental
Base
$5,540.00
estimated
base
Environmental Planning
Reviewofmodificationdetermination 50%ofmodificationapplicationfee ReviewofDecisiontoRejectDevelopmentApplication Uptoandlessthan$100,000 $64.00 $0.00 $64.00 Environmental Planningand Assessment Regulation2021 $100,001 – $1,000,000 $175.00 $0.00 $175.00 Environmental Planningand Assessment Regulation2021 Greaterthan$1,000,000 $292.00 $0.00 $292.00 Environmental Planningand Assessment Regulation2021
plusanadditional$0.40for each$1,000(orpartthereof)by whichtheestimatedcostexceedsthe basefee
feegreaterthan$10,000,000
costexceedsthe
fee
and Assessment Regulation2021
Development with estimated cost up to $500,000 $395.00 $0.00 $395.00 Environmental Planningand Assessment Regulation2021 Development with estimated cost greater than $500,000 up to $1,000,000 $670.00 $0.00 $670.00 Environmental Planningand Assessment Regulation2021 Development with estimated cost greater than $1,000,000 $1,230.00 $0.00 $1,230.00 Environmental Planningand Assessment Regulation2021
AdvertisedandRe-advertisedApplications(inadditiontonotificationfees)
OtherApplicationFees-DevelopmentAssessment
ElectronicFileManagement(Developmentapplications,ModificationstoDevelopmentConsents& ReviewsofDetermination)
Feeperapplicationfortheelectronicfilemanagementofapplicationsandaccompanyinginformation
Document
LapsedConsents
Confirmationinwritingwhetherornotconsenthas lapsed
ExtensionofConsentApplication
ReviewofDocumentationsubmittedtoConsentConditions
Determine
Page37of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Designateddevelopment $2,569.00 $0.00 $2,596.00 Environmental Planning
Assessment Regulation
AdvertisedDevelopment $1,292.00 $0.00 $1,292.00 Environmental Planning
Prohibiteddevelopment $1,292.00 $0.00 $1,292.00 Environmental Planningand Assessment
NominatedIntegratedDevelopment,Threatened SpeciesDevelopmentorClass1Aquaculture $1,292.00 $0.00 $1,292.00 Environmental Planningand Assessment Regulation2021
and
2021
and Assessment Regulation2021
Regulation2021
Management
Scanningestimatedcostof works<$10,000 $35.00 $0.00 $35.00 DocumentManagement/Scanningestimatedcostof works$10,000to$100,000 $50.00 $0.00 $50.00 DocumentManagement/Scanningestimatedcostof works$100,001to$300,000 $80.00 $0.00 $80.00 DocumentManagement/Scanningestimatedcostof works$300,001to$500,000 $130.00 $0.00 $130.00
Management/Scanningestimatedcostof works$500,001to$1,000,000 $220.00 $0.00 $220.00 DocumentManagement/Scanningestimatedcostof works$1,000,001to$5,000,000 $400.00 $0.00 $400.00 DocumentManagement/Scanningestimatedcostof works>$5,000,000 $600.00 $0.00 $600.00
/
Document
$360.00 $0.00 $360.00
$360.00 $0.00 $360.00
ExtensionofConsent
ifoperationalconsentactive(Deferred
conditions) $360.00 $0.00 $360.00 continuedonnextpage...
commencement
ReviewofDocumentationsubmittedtoConsentConditions [continued]
Determineifdocumentationsubmittedtosatisfy conditioniscompliance
ApplicationFeeRefunds/FeeWaiver
ApplicationFeeRefunds-Proportionastotimespent assessingtheapplicationuptotimeofwithdrawal/ cancellation.-AdditionalPercentageRefundcanbe appliedwheretheManagerDevelopmentand Building,DirectorEnvironment&PlanningorGeneral ManagerdeterminesthatCouncilerroridentifiedor significantfailureincustomerserviceleveloccurred
100%-wherenoassessmenthas occurred
Max80%-wherepreliminary assessmenthasbeenundertakenand noreporthasbeenprepared
Max50%-wherecomplete assessmenthasbeenundertakenand noreporthasbeenprepared
Max25%-whereassessmentand reporthavebeencompleted
100%ofNotification/advertisingfeeif notoccured
ApplicationsthatFeeWaiversApply
FullorPartialFeeWaiver/Refundcanbeapplied wheretheManagerDevelopmentandBuilding, DirectorEnvironment&PlanningorGeneralManager determinesthatCouncilerroridentifiedorsignificant failureincustomerserviceleveloccurred
Upto100%ofApplicationFee
SiteCompatibilityCertificateandsiteverificationcertificatesunderSEPPs Fee
Currentfeeassetoutinclause262AofEPAReg2000:
(1)ThemaximumfeeforanapplicationtotheDirector-Generalforasitecompatibilitycertificate(SEPPHousing2021) is$310,plus$42foreachdwellinginthedevelopmentinrespectofwhichthecertificatewasissued.
(2)ThemaximumfeeforanapplicationtotheDirector-Generalforasitecompatibilitycertificate(SEPPTransport 2021)is$310,plus$265foreachhectare(orpartofahectare)oftheareaofthelandinrespectofwhichthecertificate wasissued.
(3)ThemaximumfeeforanapplicationtotheDirector-Generalforasitecompatibilitycertificate(SEPPResourcesand Energy2021Part2.4)is$4,370.
DesignReviewPanelFee(notrequiredifadviceprovidedatPreDevelopmentstage)
EstimatedCostofConstruction(perapplication) $3,360.00 $0.00 $3,360.00
FeetoCouncilforDevelopmentApplicationsforIntegratedDevelopment
FeetoCouncilforDevelopmentApplicationsfor IntegratedDevelopment
Environmental Planningand Assessment Regulation2021
Page38of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$360.00 $0.00 $360.00
$164.00 $0.00 $164.00
continuedonnextpage...
FeetoCouncilforDevelopmentApplicationsforIntegratedDevelopment [continued]
LongServiceLevy(AllDevelopmentTypes)
BuildingServicesLongServiceLevyPaymentsAct AsLegislated(Notecurrently0.25%of thetotalcostoftheworkforbuilding andconstructionworkthatisequalor over$250,000,nochargeforcostof workunder$250,000)
DevelopmentandBuilding-BuildingAssessmentandDevelopmentEngineering
BuildingInformationCertificateApplications
ApplicationforanyNationalConstructionCode (BuildingCodeofAustralia)class1building(together withanyclass10buildingsonthesite)oranyother NationalConstructionCode(BuildingCodeof Australia)classofbuildingwithafloorareanot exceeding200m2
ApplicationforanyNationalConstructionCode (BuildingCodeofAustralia)classofbuilding(except Class1building,togetherwithanyclass10buildings onthesite)whereFloorAreaexceeds200m2
ChargeRates:
a.$250plus$0.50perm²forareaof200m²to2000m²; b.$1165plus$0.08perm²forarea2001m²orgreater
AdditionalFeeforallBuildingInformationCertificate Applicationswhereworksundertakeninprevious24 monthsrequiredDevelopmentConsent/CDC howeverwasnotobtained
AdditionalFeeforallBuildingInformationCertificate Applicationswherebuildingworkshavebeencarried outandPrivateCertifierhasnotissuedanoccupation certificate
Costbyquotationbystipulatedcharge rates
$250plusapplicableDevelopment Application&ConstructionCertificate feesifapprovalhadbeensought
$250plusConstructionCertificate feesifapprovalhadbeensought
BuildingInformationCertificatePublicNotification&Re-notificationFees
ElectronicFileManagement
Fee per application for the electronic file management of Building Information Certificates, Subdivision Certificates, CouncilCDC's,CouncilConstructionCertificates,HoardingandAnchorapplicationsandaccompanyinginformation
Page39of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Feeto
Applicationsrequiring
$374.00 $0.00 $374.00
CouncilforDevelopment
concurrence
$250.00 $0.00 $250.00
AdditionalInspectionfee $90.00 $0.00 $90.00
Modification $834.56 $0.00 $834.56 Environmental Planningand Assessment Regulation2021 DevelopmentApplication $1,385.93 $0.00 $1,385.93 Environmental Planningand Assessment Regulation2021
continuedonnextpage...
