Grant Poteat Architectural Portfolio - 2022

Page 1


M I C H A E L GR AN T POT E AT [864] 680-7901 mpoteat3@gatech.edu https://www.linkedin.com/in/grantpoteat/

EDUCATION spring 2022

GEORGIA INSTITUTE OF TECHNOLOGY - SCHOOL OF ARCHITECTURE M.Arch - Masters of Architecture - 2 year program Current Cumulative GPA - 4.0 Anticipated Graduation - Spring 2022 2021 Lord Aeck Sargent Design Fellowship Award Winner

summer 2018

CLEMSON UNIVERSITY - SCHOOL OF ARCHITECTURE Bachelor of Architecture Minor in Management

fall 2017

EXPERIENCE 2017-2020 fall 2021 - present

Cumulative GPA - 3.26

Study abroad - Barcelona, Spain | Barcelona Architecture Center Studied under internationally acclaimed architect Miguel Roldan COMPLETED ALL NCARB REQUIRED EXPERIENCE HOURS FOR ARCHITECTURAL REGISTRATION GEORGIA INSTITUTE OF TECHNOLOGY | GRADUATE TEACHING ASSISTANT Assisted with the integrated building systems I and II courses, graduate level programs. The courses aim to integrate architecture with structural, mechanical, electrical, plumbing systems into a series of three courses for masters of architecture students.

2018 - 2022

DWELL DESIGN STUDIO | ARCHITECTURAL DESIGN STAFF Engaging with medium to large scale projects, forming relationships and coordinating design decisions with consultants, engineers, and contractors. Working primarily in Revit, but also utilizing AutoCAD, and the Adobe creative suite across multi-family mixed-use projects spread throughout the United States. Designing and producing construction drawings across all phases, from schematic design through to construction documentation. Have successfully taken on many roles, gaining experience in construction detailing, consultant coordination, and the orientation of new employees.

2017 - 2018

CLEMSON UNIVERSITY DESIGN AND PLANNING CENTER | DESIGN INTERN Design intern focusing on all aspects of campus planning with Clemson University. Projects included campus signage design, capital improvement management including oversight of CORE Campus and Douthit Hills construction. Engaged with the university’s master planner Gerald Vander Mey to work on the campus long range framework plan.

summer 2017

PROFICIENCY REFERENCES

COR3 DESIGN, LLC | INTERN ARCHITECT Worked on various commercial architecture projects spreading across the southeast US. Focused primarily on design and construction drawing development utilizing AutoCAD. Revit, AutoCAD, Adobe Suite (ai, ps, id, pp), Rhino, Grasshopper, SketchUp, V-Ray, Microsoft Office, Climate Studio, Revu Bluebeam JAMES F. BARKER, FAIA Professor and President Emeritus of Clemson University 864-656-3884 | jbarker@clemson.edu SCOTT MARBLE, FAIA William H. Harrison Chair, School of Architecture; Professor scott.marble@design.gatech.edu JAY G. SILVERMAN, AIA, LEED AP Managing Principal of Dwell Design Studio 770-864-1035 ext. 1123 | jsilverman@dwelldesignstudio.com


My name is Grant Poteat and this is the total embodiment of my work. Architecture + Design is the true nature of what my past, present, and future is riveted within. With the absorption of knowledge through life experiences, insightful discussions, switching critique and powerful pedagogical curriculum, my understanding and passion for architecture + design has progressed to what it is today. Architecture is a platform that can mold and shape our future and I yearn to be a part of this. In August of 2018 I graduated with honors from Clemson University receiving my Bachelors of Arts in Architecture Degree with a minor in business management. In Spring of 2022 I will graduate with highest honors with a Masters of Architecture degree from the Georgia Institute of Technology. During my time at the Georgia Institute of Technology I have won several awards including being selected as a finalist for the John C. Portman Prize competition studio. Additionally, I received the 2021 Lord Aeck Sargent Design fellowship given to a student entering their final year of the M.Arch program at the Georgia Institute of Technology based on high academic and design achievement. I have gained approximately 5 years of relevant, professional experience in architecture and design. Throughout these years I have completed and had approved all required NCARB hours for architectural registration. Upon graduation, I will begin taking architecture registration exams to become a licensed architect. I combine my interest in traveling, people, culture, music, and intention to change my surroundings for the better in my approach to architecture + design. To me, architecture is less about buildings and more about people. I am passionate about people and making the world a better place. The driving force behind my love for architecture + design is my belief that architecture has a lasting, life-changing impact on people and communities. This portfolio contains a selection of creative works that were completed at the School of Architecture at the Georgia Institute of Technology in Atlanta, Ga, the School of Architecture at Clemson University in Clemson, SC, the Barcelona Architecture Center in Barcelona, Spain and professionally at Dwell Design Studio in Atlanta, Ga. These projects were developed with a passion for understanding, commitment, and captivation. Thank you,

Grant Poteat



ACADEMIC

01 02 03 04 05

S EGU E FALL 2 02 1

//

ATL A N TA , GA

BR I D GI N G TH E GAP SP RING 2 02 1

//

ATL A N TA , GA

//

ATL A N TA , GA

//

C O LUMBI A , SC

PA LI N D R O M O S FALL 2 02 0

C CAC SP RING 2 018

U R BA N I Z ATI ON FALL 2 017

//

BA R C E LO N A , SPA I N

PR OFE SS IO NA L

06 07 08

5 0 0 WE ST TR ADE DE SIGN STAFF

//

C H A RLOT TE , N C

1781 P E AC H T R E E DE SIGN STAFF

//

ATL A N TA , GA

TH E MER CA NTILE DE SIGN STAFF

//

O MA H A , N E


Academic selected works


+ Design + Research I - Ga Tech + Portman Prize Competition Studio - Ga Tech + Advanced I - Ga Tech + Senior Studio - Clemson University + Junior Studio - Barcelona Architecture Center


01 SE GUE Design + Research I - Fall 2021 Professor: John Peponis, Ph.D. Peachtree Center | Atlanta, Ga Museums and galleries deliberately bring together, for the benefit of their visitors, two of the fundamental meanings of the verb to see: to perceive with the eyes and to perceive or apprehend the mind. How can we design seeing and the relationship between point of view and movement as embodied and situated experience? Developed as a museum of mappings, Segue consists of a series of capsules along the main gallery space aimed at immersing the visitor into the content. The capsule acting as a segue into the mapping, the building then acting as a segue from the busy urban front to the open site. In their simplest form, mappings are visual representations of information. The goal being to present a mapping to a viewer as not merely an object to look at, but a space to inhabit and interact with. Programs Utilized: Revit, Rhino, AutoCad, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, VRay Developed with critical feedback from: Professor Emeritus Yves Abrioux, U Paris 8 Professor Michael Benedikt, U Texas, Austin Professor Emeritus Kenneth Knoespel, Georgia Tech Professor Sophia Psarra, Bartlett School of Arch. UCL Wilfried Wang, O’Neil Ford Centennial Chair, U Texas, Austin

01

Grant Poteat // Georgia Institute of Technology


01 | SEGUE

02


03

Grant Poteat // Georgia Institute of Technology


01 | SEGUE

04


Grant Poteat // Georgia Institute of Technology


01 | SEGUE


07

Grant Poteat // Georgia Institute of Technology


01 | SEGUE

08


02

B R I D G I N G T HE GA P Portman Prize Competition Studio - Spring 2021 Professor: Charles Rudolph Critic: Mario Gooden, Professor Columbia GSAPP Piedmont Park | Atlanta, Ga This studio was informed by the history of radical thinking about architecture in the 20th century and looked beyond to the manner of space making that Indigenous Peoples and Black bodies throughout the diaspora have creatively appropriated various aspects of the landscape and the built environment. The challenge was to prepare a design intervention for a 42,000 SF exhibition and performance building at the historic site of the original Negro Building in Piedmont Park. The context of the intervention was a “New South and International Exposition” to be held in the park in the near future that commemorates the 1895 Atlanta Cotton States and International Exposition. The space included exhibition spaces, Climate Hall, Justice center, lecture hall, and performance theatre. Programs Utilized: Revit, Rhino, AutoCad, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, VRay Selected as a finalist to appear before the Portman Prize Jury including: Mario Gooden Joel Sanders Felicia Davis Ada Tolla

09

Grant Poteat // Georgia Institute of Technology


02 | BRIDGING THE GAP

10


11

Grant Poteat // Georgia Institute of Technology


02 | BRIDGING THE GAP

12


13

Grant Poteat // Georgia Institute of Technology


02 | BRIDGING THE GAP

14


15

Grant Poteat // Georgia Institute of Technology


02 | BRIDGING THE GAP

16


03 PAL INDR OMOS Advanced Studio I - Fall 2020 Professor: Julie Kim, RA AIA NCARB MLK Jr. Drive | Historic Paschals Site | Atlanta, Ga Radical Good Trouble. This was the mantra behind this studio, a term coined by the late Congressman John Lewis. Through our investigative research around the site and the history of civil rights in Atlanta, as well as the country, we used our new understanding and knowledge to explore the ideas of social (in)justice, democracy, and civil disobedience at the scales of the city and of the building/site. We explored heavily how the urban landscape and architecture can act as sanctuary, refuge, stage, performance, and how it can be coalesced to develop places of multi-sensory reconciliation and action. Among many others, I created a place of solace, a place of reflection, and a place of deep understanding, in hopes that any visitor would feel welcome and as they inhabited the space, leave on the other side a better more, complete person. Intervening on the historic Paschal’s restaurant site, it was vital that the project reflected and honored the past while simultaneously looking towards the future, moving forwards while looking back. Hence, the Palindrome. Programs Utilized: Revit, Rhino, AutoCad, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, VRay

17

Grant Poteat // Georgia Institute of Technology


03 | PALINDROMOS

18


19

Grant Poteat // Georgia Institute of Technology


03 | PALINDROMOS

20


21

Grant Poteat // Georgia Institute of Technology


03 | PALINDROMOS

22


04 C CAC Senior Studio - Spring 2018 Professor: Joseph Schott Columbia, SC Columbia Cultural Arts Center. The start of creation. Designed to regenerate a city and neighborhood through the medium of art. CCAC features a 250 seat auditorium to house music performances, theatre acts, and everything in-between. Through a visit to the site, it was apparent this area needed rejuvenation. Located just south of the South Carolina State House, this museum would provide a liveliness to the area. The city of Columbia is starving for artistic expression through every medium imaginable. Providing adequate infrastructure for local artists to express themselves was vital to the program development, in addition to housing art for people to come and interact with. The aim was to create a unique environment for performances, exhibitions, education, and community outreach that welcome and impact this community. Project selected as a finalist to appear before the Columbia Design League and local professionals in Columbia, SC and was displayed during the summer of 2018 in the Columbia Public Library. Programs Utilized: Revit, Rhino, AutoCad, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, VRay

23

Grant Poteat // Clemson University


04 | CCAC

24


three

two

one

ground 25

Grant Poteat // Clemson University


04 | CCAC

26


27

Grant Poteat // Clemson University


04 | CCAC

28


05 UA NRUBR BAA NN II NZT AT I O N E G R AT I O N Study Abroad Studio - Fall 2017 Professor: Miguel Roldan Barcelona, Spain Through the concept of urbanization I was able to create the best space for the site. This building is a fully co-working space that will be fully public on the ground level, an extension of the street, and gradually become more and more private as you ascend the levels to the fully private office space at the top. Located in the neighborhood of Sant Antoni in Barcelona, Spain this site serves as the connection between the old dendritic city and the more modern Eixample grid that Barcelona is famous for. Studying at the Barcelona Architecture Center I was able to learn what it meant to live and work in a modern, urban environment. This experience allowed me to gain the knowledge to create a better functioning space in one of the biggest cities in the world.

Programs Utilized: Revit, Rhino, AutoCad, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, VRay

29

Grant Poteat // Barcelona Architecture Center


05 | URBANIZATION

30


31

Grant Poteat // Barcelona Architecture Center


Co-working Integration Green Space

Privacy

URBANIZATION OF THE SPACE

Views

Open

Intimacy

Sustainable

Flexibility l i b rari es

s chools

Public

c0-work ing spa ces

Inviting

m etro

bus

bicy cle

05 | URBANIZATION

32


33

Grant Poteat // Barcelona Architecture Center


05 | URBANIZATION

34


Professional selected works


+ 500 West Trade - Dwell Design Studio + 1781 Peachtree - Dwell Design Studio + The Mercantile - Dwell Design Studio


06 500 WE ST TR ADE Dwell Design Studio Project Manager: Greg Watford My Role: Design Staff Charlotte, NC 500 West Trade is located on the western edge of downtown Charlotte, walking distance from Johnson and Wales University, and replaces a blighted block. This concrete-framed high-rise mixed-use development with a wood-framed mid-rise over retail and parking podium sits on the new Westbound Charlotte Rail Line across the street from the site of a planned Multi-modal facility. The rooftop pool deck will provide spectacular views of the Charlotte Coliseum and the skyline. I started on this project during the Design Development stage and continued to work with it through the construction administration phase. Working on all aspects of construction documentation and exterior modeling I have included just a portion of the drawings that I personally worked on in the following pages. The biggest design impact I had on the project involved me designing the railing for the roof top amenity area, which I have included a couple design iterations that I came up with on the next page. Programs Utilized: Revit, Revu Bluebeam

35

Grant Poteat // Dwell Design Studio


06 | 500 WEST TRADE

36


E.1

G

25' - 4"

I

35' - 0"

22' - 7"

J

16

5

A5-19

9' - 6"

9' - 6"

12' - 5 3/8"

3' - 0" 2' - 9 1/2"

12' - 3 1/2" 5' - 4"

6' - 9"

11' - 2 1/2" 2' - 5 1/8" 3' - 6 1/2"

11' - 1 1/8"

6' - 9"

3' - 9"

6' - 11"

9' - 8" 3' - 9"

6' - 9"

8' - 11" 3' - 9"

5' - 10 1/2"

13' - 2" 7" 3' - 2"

6' - 9"

1/4" MAXIMUM CHANGE IN SLAB LEVEL AT ALL TYPE "A" UNITS, TYPICAL 11' - 0" 1' - 2"

3' - 9"

10' - 0"

11' - 6"

1' - 8" 2' - 1"

6' - 9"

2

3' - 9"

12' - 6" 2' - 5" 2' - 10 1/8"

A2-11A

11' - 0 1/8"

2' - 4"

6' - 9"

5' - 1"

14' - 4 1/8" 4' - 3"

2' - 7 1/2"

12' - 8" 1' - 5 5/8"

9' - 0" 6 A2-10

5' - 10 7/8"

3' - 2"

4

5 A2-11

6' - 0"

6' - 0"

A5-19A

1009

SS1 110

B2-M

STAIR #2 002

A3-32

FS 110

A3-21

SD1 133

ELEV #1 FSAE

13' - 6"

A3-26

6' - 9"

FO 101

B03AM

2

3' - 9 1/8"

1001

C1-MB

A5-18 B03AM

2 A2-06

SS1 113

SS1 113

SS1 113

1 A2-06

SS1 113

SS1 113

SS1 113

A4-13

75' - 0" 10' - 2 3/8"

1 1/2"

8' - 0"

A DEVELOPMENT FOR:

1006

1008

A1-M

A3-20

A1-M

A3-20

6' - 9"

X X X X

DATE 10/11/2019 04/24/2020

B2-MA

SS1 110

INCLUDED X

REVISION

1010

A3-20

SS1 110

DESCRIPTION

12/19/2018 FOUNDATION PERMIT PACKAGE COMMENTS 01/30/2019 PERMIT DOCUMENTS FOR CONSTRUCTION

DESCRIPTION ISSUE FOR CONSTRUCTION REVISION 16

REV 5 16

A3-22

12' - 1 7/8"

20' - 3"

1004

A1-M

A3-24

DATE

5' - 0 1/4"

23' - 0"

1002

C1-M

A5-18

ISSUE

12/11/2017 SCHEMATIC DESIGN 02/20/2018 DESIGN DEVELOPMENT 09/07/2018 PRICING SET

24' - 5"

4 A2-24

4

1.2

2' - 9" 4 A6-17

SEE SHEET A1-36 FOR SHADED REGION

13' - 1 1/2" 2' - 3"

3' - 0" 19' - 0"

3' - 3"

3' - 4 3/4"

19' - 0"

A

9' - 4 1/4"

1' - 3 5/8" 4' - 8 3/8" 6' - 0"

A.9 B

3' - 11" 5' - 8"

6' - 9"

3' - 11"

11' - 10"

6' - 9"

3' - 11"

17' - 6"

C

4' - 10 1/2"

12' - 5"

2 3' - 0" 3' - 10 1/2" A5-17 13' - 11"

3' - 11"

3' - 10 1/2"

3 A6-17

3' - 0"

4' - 10 1/2"

12' - 0 1/2"

26' - 4"

D

D.3

3' - 11"

1' - 10 1/2"

3 6' - 9" A5-17 12' - 5"

3' - 11"

6' - 9" 9' - 8 3/8"

6' - 0"

4' - 3"

2' - 9"

1 A6-17

1

2

B13

TRASH T101

1.7

1.4

6' - 9"

3 A2-06

FEC B17

TELECOM T103

1' - 5"

10' - 4"

5A A2-06

SS2 115

6' - 5 1/4"

2

B24

6' - 9"

4 A2-06

MECH. T102

B22

SS1 113

SS1 110

3

UTILITY T104

B21 8' - 5 1/4"

74' - 0"

3.7

2' - 6" 2' - 0"

LINESET SHAFT T108 A4-11 1

ELEC T106

9' - 5 1/2"

7' - 3"

B03AM B14

6' - 10"

B20

4

1 1/2"

15' - 4"

5

500 WEST TRADE

3' - 11"

2' - 0"

1007

B4-M - HC FS 110

3' - 2"

14' - 1 7/8"

ELEV #2 FSAE FO 101

23' - 11"

STAIR #1 001

5 A6-17

6' - 10"

7' - 0"

8' - 5 1/2"

2' - 3"

3' - 3"

-1/4"

7.4 7

dwell

A5-19 2' - 3"

dwelldesignstudio.com

8' - 11"

design studio

D.9

D.3

20' - 9" 2 A2-10A

FAX: 770.864.1790

D

17' - 6"

2

PHONE: 770.864.1035

CPA.8

6' - 0"

CHARLOTTE, NORTH CAROLINA

A.9 B

19' - 0"

3

3655 BROOKSIDE PARKWAY, SUITE 150 . ALPHARETTA, GA . 30022

UNIT ADDRESSES UPDATED TO MATCH ADDRESS PLAN

155' - 1"

A

1 A5-00

3' - 11"

E

E.4

4' - 9 1/2"

2' - 8 5/8"

26' - 4"

3' - 0"

4' - 9 1/2"

3' - 11"

13' - 11"

F.3

6' - 9" 11' - 0"

26' - 4"

F

5' - 1 1/2"

4' - 3"

2' - 5 1/2"

11' - 0"

H

3' - 0" 1' - 8"

10' - 0"

14' - 5"

2' - 7 1/2" 8' - 4"

22' - 7"

I

J

155' - 1" SEAL:

2

07/11/2019

WALL TYPE LEGEND

KEY PLAN

37

DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES.

CONCRETE WALL

BUILDING 3000 - TOWER - LEVEL 10 3/16" = 1'-0" BRICK WALL

BLDG 3000 TOWER

Grant Poteat // Dwell Design Studio

C dwell design studio - ALL RIGHTS RESERVED

SHEET NAME:

CMU WALL

1

5/11/2020 3:44:36 PM

C:\Users\gpoteat\Documents\173903_500West_Central_Permit_16_gpoteat.rvt

A4-11

BUILDING 3000 - TOWER LEVEL 10

JOB NUMBER:

173903

DRAWN BY

CHECKED BY

Author

Checker

A1-38

FOR CONSTRUCTION ONLY


FFE = 769' - 5 3/4" LEVEL 1 FFE = 758' - 0" LEVEL P3 FFE = 748' - 0" LEVEL P2 FFE = 738' - 6" LEVEL P1 FFE = 729' - 0"

BRICK CONTROL JOINT TYP.

2

OVERALL NORTH ELEVATION 1/16" = 1'-0"

LEVEL 4 FFE = 792' - 1 1/2" LEVEL 3 FFE = 780' - 9 5/8" LEVEL 2 FFE = 769' - 5 3/4" LEVEL 1 FFE = 758' - 0" LEVEL P3 FFE = 748' - 0" LEVEL P2 FFE = 738' - 6"

BRICK CONTROL JOINT TYP.

1

LEVEL P1 FFE = 729' - 0"

12' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8"

LEVEL 6 FFE = 814' - 1 3/8" TRUSS BEARING-1 FFE = 813' - 2 1/2" LEVEL 5 FFE = 803' - 5 3/8"

10' - 8"

LEVEL 7 FFE = 824' - 9 3/8"

EXP. JT.

11' - 4"

LEVEL 8 FFE = 835' - 5 3/8"

11' - 4"

LEVEL 9 FFE = 846' - 1 3/8"

11' - 4"

1 A4-12

11' - 5 3/4"

LEVEL 10 FFE = 856' - 9 3/8"

10' - 0"

LEVEL 11 FFE = 867' - 5 3/8"

9' - 6"

LEVEL 12 FFE = 878' - 1 3/8"

9' - 6"

ROOF TOP AMENITY FFE = 890' - 9 3/8"

16' - 0"

AMENITY BEARING FFE = 906' - 9 3/8" 2 A4-13

OVERALL EAST ELEVATION 1/16" = 1'-0"

2 A4-11

10' - 8"

10' - 8"

10' - 8"

10' - 8"

10' - 8"

12' - 8"

16' - 0"

AMENITY BEARING FFE = 906' - 9 3/8"

9' - 6"

9' - 6"

10' - 0"

11' - 5 3/4" 11' - 3 7/8" 11' - 3 7/8" 11' - 3 7/8"

10' - 8"

10' - 8"

EXP. JT.

