PORTFOLIO 2008-2017 GUANNAN CHEN
high school undergraduate study of architecture practice in FCJZ Atelier
2009
2008
2007
2006
2005
2004
2003
OFFICE OF TAIWAN GLASS SCHEME I (CONCEPT & SD)
NOVARTIS SHANGHAI CAMPUS C5 LAB BUILDING DESIGN (SD)
graduate study of architecture & internship LICENSED ARCHITECT
practice in Nbbj NY office
2017
2016
2015
2014
2013
2012
2011
2010
CONEY ISLAND HOSPITAL (CONCEPT & SD)
METROPLEX (MASTER PLAN & CONCEPT)
NANJING ECO-ISLAND BRIDGE (WON COMPETITION)
JIAHUI INTERNATIONAL HOSPITAL (SD & DD)
NANJING ECO-ISLAND OFFICE LOT (DD&CD)
INTERPLAY WITH NATURE
KIMBELL ART MUSEUM EXTENTION
OFFICE OF TAIWAN GLASS SCHEME II (SD)
SELECTED WORK
CONEY ISLAND HOSPITAL (Concept & SD Phase, Mar 2016 - Mar 2017)
EXTERIOR DESIGN
GUIDING PRINCIPLES COMMUNITY, CULTURE, & HISTORY The building design is inspired directly from the Coney Island community. A simple metaphor of earth, sea, and sky inform material selections, relate building massing setbacks, and root the podium in a contextual scale, to create a building that respects the neighborhood. The original Native American inhabitants of the region, the Lenape, called this area Narrioch. This name has been attributed the meaning of “land without shadows” or “always in light” describing how its south facing beaches always remained in sunlight. The envelope will take advantage of the distant views, and manage the daylight with an engineered sunshade system
Coney Island
SKY BEACON
CONEY ISLAND HOSPITAL SCHEMATIC DESIGN 3
ICON
FEBRUARY 16, 2017
7
SEA
EARTH
CONEY ISLAND HOSPITAL SCHEMATIC DESIGN 3
FEBRUARY 16, 2017
11
SITE AND CONTEXT
Site
NEIGHBORHOOD MATERIALS AND COLOR PALETTE
EXTERIOR DESIGN
SITE CONTEXT
COMMUNITY AND CULTURE Podium setback relates to neighborhood scale Context: Tree plantings continue street tree canopy creating privacy for patients and screens views to parking structure and mechanical
SHORE VIEW NURSING HOME WILLIAM E. GRADY HIGH SCHOOL BELT PAR KWAY
ABRAHAM LINCOLN HIGH SCHOOL BELT PARK WAY
CONEY ISLAND HOSPITAL
E. 6T H
ST RE ET
P.S. 209 MARGARET MEAD
AVENUE Z
Brick neighborhood STEPPED MASSING SCALE
ICON
AY KW R PA
COMMUNITY / INSTITUTIONAL RESIDENTIAL
The building design organization take cues directly CONEY ISLAND HOSPITAL SCHEMATIC DESIGN 3
TR EE CA NO PY
FEBRUARY 16, 2017
6
from the Coney Island community. A simple metaphor
TR EE CA NO PY
RESIDENTIAL SCALE
N EA C O
of earth, sea, and sky inform material selections, relate
CANOPY: UNIFIES ENTRY IDENTITY
TR EE CA NO PY
the building massing setbacks, root the podium in a
ENTRANCE LOBBY
contextual scale, to create a building that is a good
OPEN CORNER: PATIENT VIEWS, AND SIGNIFY ENTRY DIRECTION
TOWER
EXIST. TOWER
CONEY ISLAND HOSPITAL SCHEMATIC DESIGN 3
neighbor and respects the Coney Island culture.
EXIST. TOWER
FEBRUARY 16, 2017
9
Z (WIDE
)
STREET
15'-0"
AVENUE
/4"
515'-1 1
NOTES MAX STREET WALL HEIGHT: 35’ - PER ZR 24-521 SKY EXPOSURE SLOPE RATIO: 1:1 - PER ZR 24-521 AVENUE Z SET BACK: 15’ - PER ZR 24-521 EAST SIXTH STREET SET BACK: 15’ - PER ZR 24-521
PROPERTY LINE
SHORE PARKWAY SET BACK: 15’ - PER ZR 24-521 OCEAN PARKWAY SET BACK: 30” - PER ZR 113-30
SKY EXPOSURE PLANE B (1:1)
SKY EXPOSURE PLANE C (1:1)
BUILD IN (CDAT G # 6 P BLDG )
LEGEND
COMPLYING AS-OF-RIGHT
T.O. RO
OBSTRUCTIONS
OF 35’-0
AREAS OF NON-COMPLIANCE SKY PLANE A 35'-0"
T.O. RO
AREAS OF NON-COMPLIANCE SKY PLANE B
”
35'-0"
AREAS OF NON-COMPLIANCE SKY PLANE C
35'-0"
STREE T)
T.O. RO
(WIDE
REEN
R HOU
"
”
SE
112’-0” T.O. RO
OF 98’-0
714'-10
KWAY
T.O. SC
T.O. RO
OF 15’-0
”
OF 18’-0
MECH
”
ANICA
L BLDG
TREET)
N PAR
POWE
TOWE R (INPAT BUILDING IENT B LDG)
T.O. RO
(WIDE S
OCEA
ARAGE
”
760'-0"
NTS
EMS G
OF 12’-0
STREET
HAMM ET (demolis T PAVILION h after hospita n l is built ew )
IXTH EAST S
D-2
NORTH-WEST SKY EXPOSURE PLANE AXONOMETRIC DIAGRAM
”
Buildable Area
OF 68’-0
NOTES
T.O. RO
MAX STREET WALL HEIGHT: 35’ - PER ZR 24-521
OF 114’-
SKY EXPOSURE SLOPE RATIO: 1:1 - PER ZR 24-521
6 3/8”
AVENUE Z SET BACK: 15’ - PER ZR 24-521 EAST SIXTH STREET SET BACK: 15’ - PER ZR 24-521
T.O. RO
SHORE PARKWAY SET BACK: 15’ - PER ZR 24-521
OF 102’-
OCEAN PARKWAY SET BACK: 30” - PER ZR 113-30
SKY EXPOSURE PLANE B (1:1)
SKY EXPOSURE PLANE B (1:1)
MAIN H
OSPIT AL
LEGEND
T.O. RO
COMPLYING AS-OF-RIGHT
PROPERTY LINE
OF 20’-0
OBSTRUCTIONS
3/8”
AREAS OF NON-COMPLIANCE SKY PLANE A AREAS OF NON-COMPLIANCE SKY PLANE B
35'-0"
3 3/8”
T.O. RO
AREAS OF NON-COMPLIANCE SKY PLANE C
T.O. RO
OF 125’-
3”
OF 177’-
11 3/8”
35'-0"
T.O. RO
OF 125’-
3” T.O. RO
OF 20’-0
3/8”
35'-0"
15'-0"
30'-0" 15'-0"
D-1
742'-3 1/4"
NORTH-EAST SKY EXPOSURE PLANE AXONOMETRIC DIAGRAM NTS
SHORE PARKWAY FRONT YARD LINE
)
(NARROW STREET
PROPERTY LINE 0’
D-1 EXISTING SITE PLAN SCALE: GRAPHIC
25’ 50’
100’
250’
N
NYC EDC CONTRACT: NO. 6162001 PROJECT CODE NO. 6162 FEMA PW NO. 4593 346 BROADWAY #5, NEW YORK, NY 10013
G
F
E
D
C
346 BROADWAY #5, NEW YORK, NY 10013 110 WILLIAMS ST, NEW YORK, NY 10038
110 WILLIAMS ST, NEW YORK, NY 10038 Printed Name & Signature
7
Entity
7
Date
Base Tactical
8
H+H Printed Name & Coney Island Signature
7
H+H OFD
7 Entity
Date
Base Tactical
7
H+H Coney Island H+H OFD
Architect: NBBJ Architecture, PLLC 140 Broadway, 29th Floor New York, NY 10005 Architect: 212.924.9000 NBBJ Architecture, PLLC 140 Broadway, 29th Floor Structural Engineer: New York, NY 10005 Leslie E. Robertson Associates 212.924.9000 40 Wall Street, 23rd Floor New York, NY 10005 Structural Engineer: Leslie E. Robertson Associates MEP Engineer: 40 Wall Street, 23rd Floor 6 New York, NY 10005 Bard, Rao + Athanas
6
BAR T
6
E/T BAR
6
Bard, Rao + Athanas 105 Madison Avenue, 10th Floor Resiliency / Civil Engineer: New York, NY 10016 Arcadis 27-01 Queens Plaza North Long Island City, NY 11101 / Civil Engineer: Resiliency Arcadis Insight Civil Engineering 27-01 Queens Plaza North 222 Broadway, 19th Floor Long Island City, NY 11101 New York, NY 10038
T/S
