Why Optimizer+ Risk based maintenance leads to preventative maintenance plans Use of ‘generic maintenance strategies’ Balance between financial results, operational results and risks Use of asset tree EAM system Maintenance plans lead in determining the yearly budget Sharing knowledge with other maintenance organisations Decisions have to be objective and reproducible Strives toward continuous improvement in the maintenance process
© GiS – Gesellschaft für integrierte Systemplanung mbH
2
Relation between Optimizer+ and EAM system KPI 5-10 year maintenance budget EAM reports OEE Failure analysis
Risk based PM optimization Maintenance strategy simulation Life cycle costing
Operational Maintenance
Asset Performance Optimization
Past
Future
Present
looking back ‘lagging’
looking ahead ‘leading’
D o
Check Asset Performance Management
SAP Plan
Adapt
© GiS – Gesellschaft für integrierte Systemplanung mbH
3
Process flow of Optimizer+ • Business Objectives • Asset tree • Quick RCM • Asset library • RCM • RBI (EEMUA 159)
• Adjust maintenance • Export to EAM
• Maintenance concepts • Export to EAM
Plan
Do
Adapt
Check • ‘What if’ scenarios • RCA
© GiS – Gesellschaft für integrierte Systemplanung mbH
4
Functionalities of Optimizer+ Optimizer+ consists of the following modules: ptimizer+ consists of the following modules:
Stock management is used for optimization of spare parts Root Cause Analysis uses problem solving to identify the root cause of faults or problems
FlexGrid is a user friendly functionality to review and edit mass data
© GiS – Gesellschaft für integrierte Systemplanung mbH
5
Business objectives: severity Go to risk matrices
Risk = Probability x Severity
© GiS – Gesellschaft für integrierte Systemplanung mbH
6
Business objectives: probability
Easily configurable by the user
© GiS – Gesellschaft für integrierte Systemplanung mbH
7
Business objectives: risk matrix
Easy to update from red or green with the click of a button
© GiS – Gesellschaft für integrierte Systemplanung mbH
8
Asset tree: asset importer
Generic Excel template used to import asset structures into Optimizer+ Resulted asset tree in Optimizer+ from the excel import
© GiS – Gesellschaft für integrierte Systemplanung mbH
9
Asset tree: DIS importer for additonal data
Enhanced Asset tree from DIS import into Optimizer+
Generic Excel template used to import additonal information into Optimizer+ such as failure data, maintenance and costs.
© GiS – Gesellschaft für integrierte Systemplanung mbH
10
Asset tree: interfaces
Optimizer+ has interfaces available with SAP and other EAM systems. All interfacing is based on webservices.
© GiS – Gesellschaft für integrierte Systemplanung mbH
11
Quick RCM: goals Provide insight into the criticality of a (sub)system as a whole in a fast and efficient way Prioritize (sub)systems on criticality Deliver a fast and efficient Preventive Maintenance review
Spend time, money and energy on only important assets
© GiS – Gesellschaft für integrierte Systemplanung mbH
12
Quick RCM: grid Easy to export to Excel
Configurable layout
Apply to (sub)systems Assign effect to (sub)systems
© GiS – Gesellschaft für integrierte Systemplanung mbH
13
Quick RCM: example Gas processing & compression Mean time to Failure = 4 months
Failure cause Technically unavailable
Effect 10 – 100K minor damage
© GiS – Gesellschaft für integrierte Systemplanung mbH
14
Quick RCM: view in asset tree
Non-critical
Critical
Prioritize systems on a high level based on the business objectives
© GiS – Gesellschaft für integrierte Systemplanung mbH
15
Asset library: content
•
One-off building of Parts, Components, Failure behaviour & Preventive or corrective maintenance. • Easy to build up asset registers with the help of the library • Create your own generic PM libraries
© GiS – Gesellschaft für integrierte Systemplanung mbH
16
Asset library: drag and drop
Able to drag and drop items directly from your library to your FMECA system
© GiS – Gesellschaft für integrierte Systemplanung mbH
17
Asset library: applying multiple FM library templates
