5900 250
50
50
4400
Stone cladding to detail
Z
1550 1750
PROPOSED VILLA FOR MR. ABDULLA ABDULAZIZ ABDULLA ALZAROONI AT NADD AL SHIBA 2ND, DUBAI
250
Wall finished by stone
50 MID LANDING 5
+4.19m LVL
31
33
35
37
39
25
2100
2400
27
Z
2950
2.1mX2.4m 7'-0"X8'-0"
45 47
300
LOBBY 2250
+1.2m LVL
5300
F
F 200
Z
DRAWN
: GOWTHAMAN :
APPROVED DATE
: SHAHRIAR DEHGHAN : 16.03.2018
SCALE
: NTS @ A2
200
5000
5
6
6
PART PLAN OF FIRST FLOOR
SHEET INFORMATION
CHECKED
Y
5900
200
PART PLAN OF GROUND FLOOR
:ARCHITECTURAL
+5.6m LVL
F
5000
PROJECT PHASE DISCIPLINE
MID LANDING 6
300
5900
5
1200
49
4.70mX5.90m 15'-6"X19'-3"
2250
1550
Y
200
200
200 MID LANDING 3
750
2.05mX5.90m 6'-9"X19'-3"
200
2100
41 43
LIFT
23 2400
X
G
50
MID LANDING 4
+2.61m LVL
1650
1650
X
2400
6300
6400
5100
21
Y FG4
29
1500
2.1mX2.4m 7'-0"X8'-0"
Glazing to detail
FG4
50 50
50
1650
50
750
G
Railing to detail
200
250
1600
50
1500
2700
2400
200
F
8800 1200 2100
900
2900
1600
17 19
200
2100
900 1500
3300
3300
G
200
1500
Z
15
LIFT
LOBBY
2050
F
PART PLAN OF BASEMENT FLOOR
PROJECT
13
200
200
1550
6
STAIRCASE SECTION (16.03.2018)
35
6 5900
DN
25
5000
SHEET TITLE
X
27
Y 200
Y
+2.61m LVL
33
BASEMENT -2.1m LVL
UP
150 1000
F
Glazing to detail
200
29
2950
900
3150
-2.1m LVL
5
1
23
6.2mX1.55m 20'-3"X5'-0"
4.55mX4.15m 23'-6"X20'-3"
4150
3
200
FG4
2100
21
LOBBY
4150
GROUND LEVEL Stone cladding to detail
5
200
100
X
STORE
200
15 13 11 9 7
200
MID LANDING 4
UP
200
Wall finished by stone
FG4
2400
19
6150
2.1mX2.4m 7'-0"X8'-0"
Railing to detail
2400
6400
1
1600
31 1500
LIFT
1500
2700
17
2400
3
2900
1600
15
2100
1650 6300
1500
5
13
6200
11
4950
9
1650
+0.3m LVL
-0.9m LVL
7
6400
X
MID LANDING 2
MID LANDING 1
G
1500
Z
1650
1600
X
19 17
5
100
Y
250
Wall finished by stone
50
1600
GROUND FLOOR +1.2m LVL
21
6 5900
200
200
2700
50 50
5900
LIFT LOBBY
SECTION -ZZ
5
G
50
G
1414
1414
1
200
Railing to detail
1500
3
6
1600
23
SECTION -YY
5 200
25
Stone cladding to detail
MID LANDING 1 -0.90m LVL
5
SECTION -XX
27
MID LANDING 2 +0.30m LVL
15 13 11 9 7
3300
1500
17
MID LANDING 1 -0.90m LVL
900
STORE ROOM
29
MID LANDING 3 +1.2m LVL
900
2100
2100
2100
7 5 3 1
19
RCC Lift wall in elevation
31
900
900
1200
1200
11 9
Stone cladding to detail
23 21
MID LANDING 2 +0.30m LVL
13
25
LIFT LOBBY
MID LANDING 3 +1.2m LVL
15
GROUND LEVEL
29 27
23 21 19 17
33
MID LANDING 4 +2.61 LVL
31
1414
Stone cladding to detail
Z
35
250
MID LANDING 4 +2.61 LVL
29
BASEMENT -2.1m LVL
39 37
33
31
GROUND FLOOR +1.2m LVL
4400
35
41
4400
1572
35
39 37
33
43
MID LANDING 5 +4.19m LVL
41
4400
39
45
4400
43
1414
45
MID LANDING 5 +4.19m LVL
37
FIRST FLOOR +5.60m LVL
47 1414
43 41
27 25
49
47
45
4400
49
1414
10000
47
LIFT LOBBY
MID LANDING 6 +5.60 LVL
1572
8800
49
TERRACE +10.0m LVL
Fixed glazing
LIFT LOBBY
MID LANDING 6 +5.60 LVL
1450
Stone cladding to detail Fixed glazing
FIRST FLOOR +5.60m LVL
2600
6300
Stone cladding to detail
1550
Stone cladding to detail
4400
4400
4400
4400
4400
Stone cladding to detail
250
4400
1600
50
TERRACE +10.0m LVL
5900
2500
1650
1500
2400
200
2250
1500
DN
2900
1572
1700
4400
6300 200
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
"OYSTER " NO-9, KHADER NAWAZ KHAN ROAD, NUNGAMBAKKAM,CHENNAI-600 006,INDIA. TEL-044-42045445
SUITE-1913, P.O.BOX 123234,DUBAI. UAE TEL:971-50-4519864
REV
BY
REVISIONS
APPR.
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
2'-0" 5"
9"
2'-0" 9" 5" 1'-6" 1'-0"
3'-6"
6"
2"
3'-9"
6"
3'-6"
1'-9" 6"
15'-5"
5 4" 3
2'-3" 6" 8" 1114"
2'-3"
6"
512"
SECTIONAL ELEVATION -AA' (REF IMAGE)
6"
2'-3" 5" 112"
6"
SECTIONAL ELEVATION -BB' (REF IMAGE)
SECTIONAL ELEVATION -BB'
9"
5"
9"
2'-0"
SECTIONAL ELEVATION -AA'
5'-9" 13'-6"
2" 4"
2"
9'-6"
4'-9"
10'-6"
9'-6"
2" 4"
8" 114"
2" 2"
6"
Void
2" 2"
2'-3"
2"
4'-9"
Void
1'-8" 1'-0" 1'-0" 1'-0"
6"
1'-9"
4" 2'-3" 2" 6"
2"
1'-9"
FIXED GLASS
8'-3"
1'-0" 1'-0" 1'-0"
DOOR 2"
9'-6"
4'-9"
1'-8"
Void
Void
8" 10" 1'-0" 114" 23 4"
2"
2'-9"
1'-6" 3"
8'-6"
1'-6"
3" 15'-5"
1'-9" 3" 43 4"
SECTIONAL ELEVATION -CC' (REF IMAGE)
2"
6"
8'-0"
6" 1'-9"
6" 8" 114"
13'-4"
SECTIONAL ELEVATION -DD' (REF IMAGE)
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC'
B
D
A
A PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
59
KEY PLAN
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
DB
DIRECTOR'S CABIN-1
C
C
17'-3"x13'-6" D
SHEET TITLE
DIRECTOR'S CABIN-1-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
B NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
1'-9"
Void
Paneling partition
1'-2"
3
4
"
8"
" 1'-2" 3 4"
Window
4
3
1'-6"
4'-6"
4'-6"
4'-6"
" 1'-6"
4
"
Partition wall
" 4 3
1'-6"
1'-7"
1'-6"
3
4
2.5cmMDF/Plywood
4"2"4"
" 3
3'-6"
1'-103 4"
3'-6"
612"
2'-6"
612"
3'-6"
4"4"
4"4"
4" 63 4"
914"
41 4" 1'-4" 41 4"
1'-9"
8"
3'-0"
8"
1'-9"
9" 814"
1'-9"
Void
814"
10" 3" 1'-0" 1"
Flooring
SECTIONAL ELEVATION -AA'
D
1'-93 4"
Skirting
SECTIONAL ELEVATION -BB'
2'-9"
7'-93 4"
6"
Flooring
1'-6"
Paneling partition
912"
2'-4"
4
2.5cmMDF/Plywood
2'-4"
3'-6"
3'-6"
3
1'-6"
Void
shelf finished with appr.american walnut laminate
"
9'-9"
9'-9"
DOOR
1'-7"
4
" 1'-6"
3
4"2"4"
4
9'-9"
" 1'-6"
3
4
FIXED GLASS Horizontal Support Member Every Necessary Interval
Skirting 912"
Finished Floor Lvl
False ceiling Lvl
1'-53 4"
Cornice
9"
1'-9"
Cornice
3
shelf finished with appr.american walnut laminate
False ceiling line
8"
Void 8"
2'-03 4"
False ceiling Lvl
9"
Beam line
Finished Floor Lvl
1'-1012"
SECTIONAL ELEVATION -CC'
B 15'-3"
A
A
6"
False ceiling Lvl
8"
9"
6"
OPEN SHELF
7'-8"
13'-6"
STORAGE
OPEN SHELF
Fixed glass
PANTRY 7'-0"X8'-0"
Fixed glass
door lintel is 5'-6"
OPEN SHELF
59
Paneling partition Skirting
C
C
2'-0"
61
55
63
53
65
51
67
49
69
47
71
2'-6"
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
4" 7"
D
2'-0"
57
4"
Finished Floor Lvl
2'-0"
AHU 12'-0"X8'-3"
1'-4"
6"
8'-9"
6"
1'-4"
6"
KEY PLAN
SECTIONAL ELEVATION -DD'
B DIRECTOR'S CABIN-1 15'-0"X13'-6"
SHEET TITLE
DIRECTOR'S CABIN-1-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
2'-0" 9"
2'-0" 5"
5"
9" 4
3'-63 4"
3'-9"
"
514"
6"
3'-6" 6"
15'-5"
2" 2" 4"
2'-3" 6" 2'-3"
6"
5'-9"
6"
2'-0" 512"
11" 512" 33 4"
SECTIONAL ELEVATION -AA' (REF IMAGE)
5" 112"
SECTIONAL ELEVATION -BB' (REF IMAGE)
SECTIONAL ELEVATION -BB'
5"
9"
9"
2'-0"
SECTIONAL ELEVATION -AA'
2'-3"
6"
13'-6"
9'-6"
4'-9"
10'-6"
9'-6"
2" 4"
8" 1114" 1'-6" 1114" 3
2" 2"
6"
Void
2" 2"
2'-3"
2"
4'-9"
Void
1'-8" 1'-9"
1'-9"
4" 2'-3" 2" 6"
Void
2'-0"
9" 431'-1" 4"
4'-0"
1'-6"
7'-3"
6"
2"
1'-0" 1'-0" 1'-0"
FIXED GLASS
8'-3"
1'-0" 1'-0" 1'-0"
DOOR 2"
9'-6"
4'-9"
1'-8"
Void
1'-6"
3" 15'-5" 3"
1'-9" 3
4
"
3" 43 4"
SECTIONAL ELEVATION -CC' (REF IMAGE)
6"
8'-0"
6" 1'-9"
6" 8" 11 4"
13'-4"
SECTIONAL ELEVATION -DD' (REF IMAGE)
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC'
B
D
A
A PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
59
KEY PLAN
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
DIRECTOR'S CABIN-2
C
C
17'-3"x13'-6" D
B
SHEET TITLE
DIRECTOR'S CABIN-2-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
9"
Cornice
Void
8"
8"
Cornice Window
3
" 1'-6"
Paneling partition
4'-6"
4'-6"
4'-6"
" 1'-6"
3
4
Partition wall
4 3
DOOR
4
2.5cmMDF/Plywood
8" 3 4" 1'-1012"
514"
3'-6"
412"
2'-6"
412"
3'-6"
33 4" 1'-4" 33 4" 8"
3
" 1'-6" 3
4
Flooring
93 4"
2'-6"
8"
5'-6"
8"
2'-6"
Void
8"
1'-0"
13 4"
1