E/T XR T Insight Civil Engineering 222 Broadway, 19th Floor D (3) E/T S Landscape Architect: XR New York, NY 10038 PT ISO S T/S Elizabeth Kennedy 63 Flushing Avenue, #264 EQ CL D (3) E/T S Brooklyn, NY 11205 ISO N Landscape Architect: PT T PT ISO Elizabeth Kennedy E/T CC 63 Flushing Avenue, #264 OB POCT T/S PT N CL EQ Brooklyn, NY 11205 ISO WK (8) 4 PT E/T CC SAFE MED OB POCT T/S T/S D (3) PT WK (8) 4 E/T S TD (2) CC SAFE MED E/T T/S D (3) PROC E/T E/T S TD (2) E/T E/T CC E/T L PROC SEAL SOIL EQE/T E/T E/TE/T S DECON PAT E/T E/T E/T E/T L L E/T SEAL PROP SOIL EQ E/T S DECON E/TPAT E/T E/T S E/T E/T E/T E/T L E/T P T/S Elec E/T S E/T S E/T S E/T PROP E/T S E/T XR E/T Shared P T/S Elec E/T E/T S E/T S E/T S E/T Office XR CM CC POCT 1 2 3 4 5 6 E/T D (2) EMS St Lng PT PT EQ EVS TD (3) PT EMS T T T T T T WR (5) COM CM MED E/T S A VEST D (3) EQ CLCC POCT Lockers D (2) EMS EQ LNG PT PT N EQ EVS TD (3) PT TD EMS WR (5) COM E/T S MED ADULT E/T S A VEST CL D (3) EQ Doc EQ T T LNG N Staff TD E/T S RES Wrk E/T S ADULT CAST ST WC 1 FT Eq Work SEC E/T S VEST E/T S ST SEC ST ST ST E/T S C E/T S EKG E/T S CC M E/T S RES Off WC ST TD 1 FTNOUR LA CAST Fam SEC E/T S VEST E/T S ST SEC ST ST ST E/T S E/T S EKG E/T S T T D S Off Off Eq Nourish PEDS ADULT P T/S US S T/S Wtg TRIAGE CL TD NOUR LA 2 FT Space Type Legend E/T L RES RES Staff ADULT PEDS S T/S T TD (3) CL EQ P T/S EVS HOLD US C TRIAGE TRIAGE ST QUIET FT SOIL X Nrs Work CON 2 FT CH Space Type Legend CH P WAIT Staff E/T 3 FT RES RES EQ XR CL Public A REG EVS TD (3) Work TRIAGE ST FT SOIL CON HOLD EMS ChuteAChute CH CH P WAIT EQ N TD 3 FT FT MEDEQ FT QUIET VEST Author Designer XR P REGA REG CL Public LNG TD 101546.00 Patient 4 FT FT FT DTD (2) MED Author T T T T T T Fam Designer RDG CT EQ WK HOLD HOLD P REG CL PT Wtg 101546.00 Patient 7 WC ST 8 9 10 11 12 4 FT PT D (2) CAST A WAIT Clinical Support 1 FT SEC RDG CT EQ WK HOLD HOLD VEST 5 FT CL ST SEC ST PT EKG CT LEVEL 02 PT FT T TD XRAY NOUR LA A WAIT CT Clinical Support TD 5 FT TD WAIT PLANNING CC CTRL Clinical Work CT LEVEL 02 TRIAGE P SOIL FT E/E/D EVS 6 FT PT T 7TD FT XRAY 2 FT TD (2) CT TD WAIT PLANNING 1 P OB TRIAGE NS (5) / CTRL MED CC Clinical Work P TD (3) PT ST CL TRIAGE ST QUIET FT 6 FT E/E/D PT SOIL EVS CON 7 FT Staff Support PT / CM TD (2) PT XRAY 3 FT 1 PCL OB TRIAGE NS (5) / EQ MED A REG PT PT ST CL Staff Support XRAY TD FT FT MED CL PT / CM MEP P REG 7P 4 FT D (2) PUMP MEP PUMP SOIL 4 P 5 P 6 P HOLD 2P 3P CL PT Vertical Circulation PT 7P PUMP 5 FT PUMP SOIL 4 P 5 P 6 P HOLD 3P 2P T
5
105 Madison Avenue, 10th Floor New York, NY 10016 MEP Engineer:
7
T/S
6
ISO
ISO
ISO S T/S ISO
5
6
5
4
5
5
T/S BAR T T
4
T/S
5
4
4
4
4
3
3
MARK
DATE
L
Eq
CM
DESCRIPTION
MARK
PROJ. NO.:
DATE
DRAWN BY:
DESCRIPTION
Staff Wrk EQ
EMS COM IT
DATE:
SHEET TITLE:
DATE:
EVS
SADULT CC RES
PROJ. ARCH.:
PROJ. NO.:
TD (2)
DECON PAT 13 14 PROP P T/ST T
STElec ST
EVS Eq
2
Inpatient Tower
ED floor (2nd floor)
T
WTG
1
T WTG
Options Overview Site - -Decision SiteCirculation Circulation Decision G
F
G
“L”
F
Southeast Drop-off Southeast Drop-off
E
“Z” Northwest Drop-off Northwest Drop-off
C
D
P02
NYC DOB STAMP
TD
7 FT
E/E/D PT
Decision Waterfall SOIL EVS
Tower
WAIT
1
NYC DOB BSCAN
1
Podium Decision Options Review Overview
63
FEBRUARY 16, 2017 B
G
PAGE NO.
“L”
B
PAGE NO.
F
T
September 9, 2016
CC POCT PT D CL D (3) EQ L
Proc E/T S
POCT Copy Eq Cl E/T(5) S Staff Wrk T
E/T XR 23
T E/T S
N Nourish
WR (5) Med
20
E/T T
Con MED
Elec
E/T E/T S
E/T
Off
CE/T S Off
E/T S Staff Work US
T T CH CH P WAIT EQ 25 26 27
D (2) TD (3) Fam WtgE/T S
Eq
P T/S
CL
SOILT 24
19 T
E/T
Staff Work PT PT
PT E/T S CC E/T S w St
S T/S T
T E/T S
E/T S
T TEVS HOLD CL28
T
FT
P 1 P OB TRIAGE NS (5) / CL PT / CM
CC TD (2) MED
CT CTRL
EQ
S
PT
HOLD HOLD XRAY
CT PT
ST
CL
XRAY
3P
4P
5P
7P HOLD
6P D
PUMP
SOIL
PUMP C
“Stepped
CONEY ISLAND HOSPITAL SCHEMATIC DESIGN 3 G
Schematic Design Planning F
-
-
-
6 6
TE/T S
PROC
L
WTG
- September 9, 2016 September 9, 2016
15
SOIL
EQ
E/T E/T E/T L 17 18
A WAIT
“Z”
A
Inpatient Tower
1
E
-
- -
22
2P
A
- -
- -
T
ADULT RES
E/T T XR
E/T
E/T
E/T E/T S 16
4
E/T S
NYC DOB BSCAN
Schematic Schematic Design Planning Design Planning
- -
CC
RDG CT EQ WK
1
Podium Decision Podium Decision LEVEL SEVEN Review Review
Inpatient Tower Inpatient Tower
P02
Acute floorInpatient (tower)
6 FT
Dept. Circulation
2
PT
WK (8)
MED
D (3)
E/T S
SHEET NO:
NYC DOB STAMP
Vertical Circulation Dept. Circulation TD
21
2
SHEET NO:
“Stepped Bar” C
PEDS RES
2
CONEY ISLAND HOSPITAL SCHEMATIC DESIGN 3
D
E
Decision Decision Waterfall Waterfall
2/15/2017 8:52:45 AM C:\Users\elee\Documents\RevitLocalFiles\ARCH-CIH-CSS_FITOUT_101546_elee.rvt
LEVEL TWO
2
2/15/2017 8:50:32 AM C:\Users\elee\Documents\RevitLocalFiles\ARCH-CIH-CSS_FITOUT_101546_elee.rvt
1
2
3
2/15/2017 8:50:32 AM C:\Users\elee\Documents\RevitLocalFiles\ARCH-CIH-CSS_FITOUT_101546_elee.rvt
2/15/2017 8:50:32 AM C:\Users\elee\Documents\RevitLocalFiles\ARCH-CIH-CSS_FITOUT_101546_elee.rvt
SHEET TITLE:
E/T
D (3) PT CL EQ CC POCT
N
E/T Conf
PROJ. ARCH.:
DRAWN BY:
ISO
ISO PT
T/S
3
3
3
SAFE
ISO
E/T
OB
E/T
XR
ISO S T/S
-
13 September 9, 2016
E
D
C
F
Y
TOW
GL CU SYS
ALU SU
** G A
EXTERIOR DESIGN
BUILDING ORGANIZATION
METAL PANEL (BETWEEN NEW & EXISTING TOWER)
GLASS CURTAINWALL
** M ALU
PO (PR
GLA
DESIGN EXCELLENCE Identity: Tower focus toward primary approach along Ocean Parkway creates New icon of Coney Island Hospital Entrance and canopy unites existing with new building Amenity: Patient lounge areas with daylight and expansive views. View screening via planted terraces. Drop-off zone at exterior canopy Valet parking in weather-protected, screened enclosure SUSTAINABILITY High performance envelope incorporate green roofs. Engineered, modular sunshade system mitigates solar heat gain specific to each facade elevation
PO
BRI (BU
BRI PER
GL LOW WE
BRICK
BRICK, PERFORATED
GLASS, FRITTED MEDICAL PLANNING
PROGRAM STACKING
CSS (NEW BUILDING)
New Hospital 15'-0"
Old Hospital
MAIN BUILDING
15’-0”
BEHAVIORAL HEALTH (32)
14'-9"
BEHAVIORAL HEALTH (32)
131’-10 1/2”
14'-9"
MED / SURG (28)
121’-4 1/2”
14'-9"
MED / SURG (28)
114’-7 1/2”
14'-9"
LABOR and DELIVERY
MED / SURG
102’-4 1/2”
WOMENS CLINIC
CONNECTING CORES
90’-4”
REHAB / OT
45’-0” 33’-10”
DIETARY
LOBBY
20’-1 1/2”
MATERIALS MGMT
8’-0 8 0”
164’-6”
LVL 09
149’-9”
LVL 08
135’-0”
LVL 07
120’-3”
LVL 06
105’-6”
TOWER
122’-3” 107’-6”
PP + INPATIENT BEDS
MECHANICAL M
17'-0"
PREP / RECOVERY - SURGICAL SUITE - CATH - ENDO
56’-2”
PRIMARY CARE
179-6”
93’-6”
32'-0"
78’-6” 67’-4”
PH LVL 10
16’-6"
16’-6"
PHARM
SPD
LAB
RADIOLOGY - IR
EMERGENCY DEPARTMENT (ADULT, PEDS) PARKING
LVL 04
74’-6”
MICU / SICU
80’-0”
CRU / CCU 66’-8”
INPATIENT BEDS
56’-6” 51’-6”
LVL 03 LVL 02
40’-0”
23’-6”
INPATIENT BEDS
37’-6” 23 -6 23’-6”
15,240 SF
ED - BH + OFFICES LOBBY
ENTRANCE NEW BUILDING
EXIST. TOWER
SCHEMATIC DESIGN FEB 2017
JIAHUI INTERNATIONAL HOSPITAL (SD & DD Phase, Mar. 2014 - Sep. 2014)
PHOTO OF STUDY MODEL 工作模型照片
Jianhui international hospital is a private hospital located in Shanghai. We aimed to design a hospital connected to nature. Patient tower is located to the north of lower outpatient tower to provide maximum sun light to both. The garden between them provides outdoor space for patients, families, and staff. The main entry lobby is inside the east narrow bar. So visitors will see directly into the central garden through the glass wall of the lobby before they enter the hospital. Facade design uses terracotta ribbons to control sunlight and views. For patient tower, the ribbons open up towards south and north but become almost solid on east and west facade.
September 17, 2014
September 17, 2014 CHAPTER º6 | MEDICAL PLANNING
CHAPTER º6 | MEDICAL PLANNING
Programmatic Stacking Diagram
Jiahui International Hospital Stacking Diagram
疗 规 [
L12 L11 L10 L9 L8 L7
FUTURE ANNEX
Mechanical Roof
Future Acute Beds x28
L14
Research Research Research Research Research
Future Acute Beds x28
L13
Research Research Mechanical Roof Future Clinics (4)
L4 L3
Research
IVF / Clinic (1)
L5
Research L1 Lobby / Retail / MEP L2
Future Acute Beds x28
L12
Future Acute Beds x28
L11
医
Postpartum Beds x26
Mechanical Research Research
L6 JIAHUI CONCEPT DESIGN
L15
[
划
R L13
R
Acute Beds x28
Clinics (4) Mech. Room
L9
ICU/Flex x12
ICU/Flex x12划
L7 L6
Radiology
Dialysis
会议室 CONF
员工厕所 S TOIL
病房 ACUTE
病房 ACUTE 病房 ACUTE
电梯 CL-2
VIP病房 ACUTE (VIP)
电梯 CL-1
电梯 FL/SL-2
中心护理站 CARE TM
前室 VESTI
净物储存 CLEAN
中心工作站 WORK
前室 VESTI
中心护理站 CARE TM
中心护理站 CARE TM 护士长室 H NURS
Soiled Dock
Rad Onc / Dental Mechanical
B1
弱电 IT
强电 ELEC
前室 VESTI
电梯 PT-2
储藏 STOR
检查/治疗室 EXAM/TR
清洁室 CLEAN
药品室 MEDS
电梯 FL/SL-1
强电 ELEC
中心护理站 CARE TM 污物室 SOIL
电梯 PE-3 中心护理站 CARE TM
电梯 PE-4
访客厕所 V TOIL
电梯 PE-5
楼梯 ST-C VIP病房 ACUTE (VIP)
等候 WAIT 病房 ACUTE
病房 ACUTE
病房 ACUTE
病房 ACUTE
病房 ACUTE
病房 ACUTE
病房 ACUTE
病房 ACUTE
病房 ACUTE 病房 ACUTE
Clean Dock
Kitchen
Canteen
Mat. / Fac.
Morgue
Parking
Laundry Facility Parking / Civil Defense Area
B3
病房 ACUTE
September 17, 2014 September 17, 2014
CHAPTER º6 | MEDICAL PLANNING
Future Annex
CHAPTER º3 | LANDSCAPE DESIGN
十一-十五层平面图 - 病房 LEVEL 11-15 PLAN - PATIENT TOWER
Site Traffic
Patient Tower
[
Central Utility Plant
疗 规
Courtyard
景 观 设 计 [
Pharmacy, NICU, Labor and Delivery, Central Sterile, Labs
Interventional, Radiology, Emergency
划 [
MEP
[
医
MEP
Oncology Center
MEP
Lobby and Welcome center
JIAHUI CONCEPT DESIGN
Modular Outpatient Clinics
N° 32
Cafe
JIAHUI CONCEPT DESIGN
Lobby Interventional, Radiology, Emergency
病房 ACUTE
咨询室 CONSLT
B2
N° 117
Mech.
护士办公 NURS SPC
营养室 NOUR
员工厕所 S TOIL
中心工作站 WORK
设备储存 EQUIP
电梯 PE-1 保洁室 HKPG
楼梯 ST-A
N° 128
N° 116
Parking
JIAHUI CONCEPT DESIGN
B2
病房 ACUTE (ISO)
中心护理站 CARE TM
中心护理站 CARE TM
保洁室 HKPG
电梯 PE-2
病房 ACUTE
B1
病房 ACUTE
医师办公室 MD OFF
前室 VESTI
L2 L1
病房 ACUTE
楼梯 ST-D
电梯 PT-1
药品室 MEDS
设备储存 EQUIP
L3
Oncology
病房 ACUTE
病房 ACUTE
前室 VESTI
洗衣房 LNDRY
营业室 NOUR
办公室 OFFICE
L4
ED
病房 ACUTE
员工休息室 LOUNGE
员工厕所 S TOIL
楼梯 ST-B
中心护理站 CARE TM
L5
Med. Onc
病房 ACUTE (ADA)
员工更衣 S LOCK
前室 VESTI
污物存放 SOIL
L8
NICU / Admin
Operating Rooms
Cardio / NucMed
Public Café
Pharmacy
Roof Deck
OP Procedures / Surg. Clinic OP Pharm
Postpartum Beds x26x26 疗 Future Postpartum Beds ICU/Flex x12 ICU/Flex x12规 Mechanical Central Sterile Labs Labor & Delivery
病房 ACUTE 病房 ACUTE
病房 ACUTE
L10
[
[
医
Mechanical Roof
HOSPITAL
05-14-2014
September 17,
CHAPTER ยบ4 | ARCHITECTURE & FACADE DE
F
R
E
Q
P
7700
N
9000
K
9000
J
12000
H
9000
F
G
9000
9000
9000
C
E
D
9100
C
10400
B
B
8700
A
10400
14573
1
WT9
1
77750
WT9
4500
AE304
WT8
WT8
WT8
WT8
WT8
WT8
WT8
WT8
WT8
WT8
WT8 4500
4500
4500
4500
4500
4500
WT8
2
WT8
WT8
WT8
AE313 4500
WT8
2
2 AE314
4500
31000
WT12
WT10
WT10
4500
WT11
WT11
PARAPET
WT8
WT8
WT7
WT7
WT7
WT7
4500
3 AE345
4500
WT11 WT7
WT3
WT7
2
3 2820
4 10325
WT5
5 9000
6 9000
LOBBY 3
5
AE362
2
AE323
AE322
7 9000
8 10851
GLASS CANOPY
10 11750
Level 12 53500 Level 11 49000 Level 10 44500 Level 9 40000 Level 8 35500 Level 7 31000
Level 6 24500 Level 5 20000 Level 4 15500 Level 3 11000
PATIENT TOWER
11 10600
Level 1 0 SUNKEN GARDEN
3
GLASS VESTIBULE
9 11750
Level 13 58000
Level 2 5500
WT7
WT5
2
Level 14 62500
5500
WT7
AE329
Level 15 67000
5500
WT1
CLINICS
Level 16 71500
6500
30300
ELEVATION
00
M
9000
D
AE338
12 7650
13 9000
14 9540
15 12110
1 AE306
16 9000
2 AE315
17 9000
2 AE306
18 9000
19 9000
C
B
A
DRAWING NOTES
PLACE CLIENT LOGO HERE (OPTIONAL INFORMATION) TRUSTBRIDGE G
F
E
D
GLASS TYPES G1 LOBBY VISION GLASS 1
585
600
FF
FF
G2 WINDOW GLASS
F.O.G.
110
4
G1A LOBBY SHADOW BOX GLASS
204.5
700
1 SHADOW BOX GLASS G2A WINDOW
585
AE311
700
F.O.G.
585
F.O.G.
G3 VESTIBULE GLASS G4 STOREFRONT GLASS G4A STOREFRONT SHADOW BOX GLASS G5 LAMINATED SAFETY GLASS RAILING
PLACE LOCAL ARCHITECT LOGO HERE (OPTIONAL INFORMATION)
G6 LAMINATED GLASS CANOPY
900
M4 WINDOW FRAME EXTERIOR FINISH
Level 5 20000
M5 PAINTED ALUMINUM FACADE PANEL
1800
4
4
M10 ARCHITECTURAL STEEL 1300
M11 STOREFRONT PAINTED ALUMINUM PANEL
Level 4 15500
M12 STOREFRONT PAINTED ALUMINUM SOFFIT
3600
Level 4 15500
4500 TYP
2 AE815.0
Level 9 40000
2500
2500
ICU/FLEX
M9 PAINTED ALUMINUM REVEAL PANEL
400
4500 900
SHANGHAI JIAHUI INTERNATIONAL HOSPITAL 上海嘉会国际医院
M8 PAINTED ALUMINUM PANEL
POSTPARTUM BEDS
1
Level 9 40000 3 AE821.0
4500
M7 ALUMINUM BACKPAN PANEL
G2
4500
4500
Facade Consultant: Inhabit Group 2/F, Shun Kwong Commercial Bldg. No. 8 Des Voeux Road West Sheung Wan, Hong Kong
M6 PERFORATED PAINTED ALUMINUM PANEL
4500
2300
2300
Level 5 20000
TYP
1 AE815.0
MEP: SYSKA HENNESSY GROUP,Inc ISIS BROADWAY NEW YORK, NY 10036 PHONE:212.556.5509 FAX:212.556.3242
M3 METAL PANEL SOFFIT
1300
1300
1300
G2
900
3
M2 LOBBY MULLION
G2A
400
4500
4500 900
M1
STRUCTURAL ENGINEER: LERA 40 WALL STREET, 23RD FLOOR POSTPARTUM BEDSNY.10005 NEW YORK, PH0NE:212.750.9000 FAX:212.750.9002
1300
METAL TYPES L1
M5
3
LANDSCAPE ARCHITECT: nbbj 1555 LAKE SHORE DRIVE COLUMBUS, OH.43204 PHONE:614.224.7145 FAX:614.228.2771
1600
EGRESS DOOR CANOPY
700
PODIUM SUN SHADE LOUVER
L5
Level 10 44500
T1
4500
L4
Level 10 44500
TYP
2500
TYPICAL STORM RESISTANT LOUVER
ICU/FLEX
2500
L3
CIVIL ENGINEER: SIADR (SHANGHAI INSTITUTE OF ARCHITECTURAL DESIGN AND RESEARCH) 258 NO. 2 SHIMEN ROAD SHANGHAI , RPC 2000041
400
PERFORMANCE STORM RESISTANT LOUVER
4500
1300 3600
2300
HORIZONTAL SUN SHADE LOUVER
L2
L1 M7
400
6500
4500
VARIES VARIES 2300
L1
AE811.0
POSTPARTUM BEDS
G2
LOUVER TYPES
1300
VARIES 6500
L1
CONSTRUCTION MANAGER:
POSTPARTUM BEDS
TYP
2
M4
CONSULTANTS
2
G10 GARDEN SPANDREL GLASS
Level 6 24500
Level 11 49000
G2
G9 TOWER DOOR LAMINATED GLASS
T1
Level 11 49000
T1
M5
G8 VESTIBULE DOOR LAMINATED GLASS
Level 6 24500
G2A
2
G7 STOREFRONT DOOR LAMINATED GLASS 3000
SEE ROOF DRAINAGE PLAN FOR SLOPE
ACUTE BEDS
1600
Level 7 31000
700
SEE ROOF DRAINAGE PLAN FOR SLOPE Level 7 31000
2 RECTOR STREET, 25TH FLOOR NEW YORK, NEW YORK 10006 PHONE 212 924 9000 212 924 9292 ACUTEFAX BEDS
Level 8 35500
Level 8 35500
AE825.0
5800
DD
M14 STOREFRONT FRAME EXTERIOR FINISH
ICU/FLEX
1200
M3
4500
4500
M15 PAINTED ALUMINUM TRIM
RT1 EPDM & STONE PAVER ROOF SYSTEM
Design Documentation
1000
RT2 EXTENSIVE GREEN ROOF SYSTEM 5
Level 3 11000
RT3 INTENSIVE GREEN ROOF SYSTEM
Level 3 11000
NOT FOR CONSTRUCTION: THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT. NBBJ IS NOT THE ARCHITECT OF RECORD AND THEREFORE IS NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION 1 : RELATED 50 MATTERS.
RT4 VESTIBULE METAL ROOF SYSTEM
2600
STONE TYPES 1450
ICU/FLEX
ROOF TYPES
? G2
2600
5
10 0%
1800
M13 PERFORATED METAL PANEL
S1
T2
SECTION A - TYPICAL WINDOW
4
STONE
SECTION 1
6
METAL PANEL CLADDING
3
SECTION B - SHADOW BOX CONDITION 1 : 50
ELEVATION AT PATIENT TOWER ( RAIN SCREEN C CLARITY)
2
1 : 50
5500
G2
T1
TERRA COTTA PANELS TOWER
T2
TERRA COTTA PANELS PODIUM
Issue Date ISSUE 问题
3050
1900
1900
5500
TERRA COTTA TYPES
MARK
Level 2 5500
1000
1450
OTHER GLAZING
5500
5500
KEYPLAN
2800 150
Level 1 0
vitLocalFiles\AE-TRUSTB-SHELL_gchen.rvt
G4
CLINIC ENLARGED SECTION EAST 1 : 50
07.31.2014
DRAWN BY:
2050
SEE DRAINAGE PLAN FOR SLOPE
4
7 5
METAL FACADE PANEL
T2
7
GC
100% DD SET
CB
PROJ. NO.:
101090.00
DATE:
07/31/14
SCALE:
As indicated
AE311
T1
PROJ. ARCH.:
M5 G2 L1
1 AE811.1
TYP
3 AE811.0
TYP
1
TYP 4
AE811.0
TYP
AE811.0
DWG.
1
SECTION 2 3
室外
WINDOW SHADOW BOX
M9
900
Level 1 0
DESCRIPTION
WINDOW VISIBLE
2550
2550
550
550
Level 2 5500
DATE
6
STOREFRONT / CURTAIN WALL SHADOW BOX
900
1000
STOREFRONT / CURTAIN WALL VISIBLE
3
ENLARGED SECTIONS AT CLINIC
G2 G2A 8
3900
2
800
3900
4
400
DWG.
AE306
38
0
1m
2m
4m
110
9 2
0
AE311
AE311
1
F.O.G.
SEE ROOF DRAINAGE PLAN FOR SLOPE 750
250
550
G1A M9
1450
T2
5500
3700
M2
5
G1
2950
5500
M2 G1
Level 3 11000
550
1800
400
T2
1000
1000
935
1000
65
750
3
307
303 F.O.G.
G6
2
2100
2100
Level 2 5500
G10
5500
775
5500
400
RT4
2225
3400
3400
M2
G8
SEE DRAINAGE PLAN FOR SLOPE
1200
1500
Level 1 0
4
IAHGNAHS IUHAIJ LANOITANRETNI LATIPSOH 院医际国会嘉海上
SHANGHAI JIAHUI INTERNATIONAL HOSPITAL 上海嘉会国际医院
egakcaP DD edacaF
Facade DD Package
5 1
3
SHANGHAI JIAHUI INTERNATIONA HOSPITAL 上海嘉会国际医院
Facade DD Packag
IAHGNAHS IUHAIJ LANOITANRETNI LATIPSOH 院医际国会嘉海上
IAHGNAHS IUHAIJ LANOITANRETNI LATIPSOH 院医际国会嘉海上
SHANGHAI JIAHUI egakcaP DD edacaF INTERNATIONAL HOSPITAL 上海嘉会国际医院
Facade DD Package
egakcaP DD edacaF
2
4
ZHONG MOUNTAIN
STONE MOUNTAIN DOWNTOWN NANJING
FERTILE FARMLAND VALLEY
SCHEME 1 - ECO HORIZON ᯩṸа⭏ᘱൠᒣ㓯
ZHONG ZHON ZH ONG MOUNTAIN M UNTAIN MO
NANJING
CO
STONE S ST ONE E MOUN MOUNTAIN NTAIN
NANJING ECO-ISLAND OFFICE LOT HORIZON LINE - Feb. 2013) (DD Phase, Oct. 2012
LANDSCAPE AND CITY SCAPE - PEAKS
地块 生态科技岛
SITE
HORIZON LINE
ECO-TECHNOLOGY ISLAND “Door of the East & West, throat of the North & South” “Mountains, lakes & plains all come together in Nanjing.” “ђ㾵䰞ᡭθ्ி” “㗚ኧθ⋩⒌θᒩ䠄ਾ䳼”
YANGTZE RIVER
HORIZON - WHERE MOUNTAIN AND WATER CO
ECO-ISLAND - TIES PEOPLE BACK TO THE LAND ⭏ᘱዋ ሶӪԜ䳶㔃ࡠ䘉њ൏ൠ
HORIZON LINE TOWARDS ᵍൠᒣ㓯 A BETTER FUTURE ањ䖳ྭⲴᵚᶕ
Interaction of architecture and landscape cr harmony between man and nature. ZHONG MOUNTAIN 䫏ኡ
AUGUST 01, 2011
YANGTZE RIVER 䮯⊏
STONE MOUNTAIN ⸣ཤኡ
ISLAND XINNANJING WEI YI TECHNOLOGY 新加坡•南京生态科技岛新纬壹科技园 AUGUST 01, 2011 NANJING ECO-TECHNOLOGY ECO-TECHNOLOGY ISLANDPARK XIN WEI YI TECHNO ᯠ࣐එЬইӜ⭏ᘱ、ᢰዋᯠ㓜༩、ᢰഝ
LOT D RESIDENTIAL
LOT C
LOT D ORIGIN WORK POINT
OFFICE / RESEARCH PARK
LOT B ORIGIN WORK POINT
OFFICE / RESEARCH PARK
LOT A EXHIBITION HALL
PROPERTY LINE
ZHONG HUAN ROAD
3
LOT B
CANAL
LOT C ORIGIN WORK POINT
LOT A ORIGIN WORK POINT
SETBACK LINE
DN
CLUSTER C1
CLUSTER C3
CLUSTER B1
CLUSTER C2
BUSINESS CATERING SOUTH EL.: 9200
NORTH CAFE
BUSINESS CATERING WEST
2 96 15
2/6/2013 4:34:18 PM D:\dsakai\Documents\Lot B_Office_dsakai.rvt
2
EXTENT OF SHADING FINS
4
BUSINESS CATERING EAST
CLUSTER C5
5 43 15
CLUSTER C4
NO. 13 ROAD
EL.: 9200
STAFF CANTEEN
CLUSTER B2
CLUSTER B3
CANAL 5
HUAN DAO ROAD
SUBWAY EASEMENT LINE SUBWAY STRUCTURE LINE
6
RETAIL - N.I.C.
