COLD AND HOT WATER SUPPLY SYSTEM Gate Valve
It controls flow of pressure through the pipes and valves.
Stop Valve
It functions to totally stops the flow of liquid through a pipe.
Water Meter
It used to measure the flow of water.
SOURCE http://image.made-in-china.com/4f0j00nvuamUEkaRbH/Brass-Stop-Valve-BW120-.jpg http://i01.i.aliimg.com/photo/v0/110157941/Multi_jet_Semi_Dry_type_Wate r_Meter.jpg
SOURCE http://image.made-in-china.com/4f0j00nvuamUEkaRbH/Brass-Stop-Valve-BW120-.jpg http://i01.i.aliimg.com/photo/v0/110157941/Multi_jet_Semi_Dry_type_Wate r_Meter.jpg
SCHEMATIC DIAGRAM
FLOOR PLAN
ELECTRICAL SUPPLY SYSTEM
ELECTRICAL SYSTEM
ELECTRICAL FITTING Indoor Light
Provide lighting inside the building.
Distribution Board
Three Point Socket
Divides an electrical power feed into subsidiary circuits, while providing a protective fuse or circuit breaker.
It allows electrically operated equipment to be connected to primary alternating current power supply.
Outdoor Lighting
Weatherproof Socket
Provides Lighting at outdoor during nighttime.
It is commonly installed at outdoor due to the weatherproof characteristic.
Act 447 ELECTRICITY SUPPLY ACT 1990 28. (1) A licensee may require any person who requires a supply of electricity pursuant to subsection 24(1) to give him reasonable security for all moneys which may become due to him— (a) in respect of the electricity supply; or (b) where any supply line or electrical plant or equipment has to be provided under the same subsection in respect of the provision of such facility, and if the person fails to give such security, the licensee may, if he thinks fit, refuse to give the supply or to provide the supply line or electrical plant or equipment until the security has been given. 48. (1) No person shall, in the generation, transmission, supply or use of electricity, permit any part of his supply lines to be connected with the earth except as may be prescribed by regulations under this Act or be expressly permitted by the Commission. (2) In the event of any breach of subsection (1), the Commission may by written order require the licensee or owner to remove the connection and may prohibit the use of any supply line or works or installation until the order is complied with, and every such order shall be complied with by the person concerned.
CEILING PLAN
CEILING PLAN00
SOURCE http://www.agc.gov.my/Akta/Vol.%209/Act%20447.pdf http://www.lighting55.com.au/media/catalog/product/cache/3/image/77b5f2064537144473759549d8c8acc2/2/ _/2_6_5.jpg http://www.qvsdirect.com/media/catalog/product//d/i/distribution_board_large_4.jpg http://www.binbin.net/photos/generic/ip6/ip66-weatherproof-outdoor-sockets-13a-double-od-socket-.jpg
RAINWATER DRAINAGE SYSTEM
GOH CHIN ZHI 0314562 Subsoil Drainage System Subsoil drainage system is designed to be installed within the ground in order to remove excessive water from the soil, so that it doesn’t cause damage to buildings or the landscape.
Roof Gutter and Downpipe The purpose of gutter and downpipe is to protect a building’s foundation by channeling water away from its base.
PVC Pipe
Gutter
It is used as connection between house and main pipe to remove greywater and rainwater
A narrow channel to collect and diverts watershed away from the roof edge.
Sump
It functions to receives undesirable liquids such as water or chemicals and to manage surface runoff water and recharge underground aquifers.
UBBL 82. (1) Wherever the Dampness or position of the site of a building renders it necessary, the subsoil of the site shall be effectively drained or such other steps shall be taken as will effectively protect the building against damage from moisture UBBL (2) Where, during the making of an excavation for a building, existing subsoil drains are discovered, such drains shall either be diverted or replaced by pipes of approved material to ensure the continual passage of subsoil water through drains in such a manner as to ensure that no subsoil water entering such drains causes dampness of the building
SOURCE http://www.guttersupply.com/file_area/public/file/DSCN0127.JPG http://4.bp.blogspot.com/S0UQHACJfbs/TxQngMaLEKI/AAAAAAAAABs/02TWwHIgK6Q/s1600/sub+soil+drain.jpg http://www.sumppump1.com/images/sump-pit-liner.jpg
SEWERAGE SYSTEM
SCHEATIC DIAGRAM SCHEMATIC DIAGRAM
Manhole
Top opening to an underground utility vault used to house an access point for performing maintenance on underground and buried services including sewers.
FLOOR PLAN
Vent Pipe
It is function to regulates air pressure in sewerage system pipes and remove sewage and greywater from a building.
Street, Drainage and Building Act 1974, Act 133 100. Penalty for obstructing any authority in its duty. Any person who at any time hinders, obstructs or molests any local authority or any of its officers, employees, agents or contractors in the performance and execution of its duty or of anything which it is respectively empowered or required to do by virtue or in consequence of this Act, or removes any mark set up for the purpose of indicating any level or direction necessary to the execution of works authorized by this Act, shall be liable on conviction to a fine not exceeding one thousand ringgit or to imprisonment for a term which may extend to six months. SOURCE http://www.gmprodesign.com/arllc/wp-content/uploads/2013/02/2011-0705_18.49.00.jpg