Tatjana gorbachewskaja work1

Page 1

Selected projects

Tatjana Gorbachewskaja 2012


curriculum vitae:

cUrricULUM viTae TaTjana Gorbachewskaja 1981, Tcheremchovo, Russia

Architecture and Urbanism, sTaTes UniversiTY oF archiTecTUre and civiL enGineerinG

St. petersburg, rU

2005-07

Postgraduate studies for the degree of Master of Arts in Advanced Architectural Design, sTaaTLiche hochschULe FÜr biLdende kÜnsTe, sTÄdeLschULe, in the class of ben van berkeL

Frankfurt am, d

2004

Urbanist at sTaTes archiTecTUraL insTiTUTe sPbsniiPi, Project: Children’s Center Orlenok expansion, Krim, Russia

St. petersburg, rU

2007-08

Architect at jUsT.bUrGeFF. archiTekTen, Projects: Extension of the Clinic of Manual Therapies, Hamm, Germany Oldtimer centre Klassikstadt, Frankfurt am Main, Germany Development of business centre Plaza, Frankfurt am Main, Germany

Frankfurt am, d

2008-09

Architect at erick van eGeraaT archiTecTs, Projects: Mixed use sustainable house Columbuskwartier, Almere, The Netherlands City Hall, Budapest, Hungary Office building study Osterdok, Amsterdam, The Netherlands Elite Housing project Moika-Krjukov,St.-Peterburg, Russia

rotterdam, nL

2009-12

Architect and Design Leader at UnsTUdio, Projects: Dance palace, St. Petersburg, Russia VDNH Master plan concept development, Moscow, Russia Entre Les Deux Portes, mixed-use complex, Brussel, Belgium The National Art Museum of China, Beijing, China Pavilion for Education Executive Agency and Tax Office, Groningen, NL Theatre in Spijkenisse, The Netherlands

amsterdam, nL

2002 2004 2004

Scholarship for student exchange program, GoeThe insTiTUT 1sT. PLace for thesis project, associaTion oF rUssian archiTecTs 1sT. PLace for thesis project, National Organisation of the Education Promotion for architects, Moocao Fellow of German Academic Exchange Service daad Fellow by Centre of Contemporary Art and Sustainability cacis Resident fellow in Creative Centre arTeLes Residency fellowship by the festival arMv

Fulda, d moscow, rU moscow, rU

Thesis project exhibition at the FLorence worLd FesTivaL Solo exhibition Installation Transition // Experience, GaLLerY sarai Group exhibition Rundgang, sTÄdeLschULe Group exhibition Pre::tectonic construction, krinGs-ernsT GaLLerY Group exhibition Russian Roulet, nassaUischer kUnsTverein, Installation Amalgam of inversion Installation Projection of an interval: time-territory, inTernaTionaL TrienniaL oF visUaL arTs Group exhibition Two towns, Union oF rUssian archiTecTs Installation on Volga embankment, archiTecTUraL FesTivaL arMv

Florence, i Frankfurt am, d Frankfurt am, d cologne, d wiesbaden, d

edUcaTion 1998-04

work

selected

awards

2005-07 2012 2012 2012 eXhibiTions selected

2005 2007 2005-07 2006 2008 2009 2010 2012

curriculum vitae

Frankfurt am, d barcelona, e hämeenkyrö, Fin yaroslavl, rU

petrozavodsk, rU yaroslavl, moscow, rU yaroslavl, rU


Content: architecture: UNStudio All-Russia Exhibition Centre, VDNKH, Moscow, Russia, 2010 DANCE PALACE, St.- Petersburg, Russia, 2009 LE TOISON D’OR, Brussels, Belgium, 2010 THE NATIONAL ART MUSEUM OF CHINA, Beijing, China, 2010 THEATRE SPIJKENISSE, Spijkenisse, The Netherlands, 2011 IBG pavilion, Groningen, The Netherlands, 2011

Erick van Egeraat Associated Architects

Budapest City Hall, Budapest, Hungury, 2008 Mixed Use Columbusquarter, Almere, The Netherlands, 2009 Elite housing ”Moika-Krjukov”, St.- Petersburg, Russia Office Building Oosterdok, Amsterdam, The Netherlands, 2009

installations:

Academic:

installation: Amalgam of Inversion, Group EXHIBITION: RUSSIAN ROULETTE, NKV, Wiesbaden, Germany 2008

STAEDELSCHULE:

Thesis work Media Art Museum, Worms, Germany, 2007

ARCHITECTURE OF MOVEMENT RESIDENCY, ARCH. FESTIVAL ARMV, Yaroslavl, Russia, 2012

Design model definition

FIBRE FLOW ART RESIDENCY, ARTELES, Haukijärvi, Finland, 2012 TRANS<MATTER ART RESIDENCY, CACIS, Calders / Barcelona, Spain, 2012 TRANSITION // EXPERIENCE solo EXHIBITION, Platform sarai, Frankfurt am Main, Germany, 2007

content


All-Russia Exhibition Centre, VDNKH

Moscow, Russia, 2010

With this spatial framework we face the classic task of modernizing the park typology to come in step with the innovative history and ambitions of VDNKh. Modern public spaces, streetscapes, parks and community complexes, have morphed into multi-experiential locations. The enormous attribute of VDNKh is a historical heritage that is made up of a collection of architecturally diverse pavilions and landscapes. The design must balance important, and ongoing, needs for stewardship of existing structures, infrastructure, and ecologies, while sustaining and further endorsing the underlying economy and resulting livelihood of the park. The mixed-ness and variation of program, open-spaces and the setting of the existing historic pavilions within VDNKh is an inspiration and an architectural starting point.

UNStudio


! ?

Provocation

Curiosity

+

Landscape

105 m Infrastructure

Typology

Comfort

Programming

Orientation

Anticipation

Balancing Urban Engagement Provoking Urban Engagement

UNStudio

*

Familiar

Surprise

Civicness

~

Repetition

Engagement

Pleasure

56 m 44 m 28 m 20 m


UNStudio


Павильон США

Дом Индии (БРИК)

India House (BRIC) (new)

US Cultural Embassy (64)

Дом Китая (БРИК)

China House (BRIC) (in Far East)

Дом Бразилии (БРИК) Brazil House (BRIC) (59)

Украина (СНГ)

Павильон ЕС

EU Pavilion (Ural)

Ukraine (CIS) (58)

Павильон Культурный Центр, Узбекистан

Cultural Center Pavilion, Uzbekistan (66)

Белоруссия (СНГ) Belarus (CIS) (18)

Туркменистан (СНГ) Turkmenistan (CIS) (15)

Азербайджан (СНГ)

(Интер)Национальная платформа Делового Взаимодействия International Business Exchange Platform (67)

(Интер)Национальная платформа Делового Взаимодействия International Business Exchange Platform (68)

Azerbaijan (CIS) (14)

Армения (СНГ) Armenia (CIS) (13)

Центр достижений РФ Federation Achievement Center (71)

Таджикистан (СНГ) Tajikastan (CIS) (12)

Казахстан (СНГ)

Kazakhstan (CIS) (11)

Павильон Россия

All-Russian Pavilion (1)

Молдова (СНГ) Moldova (CIS) (10)

Торговые павильоны G-20

G20 Trade Pavilions (6)

Торговые павильоны G-20

G20 Trade Pavilions (5)

Kyrgyzstan (CIS) Kyrgyzstan (CIS) (4)

Центр достижений РФ

Federation Achievement Center (2)

UNStudio

Аллея наций


DANCE PALACE

St.- Petersburg, Russia, 2009

The 21,000 m2 Dance Palace forms part of the European Embankment city quarter masterplan for a new urban square in the historic centre of St. Petersburg. Integration with the existing neighboring buildings is achieved by both the scale of the building - which in elevation follows St. Petersburg’s typical 28m roofline – and the transformative transparency which is introduced by a facade system of triangular cladding panels. The variation between opaque and perforated panels creates a controlled openness, depending on program, views and orientation.

UNStudio


Легенда Legend

Дворец Танца Dance Palace

Общественные автомобильные маршруты Public Automobile Routes Маршруты грузовых доставок Goods and Delivery Routes Общественные пешеходные маршруты Public Pedestrian Routes Маршруты к гостиницам Hotel Routes

Князь-Владимирский Собор Prince Vladimir’s Cathedral

Вход в общественную парковку General Public Parking Entry

Петропавловский собор Peter’s and Paul’s Cathedral

Биржа Stock Exchange

VIP вход и подъезд VIP Valet & Drop Off Area

Зимний Дворец Winter Palace

Вход обслуживания и доставки Truck Delivery Entrance Видовой коридор View Corridor

Совокупность культовых сооружений 1:8000 / Family of Iconic Landmark Buildings 1:8000

Площадь российских звезд балета Square of the Russian Ballet Stars

Дворец Tанца Dance Palace

Основной вход Main Entry Гостиница Hotel

Пешеходная набережная Pedestrian Embankment

Сохраняемая башня винодельни Preserved Tower of Vine Exchange

гибкая X-модель FLEXIBLE X-TYPE

связи объемов LINKED VOLUMES

вариации X-модели X-TYPE VARIATIONS

+40

Принцип разреза SECTIONAL PRINCIPLE

Принцип плана Малая Невка PLAN PRINCIPLE

PLAN PRINCIPLE

Malaya Neva River

B

A

ВЫСТРАИВАНИЕ СВЯЗЕЙ С ОКРУЖАЮЩИМ КОНТУРОМ ЗАСТРОЙКИ BUILDING UP RELATIONS TO THE NEIGHBORHOOD

Поворотный момент Pivotal Point

+28 B вариация 04 Variation 04

вариация 01 Variation 01

minor stage

B A

A

C

C

Основное фойе Grand Foyer

+28

Service &

Service & Private Spaces

вариация 05 Variation 05

Окна в город City Windows

A B

ANCHOR POINT

льный градостроительный и культурный контекст Театра Танцев требует

The Dance Palace’s unique urban and cultural context requires a maximum effort to

льной проработки для выполнения задач привлекательного архитектурного

achieve equally admirable architectural design, quality of programming, and a high

ния, соблюдения требований и высокой степени организационной

degree of organizational consistency. As an iconographic landmark building with an

тности. Как знаковое здание международного значения театр может стать

international allure, the theater contains potential to become a contemporary and

менным узнаваемым символом города, центром притяжения друзей танца и

recognizable symbol of the city, openly welcoming friends of dance and culture.