BRICK CONTROL JOINT TYP.

ROOF TOP AMENITY FFE = 890' - 9 3/8" LEVEL 12 FFE = 878' - 1 3/8" LEVEL 11 FFE = 867' - 5 3/8" LEVEL 10 FFE = 856' - 9 3/8" LEVEL 9 FFE = 846' - 1 3/8" LEVEL 8 FFE = 835' - 5 3/8" LEVEL 7 FFE = 824' - 9 3/8" LEVEL 6 FFE = 814' - 1 3/8" TRUSS BEARING-1 FFE = 813' - 2 1/2" LEVEL 5 FFE = 803' - 5 3/8" LEVEL 4 FFE = 792' - 1 1/2" LEVEL 3 FFE = 780' - 9 5/8" LEVEL 2 FFE = 769' - 5 3/4" LEVEL 1 FFE = 758' - 0" LEVEL P3 FFE = 748' - 0" LEVEL P2 FFE = 738' - 6" LEVEL P1 FFE = 729' - 0" 2 A4-12

2

OVERALL SOUTH ELEVATION 1/16" = 1'-0"

1 A4-11

06 | 500 WEST TRADE

AMENITY BEARING FFE = 906' - 9 3/8" ROOF TOP AMENITY FFE = 890' - 9 3/8"

38


07 1781 PE ACHTREE Dwell Design Studio Project Manager: Greg Watford My Role: Design Staff Atlanta, Ga

This striking high-rise building defines the destination and electrifies the streetscape with a resident lobby that shouts “you have arrived”, a chef-driven restaurant, and a retail-inspired ground floor leasing center. This was the first project that I worked on when I started at Dwell Design Studio. Picking up the project in the Design Development stage allowed me to work thorough many challenges including value engineering and several owner inspired changes. Through collaboration with the team and visiting the site many times, we worked together to create a successful solution in the building that has now been completed. Working on all aspects of construction documentation including a sample on the following pages, I used Revit to successfully communicate the design to the contractor. I personally performed exterior lighting studies to give the client an idea of different options. Programs Utilized: Revit, Revu Bluebeam

39

Grant Poteat // Dwell Design Studio


07 | 1781 Peachtree

40


1. A0 AND A1 SERIES DIMENSIONS ARE FROM FACE OF STUD 2. A2 SERIES DIMENSIONS ARE FROM FACE OF FINISH 3. STOREFRONT DIMENSIONS ARE FROM EDGE 4. WINDOW DIMENSIONS TO CENTER OF WINDOW 5. SEE SHEET A7-10 FOR DOOR SCHEDULE 6. SEE SHEET A7-00 FOR WINDOW SCHEDULE 7. SEE SHEET A7-20 TO A7-23 FOR STOREFRONT SCHEDULE

S.9'

S.13'

6' - 8"

HEAD HEIGHT 3' - 6"

1' - 0"

2' - 10"

9' - 0"

DASHED LINE REPRESENTS 80" CLEAR HEAD HEIGHT REQUIRED

6' - 8"

HEAD HEIGHT

22' - 0"

6' - 8"

HEAD HEIGHT

3' - 6"

2' - 10"

6' - 8" 3' - 6"

2' - 10"

HEAD HEIGHT

6' - 8"

F

59 1/2"

6' - 8" 3' - 6"

2' - 10"

LEVEL 2.5 932' - 4"

S

7 1/2"

H

SED PROPO SHAFT

30" CLEAR ABOVE CEILING FOR ROUTING OF DUCTWORK Undeterm

SED PROPO SHAFT

6'A

16x10 EA

LOCATION OF TWO-HOUR FIRE RATED ACCESS PANELS FOR FUTURE 10"ø ACCESS OF RESTAURANT GREASE SHAFT/DUCT

EXHAUST SHAFT DOWN (TYP)

E OFFIC - 0" 922'

1 4.9%

919' - 6"

REST./ OFFICE ELEC.

7 RL-1 7.7%

6' - 0"

REST./ OFFICE UTILITY

REST./ OFFICE RECYCLING FD

9' - 6" DN

HIGH AMP. OUTLET FOR APPLIANCE TESTING MAINTENANCE OFFICE

STAIR 7

916' - 0" 917' - 10 1/4"

S.T.1A'

UP

J'A

DN RL-18

8.3%

248

TRENCH DRAIN

RESIDENTIAL LOADING SPACE

RESIDENTIAL LOADING SPACE

10' - 11 3/8"

HOSE BIBB WITH HOT WATER LINE

MAIN ELEC.

STAIR UP 3-2

916' - 0"

FIRE TRUCK TURN AROUND

MAIN DATA

TRENCH DRAIN

6' - 8"

6' - 8" 5/8" HEAD HEIGHT

7' - 10 7/8"

HEAD HEIGHT

3' - 6"

2' - 10"

6' - 8"

T3

S.X

PAVED SURFACE

(3) OVERHEAD DOORS T1

10 FT. HIGH - 8" CMU WALL HEAVY DUTY VEHICULAR WATERPROOFING TRAFFIC COATING

2 A4-01

Grant Poteat // Dwell Design Studio 1

OVERALL LEVEL 2 PLAN - 922'-0" 1/16" = 1'-0"

0'

8'

16'

32'

REMOVABLE STEEL BOLLARDS

3' - 0"

8"

3'A

REFER TO 1 / A1-01B

REFER TO 1 / A1-01A

2B.6

PROPERTY LINE

MB MB.5 NB

T2 PARKING DECK ENTRY @ 916'-0"

8"

CLEAR TO BOTTOM OF LANDING

LB SECURITY GATE AND FENCE

LINE OF BUILDING ABOVE DN

N'A

KB LINE OF BUILDING ABOVE

UP

M'A

FB GB.8

JB

FIRE PUMP ROOM

RL-3

PAVERS SAME LEVEL AS DRIVEWAY

CRITICAL

HB

EMERGENCY GENERATOR

18' - 5 3/4"

4' - 6"

S.8.1'

22"

BICYCLE STORAGE

STAIR EMER. ELEC. 8

TRASH LOADING SPACE

18' - 5 3/4"

916' - 3 3/4"

-3'-6" DN

RL-1

K'A MECH. CLO.

REST. OFFICE SER. ELEV.

REST./ OFFICE LOADING SPACE

E.6

RES./SER. ELEV.

RESIDENTIAL LOADING LOBBY

LOADING DOCK

UP STAIR 2-1.5 DN

E.5

10" 18"

S.Q.8

RES./SER. ELEV.

C CHANNEL OR W BEAM PER STRUCTURAL

RL-4

3

3' - 9 1/2"

E.4

KICKERS PER STRUCTURAL

2 CD-07

8"

7

EB

A4-02

R-21 BATT INSULATION

REST./ OFFICE LOADING LOBBY

RL-2

DB

9

2

5 BELOW

3" = 1'-0"

CB

DC

1

FLUID APPLIED WEATHER A5-02 BARRIER RESISTANT

TRASH ROOM

STAIR O.A. SHAFT #4 ROOF EDGE DETAIL UP

5'A5'A.1

G'A

L'A

REFER TO 1 / A1-01B

18' - 8"

RL-6 2

RE FUTU IDOR CORR

EXTEND FIRE RATED SHAFT TO ENCLOSE GREASE EXHAUST DUCT

F'A.5

5/8" GLASS MAT EXTERIOR SHEATHING

1.0% SLOPE

SED PROPO SHAFT

18x24 GEA

3'A

R7.5 CONTINUOUS EPS INSULATION

1.0%

G'A

5 A6-30

HSS STRUCT. SEE 916' - 3 3/4" 13B STRUCT. 14B DWGS 4/S6.01

918' - 10"

8.2%

F'A

F'A.5

3/4"

G'A

0' - 10

7/8"

5F'A.5 RL-1

10B

TRENCH DRAIN

60"

24"ø GEA

1

9B

2-WAY WIDE ANGLE 160 DEGREE VIEW MIRROR. 30" DIA. CONVEX OUTDOOR, SHATTERPROOF ACRYLIC AND IMPACT RESISTANT. INSTALLED 9'-0" AFF. ULINE MODEL NO. H-2076-0 DN

6.0% RAMP DN

SLOPE

16x10 EA

TUBE STEEL SUPPORT W/ STEEL CAP PLATE, REFER TO STRUCT. DETAIL 10/S6-01

CC

T SHAF UST TH LOW EXHA 1 WI AIR LEVEL INGS BE FOR L GRAT META

18

RL-5

WEB-TO-WEB CONNECTIONS BY CFS ENGINEER

SLOPE

(typ)

- 11

FSD AT ALL SHAFT PENETRATIONS, EXCEPT GREASE DUCT. GREASE EXHAUST DUCT ROUTED OUTSIDE SHAFT MUST BE 2 HR FIRE RATED DUCT (TYP )

BB

BC

PIPE INSULATION

1

19

6" CFS FRAMING PER STRUCT DWGS

R - 7.5 CONTINOUS RIGID INSULATION

l Conduit

PT Cable

30x18 OA

ly Electrica Item-Like

30x18 OA

UP

GALVANIZED STE WELDED TO HSS

A.5C

A5-02 2"

AIR AND MOISTURE BARRIER DETAIL COMPONENT WRAPPED AROUND SLEEVE

12x12 EA

HATCH REPRESENTS LOCATION OF TWO-HOUR FIRE RATED HORIZONTAL CEILING ASSEMBLY UL G586. BOTTOM OF RATED CEILING ASSEMBLY AT 15'-4" AFF AT SECOND LEVEL

1

STAIR 4-2 UP

PORTABLE TELES RIGGING INSERT

AB

A5-01

12x12 EA

ined

170'

r (typ) Reba

38 1/2"

3"

RL-7

STUCCO SYSTEM

EXHAUST SHAFT DOWN 12x14

OFFICE

5B

-3'-6"

F'A TWO-HOUR RATED VERTICAL AT SECOND LEVEL FOR INSTALLATION OF RESTAURANT DUCT WORK

2 A5-01

25 1/2"

FIXED SLEEVE

UP

METAL FLASHING PAINT TO MATCH

6.0% RAMP UP

TAPERED RIGID INSULATION, MINUMUM 1" THICK

AC

916' - 3 3/4"

200 8"ø

922' - 0" CONT. SEALANT

2" X 2" ALUMINUM CHANNEL W / LED LIGHT

59 1/2"

4 1/4"

RES. ELEV.

E OFFIC Y LOBB

ABOVE UNITS BELOW

TPO ROOFING SYSTEM ON 1 1/2" INSULATION ON GLASS MAT ROOF SHEATHING ON METAL STUD INFILL FRAMING

98' -

D'A

RES. ELEV.

E.2 5'A

4'A.6 4'A E'A.8

24' - 5 1/2"

E OFFICTY UTILI

3'A

64 1/2"

1,000 LBS MAX WORKING LOAD

SLOPE

5/8"

E.1

ICE OFFF V. ELE 4'A.7

4 RL-1

C'A

REFER TO 1 / A1-01A

18' - 0"

2' - 6

B'A.8

CABLE RAILING

METAL CLEAT (BOTH SIDES)

ADBLOCKING F.R.T WOOD AS REQUIRED

E.3

PROPERTY LINE STUCCO SYSTEM

914'

SPRING LOADED HINGED CAP

C-CHANNEL. SEE STRUCTURAL DRAWINGS

2X F.R.T WOOD BLOCKING AS REQUIRED 42" HIGH

IAL DENT RESI BBY LO "

1 1/2" METAL DECK OVER LIGHT GAUGE METAL STUDTRAFFIC COATING.

SEALANT AND BACKER ROD INSTALLED AROUND SLEEVE

4.21% RAMP DN

RL-9

J

PROVIDE 2x FRT BLOCKING FOR LED LIGHT CHANNEL WATERPROOFING LAY ATTACHMENT TRAFFIC COATING OV FRT WOOD BLOCKING

SLOPE 1/4" = 1'-0"

18' - 9 3/4"

ACCESS PANEL FOR LED MAINTENANCE BEYOND IN BETWEEN KICKERS

RL-11

5/8" GLASS MAT SHEATHING

PEDESTRIAN WATERP COATING.

DUTY VEHICU LEVEL MEDIUM 1 WATERPROOFING TR 907' - 0"

RUN TPO MEMBRANE VERTICALLY UP WALL

F.R.T WOOD BLOCKING AS REQUIRED

RL-8

METAL CAPING PAINT TO MATCH STUCCO

LEGEND

HEAVY DUTY VEHICUL

S.1'

16B

5' - 2 1/4"

SLOPE STAIR 1 SECTION @ LEVEL 1 - LEVEL 2 1/4" / FT

R - 7.5 CONTINOUS EPS INSULATION FLUID APPLIED WEATHER RESISTANT BARRIER

7'C

24

BACKER ROD & SEALANT

UP

RL-13

DRIP EDGE

S

5/8" GLASS MAT SHEATHING

VAN

922' - 0"

1-2 STAIR

15B

9'C

8'C

EVCS

DN

E IBUL VEST

12' - 8"

D T

S D

CANE DETECTION RAIL

STEEL ANGLE SEE STRUCT DWGS 6" CFMF CHANNELS SEE STRUCT. DWGS STUCCO SYSTEM

C.

VAN

1 1/2" = 1'-0"

TPO ROOFING SYSTEM ON R-20 INSULATION ON METAL DECKING

1

METAL CLEAT

2

EVCS

7. SEE SHEET A7-20 TO A7-23 FOR STOREFRONT SCHEDULE

ROOF PARAPET SECTION DETAIL

5

METAL EDGE FLASHING

ACCESS PANEL FOR LED MAINTENANCE BEYOND IN BETWEEN KICKERS

STUCCO SYSTEM

A'A.5

1/8 8' - 4

C CHANNEL OR W BEAM PER STRUCTURAL

FLUID APPLIED WEATHER RESISTANT BARRIER

T . SHAF MECH RL-12

EL PARC ROOM

B'A

1/4" = 1'-0"

SUSPENDED GYP. BD. CEILING SYSTEM W/ 5/8" TYP 'C' GYPSUM BOARD

FRT WOOD BLOCKING AS REQUIRED

7.5B

A4-02

R7.5 CONTINUOUS EPS INSULATION

MAIL ROOM

7B

259' - 2 1/8"

AIR INTAKE FOR LEVEL 1

A'A.3

PROVIDE 2x FRT BLOCKING FOR LED LIGHT CHANNEL ATTACHMENT

6B

"

"

A'A

KICKERS PER STRUCTURAL

1' - 3 3/8" PER STRUCT.

