1 minute read

Strategy plan

Next Article
Creative Process

Creative Process

A strategy plan was developed on a larger scale, from Tortugas Dam to the end of El Arenal. It includes 6 strategies, which are: Water flow release, river buffer protection, river sanitation strategies, drainage implementation, trails, and utilization of free lands.

River Sanitation

Advertisement

The contamination of the river is a problem in the area, which is why we decided to create cleaning points for the channel where two wetlands will be in charge of cleaning up the river water.

Free Properties

There are different properties parallel to the riverbed that can be used to create spaces for the inhabitants to live together, in the same way, a relocation oh houses can be carried out to create more spaces

Drain Implementation

To combat the pollution generated by the houses , we propose a drainage system o collect the waste that later enters the wetlamnd and can be incorporated into the river.

PATHWAYS/LIFELINES

The main artery of this project is the linear park, which is equipped with walkways and spaces for community interaction. This park aims to become a hub of identity, as well as providing spaces for mobility and recreation.

This article is from: