OVERALL SITE VIEW


COTTAGE #4 CONCRETE BEAM POURED


COTTAGE #4 CONCRETE BEAM POURED


COTTAGE #4 CONCRETE BEAM POURED


COTTAGE #3 BEAM FRAMING UNDERWAY


COTTAGE #3 BEAM FRAMING UNDERWAY


COTTAGE #3 BEAM REBAR INSTALLATION IN PROCESS


COTTAGE #3 BEAM REBAR INSTALLATION IN PROCESS


COTTAGE #3 VIEW FROM WHERE COTTAGES WILL SIT


COTTAGE #2 COLUMNS COMPLETED


COTTAGE #2 COLUMNS COMPLETED


FORMWORK USED FOR COLUMNS


COTTAGE #1 GRADE BEAM STEEL REINFORCEMENT READY FOR CONCRETE


COTTAGE #1 GRADE BEAM STEEL REINFORCEMENT READY FOR CONCRETE


SURVEWYY STAKING GETTING READY FOR THE BRIDGE AND RAMP


PILES INSTALLED FOR THE RESTAURANT


WATER LINE IN PROCESS


WATER LINE TIE IN POINT FROM NPS