DESIGN PORTFOLIO | Nurhamizah Izyan

Page 1

DESIGN

PORTFOLIO INTERIOR ARCHITECTURE | 01

NURHAMIZAH IZYAN


RESUME



what you don’t do is as important as what you do

4 nurhamizah izyan


CONTENTS DESIGN PORTFOLIO

07 09

Student Projects

31

Bureau of Human Behaviour

73

Anonymný

81

Kürve

93

Romanesque

97

Swarovski Facade Design

BIRTH

August 2019 Individual Project

01

December 2018 Individual Project

December 2017 Individual Project

December 2017 Group Project

December 2016 Group Project

March 2016 Group Project

Extra-Curricular Designs 103

Incubator Space

115

MI-JU - MIFF Furniture Design Competition

March 2019 Individual Project

02

October 2017 Individual Project

Internship Works 133

FIMA Toilet

155

Media City

August 2018

03

March - July 2018

nurhamizah izyan

5


6 nurhamizah izyan


STUDENT PROJECTS BIRTH Bureau of Human Behaviour Anonymný Kürve Romanesque Swarovski Facade Design

nurhamizah izyan

7


SEMESTER 7

8 nurhamizah izyan


BIRTH AUGUST 2019 INDIVIDUAL PROJECT

nurhamizah izyan

9


INTRODUCTION & SITE ANALYSIS

10 nurhamizah izyan


nurhamizah izyan 11


12 nurhamizah izyan


nurhamizah izyan 13


MECHANISM

14 nurhamizah izyan


nurhamizah izyan 15


PROGRAMMING

16 nurhamizah izyan


nurhamizah izyan 17


FLOOR PLANS

18 nurhamizah izyan


nurhamizah izyan 19


SECTION

20 nurhamizah izyan


nurhamizah izyan 21


3D VIEWS

22 nurhamizah izyan


ZEN GARDEN An open space to relax while being surrounded by greenery. Zen gardens are designed to help a person achieve the state of mind that leads eventually to enlightenment. Looking after emotional health has benefits for both the pregnant teen and her baby. When you are pregnant, your baby is exposed to everything you experience. When you feel happy and calm, it allows your baby to develop in a happy, calm environment.

A home for young mothers. Our community centre provides a family friendly environment that offers support to pregnant teenagers and guiding them to prepare for their new phase in life as mothers. Our centre is filled with the necessary facilities that will fully care for the young mothers including in house clinic, skill enhancement classes, nursery and many more.

nurhamizah izyan 23


This space is intended to provide a safe and enclosed area for these Muslim girls to repent, reflect on their actions and provide physical, mental and spiritual support throughout the whole pregnancy journey. Once a girl becomes involved in unwanted pregnancy, she needs all the support she can get. Providing an environment for the Muslim girls to repent and provide mental support throughout the journey would be more helpful to the individual herself and also to the child. There would be many different kinds of activities and spaces to rehabilitate, an environment for the babies to grow and counselling sessions for the mother.

24 nurhamizah izyan


Safe and supportive environments are essential to the health of adolescents, and they are an important component of teen pregnancy prevention programs. Safe and supportive environments refer to not only physical needs, but to the social and emotional needs of individuals.

nurhamizah izyan 25


SPECIAL STUDY

26 nurhamizah izyan


nurhamizah izyan 27


MATERIAL SELECTION

28 nurhamizah izyan


MATERIAL SELECTION Selected materials for BIRTH Centre.

01

02

03

04

WHITE BRICK WALL

PINK FAUX LEATHER

WHITE OAK TIMBER PANELS

WHITE MARBLE

- Floor

- Floor - Counter tabletop

05

06

07

08

BEIGE CARPET TILES

TIMBER PANELS

CONCRETE TILES

BROWN WALNUT CHEVRON PATTERN

- Interior walls

- Bedroom floor

- Selected upholstered furniture

- Floor - Ceiling - Massage room wall

- Floor

- Kitchen counter

nurhamizah izyan 29


SEMESTER 6

30 nurhamizah izyan


BUREAU OF HUMAN BEHAVIOUR DECEMBER 2019 INDIVIDUAL PROJECT

nurhamizah izyan 31


PHASE 1 :

ABSTRACT

32 nurhamizah izyan


nurhamizah izyan 33


PHASE 1 :

NARRATIVE

34 nurhamizah izyan


nurhamizah izyan 35


36 nurhamizah izyan


nurhamizah izyan 37


PHASE 2 :

PROGRAMMING AND MECHANISM 38 nurhamizah izyan


nurhamizah izyan 39


40 nurhamizah izyan


nurhamizah izyan 41


PHASE 2 :

ZONING

42 nurhamizah izyan


nurhamizah izyan 43


PHASE 3 :

2D drawings

44 nurhamizah izyan


PLANS & SECTION

nurhamizah izyan 45


46 nurhamizah izyan


nurhamizah izyan 47


48 nurhamizah izyan


nurhamizah izyan 49


50 nurhamizah izyan


nurhamizah izyan 51


52 nurhamizah izyan


nurhamizah izyan 53


PHASE 3 :

EXPLODED ISOMETRIC

54 nurhamizah izyan


nurhamizah izyan 55


PHASE 3 :