ElectronicFileManagement [continued]
Document
DocumentManagementestimatedcostofworks
$10,000to$100,000
Document
$100,001to$300,000
Document
Document
to$1,000,000
DocumentManagementestimatedcostofworks $1,000,001to$5,000,000
Document
$5,000,000
AmendedPlans/Documentation
ThefeeforanassessmentofanamendmenttoBuildingInformationCertificates,SubdivisionCertificates,Hoardingand Anchorapplicationspriortoitsdeterminationis:
Allamendments 50%oforiginalassessmentfee
LodgementofPrivatePCAIssuedCertificatesforRecordspurposes
OutsideofStandardHoursWorkPermitapplicationfees
Swimmingpools(PrivateSwimmingPool)
Fire
Safety
AnnualFireSafetyStatementAFSS
*30-daydiscountfeeisappliedifpaidwithin30daysoftheAFSSduedate
Page40of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$35.00 $0.00 $35.00
Managementestimatedcostofworks< $10,000
$50.00 $0.00 $50.00
Managementestimatedcostofworks
$80.00 $0.00 $80.00
$130.00 $0.00 $130.00
Managementestimatedcostofworks $300,001to$500,000
$220.00 $0.00 $220.00
Managementestimatedcostofworks $500,001
$400.00 $0.00 $400.00
Managementestimatedcostofworks>
$600.00 $0.00 $600.00
Class1aDwelling(eachdwelling) $225.00 $0.00 $225.00 Class 2-9 Building – up to 3 Stories $545.00 $0.00 $545.00 Class 2-9 Building – 4 Stories and above $760.00 $0.00 $760.00 Class2-9Buildingwhereconcretepourexceeds500 squaremetres $1,090.00 $0.00 $1,090.00
ApplicationforexemptionunderClause22of SwimmingPoolsAmendmentAct2012 $250.00 $0.00 $250.00 SwimmingPoolAct CertificateofComplianceunderSchedule1of SwimmingPoolsAmendmentAct2012 $150.00 $15.00 $165.00 SwimmingPoolAct Re-inspection $100.00 $10.00 $110.00 SwimmingPoolAct SwimmingPoolsRegistrationOnline $10.00 $1.00 $11.00 ResuscitationCharts $30.00 $3.00 $33.00
ofAFSS $150.00 $15.00 $165.00
Registration
FireSafetyCompliance
Hoardings
PublicRoads(LicenceFee)
CouncilLandOther(LeasingFee)
Note-anyadministrationcostsindevelopingaleaseagreementforHoardingonCouncilLandwillbebepassedontothe applicant
(fence
TypeB(overheadtype) $145permonth(perlinealmetreor commercialrateviavaluation-which everisthehigher)
DamageDepositsandInspectionFeesAgainstdamagetoCouncilproperty
Page41of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Fire
$455.00 $0.00 $455.00 Registrable Boarding Houses – Boarding House first 12monthsRegistrationandComplianceInspection Fee $455.00 $0.00 $455.00 RegistrableBoardingHousesAnnualInspectionFee perhourorpartthereofafter $400.00 $0.00 $400.00 RegistrableBoardingHousesRe-inspectionFeeper hourorpartthereofafter $400.00 $0.00 $400.00
SafetyComplianceProgramInspectionandReinspectionfee(i.e.SharedAccommodation, EntertainmentVenues,Industrial&Commercial premisesetc.)
Baseapplicationfee $495.00 $0.00 $495.00 Amendedapplication/plans/detail $495.00 $0.00 $495.00 Extensiontoapprovalapplication $495.00 $0.00 $495.00 Lateapplicationfee $495.00 $0.00 $495.00
TypeA(fencetype) $55permonth(perlinealmetre) TypeB(overheadtype) $75permonth(persquaremetre)
TypeA
type) $105permonth(perlinealmetreor commercialrateviavaluation-which everisthehigher)
MinorBuildingWorktothevalueof$25,000 $550.00 $0.00 $550.00 Dualoccupancyanddomesticbuildingworkincluding dual occupancy – value between $20,500 and $2,000,000 $1,900.00 $0.00 $1,900.00 Allindustrialandcommercialbuildingworkvalue between$20,000and$2,000,000 $3,750.00 $0.00 $3,750.00 SecurityagainstaccessdamagetoCouncilparksor reserves $2,300.00 $0.00 $2,300.00 Securityagainstcompliancewithtreepreservation requirements/conditions $2,250.00 $0.00 $2,250.00 Securityagainstaccessdamageforconstruction within3metresofCouncilStormwaterInfrastructure Depositamounttobedetermined basedoncostsofworkstoreplace stormwaterinfrastructure continuedonnextpage...
DamageDepositsandInspectionFeesAgainstdamagetoCouncilproperty [continued] Major Developments – Damage Deposit Works greaterthan$2,000,000invalue $1,236.00permetreofeachstreet frontageofproperty
InspectionfeesofMajordevelopments(min2 inspections) – Non refundable
GroundAnchorDeposit
WhereexcavationistobesupportedbytheuseofbelowgroundcableanchorsthatareconstructedunderCouncil's roadways/footpaths
Footpath/AssetInspectionFees
DemolitionInspectionFees
Section88GCertificate
ActivityApplicationsunderSection68,LocalGovernmentAct,1993
Page42of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$371.00 $0.00 $371.00
$1,000.00permetre
eachstreet
ofproperty
of
frontage
FirstHourorpartthereof $200.00 $0.00 $200.00 PerhourorpartthereofafterFirstHour $200.00 $0.00 $200.00 MinorBuildingWork $140.00 $0.00 $140.00 Other $200.00 $0.00 $200.00
PreDemolitionInspectionFee $250.00 $0.00 $250.00 PostDemolitionInspectionFee $250.00 $0.00 $250.00
Fee $35.00 $0.00 $35.00 ConveyancingAct
| Section88G
ApplicationFee $400.00 $0.00 $400.00 Perhourorpartthereof $340.00 $0.00 $340.00 GroundAnchorApplication(minimum4hours) $1,360.00 $0.00 $1,360.00 Informationrequest OutstandingNoticesCertificate-Environmental PlanningandAssessmentAct $230.00 $0.00 $230.00 OutstandingNoticesCertificate $230.00 $0.00 $230.00 Informationcompiledfromfilesincludingwritten responseandsearch/miscellaneousservices(per hour) $340.00 $0.00 $340.00
ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice
ProfessionalExternalConsultancyServicesFeefor ApplicationAssessment(e.g.acoustics,urbandesign, fireengineering,geotechnical,flood,bushfire, heritage, ecology etc.) – Peer review, Report and or advice.WhereCouncilhastoengagetheservicesof anoutsideconsultancyforspecialistconsultancy adviceorpeerreview,thecostofthisservicewillbe forwardedtothepartycausingtheneedforthe inspection,report,peerreviewandoradvice.In accordance with Council’s Procurement Policy and Practices.
BuildingCertification
‘As invoiced’ plus 10% for CouncilAdministrationofConsultant Engagement andContractManagement
PrincipalCertifyingServiceFee(IncludesoneOccupationCertificatefee)-Alldevelopment types
The Manager Development & Building has the authority to adjust the fee applicable (maximum 10%) based on assessmentoftheextentoftheproposedworksandjustificationofthenumberofinspections
Upto$5,000 $227.27 $22.73 $250.00
$5,001 – $25,000 $250.00Plus0.70%foreach$1 greaterthan$5k
$25,001 – $50,000
Plus0.65%foreach$1 greaterthan$25k $50,001 – $75,000
Plus0.50%foreach$1 greaterthan$50k
$75,001 – $100,000
Plus0.35%foreach$1 greaterthan$75k $100,001 – $250,000
$250,001 – $500,000
Plus0.25%foreach$1 greaterthan$100k
$1,175.00Plus0.15%foreach$1 greaterthan$250k
$500,001 – $1,000,000 $1,550.00Plus0.13%foreach$1 greaterthan$500k
$1,000,001 – $5,000,000
$5,000,001 – $10,000,000
$10,000,001andabove
Plus0.06%foreach$1 greaterthan$1mil
Plus0.03%foreach$1 greaterthan$5mil
$5,875.00Plus0.01%foreach$1 greaterthan$10mil
2.17aWhereCouncilisappointedasthereplacementPrincipalCertifier
WhereCouncilisappointedasthereplacementPrincipalCertifier,thePrincipalCertifyingServicefeeisasoutlinedinthe abovetablemultipliedby4
Page43of74 FeeName
Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Year23/24
$425.00
$587.50
$712.50
$800.00
$2,175.00
$4,675.00
ConstructionCertificateApplicationFeesforNationalConstructionCodeBuildingClasses1 and10–basedonestimatedcostofworks-(InadditiontoPCAfee)
20%discountonConstructionCertificatefeewhenlodgedtogetherwithDevelopmentApplication. -feecalculatedusingthefeetablethena20%discountisapplied Upto$5,000
$5,001 – $25,000 $250.00Plus0.70%foreach$1 greaterthan$5k
$25,001 – $50,000 $425.00Plus0.65%foreach$1 greaterthan$25k
$50,001 – $75,000
$75,001 – $100,000
$100,001 – $250,000
$587.50Plus0.50%foreach$1 greaterthan$50k
$712.50Plus0.35%foreach$1 greaterthan$75k
Plus0.25%foreach$1 greaterthan$100k
$250,001 – $500,000 $1,175.00Plus0.15%foreach$1 greaterthan$250k
$500,001 – $1,000,000
$1,000,001 – $5,000,000
$5,000,001 – $10,000,000
$10,000,001andabove
$1,550.00Plus0.13%foreach$1 greaterthan$500k
$2,175.00Plus0.06%foreach$1 greaterthan$1mil
$4,675.00Plus0.03%foreach$1 greaterthan$5mil
$5,875.00Plus0.01%foreach$1 greaterthan$10mil
ConstructionCertificateApplicationFeesforNationalConstructionCodeBuildingClasses2 to9–basedonestimatedcostofworks Upto$50,000 $715.91 $71.59 $787.50
$50,001-$100,000 $750plus2%foreach$1greaterthan $50,000
$100,001-$500,000
$500,001-$1,000,000
$1,000,001-$5,000,000
$5,000,001andabove
$1,750plus0.5%foreach$1greater than$100,000
$3,750plus0.3%foreach$1greater than$500,000
$5,250plus0.15%foreach$1greater than$1,000,000
$11,250plus0.07%foreach$1 greaterthan$5,000,000
AmendedConstructionorComplyingDevelopmentCertificates
AmendedConstructionorComplyingDevelopment Certificates 50%oforiginalfee
Page44of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$227.27
$22.73 $250.00
$800.00
continuedonnextpage...
AmendedConstructionorComplyingDevelopmentCertificates [continued] AmendedConstructionorComplyingDevelopment Certificates(MinorWorks)
ComplyingDevelopmentCertificateApplicationFeesforNationalConstructionCodeBuilding Classes1and10–basedonestimatedcostofworks
PreCDCAssessment/Review “Pre-Complying Development Certificate Advice” fee to be credited toComplyingDevelopmentCertificate Application
Plus1%foreach$1greater than$5k
$25,001 – $50,000
$50,001 – $75,000
$75,001 – $100,000
Plus0.70%foreach$1 greaterthan$25k
Plus0.58%foreach$1 greaterthan$50k
Plus
foreach$1 greaterthan$75k $100,001 – $250,000
$250,001 – $500,000
Plus0.30%foreach$1 greaterthan$100k
Plus0.20%foreach$1 greaterthan$250k
$500,001 – $1,000,000 $1,893.80Plus0.15%foreach$1 greaterthan$500k
$1,000,001 – $5,000,000
$5,000,001 – $10,000,000
Plus0.08%foreach$1 greaterthan$1mil
$5,643.80Plus0.03%foreach$1 greaterthan$5mil
$10,000,001andabove $7,143.80Plus0.01%foreach$1 greaterthan$10mil ComplyingDevelopmentCertificateNeighbour NotificationFee
ComplyingDevelopmentCertificateApplicationFeesforNationalConstructionCodeBuilding Classes2to9–basedonestimatedcostofworks Upto$50,000
$50,001-$100,000 $750plus2%foreach$1greaterthan $50,000
$100,001-$500,000 $1,750plus0.5%foreach$1greater than$100,000
$500,001-$1,000,000 $3,750plus0.3%foreach$1greater than$500,000
$1,000,001-$5,000,000
$5,250plus0.15%foreach$1greater than$1,000,000
$5,000,001andabove $11,250plus0.07%foreach$1 greaterthan$5,000,000
Page45of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$590.91 $59.09 $650.00
Upto$5,000 $227.27 $22.73 $250.00
$5,001 – $25,000 $250.00
$500.00
$675.00
$818.80
0.50%
$943.80
$1,393.80
$2,643.80
$76.82 $7.68 $84.50
$681.82
$68.18 $750.00
ComplyingDevelopmentCertificate
ModificationofComplyingDevelopmentCertificate 50%oforiginalfee
PCAInspections(Mandatoryoradditional)
OccupationCertificate.
SubdivisionCertificate Wherenonewallotments(e.g.boundary adjustments)
perlotcreatedorperunitproposed(Torrensor CommunityTitle)
LinenPlan(certification)
EndorsementofInstrumentundertheConveyancingActwhereCounciliscitedinthe instrument
ComplyingDevelopmentCertificateprivatecertifierstormwaterassessmentreferralfee
StormwaterAssessmentforCDCapplicationsasper Council'sStormwaterManagementPolicy Perapplication(perhour)$250
ProfessionalExternalConsultancyServicesFee–Peerreview,ReportandorAdvice
ProfessionalExternalConsultancyServicesFeefor ApplicationAssessment(e.g.acoustics,fire engineering,geotechnical,flood,bushfire,heritage, ecology, traffic, landscape assessment etc.) – Peer review,Reportandoradvice.WhereCouncilhasto engagetheservicesofanoutsideconsultancyfor specialistconsultancyadviceorpeerreview,thecost ofthisservicewillbeforwardedtothepartycausing theneedfortheinspection,report,peerreviewandor advice. In accordance with Council’s Procurement PolicyandPractices.
‘As invoiced’ plus 10% for Council AdministrationofConsultant Engagement and Contract Management
Page46of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Commercial
use $727.27 $72.73 $800.00
Changeof
Perinspection $309.09 $30.91 $340.00
Occupation
application $409.09 $40.91 $450.00
Certificate
$500.00 $0.00 $500.00 Fee
$285.00 $0.00 $285.00 StrataCertificate $1,000.00 $0.00 $1,000.00 StratumCertificate $1,000.00 $0.00 $1,000.00
CertificationFee $450.00 $0.00 $450.00 InspectionFee $380.00 $0.00 $380.00
CertificationFee $450.00 $0.00 $450.00 InspectionFee $380.00 $0.00 $380.00
ActivityApplicationunders.68oftheLocal
(Stormwater)
TemporaryRoad,LaneorFootpathClosure
Page47of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
ApplicationFee(perapplication) $470.00 $0.00 $470.00 InspectionFee(perhourorpartthereof) $150.00 $0.00 $150.00
DepositforworksonCouncilStormwater Infrastructure Priceonapplicationbasedoncostof works-tobedeterminedbyCouncil
GovernmentActand/ors.138oftheRoadsAct
Damage
CarParkClosure(perbayperday) $32.50 $0.00 $32.50 TemporarycompoundClosure(perm2permonth) $165.00 $0.00 $165.00 UrgentProcessingFee(within48businesshours) $270.00 $0.00 $270.00 ApplicationFee(nonrefundable) $180.00 $0.00 $180.00 RoadClosureFee(perLin.mperlaneperday) $43.50 $0.00 $43.50 Road Closure Fee – Section 68 LG Act – Cranes, Pumpsetc.(perlin.mperlaneperday) $59.50 $0.00 $59.50 FootpathOccupancyFee(persq.mperday) $11.00 $0.00 $11.00
UseofFootwayApplicationFee $200.00 $0.00 $200.00 Licencetouseroadwayforpermanentstructures Marketratetobedeterminedby valuation-Legal,Surveyand Valuationfeesatcost LocalGovernment Act1993|Section 68 OutdoorDining/Restaurants ApplicationFee $220.00 $0.00 $220.00 LicenceFee OutdoorDining-HurstvillePlaza(persquaremetre perannum) $350.00 $0.00 $350.00 Hurstville & Kogarah CBD – Without Fixed Council Umbrellas(persquaremetreperannum) $320.00 $0.00 $320.00 Hurstville & Kogarah CBD – With Fixed Council Umbrellas(persquaremetreperannum) $390.00 $0.00 $390.00 Oatley/BeverlyHills/Mortdale/Penshurst(per squaremetreperannum) $250.00 $0.00 $250.00 OtherAreas(persquaremetreperannum) $250.00 $0.00 $250.00 DisplayofGoods(adjacenttobusinesspremises) ApplicationFee $130.00 $0.00 $130.00 LicenceFee Hurstville&KogarahCBD(persquaremetreper annum) $169.50 $0.00 $169.50 OtherAreas(persquaremetreperannum) $140.00 $0.00 $140.00
UseofFootway
A-FrameAdvertisingSignage
AvertisingSignage(persignperannum)
UseofPublicSpace(non-roadreserve)
UseofPublicSpace-KogarahTownSquareand HurstvillePlaza-Rental/Useofspace(maximum feepayablepereventperday)(GSTinclusive
Outdoor
Dining/Restaurants-KogarahTownSquareDecking
ActivityApplicationDetermination
Section68LGA
Approvals
(12monthsmaximum)
CommercialUseofPublicFootways Installoroperateamusementdevices(per
Useastandingvehicleoranyarticleforthepurpose ofsellinganyarticleinapublicplacefortheperiod specifiedintheapproval
SkipBinFees-Sec68LGActManagementofWaste
PublicHealth
(note:includesCoolingTowersorWarmWaterSystems(regulatedsystems),PublicSwimmingPool&Spas,Mortuaries andSkinPenetrationPremises) Collection&analysisofwatersamplesbyNATA approvedlaboratory
Page48of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
A-Frame
$220.00 $0.00 $220.00
$1,318.18 $131.82 $1,450.00
ApplicationFee $220.00 $0.00 $220.00 Licence
Fee
stallholder) $69.00 $0.00 $69.00 Rental/Use
Space
squaremetreperannum) $330.00 $0.00 $330.00
Preparation
(newandrenewals)(per
of
(per
Fee UnderSection100LocalGovernment Act – 30% of Fee with minimum fee of $75.00
event) $358.00 $0.00 $358.00
$358.00 $0.00 $358.00
$358.00 $0.00 $358.00
Carryoutanactivityprescribedbytheregulationsor anactivityofaclassordescriptionprescribedbythe regulations
SkipBinApplicationFee $55.00 $0.00 $55.00 SkipBinsonPublicLand(perbinperweek) $110.00 $0.00 $110.00
Invoicecost
Pre-occupationCertificateInspection $260.00 $0.00 $260.00 PublicHealthNotificationFee $90.91 $9.09 $100.00 InspectionFee(firsthour) $205.00 $0.00 $205.00 InspectionFee(perhalfhour
thereofafterfirst hour) $102.00 $0.00 $102.00
Fee(firsthour) $102.00 $0.00 $102.00 continuedonnextpage...
+10%
orpart
Re-Inspection
DomesticWasteManagementServices
Page49of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Re-InspectionFee(perhalfhourorpartthereofafter firsthour) $50.00 $0.00 $50.00 Hair,SkinBeautySalon(nonskinPenetration) $125.00 $0.00 $125.00
Health
NoticesandOrders Improvement Notice – Regulated System $620.00 $0.00 $620.00 PublicHealth Regulation2012| Part9Clause97 Prohibition Orders – Regulated System $620.00 $0.00 $620.00 PublicHealth Regulation2012| Part9Clause97 Improvement Notice – Public Swimming pool & Spa andSkinPenetrationPremises $290.00 $0.00 $290.00 PublicHealth Regulation2012| Part9Clause98(b) Prohibition Orders – Public Swimming pool & Spa and SkinPenetrationPremises $290.00 $0.00 $290.00 PublicHealth Regulation2012| Part9Clause97 ProhibitionOrderReinspectionFee(perhour) $135.00 $0.00 $135.00 PublicHealth Regulation2012| Part9Clause98(b)
PublicHealth [continued]
Public
-
StandardDomesticWasteManagementCharge $511.00 $0.00 $511.00 LocalGovernment Act1993|Section 496 1x120Lgeneralwastebin,1x240Lrecyclingbin+1x240Lgardenorganicsbin AdditionalVolumeDomesticWasteManagement Charge $664.00 $0.00 $664.00 LocalGovernment Act1993|Section 496 1x240Lgeneralwastebin,1x240Lrecyclingbin+1x240Lgardenorganicsbin Extrageneralwastebinservice(120L) $163.00 $0.00 $163.00 LocalGovernment Act1993|Section 496 Extrageneralwastebinservice(240L) $326.00 $0.00 $326.00 LocalGovernment Act1993|Section 496 ChangeofService(bins)AdministrationFee $22.00 $0.00 $22.00 ThisfeemaybeappliedtotheRatesAccountforbinchangesthatexceedoneperfinancialyear SpecialAdditionalwasteservice(4ormorechildren ormedicalcondition) $133.00 $0.00 $133.00 LocalGovernment Act1993|Section 496 Extrarecyclingbinservice(240L) $115.00 $0.00 $115.00 LocalGovernment Act1993|Section 496 Extragardenorganicsbinservice(240L) $153.00 $0.00 $153.00 LocalGovernment Act1993|Section 496 continuedonnextpage...
DomesticWasteManagementServices [continued]
CommercialWasteManagementServices
Page50of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Availabilitycharge(dwellingwithprivatedomestic wastecontractor) $70.00 $0.00 $70.00 LocalGovernment Act1993|Section 496 Availabilitycharge(dwellingwithcancelledbin service) $70.00 $0.00 $70.00 LocalGovernment Act1993|Section 496
Commercialgeneralwastebinservice(240L)-once weekly $615.00 $0.00 $615.00 LocalGovernment Act1993|Section 501 Commercialgeneralwastebinservice(1100L)-once weekly $2,560.00 $0.00 $2,560.00 LocalGovernment Act1993|Section 501 Commercialrecyclingbinservice(240L)-once weekly $310.00 $0.00 $310.00 LocalGovernment Act1993|Section 501 Commercialgeneralwastebinservice(240L)-twice weekly $1,230.00 $0.00 $1,230.00 LocalGovernment Act1993|Section 501 Commercialgeneralwastebinservice(1100L)-twice weekly $5,120.00 $0.00 $5,120.00 LocalGovernment Act1993|Section 501 Commercialrecyclingbinservice(240L)-twice weekly $620.00 $0.00 $620.00 LocalGovernment Act1993|Section 501
SharedCommunityWasteStorageAreas-Security Bond $400.00 $0.00 $400.00 CommunityGardens CommunalGardenBed $46.82 $4.68 $51.50 IndividualGardenBed $93.64 $9.36 $103.00 Family/HouseholdMembership-CommunalGarden Bed $68.18 $6.82 $75.00 Family / Household Membership – Individual Garden Bed $113.64 $11.36 $125.00 CompanionAnimalFees-Lifetimeregistration-microchipping CompanionAnimalFeesaresetbyOfficeofLocalGovernmentandmaychangewithoutpriornotice Dog – Desexed (by relevant age) $75.00 $0.00 $75.00 CompanionAnimals Act Dog – Desexed (by relevant age eligible pensioner) $32.00 $0.00 $32.00 CompanionAnimals Act Dog – Desexed (sold by pound/shelter) $0.00 $0.00 $0.00 CompanionAnimals Act continuedonnextpage...
OtherWasteManagementServices
CompanionAnimalFees-Lifetimeregistration-microchipping [continued]
AnnualSpecifiedAnimalPermitFees
Dangerous/RestricedDogEnclosure
Page51of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Dog – Not Desexed or Desexed (after relevant age) $252.00 $0.00 $252.00 CompanionAnimals Act Dog – Not Desexed (not recommended) $75.00 $0.00 $75.00 CompanionAnimals Act Dog – Not Desexed (not recommended – pensioner) $32.00 $0.00 $32.00 Dog – Not Desexed (recognised breeder) $75.00 $0.00 $75.00 CompanionAnimals Act Dog-Working $0.00 $0.00 $0.00 CompanionAnimals Act Dog-ServiceoftheState $0.00 $0.00 $0.00 CompanionAnimals Act AssistanceAnimal $0.00 $0.00 $0.00 CompanionAnimals Act Cat – Desexed (sold by pound/shelter) $0.00 $0.00 $0.00 CompanionAnimals Act Cat – Desexed (Eligible Pensioner) $32.00 $0.00 $32.00 CompanionAnimals Act Cat – Desexed or Not Desexed $65.00 $0.00 $65.00 CompanionAnimals Act Cat – Not Desexed (not recommended) $65.00 $0.00 $65.00 CompanionAnimals Act Cat – Not Desexed (not recommended – pensioner) $32.00 $0.00 $32.00 Cat – Not Desexed (recognised breeder) $65.00 $0.00 $65.00 CompanionAnimals Act RegistrationLateFee $22.00 $0.00 $22.00 CompanionAnimals Act
DangerousDog $221.00 $0.00 $221.00 CompanionAnimals Act RestrictedDog $221.00 $0.00 $221.00 CompanionAnimals Act Catnotdesexedbyfourmonthsofage $92.00 $0.00 $92.00 CompanionAnimals Act Permitlatefee $21.00 $0.00 $21.00
ComplianceCertificate $150.00 $0.00 $150.00
AnimalImpoundingandEuthanasiaFees
Dailyboardingcharge&VetCareperanimalperdayforcostofcareforallanimalsnotreclaimedbytheirowneruntil thereisanoutcome,uptoamaximumcappedperiod:
Dogs&Cats-74daycaponboardingfees(14daystatholdplusmax60daysforrehoming)
SmallAnimals-30daycaponboardingfees
Allanimalsunder8weeksofageonentrywillhaveBoardingfeescappedat14daystathold.
CouncilHolddogswillbechargedfortheirentirelengthofstay– cappedfeesdonotapply. Dogsheldas‘Council Hold’ i.e.declareddangerous,menacingorrestrictedbreed,orunderinvestigationwillbecharged atthesamedailyrateuntilthereisanoutcome.
Dailychargesincludeboardingcosts,veterinarycare,exitfees,publicholidayrates.
Any animal requiring euthanasia will incur a euthanasia fee. Includes euthanasia and disposal of animal declared dangerous,menacingorrestrictedbreed.Feesareasperbelow
AnimalVeterinaryTreatmentCharge Atinvoicedcost
$35plusgstforanimalsthatarereclaimedtocovervaccinationonentry
FoodPremisesRetailandhomebusiness
Registered Charities and Not for Profit School Canteens (P&C run) are not subject to these Food Premises Fees and Charges.
Page52of74
• • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
•
ImpoundedAnimalDailyBoardingCharge-Dogs(per day) $85.00 $8.50 $93.50 Impounded Animal Daily Boarding Charge – Cats (per day) $34.00 $3.40 $37.40 Impounded Animal Daily Boarding Charge – Small Animals(perday) $34.00 $3.40 $37.40
Impounded Animal Transport Charge – Strathfield $160.00 $16.00 $176.00 Impounded Animal Transport Charge – Austral $260.00 $26.00 $286.00 AfterHoursEmergencyAnimalTransportChargeRosebery $200.00 $20.00 $220.00 AnimalIntakeAdministrationFee $75.00 $7.50 $82.50 Reduced
EuthanisiaFee-Kitten $100.00 $10.00 $110.00 EuthanisiaFee-Animal<10kg $250.00 $25.00 $275.00 EuthanisiaFee-Animal10kgto20kg $300.00 $30.00 $330.00 EuthanisiaFee-Animal>20kg $350.00 $35.00 $385.00
Impounded
to
AnnualAdministrationFee $125.00 $0.00 $125.00 Notification(registration)offoodpremises $60.00 $0.00 $60.00 Inspection Fee – First hour $205.00 $0.00 $205.00 Inspection Fee – Per half hour thereof after first hour $102.00 $0.00 $102.00 Re-inspection Fee – First hour $102.00 $0.00 $102.00 Re-inspection Fee – Per half hour thereof after first hour $50.00 $0.00 $50.00 PreOccupationCertificate $260.00 $0.00 $260.00
TemporaryFoodPremises(TFP)(includingmobilefoodvendingvehiclesandtemporaryfood stalls)
(excludemobilefoodvendingvehiclesresidingwithinGeorgesRiverCouncilLGA)
Food-Notices
ImpoundingCharges
Abandonedvehicles
Feeisthecontractor'scostwhichvariesbasedoncircumstancesandvehicletype Towingfee
Towing fee – deemed dangerous location
ProtectionoftheEnvironmentOperationLegislation
ThesefeesareissuedundertheProtectionoftheEnvironmentOperationsAct
Page53of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Application
Temporary
$125.00 $0.00 $125.00
TemporaryFoodPremises
changeofdetails $60.00 $0.00 $60.00 Inspection fee – Individual temporary food premises – Firsthour $102.00 $0.00 $102.00
Fee-Lifetime
foodPremises Permit
Re-issuingof
Permit
ImprovementNotice(pernotice) $330.00 $0.00 $330.00 FoodRegulation 2015|Part3 Clause11
Trolleys(perday) $120.00 $0.00 $120.00 ImpoundingAct OtherItems(perday) $120.00 $0.00 $120.00 ImpoundingAct AdministrationFee $28.50 $0.00 $28.50 ImpoundingAct Fee to release to owner – all impounded items $105.00 $0.00 $105.00 ImpoundingAct DisposalFee(ifnotclaimed) $66.00 $0.00 $66.00 ImpoundingAct
Feeisthecontractor'scostwhich
basedoncircumstances
ImpoundingAct
varies
and vehicletype
Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype ImpoundingAct Impoundingfee Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype ImpoundingAct HoldingFee(perday) Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype ImpoundingAct
Impounding
Fee to release to owner – all impounded items Feeisthecontractor'scostwhich variesbasedoncircumstancesand vehicletype
Act
continuedonnextpage...