SECTIONAL ELEVATION -AA'
D
1'-93 4"
Skirting
Skirting
4 4"
SECTIONAL ELEVATION -BB'
1'-6"
Paneling partition
912"
2'-4"
3'-6"
2.5cmMDF/Plywood
4"4"
2'-4"
3'-6"
4"
4"4"
3
4
3'-6"
1'-7"
Void
shelf finished with appr.american walnut laminate
" 1'-6"
9'-9"
Horizontal Support Member Every Necessary Interval
4"2"4"
" 1'-6"
3
4"2"4"
4
" 1'-6"
3
4
FIXED GLASS
1'-6" 912"
Finished Floor Lvl
False ceiling Lvl
" 1'-2" 3 4" 1'-53 4"
1'-9"
10" 1'-9"
10" 9"
False ceiling line
4
shelf finished with appr.american walnut laminate
Void 8"
" 1'-2" 3 4" 1'-53 4"
False ceiling Lvl
1'-9"
1'-9"
10"
Beam line
2'-9" 3"
7'-91 4"
6"
1'-103 4"
8" 3
SECTIONAL ELEVATION -CC'
Finished Floor Lvl
"
4
B 8"
8"
9"
A False ceiling Lvl 6"
A
1'-9"
8"
14'-9"
STORAGE
OPEN SHELF 7'-8"
Fixed glass 9'-0"
13'-6"
OPEN SHELF
PANTRY 7'-0"X8'-0"
door lintel is 5'-6"
OPEN SHELF
59
Paneling partition Skirting
C
C D
2'-0"
2'-0"
2'-0"
2'-6"
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
4"4"
Finished Floor Lvl
AHU 12'-0"X8'-3"
612" 1'-4"
6"
612" 1'-4"
8'-9"
6"
KEY PLAN
SECTIONAL ELEVATION -DD'
B DIRECTOR'S CABIN-1 14'-9"X13'-6"
NORTH
SHEET TITLE
DIRECTOR'S CABIN-2-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
2'-0"
2'-0"
5"
5"
9"
9" 1'-6" 1'-1" 3
4
3'-63 4"
3'-9"
"
514"
3'-6"
6"
2" 2" 4"
2'-3" 6" 8" 6"
11" 63 4" 33 4"
SECTIONAL ELEVATION -AA' (REF IMAGE)
6"
7'-0"
6"
2'-3" 512" 112"
11 4"
SECTIONAL ELEVATION -BB' (REF IMAGE)
SECTIONAL ELEVATION -BB'
5"
9"
9"
2'-0"
SECTIONAL ELEVATION -AA'
2'-3"
9'-6"
4'-9"
10'-6"
9'-6"
2" 4"
1'-9" 6"
15'-5"
2" 2"
6"
Void
2" 2"
2'-3"
2"
4'-9"
Void
1'-8" 1'-9"
1'-9"
4" 2'-3" 2" 6"
Void
2'-0"
9"2'-73 4" 431'-1" 4"
1'-6" 3"
8'-714"
6"
2"
1'-0" 1'-0" 1'-0"
FIXED GLASS
8'-3"
1'-0" 1'-0" 1'-0"
DOOR 2"
9'-6"
4'-9"
1'-8"
Void
1'-6"
3" 15'-5"
1'-9" 3
4
"
SECTIONAL ELEVATION -CC' (REF IMAGE)
6"
3" 412"
8'-0"
6"
1'-9"
6" 8" 114"
13'-4"
SECTIONAL ELEVATION -DD' (REF IMAGE)
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC'
B
D
A
A PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
59
KEY PLAN
57
61
55
63
53
65
51
67
49
69
47
71
UP
C
DINING
15'-2"X9'-4"
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
C
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
DIRECTOR'S CABIN-3
17'-3"x13'-6" D
B
SHEET TITLE
DIRECTOR'S CABIN-3-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
" 1'-2" 3 4" 1'-53 4"
1'-9"
Void
Cornice
8"
Cornice Window
3
4'-6"
" 1'-6"
3
3
" 1'-6"
DOOR
4
2.5cmMDF/Plywood
3
4"2"4"
" 1'-6"
3
4
Horizontal Support Member Every Necessary Interval
3'-6"
412"
2'-6"
412"
3'-6"
6"
1'-4"
4
93 4"
2'-6"
SECTIONAL ELEVATION -AA'
D
3
4"4"
Flooring
614"
8"
5'-6"
8"
2'-6"
Void
43 4" 1'-6"
8"
SECTIONAL ELEVATION -BB'
1'-6"
1'-93 4"
912"
3'-6"
3
1'-6"
814"
Paneling partition Skirting
Skirting Void
1'-1114"
2'-4"
4
1'-7"
2.5cmMDF/Plywood
8"
shelf finished with appr.american walnut laminate
" 1'-6"
" 1'-6"
3
4
FIXED GLASS
4
" 1'-6"
Paneling partition
912"
Finished Floor Lvl
False ceiling Lvl
4
Partition wall
4
shelf finished with appr.american walnut laminate
Void
9"
False ceiling line
False ceiling Lvl
" 1'-2" 3 4" 1'-53 4"
1'-9"
Beam line
4"
2'-9"
7'-91 4"
6"
Finished Floor Lvl
1'-1112"
SECTIONAL ELEVATION -CC'
B False ceiling Lvl
8"
9"
A
6"
A
1'-9"
15'-3"
STORAGE
OPEN SHELF 7'-8"
9'-9"
Fixed glass 9'-0"
13'-6"
OPEN SHELF
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
OPEN SHELF
59
Paneling partition Skirting
2'-6"
2'-6"
2'-3"
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
C
C
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
4"4"
Finished Floor Lvl
6"
D
2'-0"
6"
7'-6"
6"
2'-0"
6" 8"
KEY PLAN
SECTIONAL ELEVATION -DD'
B DIRECTOR'S CABIN-3 15'-3"X13'-6"
NORTH
SHEET TITLE
DIRECTOR'S CABIN-3-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
9" 5" 1'-4"
10'-6"
4'-9"
1'-6"
2" 4" 2"
1'-6"
1'-0"
2'-3"
8'-0"
6"
2'-3"
2'-3"
9"
2" 13 4"
3"
8"
6"
Void
8" 1'-6"
2'-3"
6"
7'-9"
6"
2'-3"
6" 112"
5"
212"
SECTIONAL ELEVATION -AA'
2"
OPEN SHELF
1'-9"
1'-9"
CLOSED SHELF
