Exchange ezone july8 2013

Page 1

Placer County Contractors Association & Builders Exchange

July 8, 2013 Vol. 7, No. 27

C ontractor’s Z one weekly newspaper

Bringing Government Contracting Opportunities to You! Click here for details on the event


Page 2

Zone . July 8, 2013 • Contractor’s


Inside This Issue This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

Inspiration for the Week

Page 2

SUPPORT OUR ADVERTISERS!

Your Weekly Smile

Page 2

They support the PCCA

Industry Links

Page 2

and deserve your business!

The Week’s Weather Forecast

Page 3

PCCA Calendar of Events

Pages 4 - 5

Contractor Yellow Pages

Page 6

News Briefs

Bottomline Lawyers

Page 22

Web site

Diamond Pacific

Page 8

Web site

Inland Busines Systems

Page 10

Web site

Pages 7 - 9

Jensen Masonry

Page 24

Web site

Industry News

Pages 10 - 15

Philadelphia Insurance

Page IFC

Classified Ads

Page 16

State Fund Insurance

Page 6

Weekly Safety Meeting

Page 17

CalTrans

Page 18

Plans On File

Pages 20 -51

Legal Ads

Page 51

Bid Results

Page 52

Web site

Don’t let the money ship sail without you! A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!


Construction Industry Links Association Links

CSLB

Contractor’s State License Board

OSHA

Occupational Safety & Health Administration

GSBE

Golden State Builders Exchange

AIA

American Institute of Architects

AGC

Associated general Contractors

BIA

Building Industry Association

SCIF

State Compensation Insurance Fund

Employers Guardian Human Resources

American Subcontractors Association

Projects Online

DGS Contracts

DOT

DOT District 3

SMUD

CSI Code List

Fed Biz Opps

— Ralph Blum

Safety

OSHA Hazard Communication

OSHA Safety & Health Topics

Click Safety Online OSHA Safety Classes

Employer Records of Occupational Injury & Illness

Governor’s Office of Emergency Services

Injury & Illness Prevention Program

Risk Management – IIPP

State & Federal Links

California Building Standards

California Prevailing Wage Rates

Federal Prevailing Wage Rates

California Dept. of Industrial Relations

California Environmental Protection Agency

Mechanics Lien Law Information

Mechanics Lien Guide

Local Government Links

California Chamber of Commerce

City of Auburn

City of Rocklin

City of Roseville

City of Lincoln

County of Placer

Page 2

“Nothing is predestined: The obstacles of your past can become the gateways that lead to new beginnings.”

Zone . July 8, 2013 • Contractor’s

What do you get when you cross a dog with a telephone? -A Golden Receiver!


Board of Directors PCCA:

Placer County Contractors Association 10656 Industrial Ave., Ste.160, Roseville, CA 95678 - 916-771-7229 470 Nevada Street., Ste.209, Auburn, CA 95603 - 530-889-3953 Open Monday-Friday: 8am-5pm

www.placerbx.com

President Patrick Remington Remington Construction Vice President Chris Harris James L. Harris Painting, Inc. Director Cheryl Gibson Von-Jac Development Director Cyndi Cook Cook Design Company Director Adam Noorani Homewood Lumber

Auburn Today 93o Sun 93o - 64o

Director Edward Johnson Warren G. Bender Co. Director Maggie Marfia Moule’s Foothill Glass VP Public Relations Tim Busk Heritage Painting VP Governmental Affairs Jack Remington Andregg Geomatics

PBX: President John Brun John Brun Masonry

Tuesday

92o 64o

Wednesday

95o 67o

Vice President Chad Twardus Twardus Construction

Thursday

90o 67o

Friday

97o 68o

Roseville Today 98o Sun 98o - 57o

Director Nick Forestiere Gurnee & Daniels LLP Director Mike Bennett Bennett Tile

Staff: Chae Gale-Director of Operations admin@placerbx.com

Tuesday

Wednesday

Thursday

Friday

Jeff Henry-Director of Business Development jhenry@placerbx.com Kellie Russell-Auburn Planroom Coordinator planroom@placerbx.com Vickie Guthrie - Roseville Planroom Coordinator planroom@placerbx.com Jim Couk - Scan Technician

95o 57o

96o 64o

93o 65o

100o 66o


July 2013 11

CPR Class Roseville PCCA Classroom. 9:00 am to 2:00 pm $75.00 per student.

17

Murphy Austin Presents Construction Contract Seminar at the Roseville PCCA Classroom.

24

Should you form a Corporation in 2013 9:00 to 11:00 at Roseville PCCA hosted by Burnett & Associates.

25

Should you form a Corporation in 2013? 1:30 to 3:3 at Roseville PCCA hosted by Burnett & Associates.

26

OPEN HOUSE New Auburn Planroom!

26

Warren G. Bender workers comp changes. Seminar at Roseville Planroom.

August 2013 5

QSP/QSD Training at Roseville PCCA

6

QSP/QSD Training at Roseville PCCA

7

QSP/QSD Training at Roseville PCCA

23

Meeks Lumber Mixer Friday Aug 23rd 11:30am – 1:30pm.

September 2013 12

Class Roseville PCCA Classroom. 9:00 am to 2:00 pm $75.00 per student.

17

Amvic Pacific ICF Training Course at Roseville 9:00 am to 4:00 pm

October 2013 3

Page 4

Zone . July 8, 2013 • Contractor’s

PG&E Roseville Training Seminar Go Ductless, Try Mini Splits 9-3


SUNDAY

July 7

July

MONDAY

TUESDAY

8

9

WED.

10

THURSDAY

11

FRIDAY

SAT.

12

13

18

19

20

25

26

27

CPR Class

14

15

16

17 Murphy Austin Presents Construction Contract Seminar

21

22

23

24 Should you form a Corporation in 2013? 9:00 to 11:00

28

29

30

31

Should you form a Corporation in 2013? 1:30 to 3:30

August 1

OPEN HOUSE

New Auburn Planroom! Warren G. Bender workers comp changes. Seminar

2

3


Contractor Yellow Pages

Jensen Masonry Mark Jensen 916.663.3429 www.Jensen-Masonry.com Paradisembj@earthlink.net

Full Service Masonry Contractor License # 804650

Legal options to improve your financial future Bankruptcy • Company & Personal Debt • Foreclosure

CALL TODAY (530) 888-7100 www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Capital Rubber Co., Ltd. Hydraulic and Industrial Hose

Air Hose Air Hose AG Spray AG Spray Paint Spray Paint Spray Two Locations to Serve You Protective Clothing Protective Clothing 1725 19th Street 1110 S. Wilson Way, Suite 1 Steam ● Adhesives Steam ● Adhesives Stockton, CA 95205 Sacramento, CA 95814 Custom Gasket Cutting Custom Gasket Cutting 209-464-1200 916-498-1800 Handtrucks and Casters Handtrucks and Casters 209-464-2773 Fax 916-498-1818 Fax Dock Hose ● Sand Blast Dock Hose ● Sand Blast Food Suction & Discharge Food Suction & Discharge www.capitalrubberco.com Contractors Water Suction & Discharge Contractors Water Suction & Discharge Garden Hose ● PVC Suction & Discharge Garden Hose ● PVC Suction & Discharge

Page 6

Zone . July 8, 2013 • Contractor’s


News Briefs Sacramento Gets $115 Million For Flood Control Projects The Sacramento region’s flood-control infrastructure got a fresh infusion of cash Last week with the announcement of about $115 million in federal money for projects for Folsom Dam, the American River watershed and south Sacramento.

center in Citrus Heights could be getting a minor makeover, with a proposal to reconfigure a portion of the development that went before the city’s planning commission last week. Staff’s recommendation was for the planning commission to approve both the design review permit modification and a tree permit for the changes outlined in the proposal.

Under the money, part of the allocation for the U.S. Army Corps of Engineers 2013 fiscal year work plan, the bulk, $98.8 million, will be spent on building an auxiliary spillway for Folsom Dam. Other projects include $2 million to raise the dam and $700,000 to improve flood protection around creeks and streams in south Sacramento County.

Under the proposal from Perkins, Williams, & Cotterill Architects, a portion of a former CVS store at 6197 Sunrise Boulevard would be torn down and a smaller addition constructed. The work would reduce the building’s footprint by a net 10,000 square feet, resulting in a 38,575-square-foot building intended for grocery or other retail users.

Though the funding also includes $13.5 million for American River watershed work, including design to support levees in Natomas and elsewhere, the region still has a bit longer wait for money to finish work on the Natomas basin, where a building moratorium over potential flood issues remains in place.

City staff wrote that the work also would allow construction of a new east-west “drive aisle” that would allow better access by connecting Sunrise Boulevard to Birdcage Street and improve visibility from Sunrise and Sunrise Mall to the east. Pedestrian access would also be increased. The project would also remove and replace several trees within the shopping center and add 30 new parking spaces along the drive aisle.

Jonelle Trimmer, press secretary for U.S. Rep. Doris Matsui, D-Sacramento, said Matsui is optimistic in getting congressional authorization this year to finish Natomas work. “We believe we’re going to see a draft bill in the next couple weeks, and the committee chair wants to have hearings this summer,” Trimmer said. The U.S. Senate included generic language giving such authorization in a bill already passed this year, so having House of Representatives authorization would then allow local flood-control officials to pursue funding to actually complete the work. Shopping Center Remodel Planned In Citrus Heights The Marketplace at Birdcage retail

Final EIR For $70 Million Jail Facility In Porterville Goes To Supervisors Another giant step toward the construction of a $70 million county jail facility in Porterville could be taken soon when the Board of Supervisors is asked to approve the final environmental impact report for the project. The EIR found that any potential environmental impacts can be mitigated, and the board should approval the final EIR to the county can proceed with the project.

The jail EIR is just one of several significant issues before the board today. Also on the agenda is the consideration of salary increases for more than 500 employees and the board itself, an appeal filed by the Tule River Indian Reservation over conditions placed on its plans to construct a wastewater treatment facility to serve residents of the reservation and the introduction of amendments to the county business licence ordinance. The jail is in the design stage, and construction could begin next year or as late as 2016. The county is proposing constructing a 500-bed — 250-double-occupancy units — jail facility on approximately 75 acres on Scranton Avenue just west of Newcomb Street. According to the staff report, the facility will employ up to 172 people working around the clock. Sport Complex In Petaluma Moves Forward A sports complex in East Petaluma that has languished on the sidelines for more than 20 years may actually break ground in the spring. The $23 million East Washington Park, which began as a $2.1 million public-private partnership concept in 1990, could see construction begin next spring on an abbreviated footprint. City leaders last week approved a $210,000 contract for design and engineering work on a $6.7 million segment, which includes at least two — maybe three — artificial turf multi-use fields, lighting, irrigation, frontage street improvements, a gravel road and parking area and provisions for seating and fencing. Continued on next page


News Briefs Continued from last page

San Francisco Condo Project Breaks Ground Oyster Development has started demolition and excavation of its 114-condo development in the Mission District, a $70 million project that will eventually abut a refurbished New Mission movie theater. Build Group is the contractor. In addition to the Mission Street site, Oyster also bought a parcel at 1296 Shotwell, which will be handed over to the Mayor’s Office On Housing for development of affordable rental housing. Givas said the neighborhood made it clear they preferred a land dedication over on-site affordable units because it generates more affordable units than on-site affordable (46 versus 14) and provides the flexibility for deeper affordability (by allowing affordable rentals instead of only affordable condos).

Regional Forecast Exceptionally Good During the downturn, new home construction plummeted along with jobs and personal incomes. A new forecast for the Sacramento region predicts these measures of economic health are poised to rise together over the next four years Home building, an economic powerhouse in the region when it’s in full swing, will return in force, rising to levels in line with population growth by 2017, according to the latest forecast by the University of the Pacific’s Business Forecasting Center. The new report for the four-county Sacramento region predicts sizable job growth over the next four years, along with falling unemployment. Personal incomes, adjusted for inflation, will eventually rise again at a rate faster than during the boom years. With more good news, real estate information firm DataQuick reported

last week that the median price for resale homes in Sacramento County rose a stunning 42 percent in the past year, from $160,000 in May 2012 to $227,500 last month. New home prices have been on the rise, too. In Placer County, a prime home building area, the median sale price of new homes rose in May to $378,500, up 23.5 percent compared with the same month a year ago. Michael Strech, president of the North State BIA, said most builders agree the new home market is on track to recover. Tulare And Visalia Summer Projects The Tulare City School District will be replacing the heating, ventilation and air conditioning units at Cherry Avenue Middle School, as well as replacing the roof. The costs for replacing the air conditioning units will be $119,000 and costs for the roof replacements will be $205,000. The district will also be upgrading the refrigerator and freezer units in its central kitchen, where all of the lunch and breakfast meals are made for all 14 school locations. The upgrade will cost the district $81,000.

http://designcenters.paccoast.com

Other projects the district will be working on during the summer is the remodeling project of the library at Pleasant Elementary School, the installation of window covers at nine school sites and routine work orders for anything that needs to be fixed. Pleasant Elementary School will remodel the existing library and combine it with the computer lab to create more space. Tulare Joint Union High School District will also be working on its own construction projects this summer.

Page 8

Zone . July 8, 2013 • Contractor’s


A classroom building at both Tulare Union and Tulare Western high schools will undergo construction. The planning for the new roofing began last October and is expected to cost the district $750,000 for both sites. The district decided to go with the same contractor, Gary Interrante Construction from Exeter, for both sites. For Visalia schools, summer improvements will come by way of Measure E, the voter-approved bond initiative used to fund ongoing construction and renovation projects. The largest project on tap for this summer is the installation of solar panels at 12 schools, beginning July 10. Redwood High School, Highland Elementary and Crowley Elementary — identified by Administrative Services Director David Loverin as the worst offenders in the district when it comes to energy costs — will be the first recipients of the new panels. The remaining schools — Pinkham Elementary, Linwood Elementary, La Joya Middle School, Veva Blunt Elementary, Willow Glen Elementary, Green Acres Middle School, Houston Elementary, Fairview Elementary and Ivanhoe Elementary — will be furnished with the new equipment by November.

replacing two portable classrooms. The school now has just one girls restroom and one boys restroom, and the boys restroom has just one urinal. It was also the consensus of the board to build a permanent, two-story, nineclassroom structure at Belleview, as opposed to a modular building. That will increase the cost of the project from around $2.8 million to more than $4.1 million. The building will replace portable classrooms across the street from Belleview, which have been at the school for 35 years. The construction of the swimming pool at Strathmore High will cost $3.3 million. The pool will be used by Harmony Magnet Academy and Strathmore High students who compete for Strathmore High boys and girls water polo and boys and girls swim teams. Those teams currently have to practice and compete in their home contests at the Granite Hills swim complex. The pool could also be used by youth clubs and possibly even the public as well. The pool will be constructed behind the tennis courts between Spartan Stadium and the junior varsity softball field on the SHS campus. All of the construction projects should be completed during the 2013-14 school year.

Four Porterville Projects Get District Approval

Central Valley Construction Rebounding

The Porterville Unified School District will include what it considers to be its four highest priority construction projects in the 2013-14 budget to be approved by the board at its June 27 meeting. Those projects are a modernization project at Roche Avenue Elementary School, the replacement of portable classrooms at Belleview School, the construction of a swimming pool at Strathmore High and the expansion of Butterfield Charter School.

Construction in the Central Valley made some definite headway by the second quarter of the year, with building permits up more than 30 percent over the same time last year. Throughout Fresno, Madera, Kings and Tulare counties, 4,449 construction permits were issued to builders in the first six months of the year, up 30.5 percent from 3,409 during the same period last year, according to a weekly report by Construction Monitor.

The Roche project will cost nearly $450,000 and will include a badly needed expansion of restrooms and

The value of all construction permits rose from $403.4 million by June of last year to $547.6 million so far this year.

Commercial permits rose from 644 during last year’s second quarter to 667 so far this year. Among those, retail, warehouses and dining jumped from 18 to 26, while offices, banks and professional buildings went from 22 to 33. Industrial and manufacturing buildings and warehouses dipped slightly to 22, although the value of those permits doubled to $39.3 million. Housing Gains Document Economic Recovery U.S. builders stepped up home construction in May and applied for permits to build single-family homes at the fastest pace in five years. The gains show housing remains a key source of growth for the economy. The overall pace of homes started rose 6.8 percent last month to a seasonally adjusted annual rate of 914,000, the Commerce Department reported. Overall, the report points to more evidence of a housing recovery that has become sustainable. New-home construction has risen 28.6 percent since May of 2012. Construction increased in May for both single-family homes and apartments and condos. And builders sought more permits to build singlefamily homes, which make up nearly two-third of the market. The seasonally adjusted annual rate rose 1.3 percent to 622,000 - the highest since May 2008. That’s a sign that construction will increase further in the coming months. A better outlook for housing has made builders more optimistic, leading to more construction and jobs. The National Association of Home Builders/ Wells Fargo builder sentiment index released last week rose to 52 this month, up from 44 in May. That was the highest reading in seven years and the largest monthly increase in more than a decade. Each home built creates an average of three jobs for a year and generates about $90,000 in tax revenue, according to NAHB statistics.


Industr y News

New Rules For Contractors Disposing Of Mercury Thermostats Beginning July 1, 2013, new rules take effect in California for both C-20 (Warm-Air Heating, Ventilating and Air Conditioning) and C-21 (Building Moving Demolition) contractors who dispose of out-of-service thermostats containing mercury. The new regulation requires the contractor to put his/her CSLB license number on the thermostat container or provide it at the collection location accepting the device. The new regulations were adopted in May by the California Department of Toxic Substances Control (DTSC) as the final part of the Mercury Thermostat Collection Act of 2008.

Though no longer sold in California, DTSC estimates up to 10 million mercury thermostats are still in California businesses and homes. C-20 contractors and C-21 contractors are seen as a critical link in proper disposal of obsolete thermostats that contain the toxin mercury. The new DTSC rules also will help identify contractors not participating. The nonprofit, industry-funded Thermostat Recycling Corporation operates about 350 collection sites in California that accept and safely recycle old thermostats. Contractors can find the nearest collection site

by clicking here and filling in a ZIP code. Under the new regulations, collection sites will provide the number of mercury thermostats received and the contractor license numbers to manufacturers, who in turn submit an annual report to DTSC. The regulations require manufacturers to collect and recycle more than 32,500 mercury thermostats in the second half of 2013, or 30 percent of the estimated number of the devices that become waste. Recycling goals will increase for the next five years. For more information, Click here.

Your Authorized www.igoinland.com

&

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your

Dealer

printing needs and develop an individualized plan of products and services that will serve your company best.

PCCA member since 2004

1500 North Market Boulevard, Sacramento, CA 95834 Continued on next page Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801 Page 10

Zone . July 8, 2013 • Contractor’s



Industr y News

Big Fan Benefits Adequate air movement is important for the productivity and safety of your crew Lack of air movement on construction sites can exacerbate safety problems associated with heat and air quality, and makeshift solutions can create new issues, such as noise control and fire hazards. Since workers are typically on construction sites only temporarily, mobile fans that supervisors can bring to every jobsite are ideal for continuous air movement needs. Durable, portable fans can be used to help create healthy and productive work environments in any location. In more permanent facilities such as warehouses used to store construction equipment and vehicles, large-diameter overhead fans maximize air movement and energy efficiency. Heat Safety Whether workers are directly in sunlight or inside a sweltering building, stagnant air can create health and safety hazards. Along with the lack of air movement, the layers of protective clothing construction workers often must wear add a challenge to keeping workers cool. According to OSHA, air temperatures exceeding 95 F significantly increase the heat load on the body, and temperatures of 100.4 F and above are dangerous for workers. This increased heat load can lead to heat-related illnesses and a difficulty focusing, resulting in a higher potential for safety issues in construction zones.

