Stramshall Greenhouse

Page 1

RANGE

A (mm)

B (mm)

6’3” x 4’3”

1295

6’3” x 6’3”

1910

6’3” x 8’3”

1910

2530

6’3” x 10’4”

3150

6’3” x 12’4”

3770

Please note that this is a brand new instruction manual. If you find any mistakes or you think anything needs improving then please email me at; james@thegreenhousepeople.co.uk or phone 01782 388811


Thank you for purchasing your new Simplicity greenhouse. We recommend you familiarise yourself with the instructions and read all safety information before you commence assembly. This instruction manual is also available online at www.greenhousepeople.co.uk in our technical help section should you need to reprint it. Should you require any additional advice you can always call us on 01782 388811. Safety Warning x Glass and aluminium can potentially cause injury. Please ensure you wear protective goggles, gloves, headgear and suitable footwear when assembling and glazing the building. x Please remember that glass is fragile and should be handled with extreme care. Always clear up and dispose of any breakages immediately.

x x

Do not assemble the greenhouse in high winds. For safety reasons and ease of assembly, we recommend that this greenhouse is assembled by a minimum of two people.

Site Preparation x When selecting a site for your greenhouse, it is vital that you choose as flat and level an area as possible.

x x x x

A concrete or slabbed base will provide the most solid foundation for your greenhouse. IMPORTANT: Do not fix your building down until the building is fully assembled, including glazing. Avoid placing your greenhouse under trees or in other vulnerable locations. To minimise the risk of wind damage, try to select as sheltered a site as possible, e.g. beside a hedgerow or garden fence.

Additional Considerations x Please bear in mind that assembling your greenhouse can be time consuming. You may need to spread the construction over two or more days. We recommend that you avoid leaving the building partially glazed. If you ever have to leave your greenhouse half assembled and not anchored down, weigh it down with slabs or bags of sand to stop the wind moving it. x You will find it helpful to prepare a large, clean and clear area in which to work in. A garage floor or flat lawn area is ideal.

x x x

If you have arranged for someone to install your greenhouse for you, please check that all components are included. Most parts are numbered and can be identified by a stamp or removable label. Alternatively, the components can be identified by lengths detailed in the packing list (see diagram below). Anchoring down your greenhouse should be the final stage of construction (including glazing). Once installed your greenhouse requires little maintenance, but to maintain the smooth running of your door(s) WD40 or similar can be applied to the door wheels and lower door guides.

Guarantee x Your new Simplicity greenhouse is guaranteed for 10 years against faulty manufacture of the framework. This does not include glass, moving parts, accidental damage or wind damage.

121

610mm

121


A (mm)

B (mm)

6’3” x 4’3”

1295

6’3” x 6’3”

1910

6’3” x 8’3”

1910

2530

6’3” x 10’4”

3150

6’3” x 12’4”

3770

OPTION 1: base on grass

OPTION 2: base on slabs

OPTION 3: base on concrete

OPTION 4: no base on brick


Page Part Ref No.

Section

Size (mm)

1

3720

5

3100

17

2480

25

1860

55

1240

3

3720

8

3100

14

2480

27

1860

58

1240

49

32

37

1314

1210

1856

6 4

6 6

6 8

6 LE

Page Part Ref No.

Section

Size (mm)

6 4

6 6

6 8

6 6 10 12

2 2

2 2

4

2 2 2 2 2 2

54

1275

1

2

3720

6

3100

12

2480

26

1860

57

1240

1

35

1117

2

61

1215

2

85 /

628 /

1

93

636

121

612

123

124

2 2

2

4

4

6

1 2

44 1651

6 6 10 12

2

8

10

1 1 1 1

4

6

8

10

4

1

2

3

4

1

1

2

3

4

612

1

1

2

3

4

610

2

2

4

6

8

1

1

2

3

4

2

2

4

6

8

M4

6

6

12 18 24

M6

2

2

4

45

49

1314

4 2

33 1103

2

34 2 30 1210

2

31

96

39

23

614

1836

1856

2

1

1 6

8


Page Part Ref No.

Section

Size (mm)

6 4

6 6

6 8

46

1605

2

95

614

1

130

619

4

137

883

2

6 6 10 12

6 LE

10mm

2

2

2

1

4000

114 138 162 182 202

48

60

72

82

92

3 roll

4 roll

4 roll

5 roll

6 roll

1

126

466

1

M6

92

106 114 128 148

M6

92

106 114 128 148

M6

1


58

4’ X2 32 55

mm

Quantity

58

1245

2

32

1210

2

55

1245

2

49

1314

2

M6

6

M6

6

Part No

mm

Quantity

27

1860

2

32

1210

4

6’

25

1860

2

X2

49

1314

4

27

25

14

49

Part No

8’ X2 17

8

10’ X2 5

3

12’ X2 1

M6

12

M6

12

Part No

mm

Quantity

14

2480

2

32

1210

6

17

2480

2

49

1314

4

M6

16

M6

16

Part No

mm

Quantity

8

3100

2

32

1210

8

5

3100

2

49

1314

4

M6

20

M6

20

Part No

mm

Quantity

3

3720

2

32

1210

10

1

3720

2

49

1314

4

M6

24

M6

24


32

32

49


Part No

mm

Quantity

Part No

mm

Quantity

30

1210

1

44

1651

1

31

1210

1

45

1651

1

33

1103

1

49

1314

2

34

1103

1

54

1275

1

37

1856

1

96

614

2

26

M6

1

2

33

96

26

34

This bar is currently riveted to the door track assembly (54). Please ignore at this stage. Part 54 fitted in section 10.

44

96

45

49

49 30

31

37


34

33

33 / 34

54

44 / 45

33 / 34

96

30 / 31 49

49

44 / 45

37

37

30 / 31


Part No

mm

Quantity

Part No

mm

Quantity

23

1856

1

39

1836

1

30

1210

1

44

1651

1

31

1210

1

45

1651

1

33

1103

1

49

1314

2

34

1103

1

26

26

M6

1

2

33

34

39

44

45

49

49

30

31

23


34

33

33 / 34

44 / 45

33 / 34

30 / 31 39

39

49

49

44 / 45

23

23

30 / 31


This bar is currently riveted to the door track assembly (54). Please ignore at this stage. Part 54 fitted in section 10.


Packed with base!

7mm

18mm

If you have a metal base and you live in a windy location then you should drill and fix the frame to the base using 10mm nuts and bolts. Drill centrally between two vertical glazing bars for neatness (it is not essential to drill every section). Make sure the bolt head does NOT interfere with the line of the glass. Cills should be drilled 18mm from the inside vertical face to avoid the front glass face. Do NOT anchor the structure to the ground until the end!


4’ 8

Part No

mm

Quantity

57

1240

1

35

1117

2

61

1215

2

85

628

1

6’

Part No

mm

Quantity

26

1860

1

35

1117

4

61

1215

4

93

636

1

14

2

8’ 20

Part No

mm

Quantity

12

2480

1

35

1117

6

61

1215

4

93

636

2

2

1

1 61

35

4

61

35

3

3

61

4

35


10’ 24

Part No

mm

Quantity

6

3100

1

35

1117

8

61

1215

4

93

636

3

12’ 36

Part No

mm

Quantity

2

3720

1

35

1117

10

61

1215

4

93

636

4

600

1

601

2

600

601

X2 M4 X 4

3? 85, 9

85 / 93


M6 10mm X 2 Part No

mm

Quantity

121

612

1

123

612

1

124

610

2

X2

X4

M4 X 2 M4 X 2

X4 610 x 610 124 X1

1220mm

121

124 121


123 610 x 610


Part No

mm

Quantity

Part No

mm

Quantity

46

1605

2

130

619

4

95

614

1

137

883

2

M6 x 10

16

M6

16

X2

95

X2

130

X2

137 46

130

46 137

130


95

46 130

46

130

Please note that you may need to change the orientation of the diagonal flat bar braces in your door/s to make fitting your door stop easier. i.e. the diagonals can be fitted in either orientation.

