GlimmerGlass
th
Olivet Nazarene University
free: one copy
April 15, 2011
1941
Anniversary
2011
Vol. 70 No. 12
In this issue
Texting and driving laws - Student Life, Page 5
Capitol Hill Gang hosts annual debate - Student Life, Page 6
photos by aly gibson
All cars were cleared from the McHie and Chalfant parking lots on April 5 to make room for the rec center.
Students say goodbye to a icon - In-Depth, Pages 8 & 9
McHie lot wrecked for rec center 4eugene burndam eburndam@live.olivet.edu
Black birds are painted all over campus - Arts, Page 11
Streets braids his beard - Sports, Page 14
Coburn to go to Spain - Sports, Page 16
INDEX
F
or many months the building of a recreational center on campus has been an idea waiting to happen. But now students and faculty can see construction of the multi-million dollar state-of-the-art project begin. Construction will be completed in approximately 18 months with an official opening date for the building set for Dec. 12, 2012, according to VP for Student Development Woody Webb. A big celebration has been planned on midnight of that date to welcome a new facility that will officially be named the New Student Life and Recreation Center. “The center is a much anticipated addition to Olivet’s campus,” Webb said. The site is estimated to measure 165,000 square feet. “The New Student Life [and Recreation] Center is nearly three times the size of the Centennial Chapel,” Webb explained. The complex will accommodate innovative and exciting features for the general student population, according to Webb. The building will be made with high-tech modern design, including windows that reduce the amount of heat coming through the glass and geothermal energy to regulate the temperature. “Behind Wisner Hall, hundreds of steel rods will be planted several yards underground, capturing the earth’s heat and joining with the building’s water circulation
News: Pages 2 & 3 In-Depth: Pages 8, 9 & 10
to give it heated water,” Webb explained. Other features include a rock climbing wall, an eight-lane running track (which will host the first indoor track and field season in the winter of 2012 and indoor track meets on Saturdays), a 10lane competition pool, and a recreational pool. A women’s intercollegiate water polo team will be added to varsity sports and instructed by the newly proposed coach of Olivet’s first intercollegiate swim team. Co-ed swimming times are yet to be finalized, Webb said. The complex will be open from 6 a.m. to midnight Monday
through Friday. Weekend hours will be set based on usage. Webb added that the center would not be open for general public use. The swim coach and the coach’s general assistant will be the only new staff members working in the center according to Webb, but a number of certified workers will be on staff to instruct and supervise students. These workers include one certified lifeguard on duty at all times while either pool is open and a certified student instructor to assist students who choose to climb the rock wall. All of these workers will be under the supervision of Director of Campus
Recreation and Student Development Matt Smith. Webb said the competition pool will be closed to general students during water polo and swim team practices although some of the lanes might be left open for noncompetitive swimmers. The leisure pool, however, will be open regularly for students to enjoy. Webb briefly spoke about the requirements for students’ attire whilst using either one of the pools. “During anytime students wish to use the pool, women would be required to wear one-piece suits and men modest shorts.” • Continued on Page 3
The new rec center will be connected to the buildings of McHie and Chalfant. The center is scheduled to be completed by December 2012.
Opinion: Page 4 The Arts: Pages 11, 12 & 13
Student Life: Pages 5, 6 & 7 Sports: Pages 14, 15 & 16
PLEASE RECYCLE