STAIR 1 SECTION @ LEVELS 2 - 6

2

6. SEE SHEET A7-00 FOR WINDOW SCHEDULE

OPEN

2 1/2"

10' - 4"

1 1/4

21' -

HEAD HEIGHT

6' - 8"

4B

SLOPE

5'A

5. SEE SHEET A7-10 FOR DOOR SCHEDULE

TO FINISH

16' - 0 3/8"

59

' - 1 3/4

3' - 9 1/4"

LEVEL 2 B.O. 922'STEEL - 0" FRAMING

2. A2 SERIES DIMENSIONS ARE FROM FACE OF FINISH

C. REVISED DOOR 201 LOCATION AT MAILROOM

C dwell design studios- ALL RIGHTS RESERVED

B. REMOVED DOOR 229

3. STOREFRONT DIMENSIONS ARE FROM EDGE

CANE DETECTION RAIL

15 5/8"

1. A0 AND A1 SERIES DIMENSIONS ARE FROM FACE OF STUD

16" MAX

LEVEL 2.5 932' - 4"

1055' - 3 1/2"3

PLAN NOTES

7 1/2"

A. REMOVED OFFICE RESTROOMS

15' - 0"

6' - 8"

REVISION # 36 SUMMARY

HEAD HEIGHT

CANE DETECTION RAIL

T.O. STEEL FRAMING

26 RISERS @ 6 7/8" EACH

TUBE STEEL SUPPORT W/ STEEL CAP PLATE, REFER TO STRUCT. DETAIL 10/S6-01

HEAD HEIGHT

6' - 8"

HEAD HEIGHT

3' - 6"

2' - 10" 2' - 10"

FLUID APPLIED WEATHER RESISTANT BARRIER

3' - 6"

6' - 8"

HEAD HEIGHT

6' - 8"

9' - 4"

16 RISERS @ 7" EACH

TPO ON TAPERED INSULATION LATERAL BRACING SEE STRURCTURAL DWGS

LEVEL 3 941' - 8"

5' - 10 1/2"

24' - 0"

4'A.7 3" 4'A.6 80' -

4'A

R

D 09

STEEL JOIST, SEE STRUCT. DWGS DASHED LINE REPRESENTS 80" CLEAR HEAD HEIGHT REQUIRED 1 1/2" METAL ROOF DECK OVER STEEL JOIST

HEAD HEIGHT

6' - 8"

HEAD HEIGHT

15' - 4"

27 RESERS @ 6 7/8" EACH

10' - 6" 10' - 6"

3B

5/8" GLASS MAT EXTERIOR SHEATHING

I

TPO ROOFING SYSTEM ON 1 1/2" INSULATION ON GLASS MAT ROOF SHEATHING ON METAL STUD INFILL FRAMING

5/8" GLASS MAT EXTERIOR SHEATHING

10' - 6"

8'A

P

MINIMUM 79" CLEARANCE CRITICAL

38 1/2"

R7.5 CONTINUOUS EPS INSULATION

8'A.1

7'A

P P

4' - 8 1/2"

6' - 8"

HEAD HEIGHT

12' - 0"

10' - 6" 6' - 8"

HEAD HEIGHT

3' - 6"

2' - 10"

6' - 8"

HEAD HEIGHT

3' - 6"

2' - 10"

6' - 8" 3' - 6"

2' - 10" 6' - 8"

HEAD HEIGHT

6' - 8"

HEAD HEIGHT 3' - 6"

6' - 8"

HEAD HEIGHT 2' - 10"

10' - 6"

18 RISERS @ 7" EACH

10' - 6"

18 RISERS @ 7" EACH

10' - 6"

18 RISERS @ 7" EACH

HEAD HEIGHT

6' - 8"

HEAD HEIGHT

2B

L

L

LEVEL 4 (TRASNFER/RES) 957' - 0"

STUCCO SYSTEM

2" X 2" ALUMINUM CHANNEL W / LED LIGHT

41

L

RUN TPO MEMBRANE VERTICALLY UP WALL

LEVEL 2 922' - 0"

5'A.16'A

RE FUTU IDOR CORR

H'A

5

5/8" GLASS MAT SHEATHING

TAPERED RIGID INSULATION, MINUMUM 1" THICK

LEVEL 6 979' - 6"

4'A.5

A4-01

D

42" HIGH PAINTED METAL HANDRAIL AND GUARDRAIL

3"

RL-10

E'A.8

L

UNIT

F.R.T WOOD BLOCKING AS REQUIRED

1/4" = 1'-0"

PROPERTY LINE

E'A

C

4. WINDOW DIMENSIONS TO CENTER OF WINDOW

1B

D

P

P

R-21 BATT INSULATION

9 A2-28

I

P

HSS STRUCT. SEE STRUCT. DWGS 4/S6.01

8' - 2"

2'A

FRT WOOD BLOCKING

P

METAL FLASHING PAINT TO MATCH

LEVEL 7 990' - 0"

1 1/2" METAL DECK OVER LIGHT GAUGE METAL STUD

LIGHT GAUGE METAL STUD SEE STRUCTURAL DWGS

64 1/2"

2" X 2" ALUMINUM 1/2" CHANNEL W / LED25 LIGHT

9 A2-28

TPO ROOFING SYSTEM ON R-20 INSULATION ON METAL DECKING

1060' - 0"

STUCCO SYSTEM

LEVEL 8 1000' - 6"

SLOPE

T.O. PARAPET

9 A2-28

FLUID APPLIED WEATHER RESISTANT BARRIER

LEVEL 9 1011' - 0"

STAIR 1 SECTION @ LEVELS 6- ROOF

3'A

ACCESS PANEL FOR LEVEL 5 BEYOND LED MAINTENANCE IN BETWEEN 969'KICKERS - 0"

S

DRIP EDGE

4 A2-28

8 A2-28

2'A'

21 RISERS @ 6 7/8" EACH

6' - 8" 3' - 6"

2' - 10"

8" CFMF CHANNELS SEE STRUCT. DWGS. STUCCO SYSTEM

2 A2-28

PROVIDE 2x FRT BLOCKING FOR LED LIGHT CHANNEL ATTACHMENT

METAL CLEAT

STEEL ANGLE SEE STRUCT DWGS

8 A2-28

7' - 5 3/4" UNIT

14 A6-28 A2-28

METAL EDGE FLASHING

LEVEL 10 1021' - 6"

12' - 8"

S.1'

HEAD HEIGHT

10' - 6" 3"3"

18 RISERS @ 7" EACH

10' - 6"

FRT WOOD BLOCKING AS REQUIRED

5' - 2 1/4"

6 A2-28

LEVEL 6 979' - 6"

HEAD HEIGHT

6' - 8"

HEAD HEIGHT

3' - 6"

2' - 10"

6' - 8" 3' - 6"

2' - 10"

LEVEL 11 1032' - 0"

4 A2-28

3 A2-28

7'A

S.13'

4 A2-28

2 A2-28

3

S.9'

WALL MOUNTED GUARD RAILING SEE, 7 / SHEET A2 - 28

HEAD HEIGHT

6' - 8"

HEAD HEIGHT

LEVEL 12 1042' - 6"

HEAD HEIGHT

6' - 8"

HEAD HEIGHT

DASHED LINE REPRESENTS 80" CLEAR HEAD HEIGHT REQUIRED

HEAD HEIGHT

6' - 8" 6' - 8"

HEAD HEIGHT

10' - 6"

WALL MOUNTED GUARD RAILING SEE, 7 / SHEET A2 - 28

2 A2-28

3 A2-28

18 RISERS @ 7" EACH

10' - 6"