ProtectionoftheEnvironmentOperationLegislation [continued]
LocalGovernmentLegislation
Community&Culture
ReplacementoflostLibrarycards
Page54of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
CleanUpNotice(UnderPOEOAct1997) $785.00 $0.00 $785.00 Protectionofthe Environment Operations (General) Regulation2022| Clause151 NoiseControlNotice(underPOEO1997) $785.00 $0.00 $785.00 Protectionofthe Environment Operations (General) Regulation2022| Clause151 PreventionNotice(UnderPOEO1997) $785.00 $0.00 $785.00 Protectionofthe Environment Operations (General) Regulation2022| Clause151 ComplianceCostNotice Costofworksorservices(Invoice)+ 10% Protectionofthe Environment Operations (General) Regulation2022| Clause151 EnvironmentalAudits/Inspection-includingvapor recoveryprogram $205.00 $0.00 $205.00
RecoveryCostNotice Varies-dependingoncostofworks LocalGovernment Act1993|Section 197and678
LibraryDeliveryorcollectionfee Deliveryorcollectionfee(morethan20items) $30.00 $0.00 $30.00 Deliveryorcollectionfee(upto5bulkyitems) $30.00 $0.00 $30.00 Deliveryorcollectionfee(upto20items) $20.00 $0.00 $20.00
Replacementcardfee(percard) $6.50 $0.00 $6.50 Photocopying,printingandscanning
performedatLibrary A4blackandwhite(perpage) $0.27 $0.03 $0.30 A3blackandwhite(perpage) $0.55 $0.05 $0.60 A4colour(perpage) $0.64 $0.06 $0.70 continuedonnextpage...
Services
Photocopying,printingandscanning [continued]
LostandDamagedLibraryItems
Page55of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
A3colour(perpage) $1.18 $0.12 $1.30 A4colourscan(perpage) $0.09 $0.01 $0.10 A3colourscan(perpage) $0.09 $0.01 $0.10
Lostordamagedcollectionitems Replacementcostofitem ProcessingFee(peritem) $20.00 $0.00 $20.00 Cleaningfeeforitemsreturneddirty(peritem) $20.00 $0.00 $20.00 Damagedpackagingreplacementfee(peritem) $12.50 $0.00 $12.50
OtherItems
Inter-LibraryLoans
Item
fromauniversityorpubliclibraryoutside Sydney(peritem)
LibraryOutreachPrograms
HirefeeforLibraryRooms
Page56of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
USB
drive
$5.45 $0.55 $6.00 Library
Pricemarkedonitem
flash
(16GB)
booksaleitems
$6.82 $0.68 $7.50
Atcost Lostordamageditemsloanedfromanotherlibrary Replacementcostofitem Processingfeeforlostordamageditemsloanedfrom anotherlibrary $20.00 $0.00 $20.00
Programsdeliveredoffsite(perhour) $68.18 $6.82 $75.00
ItemloanedfromanotherpubliclibraryinSydney(per item)
loaned
KogarahLibraryActivityRoom(perhour) $23.64 $2.36 $26.00 HurstvilleLibraryMilesFranklinMeetingRoom(per hour) $23.64 $2.36 $26.00 OatleyLibraryHall(perhour) $23.64 $2.36 $26.00 SouthHustvilleMeetingRoom(perhour) $18.18 $1.82 $20.00 HurstvilleLibraryGrevilleaRoom(perhour) $7.27 $0.73 $8.00 Audiovisualequipmentincludinglaptop,projector (perhour) $14.55 $1.45 $16.00 Hire
(forfunctionsandprograms) Audiovisualequipmentincludinglaptop,projector, PA,microphone(perhour) $14.55 $1.45 $16.00 HireofKogarahLibraryExhibitionSpace(perhour) $72.73 $7.27 $80.00 HireofHurstvilleLibraryExhibitionSpace(perhour) $72.73 $7.27 $80.00 AfterhoursfunctionincludingtwoCouncilstaff(per hour) $118.18 $11.82 $130.00 CancellationFee $45.45 $4.55 $50.00 UseofKitchen(perhour) $24.55 $2.45 $27.00 Researchfee ResearchFee(perhour,firsthalfhourfree) $118.18 $11.82 $130.00
Servicefeeforreproductionofphotographs(per order) $29.55 $2.95 $32.50 PhotographLicenceFee(perimage) $21.82 $2.18 $24.00
FeeforLibraryExhibitionVenues
Servicefeeforreproductionofphotographs
LibraryProgramsEvents,ClassesandWorkshops
HurstvilleLibraryMediaLab
MediaLabandSoundBoothequipmentpacksavailableforin-househireinclude:ElectricGuitarPack,ElectronicDrum Pack,PercussionPack,DJPack,VocalMicrophonePack,StudioRecordingPack,ElectronicMusicPack,PodcastPack, PhotographyPack,VoxPopPack,FilmMakerPack,FieldRecordingPack
HireofMediaLaborSoundBoothequipmentpackfor commercialusein-house(perpack,perhour)
HireofMediaLaborSoundBoothequipmentpackfor non-commercial
Programs
Page57of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
SpecialEvents Variesdependingoncost Basic $7.27 $0.73 $8.00 Intermediate $10.91 $1.09 $12.00 Advanced $22.73 $2.27 $25.00 Custommadeprograms(perhour) $68.18 $6.82 $75.00
$27.27 $2.73 $30.00
usein-house
$9.09 $0.91 $10.00 HireofMediaLabStudio(commercialuseperhour) $81.82 $8.18 $90.00 HireofMediaLabStudio(non-commercialuseper hour) $27.27 $2.73 $30.00 HireofSoundBooth(commercialuseperhour) $40.91 $4.09 $45.00 HireofSoundBooth(non-commercialuseperhour) $13.64 $1.36 $15.00 HurstvilleMuseum&Gallery Museum on the Move – Travelling education kits (per kit) $59.09 $5.91 $65.00 ReminiscingTherapykits(perkit) $59.09 $5.91 $65.00 DragonfliesKids'ClubActivities(perchildperactivity) $9.09 $0.91 $10.00 ArtAttackKids'Workshops(perchildperactivity) $9.09 $0.91 $10.00 Commissiononsaleofartworks 20%ofsaleprice Bookandmerchandisesales Pricemarkedonitem Event & Classes – Materials Kit Pricemarkedonitem Organised
Organisedtours $5.00perperson(minimumcharge $50.00) Tea/coffee $2.00perperson Education
Highschooleducationprograms $6.50perperson(minimumcharge $65.00) Primaryschooleducationprograms $6.50perperson(minimumcharge $65.00) Preschool/daycareeducationprograms $6.50perperson(minimumcharge $65.00) ProfessionalServicesfee(perhour) $118.18 $11.82 $130.00
(perpack,perhour)
Tours
CommunityProgramsEvents,Classes&Workshops-Museum&Gallery
GeorgesRiverArtPrize
HiringFeeforExhibitionVenues(forfunctionsandprograms)
Dragon'sLairGallery FrameHire
MervLynchReserveArtistStudio
Policy,planningorotherdocuments
ChildCareFees
Page58of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
SpecialEvents Variesdependingoncost Basic $7.27 $0.73 $8.00 Intermediate $10.91 $1.09 $12.00 Advanced $22.73 $2.27 $25.00 Custommadeprograms(perhour) $68.18 $6.82 $75.00
Entryfeeforpeopleaged18yearsandover(per artwork) $45.45 $4.55 $50.00 Entryfeeforpeopleagedunder18years(perart work) $18.18 $1.82 $20.00
Hire
Gallery
hour) $72.73 $7.27 $80.00
ofMain
(per
frame) $4.55 $0.45 $5.00 Framerepairorreplacement AtCost Exhibitionofartwork-commercialrateifselling artwork(perweek) $63.64 $6.36 $70.00 Exhibitionofartwork-Non-Commercialrateifnot sellingartwork(perweek) $36.36 $3.64 $40.00
(per
LynchReserveArtistStudio(per day) $31.82 $3.18 $35.00 HiringFeeforMervLynchReserveArtistStudio(per week-MondaytoSunday) $159.09 $15.91 $175.00 $250perweek
GST).
HiringFeeforMerv
(incl
NotforProfitCommunityGroups(each) $39.00 $0.00 $39.00 Other(each) $64.00 $0.00 $64.00
$135.00 $0.00 $135.00 Ocean Street Kindergarten – from 1 July 2023 $115.00 $0.00 $115.00
$127.00 $0.00 $127.00 Penshurst Long Day Care – from 1 July 2023 $127.00 $0.00 $127.00 Jack High Long Day Care – from 1 July 2023 $127.00 $0.00 $127.00 South
Relief) $55.00 $0.00 $55.00 continuedonnextpage...