3D VIEWS

56 nurhamizah izyan


nurhamizah izyan 57


58 nurhamizah izyan


nurhamizah izyan 59


60 nurhamizah izyan


nurhamizah izyan 61


62 nurhamizah izyan


nurhamizah izyan 63


64 nurhamizah izyan


nurhamizah izyan 65


PHASE 4 :

SPECIAL DESIGN

66 nurhamizah izyan


nurhamizah izyan 67


68 nurhamizah izyan


nurhamizah izyan 69


70 nurhamizah izyan


nurhamizah izyan 71


SEMESTER 4

72 nurhamizah izyan


anonymný

DECEMBER 2017 INDIVIDUAL PROJECT

nurhamizah izyan 73


倀刀伀䜀刀䄀䴀䴀䤀一䜀 㐀 吀䠀

䔀 吀

刀䤀

䌀䬀

匀䰀

㌀ 䘀刀 䠀伀 伀一 唀匀 吀 伀 䔀 䘀

吀栀攀 洀攀愀渀椀渀最 戀攀栀椀渀搀 琀栀攀 渀愀洀攀 䄀渀漀渀礀洀渀礀  椀猀 搀攀爀椀瘀攀搀 昀爀漀洀 愀 猀氀漀瘀愀欀 琀爀愀渀猀氀愀琀椀漀渀 眀栀椀挀栀  洀攀愀渀猀  ✀愀渀漀渀礀洀漀甀猀✀  椀渀  䔀渀最氀椀猀栀⸀  䄀渀漀渀礀洀ⴀ 渀礀  椀猀  愀  瀀漀氀椀琀椀挀愀氀  猀愀琀椀爀攀  琀礀瀀攀  漀昀  琀栀攀愀琀爀攀Ⰰ  洀愀椀渀氀礀  琀愀爀最攀琀椀渀最  琀漀  琀栀攀  瀀漀氀椀琀椀挀愀氀  椀渀挀氀椀渀攀搀  愀搀甀氀琀猀⸀ 倀漀氀椀琀椀挀愀氀 猀愀琀椀爀攀ꀀ椀猀ꀀ愀 瀀愀爀漀搀礀 漀爀 愀渀 愀挀琀ꀀ 琀栀愀琀 猀瀀攀挀椀愀氀椀稀攀猀 椀渀 最愀椀渀椀渀最 攀渀琀攀爀琀愀椀渀洀攀渀琀  昀爀漀洀ꀀ瀀漀氀椀琀椀挀猀⸀ 吀栀攀 瀀攀爀昀漀爀洀愀渀挀攀猀 愀爀攀 挀愀琀攀ⴀ 最漀爀椀猀攀搀  椀渀琀漀  搀椀û攀爀攀渀琀  瀀漀氀椀琀椀挀愀氀  椀猀猀甀攀猀  挀漀洀洀漀渀氀礀 爀愀椀猀攀搀 椀渀 䴀愀氀愀礀猀椀愀⸀  圀椀琀栀 愀 洀漀搀攀爀渀 琀愀欀攀 漀昀 搀攀猀椀最渀 昀漀氀氀漀眀攀搀 戀礀  愀 洀椀砀琀甀爀攀 漀昀 洀愀琀攀爀椀愀氀猀 爀愀渀最椀渀最 昀爀漀洀 眀漀漀搀Ⰰ  挀漀渀挀爀攀琀攀  愀渀搀  最氀愀猀猀  椀猀  甀猀攀搀  琀漀  挀爀攀愀琀攀  愀  洀礀猀琀攀爀椀漀甀猀  愀渀搀  搀愀爀欀  愀洀戀椀攀渀挀攀⸀  吀栀攀  搀攀猀椀最渀 氀椀渀欀猀 戀愀挀欀 琀漀 愀渀漀渀礀洀漀甀猀 愀猀 琀栀攀爀攀  椀猀  渀漀琀  漀渀攀  椀搀攀渀琀椀琀礀Ⰰ  琀栀甀猀  礀漀甀  挀愀渀琀  爀攀愀氀氀礀  瀀甀琀 愀 ǻ渀最攀爀 漀渀 眀栀愀琀 椀猀 愀戀漀甀琀⸀

74 nurhamizah izyan

䌀䔀

䄀一

吀刀

䔀一

䐀䤀

吀䠀

䜀䤀

䔀 唀

一匀

倀䔀

䄀䬀 䄀䈀

䰀䔀

吀䄀 䰀

䤀匀䤀

伀一

䠀唀

䴀䄀

倀唀

倀倀

䔀吀

䔀䔀

嘀䔀


䴀䔀娀娀䄀一䤀一䔀 䘀䰀伀伀刀 匀䌀䄀䰀䔀 ㄀㨀㜀㔀

䜀刀伀唀一䐀 䘀䰀伀伀刀 匀䌀䄀䰀䔀 ㄀㨀㜀㔀

nurhamizah izyan 75


䔀堀倀䰀伀䐀䔀䐀 䤀匀伀䴀䔀吀刀䤀䌀 一伀吀 吀伀 匀䌀䄀䰀䔀

䴀䄀吀䔀刀䤀䄀䰀匀 吀䠀䔀 唀一匀倀䔀䄀䬀䄀䈀䰀䔀

䘀䰀伀伀刀䤀一䜀

刀伀伀䘀

䌀䰀䔀䄀刀 吀䔀䴀倀䔀刀䔀䐀 䜀䰀䄀匀匀

圀伀伀䐀 嘀䔀一䔀䔀刀 䘀䤀一䤀匀䠀䤀一䜀

䈀䰀䄀䌀䬀  倀䄀䤀一吀䔀䐀  匀䰀䄀吀䔀  刀伀伀䘀  匀䠀䤀一䜀䰀䔀匀

䘀刀伀一吀 伀䘀 䠀伀唀匀䔀

䘀䰀伀伀刀䤀一䜀

䘀䰀伀伀刀䤀一䜀

刀䔀䐀 䈀刀䤀䌀䬀匀

刀䄀圀 䘀䤀一䤀匀䠀 䌀伀一䌀刀䔀吀䔀

䈀刀伀圀一  吀䔀堀吀唀刀䔀䐀  䄀一䐀  刀唀䜀䜀䔀䐀 圀伀伀䰀 䌀䄀刀倀䔀吀

76 nurhamizah izyan


䘀刀伀一吀 伀䘀 䠀伀唀匀䔀 ⬀ 䄀刀吀 䜀䄀䰀䰀䔀刀夀 吀栀攀 昀爀漀渀琀 漀昀 栀漀甀猀攀 椀猀 眀栀攀爀攀 琀栀攀 最甀攀猀琀猀  挀漀氀氀攀挀琀  琀栀攀椀爀  琀椀挀欀攀琀  愀渀搀  洀愀猀欀猀  戀攀昀漀爀攀  琀栀攀礀  攀渀琀攀爀  ᠠ吀栀攀  唀渀猀瀀攀愀欀愀戀氀攀ᤠ⸀  吀栀攀  猀瀀愀挀攀 愀氀猀漀 愀挀琀猀 愀猀 愀 眀愀椀琀椀渀最 爀漀漀洀 愀渀搀  琀栀攀爀攀 椀猀 愀 洀椀渀椀 愀爀琀 最愀氀氀攀爀礀 昀漀爀 琀栀攀 最甀攀猀琀猀  琀漀 栀愀瘀攀 愀 氀漀漀欀 眀栀椀氀攀 眀愀椀琀椀渀最⸀

䤀一匀倀䤀刀䄀吀䤀伀一

吀䠀䔀 唀一匀倀䔀䄀䬀䄀䈀䰀䔀 吀栀攀  唀渀猀瀀攀愀欀愀戀氀攀  椀猀  愀  瀀攀爀昀漀爀洀愀渀挀攀  愀挀琀  眀栀攀爀攀戀礀 琀栀攀 瀀攀爀昀漀爀洀攀爀猀 愀爀攀 ᠠ琀爀愀瀀瀀攀搀ᤠ 椀渀  愀  猀瀀愀挀攀  眀椀琀栀  最氀愀猀猀  眀愀氀氀猀  琀漀  搀攀瀀椀挀琀  琀栀攀  挀椀琀椀稀攀渀猀 愀琀琀攀洀瀀琀 琀漀 瘀漀椀挀攀 漀甀琀 愀戀漀甀琀 琀栀攀  瀀漀氀椀琀椀挀愀氀 椀猀猀甀攀猀⸀

䤀一匀倀䤀刀䄀吀䤀伀一

匀䔀䌀吀䤀伀一 䄀ⴀ䄀 匀䌀䄀䰀䔀 ㄀㨀㔀

nurhamizah izyan 77


吀䠀䔀 䠀唀䴀䄀一 倀唀倀倀䔀吀

䈀䔀䘀伀刀䔀 䠀伀圀 吀䠀䔀 匀吀䄀䜀䔀 圀伀刀䬀匀㨀 吀栀攀  最氀愀猀猀  戀漀砀攀猀  栀愀猀  愀  氀椀最栀琀椀渀最  猀礀猀琀攀洀  椀渀猀琀愀氀氀攀搀  愀氀氀  愀爀漀甀渀搀 琀栀攀 昀爀愀洀攀 愀渀搀 椀琀 眀椀氀氀 氀椀最栀琀 甀瀀 眀栀攀渀攀瘀攀爀 愀 瀀攀爀ⴀ 昀漀爀洀攀爀 愀挀琀猀 椀渀 琀栀攀 戀漀砀⸀ 吀栀椀猀 栀攀氀瀀猀 搀椀爀攀挀琀 琀栀攀 愀甀搀椀攀渀挀攀  漀渀  眀栀攀爀攀  琀漀  氀漀漀欀  愀琀  眀栀椀氀攀  琀栀攀  瀀攀爀昀漀爀洀愀渀挀攀  椀猀  漀渀  最漀椀渀最⸀ 吀栀攀 戀漀砀攀猀 愀爀攀 漀昀 搀椀û攀爀攀渀琀 猀椀稀攀猀 愀渀搀 琀栀攀 瀀攀爀ⴀ 昀漀爀洀攀爀猀 栀愀瘀攀 愀 猀瀀攀挀椀愀氀椀猀攀搀 愀挀琀 昀漀爀 攀瘀攀爀礀 戀漀砀⸀

