5 minute read

Comment

Next Article
Software

Software

Get the latest construction news! Follow us on Twitter @OnSiteMag

Building back while looking forward

As we approached press time for this edition of On-Site, floods hit in both the east and west, damaging critical infrastructure and impacting the ability to get people and goods to some communities. Provinces face the task of repairing and replacing impacted transportation infrastructure.

In B.C., the Ministry of Transportation and Infrastructure has already started soliciting companies for their assistance in repairing the damaged highways and other roadways. Just recently, the province sent out a request for qualifications to construction and engineering firms for the repair of two of the province’s most damaged roads: Highway 8 and Highway 1 (also known as the Trans-Canada Highway, Canada’s coast-to-coast highway system).

While there will certainly be contracting firms ready to step up and assist the province and its residents in the repairs and replacements needed to get transportation infrastructure back up and running, there are additional factors in play this year that may prevent projects from being completed as quickly as the provinces, and their residents, would like.

The COVID-19 coronavirus pandemic continues to impact the global economy as well as local economies across Canada. Pandemic-related supply chain disruptions already have projects facing serious delays. Many of these building material shortages can be attributed to a combination of a lack of raw materials for OEMs, a shortage of available ships to transport goods from Asia, and a lack of port infrastructure to process and offload the ships arriving in ports across North America.

While these supply challenges are expected to be temporary, they will certainly cause headaches for project managers trying to squeeze new projects into their already busy schedules.

Another challenge is that many companies are already busy with projects. The industry is seeing a boost in public and private investment for almost all types of infrastructure, so availability of skilled labour may further stretch viable timeframes for projects (for more on this, see our 2022 Forecast on page 11).

Since this is a state of emergency, the province will surely do its best to prioritize getting these projects shovel-ready as soon as possible, but getting such projects to the finish line will be more challenging than normal.

When these roads are rebuilt, a great deal of planning will need to go into how this infrastructure is designed for dealing with potential future flooding in the new reality we live in with rising temperatures and climate change. The rebuilding process would also be an ideal time for these provinces to review their remaining aging transportation infrastructure and take a hard look at what improvements will need to be made to protect those assets and the residents that depend on them for their day-to-day commuting and safe travels.

B.C. Minister of Transportation and Infrastructure Rob Fleming recently told news reporters that the roads and bridges will be build back better than they were, stating, “Our infrastructure will be rebuilt to withstand the new climate realities that we find ourselves in.”

Let’s hope that this is indeed the case, as this recent flooding is unlikely to be the only impending disaster stemming from the realities of a changing climate, especially in coastal provinces like B.C. and Newfoundland and Labrador.

Adam Freill / Editor afreill@annexbusinessmedia.com

MEET OUR CONTRIBUTORS FOR THIS ISSUE

MARIO CYWINSKI / Canadian Automotive Journalist

On the trends for the latest pick-up truck models:

“The big changes in the pick-up space for 2022 are in the 1500 sized group, with Toyota redesigning their U.S.-built Tundra, Ford adding a fully electric version of its F-150 (Lightning), General Motors refreshing its Chevrolet Silverado and GMC Sierra models, and Stellantis making a series of package additions and changes.”

JACOB STOLLER / Principal, StollerStrategies

On remote closing the data gap:

“More than their peers in almost any other industry, construction executives rely on disparate sources of data for their make-or-break decisions.”

DAVID BOWCOTT / Global Director – Growth, Innovation & Insight, Global Construction and Infrastructure Group at Aon Risk Solutions

On how early involvement, greater collaboration and common technology platforms converge to improve project outcomes:

“It seems only natural that outcomes will be more certain when you have all key stakeholders involved at the very early stages in the birth of an asset. This will align vision and strategies related to design, construction, and operations.”

NICOLA CREMA / Associate, Borden Ladner Gervais LLP

On mandatory arbitration in construction contracts:

“Mandatory arbitration clauses can significantly affect the dispute resolution process between parties, and close attention should be paid to these clauses during contract negotiations.”

VOLUME 66, NO.7/December 2021 www.on-sitemag.com

READER SERVICE

Print and digital subscription inquiries or changes, please contact Urszula Grzyb, AUDIENCE DEVELOPMENT MANAGER Email: ugrzyb@annexbusinessmedia.com Tel: (416) 510-5180 Fax: (416) -510-6875 Mail: 111 Gordon Baker Road, Suite 400, Toronto, ON M2H 3R1

PUBLISHER | Peter Leonard (416) 510-6847 pLeonard@on-sitemag.com EDITOR | Adam Freill (416) 510-6821 afreill@annexbusinessmedia.com

MEDIA DESIGNER | Lisa Zambri lzambri@annexbusinessmedia.com

ASSOCIATE PUBLISHER | David Skene (416) 510-6884 dskene@on-sitemag.com ACCOUNT COORDINATOR | Kim Rossiter (416) 510-6794 krossiter@on-sitemag.com COO | Scott Jamieson sjamieson@annexbusinessmedia.com

Established in 1957, On-Site is published by Annex Business Media 111 Gordon Baker Road, Suite 400, Toronto, ON M2H 3R1 Publications Mail Agreement No. 40065710

ISSN: 1910-118X (Print) ISSN 2371-8544 (Online)

SUBSCRIPTION RATES Canada $49.50 per year, United States $113.00 per year, Other foreign $136.50, Single Copy Canada $13.50. On-Site is published 7 times per year except for occasional combined, expanded or premium issues, which count as two subscription issues. Occasionally, On-Site will mail information on behalf of industry-related groups whose products and services we believe may be of interest to you. If you prefer not to receive this information, please contact our circulation department in any of the four ways listed above. Annex Business Media Privacy Officer privacy@annexbusinessmedia.com Tel: 800-668-2374

Content copyright ©2021 by Annex Business Media may not be reprinted without permission.

On-Site receives unsolicited materials (including letters to the editor, press releases, promotional items and images) from time to time. On-Site, its affiliates and assignees may use, reproduce, publish, re-publish, distribute, store and archive such unsolicited submissions in whole or in part in any form or medium whatsoever, without compensation of any sort.

DISCLAIMER This publication is for informational purposes only The content and “expert” advice presented are not intended as a substitute for informed professional engineering advice. You should not act on information contained in this publication without seeking specific advice from qualified engineering professionals.

MEMBER OF

This article is from: