1 minute read
CONTRACTORS (CO
6
Contractors (CO)
Advertisement
The element requires that contractors performing maintenance, repairs, turnaround activities, major renovation work or speciality work on the process or adjacent to the process, are well trained in carrying out the intended work and are informed of the known potential hazards related to the work and/or the processes involved.
GPIC Compliance
PROCESS SAFETY MANAGEMENT
HANDBOOK 2022
GPIC’s direct hire and/or lump sum contractors go through a selection process that starts from contractor prequalification assessment, trade testing, rental equipment physical verification, safety induction training, on the job assessment, weekly contractor safety meetings and post service evaluation. Contractors performing maintenance within the process areas are apprised of the hazards during the safety induction training and regular Tool Box Talk.
Controlling Documents
• SOP-P&W-01-01: Establishing and Managing Approved
Suppliers List • SOP-GEN-00-04: Contractor Services Management • FR-P&W-01-14: Contractor / Vendor Performance
Evaluation Form • GL-SEC-00-04: Checking of Contractors Equipment • SOP-SEC-00-02: GPIC Complex Access & Egress (Induction to contractors by SHE Department) • FR-GEN-00-09: Checklist Prior to Placement of PO for
Service Package Contractors • FR-GEN-00-10: Checklist Prior to Placement of PO for
Manpower Supply Services • FR-P&W-01-06: Supplier Pre-qualification Form • FR-MNT-00-11 to FR-MNT-00-21 and FR-MNT-00-25 to
FR-MNT-00-28 Typical Trade Test for Various Crafts