UNStudio

City Windows

Plaza Window

B

C

Service & Private Spaces

C

Вход в вестибюль Entry Vestibule Основной общественный вход Main Public Entry

B

A

C

ПЛАН 1:500 / SITE PLAN 1:500

entry Vestibule

НТР ПРИТЯЖЕНИЯ

A

Minor Stage

C

0

B

C

A

City Windows

Обслуживание и Приватные пространства

Service & Private Spaces A

Окна в город City Windows

Окно на площадь Plaza Window

B

0

VIP VIP Entry

VIP Entry

Малая сцена Minor Stage

Обслуживание и Приватные пространства

Музей и кафе Museum & Cafe

вариация 02 Variation 02

Вход GrandVIP Stage

Grand Foyer

C

B

Смещение пунктов назначения Distorted Target Points

+40

Малая сцена Minor Stage

museum & Cafe Фойе Pre-Stage

Основная сцена Grand Stage

C

A

Пространство для мероприятий Event Space

A

C

A

C

Сдвиг поворотного момента Shifted Pivot Point

вариация 03 Variation 03

вариация 06 Variation 06

вид 3 - со стрелки Васильевского Острова view 3 - from the Spit of Vasiljevsky Island

Main Public Entry

вид1- вдоль улицы Добролюбова view 1- along Dobrolyubova

вид 2 - с Дворцового моста view 2 - from the Palace Bridges


UNStudio


Structure

Program

plans

Помещения для артистов Spaces for Performers 1 Репитиционные помещения для танцев Dance Rehearsal Rooms 2.Репитиционные помещения оркестра Orchestra Rehearsal Rooms 3. Гардеробные Dressing Rooms 4. Квартиры Apartments 5. Спа Spa

Помещения для персонала и обслуживания Spaces for Staff & Service 1. Офисы преподавательского состава Creative Staff Offices 2. Офисы медицинского персонала Medical Staff Offices 3. Хранение декораций, сбор и ремонт Scenery Storage, Assembly & Repair

3

4

5 1

2

A B

1

2

Главная сцена Grand Stage Малая сцена Minor Stage

A 3

B 2 4

3 1

Помещения для зрителей Spaces for Visitors 1. Главная Вход Main Entry 2. Лобби в ”Городское окно” City Window Lobby 3. Кафе Cafe’ 4. Музей Museum

3

4 3

2

1

Помещения для артистов Spaces for Performers 1. Гардеробные Dressing Rooms 2. Оркестровое пространство Orchestra Spaces 3. Зона ожидания и подготовки Warm-Up & Waiting 4. Оркестровая ямы Orchestra Pit

UNStudio


UNStudio


UNStudio


LE TOISON D’OR

Brussels, Belgium, 2010

The mixed-use retail and residential complex is located on the Avenue de la Toison d’Or, between the two historical gates, the Porte Louise and the Port de Namur. Essential to the design is the urban context and the connection to the existing buildings. The strong verticality of the existing facade rhythm was continued in the design for the Toison d’Or building. The duality of the programme (retail and apartments) is translated into the façade design by means of V-shaped portals which act as a visual link between the two functions. These portals further create diversity and rhythm in the facade, in addition to emphasising the terrace spaces of the upper apartments.

UNStudio


Analyse het bestaand Avenue devan la Toison d’Or grid

Transitie van bestaand naar nieuw grid Analyse van het bestaand grid

Transitie van bestaand naar nieuw grid

Residenties

Commerce/Retail

Diversiteit door verspringingen in de geveldelen

V-elementen verweven beide programma delen

UNStudio


UNStudio


Nieuwstraat

€ Antoine Dansaert

Grote Markt

2.0 Stedelijke integratie Entre les Deux Portes

Avenue Louise/Avenue de la Toison D’or

Locatie

Warande Park

Commerce/Retail buurten in Brussel UNStudio

Koninklijke Musea voor Schone Kunsten van Belgiël

Koninklijk Paleis Brussel 8

Regentschapsstraat

Namense poort

Egmont paleis

Poelaert Plein

Gerechtsgebouw

Hilton Hotel

Avenue de la Toison D’or

Kleine Ring Brussel

Locatie Entres les Deux Portes Punt Louise Avenue louise

Halle poort

UNStudio

Stephanie Plein


Framing of environment

on hilt

Most important value of the project is location.

kon

ink

tel

ho

lijk

Pa

leis

The surrounding characteristics are highlighted through: - The dynamic avenue de la Toison D’Or - The two “Portes” Namur and Louse - Palace of Justice - Hilton hotel - Royal Palace These are mainly in the front, while the more residential and inner green courtyards are oriented to the back of the project. This dynamic difference between big scale public and small scale private is embedded within this project.

gerehtsgebouw

How does the project frame the environment on the level of city, building and apartment?

res

ide

UNStudio

nti

al

sca

le

n

g

e ard

Bru

sse

l


Exploration of terms:

frame cadre

city luxurious character very modern stylish bright shiny light flexible

public

privat

garden

UNStudio

stylish vivid fresh color accents cosiness comfort


6847

3

8461

8461

2820

8400 8400

UNStudio 7143

Floorplan 1:200 403

Verdieping 3

C

Brussel ELD Bouwaanvraag

Plan

O:\2009-28 Brussel ELDP\VO\Drawings\100 - plans\V103_03 Floor.dwg | printed by Tin

####

omschrijving

Verdieping 3

titel

V103

tekening nummer

schaal

1:100

tekening type

Bouwkundige randvoorwaarden06.09.2010

doel

datum

project naam

fase

2009-28

C

1000 Brussel

project nummer

architect

Quatre Brasstraat 6 bus 6

BVBA TD IMMO Invest

opdrachtgever

Brussel Entres les De

project naam

Apartment layout


6847

3

8461

Wine cellar

8461

2820

8400 8400 8400

UNStudio 7143

Floorplan 1:200 403

Verdieping 3

C

60150

B

Brussel ELDP

Plan

O:\2009-28 Brussel ELDP\VO\Drawings\100 - plans\V103_03 Floor.dwg | printed by Tina Kortmann