Page 12

Besides being unsafe, discomfort can also have a negative impact on productivity. Studies show that elevated temperatures affect both physical and mental work. Hot working conditions negatively affect worker morale and quality of workmanship and can increase absenteeism, turnover and frequency of accidents and grievances. Fans engineered to withstand harsh work environments, such as construction sites, make workers feel up to 10 F cooler, leading to safety and productivity benefits. Fan Mobility Mobility allows for flexibility in any environment, from open-air treatment plants and accompanying warehouses to construction sites. Employees at the City of Tampa Advanced Wastewater Treatment Plant sweltered in the underground 6,900-sq.-ft. facility. To help ensure employee comfort and safety, plant team leader Eddy Drovie turned to a mobile eight-ft.-diameter fan built to withstand tough environments. Using a crane, the fan was lowered into the tank and rolled from bay to bay following the workers. “The fact that you can move those fans around is a plus,” says Drovie. “I think that’s a big part of the reason why we chose this.” Air Quality Air quality is often an issue on con-

Zone . July 8, 2013 • Contractor’s

struction sites. Dust and dirt is often stirred up on jobs, and construction materials may contain harsh chemicals and toxins. Poor air quality can contribute to decreased focus in workers, leading to costly mistakes and health problems. Adequate indoor air quality is primarily important in the occupant breathing zone, which is defined as the area three to 72 inches from the floor. According to the Center for the Built Environment, temperature and air quality are two of the most important factors when considering productivity. Properly sized fans can turn the air over several times per hour, creating uniform air distribution and improving health conditions for workers. Employees at the Environmental Service Center (ESC) Household Hazardous Waste drop-off facility in Houston, Texas, sought a breath of fresh air after inhaling vapors ranging from exhaust fumes to chemicals and pesticides. In order to combat the problem, ESC facility manager Roger Jones turned to fans and increased air movement. An eight-ft.diameter vertical fan offered both massive air movement and easy transportation throughout the facility, ensuring dilution of the gases dispersed in the air. “These fans make a big difference,” Jones said. “We deal with not only the ambient temperature but the odors


from all those chemicals we handle, and the fans help move those odors out of our breathing zone.�

so being able to work with somebody who recognizes what you’re trying to achieve is important.

With so many different fan sizes, options and features, it may be difficult to know what type of fan is appropriate for your space and needs. Look for a fan that is designed by a company that understands your needs. There’s no one-size-fits-all solution,

Additional Benefits In addition to reducing heat-related troubles and air-quality issues, fans can also help reduce safety hazards in other ways. In some cases a single high-quality fan can replace several smaller fans, reducing noise

and trip hazards presented by cords on the floor. Some fans include misting options, which create ultra-fine atomized mists that have the cooling effect of up to 22 tons of air conditioning without making you feel wet. Selecting a fan that is built to withstand harsh environments reduces the chance for safety-related catastrophes and hindrances.


Page 14

Zone . July 8, 2013 • Contractor’s


Kalb Q & A

Capitol Connection Q&A Resource For Contractors By Shauna Krause and David Kalb Capitol Services, Inc. Contractors want a ‘level’ field when making bids with competition. That’s why your license number is required in advertising, signage and other places a consumer can see it. Hopefully, when they check it at CSLB it ‘flattens’ the ambition of unlicensed competitors. We also take a ‘short circuit’ in describing the route to adding a low voltage class… Q: Can we take a contract with a “C-61” license and then subcontract out a portion to a “C” class? For instance, could a “D-28” (Doors Gates Activating devices) take a contract and, knowing that there is some electrical work, sub this portion to a properly licensed “C-10”? A: It should not be a problem as long as the subcontracted work is incidental and supplemental (i.e. essential) to the completion of the “D-28” project. To the best of my knowledge, there is nothing in the law or regulations to preclude a Specialty Contractor from doing (or subcontracting) incidental work. Q: We currently have a “C-10” Electrical license and we are starting a new corporation that will focus on doing low voltage electrical work. Can my boss obtain a separate license for the new company and get a waiver of the “C-7” low voltage exam since he has the “C-10” classification already? Because of the certification requirements of “C-10” electricians he wants to have a stand-alone “C-7” license. A: Except in extremely rare cases, the CSLB will not grant a waiver of a trade exam for a brand new license

David Kalb

Shauna Krause

unless the qualifying individual has previously held the classification. He can however apply to add the “C-7” to your existing license and request to waive the exam. Keep in mind that this is only a request and in order to be approved your boss will need to show proof of at least five years of work experience within the last 7 years where the “C-7” (Low Voltage) was a significant component of the “C-10” project.

A: Unfortunately many unlicensed “contractors” advertise that they meet all the state requirements when in fact they do not have a valid contractor’s license; bonding, or Worker’s Compensation coverage for their employees. In your case, we searched and could not locate a valid license; however, we did locate someone with that name who had a license that expired two years ago. This same individual has a pending judgment against him and other pending legal actions.

Once the “C-7” has been added to the existing license he can then apply for a stand-alone low voltage license for the new company. Q: I’m a homeowner and found your name on the Internet. I want to hire a contractor (for a small bathroom remodel) who advertises in our local newspaper, but could not locate his name on the CSLB website. He said he was “licensed, bonded and insured” and gave me a good price for the work. You folks appear to know a lot about contractors and I was hoping you might have some advice. If it’s not too much of a problem, maybe you could even check to see if this guy really is licensed?

Our advice is to stay well clear of this “contractor” and find someone who has an active contractor’s license in good standing. Also, make sure if the contractor has employees, they are covered by Worker’s Compensation. While this unlicensed individual may have given you a “good price”, you’ll likely end up paying much more in the long run. If this guy lied to you about having a valid license, bonding, etc. can you really trust him to keep his word regarding your bathroom remodel? So, no valid license, judgments pending and less than truthful is three strikes, you’re out!


Classified Ads For Sale: 2 single (2 drawer) file cabinets $35 each 1 lateral (2 drawer) file cabinet $50 Please contact Chae Gale for more info. 916-771-7229 For Sale: 4 plan bin cabinets, dimensions are 33”d x 33”w x 7’h 24 cubbies in each, $150 per cabinet Please contact Chae Gale for more info. 916-771-7229 For Sale: Commercial General Contractor RETIRING selling everything from office furniture to hand tools, including plan table with digitizer and portable digitizer. Too much to list, call if interested. Rick 916-870-9637 For Sale: Stainless Steel Thermador Double Oven Model #PODC302J New In Box $5,500.00 Bob Hilton 916-508-0723 Seeking: Sacramento company looking for Experienced Gutter Installer. Someone with at least 2 years experience. Clean cut. Working cell phone. Drug test and background checks required Fax Resume to 916-943-0699 or email irina@soldate.net Salary DOE “Surplus” Sale: GHH is doing some Spring cleaning! We have a variety of construction materials and tools ranging from pipe fittings to compressors and generators. Stop by, see what we have and make us an offer! Date: February 15, 2013 Time: 9:00 am - 3:00 pm Location: 11960 Heritage Oak Place, Ste. 2B Auburn, California 95603 Questions: (530) 886-3100

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are often required. This newspaper is state-certified. Legal ads: are firms seeking bids or sub bids from DVBE/DBE/MBE/WBE/SBE companies. Legal ads are priced on the length of the ad. In general, most ads will fit into our standard ad shell which is one-column by up to 2 1/2” tall. The price for a standard sized legal ad is $35. For this price, the ad is run in all three formats from the date the ad is placed until the bid date -- unmatched coverage and distribution, all for a rediciously low price! Ads larger than 2 1/2 column inches are priced by the size. CLICK HERE to place a legal ad. Or Email your ad to: CandSpublishing@gmail.com

Page 16

Zone . July 8, 2013 • Contractor’s


Weekly Safety Meeting Company Name:

Job Name:

Date:

Buckle Up - Save A Life ‘’Belt your wife - save her life”, “Click it or ticket’’, and “Buckle up – it’s the law”, are a sayings we’ve heard frequently over the years. Seat belts were first offered by U.S. automobile manufacturers in the early sixties. Those pesky old belts have been around for 40 years now but we still see people operating motor vehicle without them. The National Safety Council reports in their 1992 Accident Facts edition that 43,500 motor vehicle deaths took place in 1951; 3,500 of these deaths happened at work. The cost of these motor vehicle accidents was an astronomical 96.1 billion dollars! Many of these injuries and deaths could have been prevented if those involved had taken time to ‘’buckle up”. Studies by the National Highway Traffic Administration show that manual lap and shoulder belts are effective in preventing fatalities, 50% effective in preventing moderate to critical injuries, and 10% effective in preventing minor injuries. In early 1992 over 40 states had enacted mandatory safety belt use laws, but studies show that only 55% of the motoring public wear their seat belts. Many new cars and trucks are now equipped with supplemental restraint systems (SRS), better know as air bags. For the SRS to be effective the operator and/or the passenger must be wearing their seat belt to fully benefit from the air bag. You may think of many reasons why you don’t or can’t wear your belt -- “they’re uncomfortable”, ‘what happens if I’m knocked unconscious and can’t get out”, “hey, I’m only going to the store, nothing will happen”, or “never had an accident so I don’t need a belt” -- all of these are just excuses and indicate plain stupidity or a very poor safety attitude. Remember, YOU are the ONLY ONE to make the decision whether you do or don’t buckle up. On or off the job, start the new year by making every trip a safe one by buckling up, and insisting that all passengers in your vehicle do the same. Who knows, the life you save may be your own! IT’S A PROVEN FACT - SEAT BELTS SAVE LIVES - BUCKLE UP!

Special topics for your project:

Employee Safety Recommendations: Reviewed MSDS #

Subject

Meeting attended by:

Supervisor’s Signature:

Date:


CalTrans CDOT 21

07/02/2013

DOT 01-364324 REPLACE DRAINAGE SYSTEMS AND INSTALL PIPELINERS AND RSP.

MENDOCINO COUNTY

0

CDOT 14

07/03/2013

DOT 01-0C3604 INSTALL HIGH FRICTION SURFACE TREATMENT

MENDOCINO COUNTY

0

CDOT 21

07/11/2013

DOT 07-265904 REPLACE BRIDGE RAILING.

LOS ANGELES COUNTY

0

07/11/2013

DOT 11-404304 CONSTRUCT OUTER SEPARATION BARRIER, WIDEN SHOULDER, MODIFY DRAINAGE.

SAN DIEGO COUNTY

0

CDOT 7

07/11/2013

DOT 08-0K3104 REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE.

CDOT 7

07/11/2013

DOT 08-0N5704 BRIDGE SEISMIC RETROFIT

SAN BERNARDINO COUNTY SAN BERNARDINO COUNTY

CDOT 57

07/16/2013

DOT 10-0G8004 PAVEMENT REHABILITATION AND BRIDGE CONSTRUCTION.

SAN JOAQUIN COUNTY

3

CDOT 43

07/17/2013

DOT 03-0F2304 BRIDGE WIDENING, PCC OVERLAY AND REPLACE CONCRETE BARRIER.

SACRAMENTO COUNTY

1

CDOT 14

07/18/2013

DOT 07-278304 REHABILITATE BRIDGE.

LOS ANGELES COUNTY

0

07/18/2013

DOT 08-491804 REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOULDERS

RIVERSIDE COUNTY

0

CDOT 7

07/23/2013

DOT 01-459704 SEISMIC RETROFIT BRIDGE COLUMNS AND ABUTMENTS, CONST CONCRETE BARRIER.

HUMBOLDT COUNTY

0

CDOT 7

07/24/2013

DOT 04-2A1104 BRIDGE REMOVAL, BRIDGE REPLACEMENT AND ROADWAY WIDENING.

NAPA COUNTY

0

CDOT 21

07/25/2013

DOT 08-368504 CONSTRUCT COMMERCIAL VEHICLE ENFORCEMENT FACILITY (CVEF)

SAN BERNARDINO COUNTY

0

07/25/2013

DOT 11-401404 REPLACE MBGR WITH CONCRETE BARRIER AND UPGRADE CRASH CUSHIONS.

SAN DIEGO COUNTY

0

08/08/2013

DOT 12-0C5604 WIDEN RDWY AND BRIDGE, CONST RETAINING WALLS AND NEW BYPASS OFF-RAMP.

ORANGE COUNTY

0

CDOT 21

CDOT 14

CDOT 21

CDOT 7

Page 18

Zone . July 8, 2013 • Contractor’s

0 0



Plans On File Monday, July 08, 2013 RFP CONSTRUCTION MANAGMENT SERVICES INTERMODAL PHASE 2 SACRAMENTO VALLEY Bid Date: 7/8/2013 PLAN #: 25028 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On # OF ADDENDA: 1 Demand PREBID: 6/18 @ 1-3PM PREBID: 401 I Street OWNER: City of Sacramento DESCR: Contact,Jose Ledesma JLedesma@cityofsacramento. orgThe City of Sacramento (“City”) Public Works Department has prepared this Request for Proposal (RFP) for submission of qualifications and proposal to provide construction management services for the Intermodal Phase 2 Sacramento Valley Station (SVS-2) Project. The construction management services will include: pre-construction design and constructability reviews; construction oversight and coordination; construction administration services; quality assurance materials sampling and testing, and special inspections; and labor compliance. Quality assurance construction inspection will be provided on an asAVAYA TELECOMMUNICATIONS EQUIPMENT PLAN #: 88071 Bid Date: 7/8/2013 Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and Planroom OWNER: County of El Dorado DESCR: Contact, Rick Blake (rick.blake@edcgov.usThis is a brand name specific bid, all items must be for Avaya products, new equipment. New and Used telecommunications equipment, purchase will be made on an as requested basis during the awarded 12 WILLOW AVENUE EXPRESSWAY BARRIER FENCING PLAN #: 105095 Bid Date: 7/8/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fresno Online & Print On Demand OWNER: Co of Fresno Ph: 559-262-4866 DESCR: Contact, Fresno, City of - Dept Purchasing Division (559) 621-1332 Construction of sections of expressway barrier fencing as shown on the provided plan sheet in conformance with City of Fresno Standard Drawing P-74 and the Technical Conditions, including all excavation, placement of concrete, fence construction, and clean up, along with all associated and incidental work. Not included in the Contractor’s responsibilities is the construction of a concrete mow strip as shown on

Page 20

Zone . July 8, 2013 • Contractor’s

RFP - MENDOCINO COUNTY SHERIFF’S OFFICE CORRECTIONAL FACILITIES SECURITY CONTROLS UPGRADE Bid Date: 7/8/2013 PLAN #: 116084 Bid Time: 2:00 PM PLANS AT: Location: Ukiah Online and Planroom OWNER: County of Mendocino DESCR: Contact, County of Mendocino (707) 234-6050 Work consists of replacing existing security controls and upgrading to an integrated touch screen control system, IP intercom, IPCCTV and video recording. ARTERIAL STREETS REHABILITATION PROJECT PLAN #: 169093 Bid Date: 7/8/2013 Bid Time: 10:00 AM PLANS AT: Costa Mesa Online and Planroom Est Cost: $937,000.00 DESCR: Irina Gurovich - 714-754-5324Bristol St-405 FWY to Anton Blvd, Sunflower Ave - Avenue of the Arts to Main St, Aton Blvd- Avenue of the Arts to Sakiota Dr. Town Center D r-Bristol St to Park Center Dr. Park Center Dr. -Town Center Dr MORGAN HILL CITY COUNCIL CHAMBER RENOVATIN PROJECT PLAN #: 270048 Bid Date: 7/8/2013 Bid Time: 2:30 PM PLANS AT: Morgan Hill Online and Planroom PREBID: MAND 6/21, 6/24, or 6/28 @ 9 am DESCR: Contact,Morgan Hill, City of Architect/Engineer (408) 778-6480 This project is a multi- prime project and the Scope of Work includes the following Construction packages: 1 Demolition 2 General carpentry – Framing and installation of new walls, gypsum board installation, insulation, doors and hardware, floor leveling 3 Plumbing – Fixtures, concrete saw cut, pour-back 4 Electrical – Audio/visual, telephone/data

C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts, and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors? For rates, call Steve today at (916) 729.5432 or email him at CandSpublishing@gmail.com


5 Signage – Interior, exterior 6 Millwork – Trim, dais 7 Flooring – Carpet and resilient flooring 8 Tile 9 HVAC – Re-ducting of existing system and new units 10 Wallboard sound attenuation, ceiling treatment, clouds, and dropped ceiling 11 Restroom partitions and accessories 12 Painting and wall covering 13 Site Work – Minor grading, concrete, and asphalt paving 14. Storefront & Glazing

Tuesday, July 09, 2013 SIDEWALK REPAIR FY 13/14-PH 1 A ST. & 11’TH ST. SIDEWALK IMPROVEMENT Bid Date: 7/9/2013 PLAN #: 5026 Bid Time: 2:00 PM PLANS AT: Location: Tracy Online and Planroom OWNER: City of Tracy DESCR: Contact, Tracy, City of - Development & Engineering (209) 831-6400 The Project is more specifically defined in the Informal Contract Documents, but generally includes the following work to be done: Installation of curb ramps, sidewalk, asphalt concrete, curb & gutter, 2013 PARKING LOT CAPE/SLURRY SEAL PROJECT PLAN #: 33022 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Roseville Online & Print On Est Cost: $1,030,000.00 # OF ADDENDA: 4 Demand OWNER: City of Roseville DESCR: Contact, City of Roseville (916) 746-1300 Work consists of roadway and parking lot resurfacing at the City Corporation Yard and the Dry Creek Waste Water Treatment Plant including dig-outs and replacement of concrete curb, gutter and BIDDERS LIST: Sub Contractor: Sierra Striping, Inc./sierr 916-652-0430 916-652-9663 OAKDALE ROAD PAVEMENT REHABILITAION PLAN #: 38027 Bid Date: 7/9/2013 Bid Time: 11:00 AM PLANS AT: Location: Modesto Online and Planroom Est Cost: $1,388,596.00 # OF ADDENDA: 2 PREBID: 6/21 @ 11AM PREBID: 1010 Tenth Street OWNER: City of Modesto, Community and Economic Development Dept. DESCR: Contact, Modesto, City of (209) 577-5256 This project will rehabilitate the pavement on Oakdale Road between Briggsmore Avenue and Floyd Avenue. Also included will be storm drainage improvements and numerous curb ramp

upgrades to current ADA standards. The road will be restriped to include bike lanes. Bid alternates include additional hot mix asphalt and additional striping. MAINTENANCE OF CITY OWNED VACANT LOTS PLAN #: 39023 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sheryl Fox - 916-808-4959Work consists of Maintenance of City Owned Vacant Lots. Contractor shall provide all labor, equipment, and materials necessary to maintain City owned vacant lots as specified in scope of work. INTERSTATE 80 VERTICAL CLEARANCE OUTREACH AND COMMUNICATION PROGRAM PLAN #: 48019 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $99,500.00 Demand PREBID: 6/18 @ 9AM PREBID: 1900 Royal Oaks Drive DESCR: Contact, Susanna Aaltonen - 916-227-6835The Department of Cal Trans District 3 office in Marysville invites qualified firms to submit a proposal, including a fee schedule for consulting services to create and execute a strategic communications plan for a multi year construction project on interstate 80 in South Placer County for public outreach services. BROADWAY STREETSCAPE IMPROVEMENTS FROM DIVISADERO TO TUOLUMNE Bid Date: 7/9/2013 PLAN #: 49016 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Fresno Online & Print On Est Cost: $700,000.00 Demand PREBID: 6/25 @ 11am PREBID: 4017N, City Hall OWNER: City of Fresno DESCR: Contact, Fresno Purchasing Dept (559) 621-1332 Construction of intersection bulb outs which shall include clearing, grubbing and proper disposal of any obstructions, improvements or facilities lying within the limits of the improvements, as well as the installation of concrete curbs, concrete curb and gutters, sidewalk and ramps. Including detectable warning devices, modified channel through walk drain, as well as installation of new drain inlets and reinforced concrete pipe. Slurry seal of existing pavement to include all required traffic striping and pavement markers as well as signage. Relocation of existing fire hydrants, installation of new landscaping and irrigation. Continued on next page


Plans On File Continued from last page

Tuesday, July 09, 2013 STATE AND CHURCH STREETS VAULT SUBSTRUCTURE PROJECT PLAN #: 52000 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Ukiah Online and Planroom PREBID: MAND 6/25 @ 10AM OWNER: City of Ukiah DESCR: Contact, City of Ukiah (707) 463-6233 Excavation and setting of new electrical vault substructure (installed by Contractor, provided by City), remove and replace two (2) concrete ADA ramp, removal of concrete sidewalk, concrete driveway and asphalt for the installation of underground electric primary conduits and secondary conduits (provided and installed by Contractor). The installation of underground electric vault substructure shall conform to City of Ukiah Electric Utility Department specifications, project drawings and City of Ukiah Public Works Department specifications. The project location is in the 100 & 200 Block of South State Street (NW & SW Corners of West PREQUALIFICATION- INTERNAL COMPLEX PHASE 1 PLAN #: 69073 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Davis Online and Planroom Est Cost: $21,500,000.00 OWNER: University Of California, Davis DESCR: Contact, Vanda Rovis - dcmcontracts@ucdavis.eduWork and construction for a three story classroom building, including a commons/lounge, administrative offices, outdoor courtyard, landscaping and support spaces for facility. include all design work, labor, materials, tools, equipment, shoring, testing, inspection, commissioning, and all other necessary general conditions.

EXTERIOR PAINTING @ TFC PLAN #: 97073 Bid Date: 7/9/2013 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Tustlin Online & Print On Est Cost: $120,000.00 Demand PREBID: MAND 6/19 @ 10AM PREBID: 15405 Landsdowne Road OWNER: County of Orange DESCR: Contact, Ronald Harper- 714-245-6077The successful bidder shall be required to furnish a Performance Bond in an amount equal to 100 percent of the amount of the contract and a Payment Bond in the amount of 100 percent of the contract, said bonds to be first approved by the County Counsel and the Risk Manager of Orange INSTALLATION OF EIGHT (8) RAIN MASTER CONTROLLERS IN VARIOUS CITY PARKS PLAN #: 114088 Bid Date: 7/9/2013 Bid Time: 1:00 PM PLANS AT: Visalia Online and Planroom Est Cost: $80,000.00 # OF ADDENDA: 2 PREBID: 6/21 @ 9AM PREBID: 247 W. Ferguson OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, City of Visalia - 559-713-4820The City of Visalia is seeking bids from qualified contractors to install upgrade irrigation controllers in various city owned parks. Bids are being sought from contractors who have a proven record of experience in providing the service required for this bid. IRVINGTON COMMUNITY CENTER HVAC AND ROOFING REPLACEMENT Bid Date: 7/9/2013 PLAN #: 125090 Bid Time: 2:00 PM PLANS AT: Fremont Online and Planroom Est Cost: $750,000.00 PREBID: MAND 6/20 @ 10am

Legal options to improve your financial future Bankruptcy • Company & Personal Debt • Foreclosure

CALL TODAY (530) 888-7100 www.BottomLineLawyers.com

Page 22

Zone . July 8, 2013 • Contractor’s

WEB SITE

INFO CENTER

ABOUT

CONTACT

985 Lincoln Way, Auburn, CA 95603


PREBID: 41885 Blacow OWNER: City of Fremont DESCR: Contact, Purchasing Department - 510-4944620HVAC and roofing replacement, specifically the HVAC work consists of replacement of five rooftop HVAC units and related ducts and plumbing lines. The roofing replacement includes removal of an existing built up roofing system and installation of a new PVC single membrane mechanically attached roofing system on all roof areas. The project also includes structural supports for HVAC units and new conduit in preparation for future installation of rooftop PV panels. BIDDERS LIST: General Contractor: Hometown 916-991-2486 9 16-991-2881 Bobo Construction, Inc 916-685-2285 9 16-714-4850 PESCADERO LOFTS PLAN #: 143062 Bid Date: 7/9/2013 Bid Time: 12:00 PM PLANS AT: Isla Vista Online and Planroom OWNER: Ashwood Construction, Inc. Ph: 559-253-7240 FAX: 559-253-5955 DESCR: Contact,Ashwood Construction (559) 253-7240 33 Residential Dwelling Units,3 story mixed-use building on a .82 ac site, 24,073 square feet, including common areas. Construction Type V-B, fully sprinkler .Wood Framed Structure with Cement Plaster and Fiber-Cement Siding w/ Single-Ply Roofing. BIDDERS LIST: Sub Contractor: Ivers Electric, Inc. 916-295-4416 530-295-0423 STORYBOOK WOODS PARK PLAN #: 145071 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Elk Grove Online & Print On Demand OWNER: City of Elk Grove DESCR: Contact, Elk Grove, City of - Public Works (916) 478-7111 The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and shall consist of the following: construction of a 1.82 acre neighborhood park, including but not limited to grading, drainage, sewer, landscaping, irrigation, electrical, resilient surfacing, picnic tables, seating tables, play equipment, bridge, shade structure and other surfacing and appurtenances. BIDDERS LIST: General Contractor: Us Matrix Co Inc 925-473-1043 925-432-7103 Olympic Land Construct 916-972-7148 916-927-5769 S W Allen Construction 916-344-2098 916-344-0307 MERCED COUNTY OFFICE OF EDUCATION PLAN #: 155067 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Merced Co.

Online and Planroom Est Cost: $5,000,000,000.00 PREBID: 6/19 @ 10AM PREBID: 2100 Cooper Ave OWNER: CT Brayton & Sons, Inc. Ph: 209-838-7388 FAX: 209-838-3960 DESCR: Greg Branch- 209-838-7388Pre manufactured metal buildings into administrative offices, site specific warehousing, conference center, and associated parking and site upgrades, scope includes selective demo, concrete removal and replacement, AC paving, landscape and irrigation, building modernization includes repair/replacement of exterior metal siding, metal stud framing and all finishes, insulation, drywall, doors and hardware, glass and glazing, polished concrete, FRP ceramic tile, carpet, acoustical ceiling tiles, painting, casework, specialty items, plumbing, HVAC and electrical including low voltage such as fire, voice and data. STOCKTON METROPOLITAN AIRPORT REHABILITATE TERMINAL APRON Bid Date: 7/9/2013 PLAN #: 177002 Bid Time: 1:00 PM PLANS AT: Print On Demand Location: Stockton PREBID: MAND 7/2 @ 1 pm DESCR: Contact: Stockton Metropolitan Airport (209) 4684700.The work included in this project shall consist of the following: -Rehabilitate Terminal Apron -Additive Alternative No. 1 – Terminal Pavement and Fencing -Additive Alternative No. 2 – Terminal Apron Shoulder Reconstruction JUVENILE JUSTICE CENTER ROOFING AND HVAC PROJECT Bid Date: 7/9/2013 PLAN #:192083 Bid Time: 2:00 PM PLANS AT: Modesto Online and Planroom # OF ADDENDA: 2 DESCR: Contact, DIEDE CONSTRUCTION (209) 3698255 (209) 368-0600 a. Demolition of 10 roof top air handler HVAC units, b. 10 new self-contained roof top HVAC units, c. Replacing the existing HVAC controls system with a new DDC system, d .Demolition of an existing HVAC central plant system, e. Demolition of an electric boiler system, f. Replacement of approximately 35,000 SF of the Juvenile Hall roof, g. Upgrading of approximately 12,000 SF of the Probation Building roof, h. Remediation and disposal of existing, regulated hazardous building materials, BIDDERS LIST: General Contractor: Diede Construction 209-369-8255 209-368-0600 Click on the blue underline to go to the Online Planroom Continued on next page


Plans On File Continued from last page

Tuesday, July 09, 2013 BUS DROP OFF AT EISENHUT ELEMENTARY SCHOOL PLAN #: 214098 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Modesto Online and Planroom PREBID: MAND 6/25 @ 2Pm PREBID: 1809 Sheldon Drive OWNER: Stanislaus Union School District DESCR: Contact, Timothy P. Huff & Associates, Inc (209)

Jensen

Masonry 916.663.3429 Paradisembj@earthlink.net www.Jensen-Masonry.com Mark Jensen, Master Mason • • • • •

BBQ’s Fireplaces Brick Rock Etc.

Wednesday, July 10, 2013 ROBERT GABRIEL DRIVE & GONZALES STREET STORM DRAINAGE IMPROVEMENTS Bid Date: 7/10/2013 PLAN #: 4019 Bid Time: 2:00 PM PLANS AT: Location: Tracy Online and Planroom OWNER: City of Tracy DESCR: Contact, Tracy, City of - Development & Engineering (209) 831-6400 Includes installation of catch basin, 40 SF of sidewalk replacement, eight RFQ PROFESSIONAL ENGINEERING SERVICES SEPTAGE AND SUPERNATANT LIQUID DISPOSAL PLAN #: 12014 Bid Date: 7/10/2013 Bid Time: 4:00 PM PLANS AT: Butte Co. Online and Planroom # OF ADDENDA: 1 OWNER: Co of Butte FAX: 530-538-7171 DESCR: Contact, Public Works Department- 530-5387681The County of Butte’s Neal Road Recycling and Waste Facility is seeking qualified engineering firms to conduct feasible study for an alternative to disposing of septage supernatant at a municipal wastewater treatment 5TH STREET, 5TH STREET VIADUCT AND RAILYARDS BOULEVARD AT SACRAMENTO RAILYARDS PLAN #: 13028 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $23,000,000.00 # OF ADDENDA: 3 PREBID: 6/6 @ 10AM (Highly Recommended) PREBID: 5’th Street Railyards Boulevard OWNER: City of Sacramento DESCR: Contact, Job Blank - 916-808-7914Includes construction of +/- 712 LF of roadway and utility improvements from H Street north to the existing 5th Street overhead bridge, including accompanying retaining walls and embankment; +/- 391 LF of elevated viaduct; +/- 725 LF of roadway and utility improvements from the 5th Street viaduct to Railyards Boulevard, including accompanying retaining

CCL #:804650

Page 24

571-2232 Demolition, site clearing, earthwork, hot-mix asphalt paving, Portland cement concrete paving, storm drainage, irrigation, chain link fencing & gates, planting, sealants & caulking; Div-16-electrical system BIDDERS LIST: General Contractor: Bc Construction 209-531-1252 2 09-531-1254

Zone . July 8, 2013 • Contractor’s


walls and embankment; +/- 2,795 LF of roadway and utility improvements from Bercut Drive to 7th Street; construction of lined retention basin and design / fabrication / installation of shade structures located at two locations on the 5th Street Overhead Bridge. BIDDERS LIST: General Contractor: Shasta Constructors 530-365-3930 530-365-5465 Sub Contractor: Kck Builders 415-459-8698 415-453-9250 Preston Pipelines 408-262-1418 408-262-1870 Supplier: Ferguson Enterprises 916-381-6100 916-381-7445 OLD HIGHWAY 99W FROM MAXWELL TO THE GLENN COUNTY LINE PLAN #: 15029 Bid Date: 7/10/2013 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Colusa Online & Print On # OF ADDENDA: 1 Demand OWNER: County of Colusa DESCR: Contact, Colusa, County of - Public Works (530) 458-0466 Includes minor pavement repairs, placement of asphalt concrete overlay with reinforcing fabric on top of a leveling course throughout the limits of the project, traffic control, shoulder backing and traffic markings. CARMICHAEL WATER DISTRICT RUSTIC WOODS PIPELINE AND BOYER DRIVE WATER MAIN EXTENSION PROJECT PLAN #: 21026 Bid Date: 7/10/2013 Bid Time: 11:00 AM PLANS AT: Carmichael Online and Planroom PREBID: MAND 6/14 @ 10AM OWNER: Carmichael Water District DESCR: Contact, Sara Rogers - 916-933-1997Construction and testing of approximately 460 Linear feet of new 8 inch diameter water main along Boyer Dive and Sarah Court, 20 linear feet of new 5 inch diameter water main, 60 linear feet of 4 inch ductile iron pipe connections in Oak Ave and Boyer drive, 450 linear feet of 3 and 430 linear feet of 2 inch diameter schedule 80 PVC within the Rustic Woods Condominiums, installation of new services, installation of new hydrants, and other appurtenances and restoration of existing surfaces. BIDDERS LIST: Supplier: Sierra Trench Protectio 530-887-9413 5 30-887-9112 RFQ WASTEWATER TREATMENT PLANT SECONDARY AND TERTIARY IMPROVEMENTS PROJECT PLAN #:42015 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Davis

Online and Planroom OWNER: City of Davis DESCR: Contact, Michael Lindquist @ mlindquist@ cityofdavis.orgDB Contractor will be required to design, construct, acceptance test, startup, commission, and obtain designated governmental approvals for secondary and tertiary improvements and upgrades to the City’s existing wastewater treatment plant. BIDDERS LIST: Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 DISTRICT OFFICE AUTOMATIC VERTICAL PIVOT GATES WITH REMOTE OPENERS PLAN #: 43043 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Truckee Online and Planroom OWNER: Truckee Donner Recreation & Park District DESCR: Contact,Truckee Donner Public Utility District (530) 587-3896 1.Design and build of automatic vertical pivot gates system with remote openers 2.Access controls, remotes and keypads 3.Concrete work for counterweight/ pad, yokes, goosenecks and bollards4.Installation of all electrical from the building to the gate. BIDDERS LIST: General Contractor: Efficient Energy Con 530-345-5658 530-879-3034 2013 STREET OVERLAY PROJECT PLAN #: 47020 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $2,700,000.00 # OF ADDENDA: 1 Demand OWNER: City of Sacramento DESCR: Contact, Greg Smith - gsmith@cityofsacramento. orgWork consists of resurfacing the following street segments: Natomas Boulevard between North Park Drive and North Bend Drive (northbound only);Northgate Boulevard between San Juan Road and Potomac Avenue; J Street between 3rd Street and 4th Street; J Street between 13th Street and 16th Street; Capitol Mall between 3rd Street and 9th Street; Power Inn Road between Fruitridge Road and Lemon Hill Avenue; Wyndham Drive between Valley Hi Drive and Bruceville Road. Resurfacing treatments include the placement of Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) overlays and Bonded Wearing Course (BWC). Other work includes: pavement planning; adjusting maintenance holes and valve boxes to grade; installing traffic signal video detection cameras; replacing existing traffic signal detector loops and related equipment which are damaged or inoperative; placing new signing and striping; and placing colored pavement surface treatment for bike lanes. Continued on next page


Plans On File Continued from last page

Wednesday, July 10, 2013 ANHEUSER-BUSCH BREWERY TOUR CENTER PLAN #: 113078 Bid Date: 7/10/2013 Bid Time: 1:00 PM PLANS AT: Location: Fairfield Online and Planroom G.C.: TRICORP HEARN CONSTRUCTION, INC. Ph: (916) 779-8010 FAX: (916) 779-8011 DESCR: Contact, TriCorp Hearn (916) 779-8010 Renovate an existing tasting area -retail - back of house areas for Anheuser Busch tasting facility, including interior demolition, new flooring - tile, metal stud framing - drywall, painting, finish carpentry -casework, acoustical ceilings, MEP, kitchen equipment, miscellaneous concrete RIVER BLUFF REGIONAL PARK EMERGENCY BANK STABILIZATION PROJECT Bid Date: 7/10/2013 PLAN #: 120078 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Ceres Online & Print On Demand PREBID: 7/2 @ 9AM PREBID: 3761 Hatch Road OWNER: County of Stanislaus DESCR: Contact, City of Ceres (209) 538-5792 Work consists of the installation of 158 L.F of 30” Class 3 RCP Storm Drain, (1) Neoprene Check valve, Rock Slope Protection, Turf Reinforcement Mat, (1) Manhole, (1) Drop Inlet, Excavation, Slope Stabilization, Seeding, Planting, Irrigation System and associated work. FOOTHILL HORIZONS OUTDOOR EDUCATION PLAN #: 131074 Bid Date: 7/10/2013 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Modesto Online & Print On Demand PREBID: MAND 7/2 @ 3PM PREBID: 21925 Lyons Blvd OWNER: Stanislaus County Office of Education DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 5712232 Div_02-demolition; Div_03-concrete reinforcement, cast-in-place concrete; Div_05-structural steel; Div_06-rough carpentry, composite decking; Div_09-painting. YULUPA AVENUE MISSION BOULEVARD CLASS II BIKE LANES PLAN #: 135018 Bid Date: 7/10/2013

Page 26

Zone . July 8, 2013 • Contractor’s

Bid Time: 2:00 PM PLANS AT: Santa Rosa Online and Planroom Est Cost: $150,000.00 OWNER: City of Santa Rosa DESCR: Contact, Rob Sprinkle - 707-543-3817Traffic control, remove existing striping & pavement markings, remove tree/grind stump, install street sign, relocate street sign, PCC curb and gutter, PCC median curb, PCC sidewalk, PCC Valley Gutter, PCC Island Paving, Detectable warning Surface, thermoplastic edge line, thermoplastic bike lane line, thermoplastic channeling line, thermoplastic crosswalk, thermoplastic yield line, thermoplastic arrow, Thermoplastic words, Thermoplastic Bike Lane Symbol and bike lane arrow, detector symbol, painted white curb marking, raised pavement marker, type Q BIDDERS LIST: General Contractor: Ghilotti Brothers Inc 415-454-7011 415-454-8376 RFQ ARCHITECTURAL SERVIVCS FOR FRONTIER HIGH SCHOOL CLASSROOM EXPANSION PLAN #: 136065 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Bakersfield Online and Planroom PREBID: 7/2 @ 9AM PREBID: 6401 Allen Road OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309 DESCR: Contact, Kern High School District (661) 827-3122 The Kern High School District (hereinafter, “OWNER”) is issuing this “Request for Qualifications” (RFQ) and is seeking qualifications with proposals from firms interested in providing\ architectural services for the following project: Frontier High School Classroom Expansion. 2027 LANCE STREET PLAN #: 138068 Bid Date: 7/10/2013 Bid Time: 4:30 PM PLANS AT: Print On Demand Location: Modesto Online & Print On Demand PREBID: MAND 6/25 @ 3PM OWNER: City of Modesto, Public Works Dept. DESCR: Contact,Modesto, City of (209) 577-5462 Housing Rehabilitation work includes: New sewer line, re-roof, new HVAC, Bathroom remodel, new doors and windows, framing, electrical, plumbing, and miscellaneous. PUBLIC SAFETY BUILDING BOILER REPLACEMENT PLAN #: 146073 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Santa Rosa Online & Print On


