FNL
Final detail drawing
Detail drawing Arc 382
1 40
150
40
2 3
50 25
25
50 25
25
50 25
25
50
25
25
50 25
25
50 25
Final Binder ARC 382
double side weld
55
1- vertical aluminum tube 7- I beam 2- horizontal aluminum tube 8- sheet metal 3- perforaited aluminum metal louvre 4- glass louvre behind the metal louvre 5- L metal clips 6- sheet metal
40
55
100
150
100
100
150
100
150
4 5 6 7 8
prof Igor Peraza Habiba Mohamed 83330