####

omschrijving

Verdieping 3

titel

V103

tekening nummer

schaal

1:100

tekening type

Bouwkundige randvoorwaarden06.09.2010

doel

Bouwaanvraag datum

project naam

fase

2009-28

0

N O C

1000 Brussel

project nummer

architect

Quatre Brasstraat 6 bus 6

BVBA TD IMMO Invest

opdrachtgever

Brussel Entres les Deux Portes

project naam

Apartment layout


C

B

A

800

6

2665

450

1430

1430

985

30

4

4

210

14%

20

20

992

1070

+ 0.00

4

escalier 4

+ 0.00

escalier 5

°

RF 120

990

EG

RF 30

RF 30

323

20

27

47

+ 0.00

440

RF 120

15 m2

SAS

RF 120

20 425

703

exterieur

EP

20

510

511

EP

840

15

3

200

compteur de gas

15

200

EP

15

455

840

gaine appartements EG

170

200

EG

20

EP

20

215

RF 30

8 m2

335

RF 30

780

780

60

43

280

100

93/231.5

157

RF 120 20

cabine haute tension

15

205

170

RF 120

RF 30

840

280

PL2

400

hauteur nette 170.0 cm

gaine appartements

832

position ascenseur à déterminer par l'acquéreur

RF 120

20

123/231.5

RF 120

347

20

60

60

778

RF 30

RF 120

EG

30

20

44

RF 30 +0.00

250

RF 30

30

RF 30

join de dilatation

44

33 m2

SAS

20

113

gaine commerce

gaine appartements

739

RF 120

270

+ 0.00

50

74

488

20

EP

+ 0.00

escalier 20

780

179

join de dilatation

17

19

RF 120

780

94

1212

9260

44

34

43

21

800

64

30

- exacte mur existant position a définir

210

6 m2

44

20

hauteur nette 157.5 cm

SAS

30

RF 120

210

270

-15.575

49

73

- exacte mur existant position a définir

330

RF 120

440

440

441

183

10 RF 120

420

22

440

10

puits d'ascenseur

7m2

SAS 277

RF 30

RF 30

20

20

20

20

48

72

10

200

20 85

240

9

15

17

16

SAS

escalier 22 commerce

130

RF 30

RF 120

123/231.5

20

gaine appartements

+ 0.00

1 2 7 8

6

13

12

11

10

14

20

40

93

200

200

compteur d'eau

60

60

780

110

55

1

2

3

4

5

6

7

8

9

10

5

4

3

2

1

400

16

09

RF 30

220

20

10

gaine haute tension

hydrofore

RF 30

13 12 11

- 0.350

420

840

20

18

20

25

33

42

10

14%

358

840

270

20 15

255

268

20

5 m2

RF 30

SAS

263

-0.30

RF 120

20

RF 30

6 m2

RF 30 RF 30

SAS

840

155

6 m2

SAS

780

780

RF 120

menage

10 117

2

10

Placard technique Commerce 4

RF 120

RF 30

8209

333

bureau

WC handicape

RF 120

460

65 m2

2506

20

8209

800

106

hauteur nette 154.5 cm

230

RF 30

90

RF 120 480

20

500

500

52

76

RF 30

RF 120

2

2 8479

8265

RF 120

Locaux de service

WC hommes

cuisine

250

-0.30

RF 30 20

20

résèrve commerce

WC femmes

60

60

60

+0.00

20

EP

51

-15.575

20

hauteur nette 170.5 cm

14%

rampe

305

1392

388

420

75

-15.575

228

Parking Privé

40

45

10

118 places

RF 120

631

rampe

840

20

205

-14.025

10 m2

SAS

44

10

80

gaine appartements

193

223

15 14

420

RF 120

escalier 6

20

RF 120

100

RF 30

3m2

SAS

RF 30

170

-15.575

PL2

200

15

compteur de l'électricité

5m2

20

EG

4469

RF 30

SAS

puits d'ascenseur

186/231.5

175

hydrofore

170

-15.575

832

47

172

RF 30

1832

2512

RF 120

20

186/231.5

15

20

20

46

71

157

211

EG

780

RF 120

bureau

RF 120

780

60

417

200

compteur de l'électricité

420

840

233

local ménage

170

RF 30

45

70

800

20

32

41

10

15 20

55

RF 30

497

Placard technique Commerce 2

15

10

10

4 m2 RF 30 RF 120

20

25 20

69

250

200

670

compteur de l'électricité

1710

200

compteur de gas

10

223

SAS

250

40

92

08

07

40

31

10

30

20

60

10

100

93/231.5

15

232

150

20

07

15

44

68

91

4101

RF 120

24

23

80 150 200

240

226

115

170

20

30

10

780

10

hauteur nette 235.0 cm

RF 120

10 70

190

200

compteur d'eau

EG

09

420

10

08

10 unités

250

90

06

22

39

10

30

38

200

29

10

289

10

20

50

70

RF 30

123/231.5

20

233

1256

06

14

43

800

05

45 unités

celliers privés

07

21

200

270

10

440

RF 30

253

RF 30

253

130

RF 30

20

gaine appartements

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

06

795

250

2251

67

2015

RF 120

forage 2

zone de forage

3025

37

28

10

36

200

27

10

celliers privés

150

20

385

80

RF 30 RF 30

17 m2

635

335

+ 0.00

RF 120

SAS

709

9

8

17

16

15

14

13

12

11

10

10

05

13

42

66

89

04

20

10

487

120

20

puits d'ascenseur

RF 120

258

8 m2

SAS

RF 120

172

42

20

123/231.5

RF 30

RF 120

7

6

5

4

3

2

1

3

3

400

150

escalier 1

420

840

10

05

04

20 25

40

03

19

26

35

245

204

10

hydrofore

245

47

60

RF 30

RF 30

88

20

120

+ 0.00

RF 120

100

158

RF 120

RF 120

gaine 3

233

20

02

18

9

8

7

6

5

4

3

2

80

RF 30

03

RF 120

2m2 150 20

20

02

SAS

413

9 m2

93/231.5

20

24

04

03

RF 30

12

11

101

41

87

RF 120

40

800

17

400

20

escalier 3

RF 120

RF 120

2692

20

RF 30

19m2

SAS

RF 120

RF 30

RF 30

450

433

468

PL1 170

20

399

RF 120

32

hauteur nette 330.0 cm

résèrve commerce

Grille h=4.0 m Grille d'extraction de fumée 8m2

RF 30

20

11 m2

170

230 20

420

Telecom

20

11 10

65

01

15 14 13 12

64

RF 30

SAS

01

20

-15.575

RF 30

RF 30

hauteur nette 330.0 cm

20

86

RF 30

170

18 17 16

150

gaine 1

RF 30

+ 0.00

escalier 19

RF 120

32

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

32

30

28

510

440

884

02

10

39

63

20

PL1

-15.575

local ménage

20

20

20

20

20

840

2216

RF 30

RF 30

20

220

projéction facade

840

20

RF 30

60

25

60

220

681

RF 120

780

RF 120

780

RF 120

ancrage facade

225

24

23

840

26

1200

28

projection plafond niveau 01

7328

55

79

800

25

plinthe (suit la pente de la rue)

3238

105 m3

97

108

27

position mur exterieur sous-sol

225

54

53

107

réservoir eaux pluviales

78

40

95

77

80

dimensions

26

759

-15.575

40

RF 30

escalier 3

escalier avec rampe

25

Ventilation

commerce

files dimensions

20

492

Ventilation RF 30

150

extraction de fumée parking 13m2

333

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

28 places

440

150 20

garage velos

extraction de fumée

°

557

16

17

18

19

20

21

22

23

09

639

80

outlet gaine 1

24

,77

93

1.175-P

RF 120

gaine 2

14%

rampe

1992

EP

01

exterieur

files

dimensions

dimensions

08

RF 120

rampe

outlet gaine 2

SAS

-15.575

6 m2 RF 30

Tour de refroidissement

1070

20

extraction de fumée 13m2

Ventilation

86

Grille h=2.0 m Grille d'extraction de fumée 15m2

10

16

357

2488

150

10

5

795

80

2665

4

975

thermopompe

745

160m3

40

565

438

RF 120

217

10

10

RF 30

20

250

exterieur

5

5

20 20

50

20

files

dimensions files

dimensions exterieur

6

-15.575

gicleur d'incendie

190

44

RF 120

85

43 m2

11

245

150

1

20

1050

dimensions

6

800

795

382

130

150

dimensions

/652/671 Plans BA-651

exterieur

files

dimensions

dimensions

/652/671

Plans BA-651

6

5

80

20

9 m2

SAS

°

,77

93

20

12

13

SAS

20

10

giron 24cm contre marche 17.5cm

235

4m2

100

C

B

745

pompe gliceur d'incendie

RF 30

150

14

269

80 6832

20 200 10 200 10 150 20 230 170

990 20 180 20

A

1030

80 440 20 186 24 840

193 467 752 98 193 1158

20

,23 86

281 20

1456 1449 ,23

20

159

10 50 20

20 370 20

outlet gaine 3

giron 24cm contre marche 17.5cm

15

giron 24cm contre marche 17.5cm

130 420 550

580 1100

SAS

300

10 10 10 10

215 195 150 20 230 20 150 190 15 20 550 585 550 550

20

giron 24cm contre marche 17.5cm

400

715

550 1095

150 10 385 20 150 20 360

-15.575

2

1152 193 35

20 245

20

1380 216 88 956 40 776 88 776 40 776 88

escalier 1

98

1825

56

80

30

840

155

840

1670

200

40

100

92

section de la colonne variable

100

1515

96

99

60

1630

225

840

EP

155

59

240

685

101

4067

4067

20

20

225

685

la rue)

910

4350

910

210

position ascenseur à déterminer par l'acquéreur

656

111

800

la pente de

sous-sol

plinthe (suit

position rampe

section de la colonne variable

604

escalier 23 commerce

position ascenseur à déterminer par l'acquéreur

596

plinthe (suit la pente de la rue)

155

escalier 21 commerce

30

emplacement réserve pour escalator

60

20

58

57

100

82

110

81

emplacement réserve pour escalator

109

840

35 100

40 485

840

15

240

840

130 30 14 20

2

17

8479

500

13 21

420

12 22

420

11 23

420

30

20

20

112

102

240

100

840

3920

92

3920

240

225

240

3866

25

93/231.5

20

1480

240

section de la colonne variable

110

section de la colonne variable

110

240

846

344 m2

Commerce 4

+0.00

RF 120

1581 m2

Commerce 3

+0.00

RF 120

1468 m2

725

725

1369

1435

Commerce 2

+0.00

805

RF 120

640 m2

Commerce 1

-0.30

projéction facade

30

29

846

32

31

PL14

3610

+0.00

240

2530

34

84

33

61

800

805

412

36

550

RF 120

SAS

62

155

500

225

RF 120

2529

104

19 m2 1295

RF 120

38

+0.00

170

83

189

AD

103

114

35

40

20

RF 30

113

840

37

1480

170

PL14

-13.825

RF 30

RF 30

1

° 978 32

10 24

132 20 600 20

350 20 230 20

9 25

740 20 230

8 26

15 425 20 230

6 28

350 5 29

20

15

2 32

105

-15.575

200

1

40

20

1

+0.00

155

20

2045

section de la colonne variable

100

1

189

100

RF 30

escalier 2

escalier 2

420

15

115

1

60

110

280

100 200

section de la colonne variable

100

840

940

846

117

840

426

80

155

846

niveau 01

20

225

118

1020

233

190

section de la colonne variable

section de la colonne variable

section de la colonne variable

section de la colonne variable

270

280

30

181

30

EP

0

R27

160

12

30

30

80

R240

282

80

280

282

266

-

160

de porte coulissante 2 segement 340.0/ 222.5

240

Entrée Commerce 4/ Sorti de secour

existant sous-sol

879

10

Grille d'extraction de fumée 30 m2

exterieur sous-sol

610

RF 120

RF 120

position mur

position mur

755

755

370

680

Grille d'extraction de CO 2.8 m2

position mur exterieur sous-sol

225

20

20

projection plafond

section de la colonne variable

110

20

plafond niveau 01

155

110

section de la colonne variable

95

130

250

280

-14.025

116

1620 40 150 20 275 40

989

300

990 20 600

170 20

20 360

3 31

25 20 250 250 250 15 60

420

30

80 5793

420

3

170 20 245

20 245 20 240 20

1 giron 24cm contre marche 15cm

1113 193 69 130

95

°

420

5

40 240 240 515

4 30

10 16 18

10

20 19

240 30 530 40 485

7 27

10 130 345

,88

3

1600 1825 1650

150 20 125 25 125 40

96

420

,88

420

96

639

0

1430

R24

1430

20 300 20

385 380 60 30 60 380 385

160 1540 40 150 20 275 40

R270

position mur exterieur sous-sol

30 240 1430 20 190 20 295

position mur existant sous-sol 120.0/ 252.5

dimensions files

dimensions exterieur

position rampe

position rampe

exterieur

files

dimensions

dimensions

sous-sol

sous-sol

Entrée Commerce 3/ Sorti de secour

Entrée Commerce 2/ Sorti de secour

Entrée Parking Public/ Sorti de secour

Entrée Commerce 1/ Sorti de secour

423

files

exterieur dimensions

dimensions

dimensions files

dimensions exterieur

dimensions files

40 420 840 420 180 840 840 840 840 714 40

dimensions exterieur

6015 dimensions exterieur

mur existant - exacte position a définir 41

dimensions files

20

30

20

340

1042

268

193

°

220.0/ 252.5 220.0/ 252.5 220.0/ 252.5 220.0/ 252.5

dimensions files

40 420 840

dimensions files dimensions exterieur

6015

dimensions exterieur

20

150

410

15

352

181

350

8

1620 90

270 250 240 240 240 225 155 85 210 85 155 225

420 180 840 840

200 90 1480 200

240 240 240 225 155 100 100

80

155

701

225

20

840

200

240

211

240

20 150

1479

250

10

240

20 150

840

10

225

700

155

160

100

10

200

giron 24cm contre marche 17.5cm

100

184

80 155

150

714

10

260

20

655

240

240

1248 20

93/231.5

20 80

40

670

dimensions files

155 569

93/231.5

20 352

93/231.5

618

30

93/231.5

UNStudio 1363

80

C

B

A

C

B

A

continue vers parking "2 Portes" a specifier par Interparking

rampe d'accès modifiée

x,xx

EG

EP

x,xx

Afgewerkte vloer doo Bestaande vloerhoogt (ten opzichte van lam

Nader te bepalen Uitzettingsvoeg

Niveau fini coupe (relatif au niveau P) Niveau de plancher existant (relatif au coordonnees lambert)

Affectation a définir Join de dilatation

Afgewerkte vloer plan

Regenwater

+x.xx Niveau fini plan (relatif au niveau P)