Match FM library data to FMECA data with a corresponding mark
© GiS – Gesellschaft für integrierte Systemplanung mbH
18
Asset library: applying multiple FM library templates
Select which data from FM library should apply to FMECA data
© GiS – Gesellschaft für integrierte Systemplanung mbH
19
Property grid: failure cause & Maintenance data
By navigating through the asset tree, it’s possible to directly see all properties per asset
Direct access to change data
© GiS – Gesellschaft für integrierte Systemplanung mbH
20
RCM: grid Configurable layout
Easy to export to Excel
For each piece of equipment you are able to see the effect the failure has on the business objectives
© GiS – Gesellschaft für integrierte Systemplanung mbH
21
RCM: example X3501 FWHL MODE/INDI IN 35XX828 (equipment) Led cluster (component) Defective Led clusters
Mean time to Failure = 10 years
Failure cause No / reduced loading arm movement
Effect 10 – 100K minor damage
© GiS – Gesellschaft für integrierte Systemplanung mbH
22
RCM: risk matrix See where your critical assets rank in the risk matrix
Click to see which items Links directly to asset structure
© GiS – Gesellschaft für integrierte Systemplanung mbH
23
Clustering activities: CLM
Able to consolidate maintenance actions into a CLM
© GiS – Gesellschaft für integrierte Systemplanung mbH
24
Maintenance program: optimization
Cost savings: See all non critical failure causes with PM Compliance: All critical failure causes without PM
© GiS – Gesellschaft für integrierte Systemplanung mbH
25
Maintenance program: report
© GiS – Gesellschaft für integrierte Systemplanung mbH
26
FlexGrid: customizable user interface
• Views with only relevant information • Directly change, add or delete data • Design your own views • Extensive filter & sort options • Obliged fields
© GiS – Gesellschaft für integrierte Systemplanung mbH
27
Simulation: what if analysis What if analysis are performed with the available data in Optimizer+. Scenarios are performed with a time frame, for example of 10 years. During the simulation Optimizer+ calculates data like costs, numbers of failures, availability in production. The simulations are based on the Monte Carlo Method. Possible scenario’s • What is the impact of redundancy? • What is the cost of maintenance and what will happen when less maintenance is performed? • Where to s tart when the maintenance budget is 10% lower? • What are the performance outliers and how can they be reduced? • What is the influence of a modification? • How can availability be increased? © GiS – Gesellschaft für integrierte Systemplanung mbH
28
Reports: totals
© GiS – Gesellschaft für integrierte Systemplanung mbH
29
Reports: downtime
© GiS – Gesellschaft für integrierte Systemplanung mbH
30
Reports: maintenance cost per period per strategy
© GiS – Gesellschaft für integrierte Systemplanung mbH
31
Reports: maintenance costs - top 10
© GiS – Gesellschaft für integrierte Systemplanung mbH
32
Reports: scenario comparison, totals
© GiS – Gesellschaft für integrierte Systemplanung mbH
33
Reports: scenario comparison, downtime
© GiS – Gesellschaft für integrierte Systemplanung mbH
34
Unique Selling Points Covers the whole FMECA process in a natural way PM-library functionality that enables users to accelerate and standardize the RCM process Simulation/ optimization functionality to perform what-if analysis and scenario comparison Web based interfacing with SAP EAM, Infor EAM and IBM Maximo Integrated RCA and RBI modules Professional development, support and roadmap Strong (technology) partners
© GiS – Gesellschaft für integrierte Systemplanung mbH
35
Detlef Aden
Seit 1984 Beratungs- und Integrationspartner im Bereich Instandhaltungs- und Betriebsführungssysteme für komplexe Anlagen.
GiS - Gesellschaft für integrierte Systemplanung mbH Junkersstr. 2 69469 Weinheim Deutschland Ronald Jansen Business Development Manager Tel:
+49 (6201) 503-91
Fax:
+49 (6201) 503-66
E-Mail:
r.jansen@gis-systemhaus.de
http://gis-systemhaus.de
© GiS – Gesellschaft für integrierte Systemplanung mbH
36