RETAIL - N.I.C.
LEGEND
Nanjing eco-island is lcoated in the middle of Yangzi River to the west of Nanjing. Nanjing is an old capital city has many different terrain types, such
7
as mounds, lakes, plains. The master plan design aims to create a miniature
YANGTZE RIVER
KEYPLAN
Nanjing landscape where mounds, lakes and plains all come together. Pentagon shaped office buildings sit on tope of those terrains, enclosing an couryard in
D
the middle to maximize natural light, views and ventilations. 1
PROJECT SITE PLAN - ROOF LEVEL SCALE: 1 : 1000
8
G
F
E
D
C
B
1
位置平面参看图纸A0.02-A0.08 LOT B LEVEL 1 EDGE OF SLAB @ 50MM FROM F.O.G.UON
5.
1
Sino-Singapore Nanjing Ecological High Technology Island Development Co. Ltd. 新加坡•南京生态科技岛投资发展有限公司
S
R
Q
P
N
M
L
K
J
153000
H
G
F
E
D
C
B
CODED NOTES 编号注释
A
GLASS TYPES 玻璃种类
PROPERTY LINE 9000
9000
9000
9000
9000
9000
9000
9000
9000
2C-1
2
2 A 4.52
AC PLANT RM 空调机房
9000
2C-2
9000
1 A 4.52
5 A 3.54
DN
9000 9000
3
1 A 3.51
1D-3 3 A 3.54
9
EL.: 9400
1B-2
9000
15.5%
8
LV ELEC 弱电 HV ELEC 强电
A 3.10
2D-1
1 A 4.12 PV-B
9000
B1B LOBBY B1B 门厅
6 A 3.54
M3B M4 PV-C
M5 M6 M6A
STAIR B2-3
M6B
EL.: 9400 PV-C
M7
UP
2
M8 B1.2
PV-C
4 90000
B1.1
9000
1C-2
1
9000
A 3.05
5
9000
1 A 4.61
1E-2
1 A 4.13
3
PV-C
1E-1
EL.: 8900
1 A 4.22
5
1 A 4.21
1 A 4.55
STAIR B1-3
A 3.05
9000
M9
A 3.05
7
B1.5
BUSINESS CATERING - WEST 商务餐饮
6
3
A 3.15
1
A 3.14 B3
UP
EL.: 8900
BUSINESS CATERING - EAST 商务餐饮
ELEV LOBBY
3E-2
EL.: 9400
1 A 4.16
STAFF CANTEEN 员工餐厅 EL.: 8900
PV-B 2 A 3.51
M14
METAL 14 金属14 - RAIL INFILL AT STAIR - 楼梯间扶手
6
RT1 RT2
INTAKE SHAFT 进风井
45 EAST 20TH STREET 4TH FLOOR NEW YORK NEW YORK 10003 TEL. 212 254 4500 FAX 212 254 1259
4
METAL 15 金属15 - PTD. STAIR STRUCTURE - 楼梯结构 METAL 16 金属16 - DOOR HARDWARE - 楼梯结构----------------------------UPDATE
WOOD 1 木料1 - T&G WOOD DECK - T&G 木平台
STONE 1 石材 - STACKED SLATE - 层叠岩板
L1
展示中心 EXHIBITION HALL M9
1
ROOF TYPE 1 屋顶种类1 - PEDESTAL ROOF PAVERS - 屋顶铺面 ROOF TYPE 2 屋顶种类2 - GREEN ROOF PLANTING SYSTEM - 绿色屋顶种植系统
LOUVER TYPES 百叶种类
LOUVER 1 百叶1 - PTD. ALUMINUM LOUVER - 铝烤漆百叶
研究/办公 RESEARCH / OFFICE CONCRETE TYPES
A 3.11
C1
CONCRETE 1 混凝土1 - PRECAST CONCRETE TREAD AND RISER - 混凝土踏步
PAVING TYPES
1 A 3.01
2 A 3.01
METAL 13 金属13 - RAIL CAP - 扶手盖
ST1
UP
基地 SITE
METAL 12 金属12 - STANCHION - 支柱
ENVIRONMENTAL DESIGN CONSULTANTS:
ROOF TYPES 屋顶种类
3B-2
A 3.14
INTAKE SHAFT 进风井 AC PLANT RM 空调机房
3
27 WEST 20TH STREET SUITE 1001 NEW YORK NEW YORK 10011 TEL. 212 462 2628 FAX 212 462 4164
STONE TYPES 石材种类
3
STAIR B3-3 1 A 4.54
4
LANDSCAPE CONSULTANTS:
METAL 6A 金属6A - CLADDING AT EXTERIOR STAIR - UNDERSIDE - 室外楼梯的包覆 - 下面 METAL 6A 金属6B - CLADDING AT EXTERIOR STAIR - INTERIOR - 室外楼梯的包覆 - 内部 METAL 7 金属7 - METAL MESH SCREEN AT LOUVER - 百叶处的金属网状屏 METAL 8 金属8 - METAL SOFFIT PANEL - 金属拱覆面板 METAL 8A 金属8A - METAL SOFFIT PANEL AT BALCONY - 金属拱覆面板 METAL 8B 金属8B - METAL FASCIA AT BALCONY - 阳台处金属板 METAL 8C 金属8C - METAL CLADDING AT STAIR - 屋顶处的金属包覆---------------------------UPDATE METAL 8D 金属8D - METAL SOFFIT AT EARTHWORKS - 土方处金属覆板 METAL 8E 金属8E - METAL CLADDING AT BASEMENT - 地下室金属包覆 METAL 9 金属9 - GRATE AT MECHANICAL VENTS - 机械通风格栅 METAL 10 金属10 - STAIR TREADS AND LANDINGS - 楼梯踏步和平台 METAL 10A 金属10A - STAIR TREAD BRACKETS - 楼梯踏步支架 METAL 11 金属11 - HANDRAIL - 扶手
WD1
3B-1
A 3.14
A 3.14
WERNER SOBEK NEW YORK 138 SPRING STREET NEW YORK NEW YORK 10012 TEL. 212 588 0233 FAX 917 210 3882
WOOD TYPES 木材种类
3D-3
A 3.14
ELEC 电
EL.: 9400
1
DN
5
1 A 3.53
A 3.14
WP B3
STRUCTURAL CONSULTANTS:
METAL 6 金属6 - CLADDING AT EXTERIOR STAIR - 室外楼梯的包覆
M13
PV-A
3E-1
A 3.16
PV-B
3 A 3.51 2 A 3.53
1B-4
3B-3
2
PV-C PV-D
PAVING TYPE A - PAVING AT CENTRAL SPINE - 中轴线上铺地 PAVING TYPE B - PAVING AT RETAIL - 商铺铺地 PAVING TYPE C - LOT B FIELD PAVING - 地块B其余铺地 PAVING TYPE D - LOT B ACCENT PAVING - 地块B重点装饰铺地 PAVING TYPE E - LOT B PATH PAVING - 地块B小径铺地
PV-E
景观/建筑的互动 OFFICE /
JANUARY 11 2013
3A-1
100% DESIGN DEVELOPMENT
LEGENDS BX.X
MARK
PILOTI TAG - SEE A0.1 SHEET SERIES FOR GEOMETRY DIAGRAMS AND DRAWINGS 斜柱墩标注 - 参看A0.1系列图纸的位置分析图和图纸
DATE
DESCRIPTION 6
Landscape set out plan
7
01/11/2013 11/06/2012 07/23/2012 DRAWN BY:
KEYPLAN
1/11/2013 5:19:08 PM D:\dsakai\Documents\Lot B_Office_dsakai.rvt
1
B3
LOT B_LEVEL 1 SCALE: 1 : 250
D
RETAIL
C
B
A
B1
DS
E
D
B2
C
B
RETAIL
DS
01/11/2013
SCALE:
As indicated
DWG.
pARKINg ENTRY
LOT B LEVEL 1 FLOOR PLAN地块B一层平面图
A 2.02 F
PROJ. ARCH.:
100868.00
DATE:
DWG.