Rijrichting

Sens de la circulation

Eaux pluviales

Vuilwaterafvoer

Mindervalide parkeer

Parking handicapes

Niveau P=0.00=+7 (lambert coordinaten

Gras

Hout

Mos-sedum

Installatie-rooster

Gazon

Grille installation

Mos-sedum

Bois

A1

H1

G1

F1

E1

D3

D2

D1

C3

C2

C1

B1

Translucent glas

Crépi / Witachtig Natuursteen / Blauw Dakpannen / Donker

Crépi / Blanc cassé Pierre naturelle / Bleu Tuiles / Foncées

Transparant glas

Verre transparent

Aluminium raam profielen / G

Métal / Blanc cassé

Geëmailleerd glas

Metaal / Witachtig

Métal / Champagne

Menuiseries aluminium / Doré

Metaal / Champagne

Métal / Doré

Verre émaillé

Metaal / Goudachtig

Pierre naturelle / Blanc cassé

Verre translucide

Glas vezel versterkt beton / W Natuursteen / Witachtig

Béton arme fibre de verre / Blanc cassé

30 min brandwerend

B

B

C

A

A

6

6

5

6 5

5

6 5

4

4

4

4

Hydrant en brandhas

Raccord pompier et dévidoir 30m

C

240 min brandweren Hydrant en brandhas

240 min résistance aux feu Raccord pompier et dévidoir 20 m

90 min brandwerend

60 min brandwerend

120 min brandweren

90 min résistance aux feu

60 min résistance aux feu

120 min résistance aux feu

30 min résistance aux feu

1:100

échelle

16.11.2010

date

ELDP

nom du projet

1000 Bruxelles

O:\2009-28 Brussel ELDP\VO\Drawings\100 - plans\V196_Parking-4.dwg | printed by Tina Kortmann

description

Plan Sous-Sol -4

titre

BA-196

numéro du dessin

plan

type de dessin

objectif

Permis de construire

phase

2009-28

numéro du projet

architecte

architecte

maître d'ouvrage

Signature

Quatre Brasstraat 6 bus 6

BVBA TD IMMO Invest

maître d'ouvrage

Entre les Deux Portes

nom du projet

Nieuw beton

Béton nouveau

Gipsblokken Lichte scheidingswand Isolatie

Blocs de plâtre Cloison légère Isolation

Kalkzandsteen

Bestaand beton

Maçonnerie nouveau Béton existant

Grès calcaire

Afbraakwerken Nieuw metselwerk

Démolition

Bestaand metselwerk

V196_Parking-4.dwg

nom du fichier

1m m

4 9 3

Maçonnerie existant

0

révision

secteur

Belgique

1000 Brussel

Hoogstraat 159

Pays-Bas

1070 AJ Amsterdam

P.O.Box 75381

Stadhouderskade 113

architecte

T

T +32 (0) 2 469 15 13

Opmerking - Remarques: 1.- Deze plannen zijn onze eigendom en mogen enkel worden overgemaakt aan derden mits onze toestemmin - Ces plans sont notre propriété et peuvent uniquement être reproduits et/ou transmis à un tiers avec notre 2.- Tijdens de uitvoering zullen alle tegenstrijdigheden met onze plannen ons worden gemeld - Pendant la phase d'exécution toutes les contradictions avec nos plans devront nous être communiquées 3.- Maten en aanduidingen zijn indicatief en dienen ter plaatse gecontroleerd te worden - Measures ou autres indications sont indicatives et doivent être vérefiées en situ

RF 240

RF 120

RF 90

RF 60

RF 30

Sécurité incendie

Hout

Uitzettingsvoeg

Join de dilatation

Metaal / Goudachtig Metaal / Champagne Metaal / Witachtig Transparant glas Translucent glas Geëmailleerd glas Aluminium raam profielen / Goudachtig Crépi / Witachtig Natuursteen / Blauw Dakpannen / Donker

Métal / Doré Métal / Champagne Métal / Blanc cassé Verre transparent Verre translucide Verre émaillé Menuiseries aluminium / Doré Crépi / Blanc cassé Pierre naturelle / Bleu Tuiles / Foncées

C1

C3

D1

D2

D3

E1

F1

G1

H1

C

B

C

B

A

6

6

5

6 5

5

6 5

4

4

4

4

3

3

3

3

1:100

échelle

16.11.2010

date

ELDP

nom du projet

1000 Bruxelles

O:\2009-28 Brussel ELDP\VO\Drawings\100 - plans\V100_00 Floor.dwg | printed by Tina Kortmann

description

Res de Chaussée

titre

BA-100

numéro du dessin

plan

type de dessin

objectif

Permis de construire

phase

2009-28

numéro du projet

architecte

architecte

maître d'ouvrage

Signature

Quatre Brasstraat 6 bus 6

BVBA TD IMMO Invest

maître d'ouvrage

Entre les Deux Portes

nom du projet

0

4 9 3

V100_00 Floor.dwg

nom du fichier

1m m

révision

secteur

Belgique

1000 Brussel

Hoogstraat 159

Pays-Bas

1070 AJ Amsterdam

P.O.Box 75381

Stadhouderskade 113

architecte

T

T +32 (0) 2 469 15 13

5m m

Rue

Rue

Hydrant en brandhaspel 30 m

A

240 min brandwerend Hydrant en brandhaspel 20 m

240 min résistance aux feu

Raccord pompier et dévidoir 30m

120 min brandwerend

90 min brandwerend

60 min brandwerend

Raccord pompier et dévidoir 20 m

120 min résistance aux feu

90 min résistance aux feu

60 min résistance aux feu

30 min résistance aux feu

Opmerking - Remarques: 1.- Deze plannen zijn onze eigendom en mogen enkel worden overgemaakt aan derden mits onze toestemming - Ces plans sont notre propriété et peuvent uniquement être reproduits et/ou transmis à un tiers avec notre accord 2.- Tijdens de uitvoering zullen alle tegenstrijdigheden met onze plannen ons worden gemeld - Pendant la phase d'exécution toutes les contradictions avec nos plans devront nous être communiquées 3.- Maten en aanduidingen zijn indicatief en dienen ter plaatse gecontroleerd te worden - Measures ou autres indications sont indicatives et doivent être vérefiées en situ

RF 240

RF 120

RF 90

RF 60

RF 30

30 min brandwerend

Natuursteen / Witachtig

Pierre naturelle / Blanc cassé B1

C2

Sécurité incendie

Glas vezel versterkt beton / Witachtig

Béton arme fibre de verre / Blanc cassé A1

Matériaux

Nader te bepalen

Bestaande vloerhoogte (ten opzichte van lambert coord

Affectation a définir

Niveau de plancher existant (relatif au coordonnees lambert)

Afgewerkte vloer doorsnede (te

Afgewerkte vloer plan (ten opzi

+x.xx Niveau fini plan (relatif au niveau P) Niveau fini coupe (relatif au niveau P)

Vuilwaterafvoer

Niveau P=0.00=+70.40 (lambert coordinaten systeem)

Regenwater

Niveau P=0.00 du projet =+70.40 (systeme de coordonnees lambert)

Eaux pluviales

Rijrichting

Mindervalide parkeerplaats

Parking handicapes Sens de la circulation

Mos-sedum

Gras

Installatie-rooster

Mos-sedum

Gazon

Grille installation Bois

Egouts

AD

Niveau fini

Isolation

Niveau P=0.00 du projet =+70.40 (systeme de coordonnees lambert)

Execution

+x.xx

Isolatie

Cloison légère

Matériaux

Legende

EG

Gipsblokken Lichte scheidingswan

Blocs de plâtre

Egouts

AD

Niveau fini

+x.xx

EP

Nieuw beton

Béton nouveau

Kalkzandsteen

Bestaand beton

Grès calcaire

Afbraakwerken Nieuw metselwerk Béton existant

Bestaand metselwerk

Maçonnerie nouveau

Maçonnerie existant Démolition

Execution

Legende

Plan: Ground floor

dimensions exterieur

Plan: Level -02

540

250

80

250

80

70

1255 253

200

20

701

173,12° 173,12°

300

20 123

80


rn

Co

.4

3

C

B

A

C

B

A

.0

75

+81.40

93

+

.6

4

.3

78

+

9

9

.9

90

+

/652/671

exterieur

6

6

800

800

+82.60

.6

3

6

87

+

77

+

6

dimensions files

dimensions exterieur

rn Co

iche

0

.8

5

5

.4

74

+

7

5

795

5

795

2665

2665

77

+

5

1430

1430

.2

+8100 (to be measured)

exisiting

4

.6

89

+

Courtyard

rn

Co

iche

4

4

1070

1070

4

4

.0

18 20 88

74

+

306

47

45

45

92

34

s.d.b.

189

289

40

30

271

dimensions

255

10

7

.5

10

140

140

buanderie

76

+

341

120

WC

10

50

562

17 17

Buanderie

255

Cuisine

10

239

20 20

90

s.d.b.

140

155

10

10

10

100

838

944

entrée

160

10

60

270

60

10

100

326

211

entrée

20

55

séjour

476

10

402

10

90

10

10

40

10

10

646

10

216

548

160

Hall

100

100 20

225

135

160

Hall

10

10

510

100

20

10

10 100

93

PL1

34

225

135

51

65

34

20

170

20

390

420

20 20

140

150

14

Hall 150

20

420

20

381

261

371

20 20

140

170

322

RF 30

715

20

135

s.d.b.

20

20

135

135

108

135

s.d.b.

247

60

34

14

Hall 358

20

14

135

14

giron 24cm contremarche 17.5 cm

escalier 7

14

20

390

20

Chambre 1

417

230

715

10

390

110

+15.225

230

escalier 12

298

34

entrée

34

dressing

20

840

20

525

s.d.b.

247

341

chambre 1

357

120

.2

160

10

341

10

135

3

3

135

93

20

154

254

365

10

3

135

Chambre2

10

14

110

135

390

135

5

R7

wc

20

130

s.d.b.

20

100

Hall

160

10

135

10

10

439

90

WC 169

34

34

2868

135

34

34

34

40

10

10

90

10

438

135

269

Cuisine

Buanderie 169

20 20

140

90

WC

135

10

723

10

10

20

34

806

34

10

159

entrée

100

10

10

135

390

20

34

100

425

90

WC 10

10

10

100

100

255

255

420

10

93

170

120

10 17

10

840

10

425

90

wc

365

34

Séjour

60

3 .9

10

10

40

135

Chambre 2

20

390

s.d.b.

135

10

74 +

161

160

10

20

160

247

376

20

Chambre 1

135

10

715

48

525

135

135

715

341

séjour

381

139

358

135

262

s.d.b.

135

Séjour

618

525 escalier 8

34

34

0

34

34

794

+4850

135

20 403

93

808

110

432

798

715

120

10

Hall

20

10

389

s.d.b.

135

247

20

135

17

10

60

160

Hall

170

432

420

367

10

840

10

120

10

100

27

45

34

160

10

135

135

170

90

wc

367

10

10

2

135

160

10

10

14

2

40

157

20

4

80

130

4

160

Hall

12 10

10

135

10

257

s.d.b.

367

389

20

135

100

427

90

WC

10

10

135

170

118

183

10

156

cuisine

10

69

40

230

6

20

398

367

426

20 2

135

s.d.b.

90

88

230

+11.375

420

24

wc 90

69

10

51

+11.375

93

6674

6691

355

257

4

2

10

10

157

90

90

365

257

236 195

160

74

4

20

4

planchet de commerce 5

+5.895

58

55

245

309

420

40

41

42

43

44

34

35

36

37

38

39

40 57

63

45

20

20 100

122

34 307

170

Balcon

420

840

113

195

305

100

233

225

840

43

+18.725

112

WC H

248

10

10

10

10

112

1613

39

Balcon

accès terrasse

183

140,00°

110

Séjour

10

454

447

EP

328

57

s.d.b.

