grace.soejanto Undergraduate Architecture Portfolio
info. Grace Soejanto Sophomore in Architectural Studies University of Illinois Urbana Champaign | 2015 grace.soejanto@gmail.com 206-434-8603
“The CAPACITY to learn is a gift, the ABILITY to learn is a skill, but the WILLINGNESS to learn is a CHOICE.“
RESUME EDUCATION
UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGN Bachelor of Science in Architectural Studies UNIVERSITY OF WASHINGTON Pre-Architecture program as a non-matriculated student
COMPETITION& AWARDS
Aug 2012 - May 2015 GPA: 4.0 / 4.0 Jun 2011 - Jun 2012 GPA: 3.1 / 4.0
BELLEVUE COLLEGE Associates in Art and Science
Sept 2010 - Jun 2012 GPA: 3.75 / 4.0
EDWARD C EARL PRIZE FIRST PLACE Nominated and won the award based on 7-Space Design Project
Urbana Champaign Fall 2012
JAMES M WHITE MEMORIAL PRIZE Nominated based on remarkable works and effort in Arch 231
Urbana Champaign Fall 2012
WORK EXPERIENCE
ACTIVITES
BELLEVUE COLLEGE DISABILITY RESOURCE CENTER Note Taker Assited and supported disabilities student through taking notes
Bellevue, WA Mar 2011 - Jan 2012
BELLEVUE COLLEGE BOOKSTORE Front Desk Assisted students to find their books Organized students’ questions
Bellevue, WA Jan 2011 - Sep 2011
STUDENT PROGRAM Peer to Peer - First Three Days Assited some school programs Took charged of the information center Monitored the questions from students
Bellevue, WA Jan 2011 - Jun 2011
INDONESIAN PRESBYTARIAN CHURCH Active Member Regulated the activities in choir & Ecclesia Represented the Head of Production Team for IPC Retreat 2012 PHI THETA KAPPA Active Member Volunteered in campus services Handled a part of construction “Build A Thon”
Seattle, WA Sept 2010 - Present
Bellevue, WA Oct 2011 - Jun 2012
INDONESIAN FELLOWSHIP CLUB Secretary Organized meeting of IFC, systemized paper works Scheduled and planned cultural based events
Bellevue, WA Apr 2011 - Jun 2012
PEER TO PEER VOLUNTEERING EVENT Volunteer and Guide for Groundbreaker Tour Directed a tour around Bellevue College campus area Assisted to motivate student in pursuing higher education PERMIAS Volunteer at Indonesian Embassy’s Self-Report Procedure
SKILLS TALENTS & ACHIEVEMENTS
LANGUAGE Fluent in Bahasa Indonesia Intermediate in Chinese MUSICAL INSTRUMENTS Piano - Both practical and Theory LEADERSHIP Experienced in leading club as well as group activities Experienced in planning and hosting events COMPUTER Expert in AutoCAD, Autodesk REVIT Expert in Adobe Illustrator, Adobe InDesign, Adobe Photoshop Expert in Google SketchUP
Bellevue, WA Feb 2012
Seattle, WA Jan 2011
TABLE OF CONTENT SPRING 2013
PAVILION- FACADE DESIGN STATE FARM PROJECT
FALL 2012
SEVEN SPACE CONSTRUCTION
( EARL PRIZE FIRST PLACE)
BRC MODEL MAKING
SPRING 2012
PAINTING& SKETCHES
THE LIGHT HOUSE FREEWAY PARK DOCUMENTATION SELF PORTRAIT PAPER COLLAGE
designed by Shigeru Ban precedent analysis study
CURTAIN WALL HOUSE
University of Illinois. Arch 272 Project. Spring 2013
Light
Circulation
Material
Precedent Study Located in the dense neighborhood of Itabashi-ku, Tokyo, Curtain Wall House is house that shows the bridging between the traditional style and the modern style of Japanese architecture. Even though it does not show directly the image of tatami or shoji screen that we find in the traditional Japanese house, we as an observer can certainly see the modernized Japanese architecture through a quick glance of the house.
Structure
Combined Parti
Even though the Curtain Wall House is not using the traditional style of Japanese architecture, it never fails to show the proud of the Japanese architecture for its simplicity and its organization of spaces. The approach of using curtain wall that spans two-stories high at the exterior faรงade is a really broad and unique idea that let this house marks its existence throughout the architecture history.
Axonometric View Scale 1/8”=1’-0”
PAVILLION DESIGN University of Illinois. Arch 272 Project. Spring 2013
First Floor Plan
Second Floor Plan
West Elevation
Section A-A
Concept Statement This pavillion was designed within the purpose of using the pavillion as temporary art exhibition place or so as gathering venue. Sited on a sloping site, one has to descended downward to reach the most important place. The verticality of entrance shares the similar value of how the facade was treated at both east and west facade. This pavillion consists of two distinct elements overall; the mass and the void. The main events can be planned inside the massing box and the void part is used as more flexible event as well as viewing platform where people can stop there and enjoy the view framed by the vertical columns.
Scale 3/64”=1’-0”
N
Earl C. Prize Fall 2012 First Place
Seven space construction
University of Illinois. Arch 271 Project. Fall 2012
Parti Diagram The overall project has its main focus in CIRCULATION. This project was derived from the thought of intersecting two rectangles with another rectangle that is perpendicular to them. While using rectangular shape to create similarity, the perpendicular rectangle helps creating some variations throughout the overall idea.
Axonometric Drawing
First Floor Plan
Second Floor Plan
Section A-A
South Elevation Scale 3/32”=1’-0”
N
AutoCAD, Sketchup and Hand-drawing
Taft house study
University of Illinois. Arch 231. Fall 2012 Taft house is located at 1401 S. Maryland Drive, Urbana IL. The study of taft house was conducted in order to help us understand how to draw basic floor plan, elevation, as well as section cut in AutoCAD program. Every measurement and drawing have been done starting from scratch.
2x8 Roof Rafters
Roof Level 30’ - 3 1/4”
2x8 Ceiling Joist
Ceiling Level 21’ - 11”
2x8 Floor Joist ROOM 208
ROOM 212A Second Level 14’ - 5”
ROOM 102
ROOM 105
Brick
First Level 3’ - 10 1/2” Ground Level 0’ - 0”
ROOM 101
Basement Level 4’ - 6 1/4”
1” Floor Sheathing
OFFICE
UTILITY ROOM
8” CMU Wall STORAGE
4” Concrete Slab 5” Gypsum Wall
ROOM 106 DOWN
East-West Section Cut
UP
ROOM 102 Roof Level
DOWN
Asphalt Shingles
DOWN
UP
31’ - 0”
ROOM 105 Ceiling Level Horizontal Wood Siding
21’ - 11”
ROOM 103 ROOM 104
Brick Foundation
Second Level 12’ - 7”
Ground Level 0’ - 0”
N
First Floor Plan Scale 3/64”=1’-0”
South Elevation
Natural Soybean Research Center
W Pennsylvania Ave.
W Pennsylvania Ave.
Summer Solstice Winter Solstice 8PM 6AM 6PM
3PM
7AM 3PM
12PM
Cemetery
5PM
12PM
S Maryland Dr.
Site Plan Scale 1/32”=1’-0”
N
designed by Shigeru Ban precedent analysis study
building research council University of Illinois. Arch 231. Fall 2012
BRC or Building Research Council is located around Champaign area. For this particular house, we are assigned to make a section model ensuring that we understand how light frame construction works. Afterwards, we also needed to generate a sketchup model.
Ceiling 8’-1”
Ground Level 0’-0”
Basement - 9’-9 1/2”
Exterior.
Interior.
1.Laying down the footing.
down the 4” concrete 2. Laying slabs on the basement.
have been stacked up 3. CMU to form a complete wall.
All bottom plates are 2x4 wood studs.
