greg lehman ARCHITECT

TORREY VIEW

San Diego, California

large campus experience

CAMPUS PROJECTS 01
02
university village 1,343,000 sf. 12 buildings, 2 parking structures, 12 fourplex residences
torrey view 515,000 sf. 3 life science/office buildings, 1 restaurant, 1 parking structure 03 trammell crow-120 e grand
04
05
06
488,000 sf. 2 life science/office buildings, 1 amenity bldg, 1 parking structure
nexus on grand 148,000 sf. 1 life science/office building, 1 parking structure
exelixis campus 900,000 sf. 4 existing bldgs, 3 new buildings, 1 parking structure
vantage 342,000 sf. 2 life science/office building, 1 parking structure 07 ritz carlton reserve 1 arrival village, 17 residential buildings, 7 guest room buildings, 2 presidential villas1 spa, 1 BOH building

UNIVERSITY

VILLAGE - Boca Raton, FL

This masterplan seeks to create a vibrant community as a holistic combination of residential, retail, restaurants, hotel and commercial office, with a variety of landscaped parks and public spaces, to create an authentically mixed-use community.

ROLE:

was the main client contact with the developer for this project. acted as the project manager and lead the design direction for this concept package. also had specific design responsibility for the Parcel A parking structure, Parcel H cafe, Parcel plaza, Parcel L senior living, Parcel K housing and Parcel N restaurant.

PROGRAM:

TOTAL BUILT GROSS AREA: 1,343,000 sf

Parcel A: Parking structure and office

Parcel B: Hotel

Parcel C: Mixed use residential and retail/food service.

Parcel D: Mixed use residential and retail/food service.

Parcel E: Future development

Parcel F: Mixed use residential and retail/food service.

Parcel G: Mixed use residential and retail/food service.

Parcel H: Two sided cafe

Parcel I: Plaza,

Parcel J: Mixed use residential and retail/food service.

Parcel K: Mixed use residential and retail/food service and parking structure

Parcel L: Senior living

Parcel M: Grocery store

Parcel N: Restaurant.

Parcel O: Four-plex housing

Parcel P: Four-plex housing

TEAM:

Team consisted of 4 architects, each focused on several individual parcels, with 1-2 junior support.

01
01 UNIVERSITY VILLAGE
Boca Raton, Florida

TORREY VIEW San Diego, CA

Boca Raton, Florida

This project, slated to be finished by the end of 2023, is a campus of 3 life science buildings, an amenity building, an underground parking structure, and amenities including a food hall, conference center and fitness area.

ROLE:

was the main client contact with the developer for this project in my role as the lead senior project manager. Repsonsibilities included the primary contact for client, consultant and contractor communications. Financial responsibilites included developing and managing the project fees, team workplan, add services, and consultant payments. maintained and monitored the project design schedule to keep aligned with fees and client expectations. tracked agency approvals and AHJ permit rerquirements. worked closely with the construction administration team to resolve difficult jobsite issues.

PROGRAM:

TOTAL BUILT GROSS AREA: 515,000 sf

Bldg A: Life science / office building

Bldg

Bldg

Amenity Bldg: Restaurant 25,000 sf

sf

sf

Parking: Parking structure 1390 below grade parking

TEAM:

Team consisted of 15-20 team members including PIC, PM, architects, junior architects, interior designers, construction administrators, and adminstrative support.

UNIVERSITY VILALGE
160,000
125,000
B: Life science / office building
sf
200,000
C: Life science / office building
02
02 TORREY VIEW San Diego, CA

TRAMMELL CROW - 120 EAST GRAND South San Francisco, CA

Boca Raton, Florida

A world-class 515,000 sf life science campus for South San Francisco. Proposed buildings include an 11-story office and laboratory building, a 5-story office and laboratory building, a 1-story amenity building, and an 8-tier parking structure.

ROLE:

was the main client contact with the developer for this project in my role as the lead senior project manager. Repsonsibilities included the primary contact for client, consultant and contractor communications. Financial responsibilites included developing and managing the project fees, team workplan, add services, and consultant payments. maintained and monitored the project design schedule to keep aligned with fees and client expectations. tracked agency approvals and AHJ permit rerquirements. worked closely with the construction administration team to resolve difficult jobsite issues.

PROGRAM:

TOTAL BUILT GROSS AREA: 515,000 sf

Bldg 1: Life science / office building 333,000 sf

Bldg 2: Life science / office building 155,000 sf

Bldg 3: Amenity Bldg: 17,000 sf

PS: Parking Structure 756 cars

TEAM:

This team consisted of 12-18 team members including PIC, PM, architects, junior architects, interior designers, and adminstrative support.

UNIVERSITY VILALGE
B1
B3 PS
B2
03
03 TRAMMELL CROW - 120 E GRAND
South San Francisco, CA

NEXUS ON GRAND South San Francisco, CA

Nexus on Grand features 148,000 square feet of state-of-the-art laboratories, office space, and amenities including a café, a fitness center, and indoor and outdoor meeting areas. A glass curtainwall façade brings natural daylight into the building and offers spectacular views.

ROLE:

was the main client contact with the developer for this project in my role as the lead senior project manager. Repsonsibilities included the primary contact for client, consultant and contractor communications. Financial responsibilites included developing and managing the project fees, team workplan, add services, and consultant payments. maintained and monitored the project design schedule to keep aligned with fees and client expectations. tracked agency approvals and AHJ permit rerquirements.

PROGRAM: TOTAL BUILT GROSS AREA:

Bldg 1:

/

sf

TEAM:

Team consisted of 7-9 team members including PIC, PM, architects, junior architects, interior designers, construction administrators, and adminstrative support.

UNIVERSITY VILALGE
4 4 4 5 5 7 8 7 11 10 5 5 15 6 14 11 ROEBLING ROAD EAST GRAND AVE RAIL TO TRAILS 04
Boca Raton, Florida
148,000
Life science
office building 148,000 sf Parking: Parking structure 363 cars
UNIVERSITY VILALGE Boca Raton, Florida VILALG Boca Fl Fl
NEXUS
04
South San Francisco, CA

This biotechnology company’s success required an expansion of their headquarter operations beyond its current handful of buildings. Establishing a fully realized campus in their current location would support future growth while enhancing the organization’s competitive edge and ability to retain top talent.

After a thorough analysis of existing assets, as well as the available properties in the immediate area, the team developed a master plan that not only optimizes current facility usage and overall functionality in a phased approach, but also establishes a vision for a cohesive, vibrant, and pedestrian-centric campus environment. The plan incorporates many elements, including new grading and landscape treatments, to physically and visually connect the various facilities.

This new campus will be created through a combination of leasing and building new facilities, ultimately culminating in a combined area of more than 500,000 square feet of new administrative, scientific workplace, and amenity spaces.

ROLE:

served as the project manager with a small team to develop this masterplan. Repsonsibilities included the primary contact for client and consultants. I worked closely with the principal in charge and the lead designer, as well as several key consultants, to create a future plan for this campus.

PROGRAM:

TOTAL BUILT GROSS CAMPUS AREA: 900,000 sf

Bldg 1-3: New life science/office buildings 500,000 sf

Parking: Parking structure 1,565 cars

TEAM:

This team consisted of 4 team members including PIC, PM, lead design and support.

Boca Raton, Florida

UNIVERSITY VILALGE
05
05 EXELIXIS CAMPUS PLAN
Alameda, CA

VANTAGE South San Francisco, CA

Boca Raton, Florida

This life sciences campus features a modern, flexible design to reflect current market conditions and the sophistication of prospective tenants. Developed by a national healthcare real estate firm and life sciences landlord based in the Bay Area, the 326,000-squarefoot Vantage consists of one five-story building and one six-story building.

ROLE:

was the main client contact with the developer for this project in my role as the lead senior project manager. Repsonsibilities included the primary contact for client, consultant and contractor communications. Financial responsibilites included developing and managing the project fees, team workplan, add services, and consultant payments. maintained and monitored the project design schedule to keep aligned with fees and client expectations. tracked agency approvals and AHJ permit rerquirements.

PROGRAM:

TEAM:

Team consisted of 8-10 team members including PIC, PM, architects, junior architects, interior designers, construction administrators, and adminstrative support.

UNIVERSITY VILALGE
06
TOTAL BUILT GROSS AREA: 326,000 sf Bldg 1: Life science / office building 177,000 sf Bldg 2: Life science / office building 149,000 sf Parking: 895 cars
UNIVERSITY VILALGE
06
Boca Raton, Florida Bo Boca ca Ratatonon, Fl F or o idda
VANTAGE
South San Francisco, CA

CARMEL VALLEY RANCH

1.Morgan’s Point Resort Gateway Arrival

Carmel by the Sea, CA

2.Resort Arrival Roadway

3.Future Resort Amenity Features

4.Resort Service Area

5.Secondary Entry Road

6.Existing Service Roadways

7.Resort Roundabout with Feature and Hotel Gateway

8.Hotel and Residential Arrival Drive

9.Ritz Reserve Hotel

10.Ritz Branded Residential

11.Future North Shore Residential

12.Existing Officers’ Club Building

13.Presidential Villas

14.Hotel Spa and Fitness

15.Hotel Service and Back of House

16.Marina Residential

17.Residential Access Roadway

18.Morgan’s Point Marina

19.Access to Morgan’s Point Peninsula

20.George’s Bay

21.Li le Sound Bay

MORGAN’S POINT, A RITZ-CARLTON RESERVE RESORT

Bermuda

The design of Morgan’s Point is a modern interpretation of the distinctive architecture of Bermuda for this resort in the Ritz Carlton Reserve line, the most luxurious of this brand’s offerings.

ROLE:

My main role on this project was the lead designer on the residential buildings, the spa and the BOH support building.

PROGRAM:

1 arrival village

17 residential buildings

7 guest room buildings

2 presidential villas

1 spa

1 BOH building

TEAM:

Team consisted of 16-20 team members split between the San Francisco and Coral Gables offices.

RANCH
CARMEL
VALLEY
SCALE1m=2000m 05025100200 ARitz-CarltonReserve PROGRESS DESIGN February 19, 2016
Carmel by the Sea, CA
Overall Master Plan 7 5 6 6 6 8 20 16 15 14 19 18 17 17 11 11 10 10 9 9 9 21 12 2 13 LEGEND:
07
07 MORGAN’S POINT, RITZ RESERVE Bermuda

greg lehman ARCHITECT

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.