G
100% DD 90% DD 100% SD
PROJ. NO.:
8
pARKINg ENTRY
5
住宅 RESIDENTIAL
RESEARCH LAndSCApE / BuILdIngPARK IntERACtIOn - LOT B
A 3.11
3A-2
CANAL
2
CONSULTANTS
METAL 4 金属4 - SHADOWBOX BACKPAN - INTERIOR FINISH - 遮光框板-室内镀层 METAL 5 金属5 - CLADDING AT PILOTI - 斜柱墩的包覆
M12
M16
2
A 3.14
1
20 CI BEI SHE NANJING CHINA 210029 TEL. (025) 84729904 FAX (025) 84729904
METAL 1 金属1 - MULLION - INTERIOR COATING - 铝窗框 - 内表面镀层 METAL 2 金属2 - MULLION - EXTERIOR COATING - 铝窗框 - 外表面镀层 METAL 2A 金属2A - SOLAR SHADING FIN - 铝竖鳍 - 外表面镀层-------------------UPDATE METAL 2B 金属2B - ALUMINIUM LOUVER - EXTERIOR COATING - 铝百叶 - 外表面镀层 METAL 3 金属3 - LOBBY STOREFRONT METAL PANEL - 大厅铺面金属面板 METAL 3A 金属3A - LOBBY STOREFRONT METAL PANEL DOORS - 大厅铺面金属面板门 METAL 3B 金属3B - METAL CLADDING AT B2A DECK COLUMNS - B2A平台处柱子的金属包覆
M11
M15
1 PV-C
PV-A
6
M10A
8
STAIR B3-1
A 3.16
1B-3
1 A 4.63
EL.: 7600
DN
3
4
M10
AC PLANT RM 空调机房
ELEC 电
ELEV LOBBY
7
M9
DN
M9
A 3.12
A 3.05
UP
6
UP
A 3.14
M8E 1 A 3.54
1
B3B LOBBY B3B 门厅
STAIR B3-2
10 A 3.54
B1.4
EXHAUST SHAFT 排风井
STAFF CANTEEN 员工餐厅
M8D
3D-2 3D-1
A 3.16
COOLING TOWER 冷却塔
4
M8C
A 3.13
EL.: 8900
2
11 A 3.54
A 3.15 A 3.04
3C-2
1 A 4.54
A 3.15
3
4
AC PLANT RM 空调机房
A 3.06
A 3.12
2A-3
AC PLANT RM 空调机房
M8A M8B
2
PV-B
ELEC 电
1 A 4.17
1 A 4.18
EL.: 9400
PV-C
A 3.04
PV-C
4
B2A LOBBY B2A 门厅
A 3.06
B1.3
ELEV LOBBY
1
2
3C-1
1 1 A 4.53
A 3.10
1A-1
AC PLANT RM 空调机房
A 3.05
WP B1
4
9000
1 A 4.51
ELEC 电
2 A 3.04
1
DN
2
1
STAIR B1-2
A 3.04
UP
A 3.02
5
2 A 4.51
1A-2
UP
STAIR B2-1
A 3.03 1 A 4.11
EL.: 8900
B1A LOBBY B1A 门厅 STAIR B1-1
5
ELEV LOBBY
DN UP
1C-1
DN
ELEV LOBBY
A 3.15
EL.: 8900
2
9000
A 3.05
GLASS 3B 玻璃3B -VISION GLASS - OFFICE MID-RISE SHADOW BOX 可视玻璃 - 中层办公楼遮光框
G6
M3A
2E-1
B2B LOBBY B2B 门厅
UP
GLASS 3A 玻璃3A -VISION GLASS - OFFICE MID-RISE DOORS 可视玻璃 - 中层办公楼的门
GLASS TYPE 6 玻璃6 -CANTILEVERED GLASS GUARDRAIL AT DECK 悬挑玻璃阳台的扶手------------------------UPDATE
M2B
AC PLANT RM 空调机房
ELEV LOBBY
1 A 3.52
GLASS 3 玻璃3 -VISION GLASS - OFFICE MID-RISE 可视玻璃 - 中层办公楼
GLASS TYPE 4 玻璃4 -VISION GLASS - BASEMENT LOBBIES 可视玻璃 - 地下室大厅
M3
AC PLANT RM 空调机房
B2.1
GLASS 2A 玻璃 2A -VISION GLASS - RETAIL DOORS 可视玻璃 - 商铺的门
GLASS TYPE 5 玻璃5 -CANTILEVERED GLASS BALCONY GUARDRAIL 悬挑玻璃阳台的扶手
M2
2E-2
3
1
GLASS 2 玻璃2 -VISION GLASS - RETAIL 可视玻璃 - 商铺
G5
M1
7
A 3.09
A 3.10 6
2 RECTOR STREET, 25TH FLOOR NEW YORK NEW YORK 10006 TEL. 212 924 9000 FAX 212 924 9292
GLASS 1A 玻璃1A -VISION GLASS - OFFICE LOBBY DOORS 可视玻璃 - 办公大厅的门
G4
M2A
2
A 3.09
A 3.10
INTAKE SHAFT 进风井
2B-2
1 A 4.64
A 3.08
1
WP B2
3 A 3.15
7
6
2
PV-A
PV-C
1 A 4.62
A 3.10
GLASS 1 玻璃1 -VISION GLASS - OFFICE LOBBY 可视玻璃 - 办公大厅
METAL TYPES 金属种类
STAIR
PV-C
2
DN DN
1
1
2D-2
A 3.02
1D-2
DN
1D-1
G3A
DN
A 3.09
8 A 3.54
G2 G2A G3
3
B2.2
A 3.15
1
G1A
7 A 3.54
DN
A 3.07
NORTH CAFE 咖啡馆
SETBACK LINE
2B-1
4 A 3.51
EL.: 7600
9000
EXHAUST SHAFT 排风井
10 1B-1
9000
G3B
A 3.10 3 A 3.52
9000
SUBWAY EASEMENT
2 A 3.52
11
9 A 3.54
9000
2C-3
A 3.07 2
COOLING TOWER 冷却塔
9000
2A-1
2A-2
15.0%
9000
G1
C O NO N ST T R FO U R C TI O N
T
A
基地 SITE
展示中心 EXHIBITION HALL
研究/办公 RESEARCH / OFFICE
住宅 RESIDENTIAL
景观/建筑的互动 LAndSCApE / BuILdIng IntERACtIOn
Typical office plan
CANAL
B3
B1
pARKINg ENTRY
B2
RETAIL
基地 SITE 展示中心 EXHIBITION HALL
研究/办公 RESEARCH / OFFICE
住宅 RESIDENTIAL
立面方案1
RECOMMENDED (推荐)
FACADE OPTION 1
South elevation
Southwest elevation
基地 SITE 展示中心 EXHIBITION HALL
PERFORATED BENT PLATE(推荐) FIN FASTENED TO RECOMMENDED MULLION EXTERIOR
穿孔弯曲板构件安装在幕墙竖框外侧
研究/办公 RESEARCH / OFFICE
住宅 RESIDENTIAL
立面方案1 FACADE OPTION 1
新加坡南京生态科技岛新纬壹科技园 NANJING ECO-TECHNOLOGY ISLAND XIN WEI YI TECHNOLOGY PARK
Northwest elevation
November 19, 2012
Northeast elevation
Southeast elevation PERFORATED BENT PLATE FIN FASTENED TO MULLION EXTERIOR
穿孔弯曲板构件安装在幕墙竖框外侧
基地 SITE 展示中心 EXHIBITION HALL
研究/办公 RESEARCH / OFFICE
住宅 RESIDENTIAL
立面方案1 FACADE OPTION 1
RECOMMENDED (推荐)
1 3
ERE
纬壹科技园 NANJING ECO-TECHNOLOGY ISLAND XIN WEI YI TECHNOLOGY PARK
3 CUSTOM PERFORATED BENT ST. STL. PLATE
1 3 1 THERMALLY BROKEN PTD. ALUM. MULLION, UNITIZED 绝热镀漆铝合金龙 骨, 单元式
2 PTD. ALUM VERTICAL MECHANICAL FASTENING CLIP FOR IGU 烤漆铝合金竖向机械 玻璃夹
LINE OF VENT OPERATION, WHERE OCCURS
November 19, 2012
2
1
3
开启扇可见线
新加坡南京生态科技岛新纬壹科技园 NAN
NANJING ECO-ISLAND BRIDGE (Won competition, Feb 2015 - Mar 2015)
SU BW
14.1M
EA S
1/14
EM
EN T
13.1M
19
1/1
4
14.6M
AY
14.6M
道
6 1/1
55
地 铁
范 围
线
19.7M
步
行
林
阴
7.76M
12.1M
LE VA R
D
7 7.69M
PE DE ST R
AI N
1/1 4
BO U
OVERLOOK
8.6M
7
眺望台
12.1M
7.66M
8
6 7.67M
5 0
+/-8.3
20 10
+/-7.8
40
+/-12.1 5.0 CLEAR
4.0 CLEAR
BOULEVARD
5.0 CLEAR
ROAD
LEVEE
Positioned at the junction between the Central Pedestrian Boulevard and the Waterfront Path, the Pedestrian Bridge serves as a vital link for pedestrian and bicyclists. In addition to providing clearance at the boulevard and road, the bridge negotiates an approximately 4m elevation change between the boulevard grade level and the top of the levee.