Oatley West Early Learning Centre – from 1 July 2023
Carss Park Narani Long Day Care – from 1 July 2023
HurstvilleKindergarten-From1July2023(not declaringStartStrongFee
ChildCareFees [continued]
SouthHurstvilleKindergartenEquityFee
SouthHurstvilleKindergarten-2DayEnrolment(with signedStartStrongFeeReliefDeclarationForm nominatingSHK)-perweek
SouthHurstvillePreschoolfeesforchildrenagedatleast3yearsonorbefore31Julyofyearenrolled
SouthHurstvilleKindergarten-3DayEnrolment(with signedStartStrongFeeReliefDeclarationForm nominatingSHK)-perweek
SouthHurstvillePreschoolfeesforchildrenagedatleast3yearsonorbefore31Julyofyearenrolled
SouthHurstvilleKindergartenAfterSchoolCare
ChildCare-OtherCharges
Excursionfee(perchild)
SouthHurstvilleKindergarten-Eventprogram
(perterm)
OccasionalCare(perhour)-OceanStreet Kindergarten
ChildcareWaitingListRegistrationFee(nonrefundable)
Enrolment:Twoweeksfeesinadvancetobepaid priortocommencementofschoolyearoron acceptanceofplacement(tobeheldasrefundable bondperchild) 2weeksoffees(proratabasedon numberofenrolleddays)
Latepickupfee
$50.00forthefirst10minutesorpart thereof,plus$20.00persubsequent5 minutes Latepaymentoffees(perweek)
EnrolmentcancellationinTerm4at South Hurstville Kindergarten – full termfeesmustbepaid. Enrolmentcancellationsreceivedprior tocommencementofattendance$200cancellationfee.
CommunityKeys
Page59of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$20.00 $0.00 $20.00
$7.07 $0.00 $7.07
$62.07 $0.00 $62.07
$10.00 $0.00
$10.00
$25.00 $0.00 $25.00
$20.00 $0.00 $20.00
fee
$18.00 $0.00 $18.00
$30.00 $3.00 $33.00
$30.00 $0.00 $30.00
DishonourFee(chargedperfamilyper transaction) $30.00 $0.00 $30.00 EnrolmentCancellation 2weeksnotice. Note:
Children'sHat $13.64 $1.36 $15.00 WetBags $9.09 $0.91 $10.00
DirectDebit
MasterLocksmithAccessKey(MLAK) $25.91 $2.59 $28.50 SeniorsCentreLockerKey $36.36 $3.64 $40.00
CarssParkLifeSavingHall
CarssParkStrawBaleShed
HurstvilleSeniorCitizensCentre
Regular
Page60of74 • • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
LateKeyreturn(perWeek) $22.73 $2.27 $25.00 SecurityBond $400.00 $0.00 $400.00 KeyDeposit $50.00 $0.00 $50.00
CommunityCentres
CasualBookings MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00 RegularBookings RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $29.09 $2.91 $32.00
CasualBookings Perhour $20.00 $2.00 $22.00 Regular
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod Perhour $11.77 $1.18 $12.95 DragonRoom MondaytoFriday(perhour) $56.36 $5.64 $62.00 Saturday(perhour) $68.18 $6.82 $75.00 Sunday(perhour) $68.18 $6.82 $75.00 RiverRoom MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
Bookings
CasualBookings MondaytoFriday(perhour) $51.36 $5.14 $56.50 Saturday(perhour) $62.73 $6.27 $69.00 Sunday(perhour) $62.73 $6.27 $69.00 Regular
Bookings
months
financialyear,
26bookings
continuedonnextpage...
Hirersareoncepermonthfor10
inthesame
or
ina3monthperiod
RegularBookings [continued]
KingsgroveCommunityCentre
CasualBookings
RegularBookings
KogarahSchoolofArts
CasualBookings
RegularBookings
MortdaleCommunityCentre
RegularBookings
OatleyCommunityHall
Bookings
Page61of74 • • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
MondaytoFriday(perhour) $45.45 $4.55 $50.00 Sunday(perhour) $57.27 $5.73 $63.00
MondaytoFriday(perhour) $51.36 $5.14 $56.50 Saturday(perhour) $62.73 $6.27 $69.00 Sunday(perhour) $62.73 $6.27 $69.00
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $45.45 $4.55 $50.00
MondaytoFriday(perhour) $51.36 $5.14 $56.50 Saturday(perhour) $64.09 $6.41 $70.50 Sunday(perhour) $62.73 $6.27 $69.00
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $45.45 $4.55 $50.00
MondaytoFriday(perhour) $60.00 $6.00 $66.00 Saturday(perhour) $65.45 $6.55 $72.00 Sunday(perhour) $65.45 $6.55 $72.00
CasualBookings
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $48.18 $4.82 $53.00
Casual
MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
RegularBookings
OatleyCommunityHall-meetingrooms1&2
CasualBookings
RegularBookings
PJFerryReserveCommunityHall
Bookings
RegularBookings
StGeorgeCommunityCentre
RegularBookings
Regular
CommunityCentreWaste-ExtraItemsifRequired
Page62of74
• • • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
•
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $29.09 $2.91 $32.00
MondaytoFriday(perhour) $17.05 $1.70 $18.75
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $11.77 $1.18 $12.95
Casual
MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $29.09 $2.91 $32.00
Casual
MondaytoFriday(perhour) $34.55 $3.45 $38.00 Saturday(perhour) $40.00 $4.00 $44.00 Sunday(perhour) $40.00 $4.00 $44.00
Bookings
Hirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod MondaytoFriday(perhour) $29.09 $2.91 $32.00 Sunday(perhour) $34.55 $3.45 $38.00
1100LCommercialWasteBin(PerBin) AsperCommercialWaste ManagementServicesfee 240LCommercialRecyclingBin(PerBin) AsperCommercialWaste ManagementServicesfee 240LCommercialWasteBin(PerBin) AsperCommercialWaste ManagementServicesfee
WaratahRoom
BanksiaRoom
HurstvilleOval-PavilionRoom
CasualBookings
RegularBookings
RegularHirersareoncepermonthfor10monthsinthesamefinancialyear,or26bookingsina3monthperiod
MaranaAuditoriumandHurstvilleSeniorCitizensCentrePackage
FeesincludeTechnicalOfficerforMaranaAuditorium.
MaranaAuditorium,CivicTheatreandHurstvilleSeniorCitizensCentrePackage
FeesIncludeTechnicalOfficer
Page63of74 • FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
MondaytoFriday(perhour) $28.64 $2.86 $31.50 Saturday(perhour) $33.64 $3.36 $37.00 Sunday(perhour) $33.64 $3.36 $37.00
MondaytoFriday(perhour) $14.36 $1.44 $15.80 Saturday(perhour) $19.09 $1.91 $21.00 Sunday(perhour) $19.09 $1.91 $21.00
MondaytoFriday(perhour) $60.00 $6.00 $66.00 SaturdayandSunday(perhour) $65.45 $6.55 $72.00
MondaytoFriday(perhour) $48.18 $4.82 $53.00
Monday-Friday(Minimum3hours) $276.36 $27.64 $304.00 Saturday,SundayandPublicHolidays(Minimum3 hours) $368.18 $36.82 $405.00
Monday-Friday(Minimum3hours) $431.82 $43.18 $475.00 Saturday,SundayandPublicHolidays(Minimum3 hours) $495.45 $49.55 $545.00
Auditorium WeekdaysMonday-Friday(perhour,minimum3 hours)-includesTechnicalOfficer $245.45 $24.55 $270.00 Weekends
publicholidays(perhour,minimum
hours)
includes
Officer $336.36 $33.64 $370.00
$131.82 $13.18 $145.00
Price
Performancevenues Marana
&
3
-
Technical
CommercialKitchenHire(perhour,minimum3hours) -includesTechnicalOfficer
HireofLargeLEDScreen(perday)
onrequest
CivicTheatre
MaranaAuditoriumandCivicTheatrePackage
Page64of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
MondaytoFriday(perhour)-includesTechnical Officer $172.73 $17.27 $190.00 Weekends&publicholidays(perhour)-includes TechnicalOfficer $195.45 $19.55 $215.00
WeekdaysMonday-Friday(perhour,minimum3 hours) $409.09 $40.91 $450.00 Weekends&publicholidays(perhour,minimum3 hours) $522.73 $52.27 $575.00 VideoPackage1 $1,372.73 $137.27 $1,510.00 VideoPackage2 $1,700.00 $170.00 $1,870.00 RecordedVideoFile $54.09 $5.41 $59.50 StreamingOption(livestreamtheevent) $109.09 $10.91 $120.00 LiveProjectionOption(projectyoureventliveonthe screen)RequiresAudioVisualTechniciancostper hour(minimum4hours) $61.36 $6.14 $67.50 MusiciansPackage1 $222.73 $22.27 $245.00 MusiciansPackage2(WirelessOption) $331.82 $33.18 $365.00 CrossStageLightingPackage $813.64 $81.36 $895.00 Furtheradditionalaudiovisualequipmentavailable Priceonrequest PublicHolidaysurcharge Flatratesurchargeforvenuehirebookingsona PublicHoliday(per3hourblockorpartthereof) $118.18 $11.82 $130.00 Additionalcharges FrontofHouseOfficer(Minimum4hoursplus overtimeandpenaltyratesifapplicable) $59.09 $5.91 $65.00 MovingLightingPackage:6xMovingHeads $909.09 $90.91 $1,000.00 Multicorecablehire $45.45 $4.55 $50.00 TechnicalOfficer(Minimum4hoursplusovertimeand penaltyratesifapplicable) $59.09 $5.91 $65.00 Breachoftermsandconditions(perbreach) $109.09 $10.91 $120.00 Standarddataprojector(CivicTheatre)(perday) $0.00 $0.00 $0.00 Dataprojector(allothervenues) $65.00 $6.50 $71.50 Allotherstagingandequipment Priceonrequest PianoHireorRemoval(includestuning) $240.91 $24.09 $265.00 Securityguard(perhour,4hourminimumplus overtimeandpenaltyratesifapplicable) $61.36 $6.14 $67.50 AdditionalAudiovisualtechnician-mandatoryforthe MaranaAuditorium(perhour,4hourminimumplus overtimeandpenaltyratesifapplicable) $54.55 $5.45 $60.00 MovingLightingPackage:2xMovingHeads $281.82 $28.18 $310.00 continuedonnextpage...
