Raising The Bar - Spring/Summer 2015

Page 1

RAISING THE BAR AA N ew w ss ll eetttteerrf of ro rO rMaendgiec aRle Sgti oa nf a cag l eC eRnetgeiro’ na s M c iacl aSl tCaef fn t e|r V os luummmee 1 Ne f l oM f eOdri an l eMdeid r/N f aulm l b2e0r1 1 5

Topping Off Ceremony Concludes Steel Construction Orange Regional Medical Center held a Topping Off Ceremony on October 16 for its Spagnoli Family Cancer Center and Physician Office Building project. A Topping Off Ceremony is a tradition amongst construction companies and ironworkers marking the end of steel construction on a new project. Additionally, Orange Regional kicked off “The Future Is Orange” Capital Campaign to raise $3 million. Here are some fun facts about the construction project that you probably did not know: • 738 tons of steel; 1,350 pieces • 219 exterior panels – 126,000 bricks • 4,341 light fixtures • 135 tons of rebar • 10,300+ tons of concrete • 67,500 ft. of electrical conduit = 12.78 miles • Linear accelerator vault – 10 truckloads of concrete for base • 40 truckloads of concrete for walls • 340 ton roof

In This Issue

5 6 7

Physician Recognition

Healthgrades Recognition

Medical Education Endowment Fund A member of the Greater Hudson Valley Health System


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.