ReSource May 2022

Page 28

GREEN BUILDING

Proactive approach to managing

CONSTRUCTION WASTE The construction industry is a key player in helping South Africa achieve net zero gas emissions by 2050. But while green building design and the use of sustainable materials are integral to achieving this objective, the issue of construction waste must not be overlooked.

W

aste is an inevitable by-product of any construction project and, if not managed effectively, could seriously hamper South Africa’s ability to conserve our natural resources, says Morag Evans, CEO, Databuild. Globally, the construction industry generates an enormous amount of waste each year; according to Transparency Market Research, it could be as much as 2.2 billion tonnes by 2025. In South Africa, a report by the CSIR reveals that our construction industry is responsible for around five to eight million tonnes of construction and demolition waste each year. And with 90% of all the general waste produced in South Africa going to landfills, the country is rapidly running out of space to dispose of its waste.

26

M AY 2 0 2 2

|

ReSource

While it is impossible for a construction site not to produce any waste during its operations, Evans says construction companies need to closely examine their construction practices and identify areas where they can reduce the amount of materials discarded during a project. “Most of South Africa’s construction waste goes to landfills – which is not a sustainable solution. Construction companies need to reduce the amount of waste generated during a project. One of the best ways to divert waste from landfills is through repurposing or recycling. “The good news is that the majority of excess, damaged or scrap building materials can be recycled or repurposed and thus diverted from landfills. For example, coarse and fine aggregate such as new concrete, mortar and floor tiles can be produced from unused bricks and stones or waste concrete, while damaged wood can be used to make paper or recyclable slab. Additionally, dirt and muck are ideal materials for laying foundations, and metals such as steel can be melted down and reprocessed,” asserts Evans. Inaccurate estimates in materials orders are another major contributor to construction waste, he continues. “If these excess materials are in good condition,

however, construction companies could consider selling them or reusing them in another project.”

A proactive approach Of course, the management of construction waste is most effective when it is done proactively. This entails the development of a comprehensive waste management plan early in the design phase of the project that clearly indicates which materials can be recycled, reused or resold. In this way, project waste becomes an integral part of materials management from the outset. In a nutshell, the plan should: • identify the types of waste that will be generated during the project, and which of these can be recycled, reused or resold with a view to reducing the amount of waste that is sent to landfills • indicate who will be responsible for managing the plan and ensuring that it is carried out effectively on-site • identify companies/contractors to be used to dispose of the waste generated on-site in accordance with the plan • include training and regular information sessions to ensure the project team is adhering to the plan. Communication with project stakeholders should also form a key component of the plan, Evans adds.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Finding new waste beneficiation opportunities through science, technology and innovation

5min
pages 44-45

through science, technology and innovation

4min
pages 44-46

Best practices for transitioning to a green economy

4min
pages 42-43

Increasing investments in the resource sector

2min
page 47

Solutions to the growing problem of e-waste

2min
page 41

Making e-waste recycling easy

5min
pages 38-39

Gauteng launches E-waste recycling project

3min
page 40

South Africa’s commitment to reducing food waste

5min
pages 32-34

Coffee goes green

3min
pages 30-31

Used oil pioneer extends green footprint

6min
pages 26-27

Turning the wheels on waste

4min
pages 24-25

Proactive approach to managing construction waste

5min
pages 28-29

EPR legislation: A benefit, not a burden

5min
pages 22-23

The future for sustainable mining lies in circular thinking

6min
pages 18-19

Specialist lining contractor becomes new Patron Member

1min
page 15

The circular economy – moving beyond landfill diversion

6min
pages 16-17

Editor’s comment

3min
pages 5-6

Unlocking a sustainable future

5min
pages 20-21

A proud new Patron Member

2min
page 14

President’s comment

3min
page 7

News round-up

5min
pages 12-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.