匀䔀䌀吀䤀伀一 夀ⴀ夀 匀䌀䄀䰀䔀 ㄀㨀㔀

78 nurhamizah izyan

䄀䘀吀䔀刀 䤀一匀倀䤀刀䄀吀䤀伀一


䐀䤀䜀䤀吀䄀䰀 嘀䤀匀䤀伀一 䐀椀最椀琀愀氀  瘀椀猀椀漀渀  椀猀  愀  氀漀渀最  挀漀爀爀椀搀漀爀  眀椀琀栀  洀漀渀椀琀漀爀猀 漀昀 愀氀氀 猀椀稀攀猀 愀爀攀 洀漀甀渀琀攀搀 漀渀 琀栀攀  眀愀氀氀猀⸀  吀栀攀  洀漀渀椀琀漀爀猀  愀瀀瀀攀愀爀愀渀挀攀  椀猀  愀氀氀  眀栀椀琀攀  愀渀搀  琀栀攀  漀渀氀礀  眀愀礀  琀漀  爀攀愀搀  琀栀攀  栀椀搀搀攀渀 洀攀猀猀愀最攀 椀猀 戀礀 眀攀愀爀椀渀最 琀栀攀 洀愀猀欀  瀀爀漀瘀椀搀攀搀  眀栀攀渀  琀栀攀  最甀攀猀琀猀  瀀椀挀欀攀搀  甀瀀  琀栀攀椀爀 琀椀挀欀攀琀猀⸀

䤀一匀倀䤀刀䄀吀䤀伀一

吀䠀䔀  吀刀䤀䌀䬀 匀䰀䔀䔀嘀䔀 吀栀攀 吀爀椀挀欀 匀氀攀攀瘀攀 椀猀 眀栀攀爀攀 琀栀攀 最甀攀猀琀猀 挀愀渀  挀栀漀漀猀攀  琀漀  攀渀琀攀爀  漀爀  渀漀琀  昀爀漀洀    ᠠ吀栀攀  唀渀ⴀ 猀瀀攀愀欀愀戀氀攀ᤠ⸀  䤀琀  椀猀  愀  猀瀀愀挀攀  眀栀攀爀攀戀礀  琀栀攀  最甀攀猀琀猀 挀愀渀 攀砀瀀攀爀椀攀渀挀攀 甀猀椀渀最 琀栀攀 椀渀ǻ渀椀琀礀  猀琀愀椀爀挀愀猀攀 眀栀椀氀攀 眀愀琀挀栀椀渀最 愀 瀀攀爀昀漀爀洀愀渀挀攀  椀渀 琀栀攀 洀椀搀搀氀攀⸀

䤀一匀倀䤀刀䄀吀䤀伀一

匀䔀䌀吀䤀伀一 䈀ⴀ䈀 匀䌀䄀䰀䔀 ㄀㨀㔀

nurhamizah izyan 79


SEMESTER 4

80 nurhamizah izyan


KÜRVE

DECEMBER 2017 INDIVIDUAL PROJECT

nurhamizah izyan 81


82 nurhamizah izyan


KÜRVE

Group Project

Kurve is a furniture design project that my team and I had undertaken during our course at Taylor’s University. It is a chair that is made out of plywood, veneer and coated in wood varnish. What makes this furniture special is the curves in multiple directions that wouldn’t be possible using a single plywood, as plywood only bends in a single direction following its natural grain.

We overcame this obstacle by bending the middle spine plywood in a different direction from the base and backrest. We used the layering technique during the construction process to achieve the strength and rigidity required. This is also our first project involving woodwork, hence we spent an extensive amount of time in our campus workshop to deliver the final product.

nurhamizah izyan 83


PRODUCED BY AN AUTODES

800 660

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

50 680

284

903

346

619

60

PL

-

PLAN Scale 1:10

K EDUCATIONAL PRODUCT 84 nurhamizah izyan


SK EDUCATIONAL PRODUCT

NOTE:

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.

4. COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

PROJECT:

PROPOSED FURNITURE DESIGN OF KURV

CLIENT:

TAYLOR'S UNIVERSITY NO.1, JLN TAYLOR'S 47500 SUBANG JAYA,SELANGOR TEL: 603-56295000

DRAWN TITLE: KURV PLAN

DRAWN BY: CHECKED BY: SCALE: 1:10 DATE: 13 / 12 / 2017 DRAWING NO:

FOO SHER MING

DWG_FD_PL_01 PRODUCED BY AN AUTODE nurhamizah izyan 85

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

60

3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTORS SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.


PRODUCED BY AN AUTODES

800 660

446

668

222

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

60

EL

-

FRONT ELEVATION Scale 1:10

K EDUCATIONAL PRODUCT 86 nurhamizah izyan


SK EDUCATIONAL PRODUCT

NOTE:

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.

4. COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

PROJECT:

PROPOSED FURNITURE DESIGN OF KURV

CLIENT:

668

TAYLOR'S UNIVERSITY NO.1, JLN TAYLOR'S 47500 SUBANG JAYA,SELANGOR TEL: 603-56295000

DRAWN TITLE:

KURV FRONT ELEVATION

DRAWN BY: CHECKED BY: SCALE: 1:10 DATE: 13 /12 / 2017 DRAWING NO:

FOO SHER MING

DWG_FD_EL_02 PRODUCED BY AN AUTODE nurhamizah izyan 87

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

60

3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTORS SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.


PRODUCED BY AN AUTODES

800 660

60

141 351

668

60

50

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

60

EL

-

REAR ELEVATION Scale 1:10

K EDUCATIONAL PRODUCT 88 nurhamizah izyan


SK EDUCATIONAL PRODUCT

NOTE:

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.

0

4. COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

PROJECT:

PROPOSED FURNITURE DESIGN OF KURV

CLIENT:

TAYLOR'S UNIVERSITY NO.1, JLN TAYLOR'S 47500 SUBANG JAYA,SELANGOR TEL: 603-56295000

DRAWN TITLE: KURV REAR ELEVATION

DRAWN BY: CHECKED BY: SCALE: 1:10 DATE: 13 / 12 / 2017 DRAWING NO:

FOO SHER MING

DWG_FD_EL_03 PRODUCED BY AN AUTODE nurhamizah izyan 89

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTORS SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.


PRODUCED BY AN AUTODES

443

668

997

70 554

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

903

EL

-

SIDE ELEVATION Scale 1:10

K EDUCATIONAL PRODUCT 90 nurhamizah izyan


SK EDUCATIONAL PRODUCT

NOTE:

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.

4. COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

PROJECT:

PROPOSED FURNITURE DESIGN OF KURV

CLIENT:

TAYLOR'S UNIVERSITY NO.1, JLN TAYLOR'S 47500 SUBANG JAYA,SELANGOR TEL: 603-56295000

DRAWN TITLE: KURV SIDE ELEVATION

DRAWN BY: CHECKED BY: SCALE: 1:10 DATE: 13 / 12 / 2017 DRAWING NO:

FOO SHER MING

DWG_FD_EL_04 PRODUCED BY AN AUTODE nurhamizah izyan 91

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTORS SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.


SEMESTER 2

92 nurhamizah izyan


ROMANESQUE

DECEMBER 2016 GROUP PROJECT

nurhamizah izyan 93


About this project:

For this group assignment, we were to design and build a model (300 x 300 x 100mm) that best conveys the main design elements of the chosen building. The given era was Romanesque and we chose to analyse and identify the main design elements of the Pisa Cethdral’s main door.

94 nurhamizah izyan


ROMANESQUE FACADE

PISA CATHEDRAL, ITALY. Pisa Cathedral is a medieval Roman Catholic cathedral dedicated to the Assumption of the Virgin Mary, in the Piazza dei Miracoli in Pisa, Italy. It is a notable example of Romanesque architecture, in particular the style known as Pisan Romanesque.

The main material that was used to create this model was busing balsa wood. Balsa wood was the selected material because it is so light and easily cut with a craft knife, it is perfect for model making.

nurhamizah izyan 95


SEMESTER 1

96 nurhamizah izyan


SWAROVSKI FACADE DESIGN March 2016 GROUP PROJECT

nurhamizah izyan 97


About this project:

For this group assignment, we were to design a facade design for a brand of our choice based on their corporate image. We have decided to choose Swarovski for the face of our facade design.

98 nurhamizah izyan


SWAROVSKI INSPIRED FACADE DESIGN

SWAROVSKI

With a twist! Inspired by the Victorian-era shop house facade. We decided to add a frosted crystal awning lined with matte black right at the entrance and added a few steps towards the shop. Our overall vision is to have this facade design located along the streets of high end shops.

Not forgetting Swarovski’s main design feature which is the crystals, we used aluminium foil to replicate it and printed out their poster to indicate an advertisement space. A splash of matte black was added to outline and enhance the overall look so that the ‘crystals’ stand out over the white base.

nurhamizah izyan 99


100 nurhamizah izyan


EXTRACURRICULAR DESIGNS Incubator Space MI-JU - MIFF Furniture Design Competition

nurhamizah izyan 101


102 nurhamizah izyan


INCUBATOR SPACE MARCH 2019 INDIVIDUAL PROJECT

nurhamizah izyan 103


104 nurhamizah izyan


Mood Board nurhamizah izyan 105


LEGEND TO BE DEMOLISHED TO BE ADDED

106 nurhamizah izyan


Demolition Plan

not to scale

nurhamizah izyan 107


LEGEND TO BE DEMOLISHED TO BE ADDED

108 nurhamizah izyan


Demolition Plan

not to scale

nurhamizah izyan 109


110 nurhamizah izyan


3D VIEWS Taylor’s University Business Faculty has approached The Design School’s Academicians and students to propose and design a new layout for an existing space in Taylor’s University to be converted into a collaboration space that is open for public use called “The SetUp”. There were two selected students that was involved which is myself and another classmate. It was an urgent ongoing project during our semester break before our final semester and the client requested that we finish all the requirements within a month, with only 3 times allowed amendments. From the original layout, we removed most of the existing glass panels and added a glass door entrance. The required number of pax was 40 (minimum) and we manage to fit around 61 pax in total. Due to a tight budget, the client has requested to reuse any existing furniture and built-ins such as the pantry’s counter, working table and chairs. We incorporated bright colours in our design to brighten up the whole space as the existing space was very dark and gloomy.

nurhamizah izyan 111


SELECTED GRAPHIC DESIGN

112 nurhamizah izyan


Other variants:

Not only did we do the schematic design, 3D Visualisations, Material and Fitting selection, the client requested some inspiring/motivational graphic quotes to go along with the whole interior design. Here are a few of the selected designs and the other variants as well.

nurhamizah izyan 113


114 nurhamizah izyan


MI-JU

MIFF FURNITURE DESIGN COMPETITION

OCTOBER 2017 INDIVIDUAL PROJECT

nurhamizah izyan 115


116 nurhamizah izyan


nurhamizah izyan 117


118 nurhamizah izyan


nurhamizah izyan 119


120 nurhamizah izyan


nurhamizah izyan 121


122 nurhamizah izyan


nurhamizah izyan 123


124 nurhamizah izyan


nurhamizah izyan 125


126 nurhamizah izyan


nurhamizah izyan 127


128 nurhamizah izyan


nurhamizah izyan 129


130 nurhamizah izyan


INTERNSHIP WORKS FIMA Toilet Request For Proposal Projects (RFP) Media City

nurhamizah izyan 131


132 nurhamizah izyan


FIMA TOILET

AUGUST 2018

nurhamizah izyan 133


134 nurhamizah izyan


nurhamizah izyan 135


136 nurhamizah izyan


nurhamizah izyan 137


138 nurhamizah izyan


nurhamizah izyan 139


C

E

A

1293

FT

WC-2

WC-2

fall

HB

dp25

WC

fall

WC

FT

HB

HB

FT WC

fall

fall

300

1070

FT HB

dp25

HB

300

FT

1869

fall

S

WC

fall

fall

slope 25

slope 25 WC

B

fall

dp25

fall

FT HB

fall

dp25

fall

fall

S

HB

FT 722

1390 810

slope 50

1189

772

810

960

810

772

800

1395

B

810

722

slope 50

HD

722

D

2165

810

772

fall

300

FT 100 377

dp25

fall

WC

1070

dp25

WC

443

fall

fall

F

FT

HB

WC

390 117

251 1397

487

251

487 133

2700

E

A

FIMA Toilet • BLOCK C - Toilet PL • Floor Plan

01

06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

251

1845

C

140 nurhamizah izyan

487

Scale 1 : 50

GENERAL ARRANGEMENT FIMA TOILET - FLOOR PLAN

All dimensio Figured dim All discrepa

Pind


100mm floor trap Openable tiles for service

450

WC-2

780

780

650

dp25

WC

fall

FT

200 50

FT

HB

900

200

150

200

FIMA Toilet • BLOCK C - Toilet PL • Toilet Detail 1

02 780

06 Series - Detail Arrangement

Scale 1 : 25

FT

1510

HB

WC

fall

560

fall

B

400

FT

HB 1220

910

1470

slope 25

WALL HEIGHT LEGEND

B

S

HD

D FT 560

1480

920

3 350

03

06 Series - Detail Arrangement

Scale 1 : 25

WALL HEIGHT LEGEND

2750 ht.

2400 ht.

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

FIMA Toilet • BLOCK C - Toilet PL • Toilet Detail 2

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Nombor Helaian

nurhamizah izyan GDPi7/2000/FB/TD/06-01-001

4-June-18 AIN

Status Lukisan

TD

Pindaan

1410


n

460

50mm shadow gap

460

460

1420

1038

705

1200

460

460

1200

460

Dotted line indicate sink countertop

783

2000

473

2026

922

2815

705

783

01

FIMA Toilet • BLOCK C 06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

142 nurhamizah izyan

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

GENERAL ARRANGEMENT FIMA TOILET - REFLECTED CEILING PLAN

All dimen Figured d All discre

Pi


100mm diameter Round LED downlight

300 x 1200mm Rectangle LED light

Water-based plaster ceiling

Speaker Ledge indication

Ventilation

2000

1769

Sink countertop indication

WALL HEIGHT LEGEND

- Toilet PL • Reflected Ceiling Plan

2750 ht.

Scale 1 : 50

2400 ht.

nsions on this drawing shall be checked on site before work commences. dimensions shall be taken in preference to scale dimensions. epancies are to be reported for clarification before work commences.

indaan

Tarikh

Nota

TENDER DRAWING Skala

1:50

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Status Lukisan

Nombor Helaian

GDPi7/2000/FB/TD/06-01-002 nurhamizah izyan

TD

4-June-18 AIN

Pindaan

143 0


an

LEVEL 1

CEILING LEVEL

HT02

FLOOR LEVEL

565

955

2400

2650

40mm thk. ledge

01

FIMA Toilet • 06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

144 nurhamizah izyan

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

GENERAL ARRANGEMENT FIMA TOILET - SECTION A-A

All dimen Figured d All discre

Pi


800

400

Expanded metal

450

900

1200

2100

2650

200

HT01

BLOCK C - Toilet PL • Section A-A Scale 1 : 25

nsions on this drawing shall be checked on site before work commences. dimensions shall be taken in preference to scale dimensions. epancies are to be reported for clarification before work commences.

indaan

Tarikh

Nota

TENDER DRAWING Skala

1:25

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Status Lukisan

Nombor Helaian

GDPi7/2000/FB/TD/06-01-003 nurhamizah izyan

TD

4-June-18 AIN

Pindaan

145 0


an

0

3370

LEVEL 1

CEILING LEVEL

HT02

100

130

150

2400

2700

HT02

FLOOR LEVEL

600

390

HT01

02

FIMA Toilet • 06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

146 nurhamizah izyan

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

GENERAL ARRANGEMENT FIMA TOILET - SECTION B-B

All dimens Figured di All discrep

Pin


3390

HT02

HT02

500

2100

40

200

HT01

360

900

1200

1200

25

BLOCK C - Toilet PL • Section B-B Scale 1 : 25

sions on this drawing shall be checked on site before work commences. imensions shall be taken in preference to scale dimensions. pancies are to be reported for clarification before work commences.

ndaan

Tarikh

Nota

TENDER DRAWING Skala

1:25

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Nombor Helaian

nurhamizah izyan GDPi7/2000/FB/TD/06-01-004

4-June-18 AIN

Status Lukisan

TD

Pindaan

147 0


DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

LEVEL 1

CEILING LEVEL Expanded metal LEVEL 1 Openable expanded metal for service (hand dryer)

CEILING LEVEL

Back wall to clad with HT02 Mirror 2650

Hand dryer

150

300

Polished concrete

FLOOR LEVEL

FLOOR LEVEL

HT02

600

Openable expanded metal for service (bin)

03

FIMA Toilet • BLO 06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

148 nurhamizah izyan

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

GENERAL ARRANGEMENT FIMA TOILET - SECTION C-C

All dimensio Figured dim All discrepa

Pind


Di lukis

MIZAH

Di semak

AIN

Helaian

HT01

OCK C - Toilet PL • Section C-C Scale 1 : 25

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

1:25

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Nombor Helaian

nurhamizah izyan GDPi7/2000/FB/TD/06-01-005

4-June-18 AIN

Status Lukisan

TD

Pindaan

1490


n

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

LEVEL 1

CEILING LEVEL

FLOOR LEVEL

04

FIMA Toilet • 06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

150 nurhamizah izyan

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

GENERAL ARRANGEMENT FIMA TOILET - SECTION D-D

All dimen Figured d All discre

Pi


Di lukis

MIZAH

Di semak

AIN

BLOCK C - Toilet PL • Section D-D Scale 1 : 25

nsions on this drawing shall be checked on site before work commences. dimensions shall be taken in preference to scale dimensions. epancies are to be reported for clarification before work commences.

indaan

Tarikh

Nota

TENDER DRAWING Skala

1:25

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Nombor Helaian

nurhamizah izyan GDPi7/2000/FB/TD/06-01-006

4-June-18 AIN

Status Lukisan

TD

Pindaan

151 0


an

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

LEVEL 1

CEILING LEVEL

HT02

FLOOR LEVEL

05

FIMA Toilet • 06 Series - Detail Arrangement

PERMOHONAN CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : PARCEL 3 i) BLOK 1 PANGSAPURI PERKHIDMATAN 45 TINGKAT YANG MENGANDUNGI 41 TINGKAT PANGSAPURI PERKHIDMATAN (393 UNIT) DARI ARAS 5 HINGGA ARAS 47, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34, DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21, ARAS 34 DAN ARAS 48 ii) BLOK 2 PANGSAPURI PERKHIDMATAN 32 TINGKAT YANG MENGANDUNGI, 29 TINGKAT BILIK PANGSAPURI PERKHIDMATAN (273 UNIT) DARI ARAS 5 HINGGA ARAS 33, PEJABAT PENGURUSAN DI ARAS BAWAH TANAH, KEMUDAHAN PENDUDUK DI ARAS 4, ARAS 34 DAN ARAS 35, RUANG M&E DI ARAS 5, ARAS 21 DAN ARAS 34, iii) PODIUM TEMPAT LETAK KERETA 8 TINGKAT YANG MENGANDUNGI 1 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH, 4 TINGKAT TEMPAT LETAK KERETA TERMASUK 2 TINGKAT ARAS BAWAH TANAH DAN 2 TINGKAT BESMEN, SATU TEMPAT PEMUNGGAHAN DI ARAS BESMEN SERTA SATU BANGUNAN PONDOK PENGAWAL DI ARAS BAWAH TANAH

152 nurhamizah izyan

Proposed upgrading works of general toilet PL level, Block C for Kumpulan Fima Berhad, Plaza Damansara, No.45 Jalan Medan Setia 1, Bukit Damansara 50490 Kuala Lumpur.

DI ATAS SEBAHAGIAN LOT PT143, SEKSYEN 56 DI JALAN HANG TUAH/JALAN PUDU, WILAYAH PERSEKUTUAN KUALA LUMPUR. UNTUK TETUAN BBCC DEVELOPMENT SDN BHD.