H PAT WATERFRONT
河堤 步行 道
CENTRAL PEDESTRIAN BOULEVARD
7.99M
LE V EE P ATH W
AY
8.11M
FLOOR WASHED LIGHTING
OVERLOOK BEYOND
洗地灯
远方的眺望台
PRECAST CONCRETE PAVER
预制混凝土铺地板 MAIN PLANTER
PLANTING BED
花坛
1.1
中央花坛
ZINC CLADDING TYPE 1
0.5
锌面板 类型1
1.5
ZINC CLADDING TYPE 2
锌面板 类型2
LINEAR LIGHTING
线性灯光 ZINC CLADDING TYPE 2
锌面板 类型2
1 0
STAIR
OVERLOOK
楼梯
眺望台
4 2
8
5 CLR. 4 CLR.
BOULEVARD
林荫道
5 CLR.
ROAD
道路
ROAD 公路 LOT B SIDE PIER B地块桥墩
LEVEE SIDE PIER 堤坝桥墩
ROAD 公路
STEEL TRUSS SPAN 钢跨距构架
STEEL TRUSS BRACE 钢支撑构架 LEVEE SIDE PIER 堤坝桥墩
STEEL TRUSS BRACE 钢支撑构架 STEEL TRUSS SPAN 钢跨距构架 BOULEVARD 林荫道
LOT B SIDE PIER B地块桥墩
ROAD 公路
ROAD 公路
LOT B SIDE PIER B地块桥墩
LEVEE SIDE PIER 堤坝桥墩
STEEL TRUSS SPAN 钢跨距构架
STEEL TRUSS BRACE 钢支撑构架 STEEL TRUSS SPAN 钢跨距构架 BOULEVARD 林荫道 LEVEE SIDE PIER 堤坝桥墩
LOT B SIDE PIER B地块桥墩 LOT B SIDE PIER B地块桥墩
STEEL TRUSS BRACE 钢支撑构架 LEVEE SIDE PIER 堤坝桥墩
Planning: New Product to Market Traditional Tower
Planning: New Product to Market Traditional Tower
Sliding Plates (Exterior Space)
Center Core
Brandywine Metroplex Phase 2
11/07/16
METROPLEX (Concept & SD Phase, Mar 2015 - Jul 2015) Offset Core Center Core
Center Core
Offset Core
Offset Core
PE
S NN
YL
VA
NI
A
TU
RN
PI
KE
N
Site Analysis - Context and Constraints
W
Y
HIGHWAY
RAIL
SETBACK
INDUSTRIAL WASTE
FORMER QUARRY
SANITARY LINE
VE
TE
RA
N
S‘
M
EM
O
R
IA
L
H
TREES
BIO BASIN FLOOD LINE
COURTYARD
ENTRY PLAZA
ROAD
EXISTING TRAILS
CHEMICAL
e Plan
The Noun Project
COMMUNITY PLAZA
OW ANT
DROP OFF PLAZA
WELLNESS GARDEN
IKE NP
OFFICE TOWER
CROSS COUNTY TRAIL
Brandywine RMetroplex Phase 2 OAD CHEMICAL
ERM
PARKING GARAGE
METROPLEX PHASE 1
ST G WE
Proposed Amenities (inclusive of all discussed) Conference Center Outdoor Space Designed for Event Fitness PENNSYLVANIA Center TURNPIKE NORTH Designated FoodEAST TruckEXTENSION Parking Landscape Fire Pits - Outdoor meeting spaces METROPLEX Bike Racks with Shower Facilities PHASE 2 Bike Rental Amazon Locker or similar space for Delivery Digital Signage F&B Playing fields (Community Integration) Dry Cleaner
11/07/16
ROAD
Tower Option 1: Side Core 45+45 Side Core 45+45
GROSS FLOOR AREA
28,576 SF
INTERIOR VISIBILITY
WINDOW ACCESS
DAYLIGHT FACTOR
SINGLE TENANT FLOOR R/U RATIO EFFICIENCY (U/GR)
1.12 83.87%
Tower Option 1: Side Core 45+45
EFFICIENCY (U/GR)
1.18 79.48%
11,307 SF
195°
28,576 SF 28,510 SF 1,750 SF 26,760 SF 4,075 SF 93.65% 796 FT 0.028 0.390
Interior Visibility Window Access Daylight Factor
11,307 SF 195 29.20%
1 TENANT Floor Usable Area Floor Common Area Floor R/U Area Efficiency (Usable to Gross) Free Columns
23,966 SF 2,794 SF 1.12 83.87% 4
2 / 3 TENANT Floor Usable Area Floor Common Area Floor R/U Area Efficiency (Usable to Gross) Free Columns
22,797 SF 3,963 SF 1.17 79.78% 2
4 TENANT Floor Usable Area Floor Common Area Floor R/U Area Efficiency (Usable to Gross) Free Columns
22,711 SF 4,049 SF 1.18 79.48% 2
R/U - AVERAGE EFFICIENCY - AVERAGE
1.16 81.04%
DAYLIT ELEVATOR DAYLIT TOILET ROOMS STRUCTURAL SIMPLICITY MEP SIMPLICITY FREE COLUMNS
MULTI-TENANT FLOOR R/U RATIO
Gross Area Gross Measured Area Major Vertical Penetrations Floor Rentable Area Core Area Rentable / Gross Perimeter Length (typ.) Perimeter to Gross Wall Area to Gross
29.2%
BRANDYWINE METROPLEX II
SINGLE TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
Tower Option 1: Side Core 45+45
SINGLE TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.12 83.87%
THREE TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.17 79.78%
TWO TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.12 83.87%
THREE TENANT
1.17 79.78%
FOUR TENANT
MAY 14, 2015 FLOOR R/U RATIO EFFICIENCY (U/GR)
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.17 79.78%
1.18 79.48%
BRANDYWINE METROPLEX II
MAY 14, 2015
Tower Option 2: Center Core 45+30+45
Cen
GROSS FLOOR AREA
30,256 SF
INTERIOR VISIBILITY
WINDOW ACCESS
DAYLIGHT FACTOR
SINGLE TENANT FLOOR R/U RATIO EFFICIENCY (U/GR)
1.10 85.42%
Tower Option 2: Center Core 45+30+45
MULTI-TENANT FLOOR R/U RATIO EFFICIENCY (U/GR)
1.18 79.77%
11,019 SF
190°
24.0%
BRANDY
SINGLE TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.10 85.42%
THREE TENANT
1.18 79.77%
FOUR TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.18 79.77%
Tower Option 2: Center Core 45+30+45
SINGLE TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.10 85.42%
THREE TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.18 79.77%
TWO TENANT
FLOOR R/U RATIO EFFICIENCY (U/GR)
FLOOR R/U RATIO EFFICIENCY (U/GR)
1.18 79.77%
BRANDYWINE METROPLEX II
MAY 14, 2015
D
11
10 30' - 0"
9
8
30' - 0"
30' - 0"
1
18' - 0
11' - 6"
13' - 8"
E
LEVEL 1 143' - 0" T.O. Footing 138' - 0"
C
NORTH ELEVATION 1/16" = 1'-0" 7
30' - 0"
6
30' - 0"
30' - 0"
B
DRAWING
2
1
A-260
5
4
3
30' - 0"
30' - 0"
2 30' - 0"
A-260
1 30' - 0"
140 BROADWAY, 29TH FLOOR NEW YORK, NEW YORK 10005 B PHONE 45' -212 0" 924 9000 FAX 212 924 9292
A
4
T.O. PENTHOUSE 316' - 6"
C 45' - 0"
T.O. PENTHOUSE 316' - 6"
15' - 0"
15' - 0"
1
CONSTRUCTION MANAGER:
CIVIL ENGINEER:
LEVEL 11 287' - 0" 14' - 0"
14' - 0"
LEVEL 11 287' - 0"
LANDSCAPE ARCHITECT:
1' - 8"
3' - 0"
14' - 0" 14' - 0"
LEVEL 7 231' - 0"
14' - 0"
14' - 0"
LEVEL 6 217' - 0"
LEVEL 5 203' - 0" 14' - 0"
39' - 0"
LEVEL 5 203' - 0"
LEVEL 4 189' - 0"
LEVEL 4 189' - 0" 14' - 0"
14' - 0"
6
LEVEL 3 175' - 0"
LEVEL 3 175' - 0"
14' - 0"
14' - 0"
3
LEVEL 2 161' - 0"
18' - 0"
18' - 0"
LEVEL 2 161' - 0"
2
WEST ELEVATION LEVEL 1 143' - 0" T.O. Footing 138' - 0"
1/16" = 1'-0"
LEVEL 1 143' - 0" T.O. Footing 138' - 0"
CODED
Metroplex II
EVATION
F
E
D
1
C
B
A
B 45' - 0"
D R AF T
A-260
C 45' - 0"
4
15' - 0"
T.O. PENTHOUSE 316' - 6"
Schematic Design
14' - 6"
ROOF 301' - 6"
14' - 0"
LEVEL 11 287' - 0"
LEGEND METAL PANEL
14' - 0"
LEVEL 10 273' - 0"
5
FROSTED GLASS
14' - 0"
3' - 0" 9' - 8" 4' - 4" 9' - 8" 4' - 4" 9' - 8"
Issue Date
SPANDREL GLASS
LEVEL 8 245' - 0"
ISSUE
14' - 0"
MARK
DATE
DESCRIPTION
METAL SCREEN WALL
LEVEL 7 231' - 0" 14' - 0"
GREEN WALL
PRECAST CONCRETE
LEVEL 6 217' - 0" 14' - 0"
1' - 4"
VISION GLASS
LEVEL 9 259' - 0"
14' - 0"
LEVEL 5 203' - 0"
14' - 0"
LEVEL 4 189' - 0"
KEYPLA
WEST ELEVATION
LEVEL 1 143' - 0" T.O. Footing 138' - 0"
1/16" = 1'-0"
PROJ. ARCH.:
PROJ. NO.:
101456.00 6
DWG.
OFFICE EXTERIOR ELEVATIONS NORTH & WEST
C A
DWG.
A-211 D
C
B
Designer
DATE:
B
14' - 0"
2
18' - 0"
LEVEL 2 161' - 0"
DRAWN BY:
Author
PLACE KEYPLAN HERE (OPTIONAL INFORMATION)
LEVEL 3 175' - 0"
E
LEVEL 8 245' - 0"
2
14' - 0"
1' - 4"
14' - 0" 14' - 0"
LEVEL 6 217' - 0"
11' - 6"
1' - 8"
6' - 0" 13' - 8"
29' - 0"
11/7/2016 9:12:34 AM J:\NYC01\101456.00 Metroplex II\08 3D Models\08.1 Central File\ARCH-MPLX-OFF-00.rvt
39' - 0"
LEVEL 7 231' - 0"
LEVEL 9 259' - 0"
MEP:
9' - 8" 4' - 4" 9' - 8" 4' - 4" 9' - 8"
14' - 0"
LEVEL 8 245' - 0"
sible and High Profile
14' - 0"
14' - 0"
STRUCTURAL ENGINEER:
LEVEL 9 259' - 0"
5
LEGEN
LEVEL 10 273' - 0"
LEVEL 10 273' - 0"
14' - 0"
1' - 11" 2' - 9" 8' - 0" 6' - 0"
ROOF 301' - 6" 14' - 6"
14' - 6"
ROOF 301' - 6"
ew from Highway
CODED
A
A
KEYPL
PL (O
Level 7 - Single Tenant
Test Fit
tiF tseT
Plan Type A Level 7 - Single Tenant
B epyT nalP tnaneT elgniS - 9 leveL
Metrics
132 People Total 112 Workstations (85%) 20 Private Offices (15%)
Test Fit
180 Total Conference/Lounge Seats (1:1.36 Ratio) 146 Enclosed Conf/Lounge Seats (1:1.11 Ratio) 34 Open Conf/Lounge Seats (1:0.25 Ratio) Note: Cafe seating not included
Plan Type B Level 9 - Single Tenant scirteM
Test Fit
latoT elpoeP 331 )%58( snoitatskroW 311 )%51( secfifO etavirP 02 )oitaR 33.1:1( staeS egnuoL/ecnerefnoC latoT 771 )oitaR 50.1:1( staeS egnuoL/fnoC desolcnE 931 Plan Type B )oitaR 82.0:1( staeS egnuoL/fnoC nepO 83 Level 9 - SingledeTenant dulcni ton gnitaes efaC :etoN
61/70/11
Metrics
132 People Total 112 Workstations (85%) 20 Private Offices (15%)
Brandywine Metroplex Phase 2
180 Total Conference/Lounge Seats (1:1.36 Ratio) 146 Enclosed Conf/Lounge Seats (1:1.11 Ratio) 34 Open Conf/Lounge Seats (1:0.25 Ratio) Note: Cafe seating not included
Brandywine Metroplex Phase 2
2 esahP xelporteM eniwydnarB
11/07/16
Metrics
133 People Total 113 Workstations (85%) 20 Private Offices (15%) 177 Total Conference/Lounge Seats (1:1.33 Ratio) 139 Enclosed Conf/Lounge Seats (1:1.05 Ratio) 38 Open Conf/Lounge Seats (1:0.28 Ratio) Note: Cafe seating not included
Metrics
133 People Total 113 Workstations (85%) 20 Private Offices (15%)
Brandywine Metroplex Phase 2
C5
FCJZ Atelier designed master plan for Novartis' new
NOVARTIS SHANGHAI CAMPUS C5 LAB BUILDING DESIGN (July. 2008 - Nov. 2008 )
campus near Shanghai. The campus design gives each building its own courtyard and allows each building enjoy views to two other courtyards by its sides. Later FCJZ designed C5 building. Two important ideas in C5 lab building design are open lab and regional culture facade. For facade design, we like the shading function and materiality provided by the roof tile of Chinese vernacular architecture and tried to use a innovative way to apply it to facade.
Design Concept Open Lab Concept
Flexibility
Interaction / urban lab
Regional Culture Facade
Communication
Simple structure Modular service system Flexible working space
Communal space
Chinese vernacular architecture
Urban unit / Work station
Plaza /Interaction area: open to landscape Solar garden Traditional application
Facade development Three GRC tiles application
Ground floorLaboratory plan
ab ab design design
Communal Space From main entrance to high rise bu
Simple structure
pipelines pipelines pipelines
modular service system
and and lab lab service service and lab service
System analysis flexible working space
From communal space to main en
Steel supporting structure for the tile installation.
Application
ngiseD edac eciveD gnidahS derevelitnaC
noitavelE tse
Half of the tiles are installed on the structure.
Facade Design
erutcurts gnitroppus leetS .noitallatsni elit eht rof
South Elevation
eciveD gnidahS derevelitnaC
noitacilppA
Cantilevered Shading Device dellatsni era selit eht fo flaH .erutcurts eht no
erutcurts gnitroppus leetS .noitallatsni elit eht rof
eciveD gnidahS derevelitnaC
All tiles are installed on the eht no dellatsni era selit llA dellatsni era selit eht fo flaH .erutcurts .erutcurts eht no structure.
erutcurts gnitroppus leetS .noitallatsni elit eht rof
eht no dellatsni era selit llA .erutcurts
dellatsni era selit eht fo flaH .erutcurts eht no
Application Steel supporting structure for the tile installation.
eht no dellatsni era selit llA .erutcurts
ngiseD edaca
eciveD gnidahS derevelitnaC
noitavelE htuoS
eciveD gnidahS derevelitnaC
Half of the tiles are installednoitacilppA on the structure. erutcurts gnitroppus leetS .noitallatsni elit eht rof
eciveD gnidahS derevelitnaC noitacilppA dellatsni era selit eht fo flaH .erutcurts eht no
erutcurts gnitroppus leetS .noitallatsni elit eht rof
noitacilppA
All tiles are installed ellatsni era selit eht fo flaH eht no de llatsni era selit llA on dthe .erutcurts eht no .erutcurts structure. eht no dellatsni era selit llA .erutcurts
erutcurts gnitroppus leetS .noitallatsni elit eht rof
dellatsni era selit eht fo flaH .erutcurts eht no
OFFICE OF TAIWAN GLASS SCHEME I (Feb. 2009 - June 2009 )
The client is a glass manufacturer, and this is their new office building in Huai'an. We wanted the whole building could express the materiality of glass. The site is in a rural area with many trees. The structure of the new building mimic trees. Those courtyards inside the building not only let natural light in but also loosely divide the plan into different departments. When one walks inside the building, one feel like walking in a forest.
B
A
A
B
Structure diagram
Section A
Section B
OFFICE OF TAIWAN GLASS SCHEME II (Jan. 2010 - April 2010 )
Courtyard enclosed by four layers of glass creates different degrees of transparency towards courtyard. Facade made of Screen printing glass fluctuate up and down to provide shading as well as open view for the office area.
2nd floor
section
1st floor
West Facade
East Facade
South Facade
North Facade
KIMBELL ART MUSEUM EXTENTION ( Date: Jan. 2011 - May 2011 ) The new extentsion of Kimbell Art Museum is designed to accomodate large scale contemporary art works. The new extension project is located to the back side of Kimbell occupying the previous road to avoid destroying the landscape in front of Kimbell. Also, this location provides an easy access for visitors after they finish their tour of Kimbell. The landscape walls outside Kimbell designed by Kahn are extended to enclose a courtyard for the new building. The supporting programs are integrated into the volume to the east of the courtyard. The Gallery is a simple box with channel glasses facade floating above the courtyard.
NORTH LIGHT
SOUTH LIGHT
A kitchen
A’
storage
STACKS
OFFICE
OFFICE
LOBBY GALLERY
CAFE
storage
SHOP
OFFICE
STUDIO
CLASSROOM
CLASSROOM
OFFICE
OFFICE
OFFICE C’
C’ READING
UP
UP
B
B
B’
COURTYARD
KITCHEN
MEMBERSHIP
B
AUDITORIUM
MEP
MEP
DOWN
DOWN A
kitchen
A
FIRST FLOOR PLAN
wall section ( cut through gallery)/auto cad&illustrator
DOWN
DOWN
SECOND FLOOR PLAN
36'
30'
25'6''
13'
0'
SECTION AA 36'
30'
13'
0'
-11'
SECTION BB
INTERPLAY WITH NATURE ( Jan. 2012 - May 2012 )
The site faces two water ecologies --- rainwater coming down from drainage way of the hill and Mississippi river fluctuating constantly. The landscape design starts from playing with these two features and make them visible. Those wired shape ponds which mimic the landform of the natural drainage sustain rainwater as well as visualize water level change of the river since they are connected to the river underneath and have different depth. Landform between those ponds helps to guide water. Different plants grow on different elevations related to water level. The narrower part of the park to the west is close to the entrance and accommodates visitors' activities, the rest of the park is reserved for nature. The building is an eco-learning center which is located between two parts of the park (one part is for visitors' activities and another part is for nature). The qualities of the park set the tone for the design of the building. The building follows the softly undulating surrounding landscape and intertwines with it. The building is built by light weight structure (tensile structure and wooden lattice shell) and replenishable material.
PLAN
A
B
B
A
Section BB’
1’’=8’
Section BB’
1’’=4’