Additionalcharges [continued]
StagingandEquipment
TemporaryvinyldancefloorhireforMarana Auditorium – subsequent days
Temporary vinyl dance floor labour – install and removal(flatratecoversinstallationandremoval)
KogarahTownSquare,HurstvillePlazaorCivicForecourtArea CharityEventFees
AdditionalGarbageBins(onapplication) Priceonrequest
RequestedCouncilServiceseg.Barricadesetc.
PrivateEvent
Page65of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Catering Drinksandcateringpackages availableuponrequest Cleaninginexcessofnormalcleaningafterafunction (perhour,minimum2hours) $118.18 $11.82 $130.00
FlyPerson-MaranaAuditorium(Minimum4Hours) $59.09 $5.91 $65.00 Flipchart/whiteboard(chargeperitem) $20.00 $2.00 $22.00 TV(perday) $39.55 $3.95 $43.50 Drapes(1set,maximum4sets)perset $64.09 $6.41 $70.50 Projectorscreen $39.55 $3.95 $43.50 SmallPortablePASystem(subjecttoavailability, including1xcordedmicrophone) $73.64 $7.36 $81.00 Tablecloths(peritem) $12.14 $1.21 $13.35 Portableurn(perday) $39.55 $3.95 $43.50 AdditionalcordedmicrophonesShureSM58orSM57 (perday) $24.55 $2.45 $27.00 Additionalwirelesshandheldmicrophone(peritem) $86.36 $8.64 $95.00 Additionalwirelessheadsetmicrophone(peritem) $86.36 $8.64 $95.00 Additionalwirelesslapelmicrophone(peritem) $86.36 $8.64 $95.00 Choirmicrophone(setof3) $122.73 $12.27 $135.00 CondenserMicrophonesSetof2 $81.36 $8.14 $89.50 Hazemachine $109.09 $10.91 $120.00 Equipmentstoragefee(perdayorpartthereof) $56.36 $5.64 $62.00 Temporary
$218.18 $21.82 $240.00
$122.73 $12.27 $135.00
vinyldancefloorhireforMarana Auditorium – first day of hire
$268.18 $26.82 $295.00 Front
portableHardDrive) $118.18 $11.82 $130.00
$272.73 $27.27 $300.00
ofHouseMixRecording(clienttoprovide
Multitrackrecording(clienttoprovideportableHard Drive)
Priceonrequest
OnApplication Determinedperapplication,minimum charge$800for4hrs
CommercialFilmingonCouncilProperty
UseofPublicSpaces
Conditions
-Organisationscanapplyforamaximumof12occasionsinaCalendaryearbutnotmorethanoneoccasionpermonth
- Not for Profit Organisations seeking a further reduction in fees, refer to guidelines in accordance with the Grants, Donations&SponsorshipPolicy
-CommercialorganisationsthatconductStreetStallactivitiesonbehalfofnotforprofitorganisationsarenoteligiblefora 50%reductionontheStreetStallfee
CommercialActivitiesondesignatedCouncilfootways,publicplazas,orsquares
IndependentFestivalsorEventsinParksandTownCentres
Note:
- Additional charges will apply for any Street Stall activities that require temporary food inspections, access to water, electricity,Councilwasteservicesorroadclosures
-StreetStallsoreventsinCouncilsParksandReservesorstallsassociatedwithCouncilfestivalsandevents(suchas AustraliaDayandLunarNewYear)areconsideredseparatelytothispolicy
Page66of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
PublicLiability $36.50 $0.00 $36.50 ApplicationFee $285.00 $0.00 $285.00 Bond $515.00 $0.00 $515.00 Daily Rental Fee (Note – Major Projects) $820.00 $0.00 $820.00 Daily Rental Fee (Note – Minor Projects) $250.00 $0.00 $250.00
Application $168.18 $16.82 $185.00 ApplicationdiscountedfeeforLocalBusinesses withinLGA $122.73 $12.27 $135.00 ApplicationdiscountedfeeforNon-Profitand CommunityGroupswithinLGA $81.36 $8.14 $89.50 Rental/UseofSpace(maximumfeepayableper eventperday) $1,481.82 $148.18 $1,630.00 StreetStallFee(perday) $75.45 $7.55 $83.00 StreetStalldiscountedfeeforNon-Profitand CommunityGroupswithinLGA(perday) $37.27 $3.73 $41.00
Perhour(minimumtwohours) $100.00 $10.00 $110.00 Perday $409.09 $40.91 $450.00
Bond $1,070.00 $0.00 $1,070.00 DailyRentalFee $472.73 $47.27 $520.00 ToiletCleaningFee $409.09 $40.91 $450.00 ElectricityandWaterFee $159.09 $15.91 $175.00 WasteRemoval Priceonrequest
EventManagement
StreetstallfeeatmajorCouncilevents
ExtraEventManagementProvisions
StreetstallfeeatotherCouncilevents
Events,performances,shows,cinemasandactivities
Banners
Uses
Page67of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
EventApplicationFormFee(Non-refundable) $50.00 $5.00 $55.00 Busking/Streetperformancepermit $16.60excludingGST Min.Fee:$16.00
Power(per10amps,availableonrequest) $109.09 $10.91 $120.00
SiteFeeonly(3mx3m) $187.27 $18.73 $206.00 SitefeediscountedforLocalBusinesseswithinLGA $140.45 $14.05 $154.50 SitefeediscountedforNon-ProfitandCommunity GroupswithinLGA $112.27 $11.23 $123.50
StreetPerformancePermit $16.60 $0.00 $16.60 Ticketingand/orbookingfeesforCouncilrunevents, performances,shows,cinemasandactivities Ticketingand/orbookingfeesfor Councilrunorsupportedevents, performances,shows,cinemas andactivities$0.00-$100.00(ex. GST) Advertising Perday,oratCouncil'sdiscretion Any flagpole/Banner Poles – Users From LGA $9.60 $0.00 $9.60 Flagpole/BannerPoleToddPark(PrincesHwy) $13.40 $0.00 $13.40 BannerPole(CoxReserveCarwarAve/PrincesHwy) $13.40 $0.00 $13.40 BannerPole(ClaydonReserve) $13.40 $0.00 $13.40 BannerPole(ArrowsmithReserve) $13.40 $0.00 $13.40 CorporateUsers(atCouncil'sdiscretion) $18.00 $0.00 $18.00 Promotional
Other
Application $126.45 $12.65 $139.10 Rental/UseofSpace(maximumfeepayableper eventperday) $608.64 $60.86 $669.50 PublicLiability $25.36 $2.54 $27.90
Corporate MapProduction
CouncilPlans
ElectronicMediaOutput
AddressReviewService Address
LegalProceedings
CostsinLegalProceedings
Subpoenas
Page68of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
FirstHour(minimum1Hour) $130.00 $0.00 $130.00 Per30Minutesorpartthereofafterfirsthour $34.00 $0.00 $34.00
USBorDigitalImage $25.00 $0.00 $25.00
ReviewServiceFee Firsthourfreetoassessandquote, then$35perhourthereafter
ReimbursementofStaffInPrivateCourtActions GeneralManager(perday) $735.00 $0.00 $735.00 Directors(perday) $615.00 $0.00 $615.00 Managers(perday) $490.00 $0.00 $490.00 Anyotherstaff(perday) $370.00 $0.00 $370.00 Solicitor $250-$350,dependingon experiencelevel
In-HouseGeneralCounsel(perhour) $635.00 $0.00 $635.00 In-HouseSeniorSolicitor(perhour) $510.00 $0.00 $510.00 In-HouseSolicitor(perhour) $350.00 $0.00 $350.00 In-HouseInternalParalegal/LegalOfficer(perhour) $230.00 $0.00 $230.00 In-HouseLegalAdministrative/SupportOfficer(per hour) $85.00 $0.00 $85.00 CouncilOfficer/InternalExpert(perhour) $510.00 $0.00 $510.00 ExternalLegalFees(asincurred) Asincurred ExternalExpert(asincurred) Asincurred
Conduct Money – deposit payable on application $39.00 $0.00 $39.00 FirstHourorpartthereof $40.00 $0.00 $40.00 PerhourorpartthereofafterFirstHour $40.00 $0.00 $40.00 CostofCouncilOfficertoattendasWitnessandfor CourtAppearances(perpersonandperhour) includingtravellingtime $200.00 $0.00 $200.00
SaleofContract,TenderandSimilarDocuments
CouncilDocuments
GovernmentInformationPublicAccess(GIPA)
NatureofApplication
(a)Accesstorecordsbynaturalpersonabouttheirpersonalaffairs-Applicationfee
ProcessingChargeafterfirst20hours
(b)AllotherGIPAApplications Application
review
AccrualofInterestonRates&Charges
$30.00perhourafterfirst20hours
$30.00,
Page69of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Contractvalue<$500,000(percopy) $0.00 $0.00 $0.00 Contractvalue>=$500,000(percopy) $0.00 $0.00 $0.00
Minutes/AgendasMailingList(peryear) $730.00 $0.00 $730.00 Audiotape/CDofmeetings(pertape/CDper meeting) $2.80 $0.00 $2.80
Fee
subjectto
50%reductionfor financialhardship,non-profit organisationsshowingfinancial hardshipandholdersofpensioner healthbenefitscardandchildren. Reductionmayapplyforpublic interestreason. ProcessingChargeafterfirsthour(perhour) $30.00 $0.00 $30.00 Retrievaloffilesheldoffsite(perfile) $35.50 $0.00 $35.50 Internal
ApplicationFee
hardship,
organisationsshowingfinancial hardship
holdersofpensioner healthbenefitscardandchildren. Reductionmayapplyforpublic interestreason. CreditCardservicefee AmericanExpress Fee 1.40%oftotaltransactionvalue Visa/MasterCard Fee 0.45 % of total transaction value.