Starting to stack 8”x8”x18” CMU.
the stairs. 4x4 posts 6. Forming are used to bear the weight
of the stairs. On top of it, there are 2x10 @ 1’-0” o.c. wood studs.
the stairs with Resilient 7. Covering Performed Thread Cover.
Thick Friction-Fit Fiberglass 12.Exterior part of the first floor 11. Full insulation are used in the is covered by 12” C-C Exterior exterior wall.
Grade DEPA Plywood Unsanded as well as 3/8” Ext. C-C Plywood Medium Density.
down the bottom plate 4. Laying of the basement wall studs.
down the floor joists. 8. Laying All floor joists are made out of 12” bar joists @ 2’-0” o.c.
13. Before laying down the roof
trusses, there is a 1/2” Gypsum Drywall which their lenght depends on the trusses.
top of the floor joists, laid out 9. On Steel Concrete Deck Form. Right above it is the 3” concrete slabs.
Friction Fit as 14. 6”roofFiberglass insulation. 4 mil Polyethylene.
of forming the 5. Continuation wall with wall studs. All wall studs are 2x4 @1’-4” o.c.
the same 2x4 @ 1’-4” o.c. 10. Using wood studs to form the first floor wall.
15. Putting the roofing felt on top of the trusses.
Measured Detail. AutoCAD Drawing Scale: 1/2”=1’-0”
1. 2. 3. 4. 5. 6. 7.
1/2” OSB SHEATHING 2 x 6 CEILING JOISTS 2 x 6 ROOF RAFTERS @ 24“ O.C. 2 x BLOCKING 2 x 4 FRAMING @ 24” O.C. 5/8” GYPSUM BOARD 5/8” OSB SHEATHING
8. 9. 10. 11. 12. 13. 14.
1/2“ GLUED-LAMINATED BAMBOO 1-1/2” RIGID INSTULATION FOAMED-IN PLACED INSTULATION 2 x BLOCKING SOLAR PANEL CONNECTOR 12“ LOAKSEAM METAL ROOF FELT UNDERLAYMENT
15. 2 x 4 SUPPORTING MEMBER FOR ROOF SHEATHING 16. 5/8 x 4 TREATED LUMBER 17. 3/4 x 4 TREATED NON-CONTINOUS LUMBER 18. 3/4 x 10 RECLAIMED BOARD SIDING 19. TYVEK PROTECTOR 20. TYVEK AIR RETARDANT WRAP 21. 1/2” EXTERIOR GRADE PLYWOOD SHEATHING
the light house University of Washington. Arch 211 Project. Spring 2012 As how lighthouse usually guide the direction of the ship, this tower guide the way of the visitors through the light and cast-shadows it has. The most important point of this tower lies on the top viewing room, therefore all the light guides the visitors to reach there and enjoy the view captured by the space.
Circulation Diagram
Space Diagram
Cut-away Axonometric View
A
B
C
C
D
D
C
C
D
D
C
C
D
D
A
B
Floor Plan Scale 1/32”=1’-0”
N
“Let the light guide your way! ” Section DD
Section AA
Section BB
Section CC
PIGOTT MEMORIAL CORRIDOR University of Washington. Arch 211 Project. Spring 2012 1 Perspective 1
Perspective 2
Perspective 3
2 3 4
Piggot Memorial Corridor is located nearby Freeway Park in Seattle. Both Freeway Park and Piggot Memorial Corridor was designed to bridge over Interstate 5 separation that divides Seattle into two parts (East and West Seattle).
Perspective 4
Piggot Memorial Corridor itself contain the combination between stairs and ramps. These two elements intersect each other and weave together in creating a unified space. Section A-A
Section B-B
Division of Groundsheet.Horizontal -Vertical Version
Art 110 Project. Understanding Composition. Bellevue College. Winter 2011.
Division of Groundsheet. Curvilinear Version
Art 120 Project. Self Portrait. Charcoal on 18” x 24” Strathmore Paper Bellevue College. Spring 2011.