18 RISERS @ 7" EACH

10' - 6"

18 RISERS @ 7" EACH

12' - 6"

22 RISERS @ 6.82" EACH

T.O. STEEL FRAMING 1054' - 0"

PROPERTY LINE

SUSPENDED GY SYSTEM GY


07 | 1781 Peachtree

42


08 THE MER CANTILE Dwell Design Studio Project Manager: Simon Lee My Role: Design Staff Omaha, NE Bringing a new twist to the Old Market neighborhood in Nebraska, The Mercantile is the first phase of a city-defining mixed-use redevelopment. With contextualism at the forefront, our approach was to bridge the Old Market neighbor and the new commercial/hotel waterfront complex. We embraced and activated the pedestrian street edge with shopping, amenities and commercial office space. This is the first project that I started completely from the beginning all the way through to construction. Our team received this project after a simple density study was completed, tasked with designing units, exterior, and interior layouts. I helped design several units from scratch, unique to this project, which can be found on the following pages. I also modeled a significant portion of the exterior elevations in Revit for the entire building. A challenge for this project was understanding the local climate and having to take into consideration designing things to function in cold weather, that is not typical in the southeast. Programs Utilized: Revit, Revu Bluebeam

43

Grant Poteat // Dwell Design Studio


08 | THE MERCANTILE

44


3' - 4 3/4"

31' - 0"

LEVEL 1 ONLY

Farnam Street 5' - 4 3/4"

6' - 0 1/2"

GROUND LEVEL ONLY

3/16" = 1'-0"

UP

Harney Street

1

8th Street

10th Street

UNIT A1

UNIT 30" A1

3' - 3 1/2"

HIL UNIT A2.1

Farnam Street 3' - 11 1/4"

60" 5' - 8 1/2"

3' - 10"

DBL R & S

27' - 0"

DATE

9/18/2019

UP

UP

3/16" = 1'-0"

UA-A1

54"

1

UNIT A5 3/16" = 1'-0"

Harney Street

BUILDING 4000

BUILDING 5000

BUILDING 4000

BUILDING 5000

PHONE: 770 . 864 . 1035 dwelldesignstudio.com

3655 BROOKSIDE PKWY, SUITE 150 ALPHARETTA, GA . 30022

3' - 5 1/2"

12' - 4 1/2"

6' - 10 3/4"

10 1/2"

180804

MECH

KEY PLAN R&S

6' - 5 1/4"

JOB NUMBER

DRAWN BY

COAT

PAN

THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 11 x 17 INCHES.

REF

SHEET NAME:

30"

W/D

UNIT A2.1

5' - 9 7/8" 180804

4' - 0"

MECH

10TH AND HARNEY STREETS OMAHA, NE 68102 7' - 7" 17' - 5 1/2"

5' - 0"

32' - 6"

LAUND. W/D

SHEET NAME:

d w e l l ds teusdi gi on DISCLAIMER:

KITCHEN 13'-4" X 11'-1"

DEN 6'- 6" X 11'- 7"

9' - 10"

REF

3' - 5"

THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 11 x 17 INCHES.

11 1/2"

1

36" GARDEN TUB

DISCLAIMER:

KITCHEN 13'-2" X 11'-1"

54"

UP

DW

CLOSET

PAN

36" GARDEN TUB

KEY PLAN

7' - 7"

R&S R&S

9' - 4 3/4"

7' - 0 7/8"

BATH TOWEL BAR

R&S

C dwell design studio - ALL RIGHTS RESERVED

5' - 0 7/8"

CLEAR

48"

3' - 10 3/4" 3' - 4 3/4"

PAN

3' - 6"

DWR

WALK IN CLOSET R&S

48"

5' - 6 3/4"

REF

BATH

C dwell design studio - ALL RIGHTS RESERVED 60"

54"

DWR

COAT

W/D

3' - 6 3/4"

MECH

3' - 6"

60"

LAUN

DW

LIN ROBE HOOK

ROBE HOOK

38" x 60" SHOWER

CLEAR

10th Street

DBL R & S

32' - 6"

TOWEL RING

WALK-IN CLOSET

LIVING ROOM 13'-10" X 17'-0"

ROBE HOOK

3' - 6"

DW

KITCHEN 9'-11" X 9'-0"

2' - 7 1/4"

6' - 5 1/2"

26' - 0" 10"

R&S

6' - 7 1/2"

TOWEL BAR

BATH

3' - 11 1/2"

10' - 7"

LIN DWR

3' - 0"

COAT

R&S

WALK-IN CLOSET

NET A2.1 749 SF TOWEL RING

7' - 11"

10

R&S DBL R & S

61 SF

BEDROOM 12'-0" X 11'-9"

2' - 4 1/2"

LIVING ROOM 11'-5" X 16'-5"

'-

8"

KING

14' - 6 1/2"

DATE:

17' - 5 1/2"

13' - 1"

'26

NET A1 699 SF

BEDROOM 9'-9" X 15'-5"

HINES OMAHA MIXED USE DEVELOPMENT

8"

16

'-

0"

"

BEDROOM 10'-4" X 12'-0"

12' - 5APPROVAL 1/2" SIGNATURE:

4' - 0 1/2"

-1

LIVING ROOM 10'-0" X 12'-0"

10TH AND HARNEY STREETS OMAHA, NE 68102

5'

DATE:

8' - 7 3/4"

PHONE: 770 . 864 . 1035 dwelldesignstudio.com

BALCONY

# OF UNITS:

8th Street

3655 BROOKSIDE PKWY, SUITE 150 ALPHARETTA, GA . 30022

APPROVAL SIGNATURE:

749 SF 810 SF 27' - 0" 4

NET AREA: GROSS AREA :

12' - 3 1/2"

HINES OMAHA MIXED USE DEVELOPMENT

23' - 0"

4

# OF UNITS:

UNIT A2.1

d w e l l ds teusdi gi on

UNIT A1 699 SF NET AREA: - 8SF 1/2" GROSS AREA : 10'699

JOB NUMBER

9 5/8"

DRAWN BY

DATE

HIL

9/18/2019

UA-A2.1

2 A4-15

2 A4-14 2 A4-15

2 A4-14

Truss Bearing - Bldg 4 FFE = 1059' - 4 3/4" Level 3 FFE = 1050' - 4 5/8" Level Truss 2Bearing - Bldg 4 FFE = = 1059' 1039' -- 4 8 3/4" 3/4" FFE Level 1 3 Level FFE FFE = = 1050' 1028' -- 4 0 5/8" 7/8" Level 2 GROUND LEVEL FFE = 1039' - 8 3/4" FFE = 1016' - 4" Level 1 FFE = 1028' - 0 7/8" GROUND LEVEL FFE = 1016' - 4"

4

1 A4-12

3 A4-11

4

1

BUILDING 1000

BUILDING 2000

4

1

BUILDING 1000

BUILDING 2000

3 - Bldg A4-11

4

OVERALL NORTH / FARN 1" = 20'-0"

OVERALL NORTH / FARN 1" = 20'-0"

1 A4-12

Truss Bearing 1&2 FFE = 1091' - 4 5/8" Level 6 FFE = 1082' - 4 1/4" Truss Bearing - Bldg 1 & 2 FFE = 1091' - 4 5/8" Level 5 Level=61071' - 8 7/8" FFE FFE = 1082' - 4 1/4" Level 4 FFE = 1061' - 0 1/2" 5 Level 3 FFE = 1071' 8 5/8" 7/8" 1050' - 4 4 Level 2 FFE = 1061' 0 3/4" 1/2" 1039' - 8 Level Level 3 1 FFE 4 7/8" 5/8" FFE = = 1050' 1028' -- 0 Level 2 FFE = 1039' - 8 3/4" Level 1 FFE = 1028' - 0 7/8"