342

730

840

Balcon

2

840

610

123

161

506

36

89

20

2097

120

840

5

17

10

50

77 10

10

220

220

10

dressing

57

s.d.b.

107

840

10

R75

447

Couloir

90

17

225

10

230 129

s.d.b.

120

wc

287

102

248

90

90

10

wc

120

100

263

14

20 14

194

558

10

282

194

209

307

838

100

280

20

280

100

80

wc

giron 24cm contremarche 17.3 cm

10

545

s.d.b.

244

194

Chambre

251

+11.375 EXIT

369

93

143

928

wc

931

Hall

57

93

560

820

90

90

10

R75

143

Hall

159

70

20

2

20

506

336

342

90

20,00°

840

90

2

560

15

75

10

107

70

840

10

10

PL5

170

20

3268

15

40

662

60

195

2

2023

20

506

322

840

2

195

2

2

342

14

20 14

10

100

342

662

40

300

77

10

100

14

20

EP

120

wc

613

+

506

R75

560

365

50

447

93

9 .6 72

603

626

Balcon

300

2

57

220

s.d.b.

220

785

90

10

Séjour

740

506

10

220

10

48

10

140,00°

90

90

dressing

220

s.d.b. 161

685

57

s.d.b.

375

10

107

140,00°

194

269

5

98

254

R200

328

10

90

90

255

5

49

49

324

140

s.d.b.240

10

275

215

EXIT +11.375

227

EXIT +11.375

53

98

98

EXIT +11.375

114

EXIT +11.375

80

5

35

288

10

11

14

49

81

90

49

59

31

45

s.d.b.

90

90

838

235

260

140

10

19

59

10

11

8

54

10

34

34

34

34

49

49

489

100

10 60

83

103

RF 30

entrée

103/231.5

10

44

10

10

9

8

7

6

5

4

3

2

1

163

10

160

21

11

12

13

14

15

16

17

18

19

20

103

10

230

295

350

230

+18.655

10

90

90

40

846

81

Hall

11

12

13

14

15

16

17

18

19

20

21

trappe

trappe

194

387

20,00°

90

90

448

342

s.d.b.

195

entrée

26

70

46

26

26

10

10

107

10

10

dressing

20

180

10

Hall

57

387

s.d.b.

R75

RF 30

60

10

10

60

55

1

250

495

10

20

R75

150

342

662

40

20

Hall

280

405

395

10

20

20

18 17

11

12

13

14

15

16

10

34

34

34

dressing

10

10

80

240

240

60

93

620

228

diner

1

2

3

4

5

6

7

8

9

10

34

34

34

199

199

10

10

125

30

Buanderie

10

95

wc

20

10

125

95 wc

230

220

160

wc

90

+18.655

Balcon EP

Cuisine

21 20 19 18

342

44

10

1

2

3

4

5

6

7

8

9

10

44

83

100

846

14

2014

20 14

776

815

1001

222

diner

10

609

séjour

57

Séjour

299

300

520

90

90

Bureau

582

° 40,00

cuisine 241

chambre 1

472

Bureau

527

527

Bureau

532

Séjour

601

107

10

582

407

417

diner

séjour

681

566

606

581

235

s.d.b.

chambre 1

10

chambre 2

502

90

582

10

séjour 502

90

394

241

chambre 1

séjour

Séjour

séjour

69

Séjour

395

90

90

80

429

429

dressing 161

10

900

10

1006

7 .0 71 +

846

840

119

11

12

13

14

15

16

17

80 20

40

10

escalier 17

20

Buanderie

10

70

40

10

57

10

10

50

10

escalier 15

230

230

+18.655

wc

90

160

WC

s.d.b.

249

80

cuisine

17

634

Buanderie

34

10

21

20

19

18

17

16

15

14

13

12

11

21 20 19

dressing

80

161

escalier 17

230

+11.375

594

200

10

1011

17

280

395

200

600

34 10

27

10

9

8

7

6

5

4

3

2

1

20

230

Appartement

Cuisine

Cuisine

190

10

WC

Appartement

404

21

20

19

18

17

16

15

14

13

12

11

20

9 222 38

Cuisine

Buanderie

342

248

15

10

75 20

190

s.d.b.

10

10

464

150

280

640

388

840

s.d.b.

cuisine

90

90

Appartement

10

trappe

cuisine 359

entrée

10 75

10

entrée

Balcon

208

10

9

8

7

6

5

4

3

2

1

10

diner

44

83

Appartement

34

404

cuisine

10

s.d.b.

s.d.b.

R75

65

10

10

EP

228

240

10

805

20

372

Balcon

90

WC

280

20

entrée

s.d.b. 260

10 75

buanderie

Chambre 2

275

103/231.5

100

Hall

100

100

R75

s.d.b.

158

100

275

Hall

1

1

+11.375

WC

10

55

local a 204 menage

260

10

entrée

240

228

escalier 15

chambre 2

Balcon

248

83

44

250

RF 30

110

103/231.5

7 29

dressing

180

25

0

10

510

10

175

34

52

75

210

local a menage

26 34

32

26

Appartement

119

trappe

194

194

76

20

porte a galandage (ferme en cas d' incendie)

dressing

Chambre 2

10

Chambre 1

460

460

Chambre 1

10

350

51

51

+11.375

Chambre 2

Chambre 2

1

2

3

4

5

6

7

8

9

10

20

2 28

93

620

Hall

escalier 16

144

trappe

Lobby

467

dressing

10

57

846

+18.655

145

21

dressing

840

369

324

90

18 19 20

plantes

escalier 14

0 10

10

309

230

230

WC

626

16 17

51

80

buanderie

10

15

240

662 40

chambre 2

porte a galandage (ferme en cas d' trappe incendie)

+11.375

s.d.b.

420

194

37

36

35

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

+11.375

s.d.b.

21

20

19

18

17

16

15

14

13

12

11

10

230

260

1

228

Appartement

449

escalier 2

764

Chambre 1

s.d.b.

279

Chambre 3

245

Balcon

215

0

R20

00 R2

Balcon

245

Balcon

0

R20

R200

218 231

10

10

escalier 16

81

221

Chambre 1

406

Chambre 3

236

419

10

9

8

7

6

5

4

3

2

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

chambre 1

240

s.d.b.

trappe

100

Balcon

80

49

130

5

WC

179

s.d.b.

183

90

90

dressing 194

10

840

tunnel technique accessible sous le niveau 2

90

190

10

trappe

chambre 1

369

feu portes coupe d' incendie) (ferme en cas

194

10

16

20

100

Chambre 2

240

Cuisine

14

100

R200

R200

35

369

100

164

SAS

203

1

+9.60

0 .0 72 +

53

+9.60

SAS

220

99

230

244

254

260

10

17

164

SAS

0 .9 70

100

838

+

avant la marche

Cuisine

256

SAS

49

salle403de jeu

403

étagères

156

5

1146

Chambre 2

2

1063

10

10

90

90

685

10

93

trappe

s.d.b.

Séjour

342

83

2

107

840

44

dressing

447

17

195

étagères

séjour

ventilation PL 6

589

531

369

sous le niveau

chambre 4

Couloir

120

613

534

514

RF 120

813

accessible

trappe

Chambre 1

10

wc

545

10

560

2

228

10

Couloir

Chambre 1

Balcon

Balcon

14

EP

248

15

240

chambre 3

Groupe 2

228

240

Séjour & Cuisine

57

20

90

90

tunnel technique

+9.60

118 m2/ 24 enfants

2

plantes

856

+11.375

59

194

194

1875

plantes

10

44

83

840

Appartement

entrée

cuisine 214

240

228

RF 30 103

103/231.5

20

20

306

chambre 2

170

Balcon

Balcon

20

2

Balcon

248

83

44

10

170

170

chambre 2

chambre 1

195

75

424

260

240

228

Séjour & Cuisine

+18.655

Hall

10

10

2

10

+18.655

RF 30

820

159

928

3723

15

10

10

44

trappe

+11.375

EXIT

+11.375

Hall

5

R7

80

10

RF 30

+11.375

2721

928

840

107

escalier 18

contremarche

giron 24cm 17.3 cm

,00° 140

140,0

940 103/231.5

154

trappe

879

10

83

60

escalier 13

928

103/231.5

10

545 escalier 13

215

s.d.b.

90

90

marche 533

Chambre

215

545

aire de jeu

533

545

15

10

escalier 18

WC

10 85

238

10

90

90

183

840

dressing194

Crèche 2

s.d.b.277

RF 120

244

331

369

chambre 1

119

Chambre 2

10

14 20

39

50

36

5 .1

100

0° 140,0

14

54

54

49

94 +

2

iche rn Co

369

25

sous le niveau

WC/ change

208

accessible

trappe

extensive green

34

+11.375

EXIT

60

103/231.5

103

+9600

34

34

100

RF 30

Courtyard

354

Chambre 3

90

90

176

banquette

10

projection plafond

Couloir

552

45

183

397

122

133

Séjour

806

359

60 10

8209

17

120

8209

83

banquette

44

90

90

concièrge

trappe

167

s.d.b.

escalier 25

+11.375

260

2

786

465

467

tunnel technique

1460

177

Loge concièrge

projection plafond

Chambre 1

262

10

220

Chambre 2

Cuisine

240

629

Cuisine 20

93

15

228

2 8479

40

342

15

20

170

Lobby

2521

731

775

763

762

57

56

55

54

53

52

51

50

49

48

47

46

45

20

161

2

840

+11.375 EXIT

590

240

8479

banquette

14

342 398

248

40

Balcon

228

314

10

EP

1079

245

233

245

+9.115

1398

WC F

109

775

37

37

616

Personnel

dressing

Chambre 4

236

20

270

393

328

194

147

1040

Chambre 1

s.d.b.

129

63

44

90

3

112

305

255

trappe

maintenance/ remise

.3 74 +

34

305

90

358

539

gaine crèche

vestiaire

10

153

banquette

655

113

20

tunnel technique accessible sous le niveau 2

2 40

4

2

67

90

90

bord de planchet

4 45

44

402

2

30

55

146

45

44

160

45

Buanderie

Cuisine

405

44

74

buanderie

257

s.d.b.

256

escalier 10

Chambre 2

100

135

0 .5

44

74 +

135

chambre 2

366

20

422

420

Appartement

100 10

144

45

Buanderie

Cuisine

40

10

60

124

389

20

Chambre 2

10

256

165

156

s.d.b.