a
$40.00,subjecttoa50%reductionfor financial
non-profit
and
Interestrate ThemaximumratesetbytheMinister forLocalGovernment,calculatedona dailybasis LocalGovernment Act1993|Section 197and678
ChargesonOtherCarriers
Undergroundgas,waterandsewermainsandpipes Annuallevybasedonaformulathat includesthelengthofpipesand volume
Postboxes/mailcollectionpointsonroadreserve AsperagreementwithAustraliaPost
RateEnquiryFees
RatesEnquiryFee-includingwrittenreplies(per hour,perofficer(minimum1hour,followedby15min increments)
UnpaidSundryDebtorAccounts
Cheque
InformationResearchFee
Page70of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$60.00 $0.00 $60.00 RatesEnquirySearch $135.00 $0.00 $135.00 RatesNoticeAmended(pernotice) $38.00 $0.00 $38.00 RateNoticeRe-print
years,pernotice) $38.00 $0.00 $38.00 Section
$95.00 $0.00 $95.00 Section 603 Certificate – urgency fee $75.00 $0.00 $75.00
$44.00 $0.00 $44.00 Section
Fee
not alreadyissued) $44.00 $0.00 $44.00 Aggregation
$295.00 $0.00 $295.00 RatesBalanceConfirmationLetter $60.00 $0.00 $60.00 RefundApplicationFee(excludespensioners) $44.00 $0.00 $44.00 ItemisedStatementofRateAccount(perproperty/ perfinancialyear) $60.00 $0.00 $60.00 Urgency
Letters
$75.00 $0.00 $75.00 RatesPaymentProcessing-Over10ratesaccounts (perratesaccount) $4.40 $0.00 $4.40
(prior
603Certificate
Section603CertificateCopy/Reissue(where certificatehasbeenissuedmorethan30daysprior)
603CertificateCancellation
(if
OfLandValuesForRatingPurposesPerTitle
Fee-RatesConfirmation
And Itemised Statements – 72 Hour Response
ReminderNoticeFeeforunpaidaccounts $13.64 $1.36 $15.00 Interestchargesforunpaidaccounts TheratesetbytheMinisterforLocal Government,calculatedonadaily basis LocalGovernment Act1993|Section 197and678 Dishonoured
Fee $80.00 $0.00 $80.00 DishonouredDirect
Fee(Nochargeisappliedforfirstoccurrence) $54.00 $0.00 $54.00
Fee $70.00 $0.00 $70.00
Debit
StormwaterManagementServiceCharge
$25.00 per350squaremetresofland area,orpartthereoftoamaximumof $1,500perrateableproperty
$25.00per350squaremetres(orpartthereof)oflandareathatwouldapplytothelandsubjecttothestratascheme dividedonapro-ratabasisbetweenthelots,notlessthan$5.00foranyindividuallot
Leases/Licenses/Occupation/EasementsofCouncilCommunityPropertiesSubjectto Council'sCommunityLeasePolicy New/Renewals
Leases/Licences/EasementsofCouncilPropertyandStatutoryPropertyMatters
Page71of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
Residential(perrateableproperty) $25.00 $0.00 $25.00 ResidentialStrata(perrateableproperty) $12.50 $0.00 $12.50 Business – Non Strata
Business – Strata Lot $5.00 $0.00 $5.00
Lease/LicenceAgreementsAdministrationFee (includesadvertisingforPublicNotice) $360.00 $36.00 $396.00 ReimbursementtoCouncilforincurredlegalcosts AsdeterminedbyCouncil'sSolicitor (cappedat$5,000) ValuationFee AtMarketValue-Asdeterminedby registeredvaluerorCouncilProperty Consultant SurveyFee AsdeterminedbyCouncil'sSurveyor MinimumAnnualRentGroundLease/Community Building $556.36 $55.64 $612.00
CommercialAgreements Atmarketvalueasdeterminedby registeredvaluerorproperty consultant AdministrationFee $354.55 $35.45 $390.00 ReimbursementofCouncil'sLegalFees AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant ValuationFee AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant SurveyFee AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant Renewals(includingOptions)orAssignments AdministrationFee $177.27 $17.73 $195.00 ReimbursementtoCouncilforincurredlegalcosts AsdeterminedbyCouncil'sSolicitor continuedonnextpage...
NewAgreements
Renewals(includingOptions)orAssignments [continued]
ValuationFee
SurveyFee
Roadclosures(permanent)feesasdeterminedby relevant authority and statutory provisions – at cost
GroundAnchorsaffectingCouncilLand FeetoInstallGroundAnchor-peranchor
Permit to install Ground Anchors on Council Land – AdministrationandAssessmentFee
Keys-Leases/Licences
Firstset
Carparking
AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant
AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant
AtMarketValue-Asdeterminedby registeredvaluer,solicitororCouncil PropertyConsultant
Thecarparkingfeeslistedbelowstatethemaximumamountsthatwillbechargedateachsite.Councilhasthediscretion toreducethesefeesfromthestatedamountsifrequired.
KogarahTownSquare-DerbyStreet 0 – ½ hour
Page72of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
$2,120.00 $0.00 $2,120.00
$400.00 $0.00 $400.00
additionalkey) $60.45 $6.05 $66.50
Replacement&Additionalset/s(per
½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00
hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $22.73 $2.27 $25.00 LOSTTICKET $22.73 $2.27 $25.00 OvernightFlatRate $13.64 $1.36 $15.00 Frommidnight
Free
3-4
AccessControlledParking–GreenbankStreet
AccessControlledParking–TheAvenue
Page73of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST)
0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $13.64 $1.36 $15.00 LOSTTICKET $22.73 $2.27 $25.00 OvernightFlatRate $13.64 $1.36 $15.00 Frommidnight PermanentParking(perweek) $63.64 $6.36 $70.00
0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00 4+hours(MaxDaily) $22.73 $2.27 $25.00 LOSTTICKET $22.73 $2.27 $25.00 OvernightFlatRate $13.64 $1.36 $15.00 Frommidnight AccessControlledParking–EmpressLane 0 – ½ hour Free ½hour-1hour $1.82 $0.18 $2.00 1-2hours $3.64 $0.36 $4.00 2-3hours $5.45 $0.55 $6.00 3-4hours $8.18 $0.82 $9.00
+hours(MaxDaily) $10.91 $1.09 $12.00 OvernightFlatRate $9.09 $0.91 $10.00 PermanentParking(perweek) $45.45 $4.55 $50.00 MeteredParking-TreacyStreet 0-1Hour Free 1-2Hours $2.73 $0.27 $3.00 2-3hours $4.55 $0.45 $5.00 3-4hours $6.36 $0.64 $7.00 AllDay $10.00 $1.00 $11.00 PermanentParking(perweek)-Pleasecontact StrategicProperty $40.91 $4.09 $45.00
4
Page74of74 FeeName Year23/24 Legislation Fee(excl. GST) GST Amount Fee(incl. GST) MeteredParking
0-1Hour Free 1-2Hours $2.73 $0.27 $3.00 2-3hours $4.55 $0.45 $5.00 3-4hours $6.36 $0.64 $7.00 AllDay $10.00 $1.00 $11.00 PermanentParking(perweek)-Pleasecontact StrategicProperty $40.91 $4.09 $45.00 MeteredParking-Patrick/MacMahonSt.CarPark 0-1Hour Free 1-2Hours $2.73 $0.27 $3.00 2-3hours $4.55 $0.45 $5.00 3-4hours $6.36 $0.64 $7.00 AllDay $10.00 $1.00 $11.00 PermanentParking(perweek)-Pleasecontact StrategicProperty $40.91 $4.09 $45.00 Replacementcard-PermanentParkingPermit Fee $28.64 $2.86 $31.50 EmergencyAfterHoursBoomGateorCarParkOpeningCharges MooreReserve,BaldFacePointReserve,Donnelly Park,OatleyPark,OldsPark(peropening) $192.73 $19.27 $212.00 Commercial Car Parks – Kogarah Town Square, GreenbankStreet,TheAvenueandEmpressLane (peropening) $113.64 $11.36 $125.00 ParkingPermit 1stResidentParkingPermit $20.00 $0.00 $20.00 2ndResidentParkingPermit $20.00 $0.00 $20.00 1stVisitorParkingPermit $30.00 $0.00 $30.00 2ndVisitorParkingPermit $50.00 $0.00 $50.00 ReplacementFeeCost atthecostoforiginalpermit atthecostoforiginalpermit CommunityGroup-DirectionalSign Fee $240.91 $24.09 $265.00
-GloucesterRoad
Georges River Council acknowledges the Bidjigal people of the Eora Nation, who are the Traditional Custodians of all lands, waters and sky in the Georges River area. We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples who live, work and meet on these lands.
For more information on this document, please visit georgesriver.nsw.gov.au
Georges River Civic Centre
Corner MacMahon and Dora Streets, Hurstville
Phone
9330 6400
Email mail@georgesriver.nsw.gov.au
Postal address PO Box 205, Hurstville NSW 1481
georgesriver.nsw.gov.au
Language Assistanc e 131 450