Est Cost: $159,000.00 Demand OWNER: City of Santa Rosa DESCR: Contact, Dave Vandeveer 707-543-4521Public safety building boiler replacement, No bid will be awarded to a Contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division 3 of the Business and Professions Code. H S A BOILER PROJECT PLAN #: 159085 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Demand PREBID: MAND 6/20 @ 9AM PREBID: 44 N. San Joaquin Street OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-2121 furnish and install new boiler equipment at the Human Services Building and provide any new infrastructure as per specifications. RFQ ARCHITECTURAL SERVICES FOR HIGHLAND HIGH SCHOOL CLASSROOM EXPANSION PLAN #: 168082 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Bakersfield Online and Planroom PREBID: 7/1 @ 9AM PREBID: 2900 Royal Scots Way OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309 DESCR: Contact,Kern High School District (661) 8273122 Full architectural services for the classroom expansion at Highland High School campus presently identified as “Highland High School HIGHWAY 99 WATER MAIN PROJECT PLAN #: 186097 Bid Date: 7/10/2013 Bid Time: 2:30 PM PLANS AT: Location: Gridley Online and Planroom Est Cost: $265,000.00 # OF ADDENDA: 2 DESCR: Contact, Gridley, City of . (999) 999-9999 Construction of approximately 1,693 lineal feet of 1 0-inch diameter water main and appurtenances, and destruction of an existing well, complete. BIDDERS LIST: General Contractor: Whitehawk Construction 530-547-5944 530-547-5944 Rsc General Engineering 916-971-3216 916-452-4739 Newland Entities, Inc. 530-755-1178 530-674-0756 PSYCHIATRIC HEALTH FACILITY - REQUEST FOR STATEMENTS OF QUALIFICATIONS PLAN #: 190096 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Ceres

Online and Planroom DESCR: Contact, DIEDE CONSTRUCTION (209) 369-8255 Later this year, Stanislaus County intends to receive sealed Bids from Bidders pre-qualified through this Request for Statements of Qualifications (“RFSOQ”) for the construction of the Psychiatric Health Facility (“Project”) in Ceres, California. The Project will consist of constructing a 16-bed Psychiatric Health Facility (PHF) by remodeling an existing County-owned building located at 1904 Richland Avenue, Ceres, California 95307. The building is currently vacant, and was most recently used as a clean and sober living facility. Remodeling of the current facility will be needed to meet the varying code requirements of licensing a PHF within the existing building. A minor remodel was performed in 1998. The existing facility will be remodeled to meet State Department of Social Services licensing requirements and California Health and Safety Code Section 1250.2. The facility is not regulated by OSHPD. The Project generally includes the following requirements for the new PHF facility: a. 16-bed in-patient rooms with restrooms, showers, and storage lockers b. Intake & Processing Rooms and Visitors Lobby c. Offices for: 1 Psychiatrist, 2 Administrative Personnel, Patient Interview Room(s), Hearing/Conference Room and 1 Exam Room d. Nurses Station(s), 1 Group Therapy Room, 1 Day Room/ Dining Room with adjacent food prep and warm-up kitchen, 1 Activity Room e. Staff support components: break room with storage lockers, restroom f. Separate client shower room g. Seclusion Rooms, Quiet Room h. Storerooms for: cleaning supplies, hygiene, food, patient records, patient personal items, miscellaneous i. Secure storage room for drugs j. HVAC system replacement or renovation, potentially including HVAC roof top package unit and ductwork k. Roofing system replacement or repair l. A new fire alarm system, subject to evaluation of the existing system BIDDERS LIST: General Contractor: Diede Construction 209-369-8255 209-368-0600

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are often required. This newspaper is state-certified. Email your ad to: CandSpublishing@gmail.com Continued on next page


Plans On File Continued from last page

Wednesday, July 10, 2013 BUILDING 650 PANCAKE FINISHES PLAN #: 201098 Bid Date: 7/10/2013 Bid Time: 10:00 AM PLANS AT: Location: Mather Online and Planroom Est Cost: $250,000.00 # OF ADDENDA: 2 PREBID: 6/21 @ 4:30 PM DESCR: Contact, BVB Construction, Inc. Michael Corral (805) 642-8381 Upgrade finishes in primary care, to include new paint, flooring, and cove base. The work site is located at the Sacramento V.A. Hospital, 10535 hospital Way, Mather Ca., 95655, Bldg 650. Paint one prime and two finish coats in all offices, waiting rooms, and hallways, and in all areas as indicated on drawings, and in accordance with specifications. Each office / exam room will have one accent wall. Install VCT flooring in accordance with manufacturer’s recommendations. Install 6” cove base

Thursday, July 11, 2013 NEW HOUSEHOLD HAZARDOUS WASTE FACILITY AT THE AMERICAN AVENUE DISPOSAL SITE PLAN #: 1029 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Fresno Online and Planroom PREBID: 6/27 @ 9AM PREBID: 18950 W. American Avenue, Kerman OWNER: Co of Fresno Ph: 559-262-4866 DESCR: Contact, Public Works - 559-600-4399Constructing a new 15,000 square foot household hazardous waste facility at the American avenue disposal site, the construction work shall include but is not limited to the following; Native soil excavation and compaction, placement and separation geotextile fabric, placement and compaction of aggregate base cast in place steel, reinforced concrete slabs, landings and liquid recovery basins, parking painting, pre fabricated toilet building, reverse osmosis water purification plant, booster pump, drains and pipe, selective epoxy painting of concrete surfaces, shade canopy structure, electrical main panel, telephone and low voltage alarm wiring, site plumbing to include water, sewer and drain pipe, below grade liquid recovery, chain link fencing and gates, placement and electrical grounding of owner supplied shipping storage containers. PAITING TRAFFIC SIGNL HARDWARE Bid Date: 7/11/2013 PLAN #: 8017 Bid Time: 2:00 PM PLANS AT: Print On

Page 28

Zone . July 8, 2013 • Contractor’s

Demand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sacramento, city of (916) 808-2266 Painting of traffic signal heads, pedestrian signal heads, and related hardware located on traffic signal and pedestrian signal poles throughout the City of Sacramento. MATHER MAINBASE ELEVATED TANK RECOATING PROJECT PLAN #: 9056 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $600,000.00 # OF ADDENDA: 1 PREBID: MAND 6/25 @ 2PM OWNER: County of Sacramento DESCR: Contact, Municipal Services (x 5) (916) 874-6544 Perform coating and minor repair of an elevated treated water storage tank, including surface preparation of exterior and interior surfaces of the elevated tank, application of exterior / interior coating systems and application of two painted tank logos. WATSONVILLE MUNICIPLE AIRPORT RECONSTRUCTION OF TAXIWAY C AND GENERAL PLAN #: 11025 Bid Date: 7/11/2013 Bid Time: 11:00 AM PLANS AT: Watsonville Online and Planroom Est Cost: $735,000.00 PREBID: 6/26 @ 11am PREBID: 100 Aviation Way OWNER: City of Watsonville DESCR: Contact, Rayvon Williams-831-728-7717Reconstruction of Taxiway C(35 ft x1,350 ft) and reconstruction of General Aviation Apron Phase 1 (5,850 sq yards) BIDDERS LIST: General Contractor: Duran & Venables 408-934-7300 408-934-7310 CONSTRUCTION ON COUNTY ROADS VARIOUS LOCATIONS SEAL-COAT SURFACING Bid Date: 7/11/2013 PLAN #: 18033 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Colusa Online & Print On Demand OWNER: County of Colusa DESCR: Contact,County of Colusa Department of Public Works Mobilization, signs and traffic control, seal coat, fog seal, traffic markings, County roads various locations seal coat surfacing.


LEASE AND MAINTENANCE OF MULTIFUNCTION PRINTERS AND MAINTENANCE OF WIDE FORMAT AND LASER PRINTERS PLAN #: 20012 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Elk Grove Online and Planroom OWNER: City of Elk Grove DESCR: Contact, Purchasing Manager - jsimone@ elkgrovecity.orgThe purpose of this contract is to secure and establish a contract to lease Multi function printers, including full services maintenance as defined, all supplies and consumables such as toner, drums, image belts, fusers, developer, staples, user replaceable component. RFP TRANSIT TECHNOLOGY SOLUTION PLAN #: 22019 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom OWNER: Co of Nevada Ph: 530-265-1403 DESCR: Contact, Pamela Mowry - 530-265-1692Ability to provide reports on all functions listed, a vehicle locator, including latitude, longitude, time and odometer, vehicle maintenance, ability to provide reports on activities such as mileage, bus stop boarding, fare data, driver information and productivity. KIEFER LANDFILL MULTI- PURPOSE AREA ASPHALT REHABILITATION Bid Date: 7/11/2013 PLAN #: 30026 Bid Time: 2:30 PM PLANS AT: Sacramento Online and Planroom Est Cost: $417,118.00 PREBID:6/19 @ 10AM PREBID: 12701 Kiefer Boulevard OWNER: County of Sacramento DESCR: Contact, Michael Anderson (andersonmi@ saccounty.net)Apply an asphalt concrete overlay with a thickness of 8” to extend the service life by 10 years, including cold milling 3” of the existing asphalt and using Caltrans hot mix asphalt Type C for the overlay. RFP ANTELOPE ROAD SAFE ROUTES TO SCHOOL PLAN #: 34019 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Antelope Online and Planroom OWNER: City of Citrus Heights DESCR: Contact, Citrus Heights, City of - Eng/Gen Services/ Planning (916) 727-4770 The City of Citrus Heights General Services Department (City) invites your proposal to assist us in preparing for the construction of a Safe Routes to School (SR2S) sidewalk infill project along the north side of Antelope Road between Auburn Boulevard and Interstate 80. This project is funded through a Safe Routes to School grant from the State of California WHITE ROCK DUMP CLOSURE DUMP-1 AND DUMP-2 PLAN #:37020 Bid Date: 7/11/2013

Bid Time: 12:00 PM PLANS AT: Sacramento Online and Planroom PREBID: 6/18 @ 8AM or 6/25 @ 8AM PREBID: 10951 White Rock Road, Room 103 OWNER: County of Sacramento DESCR: Contact, Dennis Fong - 916-876-6313Clean closure of White Rock Dump 2 and consolidation of burn dump debris and contaminated soil at the White Rock dump 1. Site preparation, earthwork, excavation and transport of burn debris from WRD 2 to WRD1. installation of perimeter fence along White Rock Road and installation of temporary fencing as necessary. BIDDERS LIST: General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 Gabe Mendez 916-663-3372 916-663-1478 Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925 2013 WATER PROJECT PLAN #: 73071 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Williams Online and Planroom Est Cost: $2,800,000.00 PREBID: 6/28 @ 10AM OWNER: City of Williams DESCR: Contact, Project Manager PACE Engineering (530) 244-0202 Work consists of theater drive pump station, 1.0 million gallon welded steel tank, approximately 1,400 feet of 16” water main, Well 9 manganese filtration system, Supervisory Control and Data Acquisition system improvements at Wells 6, and 10. BIDDERS LIST: General Contractor: R & R Horn, Inc. 530-342-8655 530-892-1324 Argonaut Constructors 707-542-4862 707-542-4897 Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 DOLLAR HILL II WATER SERVICE REPLACEMENT PROJECT Bid Date: 7/11/2013 PLAN #: 82079 Bid Time: 10:00 AM PLANS AT: Tahoe City Online and Planroom Est Cost: $125,000.00 PREBID: MAND 6/27 @ 1pm PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact, Tahoe City, City of - Public Utility District (530) 583-3796 Construct +/- 1,813 LF of 2” water service pipe and associated Continued on next page


Plans On File Continued from last page

Thursday, July 11, 2013 CITY OF STOCKTON IT DEPARTMENT RELOCATION PROJECT Bid Date: 7/11/2013 PLAN #: 87079 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Est Cost: $1,800,000.00 Demand PREBID: 6/13 @ 10am DESCR: Contact, Stockton, City of (209) 937-8088 Perform tenant improvements, including but not limited to architectural, mechanical, electrical, and plumbing components as described in the Plans and Specifications to accommodate the relocation of the City of Stockton’s Information Technology Division. BIDDERS LIST: General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 Hometown 916-991-2486 916-991-2881 Younger General Contract 916-631-8000 916-631-8293 Younger General Contrac 916-631-8000 916-631-8293 Seward L. Schreder 530-229-0001 530-229-0070 Bobo Construction, Inc. 916-685-2285 916-714-4850 S W Allen Construction 916-344-2098 916-344-0307 Diede Construction 209-369-8255 209-368-0600 Sub Contractor: Gehvac Company 209-204-0100 209-566-9995 National Electric, Inc. 510-475-9400 510-475-9411 ASPHALT CONCRETE OVERLAY PROJECT PLAN #: 89077 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $3,065,000.00 PREBID: 6/26 @ 10AM PREBID: 9630 Conservation Wy OWNER: County of Sacramento DESCR: Contact, Purchasing Department - 916-875-2700All labor, materials and equipment associated with placing rubberized asphalt concrete pavement, grinding the pavement to accommodate the overlay, adjusting manholes to grade, installing new sidewalk accessibility ramps, replacing detector loops, placing pavement striping, BIDDERS LIST: General Contractor: Teichert 916-645-4840 916-645-4801 CALABAZAS PARK COURTS LIGHTING IMPROVEMENTS PROJECT Bid Date: 7/11/2013 PLAN #: 92081 Page 30

Zone . July 8, 2013 • Contractor’s

AND

Bid Time: 3:00 PM PLANS AT: Print On Demand Location: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact,San Jose, City Of (408) 535-8300 Construction,Tennis/Sports Court, Lighting Services for Parks, Athletic Fields, Parking Lots, etc. Park Area Construction/ Renovation Demolition, Concrete reinforcing, site furnishings, earthwork, exterior improvements. INMAN AVENUE RECONSTRUCTION PLAN #: 96093 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: San Joaquin Online and Planroom OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 Reconstructing approximately 0.36 mile of existing local road with asphalt concrete, aggregate base over soil stabilization fabric, removing and replacing portions of curb, gutter and sidewalk. JACK TONE ROAD BRIDGE NO. 29C-163 SCOUR MITIGATION AND PILE REPAIR Bid Date: 7/11/2013 PLAN #: 98073 Bid Time: 1:30 PM PLANS AT: San Joaquin Online and Planroom Est Cost: $200,000.00 OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3043 The work, in general, consists of placing rock slope protection around the piles and southern abutment of the Jack Tone Road Bridge across Mormon Slough. This project also includes, but not limited to: channel excavation, CHRISTINA AVENUE AND DE OVAN AVENUE RESURFACING PLAN #: 99078 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: Print On Demand Location: San Joaquin Online & Print On Est Cost: $200,000.00 Demand OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3043 The work, in general, consists of removing, resurfacing, and repairing approximately 1.32 miles of existing urban roadway with asphalt concrete, and other items or details that are required by the Plans, Standard Specifications or these or these special provisions shall be performed, placed, constructed or installed. CHIPPEWA SOUTH CSA PAVEMENT REHABILITATION PLAN #: 109089 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Lake County


Online and Planroom Est Cost: $615,000.00 PREBID: 6/27 @ 10AM PREBID: 9192 Chippewa Trail, Kelseyville OWNER: County of Lake Ph: 707-263-2341 DESCR: Contact, County of Lake (707) 263-2341 Work consists of the rehabilitation of approx. 410,900sf of County maintained roads located in Lake County. Work includes traffic control, signage, adjusting utilities to grade, in-place pulverization and reconstruction of existing asphal surfaces and 1.5” HMA overlay. WOODBRIDGE STREETS IMPROVEMENTS, PHASE II Bid Date: 7/11/2013 PLAN #: 128075 Bid Time: 1:30 PM PLANS AT: Print On Demand Location: San Joaquin Online & Print On Demand PREBID: 7/2 @ 1:30 PM PREBID: 1810 East Hazelton Ave OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 The work, in general, consists of constructing curb, gutter, sidewalk, installing new water line, reconstructing roadway, installing drainage features, and performing various work as required by the plans, specifications, and these Special Provisions. WEST COUNTRY CLUB RECONSTRUCTION, PHASE 6 PLAN #: 137072 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: Print On Demand Location: San Joaquin Online & Print On Demand OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 Reconstructing 0.61 mile of urban streets with asphalt concrete, aggregate base over soil stabilization fabric, replacing portions of curb, gutter, and sidewalk. DOLLAR HILL II WATER SERVICE REPLACEMENT PROJECT PLAN #: 82079 Bid Date: 7/11/2013 Bid Time: 10:00 AM PLANS AT: Tahoe City Online and Planroom Est Cost: $125,000.00 PREBID: MAND 6/27 @ 1pm PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact, Tahoe City, City of - Public Utility District (530) 583-3796 Construct +/- 1,813 LF of 2” water service pipe and associated EIGHT MILE ROAD BRIDGE AND BACON ISLAND ROAD BRIDGE Bid Date: 7/11/2013 PLAN #: 142059

Bid Time: 1:30 PM PLANS AT: Print On Demand Location: San Joaquin Online & Print On Demand PREBID: 7/2 @ 1:30PM PREBID: 1810 East Hazelton Ave OWNER: County of San Joaquin DESCR: Contact,San Joaquin, County of (209) 468-3043 The work, in general, consists of excavating the existing asphalt concrete approaches and placing precast reinforced concrete slabs to mitigate approach settlement SR-GAP CLOSURE PLAN #: 157075 Bid Date: 7/11/2013 Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Bakersfield Online & Print On Est Cost: $15,000,000.00 Demand OWNER: City Of Bakersfield DESCR: Contact, Teichert Construction 559-813-3100Petroleum, sand and gravel, asphalt supplier, concrete and cement supplier, pipe supplier, drainage system, storm water, traffic stripes, markings and traffic control, adjust roadway items, groove and grind pavement, speed monitoring station, water truck, asphalt oil tankers, street sweeping truck broker and other items and related work not DAVIS ROAD AND WAGNER HEIGHTS ROAD TRAFFIC SIGNAL INSTALLATION PROJECT PLAN #: 161066 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Stockton Online and Planroom Est Cost: $350,000.00 PREBID: MAND 6/20 @ 10am PREBID: 425 N. El Dorado Street OWNER: City of Stockton DESCR: Contact, Dennis Yep - 209-937-8825Furnish and installation, termination of fiber optic cables, conduits and accessories in Weston Ranch area and at San Joaquin Regional Transit District office. RFQ- CMAR-COOPER COURT RESIDENCE HALL PLAN #: 166078 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Reno Online and Planroom OWNER: Nevada System of Higher Ed DESCR: Contact, Melanie Lever - 775-784-6503The intent of this project is to provide pre construction services that ultimately leads to the delivery of a guaranteed maximum price for the demolition of existing multiple buildings and the follow up construction of Click on the plan title to go directly to that plan on the Online Planroom Continued on next page


Plans On File Continued from last page

Friday, July 12, 2013

RFQ FEASIBILITY STUDY FOR BRUNSWICK ROAD/ LOMA RICA DRIVE INTERSECTION PLAN #: 27027 Bid Date: 7/12/2013 Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom OWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, Nevada, County of (530) 265-1238 The Nevada County Purchasing Agent, on behalf of the Department of Public Works, hereinafter collectively referred to as “County,” is requesting Statements of Qualification (“SOQ”) from traffic and/or civil engineering firms interested in providing a Feasibility Study for Brunswick Road / Loma Rica Drive Intersection Improvements. STANFORD RANCH ROAD RECONSTRUCTION & INTERSECTION MODIFICATIONS PLAN #: 50008 Bid Date: 7/12/2013 Bid Time: 3:00 PM PLANS AT: Rocklin Online and Planroom PREBID: MAND 7/9 @ 10am PREBID: 4081 Alvis Ct OWNER: City of Rocklin DESCR: Contact, Purchasing Department 916-625-5119Reconstructing paved roadway, constructing new sidewalks, pedestrian ramps, curbs and decorative concrete, modify existing and installing new traffic signals, applying slurry seal, applying pavement striping and related improvements. ASPHALT AND EMULSION, DELIVERED AND SPREAD FOR THE COUNTY’S CHIP SEAL PROGRAM Bid Date: 7/12/2013 PLAN #: 156092 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Santa Clara Online & Print On Demand OWNER: City of Santa Clara DESCR: Contact, Loretta Smith - 408-491-7488The County of Santa Clara (hereinafter, “County”) is requesting bids from qualified suppliers to provide asphalt and emulsion products delivered and spread by the supplier as required by the County Roads Department for the County’s Chip Seal program. RFQ - ENERGY EFFICIENCY MEASURES AT COUNTY GOVERNMENT CENTER PROJECT PLAN #: 167075 Bid Date: 7/12/2013 Bid Time: 5:00 PM PLANS AT: Print On Demand Location: Santa Clara Online & Print On

Page 32

Zone . July 8, 2013 • Contractor’s

Demand OWNER: County of Santa Clara DESCR: Contact,Santa Clara, County of (408) 993-4600 The County wishes to prequalify Design/Build Entities (DBEs) with the demonstrated experience, competency, and capacity to design and install the comprehensive energy efficiency measures listed in the Attachment 2 Scope of Work and Exhibit 2 Investment Grade Audit Report at its County Government Center (Project), and their Qualifying Team Members with sufficient experience and training to competently manage and complete the design and installation of the Project. The County is conducting a two-step selection process. RENOVATE DIAGNOSTIC, IMAGING, CARDIOLOGY, AND ENDOSCOPY (RDICE) Bid Date: 7/12/2013 PLAN #: 187007 Bid Time: 1:00 PM PLANS AT: Washose Online and Planroom Est Cost: $100,000.00 PREBID: 7/2 @ 2PM PREBID: 975 Kirman Avenue DESCR: Contact, Kevcon Enterprises, Inc. (760) 432-0307 In general, work consists of but not limited to remodel and expand Diagnostic, Imaging, Cardiology & Endoscopy (DICE) Services. Site work includes: 28,000sf renovation different floors of Bldg 1D and approximately 2,000 sf of new square footage on the 1st and 2nd floors. REPLACE HEATING HOT WATER EXCHANGERS PLAN #: 197002 Bid Date: 7/12/2013 Bid Time: 1:00 PM PLANS AT: Palo Alto Online and Planroom Est Cost: $250,000.00 PREBID: 7/3 @ 10AM PREBID: 3801 Miranda Avenue DESCR: Contact, Estimating (760) 432-0307 Replace two (2) existing HVAC heating hot water exchangers with two (2) new heating hot water exchangers and auxiliary components serving HVAC reheat coils in Building 100 at VAPAHCS campus. RFP LANDSCAPE MAINTENANCE SERVICES PLAN #: 209010 Bid Date: 7/12/2013 Bid Time: 2:00 PM PLANS AT: Marin Co. Online and Planroom OWNER: County of Marin DESCR: Contact, Ilya Filmus (415) 491-2525 The Housing Authority of the County of Marin (MHA) is requesting proposals from qualified contractors to provide landscape maintenance services at its six public housing properties and central office. The initial term of the contract is for two years with options to extend by one-year terms for up to a total of five years.