1'-9"
1'-6"
OPEN SHELF
1'-6"
1'-6"
CLOSED SHELF
1'-0" 1'-0" 1'-0"
1'-6"
1'-8"
1'-4"
OPEN SHELF
SECTIONAL ELEVATION -BB'
SECTIONAL ELEVATION -AA' (REF IMAGE)
SECTIONAL ELEVATION -BB' (REF IMAGE)
1'-8" 1'-0" 1'-0" 1'-0" 1'-9"
Void
Void
1'-812" 7"
1'-8" OPEN SHELF
1'-0" 1'-0" 1'-0"
CLOSED SHELF
Void
1'-9"
1'-6"
CLOSED SHELF
OPEN SHELF
1'-9"
Void
OPEN SHELF
1'-6"
1'-6"
1'-4"
Void
3'-514"
6"
4'-6"
6"
2'-6"
CLOSED SHELF
FIXED GLASS OPEN SHELF
CLOSED SHELF
OPEN SHELF
Void
6" 1'-812"
1'-8"
612"
2'-9" 53 4"
SECTIONAL ELEVATION -CC'
SECTIONAL ELEVATION -CC' (REF IMAGE)
B
D
OPEN SHELF
A
1'-6" 3"
7'-9"
1'-812"
3"
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -DD' (REF IMAGE)
A
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
DIRECTOR'S CABIN-4
59
KEY PLAN
15'-2"x14'-9"
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
DIRECTOR'S CABIN-4 15'-2"X14'-9"
C
C D
B
SHEET TITLE
DIRECTOR'S CABIN-4-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
10"
1'-9"
1'-9"
9"
9"
8"
8"
Cornice
4'-6"
3
4
Paneling partition 4'-6"
OPEN SHELF
False ceiling line
6'-7"
812"
Flooring
3'-0" 3
2"
4
9'-9" 1'-1012"
SECTIONAL ELEVATION -AA'
GLASS STORAGE
3'-6"
1'-9"
3'-6"
53 4"
2'-6"
4"2"4"
Flooring
8"
1'-53 4"
1014"
3'-0"
8"
5'-2"
8"
8" 3"
3'-0"
SECTIONAL ELEVATION -BB'
SECTIONAL ELEVATION -CC'
B STORAGE
GLASS STORAGE
A 1'-9"
D
3"
"
False ceiling Lvl
" 1'-6"
3
4
Void
" 1'-2" 3 4" 1'-53 4"
914"
4"4"
912"
4"4"
Skirting Void
3'-112"
A
3'-6"
3'-6" 2'-4"
OPEN SHELF
2'-4"
4 3
OPEN SHELF
OPEN SHELF
1'-6"
2'-10"
Appr.stone cladding
" 1'-6"
3
4"2"4"
4
2" 1'-6"
OPEN SHELF
4"2"
Finished Floor Lvl
" 1'-6"
2"
3
4
OPEN SHELF
shelf finished with appr.american walnut laminate
Void
" 1'-6"
9" 8" 2" 1'-4" 1'-8"
OPEN SHELF
" 1'-2" 3 4" 1'-53 4"
1'-9"
False ceiling line False ceiling Lvl
" 1'-6"
3
4
FIXED GLASS
Fixed glass
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
3
4
DOOR
" 1'-6" 1'-6"
3
4
C Skirting
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
DB
Finished Floor Lvl
Void
STORAGE
2'-9" 1
1 2"
D
57
SERVICE STAIRCASE
6"
9'-212"
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
912"
C
59
2'-03 4"
KEY PLAN
SECTIONAL ELEVATION -DD'
B DIRECTOR'S CABIN-4 15'-0"X14'-0"
NORTH
SHEET TITLE
DIRECTOR'S CABIN-4-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
2'-0" 9" 5"
9"
1'-9"
6"
2"
10'-3"
1'-9"
15'-7"
63 4"
1'-6"
6" 8" 2"
114"
3'-6"
6"
3'-9"
6"
3'-6"
6" 2"
3"
SECTIONAL ELEVATION -AA' (REF IMAGE)
8"
2"
SECTIONAL ELEVATION -BB' (REF IMAGE)
SECTIONAL ELEVATION -BB'
5"
9"
9"
2'-0"
2'-0"
SECTIONAL ELEVATION -AA'
2" 4"
2'-3" 6"
6"
Void
3" 33 4"
2" 2"
1'-9"
8'-3"
1'-0" 1'-0" 1'-0"
4'-9"
1'-8"
Void
6" 3 2'-2 2'-3" 2'-7" 4"
10"
9'-6"
1'-9"
4" 2'-3" 2" 6"
2"
2'-3" 512"
114" 23 4" 6" 112"
SECTIONAL ELEVATION -CC' (REF IMAGE)
2"
1'-6"
1'-6" 3"
7'-3"
1'-6"
3"12'-11"
2"
SECTIONAL ELEVATION -DD' (REF IMAGE)
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC'
D
FIXED GLASS
Void
8" 10" 1'-0" 8"
1'-0" 1'-0" 1'-0"
9'-6"
DOOR 2"
9'-6"
2" 4" 2" 2"
2'-3"
2"
10'-6"
4'-9"
4'-9"
1'-8"
5"
Void
B
A
A PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
59
KEY PLAN
DIRECTOR'S CABIN-5
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
15'-8"x14'-7"
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
C
C D
B
SHEET TITLE
DIRECTOR'S CABIN-5-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
9"
2'-0" 5" 1'-6" 4
"
6'-712"
4'-43 4" 3"
8'-3"
9'-6"
6"
2"
6"
Void
3
2" 4" 2"
2'-3"
2"
4'-9"
Void
2'-3"
3'-73 4" 6'-314" 3'-6" 2'-11" 914" 2" 2" 33 4"
17'-10"
3" 53 4"
SECTIONAL ELEVATION -AA' (REF IMAGE)
1'-4" 3'-7"
13'-23 4"
0"
8" 114"
63 4"
SECTIONAL ELEVATION -BB' (REF IMAGE)
SECTIONAL ELEVATION -BB'
5"
9"
2'-0"
SECTIONAL ELEVATION -AA'
7'-103 4"
1'-0" 1'-0" 1'-0" 1'-9" 6"
1'-9"
2'-3" 2" 2" 6"
2"
4"
2"
1'-0" 1'-0" 1'-0"
4'-9"
1'-8"
1'-8"
Void
Void 2'-23 4" 2'-6"
4'-0"
1112"
11'-3" 4'-6"
2'-3"
8"
8"
3 112" 7 4"
1'-9" 3"214"
SECTIONAL ELEVATION -CC' (REF IMAGE)
8'-0"
2'-10"
12'-1014"
SECTIONAL ELEVATION -DD' (REF IMAGE)
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC'
D
6"
B
DIRECTOR'S CABIN-6
17'-0"x13'-6"
A
A PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
59
KEY PLAN
57
61
55
63
53
65
51
67
49
69
47
71
UP
C
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
C
D
DINING
15'-2"X9'-4"
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
B
SHEET TITLE
DIRECTOR'S CABIN-6-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
1'-9" 8"
Void
3
" 1'-6" " 1'-6"
3
6"
2'-9"
6"
1'-6"
Flooring
43 4"
83 4"
2'-6"
SECTIONAL ELEVATION -AA'
8"
5'-6"
8"
2'-6"
9"
3
Void
73 4"
SECTIONAL ELEVATION -BB'
4'-9"
8" 43 4" 1'-0" 5" 1'-414"
3'-6"
714"
1'-6"
Finished Floor Lvl
1'-103 4"
SECTIONAL ELEVATION -CC'
B A
False ceiling Lvl
8"
9"
A
1'-9"
D
3
4
7'-912"
4"4"
4"4"
Void
1'-103 4"
1'-93 4"
Skirting
912"
Paneling partition
Skirting
2'-4"
3'-6" 2'-4"
3
4
1'-814"
" 1'-6"
3
" 1'-6"
4
Horizontal Support Member Every Necessary Interval
1'-6" 912"
Finished Floor Lvl
shelf finished with appr.american walnut laminate
4
4'-6" 4"2"4"
DOOR
4
9'-9"
" 1'-6"
3
4
4'-6"
" 1'-6"
Paneling partition FIXED GLASS
4"2"4"
3
4
Partition wall
False ceiling Lvl
" 1'-2" 3 4" 1'-53 4"
9"
1'-9" 8"
" 1'-2" 3 4" 1'-53 4"
Cornice
4
shelf finished with appr.american walnut laminate
Void
Cornice
9"
False ceiling line
False ceiling Lvl
OPEN SHELF 7'-8"
9'-9"
Fixed glass
9'-6"
STORAGE
OPEN SHELF
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
OPEN SHELF
59
Paneling partition Skirting
2'-0"
2'-0"
2'-0"
2'-7"
57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
DB
Finished Floor Lvl
4"4"
C
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
C
8"
D
1'-4"
6"
8'-10"
6"
1'-4"
4"
KEY PLAN
SECTIONAL ELEVATION -DD'
B DIRECTOR'S CABIN-6 15'-0"X13'-6"
NORTH
SHEET TITLE
DIRECTOR'S CABIN-6-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
1'-6" 11" 10'-1" 2'-4"
2'-4"
2"4"4"
2"4"4"
2"4"4"
Skirting
Flooring
Flooring
SECTIONAL ELEVATION -AA'
SECTIONAL ELEVATION -BB'
D
SECTIONAL ELEVATION -CC'
False ceiling line 1'-6"
C
4"2"4"
10'-1"
Horizontal Support Member Every Necessary Interval
4"2"4"
10'-1" 2'-4"
4"2"4"
Horizontal Support Member Every Necessary Interval
Skirting Finished Floor Lvl
4'-6"
Paneling partition
4'-6"
Vinyl glass
4'-6"
Cornice
11"
11"
Cornice
9"
9"
9"
False ceiling Lvl
1'-6"
False ceiling line
1'-6"
False ceiling line
11"
9"
False ceiling Lvl Cornice
4'-6"
Paneling partition
A
PANTRY 7'-0"X8'-0"
15'-2"X9'-4"
Horizontal Support Member Every Necessary Interval
59
4"2"4"
DINING
AHU 12'-0"X8'-3" door lintel is 5'-6"
10'-1"
A
57
61
55
63
53
65
51
67
49
69
47
71
DINING
15'-2"X9'-4"
UP
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
2'-4"
DB
B
B Flooring
C
DINING 15'-2"X9'-4"
NORTH
SHEET TITLE
DINING -SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
2"4"4"
Skirting Finished Floor Lvl
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
KEY PLAN SECTIONAL ELEVATION -DD'
D
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
1'-9"
False ceiling line
Cornice
5"
9"
1'-8" 9" 1" 8"
False ceiling line
8"
1'-9" 9" 8"
False ceiling Lvl
4"2"4"
4" 2"4"
4'-6"
S T O R A G E
Horizontal Support Member Every Necessary Interval
Fixed glass 9'-0" 9'-7"
DOOR
Paneling partition
4"2"4"
4'-6"
9'-9"
4'-6"
Void
2'-4"
3'-6"
2'-4"
3'-6"
2'-4"
3'-6"
Paneling partition 2.5cmMDF/Plywood
Skirting
4"4"
4"4"
4"4"
Skirting
Finished Floor Lvl
Flooring
Void
Flooring 8"
2'-10"
8"
2'-10"
8"
3'-9"
8"
3'-6"
8"
5'-9"
8"
3'-6"
8"
8"
2'-4"
8"
2'-6"
8"
2'-4"
8"
3'-6"
412" 1'-2" 41 2"33 4"1'-2" 33 4 "73 4"
SECTIONAL ELEVATION -AA'
2'-9"
8"
2'-9"
73 4" 1'-1" 4"
1'-6"
4"
1'-6"
4"
1'-6"
4" 1'-4"
1'-91 2"
1'-4"
4"
1'-6"
4"
1'-6"
4"
3'-61 4"
6"
SECTIONAL ELEVATION -BB'
Cornice
Cornice
1'-8"
False ceiling line
8" 9" 1"
False ceiling line
5"
1'-8" 5"
8" 9"
False ceiling Lvl
2'-3"
Beam line False ceiling line
Cornice
Paneling partition
9'-0" 4"
Fixed glass
Door Section 4" 2"
4"2"4"
9'-0"
Paneling partition
9'-0"