257

Séjour

20

548

93

50

4 45

695

794

34

60

60

entrée

10 124

buanderie

chambre 2

WC

Chambre 1

PL2

20

390

420

+

1 .3 95

45

10

cuisine

10 90

10

10

170

10

135

séjour

427

28

27

26

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

840

10

120

10

100

iche rn Co

60

160

entrée

+15.925

34

34

14

135

20

341

s.d.b.

247

RF 30

27 60

358

20

390

420

chambre 1

135

escalier 08

+9.625

715

20

Chambre 1

s.d.b.

261

giron 24cm 17.5 cm contremarche

20 20

635

chambre 1

giron 24cm contremarche 17.5 cm

420

10

34

120

Appartement

s.d.b.

escalier 11 525

Hall

20

20

93

17

390

431

34

10

Private Garden

420

20

525

322

intensive green

261

s.d.b. 355

20 20

139

34

Chambre 1

4

.2

75

48

+8.925

+

135

170

10

séjour

34

27

+15.225

14

110

730

s.d.b.

20

14

60

10

140

20 20

390

20

40

Séjour

130

R75

Hall

417

118

730

s.d.b.

100

160

escalier 11

341

135

34

806

60

10

135

chambre 2

371

20

60

390 135

140

420 20 20

entrée

dressing

840

10

120

170

420

Cuisine

155

135

160

Hall

10

135

10 60

60 27

35

séjour

Buanderie

14

806

170

730

840

110

120

10

390

20

Chambre 2

379

s.d.b.

wc

90

169

269

Cuisine

269

+9625

+5100 (check!)

Buanderie

269

10

255

s.d.b.

255

Appartement

intensive green

chambre 1

s.d.b.

420

439

wc

378

20

390

420

20 20

140

34

365

cuisine

155

390 290

chambre 1

buanderie

Appartement

378

34

Private Garden

s.d.b.

268

buanderie

168

cuisine

110

10

intensive green

34

34

34

120

420

Garden/ Playground

3321

10

34

buanderie

269

cuisine

10

s.d.b.

269

chambre 2

379

20

390

Appartement

10

135

Chambre 2

10 90

730

14

10

60

140

20 20

390

20

Cuisine

17

Vestiaire

265

Séjour

372

Séjour

840

120

100

100

WC

90

s.d.b.

364

160

10

10

entrée

10

118

254

chambre 1

Chambre 1

417

420

367

20

390

420

10

154

806

60

730

34

cuisine

34

27

60

Appartement

10

372

372

840

10

10

séjour

séjour

10

337

108

R75

34

108

73

140

+

0

20 20

20 135

390

intensive green

337

120

Hall

20

10

60

230

34

135

Private Garden

+15.925

135

34

34

230

230

34

110

escalier 12

298

10 120

+9.625

34

34

10

escalier 07

261

20

+8.925

150

135

34

34

PL1

355

s.d.b.

10

170

135

chambre 3

371

20

390

Chambre 3

235

Séjour

17

10

135

Séjour

730

R75

14

10

60

60

140

20 20

Chambre

476

10

510

120

10

dressing

wc

365

wc

120

279

Chambre 2

189

289

235

135

chambre 1

34

34

27

135

séjour

Appartement

10

60

dressing

WC

10 105

10

646

536

extensive green +9625 (CHECK!)

Roof

dressing

120

10

20

20

30

s.d.b.

639

427

exterieur

files

161

88

597

cuisine

+4850

Cuisine

128

43

279

chambre 2

Appartement

Buanderie

210

306

10

dressing

cuisine

s.d.b.

140

45

dimensions

40

10

458

buanderie

271

210

chambre 1

Chambre 1

0

140

20 20

420

631

dimensions

files dimensions

Plans BA-651

iche

rn

Co

+84.01

iche

rn

Co

/658 Plans BA-651

+83.01

+83.78

+83.96

+83.17

+82.46

+81.82

+

5 44 606 10 145

10 91

10 531

88

10

+

44 332 274

iche

401 350

54 10 10

145 91 174 357

322 10 529 10 189

322

322 10

200

10

529 531

10

10

85

10 195 34 10 55 150 20 230 34

299

321

322 195 2014 55

0

10

337

230

120

614

10 10

322 195 533 342

150 20 1420 342 337

10

50

322 10 529 10 189 529

322 60 10

322 60 10 135 10

135 10 198 10 657

198 10 657

10

giron 24cm 17.5 cm

44 321

10

630

10 240

10

373

10 10

322 10 529 10

322 10 195

200

10

10

10 195 34 10 55 150 20 230 34 342

.3

300

341

382 135

198 315

382 135 198

322

75

334

342

10 10 10

10

342 499

10

14 20

contremarche

70

342

25

1420

162

20 170

10

357

10

195 421

60 10

44

315 342 10

322 195 2014 65 150 20 230

10

44

10

204

5

14 20

524 342

R7

5

85 257

10

54

10 198

R75 529

315

20 14

10

315

10

529

322 60 10 135 10 198

10 657

618 164 636

751 20 360 20 245 60

170 20 170 20 245

3

10

342 230

20 150

55

14 20 195

342 181

220

72 10 135

60

322 60

79

+ 198

10

529

10 10

°

34 691

420

R200

135 198 10 315 342

10 210

421

20,00

10

70 426 100

29 40 10

337 240 20 14 44

10 10

251 301 300 370 29

191 670 39

40 386

674 43 163 26 255 59 236

10 65 165 10

220 44 356

10

420

195

150

10

460 R7 5 194

60

20 62 14

25

44 54

10 379

10 66 419

41 241

10

44

376 240 20

10 225 26

100 20 55 26

672 45 163

40

55 26 472

639

337

10

10 10

10

426 80 65 465

34

26 10 65

R7

322

10

R75 80 100

10

40

163 40 163

146

10

75 200 80 237

352 103 137

40

85 1118 1564 780

464 111

10 10

R200

220

41 29 40 427 20 14 65 185 20 255 49

41

90 3514 99

99 170 746 247

210 11

° 20,00

2

1430

10

191 100

166

137

103

10

79 237

49

10 5

90

195 275

120 352

255

20 185

65 14 20

19 301

100 80

65 R75

465 44 195 5

44

4

106 5

220 44 356 10 100

75 26

10 185 30

44 812 30 331

130

chambre 1

191

330

25

200

311

80

4

10

4

4

°

10

4

4

39,95°

282

4

10

Balcon

240

Balcon

39,95

44

10

Balcon

44

85

240

Balcon

° 39,95

44

44

10

Balcon

39,95°

80

19

75

10

44

10

10

240

240

0 .7 70 +

44

70

Balcon

° 39,95

44

282

258

39,95°

75

19

75

44

258

280

75

19

37 19

311

90

11 65

44

10 65

106

séjour

diner

280

200

200

rn

80 0. 10 +

EP

EP

EP

exterieur

files

dimensions

dimensions

dimensions files

dimensions exterieur

iche

4 .9 70 +

Co

160

+

0 .0 70 70 183 1101

1430

477

342 10 135

60

19

R200

10 10 111

65

80

11 10

79

10 301

250 166

157 10

10 10

536 241 379 54

3604 46 420 180 139 282

106 870 245 104 125

419 380

111 245 151 245 111 125

450 349 281 210 547

104 245 780 157 R200

191

44

3

925 247 928

116 34 170 20 150

163 °

6

78 0

,88

8

49 R5

96 241

9

20 701 40 34 542 20 150 34

10

10

118 1135 1546 780

7

426 212 17 60

79

166 170 20

tunnel technique accessible sous le niveau 2 40

80 64 93 191 103

260

10 193 34 150 20 337

104 93 466 184 496

20 275 34 248 10 272 10 143 27 161 68 331 10 165

103 771 103 496 114

10 170 34 170 20 330 42 150 34 193

446 93 105 103 162 93 93

10 232

30

4558 44

98 379

10

612 34 309 234

347 30 309 10 234 10 309

431

44

40

166 65

7

276

220 79

41

82 10

10 431

giron 24cm contremarche 17.3 cm

140,0

0° 174

giron 24cm contremarche 17.3 cm

41 60

20,00

10

10 10 10

174 174

60 309

10 10

10 10

10

164 174 60 193 116 60 174

157 645 550 162

34 712 60 157

140,0 34

91

419

10 10

10 100

166

191

10

10

100

°

44 10 10

276 360 136 17 133 193 14 20 507 20 275 14 20 193 210

330

10 giron 24cm contremarche 17.3 cm

10 10

173

17 210 249 30 28 249

10 10 10 10 10 2014

17 173 450

340

193 170 20

522 20 14 193 133 17

10 10 10

44 240 15

10 568 30 346 109 10 10 436

240 44 44 240

10 820 30

40 420 840 420 180

1284 90 189 228 40 228 173

90 857 90

189 195

10

139

10

10 322

247

322

176

322

340

360 10 180 375 30 365 10 10 106 190 10 30 119 616

159 27

15 240 44 44

255 10 545

30 478

10 322 30 616

240 15 0

19

10

44

4 .9 69 +

6015 dimensions exterieur

90 838 90 83

840 840 840

838 90 662 90

228 40 228 83 90 369 100 369 90 83

838 90 662 90

228 40 228 83 90 334 150

840 714 40 dimensions files

179 155 71 150

240 44 R15

220

426

10 250

250

0

536

R20

220

10

0

426

R20

44

R200 220

giron 24cm contremarche 17.3 cm

44 1291 92 368 30 368 92 806 474

337

30

10

810

542

30

334

20

350

200

92

20

R150

10 421

355

10

355

10 337

355

140

60

355

791

10

355

10 135

1013

44

355

459

10

R50

°

198 337

R200

,12

10

140,0

83

514

337

40

34

447

420

10

310

34 10

713

10 70

403

971

34

840

642

44

90

337

90

531 582

407

10 10

55 60

767

514

10

202

150 135

420

20 10

237

230

26

23

36

180

10 198

356

180

340

220

237

561 152

10

19

150

54 341

506

10

216

19

197

26

10

50

840

817 181

90

428

20

90

30 5

244

10

215

489

531

336

244

642

230 285

90

381

190

10

90

616

6015

51

321

107

55

840

321

36

10

75

150

230

20

75

506

215

237

26 140

23

286

5

237

326

506

236

321

150

20

840

10

163

20

220

107

9

55

19

90

8

26 50

90

7

244

115

194

6

26

5

244

396

100

5

342

26

0° 244

616

194

4

54

20

140,0

90

163

376

90

3

255

298

107

2

59

43

840

313

65 44

150

31

10

506

553 165

237

163

10

23

81 40

146

237

53

163

10

506

106

285

150

1

26

220

714

2

471

19 107

3

50

90

4

381

90

5

441

34

6

10

182

7

100

148

8

10

40

1

UNStudio 163/270

9

75

dimensions files

163/270

10

187

6 .9 69 +

+

C

B

A

9 .4 70

C

B

A

8 .8 70 +

0 .1 70 +

8 .6 70 +

1 .6 69 +

3 .8 69 +

7 .5 70 +

8 .4 70 +

9 .7 70 +

9 .3 70 +

7 .2 70 +

2 .0 70 +

7 .7 69 +

4 .6 69 +

5 .5 69 +

Gipsblokken Lichte scheidingswand

x,xx

Mindervalide parkeerplaats Rijrichting

Regenwater

Niveau P=0.00=+70.40 (lambert coordinaten systeem)