MONTGOMERY ESTATES AREA 2 EROSION CONTROL PROJECT Bid Date: 7/12/2013 PLAN #: 254070 Bid Time: 2:00 PM PLANS AT: El Dorado Co. Online and Planroom Est Cost: $450,000.00 DESCR: Contact,Daniel Kikkert (530) 573-7900 Construction of erosion control improvements including culverts, rock-lined channels, blanket-lined channels, curb and gutter, drainage inlets, sediment traps, basins, and slope stabilization.

Monday, July 15, 2013 COOPER AVE. STORM DRAIN LINE PLAN #: 31022 Bid Date: 7/15/2013 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Turlock Online & Print On Est Cost: $564,000.00 Demand OWNER: City of Turlock DESCR: Contact,Turlock, City of - Dev. Ser. Dept/Engineering (209) 668-5599 work consists, in general of: demolition, excavation, trenching, pipe placement, manholes, catch basins, paving and furnishing all necessary labor, materials, tools, equipment and any incidentals needed to perform VEHICLE GLASS REPLACEMENT SERVICES PLAN #: 94072 Bid Date: 7/15/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Demand OWNER: County of San Joaquin DESCR: Contact,San Joaquin, County of - Purchasing (209) 468-2074 Provide glass replacement services on heavy and light equipment for San Joaquin County. Repair or replace glass in the field, travel to designated locations within the san Joaquin Co. and replace or repair vehicle glass for various light and heavy equipment. ASPEN ROAD PAVING PROJECT PLAN #: 118083 Bid Date: 7/15/2013 Bid Time: 4:30 PM PLANS AT: Mono Co. Online and Planroom PREBID: 6/25 @ 11am PREBID: 74 North School Street OWNER: County of Mono FAX: 760-932-5441 DESCR: Contact, Purchasing Department - 760-9325440Mono County Department of Public Works calls fo bids from qualified General Engineers or Earthwork and Paving contractors for the Aspen Road Paving Project. Re paving of Aspen Road. PROVIDE AGGREGATE BASE FOR COUNTY OF ORANGE LANDFILL SITES PLAN #: 151071 Bid Date: 7/15/2013

Bid Time: 4:15 PM PLANS AT: Orange Co. Online and Planroom OWNER: County of Orange DESCR: Contact, County of Orange - 714-356-2278The County of Orange, OC Waste & Recycling, (hereinafter referred to as “County”) is requesting competitive sealed bids from qualified firms (hereinafter referred to as “Bidder”) to establish an annual contract to provideAggregate Base for County of Orange Landfill Sites, renewable annually for two additional one year periods.The awarded contract, (hereinafter referred to as “Contract”) will be a firm fixed price Contract between the County and awarded Bidder (hereinafter referred to as “Contractor”) in RFQ-UCLA UNIVERSITY EXTENSION SEISMIC CORRECTION PLAN #: 154073 Bid Date: 7/15/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Los Angeles Online & Print On Demand DESCR: Contact, Liliana Martinez - 310-206-3128Seismic improvements of the existing 95,065 gross square foot building and code triggered upgrades to meet the California Building code and the Americans with Disability act. Pre design evaluations of possible facility improvements for UCLA extension programs, which may be incorporated into seismic project scope or considered for a subsequent PROVIDE DOOR CONTRACTOR SERVICES AS REQUIRED BY FACILITIES MIANTENANCE PLAN #: 207099 Bid Date: 7/15/2013 Bid Time: 3:00 PM PLANS AT: Santa Monica Online and Planroom PREBID: 7/2 @ 9:30AM OWNER: City of Santa Monica DESCR: Contact,Mark Cuneo -mark.cuneo@smgov. netProvide door contractor services as required by facilities maintenance Division. Furnish and deliver materials and labor for door contractor services per the attached terms, specifications and conditions. PROVIDE POOL MAINTENANCE AND REPAIR SERVICES AT THREE CITY OF SANTA MONICA FACILITIES AS REQUIRED BY FACILITIES PLAN #: 208017 Bid Date: 7/15/2013 Bid Time: 3:00 PM PLANS AT: Santa Monica Online and Planroom PREBID: 7/3 @ 9:30AM OWNER: City of Santa Monica DESCR: Contact, Purchasing Department - Mark Cuneo - mark.cuneo@smgov.netProvide pool maintenance and repair services at three city of Santa Monica facilities as required by facilities maintenance.

Continued on next page


Plans On File Continued from last page

Tuesday, July 16, 2013 2013 STREET REJUVENATION PROJECT PLAN #: 6036 Bid Date: 7/16/2013 Bid Time: 3:00 PM PLANS AT: Napa Online and Planroom Est Cost: $190,500.00 OWNER: City of Napa DESCR: Contact, Mike Socorro - 707-257-9305Control of work, control of materials, traffic control, mobilization, water pollution control, rejuvenating seal. HISTORIC FOLSOM STATION LIGHTING, LANDSCAPING AND ENHANCEMENTS PROJECT Bid Date: 7/16/2013 PLAN #: 16031 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Folsom Online & Print On Demand OWNER: City of Folsom DESCR: Contact, Dave Nugen 916-355-7247Mobilization, ground plane planting, trees, shrub. soil analysis, hardwood mulch, root barrier, native planting, 1 year landscape maintenance, trash receptacle, tree guard, bicycle rack, removable handrail, irrigation system, irrigation controller, copper wire, photo cell, Pioneer lighting and power, wall mount weather proof, sound system, furnish and install stage BROOKS SWIM CENTER RENOVATION PLAN #: 23028 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Woodland Online and Planroom Est Cost: $770,000.00 PREBID: Call Clara Olmedo to view site OWNER: City of Woodland DESCR: Contact ,Clara Olmedo (clara.olmedo@ cityofwoodland.org) (530) 661-5952 Renovate the pool, including repairs of structural cracks, removal / replacement of plaster, abandonment of observation chamber, replacement of edge coping, deck replacement, replacement of electrical conduits, new starting blocks, RFQ-STORM DRAINAGE RATE IMPLEMENTATION ASSISTANCE PLAN #: 41021 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento

Page 34

Zone . July 8, 2013 • Contractor’s

DESCR: Contact, Wally Cole - 916-808-6203The City of Sacramento Department of Utilities (DOU) is in the process of analyzing its Storm Drainage rate to determine whether or not a revised rate structure should be proposed. Proposition 218 requires voter approval for any storm drainage rate increase. This Request for Qualifications (RFQ) is being issued to request a Statement of Qualifications (SOQ) from firms interested in providing services to the City of Sacramento (City) to assist in the process of implementing any STOCK RANCH NATURE PRESERVE RE -BID PLAN #: 66091 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Citrus Heights Online & Print On Demand PREBID: MAND 6/19 @ 10am PREBID: Trellis Hall DESCR: Contact, Citrus Heights, City of - Eng/Gen Services/ Planning (916) 727-4770 The work to be performed consists, in general, of building The Stock Ranch Nature Preserve, which is a Nature Education Facility consisting of interactive exhibits, identification and educational signage, demonstration garden, oak restoration area, and outdoor classroom area; and all other work as shown on the contract documents COVERED WALKWAY EXTENSION AT MARY LOU DIETERICH ELEMENTARY SCHOOL PLAN #: 69073 Bid Date: 7/16/2013 Bid Time: 3:00 PM PLANS AT: Modesto Online and Planroom PREBID: MAND 7/9 @3pm PREBID: 2412 Warm Springs Drive OWNER: County of Stanislaus DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 571-2232 Covered Walkway Extension At Mary Lou Dieterich Elementary, Cutting and patching, fitting or patching that may be required to complete the work. clean up, communications, indemnification, BIDDERS LIST: General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 REROOF POLICE DEPARTMENT HEADQUARTERS PLAN #: 85064 Bid Date: 7/16/2013 Bid Time: 3:00 PM PLANS AT: Fresno Online and Planroom Est Cost: $220,000.00 OWNER: City of Fresno


DESCR: Contact, Mark Johnson - 559-621-1163Removal of existing roofing materials, related finishing elements, asbestos containing asphaltic felts and specific mechanical equipment, installation of two new loose laid and mechanically attached 60 mil PVC thermoplastic membrane roofing system, over layer of 3.0 loose laid, isocyanurate roof insulation and 1/2 gypsum cover board and related components. Roof systems shall include air vents as specified by primary roofing materials manufacturer install replacement roof access FRESNO STREET BIKE LANES - A STREET TO C Bid Date: 7/16/2013 PLAN #: 100088 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fresno Online & Print On Demand OWNER: City of Fresno DESCR: Contact, Purchasing Department 559-621-5600Grinding off thermoplastic crosswalk striping, the placing of type II slurry seal and application of temporary traffic control markers to delineate traffic, bike lanes and crosswalks. UNIVERSITY HOUSING WROUGHT IRON FENCE PLAN #: 103092 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Carson Online & Print On Demand PREBID: MAND 6/25 @ 10AM DESCR: Contact, Adelbert baylis - 310-243-3799Contractor shall provide all labor and limited materials, tools, equipment, rigging, transportation, etc. necessary to strip and repaintUniversity Housing exterior wrought iron fence. UNIVERSITY HOUSING WROUGHT IRON FENCE PLAN #: 103092 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Carson Online and Planroom PREBID: MAND 6/25 @ 10AM OWNER: State of CA DESCR: Contact, Adelbert baylis - 310-243-3799Contractor shall provide all labor and limited materials, tools, equipment, rigging, transportation, etc. necessary to strip and repaintUniversity Housing exterior wrought iron fence. RFQ NACIMIENTO WATER TREATMENT PLANT PLAN #: 112089 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Paso De Online and Planroom PREBID: 6/26 @ 2PM PREBID: 1600 Ramada Drive, Paso Robles

OWNER: City of El Paso de Robles DESCR: Contact, City of Paso Robles Public Works Dept. (805) 237-3861 The City wishes to construct a water treatment plant (WTP) to treat surface water received from Lake Nacimiento, utilizing this additional water source to increase supply reliability, particularly during the summer months. The treatment plant will be located on an 18-acre City-owned parcel within the City limits. Five City drinking water wells and the NWP pipeline flow control and metering structure are currently located on the parcel. The WTP is to provide a daily treatment capacity of approximately 2.4 MGD of potable BIDDERS LIST: General Contractor: C. Overaa And Co. 510-234-0926 5 10-237-2435 LEVEE SEEPAGE REPAIR PROJECT SLURRY CUTOFF WALL SAN JOAQUIN, RIVER MILE 42.3 RIGHT BANK AT STATION 118+00 TO STATION 134+93 PLAN #: 115082 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: San Joaquin Online and Planroom PREBID: 7/8 @ 10Am OWNER: County of San Joaquin DESCR: Contact, Purchasing Department 209-946-0268Clearing and grubbing, tree removal and disposal, removal of pipes and concrete standpipes, remove existing power pole, excavate levee crown, install soil bentonite slurry cutoff wall to a tip elevation of minus 23, placement and removal of 12,400 cu yd of temporary cap, settlement monitoring, install tracer wire and boxes, furnish and place import crown fill material and furnish aggregate base materials. REPAIR CONCRETE WALKWAYS @ OCFC PLAN #: 170003 Bid Date: 7/16/2013 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Orange Co. Online & Print On Est Cost: $80,000.00 Demand PREBID: MAND 7/2 @ 10AM PREBID: 401 The City Drive OWNER: County of Orange DESCR: Contact, Ronald Harper - 714-245-6077Provide and install articulating concrete walkway joints as indicated at new/replacement sections of concrete walkways as indicated, The work shall consist of grinding existing concrete walkway joints, removal of concrete walkway sections including root removal and paving base restoration, and do other work in accordance with these specifications.

Continued on next page


Plans On File Continued from last page

Tuesday, July 16, 2013

RFQ WATER TREATMENT PLANT PLAN #: 171002 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: El Paso De Online and Planroom PREBID: 6/26 @ 2PM OWNER: City of El Paso de Robles DESCR: Contact, Christopher Alakel- calakel@prcity.com The City of El Paso de Robles invites general contractors to apply for pre qualification in connection with the City’s upcoming Water Treatment Plant Project.

Wednesday, July 17, 2013 WHITE SLOUGH WATER POLLUTION CONTROL FACILITY DIGESTER PAINTING PROJECT PLAN #: 7029 Bid Date: 7/17/2013 Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Lodi Online & Print On Demand PREBID: MAND 7/2 @ 10AM PREBID: White Slough WPCF OWNER: City of Lodi DESCR: Control, City of Lodi (209) 333-6740 The work consists of preparing and coating the exterior roofing and piping components associated with Anaerobic Digesters No. 1, 2 and 3 at the White Slough Water Pollution Control Facility (WPCF). AUBURN AREA RECREATION & PARK DISTRICT (530) 885-0611 PLAN #: 75070 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: Auburn Online and Planroom PREBID: MAND 6/27 @ 10AM PREBID: 1601 Auburn Ravine Road OWNER: Auburn Area Recreation & Park District Ph: 530-885-0611 DESCR: Contact, Pamela Vann (x 102) (530) 885-0611 Includes renovation of existing ADA parking surfaces and hardscape at the existing restrooms, new retaining walls and stairs and renovation of existing paving and pond overflow at existing pond area. BIDDERS LIST: General Contractor: Pbm Construction Inc. 916-315-2614 916-315-2619

Page 36

Zone . July 8, 2013 • Contractor’s

POWERLINE ROAD STORM DRAIN PLAN #: 10029 Bid Date: 7/17/2013 Bid Time: 10:00 AM PLANS AT: Olivehurst Online and Planroom Est Cost: $114,000.00 OWNER: County of Yuba DESCR: Contact, Public Works - 530-749-5420Placing and/ or replacing storm drain culverts on Powerline Road from North of 10’th Ave to North of 9’th Ave in Olivehurst, CA. CHAIN LINK FENCE INSTALLATION AT THE MAXWELL TRANSFER STATION PLAN #: 19034 Bid Date: 7/17/2013 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Colusa Online & Print On Demand OWNER: County of Colusa DESCR: Contact, County of Colusa (530) 458-0466 Work consists of providing site preparation, the placement of line posts, gate posts and chain link fabric, mobilization, clearing and grubbing, 8’ chain link fence, 20 foot swing gate. LAW ENFORCEMENT DUTY AND SAFETY GEAR PLAN #: 57009 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and Planroom OWNER: County of El Dorado DESCR: Contact, Purchasing District (530) 622-4513. Miscellaneous law enforcement accessories for various departments throughout El Dorado County on an as requested basis. ASHFORD PARK PAVING RENOVATION PROJECT PLAN #: 75070 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: Auburn Online and Planroom PREBID: MAND 6/27 @ 10AM PREBID: 1601 Auburn Ravine Road OWNER: Auburn Area Recreation & Park District Ph: 530-885-0611 DESCR: Contact, Pamela Vann (x 102) (530) 885-0611 Includes renovation of existing ADA parking surfaces and hardscape at the existing restrooms, new retaining walls and stairs and renovation of existing paving and pond overflow at existing pond area. BIDDERS LIST: General Contractor: Pbm Construction Inc. 916-315-2614 916-315-2619


FRANK RAINES OHV PARK WATER FILTRATION AND DISTRIBUTION SYSTEM IMPROVEMENTS PLAN #: 129072 Bid Date: 7/17/2013 Bid Time: 2:00 PM PLANS AT: Modesto Online and Planroom Est Cost: $750,000.00 OWNER: County of Stanislaus DESCR: Contact,Stanislaus, County of (209) 525-4130 Work consists of an upgrade to the water distribution system for portable and non-portable water supply for Frank Raines OHV Park Water Filtration and Distribution System Improvements. BIDDERS LIST: General Contractor: Tricon Construction 916-638-9866 916-638-9867 SALIDA SIDEWALK REPAIR PROJECT PLAN #: 133074 Bid Date: 7/17/2013 Bid Time: 2:30 PM PLANS AT: Modesto Online and Planroom Est Cost: $165,000.00 OWNER: County of Stanislaus DESCR: Contact,County of Stanislaus (209) 541-2509 Work consists of repairing damaged sidewalks, and removing and replacing trees along Pirrone Road in the Town of Salida. ANNEX BUILDING STAGE PROJECT PLAN #: 181007 Bid Date: 7/17/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: San Francisco Online & Print On Est Cost: $360,000.00 Demand PREBID: 7/9 @10Am PREBID: 1600 Holloway Ave OWNER: San Francisco State University DESCR: Contact, Rose DiMaggio - 415-405-3654In general, the work consists of furnishing labor and material necessary to install stage, truss, audio equipment, power distribution and cable, lighting and sound equipment in Annex building in the Campus of San Francisco State University. The work is located at 1600 Holloway A venue, San Francisco, California 94132 and will be constructed in accordance with the plans and specifications prepared by Capital planning, Design & BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437