Horizontal Support Member Every Necessary Interval
Fixed glass
4'-6"
4'-6"
Paneling partition
2'-4"
2'-4"
3'-6"
2.5cmMDF/Plywood
Skirting
4"4"
Skirting 4" 4"
Skirting Finished Floor Lvl Flooring Flooring 6" 1'-13 4" 4" 1'-0" 4" 1'-1"
4'-81 4"
814 "
5'-8"
81 4"
4'-111 4"
8"
3'-6"
8"
3'-6"
91 2"
8" 71 4"
1'-9"
1'-2" 4"
1'-6"
4"
1'-6"
4" 1'-4"
1'-912"
81 4"
3'-6"
EXECUTIVE BOARD ROOM - SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
6'-0"
8"
3'-6"
8" 33 4" 1'-2" 4"412 " 1'-2" 41 2"
3'-6"
8"
2'-4"
8"
2'-6"
8"
2'-4"
10"
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC'
SHEET TITLE
8"
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
D
B
D
EXECUTIVE BOARD ROOM
B
EXECUTIVE BOARD ROOM
A
A
A
A
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3"
4" 1'-1" 1'-6" 4"
C
C
1'-6" 1'-4" 4" 7'-014"
4'-111 4"
63
53
65
51
67
49
69
47
71
UP
15'-2"X9'-4"
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
KEY PLAN
4'-111 4"
4"
1'-11 4"
1'-9"
4'-014"
4"
1'-6"
4" 1'-2" 4"
1'-6"
4" 4'-014"
4"
1'-6"
4" 1'-6" 1'-2" 4"
55
DINING
4"
2'-514"
1'-11 4"
1'-9"
61
4"
1'-6" 1'-4" 4"
6"
4" 1'-4"
4'-1114"
C
57
1'-6"
7'-014"
4" 1'-4"
4'-111 4"
1'-6"
2'-514"
1'-6"
6"
4" 1'-4"
4"
1'-6"
C
1'-6"
4"
1'-6"
4" 1'-1"
door lintel is 5'-6"
59
D
B
D
EXECUTIVE BOARD ROOM - FALSE CEILING LAYOUT
EXECUTIVE BOARD ROOM 27'-2"X33'-0"
SHEET TITLE
EXECUTIVE BOARD ROOM - SECOND FLOOR PART PLAN - WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
B
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
2'-0"
3'-6"
9'-7"
9'-6"
2" 2'-3"
4"
9'-6"
2"
2'-3"
2" 4"
2"
4'-9"
5"
9"
2'-0" 4'-9"
5"
9"
2'-0" 9" 712"5" 4'-9"
3'-6" 712" 8" 2'-3"
2" 2" 6"
6"
2" 2"
2" 6" 2"
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
59 57
61
55
63
53
65
51
67
DINING
15'-2"X9'-4"
8"
2'-0"
6"
4'-6"
3'-6"
11'-6"
6"
2'-6"
6" 8"
8"
6'-0"
6"
2'-3"
6"
3'-6"
1'-9"
1'-9"
6'-0"
1'-414"
1'-41 2"
1'-412"
1'-412"
1'-412"
1'-3"
1'-412"
1'-412"
3'-31 4"
1'-412"
49
69
47
71
UP
26'-10" 53 4"
11 4"
3"
3" 32'-8 4"
714"
6"
412"
412"
412"
412"
3
SECTIONAL ELEVATION -AA'
3" 212"
412"
412"
412"
1012"
V
V
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
8'-5 2"
KEY PLAN
SECTIONAL ELEVATION -BB'
SECTIONAL ELEVATION -BB' (REF IMAGE)
2'-0" 9" 2" 2'-3"
9'-6"
4'-9"
5"
8" 7'-8"
9'-7"
2" 4"
5'-10"
6"
6'-0"
6"
5'-0"
4"
8'-0"
6"
6"
1'-113 4" 1'-312"
6" 8"
712"
114"
1012"
29'-312"
1'-41 2"
1'-412"
1'-412" 1'-812" 6"
412"
412"
412"
8'-512"
PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
9'-0"
6"
2'-3"
1'-9" 3" 3" 32'-83 4"
1'-3" 3"
3'-6"
6"
2'-3"
6"
3"
6'-0"
8" 1 73 4" 1 4"
SECTIONAL ELEVATION -DD'
SECTIONAL ELEVATION -CC' (REF IMAGE)
EXECUTIVE BOARD ROOM - SECOND FLOOR WALL ELEVATION
6"
51 4"
SECTIONAL ELEVATION -CC'
SHEET TITLE
2'-3"
1'-10"
2" 2"
2" 93 4" 1'-3" 1012"
2" 2"
1'-71 4"
6"
2"
2'-3"
2"
7'-8"
9'-6"
4'-9"
5"
8"
9"
2'-0"
SECTIONAL ELEVATION -AA' (REF IMAGE)
9'-7"
Lockers
TOILET 14'-10"X9'-0"
DB
1
1'-10"
DB
DN
SERVICE STAIRCASE
2" 4"
53 4 "
714"
73 4"
11 4"
SECTIONAL ELEVATION -DD' (REF IMAGE)
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
3'-0"
8"
4'-0"
8"
7'-0"
8"
4'-0"
8"
3'-0"
24'-4" SHELF
SHELF
2'-2" " 4
3
" 4 3
1'-0"
" 4
3
1'-0"
" 3
4
1'-0"
3
4
4'-6"
1'-10"
Paneling partition
1'-13 4" 1'-0" 7"
"
1'-81 4"
1'-93 4"
2'-6"
8"
31 4"
SECTIONAL ELEVATION -AA'
D
Flooring
8"
SHELF
Partition wall
4"4"
4"4" 73 4"
STRUCTURAL GLAZING IN ELEVATION
Horizontal Support Member Every Necessary Interval
Void
Skirting
Finished Floor Lvl
6'-412"
DOOR
S T O R A G E
3'-8"
8"
3'-8"
6"
2'-9"
1'-13 4"
4'-73 4"
2'-4" 3'-6"
Appr.Black marcino stone cladding
Void
Appr.vinyl glass
4"2"4"
SHELF
S T O R A G E
Cornice Appr.travertine stone cladding
2'-4"
SHELF
4"2"4"
SHELF
4'-6"
Paneling partition
2'-1012"
Appr.vinyl glass
1'-312"
2'-23 4"
8"
2'-23 4"
9"
Cornice
8"
Cornice
9"
False ceiling line
1'-9"
False ceiling line
False ceiling Lvl
Void
Flooring
6" 1'-0"
1'-113 4"
4'-4"
8"
314"
SECTIONAL ELEVATION -BB'
15'-4"
2'-0"
8"
SECTIONAL ELEVATION -CC'
B SHELF
A
A
S T O R A G E
OPEN SHELF
7'-8"
Appr.vinyl glass
2'-1012"
15'-6"
STORAGE
Appr.stone cladding
9'-9"
8"
2'-23 4"
9"
False ceiling Lvl
PANTRY 7'-0"X8'-0"
2'-23 4"
59
4'-73 4"
2'-23 4"
2'-23 4"
Skirting
57
61
55
63
53
65
51
67
49
69
47
71
DINING
15'-2"X9'-4"
UP
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
Finished Floor Lvl
DB
4"4"
C
AHU 12'-0"X8'-3" door lintel is 5'-6"
OPEN SHELF
C
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
KEY PLAN SHELF 4'-2"
1'-0"
8'-4"
1'-0"
2'-8"
1'-0"
SECTIONAL ELEVATION -DD'
D
B
MANAGING DIRECTOR'S CABIN-1 24'-4"X15'-6"
NORTH
SHEET TITLE
MD'S CABIN-1-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
X
5"
9"
6" 1'-0"
Z
1'-3" 4'-10"
2" 2" 6"
2'-3" 2" 10" 8"
OPEN SHELF
Void
8"
3'-6"
3'-9"
3"
X
3'-6"
6'-9"
3'-6"
1'-0" 3"
1'-0" 1'-0" 1'-0"
OPEN SHELF
1'-9"
9'-6"
7'-7"
OPEN SHELF
1'-9"
2" 4" 2"
9'-6"
4'-9"
1'-0" 1'-0" 1'-0" 1'-3"
Void
1'-6"
8" 6"
2'-6"
2"
3"
SECTIONAL ELEVATION -AA'
6"
10'-0"
6"
2'-6"
8" 8" 314"
Z SECTIONAL ELEVATION -BB'
REFERENCE IMAGE -AA'
REFERENCE IMAGE -BB'
9" 5"
5"
9"
Y
1'-10"
3'-2"
7'-1"
3'-2"
4'-812"
3'-4"
SECTIONAL ELEVATION -CC'
6" 8"
1'-0" 3"
D
2'-3"
2"
2'-3" 6"
2" 2"
Void
1'-6"
4'-9" 4" 2"
FIXED GLASS
2" 3" 3"
FIXED GLASS
9'-6"
4'-9"
1'-0" 1'-0" 1'-0" 1'-3"
FIXED GLASS
1'-9"
9'-6"
Void
DETAIL-P
1'-0" 7"
1 3" 1 2"
3"
3"
REFERENCE IMAGE -CC'
3"
2'-9"
2'-3" 5"
6"
6'-9"
6" 2'-9"
8" 1 33 4" 1 4"
Y
SECTIONAL ELEVATION -DD'
REFERENCE IMAGE -DD'
B
A
A
DETAIL-Q
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
KEY PLAN
59 57
61
55
63
53
65
51
67
49
69
47
71
UP
DINING
15'-2"X9'-4"
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
MANAGING DIRECTOR'S CABIN-3
25'-0" X 17'-6"
C
D
C
B MANAGING DIRECTOR CABIN-3 25'-0"X17'-6"
SHEET TITLE
MANAGING DIRECTOR'S CABIN-3 SECOND FLOOR-WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
6" 9"
Z
1'-3"
4'-10"
6"
4'-3"
6"
9'-0"
6"
4'-3"
6"
2"
2'-3" 3'-2"
OPEN SHELF
3'-6" OPEN SHELF
2"
6" 6"
S T O R A G E
OPEN SHELF
1'-0" 1'-0" 1'-0"
SHELF
1'-9"
SHELF
4" 2" 9'-6"
SHELF
Void
Void
2'-3"
1012"
212"
512"
6" 1'-6"
SECTIONAL ELEVATION -AA'
2'-8"
1012"
REFERENCE IMAGE -AA'
8"
Z
9'-0"
8"
2'-8"
1'-0" 8" 2"
SECTIONAL ELEVATION -BB'
REFERENCE IMAGE -BB'
5"
9"
Y
Void
Void
9'-6"
4'-9"
1'-0" 1'-0" 1'-0" 1'-3"
Void
S T O R A G E
1'-9"
2" 6"
2'-3"
2"
4"
2"
SHELF
S T O R A G E
Void
1'-812"
4'-3"
6"
15'-10"
Void
Y
1'-6" 8" 6"
8" 1 2
10 "
SECTIONAL ELEVATION -CC'
D
Void
2"
REFERENCE IMAGE -CC'
2'-6" 111 4"
6"
8'-3"
2'-9"
3
5 4"
SECTIONAL ELEVATION 5"-DD'
8" 714"
1'-03 4"
REFERENCE IMAGE -DD'
B
A
A MANAGING DIRECTOR'S CABIN-1
24'-3" X 17'-6" storage
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
KEY PLAN
59 57
61
55
63
DINING
15'-2"X9'-4"
53
65
51
67
49
69
47
71
UP
DB
Lockers V
TOILET 14'-10"X9'-0"
DN
V
SERVICE STAIRCASE
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
C
C D
MANAGING DIRECTOR CABIN-1 24'-3"X15'-6"
SHEET TITLE
MANAGING DIRECTOR'S CABIN-1 WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
NORTH
B
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
3'-6"
D
6"
3'-8"
6"
3'-6"
8"
3'-8"
SECTIONAL ELEVATION -AA'
8"
3'-6"
1014" 1012"
Flooring
8"
23 4"
8"
10"
8"
3'-0"
13 4"
9" 4'-6"
8"
9" 8" 2" 1'-4" 1'-8"
FIXED GLASS
8"
3'-6"
8"
3'-6"
8"
3'-0"
1'-014"
2'-10"
CLOSED SHELF
CLOSED SHELF
2'-4"
4"2"4"
OPEN SHELF
Flooring
2'-1"
9'-9"
2" 2" 1'-6"
OPEN SHELF
8" 73 4" 1
SECTIONAL ELEVATION -BB'
B
3'-0" 2
6'-7"
7"
"
10"
3'-0"
8'-3"
8"
2'-6"
63 4" 214"
53 4"
SECTIONAL ELEVATION -CC'
A
STORAGE
A
CLOSED SHELF
4"4"
2'-0"
Void
93 4"
CLOSED SHELF
4"2"
Skirting
1'-6"
3
4
1'-91 4"
Void
1'-1114"
OPEN SHELF
4
9'-9"
" 1'-6" 4 3
Appr.travertine stone cladding
" 1'-6"
1'-7"
1'-93 4"
OPEN SHELF
3
Appr.vinyl glass
912"
2'-2"
1'-612" " 1'-2" 4
3
" 1'-6"
Paneling partition
3
1'-10" 1'-13 4"
Finished Floor Lvl
Void
Window
4
"1'-0" 3 4"1'-0" 3 4"1'-0" 3 4" 1'-312" 3 4"
Cornice Void
1'-9"
10" 1'-9"
False ceiling line
False ceiling Lvl
9" 8"
8"
9"
7"
False ceiling Lvl