46



A

Z

R

X N

S

A

X

R

X

S

S

S

S

S

S

R D

D

A X

Y

A

Size (mm)

4’

6’

8’

10’ 12’

S

610 X 1210

9

11 13

15

17

R

610 x 1133

3

5

6

7

8

A

610 x 610

3

3

4

5

6

D

610 x 533

1

1

2

3

4

N

610 x 205

1

610mm

5

A

610 x 610

1

D

610 x 153

1

L

573 x 100

5

A S

S

S

L

D

653 444 438

Y 610

X

16 610

Z

245 35 610


A

Z C A

A

C

A

C

U

A

A

A

A

A

A

A

A

A

U

U

U

U

A

N

A

A

A

A

A

A

A

Size (mm)

4’

A

610 X 610

24 30 36

42

48

R

U

610 X 535

4

10

12

B

610 X 457

1

B

N

610 X 205

1

C

6’ 6

8’ 8

10’ 12’

L

A A

A

A

A

A

R

610 x 153

1

L

573 x 100

5

D

450

248 35 610

D

C

35 610

Z

245 35 610


Z

A R

N

Q

S

A

P

O

R

Q

S

R D

D

A O

A

S

S

Size (mm)

4’

6’

8’

10’ 12’

S

610 X 1210

4

6

8

10

12

R

610 X 1135

3

5

6

7

8

A

610 X 610

3

3

4

5

6

U

610 X 535

1

1

2

3

4

N

610 X 205

573 x 100

5

1

L

447

S

610

1650

1871

C

1650

245 35 610

O

P 1658

1235

610

Q

610

1235

610



Attach upper door track 54 to the two bolts left ready in section 2 with nuts (position 54 vertically and push it through the central section between the two glaze bars. Twist 54 so that the slots in the mounting bar are facing upwards). Slide doors into upper track (54) and lower track (37), adjust the height of 54 until the door is running smoothly leaving enough room for the pane of glass above.

54

54

1275

1

Carefully remove 2 nuts from door rear and attach door stop/ handle (see diagrams below). Re attach the nuts!

37

126

466

1

126 126


SAN D

No 10 x 2�

O7mm

Please note you will have to drill and screw through your metal base and into your solid foundation at an angle from outside the building.


To help waterproof the building it is a good idea to use a transparent all-weather silicone inside and outside of the building where there are any gaps. Also the top of the vents can be siliconed.

Vent top corner siliconed along with bar capping. Leave cap to allow water to drain.

Inside eave area siliconed.

Outside eave area siliconed with bar capping.

Here’s how you can earn £25 and have your new greenhouse feature in our next brochure…. We are always interested to hear how you went on assembling your simplicity greenhouse, and we are particularly interested to see photos of the finished article. We like to see where you’ve put it, how you’re using it and how it looks in your garden. Often we glean ideas from this which we can pass on to other gardeners as useful tips. It is always nice if we can include ‘real’ greenhouse photos in the brochure, so if you send us a photo of your greenhouse to us and it is good enough to get into our next brochure, we will send you a £25 reward. Please send your photos to: Photo competition Simplicity Greenhouses Blythe Park Cresswell Stoke-on-Trent Staffs ST11 9RD 01782 388811 Or better still, email us on sales@simplicitygreenhouses.co.uk Please write on the reverse of photos your name and address and if you would like them back, please write ‘please return’ on them too. We wish you all the best with your new greenhouse, and we look forward to seeing your photos in the near future!


mm

3720

3720

3720

3100

3100

3100

2480

2480

2480

1856

1860

1860

1860

1210

1210

1210

1103

1103

1117

1856

1836

1651

1651

1605

1314

1275

No

1

2

3

5

6

8

12

14

17

23

25

26

27

30

31

32

33

34

35

37

39

44

45

46

49

54

2

2

4

1

1

2

2

2

8

2

2

2

1

1

2

2

2

6

1

4

2

1

8

2

2

2

1

1

6

2

2

6

2

2

1

8

2

2

2

1

1

8

2

2

8

2

2

1

8

2

2

2

1

1

10

2

2

10

2

2

601

600

137

130

2

2

126

1

123 124

2

1

1

121

2 1

96

2

1

95

93

2

58

2

85

57

1

1

55

2

61

No

12’

2

10’

1

8’

2

1

6’

2

2

1

4’

460

608

883

619

466

610

612

612

614

614

636

628

1215

1240

1240

1240

mm

4m

3

1

2

4

1

2

1

1

2

1

1

2

2

1

2

4’

4m

4

2

2

4

1

4

2

2

2

1

2

4

8’

4m

5

3

2

4

1

6

3

3

2

1

3

4

10’

4m

6

4

2

1

2

4

1

8

4

4

2

1

4

4

12’

1 smalls pack for correct size of building

4m

4

1

2

4

1

2

1

1

2

1

1

4

6’


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.