Thursday, July 18, 2013 HAPPY VALLEY SAFE ROUTE TO SCHOOL PLAN #: 2025 Bid Date: 7/18/2013 Bid Time: 11:00 AM PLANS AT: Shasta Co. Online and Planroom OWNER: County of Shasta FAX: 530-225-5667 DESCR: Contact, County of Shasta (530) 225-5661 Work consists of constructing approx. 5,860 feet of hot mix asphalt path and approx. 1,150 feet of concrete

sidewalk, curb and gutter. The path will be constructed along the West side of Oak Street, from Scout Street to approximately 530 feet north of Craig lane. SAN JUAN NEW CONSTRUCTION PLAN #: 17019 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Ceres Online & Print On # OF ADDENDA: 1 Demand OWNER: Housing Authority of County of Stanislaus Ph: 209-557-2008 FAX: 209-557-2011 DESCR: Contact, Housing Authority Of Co. Of Stanislaus @ 209-557-2007Construction of two-story single family dwelling units & one single story dingle family dwelling unit, including demolition, site clearing, excavation, filling & grading, hot mix asphalt paving, Portland cement concrete paving;-rough & finish carpentry; insulation, weather resistant membrane, sealants & caulking; vinyl windows, finish hardware;lath & plaster, decorative laminate flooring, vinyl sheet flooring, carpeting, painting;appliances; -wood casework; plumbing, HVAC;-electrical system BIDDERS LIST: General Contractor: Bc Construction 209-531-1252 209-531-1254 Diede Construction 209-369-8255 209-368-0600 Harris Builders, Inc. 209-664-9486 209-667-0738 DTLL PHARM HVAC MODIFICATIONS TO CIVA ROOM PLAN #: 25028 Bid Date: 7/18/2013 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Davis Online and Planroom Est Cost: $150,000.00 # OF ADDENDA: 1 PREBID: MAND 6/25 @ 10AM OWNER: University of California, Davis Health System DESCR: Contact, Design and Construction 916-734-7024Selective demolition of suspended ceiling, ductwork, and supports, relocate existing 5 ton AC unit and reconfigure ductwork. Relocate DX and hydronic piping to new location, construct new wall and infill openings. Install doors and windows, flooring patching with base, paint and patch, BIDDERS LIST: General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 WESTERN NEVADA COUNTY 2013 OVERLAY PLAN #: 55003 Bid Date: 7/18/2013 Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom Est Cost: $1,119,723.00 OWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, Nevada, County of (530) 265-1766 Overlay approximately 8.2 miles of roadway in the western portion of Nevada County, place striping and pavement markers. Continued on next page


Plans On File Continued from last page

Thursday, July 18, 2013 ANTELOPE VALLEY EAST KERN TURNOUT, TEHACHAPI EAST AFTERBAY Bid Date: 7/18/2013 PLAN #: 60095 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $870,000.00 Demand PREBID: 6/27 @ 10AM PREBID: OSO Pumping Plant OWNER: Dept. of Water Resources Ph: 916-653-4867 FAX: 916-653-6166 DESCR: Contact, Jim Veres - 916-653-4867Mobilization and demobilization. 2. Clearing and grubbing. 3. Temporary erosion control. 4. Cofferdam. 5. Dewatering. 6. Demolition including, but not limited to: a. Removal of existing concrete channel liner. b. Removal of existing concrete drainage ditch. c. Removal of existing asphalt concrete road. 7. Earthwork: a. Excavation. b. Compacted backfill. c. Compacted soil liner (CSL). d. Slurry backfill. 8. Miscellaneous pavement repairs. 9. Steel pipe and fittings. 10. Concrete and reinforcing steel. 11. Miscellaneous metalwork: a. Trash rack. b. Fasteners and miscellaneous hardware. 12. Raceways and boxes: a. PVC conduit. b.

300,000 gallon welded steel chlorine contact tank, clarification / filtration units, filtered water transfer pumps, backwash pump, high service pumps, backwash water recovery basin modifications, decant return pump station, filter to waste basin modifications, filter to waste return pump station, new plant electrical service, standby power generators, plant control system, piping, paving, grading and miscellaneous other site BIDDERS LIST: General Contractor: Westcon Construction 916-663-2425 916-663-2448 Westcon Construction 916-663-2425 916-663-2448 REPLACE AIR CONDITIONING G&T BUILDINGS Bid Date: 7/18/2013 PLAN #: 101091 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Patton Online & Print On Demand PREBID: MAND 6/27 @ 9am PREBID: 3102 E. Highland Ave OWNER: State of CA DESCR: Contact, Kristen Hernandez - 909-425-7900Replace existing steam heat and evaporative cooling systems with HVAC system in the G&T Buildings. The floor plan for G is apprx 14,000 sq ft and floor plan for T is apprx 10,000 sq ft.

KIEFER LANDFILL, 2013 GAS EXTRACTION WELLS & PIPING INSTALLATION Bid Date: 7/18/2013 PLAN #: 62008 Bid Time: 2:00 PM PLANS AT: Sloughhouse Online and Planroom Est Cost: $200,000.00 PREBID:7/2 @ 10 AM PREBID: 12701 Kiefer Blvd OWNER: County of Sacramento DESCR: Contact, County of Sacramento Tim Isreal -916) 876-9431 Furnishing of all labor, materials, tools, equipment and transportation. Construct eight vertical gas collection wells and install wellheads and 3” lateral piping.

INSTALLATION OF BIRD NETTING FOR PIGEON PLAN #: 107097 Bid Date: 7/18/2013 Bid Time: 2:15 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $11,052.00 Demand PREBID: 7/10 @ 10AM PREBID: 1120 N Street OWNER: State of CA DESCR: Contact, Ronald Beasley - 916-227-6491Contractor shall provide a one-time installation of bird netting to enclosed or semi enclosed areas where bird pest population needs to be

PRE QUALIFIED BIDDERS--AUBURN LAKE TRAILS WATER TREATMENT PLANT UPGRADES PROJECT PLAN #: 76074 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Georgetown Online & Print On Est Cost: $8,000,000.00 # OF ADDENDA: 1 Demand OWNER: Public Utility District DESCR: Contact, Kelly Shively (kshively@gd-pud. orgIncludes a new raw water pump station, new filter building,

PASO ROBLES UPTOWN FAMILY PARK PROJECT PLAN #:111091 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: El Paso De Online and Planroom Est Cost: $1,861,650.00 OWNER: City of El Paso de Robles DESCR: Contact,Paso Robles, City of (805) 227-7245 Furnishing all labor, materials, equipment, services, testing, permits, temporary controls and construction facilities, and all general conditions, general requirements and incidentals required to complete the Work for the

Page 38

Zone . July 8, 2013 • Contractor’s


Paso Robles Uptown Family Park Project, Project No. 11-13A, in its entirety as described in the Contract Documents, which includes, but is not necessarily limited to, the following: installation of entry elements, buildings, community garden, amphitheatre, pervious pavement and asphaltic concrete parking lot; play equipment, shade structures, site furnishings, hardscape, poured-in place resilient surfacing, walkways, stairs, walls, fencing, railings, drainage elements, utilities, irrigation, electrical, and surrounding landscape areas, as more fully described in the bidding and contract documents BIDDERS LIST: General Contractor: Sansone Company, Inc. 805-549-0667 805-549-0702 SALE & REMOVAL OF ASPHALT GRINDING MATERIALS PLAN #: 117080 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Visalia Online & Print On Demand PREBID: 7/10@ 9AM PREBID: 707 W. Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, Visalia, City of (559) 713-4334 The City of Visalia Public Works Department has a large volume (approx. 2,500 c.y.) of Asphalt Grinding Materials located northwest of the intersection of Burke and Goshen Avenues in Visalia, CA. Bidders are bidding on all materials and will be sold to the highest bidder. Awarded Bidder will be responsible for removal of materials. SMITH CCAAL WET WELL REHABILITATION AND MISCELLANEOUS SITE IMPROVEMENTS Bid Date: 7/18/2013 PLAN #: 124084 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Est Cost: $1,500,000.00 Demand PREBID: 7/2 @ 10AM PREBID: 2130 Fontana OWNER: City of Stockton DESCR: Contact, Public Works - 209-937-8753Concrete wet well rehabilitation(bypass pumping during construction) removal existing deteriorated concrete, surface preparation, installation of new reinforced concrete, corrosion barrier, new side gates, new isolation knife gate valves, new flow meter, new bio filter humidifier, new roofing, ceiling repair, new miscellaneous appurtenances and closed circuit televising of upstream sewers. BIDDERS LIST: General Contractor: Andrew L. Lee, Inc. 209-369-8077 209-368-2435 Diede Construction 209-369-8255 209-368-0600 Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

LANDSCAOE MAINTENANCE FOR MUNICIPLE UTILITIES DEPARTMENT FACILITIES PLAN #: 139071 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Demand PREBID: MAND 6/25 @ 9AM PREBID: 2500 Navy Drive OWNER: City of Stockton DESCR: Contact, Deedee Antypas - 209--464-8724The Municipal Utilities Department facilities consists of its main plant, a warehouse, various storm pump stations and sanitary pump stations. The City desires to procure the services of a licensed landscape contractor to provide landscape maintenance for Municipal Utilities Department facilities. Regular scheduling mowing, edging, shrub trimming, fertilizing, litter/trash collection, graffiti, abatement, weed HVAC MAINTENANCE @ CHP DONNER COMMERCIAL VEHICLE ENFORCEMENT FACILITY PLAN #: 163079 Bid Date: 7/18/2013 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Truckee Online & Print On Est Cost: $28,000.00 Demand PREBID: MAND 7/9 @10AM PREBID: 12800 Interstate 80 OWNER: Dept. of California Highway Patrol Ph: 916-375-2940 FAX: 916-375-2944 DESCR: Contact- Department of CA Highway Patrol (916) 843-3819 Contractor agrees to provide all personnel, labor, tools, equipment, materials, permits and license necessary to provide HVAC maintenance at the CHP Donner commercial Vehicle Enforcement Facility. REPAIR POOL PLAN #: 174008 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Eldridge Online & Print On Est Cost: $50,000.00 Demand PREBID: MAND 7/12 @ 10AM PREBID: Plant Operations Building 15000 Arnold Drive OWNER: Sonoma Development Center DESCR: Contact, Tammy Davis - (707) 938-6000 The contractor shall provide all materials, labor, tools, transportation, equipment, supervision and any other services or items necessary to renovate one (1) outdoor swimming pool. This may involve, but not be limited to removing existing pool surfaces and equipment hardware, drains, inlet fittings, skimmers or covers and replace with new code compliant materials resulting in a fully renewed interior surface of the pool and all appurtenances, in essentially like-new condition. Continued on next page


Plans On File Continued from last page

Friday, July 19, 2013 RFQ CA DMV SECURITY AND ACCESS CONTROL MAINTENANCE Bid Date: 7/19/2013 PLAN #: 58018 Bid Time: 12:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $200,000.00 Demand OWNER: State of CA - Dept. of Motor Vehicles DESCR: Contact, Rafael Gonzales - 916-648-8591Provide quarterly preventative maintenance, inspections and remedial services for DMV Headquarters Complex Security and Access Controls System, including a one-time purchase of additional security RFP PROFESSIONAL DESIGN SERVICES FOR THEMILL CREEK BANK STABILIZATION PROJECT BETWEEN STEVENSON ST. AND JOHNSON ST. PLAN #: 121084 Bid Date: 7/19/2013 Bid Time: 11:30 AM PLANS AT: Visalia Online and Planroom Est Cost: $411,000.00 PREBID: 7/2 @ 9AM OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, Purchasing Department - 559-7134334The City of Visalia is requesting design proposals from qualified consulting firms experienced in professional design services for a topographic survey and the design of cleanup and stabilization of the Mill Creek Bank between Johnson St. and Stevenson St. RFP PROFESSIONAL DESIGN SERVICES FOR THE MILL CREEK BANK STABILIZATION PROJECT BETWEEN STEVENSON ST. AND JOHNSON ST. Bid Date: 7/19/2013 PLAN #: 121084 Bid Time: 11:30 AM PLANS AT: Location: Visalia Online and Planroom Est Cost: $411,000.00 PREBID: 7/2 @ 9AM OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, Purchasing Department - 559-7134334The City of Visalia is requesting design proposals from qualified consulting firms experienced in professional design services for a topographic survey and the design of cleanup and stabilization of the Mill Creek Bank between Johnson St. and Stevenson St. RFP FOR VENDING SERVICES PLAN #: 123089 Bid Date: 7/19/2013 Page 40

Zone . July 8, 2013 • Contractor’s

Bid Time: 11:00 AM PLANS AT: Visalia Online and Planroom PREBID: 7/2 @ 11AM PREBID: 707 W Acequia Ave DESCR: Contact, Purchasing Division - 559-713-4334The City of Visalia is requesting proposals for vending machines and services , the initial contract shall be 12 months. The City of Visalia desires vending machines for both drinks and snacks to be located in various City department locations including but not limited to the airport, Waste Water Treatment plant, Police Department and City Hall West. RFP ENERGY EFFICIENCY MEASURES (EEM) RETROFIT PROJECT CONSTRUCTION MANAGEMENT PLAN #: 147066 Bid Date: 7/19/2013 Bid Time: 2:00 PM PLANS AT: Visalia Online and Planroom # OF ADDENDA: 1 PREBID:6/18 @ 11AM PREBID: 707 W Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, Purchasing Division - 559-7134802Act as a liaison with the City project Manager, review all product submittals from the construction contractor, facilitate all construction meetings, manage the overall project timeline to ensure completion within the 90 day project period. Confirm that all EEM retrofit work is conducted to applicable state and local codes.

Saturday, July 20, 2013 JANITORIAL SERVICES FOR THE WATSONVILLE DMV FIELD OFFICE PLAN #: 144069 Bid Date: 7/20/2013 Bid Time: 1:30 PM PLANS AT: WAtsonville Online and Planroom OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Allison Stanek - 916-657-9810The Department of Motor Vehicles is inviting responses for the janitorial services bid for the Watsonville DMV field office located at 90 Alta Vista Ave. Janitorial services at the Watsonville DMV field office.

Monday, July 22, 2013 RFQ-QUALIFIED DEVELOPERS FOR MHSA HOUSING Bid Date: 7/22/2013 PLAN #: 91072 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: San Joaquin Online & Print On


Demand OWNER: County of San Joaquin DESCR: Contact, San Joaquin Co Purchasing (209) 4682074 The intent of this Request for Qualifications (RFQ) is to identify qualified developers and borrowers, as defined in the Mental Health Services Act (MHSA) Housing program guidelines, to develop permanent, affordable rental housing units, including shared housing, with supportive services for individuals who have a mental illness and are homeless or at risk of homelessness. Through the MHSA Housing Program, $6,339,500 was allocated to San Joaquin County to support capital development and capitalized operating subsidies associated with the development, acquisition, construction and/or rehabilitation, and operation of permanent supportive housing. RFP BODIE CEMETARY STONE & CEMENT FEATURES CONSERVATION PLAN #: 132074 Bid Date: 7/22/2013 Bid Time: 2:00 PM PLANS AT: Bodie Online and Planroom Est Cost: $90,000.00 PREBID: MAND 6/20 @ 1PM PREBID: Bodie State Historic Park OWNER: State of CA DESCR: Contact, Betsey Leber - 916-653-9921Conservation of cemetery headstones, copings and wall, wood grave features. Seeking a firm to provide conservation 9of historic stone and cement coping, walls and monuments in the cemeteries at Bodie SHP.

Tuesday, July 23, 2013 BICENTENNIAL PARK ACCESSIBILITY UPGRADES PHASE II Bid Date: 7/23/2013 PLAN #: 44030 Bid Time: 2:00 PM PLANS AT: Clovis Online and Planroom OWNER: City of Clovis DESCR: Contact, Clovis, City of (559) 324-2382 Furnishing all labor, materials, services and equipment, and performing all work necessary as specified for but not be limited to, removal of concrete and asphalt concrete, construction of ADA compliant concrete sidewalk, curb ramp, and asphalt concrete, purchase and installation of a park shelter and amenities, purchase and installation of playground boulders and safety surface, volleyball courts, park benches, electrical and lighting, modifications to the existing landscape and irrigation system, and other associated improvements. CURVE REALIGNMENT AND REPLACE BRIDGE PLAN #: 61086 Bid Date: 7/23/2013 Bid Time: 2:00 PM PLANS AT: San Joaquin Online and Planroom Est Cost: $2,470,000.00 DESCR: Contact, Denise Silva - 916-354-8535San Joaquin County near Bellota from .3 miles West of Sandstone Creek Bridge to Shelly Road.

CONSTRUCT 10-INCH NATURAL GAS PIPELINE MODIFICATIONS FOR THE CITY OF REDDING POWER PLANT Bid Date: 7/23/2013 PLAN #: 93079 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $735,000.00 PREBID: MAND 7/9 @ 8AM PREBID: 17120 Clear Creek Road OWNER: City of Redding DESCR: Contact, City of Redding (530) 225-4170 Furnish necessary labor, material, and equipment to modify the natural gas pipeline at the City of Redding Power Plant and the Eastside Road Gas Metering Yard. TRANSIT SERVICES 4’TH FLOOR REMODEL PLAN #: 102099 Bid Date: 7/23/2013 Bid Time: 11:00 AM PLANS AT: Modesto Online and Planroom Est Cost: $67,215.00 PREBID: 7/2 @11am PREBID: 1010 Tenth Street OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto - Engineering Department (209) 577-5462 Demolition, cold-formed metal framing, miscellaneous metals, interior partition acoustical insulation, sealants & caulking, interior aluminum door & window framing, flush wood doors, finish hardware, glazing, acoustic ceiling system, gypsum board, painting, plastic laminate BIDDERS LIST: General Contractor: Iomlan Construction 209-664-9960 209-664-9979 MANTECA GOLF COURSE DRIVING RANGE NETTING IMPROVEMENTS PROJECT PLAN #: 189023 Bid Date: 7/23/2013 Bid Time: 10:00 AM PLANS AT: Manteca Online and Planroom Est Cost: $32,000.00 DESCR: Contact, Kevin Fant (209) 456-8400 The work consists of driving range golf course netting improvements at the City of Manteca Golf Course 305 N. Union Rd. Provide and install 500’ linear feet of 20’ foot tall (above grade) posts, netting , and other netting system components. RFP-ENGINEERING SERVICES FOR THE TRANSFER STATION BALE STORAGE EXPANSION PROJECT PLAN #: 193099 Bid Date: 7/23/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $1,300,000.00 PREBID: 7/9 @ 11AM OWNER: City of Redding DESCR: Contact,Redding, City of (530) 225-4138 Provide preliminary engineering and final design services culminating in the preparation of contract documents, including plans, specifications and construction cost estimates, complete and ready for invitations for bid and assist during construction. Continued from last page


Plans On File Continued from last page

Tuesday, July 23, 2013 EDD, ALTERATIONS, ALARM AND FIRE SYSTEM, SACRAMENTO EMPLOYMENT DEVELOPMENT DEPARTMENT PLAN #: 105096 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $520,000.00 PREBID: MAND 7/2 @ 10AM PREBID: 5009 Broadway Ave OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778 DESCR: Contact, Maria Gassoumis (916) 375-4212 Demolition, new fire alarm system, replacement of security alarm system, excavation, parking lot re-pavement, new concrete walkways, landscaping, irrigation, accessibility improvements, modifications to existing restroom and signage. BIDDERS LIST: General Contractor: Younger General Contrac 916-631-8000 916-631-8293 Sub Contractor: Universal Security & Fire 916-563-1700 916-563-1755

Wednesday, July 24, 2013 POLICE FIREARMS PRACTICE RANGE ELECTRICAL PLAN #: 3024 Bid Date: 7/24/2013 Bid Time: 2:00 PM PLANS AT: Location: Tracy Online and Planroom PREBID: 7/17 @10AM PREBID: 6649 S Tracy Blvd OWNER: City of Tracy DESCR: Contact,Tracy, City of - Development & Engineering (209) 831-6400 Installation of 400 amp electrical service, including overhead service and subpanels to various buildings on 14 acre police firing range. CLOSED CIRCUIT TELEVISION INSPECTIONS PLAN #: 28020 Bid Date: 7/24/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $165,000.00 Demand OWNER: City of Sacramento DESCR: Contact,Sonia Lopez (slopez@cityofsacramento. orgThese Special Provisions cover closed circuit television (CCTV) inspection for approximately 48,000 lineal feet of Page 42