4'-6"
OPEN SHELF
DOOR
7'-8"
Window Appr.vinyl glass
PANTRY 7'-0"X8'-0"
GLASS STORAGE
STORAGE
GLASS STORAGE
2'-312"
2'-312"
OPEN SHELF 3'-0"
Skirting
61
55
63
53
65
51
67
49
69
47
71
DINING
15'-2"X9'-4"
UP
Lockers
DB
V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
DB
1'-0" 1"
D
2'-312"
57
4"4"
Finished Floor Lvl
2'-4"
C
59
4"4"
C
AHU 12'-0"X8'-3" door lintel is 5'-6"
4"2"4"
OPEN SHELF
2'-9" 33 4"
8"
11'-6"
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
111 4" 8"
KEY PLAN
514"
SECTIONAL ELEVATION -DD'
B MANAGING DIRECTOR'S CABIN-2 24'-6"X17'-8"
NORTH
SHEET TITLE
MD'S CABIN-2-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
Y
1'-9"
1'-9"
10'-6"
1'-0" 1'-0" 1'-0" 1'-3"
Void
1'-0" 1'-0" 1'-0" 1'-3"
Void
Void
Void
8" 111 4"
1'-9" 11 27"12"
2'-6"
6"
9'-6"
SECTIONAL ELEVATION -AA'
6"
2'-6"
Y
63 4"
SECTIONAL ELEVATION -BB'
REFERENCE IMAGE -AA'
REFERENCE IMAGE -BB'
OPEN SHELF
1'-3" 4'-4"
8"
6"
2'-3"
OPEN SHELF
1'-9"
1'-9"
CLOSED SHELF
6"
7'-6"
6"
2'-3"
1'-3"
8'-3"
51 2"
6" 3
2'-9"
X
"
4
6"
1'-2"
11 2"
514"
SECTIONAL ELEVATION -CC'
3
2'-9"
1'-0" 6"
6" 1'-0"
53 4" 3"
"
4
REFERENCE IMAGE -CC'
D
9'-6"
10'-6"
OPEN SHELF
1'-0" 1'-0" 1'-0"
1'-4" 1'-6" 1'-6" 1'-6"
OPEN SHELF
CLOSED SHELF
1'-9"
1'-4" 1'-6" 1'-6"
OPEN SHELF
1'-6"
X
8"
1 3" 1 4"
SECTIONAL ELEVATION -DD'
REFERENCE IMAGE -DD'
B
A DETAIL-Q
PANTRY 7'-0"X8'-0"
AHU 12'-0"X8'-3" door lintel is 5'-6"
KEY PLAN MANAGING DIRECTOR'S CABIN-2
59 57
DINING
61
15'-2"X9'-4" 55
63
53
65
51
67
49
69
47
71
UP
DB
Lockers V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
24'-8" X 17'-8"
DB
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
C
B
D MANAGING DIRECTOR CABIN-2 24'-6"X17'-8" NORTH
SHEET TITLE
MANAGING DIRECTOR'S CABIN-3 WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision
8"
"1'-0" 3 4"1'-0" 3 4"1'-0" 3 4" 1'-312" 3 4"
4'-6"
DOOR
Window
1'-103 4"
3'-014"
7'-0"
4'-614"
Flooring
6'-113 4"
1'-2" 4"
2'-9"
314"
33 4"
6"
8"
3'-0"
8"
3'-0"
8"
2'-6"
1'-10"
Void
Flooring
914"
3'-6"
1'-4" 43 4 "
3"
SECTIONAL ELEVATION -AA'
D
3'-0"
2'-4"
Skirting
4"4"
Skirting
Void
4"4"
2'-4"
3'-6"
1'-93 4"
Paneling partition
3
Appr.travertine stone cladding
3
1'-10" 1'-13 4"
Finished Floor Lvl
Paneling partition
4
4"2"4"
partition wall 1'-7"
1'-2" 1"
43 4 "
1'-2" 1"4"
SECTIONAL ELEVATION -BB'
3'-6"
1'-2" 33 44"12"
5'-0"
3'-6"
714"
1'-13 4"
4'-6"
FIXED GLASS
9'-9"
FIXED GLASS
2'-2"
9"
9" 8"
Void
Appr.vinyl glass
4"2"4"
2'-2" "1'-0" 3 4"1'-0" 3 4"1'-0" 3 4" 1'-312" 3 4"
Cornice Appr.vinyl glass
4
Appr.travertine stone cladding
Cornice Void
1'-9"
1'-9"
False ceiling line
False ceiling Lvl
1'-103 4"
412"
SECTIONAL ELEVATION -CC'
B
A
A 9"
STORAGE
8"
9"
False ceiling Lvl
OPEN SHELF
7'-8"
9'-0"
Window PANTRY 7'-0"X8'-0"
OPEN SHELF
AHU 12'-0"X8'-3" door lintel is 5'-6"
59
Paneling partition 2'-312"
Skirting
C
Finished Floor Lvl
2'-312"
OPEN SHELF 3'-0"
61
55
63
53
65
51
67
49
69
47
71
DINING
15'-2"X9'-4"
UP
Lockers
DB
V
DN
TOILET 14'-10"X9'-0" V
SERVICE STAIRCASE
DB
4"4"
C
2'-312"
57
EXECUTIVE BOARD ROOM 27'-2" x 33'-0" (21 SEATS)
10"
1'-6"
8"
11'-6"
8"
1'-6"
8"
KEY PLAN
SECTIONAL ELEVATION -DD'
D
B MANAGING DIRECTOR'S CABIN-3 25'-0"X17'-6"
NORTH
SHEET TITLE
MD'S CABIN-3-SECOND FLOOR WALL ELEVATION PROJECT
PROPOSED OFFICE BUILDING FOR M/S.KALPATHI INVESTMENT PRIVATE LIMITED, AT T.NAGAR,CHENNAI-17.
SHEET INFORMATION
NOTES: THIS DRAWING IS COPYRIGHT. DO NOT SCALE FROM THE DRAWING. THE CONTRACTOR AND HIS SUB CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING MANUFAUTURE. THE CONTRACTOR IS TO BRING TO THE NOTICE OF THE ARCHITECT OF ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO WORK COMMENCEMENT
PROJECT PHASE DISCIPLINE
: PRESENTATION
DRAWN
: GOWTHAMAN
CHECKED
:
APPROVED
: SHAHRIAR DEHGHAN
DATE
: 08.01.2018
SCALE
: 1/8"=1'-0" @ A3
SHEET NO.
SUITE-1913 P.O.BOX 123234,DUBAI. UAE
REV
BY
REV
BY
APPR.
REVISIONS
DESCRIPTION
DATE phase
sector
building
discipline
sub-dis
sheet type
sequence
number
dwg part.
revision