Sens de la circulation

Eaux pluviales

Niveau P=0.00 du projet =+70.40 (systeme de coordonnees lambert)

30 min résistance aux feu

C

B

6

6

5

5

4

4

3

3

Hydrant en brandhaspel 30 m

Raccord pompier et dévidoir 30m

A

240 min brandwerend Hydrant en brandhaspel 20 m

240 min résistance aux feu Raccord pompier et dévidoir 20 m

90 min brandwerend

60 min brandwerend

120 min brandwerend

90 min résistance aux feu

60 min résistance aux feu

120 min résistance aux feu

x,xx

EG

EP

5m m

F i

4 9 3

Nieuw beton

Gipsblokken Lichte scheidingswand Isolatie

Blocs de plâtre Cloison légère Isolation

Kalkzandsteen

Bestaand beton Béton nouveau Grès calcaire

Afbraakwerken Nieuw metselwerk

Maçonnerie nouveau

Bestaand metselwerk

V102_02 Floor.dwg

nom du fichier

1m m

révision

secteur

Belgique

1000 Brussel

Maçonnerie existant

0

T

Hoogstraat 159

Hout

Metaal / Champagne Metaal / Witachtig Transparant glas Translucent glas Geëmailleerd glas Aluminium raam profielen / Goudachtig Crépi / Witachtig Natuursteen / Blauw Dakpannen / Donker

Métal / Champagne Métal / Blanc cassé Verre transparent Verre translucide Verre émaillé Menuiseries aluminium / Doré Crépi / Blanc cassé Pierre naturelle / Bleu Tuiles / Foncées

C3

D1

D2

D3

E1

F1

G1

H1

C

B

B

C

A

A

6

6

5

5

6 5

4

4

4

4

3

3

3

3

1:100

échelle

16.11.2010

date

ELDP

nom du projet

1000 Bruxelles

O:\2009-28 Brussel ELDP\VO\Drawings\100 - plans\V104_04 Floor.dwg | printed by Marie Prunault

description

Plan Niveau +4

titre

BA-104

numéro du dessin

plan

type de dessin

objectif

Permis de construire

phase

2009-28

numéro du projet

architecte

architecte

maître d'ouvrage

Signature

Quatre Brasstraat 6 bus 6

BVBA TD IMMO Invest

maître d'ouvrage

Entre les Deux Portes

nom du projet

0

4 9 3

V104_04 Floor.dwg

nom du fichier

1m m

révision

secteur

Belgique

1000 Brussel

Hoogstraat 159

Pays-Bas

1070 AJ Amsterdam

P.O.Box 75381

Stadhouderskade 113

architecte

T

T +32 (0) 2 469 15 13

5m m

Rue

Rue

Hydrant en brandhaspel 30 m

6 5

240 min brandwerend Hydrant en brandhaspel 20 m

240 min résistance aux feu

Raccord pompier et dévidoir 30m

120 min brandwerend

90 min brandwerend

60 min brandwerend

Raccord pompier et dévidoir 20 m

120 min résistance aux feu

90 min résistance aux feu

60 min résistance aux feu

30 min résistance aux feu

Opmerking - Remarques: 1.- Deze plannen zijn onze eigendom en mogen enkel worden overgemaakt aan derden mits onze toestemming - Ces plans sont notre propriété et peuvent uniquement être reproduits et/ou transmis à un tiers avec notre accord 2.- Tijdens de uitvoering zullen alle tegenstrijdigheden met onze plannen ons worden gemeld - Pendant la phase d'exécution toutes les contradictions avec nos plans devront nous être communiquées 3.- Maten en aanduidingen zijn indicatief en dienen ter plaatse gecontroleerd te worden - Measures ou autres indications sont indicatives et doivent être vérefiées en situ

RF 240

RF 120

RF 90

RF 60

RF 30

30 min brandwerend

Metaal / Goudachtig

Métal / Doré C1

C2

Sécurité incendie

Glas vezel versterkt beton / Witachtig Natuursteen / Witachtig

Pierre naturelle / Blanc cassé

f

s

r

I

l

a

F

T

c

i

F

T

c

F

c

F

c

Uitzettingsvoeg

Join de dilatation

Béton arme fibre de verre / Blanc cassé A1

B1

Matériaux

Nader te bepalen

Affectation a définir

Afgewerkte vloer doorsnede (ten Bestaande vloerhoogte (ten opzichte van lambert coordi

Niveau de plancher existant (relatif au coordonnees lambert)

Niveau fini coupe (relatif au niveau P)

Afgewerkte vloer plan (ten opzic

Vuilwaterafvoer

Niveau P=0.00=+70.40 (lambert coordinaten systeem)

Niveau P=0.00 du projet =+70.40 (systeme de coordonnees lambert)

Regenwater Egouts

Eaux pluviales

Rijrichting

Mindervalide parkeerplaats

Parking handicapes Sens de la circulation

Mos-sedum

Mos-sedum

Gras

Installatie-rooster

Gazon

Grille installation Bois

f

s

r

I

l

a

F

T

c

1070 AJ Amsterdam Pays-Bas

P.O.Box 75381

c

F

c

F

Stadhouderskade 113

architecte

Béton existant

+x.xx Niveau fini plan (relatif au niveau P)

AD

Niveau fini

1:100

échelle

04.11.2010

P E C T

T y

Démolition

Execution

Legende

+x.xx

ELDP

nom du projet

date

O:\2009-28 Brussel ELDP\VO\Drawings\100 - plans\V102_02 Floor.dwg | printed by Tina Kortmann

description

1000 Bruxelles

N O C Plan Niveau 2

titre

BA-102

numéro du dessin

plan

type de dessin

objectif

Permis de construire

phase

2009-28

numéro du projet

architecte

architecte

maître d'ouvrage

Signature

Quatre Brasstraat 6 bus 6

BVBA TD IMMO Invest

maître d'ouvrage

da

nom du projet

Opmerking - Remarques: 1.- Deze plannen zijn onze eigendom en mogen enkel worden overgemaakt aan derden mits onze toestemming - Ces plans sont notre propriété et peuvent uniquement être reproduits et/ou transmis à un tiers avec notre accord 2.- Tijdens de uitvoering zullen alle tegenstrijdigheden met onze plannen ons worden gemeld - Pendant la phase d'exécution toutes les contradictions avec nos plans devront nous être communiquées 3.- Maten en aanduidingen zijn indicatief en dienen ter plaatse gecontroleerd te worden - Measures ou autres indications sont indicatives et doivent être vérefiées en situ

RF 240

RF 120

RF 90

RF 60

RF 30

c

Uitzettingsvoeg

Join de dilatation

30 min brandwerend

Nader te bepalen

Affectation a définir

Sécurité incendie

Afgewerkte vloer doorsnede (ten Bestaande vloerhoogte (ten opzichte van lambert coordi

Niveau fini coupe (relatif au niveau P) Niveau de plancher existant (relatif au coordonnees lambert)

Afgewerkte vloer plan (ten opzic

Mos-sedum

Gras

Hout

Installatie-rooster

Parking handicapes

Gazon

Mos-sedum

+x.xx Niveau fini plan (relatif au niveau P)

AD

Niveau fini

+x.xx

RW

Grille installation Bois

Isolatie

Kalkzandsteen

Isolation

Cloison légère

Nieuw beton Grès calcaire

Bestaand beton

Blocs de plâtre

Afbraakwerken Nieuw metselwerk

Béton nouveau

Bestaand metselwerk

Maçonnerie nouveau Béton existant

Maçonnerie existant Démolition

Execution

Legende

Plan: Level 05

dimensions exterieur

Plan: Level 03


THE NATIONAL ART MUSEUM OF CHINA Beijing, China, 2010

The architectural concept in the design for the NAMOC is based on uniting dualities; past and future, day and night, inside and outside, calm and dynamic, large and small, individual and collective. The two volumes of the building reference ancient Chinese ‘stone drums’. Whilst the architecture of the museum is represented by the ancient artifact of the stone drum, the art within represents its spirit, or its “essence”. In the same way that the agile strokes of ink in a Chinese painting give spirit to a blank piece of paper, the art collection gives spirit to the museum. The main focus of the design is to create optimal and varied spaces for the display of art.