Zone . July 8, 2013 • Contractor’s

sewer pipes using the NASCSCO’s PACP defect coding system. Maps showing the locations of sewer pipes are located in Appendix A of these Special Provisions CURED-IN-PLACE-PIPE REHABILITATION PLAN #: 29022 Bid Date: 7/24/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $566,000.00 Demand OWNER: City of Sacramento DESCR: Contact, City of Sacramento (916) 808-1437 Work consists of the rehabilitation of several 6-inch and 8-inch diameter sewer pipeline segments, and one 10-inch diameter storm drain pipeline segment, at various locations within the City. The work includes cleaning pipeline segments and manholes, pre- and post-lining CCTV documentation, performing required point repairs, installing cured-in-place pipe liners, reinstating all live sewer service connections and rehabilitating specified manholes. WESTERN WAY PS TEMPORARY BYPASS PIPING, PHASE 2 2013 PLAN #: 127072 Bid Date: 7/24/2013 Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Perris Online & Print On Demand PREBID: MAND 7/9 @ 9am PREBID: Western Way and Harley Knox Blvd OWNER: Eastern Municipal Water District Ph: 951-928-3777 FAX: 951-928-6111 DESCR: Contact, Beatriz Pillow - pillow@emwd.orgWelding steel and PVC piping, fittings and valves as well as constructing the associated electrical services/distribution for the temporary bypass piping facilities and temporary pump station facilities including panels, conduit, wiring, pull boxes, instrumentation, controls, and related grading, concrete, fencing and site work. KERN HIGH SCHOOL DISTRICT AG FARM: NEW POULTRY BUILDING PLAN #: 153074 Bid Date: 7/24/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Bakersfield Online & Print On Demand PREBID: 7/2 @ 9AM PREBID: 3800 East Belle Terrace OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309 DESCR: Contact, Kern High School District (661) 827-3122 Selective site demolition; concrete; rough & finish carpentry,


sheathing, solid polymer fabrications; building insulation, joint sealers; steel doors & frames, storm doors & frames, access doors & panels, finish hardware; painting; toilet & bath accessories; pre-engineered structures; plumbing; HVAC; electrical; earthwork, site clearing, excavation & backfill for structures, trench excavation & backfill for utilities, erosion & sediment control; asphalt concrete paving, exterior concrete pavement, pavement BIDDERS LIST: General Contractor: Jts Construction 661-835-9270 661-835-8424

Thursday, July 25, 2013 PALO CEDRO WWTP-POND REPAIRS PLAN #: 24018 Bid Date: 7/25/2013 Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Shasta Co. Online & Print On Est Cost: $560,000.00 Demand PREBID: 7/12 @ 10 AM PREBID: end of Charlolais Way OWNER: County of Shasta FAX: 530-225-5667 DESCR: Contact,Shawn Ankeny (sankeny@co.shasta.ca.us) Deconstruct a portion of an existing dike, amend the removed soil witbentonite, reconstruct the dike with the amended soil to its original dimensions and place rip-rapping on portions of an interior pond slope. SWENSON PARK NORTH SANITARY PUMP STATION VALVE REPLACEMENT PROJECT PLAN #: 35025 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Demand PREBID: 7/9 @ 10AM PREBID: 6803 Alexandria Place OWNER: City of Stockton DESCR: Contact, Project Manager - 209-937-8753The work includes: removal and replacement of two 24-inch gate valves and AC flatwork to its original condition. BING KONG TONG CENTER STRUCTURAL PLAN #: 36018 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $175,000.00 # OF ADDENDA: 1 Demand PREBID: 6/27 @ 1 PM or 7/2 @ 9 AM PREBID: 29 Main Street, Isleton OWNER: Sacramento Housing & Redevelopment Agency FAX: 916-927-6963 DESCR: Contact, Michael Ordonia - 916-449-6275Hazmat abatement, hazardous material and biological material, structural rehabilitation, roof replacement, restoration of a

portion of the faรงade of the existing building and weatherization of the building. DELTA-MENDOTA CANAL BRIDGE SEISMIC RETROFIT ON WEST SIERRA AVENUE PLAN #: 44031 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fresno Online & Print On Demand OWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact, County of Fresno - Public Works (559) 262-4076 The work to be done consists, in general, of seismic retrofitting of the existing Delta-Mendota Canal Bridge at West Sierra Avenue. The work includes the construction of cast-indrill-hole piles with pile caps adjacent to bridge abutments. The work also includes replacement of asphalt concrete pavement on the 30-foot segments on each side of the bridge approaches. Restriping of the approach segments is also to be NEVADA COUNTY THERMOPLASTIC SAFETY PROJECT 2013 Bid Date: 7/25/2013 PLAN #: 46099 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Nevada Co. Online & Print On Est Cost: $392,323.00 Demand OWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, Nevada, County of (530) 265-1766 Place raised and recessed thermoplastic striping and pavement markers on various County roads. NAPA COUNTY HALL OF JUSTICE FIRE DAMPER REPAIR PROJECT PLAN #: 56071 Bid Date: 7/25/2013 Bid Time: 3:30 PM PLANS AT: Napa Co. Online and Planroom Est Cost: $862,000.00 PREBID: MAND 7/12 @ 10AM PREBID: A valid security Clearance form and a notarized bi OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627 DESCR: Contact, Frank Lucido - Frank.Lucido@ countyofnapa.orgThe work involves demolition and replacement of existing Ruskin smoke damper actuators and testing the assembly, installing a damper monitoring and control system, installing electrical conduit, smoke testing, smoke and fire proofing, and interfacing with the existing fire BIDDERS LIST: General Contractor: Romkon Inc. 415-525-4432 415-529-2073 Bobo Construction, Inc. 916-685-2285 916-714-4850 A.e. Nelson Construction 707-636-1750 707-636-1755 Continued on next page


Plans On File Continued from last page

Thursday, July 25, 2013 COMPUTER ROOM FIRE SUPPRESSION SECRETARY OF STATE Bid Date: 7/25/2013 PLAN #: 71080 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Demand PREBID: MAND 7/9 @ 9:30AM PREBID: 1500 11’th Street OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778 DESCR: Contact, William Barnett - 916-375-4225Project comprises labor, material and services necessary for: Installation of a clean agent fire suppression system with related electrical work and mechanical work. COLONY ROAD OVERLAY PROJECT PLAN #: 80071 Bid Date: 7/25/2013 Bid Time: 3:00 PM PLANS AT: Location: Ripon Online and Planroom OWNER: County of San Joaquin DESCR: Contact,Purchasing Department - 209-523-8323 Conform grind 2’x8’0 at intersection, leveling course, pavement fabric, AC deep lift repairs, pavement markings, thermoplastic, adjust utilities to grade, traffic control, SWPPP, yellow centerline stripe thermo, white bike lane, white edge line thermo, bike symbol, type D11+1 sign, conform grind, grind of existing AC, leveling course, pavement fabric, asphalt overlay, adjust utilities to grade, traffic control, SWPPP. 2013 MIANTENANCE BUILDING EXPANSION PROJECT PLAN #: 90090 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Location: Ceres Online and Planroom PREBID: 7/16 @ 9AM PREBID: 3420 Harold St OWNER: City of Ceres DESCR: Contact, City Engineer (209) 538-5792 Includes a new metal building / foundation / footings, new asphalt paving, new concrete work, drainage inlets, 8” RCP storm drain line, bollards, new inside office structure, mew mechanical equipment, plumbing, fire sprinklers / connections, electrical equipment / connections, erosion controls, demolition of asphalt / concrete / existing siding and associated EDD, ALTERATIONS, ALARM AND FIRE SYSTEM, SACRAMENTO EMPLOYMENT DEVELOPMENT DEPARTMENT Bid Date: 7/25/2013 PLAN #: 105096 Page 44

Zone . July 8, 2013 • Contractor’s

Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $520,000.00 PREBID: MAND 7/2 @ 10AM PREBID: 5009 Broadway Ave OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778 DESCR: Contact, Maria Gassoumis (916) 375-4212 Demolition, new fire alarm system, replacement of security alarm system, excavation, parking lot re-pavement, new concrete walkways, landscaping, irrigation, accessibility improvements, modifications to existing restroom and signage. BIDDERS LIST: General Contractor: United Building Contract 530-345-8455 530-345-8885 Younger General Contract 916-631-8000 916-631-8293 Carter-kelly, Inc. 530-621-0950 530-621-2344 Sub Contractor: Universal Security & Fire 916-563-1700 916-563-1755 T B K Electric 916-627-9857 916-684-1218 REROOF STORAGE BUILDING PLAN #: 150066 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Alameda Co. Online & Print On Est Cost: $60,000.00 Demand PREBID: MAND /28@10AM and /12 @ 1AM6 OWNER: Dept. of Fish & Game Ph: 916-323-1587 FAX: 916-323-1622 DESCR: Contact, Ruben Salvador - 916-323-1584 The project consists of removing existing composition roof materials, underlayment, remove and replace roof sheathing, install new underlayment, install new asphalt roof shingles, new roof sheathing, new TPO roofing and miscellaneous work. RFQ-ARCHITECTURAL SERVICES PLAN #: 162070 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Location: Ukiah Online and Planroom OWNER: County of Mendocino DESCR: Contact-Kristin McMenomey - (707) 234-6050 Provide professional architectural services on an on-going basis for a wide range of scopes from new design and construction to major and minor improvement work, including programming, site planning, development of schematic / design development / construction documents / as-built drawings, cost estimates and support during FULL DEPTH REHABILITATION WITH CEMENT AND ASPHALT CONCRETE OVERLAY ON PAIGE AVE Bid Date: 7/25/2013 PLAN #: 277044


Bid Time: 2:00 PM PLANS AT: Location: Tulare Online and Planroom DESCR: Contact,Tulare, City of Mike Whitlock, City Engineer (559) 684-4207 The work consists of the full depth rehabilitation of deteriorated pavements on City streets by grinding and pulverizing pavement, applying, mixing and hydrating cement to create a stabilized base section, placing asphalt concrete on the prepared base section, the application of an Asphalt Rubber CAPE Seal on Mooney Blvd., the replacement of pavement delineation, pavement markers and pavement

Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Tahoe City Online & Print On Est Cost: $38,500.00 Demand PREBID: MAND 7/16 @ 2 PM PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact,Cory Allison (callison@tcupd.orgInstall 47 domestic water service meter pits with integrated PRVs and shutoff valves at 47 locations in the Tahoma Meadows water service

Friday, July 26, 2013

SOE FAN COIL AND HVAC PIPING REPLACEMENT Bid Date: 7/30/2013 PLAN #: 40020 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Davis Online & Print On Est Cost: $1,700,000.00 Demand PREBID: MAND 7/9 @ 9:30am OWNER: University Of California, Davis DESCR: Contact, UC Davis (530) 752-0867 Includes the comprehensive removal and replacement of fan coils and HVAC piping, gypsum board with acoustical tile corridor ceiling removal / placement of T-bar grid acoustical ceiling tile, necessary removal / replacement of hard lid ceiling in office spaces to effect removal / installation of HVAC piping and fan coils, communications above ceiling and surface raceway, boxes / faceplates and cat5e wiring and terminations in and throughout the School of Education building. BIDDERS LIST: General Contractor: Hometown 916-991-2486 916-991-2881

WASTE WATER TREATMENT PLANT EXPANSION PROJECT PLAN #: 95068 Bid Date: 7/26/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Visalia Online & Print On # OF ADDENDA: 3 Demand PREBID: MAND 5/8 @ 9am PREBID: 7579 Ave 288 OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, Purchasing Division - 55-713-4334 Waste water treatment plant expansion. BIDDERS LIST: Sub Contractor: C. Overaa And Co. 510-234-0926 510-237-2435 Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 Ryan Process 800-839-0670 925-837-4832 Misco 925-225-1900 925-225-9200 RFP-LOWER KAWEAH RIVER & MILL CREEK SYSTEM FLOOD CONTROL IMPROVEMENTS Bid Date: 7/26/2013 PLAN #: 130076 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Visalia Online & Print On Demand PREBID: 7/10 @ 11AM PREBID: 707 W Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802 DESCR: Contact, Visalia, City of (559) 713-4334 Engineering and Regulatory Services for the DWR Flood Corridor Program Funded Project entitled “Lower Kaweah River & Mill Creek System Flood Control Improvements.

Tuesday, July 30, 2013 TAHOMA MEADOWS MUTUAL WATER METERING PROJECT Bid Date: 7/30/2013 PLAN #: 14024

CO.

GENTERATOR REPLACEMENT PLAN #: 59011 Bid Date: 7/30/2013 Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and Planroom Est Cost: $175,000.00 PREBID: MAND 7/17 @ 1PM PREBID: Between 330 and 360 Far Lane OWNER: County of El Dorado DESCR: Contact, Procurement Department- (530) 622-4513. Furnishing of all labor, material and equipment for construction of improvements for the emergency back up power system at the main government center. ELEVATOR MAINTENANCE / REPAIR SERVICE ONLINE ONLY PLAN #: 63099 Bid Date: 7/30/2013 Bid Time: 3:00 PM PLANS AT: Bakersfield Online and Planroom PREBID: MAND 7/18 @ 10AM PREBID: 4201 Sabodan OWNER: State of CA DESCR: Contact, Ben Nixon - 661-858-5678Contractor shall provide inspection, maintenance, testing and annual certification of two (2) passenger elevators and three (3) freight elevators Continued on next page


Plans On File Continued from last page

Tuesday, July 30, 2013 SAFE ROUTES TO SCHOOL PHASE 2 (SRTS) PLAN #: 65007 Bid Date: 7/30/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $431,473.00 OWNER: City of Redding DESCR: Contact, John Abshier - 530-245-7159Construct pedestrian and bicycle improvements including curb, gutter and sidewalk. Install storm drain improvements and bike lane signing and marking, relocate water main and reconnect water services. LANDSCAPE AT CHP PLAN #: 68071 Bid Date: 7/30/2013 Bid Time: 4:00 PM PLANS AT: Location: Tracy Online and Planroom Est Cost: $13,000.00 PREBID: MAND 7/16 @ 11AM PREBID: 385 W. Grant Line Road OWNER: State of CA DESCR: Contact, Nancy Leonard - 916-843-3800Landscape Maintenance. Contractor agrees to provide all equipment, labor, materials and supplies necessary for the performance of the work DOWNEY TERRACE SENIOR HOUSING PLAN #: 84087 Bid Date: 7/30/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Modesto Online & Print On Demand PREBID: 7/2 @ 10AM PREBID: 412 Downey Ave OWNER: Housing Auithority of the County of San Joaquin Ph: 209-4160-5000 FAX: 209-460-5100 ARCHITECT: Timothy P. Huff & Assoc. Ph: 209-571-2232 FAX: DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 5712232 The Project consists of the construction of eleven (11) senior housing dwelling units, community spaces, related site development, and utility BIDDERS LIST: General Contractor: Diede Construction 209-369-8255 209-368-0600 RAILROAD CROSSING IMPROVEMENTS @ VARIOUS LOCATIONS PLAN #: 119088 Bid Date: 7/30/2013 Page 46

Zone . July 8, 2013 • Contractor’s

Bid Time: 2:00 PM PLANS AT: Humboldt Co. Online and Planroom Est Cost: $104,000.00 OWNER: County of Humboldt Ph: 707-445-7652 FAX: 707-445-7409 DESCR: Contact, County of Humboldt (707) 445-7493 Work consists of reconstructing railroad crossings including traffic control, removal and disposal of treated wood planks, asphalt concrete and road signage. 2014-2016 ON-CALL PROFESSIONAL SERVICES Bid Date: 7/30/2013 PLAN #: 182006 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: El Dorado Online & Print On Demand DESCR: Contact: El Dorado Irrigation District (530) 6224513.RFP for the following services: 1. Appraisal Services 12. Information Technology 2. Arborist/Tree Faller 13. Legal Services – Labor/HR Counsel 3. Cultural Studies 4. Dam Safety Engineering 5. Drafting 14. Legal Services – Title Search 15. Legal Services – Water Rights Counsel 6. SCADA – Electrical/Instrumentation 16. Painting Inspection 7. Environmental – CEQA / NEPA /Biological Studies 17. Regulatory Permitting 18. Surface Water Hydrology 8. General Engineering 9. Geographic Information Systems 19. Survey 20. SWPPP Development(GIS) 10. Geotechnical 21. Water/Wastewater Laboratory Analysis 11. Hydroelectric Compliance

Wednesday, July 31, 2013 FIBER OPTIC INSTALLATION FROM CITY HALL TO TRANSIT CENTER PLAN #: 26099 Bid Date: 7/31/2013 Bid Time: 2:00 PM PLANS AT: Location: Tracy Online and Planroom OWNER: City of Tracy DESCR: Contact, Ripon Bhatia - 209-831-6455Install fiber optic cable, conduit, boxes and related equipment to create a fiber optic connection between City Hall and the Transit Center.


RFP-PURCHASE AND DEVELOP CITY OF SACRAMENTO PROPERTY AT THE SOUTHWEST CORNER OF HOWE AVENUE AND FAIR OAKS Bid Date: 7/31/2013 PLAN #: 33024 Bid Time: 12:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sacramento, City of (916) 808-3789 The City of Sacramento is soliciting proposals for the purchase and development of City-owned real property, located at the southwest corner of Fair Oaks Boulevard and Howe Avenue. The property is approximately 3.12 unimproved acres at the busiest intersection in the City and is designated as Assessor’s Parcel Number 295-0020-007 (the “Project Site”). It is surrounded by numerous commercial enterprises, California State University, Sacramento, and residential neighborhoods. The development sought for this location would be one that has a low traffic IFB CNG TANK SVS 2013 PLAN #: 51003 Bid Date: 7/31/2013 Bid Time: 3:30 PM PLANS AT: Location: Sacramento Online and Planroom PREBID:7/2 @ 1030 AM PREBID: 1416 10th Street OWNER: State of CA DESCR: Contact, Melanie Zbur- 916-928-2780Compressed Natural Gas Tank preventative maintenance, inspection, testing, repair and training services, Testing and Repair services at the Sacramento State Garage. YARD MAINTENANCE SERVICES PLAN #: 141064 Bid Date: 7/31/2013 Bid Time: 10:00 AM PLANS AT: Location: Vallejo Online and Planroom PREBID: MAND 7/17 @ 10AM OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District (707) 644-8949 Yard maintenance services at the District Treatment Plant at 450 Ryder Street, Vallejo, California. REPLACE FIRE DETECTION AND ALARM SYSTEM, PHASE 5 Bid Date: 7/31/2013 PLAN #: 53001 Bid Time: 2:30 PM PLANS AT: Print On Demand Location: Atascadero Online & Print On Est Cost: $268,000.00 Demand PREBID: MAND 7/17 @ 930AM PREBID: 10333 El Camino Real OWNER: State of CA DESCR: Contact, Ann Malek - 805-468-3410Contractor shall furnish all labor, materials, tools, equipment, transportation and any other services necessary to “Replace Fire Detection and Alarm System, Phase 5” and arrange inspections by the State Fire Marshal during the course of the work.

YARD MAINTENANCE SERVICES PLAN #: 141064 Bid Date: 7/31/2013 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Vallejo Online & Print On Demand PREBID: MAND 7/17 @ 10AM OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District (707) 644-8949 Yard maintenance services at the District Treatment Plant at 450 Ryder Street, Vallejo, California.

Thursday, August 01, 2013 2013 FISH ROCK SEDIMENT REDUCTION PROJECT Bid Date: 8/1/2013 PLAN #: 152067 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Ukiah Online & Print On Est Cost: $185,000.00 Demand OWNER: County of Mendocino DESCR: Contact, Mendocino, County of , Dept. of Transportation (707) 463-4363 Includes reshaping inside ditch, clearing / grubbing, U-channel sign posts, water bars, removal of culvert, installation of culverts, elbows, 24” flume, inlet treatments, RSP outlets, fiber roll and water pollution control

Tuesday, August 06, 2013 REPLACE THE EXISTING METAL BEAM GUARD RAIL WITH CONCRETE BARRIER Bid Date: 8/6/2013 PLAN #: 106099 Bid Time: 2:00 PM PLANS AT: Location: Fresno Online and Planroom Est Cost: $1,130,000.00 OWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact, Denise Silva - 916-348-8654Fresno County in Fresno on Route 41 from the Route 180/41 connector to Olive Ave undercrossing and on Route 180 from Blackstone Ave undercrossing to Route 180/41 Connector. JANITORIAL SERVICES PLAN #: 191092 Bid Date: 8/6/2013 Bid Time: 4:00 PM PLANS AT: Location: Truckee Online and Planroom Est Cost: $47,000.00 PREBID: MAND 7/23 @ 10AM OWNER: State of CA DESCR: Contact, Nancy Leonard - 916-843-3800Janitorial services at Donner CVEF 12800 Interstate 80 Truckee, CA 96161. Floor maintenance, sweep, damp mop, strip, treat and buff, dust, furniture surfaces.

Continued on next page


Plans On File Continued from last page

Thursday, August 08, 2013 MIRALOMA PARK AND COMMUNITY CENTER Bid Date: 8/8/2013 PLAN #: 104096 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Anaheim Online & Print On Demand OWNER: City of Anaheim DESCR: Contact, Stephen Stoewer - 714-765-4338Demolition, mobilization and removals of existing facilities, constructing of new facilities, site work in accordance with the project documents. WIDEN ROADWAY AND BRIDGE, CONSTRUCT RETAINING WALLS AND NEW BYPASS OFF RAMP Bid Date: 8/8/2013 PLAN #: 179000 Bid Time: 2:00 PM PLANS AT: Anaheim Online and Planroom Est Cost: $19,800.00 OWNER: State of CA DESCR: Contact, Denise Silva - 916-808-3564Widen Roadway and Bridge, construct retaining walls and new bypass off-ramp. In Orange County In Anaheim From 0.3 Mile West of Tustin Avenue overcrossing To 0.3 miles East Of 91/55 separation and at Lakeview Avenue overcrossing

Friday, August 09, 2013 CONSTRUCTIN OF WESTERN PLACERVILLE INTERCHANGES PROJECT PHASE 1A PLAN #: 77072 Bid Date: 8/9/2013 Bid Time: 2:00 PM PLANS AT: Placerville Online and Planroom Est Cost: $5,000,000.00 PREBID: 7/19 @2pm1 PREBID: 3’rd Floor City Hall OWNER: City of Placerville DESCR: Contact, Engineering Division 530-642-5250Construction of westbound on ramp from Ray Lawyer Drive onton Highway 50 and a westbound auxiliary lane between the new westbound on ramp and the existing westbound off ramp at Placerville Drive. Realignment of Fair Lane, retaining wall to support realigned Fair lane and auxiliary lane, and utility improvements including new storm drain and sanitary sewer facilities and a detention basin.

Click on any blue underline because it’s an active link!

Page 48

Zone . July 8, 2013 • Contractor’s

Tuesday, August 13, 2013 REPALCE PAVEMENT WITH HMA AND REHABILITATE BRIDGE DECKS PLAN #: 164082 Bid Date: 8/13/2013 Bid Time: 2:00 PM PLANS AT: Kings Co. Online and Planroom Est Cost: $4,400,000.00 OWNER: State of CA DESCR: Contact, Denise Silva - 916-8085464 Kings County in and near Hanford at various locations from14th Avenue Undercrossing to 11th Avenue Undercrossing.

Thursday, August 15, 2013 EAST SIDE PUMP STATION REHABILITATION PLAN #: 140065 Bid Date: 8/15/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Colusa Co. Online & Print On Est Cost: $1,290,000.00 Demand OWNER: City of Colusa DESCR: Contact, Colusa, City of (530) 458-4740 (530) 4588674 Replacement of various components, both mechanical & electrical, at 4 sewer pump stations & 1 storm water pump station. Depending on the station, the replacement components include, but may not be limited to, submersible pumps, wet well covers, rails, discharge piping, valves, control panels, pump controllers, backup electrical power generators, and telemetry equipment. The work also includes the purchase, configuration and programming of a SCADA Server and base

Friday, August 16, 2013 RFP GROUND LEASE AND DEVELOPMENT OF LAND ADJACENT TO EVERGREEN VALLEY COLLEGE, SAN JOSE PLAN #: 126077 Bid Date: 8/16/2013 Bid Time: 3:00 PM PLANS AT: San Jose Online and Planroom PREBID: 6/20 @ 10:30AM and 6/26 @ 10:30AM PREBID: 4750 San Felipe Road DESCR: Contact, San Jose Evergreen School - 408-2706402The District welcomes proposals for the ground leasing of the land needed to site development of retail, multi family residential, and or other related compatible uses such as health care and educational uses, in a desirable urban scale environment. The size of the Property permits capitalizing on scale advantages not available elsewhere in the market


RFP GROUND LEASE AND DEVELOPMENT OF LAND ADJACENT TO EVERGREEN VALLEY COLLEGE, SAN JOSE PLAN #: 126077 Bid Date: 8/16/2013 Bid Time: 3:00 PM PLANS AT: San Jose Online and Planroom PREBID: 6/20 @ 10:30AM and 6/26 @ 10:30AM PREBID: 4750 San Felipe Road OWNER: San Jose/Evergreen Community College District DESCR: Contact, San Jose Evergreen School - 408-2706402The District welcomes proposals for the ground leasing of the land needed to site development of retail, multi family residential, and or other related compatible uses such as health care and educational uses, in a desirable urban scale environment. The size of the Property permits capitalizing on scale advantages not available elsewhere in the market

Tuesday, August 20, 2013 RAHAB BRIDGES WITH POLYESTER CONC OVERLAY AND RDWY WITH HMA OVER AB Bid Date: 8/20/2013 PLAN #: 67086 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Shasta Co. Online & Print On Est Cost: $7,650,000.00 Demand OWNER: State of CA DESCR: Contact, Denise Silva -916-354-8534Shasta County at various locations, Rehabilitate bridges with polyester conc overlay and roadway with HMA over AB.

Thursday, August 22, 2013 CONSTRUCT FREEWAY CONNECTION TO ROUTE 905 Bid Date: 8/22/2013 PLAN #: 165083 Bid Time: 2:00 PM PLANS AT: San Diego Co. Online and Planroom Est Cost: $58,000,000.00 OWNER: State of CA DESCR: Contact, Denise Silva - 916-8086456Construct freeway connection to route 905. In San Diego County In and near San Diego on route 11 from route 11/905 separation to Enrico Fermi Drive And on route 905 From 0.1 mile East of La media road undercrossing To 0.2 Mile West of airway Road undercrossing.

Tuesday, December 31, 2013 LIST OF QUALIFIED CONTRACTORS/YUBA CITY PLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City Planroom OWNER: City of Yuba City

DESCR: Contact, (dlangley@yubacity.net) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013. BIDDERS LIST: Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORS PLAN #: 223091 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Placer Co. Online and Planroom OWNER: Placer Office Education Ph: 916-415-4424 DESCR: In accordance with the State of California Uniform Public Construction Cost Accounting Commission, The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2013. You must resubmit to be included on the 2013 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Contact, Matt Shawver, 530-889-8020. Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2013 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board. BIDDERS LIST: Sub Contractor: Kitchen Art, Inc. 916-852-8111 916-852-7981 Oxford Fire Inc. 916-865-6146 916-987-0201 CO OF TUOLUMNE - QUALIFIED BIDDERS LIST PLAN #: 247054 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Co. Online and Planroom OWNER: County of Tuolumne DESCR: County of Tuolumne, Sharon Mikesell, (SMikesell@ co.tuolumne.ca.us) Inviting all licensed contractors to submit the name of their firm for inclusion on the Agency’s list of qualified bidders for 2013. SOLANO COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LIST PLAN #: 248050 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Solano Online and Planroom OWNER: Solano County Water Agency DESCR: Sandra McLean, 707-451-6090. Inviting contractors to submit their company’s information to be placed on the Agency’s list of qualified bidders for the following year. Continued on next page


Plans On File Continued from last page

Tuesday, December 31, 2013 QUALIFIED BIDDERS - CITY OF CUPERTINO PLAN #: 253057 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Cupertino Online and Planroom OWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, City of Cupertino, 408-777-3354. City of Cupertino is in the process of updating their Contractors List to establish and maintain a list of qualified contractors to receive future public projects. APPLICATION - CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT/2013 CALENDAR YEAR Bid Date: 12/31/2013 PLAN #: 256052 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Carmichael Online and Planroom OWNER: San Juan Unified School District DESCR: Aida Gonzales, (aida.gonzalez@sanjuan.edu) Complete form and return to San Juan Unified School District Purchasing Department if you wish to be included in the 2013 Calendar year California Uniform Public Construction Cost Accounting Program FOLSOM-CORDOVA USD BIDDERS LIST PLAN #: 274042 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Ranch Online and Planroom OWNER: Folsom Cordova USD Ph: 916-355-1111 DESCR: Contact, Folsom Cordova Unified School District, 916294-9000. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013. BIDDERS LIST: Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 SUMMERVILLE UNION HIGH SCHOOL DISTRICT PLAN #: 291049 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Summerville Online and Planroom OWNER: Summerville Union High School District Ph: 209-928-1955 FAX: 209-928-4454 DESCR: (wvanbolt@summbears.k12.ca.us) or 209-9281955. Summerville Union H.S. District, Maintenance Dept. in Tuolumne Co., is requesting Contractors’s PreQualification Applications for upcoming year.

Page 50

Zone . July 8, 2013 • Contractor’s

TWIN RIVERS UNIFIED SCHOOL DISTRICT QUALIFIED CONTRACTORS PLAN #: 301009 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: North Online and Planroom OWNER: Twin River Unified School District Ph: 916-566-1600 FAX: 916-286-4959 DESCR: Twin Rivers Unified School District, Facilities Planning & Construction. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013. BIDDERS LIST: Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 SANTA CRUZ PORT DISTRICT’S/LIST OF QUALIFIED BIDDERS Bid Date: 12/31/2013 PLAN #: 304012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online and Planroom OWNER: Santa Cruz Port District DESCR: Contact, Santa Cruz Port District, (831) 475-6161. Santa Cruz Port District is inviting licensed contractors to submit the name of their firm for inclusion on the Port Districts list of potential bidders. Provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number, the type of work in which you are interested and are currently licensed to do, the class of contractor’s licenses held and the contractor license numbers. Mail information to Santa Cruz Port District at scpd@santacruzharbor. org and reference “Contractor List” in the subject line. CITY OF LINCOLN/CONTRACTOR’S PREPLAN #: 311007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Lincoln Online and Planroom OWNER: City of Lincoln DESCR: City of Lincoln, 916-434-2450. City of Lincoln inviting all qualified contractors to submit their name and company for inclusion on the qualified bidders list for the year 2013. BIDDERS LIST: Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 Kitchen Art, Inc. 916-852-8111 916-852-7981 Guardian Environmental, 916-997-1830 916-641-5690 SIERRA COLLEGE - LIST OF QUALIFIED PLAN #: 314007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Rocklin Online and Planroom


OWNER: Sierra Community College DESCR: Contact, Kerri Hester, 916-624-3333. Sierra Joint Community College District is updating its list of Qualified Contractors for the 2013 calendar year. BIDDERS LIST: Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Wednesday, December 31, 2014 ARDEN PARK RECREATION AND PARK DISTRICT’S CONTRACT BID LIST

PLAN #: 315005 Bid Date: 12/31/2014 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom OWNER: Arden Park Recreation and Park District Ph: 916-483-6069

DESCR: Colin Miller, (cmiller@aprpd.org) or 916-4836069. Arden Park Recreation and Park District invite licensed contractors to submit their information to be included on their contract bid list. BIDDERS LIST: Sub Contractor: Oxford Fire Inc.

916-865-6146 916-987-0201

Plans On File - Residential Wednesday, July 24, 2013 COPPERSTONE VILLAGE II & III IN SACRAMENTO PLAN #: 317019 Location: Sacramento Bid Time: 2:00 PM PLANS AT: Print On Demand Online & Print On Demand G.C.: USA Construction Management Inc. Ph: 916-724-3856 Fax: 916-773-1931 DESCR: Contact, USA Construction Management, Inc. (916) 7243882 Copperstone Village II & III Apartments is a market rate, multi-building, three story apartment complex totaling 270 units and

featuring a single story Clubhouse, pool, carports and open parking on a 10+ acre site. The project is type V wood frame construction with stucco siding and concrete tile roofs. The project will be built utilizing Build-it-Green energy efficiencies. Excavation, demolition, utilities, septic, paving, foundation, masonry, retaining wall, siding, framing, insulation, drywall, roofing, doors, windows, painting, plumbing, HVAC, electrical, data cabling, flooring, cabinets, counter tops, finish carpentry and interior trim, gutters. BIDDERS LIST: Sub Contractor: Gadda Construction 916-425-7242 916-000-0000

Legal Ad REQUEST FOR QUOTES FROM QUALIFIED DBE, MBE AND WBE- SUBCONTRACTORS AND SUPPLIERS FOR: Dingee Pipeline & Claremont Center Aqueducts Replacements OWNER: East Bay Municipal Utility District Subtrades include but not limited to: Electrical, Landscaping, Paving and Traffic Control. BID OPENING: 7/17/2013 @ 1:30 pm Ranger Pipelines, Inc. will supply information regarding plans and specifications, bonds, lines of credit and/or insurance requirements upon request. Plans and specifications are available for review in our office by appointment or by viewing the EBMUD website https://portal.ebmud.com/cbo/specifications/default.aspx

Ranger Pipelines, Inc.

P.O. Box 24109, San Francisco, CA 94124 Contact Person: Daire O’Rourke License No.: 417996 Class A Phone: (415) 822-3700 Fax (415) 822-3703 Equal Opportunity Employer


Bid Results Wednesday, June 26, 2013

Friday, June 28, 2013

EAST ARBORETUM AREA, CALIFORNIA NATIVE PLANT GARDEN (CNPG) AND DAVIS COMMON PARKING LOT (DCP), Davis

Plan Number:

79057

Gateway Landscape $627,000 JA Gonsalves & Son Construction, Inc. $669,669.69 TRASH COMPACTOR FOR THE NEW SCIENCE AND MATHEMATICS BUILDING, San Joaquin Co.

Plan Number:

150065

Netbuilds $39,877 A-Vet Construction, Inc. $56,750 LOW LIFT ACCESS ROAD IMPROVEMENTS , Yuba

Plan Number:

106098

DeWitt Bros. & Co., Inc. Franklin Construction R.J. Heuton Construction Thursday, June 27, 2013

$126,930 $140,730 $148,375

RENOVATIONS AT SENIOR HOUSING UNITS, LAWRENCE ST. CERES , Ceres

Plan Number:

24017

California Structures $233,314.25 Alameda Construction $341,114 Iomlan Construction Services, Inc. $363,400 METHACRYLATE BRIDGE DECK SEAL 2013 PROJECT , Redding

Plan Number:

18032

JF Shae Construction, Inc. $130,306 TAHOMA MEADOWS MUTUAL WATER CO. TRANSMISSION PIPELINE PROJECT- PHASE 2 ,

Plan Number:

19033

Reno-Tahoe Construction Page 52

$320,556.34

Zone . July 8, 2013 • Contractor’s

LIGHTHOUSE BUS SHELTER , Placer Co.

Plan Number:

59010

Orlando Enterprises DML Construction Pullman Construction Tuesday, July 02, 2013

$45,454 $46,500 $94,000

FLIGHTLINE DRIVE REHABILITATION PHASE 1, Lincoln Plan 70081 Number:

J D Pasquetti Engineering Inc. $461,788 All Phase Construction & Engineering $463,842 Knife River Construction $468,940 SAFE ROUTES TO SCHOOL, Lincoln

Plan Number:

49015

FBD Vanguard Construction $541,106 2013 ARTERIAL MICROSURFACING PROJECT, Roseville Plan 39022 Number: Windsor Fuel Co. $1,449,200 Central Valley Engineering & Asphalt $1,572,326 Sierra Nevada Construction (SNC) $1,579,007

2013 CAPE / SLURRY SEAL PROJECT, Roseville

Plan Number:

16029

Intermountain Slurry Seal, Inc. $1,979,979 Central Valley Engineering & Asphalt $2,090,256 Windsor Fuel Co. $2,126,598

FIRST NEW GROUND LEVEL TANK , Woodland

Plan Number:

23027

Myers & Sons Construction Skaer Construction, Inc

$7,050,000 $7,100,000


4 8 6 $ ion l l i b

The Internet Accounts For 4.7% of the U.S. Economy

Survey Says: 77% of Americans would be willing to give up chocolate for an entire year, rather than go without the Internet. Only 21% though would give up sex, and an even smaller 7% would go without a shower.

According to a recent survey conducted by CNN Money, the Internet contributes more to the American economy than the entire federal government, according to a new study by the Boston Consulting Group. The Internet accounted for $684 billion, or 4.7% of all U.S. economic activity in 2010, Boston Consulting Group found. By way of comparison, the federal government, contributed $625 billion, or 4.3%, to the nation’s output. If it was considered its own separate industry, the Internet would also be larger than America’s education, construction or agricultural sectors.

In the retail sphere alone, e-commerce accounted for 5% of U.S. sales in 2010. “All businesses are increasingly digital and need to think about how to take advantage of these opportunities,” said Dominic Field, a BCG partner and co-author of the report. Boston Consulting Group predicts the Internet will grow about 10% a year through 2016 in the Group of 20 nations.

Advertising HERE makes dollars, and sense! And this digital media will grow every year.

Call Steve today to get your powerful display ad started. 916.729.5432


Placer County Contractors Association & Builders Exchange

PCCA

N ewspaper R ate S heet REV JULY 2012

Display Advertising Policy, Rates and Information The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Our LOWEST rates

Upgraded format, larger ad sizes, lowered rates: Ad Type

Ad Size

1 run

6 runs

13 runs

26 runs

52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall

$782

$639

$497

$355

$209

Full page (bleed) 8 5/8” wide by 11 1/4” tall

$427

$355

$284

$213

$139

Full page (boxed) 8” wide by 9 3/4” tall

$427

$355

$284

$213

$139

Half page 8” wide by 4 3/4” tall

$229

$193

$158

$123

$87

One Third (V) 2 7/8” wide by 7 1/2” tall

$171

$144

$118

$92

$63

One Third (H) 8” wide by 3 1/8” tall

$171

$144

$118

$92

$63

$97

$81

$64

$47

$39

$32

$24

$19

Quarter Page 3 7/8” wide by 4 3/4” tall Contractor Yellow Pages (Business Card Sized Ad) Legal ads

• 3 7/8” wide and up to 2 1/4” tall $50

• 3 7/8” wide and up to 3 1/2” tall

• 3 7/8” wide and up to 5” tall

• 3 7/8” wide and up to 6 1/2” tall $135

$95

$75

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:candspublishing@gmail. com. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: CandSpublishing@gmail.com. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members! Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract. For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:candspublishing@gmail.com See the newspaper onlne at www.PCCAe-Zone.com Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, Zone . July 8, 2013 • Contractor’s Page 54 anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.