45

Grant Poteat // Dwell Design Studio

3

OVERALL SOUTH / HARN 1" = 20'-0"


Harney Street

UNIT A5

3' - 5"

11' - 3 5/8"

2' - 11 3/8"

JOB NUMBER

180804

DRAWN BY

UP

UP

DATE

3/16" = 1'-0"9/18/2019 HIL

UA-A5

1 A4-15

1 A4-15

Harney Street

BUILDING 5000

DBL R & S

3655 BROOKSIDE PKWY, SUITE 150 ALPHARETTA, GA . 30022

10' - 1 1/4"

R&S

60"

54"

Farnam Street

35' - 0"

UNIT B1

MECH

KEY PLAN

SHEET NAME:

COAT

REF

24' - 8"

10TH AND HARNEY STREETS OMAHA, NE 68102

DINING 13'-3" X 10'-4"

UNIT B1

R&S

KING

ROBE HOOK

TOWEL BAR

36' - 3"

PAN

MASTER BEDROOM 13'-11" X 11'-5"

11' - 7"

36" GARDEN TUB

MASTER BATH

SHEET NAME:

CLEAR

3' - 6"

DW

KITCHEN 16'-4 X 9'-4"

REF

48" x 36" SHOWER

THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 11 x 17 INCHES.

WALK-IN CLOSET 5' - 5"

KITCHEN 9'-3" X 15'-5"

TABLE

KE

LIN

Fa

JOB NUMBER

8' - 5 1/2"

1

13' - 0"

180804

DRAWN BY

DATE

HIL

9/18/2019

UNIT C2

UA-B1

BUILDING 10003/16" = 1'-0"

14' - 5 3/4"

10th Street

1

W/D

TABLE

DISCLAIMER:

C dwell design studio - ALL RIGHTS RESERVED R&S

UP

8th Street

Farnam Street

LIN

THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 11 x 17 INCHES.

LIVING ROOM 16'-4" X 13'-6"

R&S

3' - 6" CLEAR

8th Street

8' - 11"

UP

CLEAR

TOWEL BAR

PAN

10th Street

2' - 9"

3' - 9 1/4"

36" GARDEN TUB

WALK-IN CLOSET

DWR

3' - 6" CLEAR

W

BATH

3' - 6"

DW

3' - 9 1/4"

DWR

DBL R & S

5' - 8"

R&S

2' - 0"

DWR

10"

R&S

TOWEL RING

KEY PLAN

D

DISCLAIMER:

C dwell design studio - ALL RIGHTS RESERVED

30" GARDEN TUB

R&S

6' - 1 1/2"

WALK IN CLOSET

ROBE HOOK

NET B1 1013 SF

COAT

BATH

DBL R & S LIN

SHELF 48" AFF

12' - 2 3/4"

10TH AND HARNEY STREETS OMAHA, NE 68102

HINES OMAHA MIXED USE DEVELOPMENT

MECH

TOWEL BAR SH

36" X 60" SHOWER

CLOSET

116 SF

PHONE: 770 . 864 . 1035 dwelldesignstudio.com

d w e l l ds teusdi gi on

TOWEL RING

16' - 10 1/2"

R&S

QUEEN

HINES OMAHA MIXED USE DEVELOPMENT

DWR

5' - 9 1/2"

CLEAR

N O BA LC 5' - 6" 13' - 3 1/2"

LIVING ROOM 11'-0" X 16'- 8"

BEDROOM 10'-1" X 12'- 8"

10th Street

24' - 11"

LIN ROBE HOOK

46' - 0 1/2"

BEDROOM 10'-8" X 10'-11"

QUEEN

BATH

NET A5 878 SF

BEDROOM 10'-8" X 11'-4"

12' - 4"

MASTER BEDROOM 12'-7" X 14'-7"

"

2' - 4 3/4"

-6

Y

5'

16' - 1 1/4"

DATE:

11' - 3 1/2"

DATE:

DBL R & S

WALK IN CLOSET

6' - 7"

4

7 12' - 1"

APPROVAL SIGNATURE:

10' - 0"

# OF UNITS:

APPROVAL SIGNATURE:

1,015 SF 1,131 SF

# OF UNITS:

34' - 7"

878 SF 878 SF

6' - 10"

R&S

NET AREA: GROSS AREA :

13' - 0" 3655 BROOKSIDE PKWY, SUITE 150 ALPHARETTA, GA . 30022

5' - 6"

PHONE: 770 . 864 . 1035 dwelldesignstudio.com

UNIT A5

d w e l l ds teusdi gi on

UNIT B1 NET AREA: GROSS AREA :

2 A4-11

Truss Bearing - Bldg 1 & 2 FFE = 1091' - 4 5/8" 2 A4-11

BUILDING 5000

BUILDING 1000

Level 6 FFE = 1082' - 4 1/4" Truss Bearing - Bldg 1 & 2 FFE = 1091' - 4 5/8" Truss Bearing - Bldg 5 & 3 FFE = 1080' - 9 1/4" Level 6 5 FFE = 1082' Level - 4 1/4" FFE = 1071' - 8 7/8" Level Truss Bearing - Bldg 5&4 3 FFE FFE = = 1061' 1080' -- 0 9 1/2" 1/4" 5 Level 3 1071' - 4 8 5/8" 7/8" FFE = 1050' 4 Level 2 FFE = 1061' 1039' - 0 8 1/2" 3/4" Level 1 3 Level FFE FFE = = 1050' 1028' -- 4 0 5/8" 7/8" Level 2 FFE = 1039' - 8 3/4" Level 1 FFE = 1028' - 0 7/8"

NAM STREET ELEVATION 0'

10' - 0" 20' - 0"

40' - 0"

NAM STREET ELEVATION 2 A4-12 0' 10' - 0" 20' - 0"

1 A4-13

40' - 0"

2 A4-12

BUILDING 2000

BUILDING 3000 1 A4-13

BUILDING 2000

BUILDING 3000

Truss Bearing - Bldg 5 & 3 FFE = 1080' - 9 1/4" Level 5 FFE = 1071' - 8 7/8" Level Truss Bearing - Bldg 5&4 3 FFE = = 1080' 1061' -- 0 FFE 9 1/2" 1/4" 5 Level 3 FFE = 1071' 8 5/8" 7/8" 1050' - 4 4 Level 2 FFE = 1061' 0 3/4" 1/2" 1039' - 8 Level Level 3 1 FFE 4 7/8" 5/8" FFE = = 1050' 1028' -- 0

NEY STREET ELEVATION 0'

10' - 0" 20' - 0"

08 | THE MERCANTILE 40' - 0"

Level 2 FFE = 1039' - 8 3/4"

ISSUE

Level 1 FFE = 1028' - 0 7/8"

02/13/2019 05/22/2019 05/29/2019 07/19/2019 10/10/2019 10/24/2019 01/10/2020

DATE

46

ISSUE DATE

02/13/2019 05/22/2019 05/29/2019 07/19/2019 10/10/2019 10/24/2019 01/10/2020

REVISI


© 2022 GRANT POTEAT. ALL RIGHTS RESERVED


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.