UNStudio


公共服务 Public Service 办公室 Offices

临时展览 Temporary Exhibition 固定展览 Fixed Exhibition

固定展览 Preservation and Photography

高原 7 PLATEAU 7 + 60.000

办公室 Offices 固定展览 Fixed Exhibition 临时展览 Temporary Exhibition

固定展览 Fixed Exhibition

高原6 PLATEAU 6 + 45.000

教育 Education 办公室 Offices

临时展览 Temporary Exhibition 固定展览 Fixed Exhibition

公共空间 Public Space

高原 5 PLATEAU 5 + 35.000

教育 Education

教育 Education 公共空间 Public Space

临时展览 Temporary Exhibition

高原 4 PLATEAU 4 + 25.000

教育 Education 临时展览 Temporary Exhibition

固定展览 Fixed Exhibition

固定展览 Fixed Exhibition

临时展览 Temporary Exhibition

办公室 Offices

固定展览 Preservation and Photography

临时展览 Temporary Exhibition

Looping

高原 3 PLATEAU 3 + 20.000

固定展览 Fixed Exhibition

高原 2 PLATEAU 2 + 15.000

艺术和科学中心 Art and Science center

高原 1 PLATEAU 1 + 6.000

临时展览 Temporary Exhibition

2 + 1 建筑策略 2 + 1 buildings strategy

办公室 Offices 设计与艺店 Design and Art shops

中式餐厅 Chinese restaurant

咖啡厅 Cafe

入口大堂 Entrance hall

售票处和信息中心 Ticket office and information

办公室 Offices 艺术精品店 Art Boutique

教育精品

Education Boutique National Art Museum of 书店 China - 110110 Book shop

机房 Technical space 设计精品店 Design Boutique

欧洲餐厅 European restaurant 儿童休息室 Childrens lounge

可持续发展中心 Sustainability center

机房 Technical space 纪念品商店 Souvenir shop

UNStudio National Art Museum of China - 110110

学生中心 Student center

高原 -1 PLATEAU -1 + 0.000

National Art M


UNStudio


新闻办事处 Press Office 办公室 Offices

总办事处壹 Head Office I 实验室 Lab

开放式办公室 Open Office

厨房 Kitchen

总办事处II Head Office II

办公室 Offices 空中酒吧 Sky Bar 空中展览厅 Sky Gallery

跳空 Void

空中酒廊 Sky Lounge

厨房 Kitchen

中式餐厅 Chinese Restaurant

艺术平台 Art Platform

会议室 Meeting

咖啡馆 Coffebar

Panorma Platform

挑空空间 Void

中央公共广场 Public Plaza

环景电梯 Panorama Elevator

当代中国画 Contemporary Chinese Paintings

中国艺术 Chinese Art

实验室 Lab

酒廊 Lounge

艺术和科学 Art & Science

美术馆咖啡厅 Museum Cafe

售票处 Ticket Office

世博园区 Exposition Area 世博园区 Exposition Area

美术馆商店 Museum Shop

挑空空间 Void

世博园区 Exposition Area

美术馆图像商店 Museum Image Shop

空中餐厅 Sky Restaurant

厨房 Kitchen

世博园区 Exposition Area

屋顶阳台 Roof terrace + 69.000 屋顶花园 Roof Garden

+ 66.000

咖啡厅 Cafe

世博园区 Gallery

+ 51.000

跳空 Void

世博园区 Gallery

+ 46.000

+ 38.000

世博园区 Gallery

世博园区 Gallery

+ 56.000

实验性展览 Experimental Exhibitions

+ 16.000 + 11.000 湖景东路 East Hujing Road

+ 6.000 + 0.000

连接到地铁站 Connection to metro 地下环形隧道 Tunnel Ringroad

UNStudio

+ 60.000

+ 45.000 + 40.000 + 35.000

全景电梯 Panorama Elevator

中国民间艺术专室陈列 Display of Chinese Folk Art

礼品店 Art Shop

办公室 Offices

+ 50.000

办公室 Offices

+ 45.000

教育 Education

政府间文化交流展 Intergovernmental cultural exchange exhibition

跳空 Void

+ 60.000

展览大厅 Exhibition Area

+ 50.000

展览厅 Gallery

+ 45.000

办公室 Offices

办公室 Offices

展览厅 Gallery

Gallery National Art Museum of China - 110110

展览厅

+ 40.000

+ 35.000

教育 Education

展览 Gallery

展览厅 Gallery

展览厅 Gallery

+ 35.000

中央广场 Media plaza + 25.000 展览厅 Gallery

+ 20.000 + 17.500

+ 15.000

+ 10.000

+ 10.000

+ 6.000

橋 Bridge

+ 6.000

连接到地下商业空间 Connection to Underground

+ 0.000

步行广场 Pedestrian square

+ 0.000

展览厅 Gallery 跳空 Void

展览厅 Gallery

可持续发展中心 Sustainability center

入口 Entrance 售票处 Ticket area 商業区 Commercial area

地下商业空间 Underground Commercial area 停车场 Parking

展览厅 Gallery

+ 40.000

入口 Entrance

售票区 Ticket area

餐厅 Restaurant

+ 25.000

+ 25.000

图书馆 Library

世博园区 Gallery

+ 55.000

礼堂 Auditorium

中央广场 Media Plaza

+ 25.000

+ 65.000 展览厅 Gallery

+ 60.000

+ 55.000

世博园区 Gallery

全景电梯 Panorama Elevator

大活动公共空间(1000人) 1000 p. event public space

+ 21.000

+ 65.000

+ 65.000

全景餐厅 Panoramic Restaurant

+ 61.000

+ 70.000

屋顶阳台 Roof terrace

停车场 Parking 停车场 Parking

展览厅 Gallery

+ 20.000

展览厅 Gallery

+ 15.000

+ 6.000

橋 Bridge

+ 0.000 停车区 Parking


UNStudio


休息区 Contemplation zone 咖啡厅 Cafe

全景 梯 Restaurant

深入路线 Intensive route 决策时刻 Decision moment

全景 梯 Museum shop

快速路线 Fast route

升降机 / Elevator

全景 梯 Educational shop 固定展览/ Fixed Exhibition

临时展览/ Temporary Exhibition

电梯 / Escalator

全景 梯 Museum shop

楼梯 / Stairs

斜坡 / Ramp

全景 梯 Education

全景 Cafe

召集区 / Meeting area

书店 / Book shop

全景 梯 Educational shop 深入路线 Intensive route

全景 梯 Familty corner

咖啡厅 / Café

全景 梯 Education

休息区 Contemplation zone

全景 梯 Public plaza

全景 梯 Education

全景 梯 Education

全景 梯 Educational shop

全景 梯 Restaurant

全景 梯 Familty corner 休息区/ Contemplation zone 咖啡馆/ Cafe

深入路线 / Intensive route 固定展览/ Fixed Exhibition

1 2

全景 Cafe

全景 梯 Museum shop

决策时刻/ Decision moment

交汇点位置 Node positions isometry 快速路线 / Fast route

UNStudio

全景 梯 Tickets

i


THEATRE SPIJKENISSE Spijkenisse, The Netherlands, 2011

The design for the Theatre Spijkenisse focuses on the placement and orientation of the building in the urban location, whilst simultaneously providing architectural solutions for programming needs and public access. The placing of the programmes within the building aims for efficient routing through the theatre, coupled with a logical relationship to the surroundings, whilst the design and placement of the various volumes make use of the natural variations in the levels of the site. The two main theatre spaces are positioned to receive the visitor flow directly from the foyer and the public square. From the foyer, a sculptural stairway forms the binding element towards the entrances to the theatre rooms. The theatre cafe is located adjacent to the nearby water and is designed as a third theatre, in the form of an amphitheatre.

UNStudio


3

1

theater cafĂŠ

grote zaal

2

UNStudio

kleine zaal


1 • •

UNStudio

Interior layer possible sound reflector function

2 • •

Structural elemants High frequensy reflectors

3 • •

Lighting and Color panels Low / High frequensy reflectors


Bright Glamour

Representative Dynamic

Diverse

Elegant

Exclusive Distinctive

Cozy Intimate

Light Open

Dynamic Nature and Culture

Public Flexible

Stage foyer

Boheme foyer

Water front foyer

UNStudio


IBG pavilion Groningen, The Netherlands, 2011

UNStudio


UNStudio


UNStudio


UNStudio


UNStudio


UNStudio


EXHIBITION: RUSSIAN ROULETTE installation: Amalgam of Inversion, Wiesbaden, Germany 2008

Mirror installation investigates compressed duration of time between past, present and future. Live is motion back toward. Viewing a past - zone of our experience, moving ahead with our blind side - zone of unknown. Always if a new step going to be done, then one step back has to be done in relation to previous experience. Incredible a moment of bifurcation and inversion of motions vector is taking place. Because of concave-convex structure of an installation observer is never placed in frontal position to the present. He is not able to get an image of “now-self reflection�. Perception attracted by kaleidoscopic effect of surroundings and other visitors reflections. Mirrored reflections, dynamic images are cross-linked, superimposing presence into past, future into presence, which is, according to Bergson, how we experience time.

installation: Amalgam of Inversion


time - movement

caleidoscope effect

2

light

is ax present 3

of

3

n sio

r

e inv

1 past

entrance

1

2

focused view self reflection

assembling

2

1

2 1

installation: Amalgam of Inversion

peripheral view space reflection


installation: Amalgam of Inversion


installation: Amalgam of Inversion


ARCHITECTURE OF MOVEMENT RESIDENCY, ARCH. FESTIVAL ARMV Yaroslavl, Russia, 2012

How the energy of the past is transformed into a new, into now? Where is the moment of transition in time and space, how we can reflect it? Possibly overlay of the past and the future can create the visualization, as in light interference work with mutual gain or attenuation of the amplitude of intersecting waves. The installation “Architecture movement” attempts to introduce a mechanism that transforms perception of existing context. Arrangement of design elements to create a dynamic visual effect “moire”, where the interval of the sequence of elements organized undulating, gently graded pattern. The viewer moves around the sculpture resembles the natural flow of energy and is involved in the unfolding of the field of visual effects, which depends on the angle and speed of movement of the participant. installation: ARCHITECTURE OF MOVEMENT


Community centre Church Museum

1500m Church of Elijah

Church of Elijah and Tikhon

Historical city XVIII-XIX

Uspensky Cathedral

Installation 500m

Park “Strelka” 2011

Volga

view interaction Upper embankment promenade, XIX century Lower embankment promenade, XX century Contemporary embankment, 2011

installation: ARCHITECTURE OF MOVEMENT

move SEQUENCES

view interaction


installation: ARCHITECTURE OF MOVEMENT


installation: ARCHITECTURE OF MOVEMENT


FIBRE FLOW ART RESIDENCY, ARTELES Haukijärvi, Finland, 2012

The project explores the notion of flow that based on the results of textile structure analysis. It investigates physical experiments that create three dimensionally heterogeneous materials with a graded stiffness, a structural hierarchy, and a locally controlled lighting dynamic performance. Presented model translate soft textile organization to the pre-tectonic, pre-architectural landscape organization.Studies are split up in two basic typologies and got focused on “layering” and “branch” fiber composite organizations. Architectural design is very often is not about having ideas but about having techniques: techniques that operate on a material level. If we need ideas, they follow from techniques, and techniques follow from matter. It is about making matter think and live by itself. installation: fibre flow


installation: fibre flow


TRANS<MATTER ART RESIDENCY, CACIS Calders / Barcelona, Spain, 2012

Traditions of textile weaving, basketwork techniques are crucial historical and cultural artefacts in the study of lightness as a mean of reducing energy consumption. There is a fascinating crossing of textile tradition and architecture, particular in Spanish architecture. From Churrigueresque 18th century stile to Catalan Modernism is recognizable tremendous Spanish technique of weaving, bobbin lace (majaderuelos). The Project deals with recreating lightness with the synergy of different materials, as rattan fibres and plastics, in dialog with local craft tradition.

installation: TRANS<MATTER


installation: TRANS<MATTER


EXHIBITION:

TRANSITION // EXPERIENCE

Platform sarai, Frankfurt am Main, Germany, 2007

During the exhibition were presented the results of my studies and researches at Staedelschule in Frankfurt. My interest was interdisciplinary research between architecture, manufacturing and ecology. As such, these interests are concerned with material organization and performance across all scales of design thought and practice. Investigation based on analyses of graphic and textile field of organisation. Graphic sample is a painting of Armand Fernandes, Crusaders 1968 and textile sample is a malimo weave technique. The project aim was a definition of design-models principles and implementation of it in 3 scales: body (human scale), movables (interior landscape scale), building (architectural scale). installation: TRANSITION // EXPERIENCE


installation: TRANSITION // EXPERIENCE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.