GENERAL ARRANGEMENT FIMA TOILET - SECTION E-E

All dimen Figured d All discre

Pi


Di lukis

MIZAH

Di semak

AIN

HT01

• BLOCK C - Toilet PL • Section E-E Scale 1 : 25

nsions on this drawing shall be checked on site before work commences. dimensions shall be taken in preference to scale dimensions. epancies are to be reported for clarification before work commences.

indaan

Tarikh

Nota

TENDER DRAWING Skala

1:25

Tarikh

Di lukis

MIZAH

Di semak

Nombor Projek

2000

Nombor Helaian

nurhamizah izyan GDPi7/2000/FB/TD/06-01-007

4-June-18 AIN

Status Lukisan

TD

Pindaan

153 0


154 nurhamizah izyan


MEDIA CITY

MARCH - JULY 2018

nurhamizah izyan 155


-004.4

03

1272

IW302

540

KEY PLAN

1290

WP308

AD 4

02 A.3/06-01 -004.3

A.3/06-01 -004.5

WP308

964

04

WP3

LOCKER CABINETS

38

01 06 Series- Detail Arrangement

156 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

S

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

01

A.3/06-01 -004.2

A.3/06-01

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

1707 999

AW 4

1790

WP308

WP308

308 IW302

IW302

845

PLAN

Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1570


4520

A 1

01

REFLECTED CE 06 Series- Detail Arrangement

n

158 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES

*ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

5600

2282

2850

ACL 102

5980

EILING PLAN Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004.1

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1590


FCL

FB 03

1400

3450

WP 308 4

650

AW 4

FFL

800

AFF 1

2150

01 06 Series- Detail Arrangement

n

160 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

All dimensio Figured dime All discrepan

Pind


DESIGN INTENT NOTES

*ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

IW 302

4200

ACL 102

820

LM 16

ELEVATION Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. ensions shall be taken in preference to scale dimensions. ncies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004.2

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1610


1480

3450

1980

FCL

670

795

LM 16

FFL

1700

02 06 Series- Detail Arrangement

n

162 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES

*ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

ACL 102

IW 302

FB 03

WP 308 4

AW 4

LM 16

AFF 1

1670

1590

ELEVATION Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004.3

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1630


IW 302

FCL

ACL 102

3450

4200

FB 03

2400

WP 308 4 LM 16

AD 4

AFF 1

FFL

1180

1225

03 06 Series- Detail Arrangement

n

164 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :-

1400

For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

650

AW 4

1000

ELEVATION Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004.4

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1650


FFL

670

795

1480

3450

1980

FCL

1000

04

06 Series- Detail Arrangeme

n

166 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

ACL 102

IW 302

FB 03 WP 308 4

WP 309 4

AFF 1

2960

1000

ELEVATION

ent

Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Wall Panel

AD 00

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004.5

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1670


FFL

670

795

1480

3450

1980

FCL

1000

04

06 Series- Detail Arrangeme

n

168 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM 1 Level 2 (MUSIC AND DANCE PRACTICE STUDIO)

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

ACL 102

IW 302

FB 03 WP 308 4

WP 309 4

AFF 1

2960

1000

ELEVATION

ent

Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Wall Panel

AD 00

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-004.5

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1690


EL

8240

9020

ACL 102

377

0

2120

01

REFLECTED CE 06 Series- Detail Arrangement

n

170 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM Level 2 (MUSIC STUDIO & ORCHESTRA)

All dimensio Figured dime All discrepan

Pind


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :-

8240

For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

0

382

EILING PLAN Scale 1 : 75 @ A3

ons on this drawing shall be checked on site before work commences. ensions shall be taken in preference to scale dimensions. ncies are to be reported for clarification before work commences.

daan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-006.1

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1710


1200 FCL

ACL 102 FB 03

3450

WP 307 4

600

650

1

LM 16

1400

AW

FFL

AFF 1 800

2440

2100

01 06 Series- Detail Arrangement

n

172 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM Level 2 (MUSIC STUDIO & ORCHESTRA)

All dimensio Figured dim All discrepa

Pind


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

1220

815

AD 4

2400

1410

4200

IW 302

1720

ELEVATION Scale 1 : 50 @ A3

ons on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. ancies are to be reported for clarification before work commences.

daan

Wall Panel

AD 00

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-006.2

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

1730


H

1300

CFL

FB 03

FFL

640

1500

3440

WP 307 4

AFF 1

2300

1280

1340 8500

02 06 Series- Detail Arrangement

an

174 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM Level 2 (MUSIC STUDIO & ORCHESTRA)

All dimen Figured d All discre

Pi


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

ACL 102 IW 302

1110

AW 1

1280

LM 16

2300

ELEVATION Scale 1 : 50 @ A3

nsions on this drawing shall be checked on site before work commences. dimensions shall be taken in preference to scale dimensions. epancies are to be reported for clarification before work commences.

indaan

Wall Panel

AD 00

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-006.3

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

175 0


H

WP 307 4

2400

815

1410

AD 4

FFL AFF 1 1720

1220

210

03 06 Series- Detail Arrangement

aan

0

ACL 102

IW 302

3450

FCL

176 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM Level 2 (MUSIC STUDIO & ORCHESTRA)

All dimens Figured dim All discrep

Pin


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

1200

1400

LM 16

AW 1

650

600

4200

FB 03

00

2440

800

ELEVATION Scale 1 : 50 @ A3

sions on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. pancies are to be reported for clarification before work commences.

ndaan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-006.4

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

177 0


1300

CFL

WP 304

3440

FB 03

FFL

640

820

1500

WP 304

AFF 1

1000

650

850

04

06 Series- Detail Arrangem

n

178 nurhamizah izyan

CADANGAN MEREKABENTUK, MEMBINA, MELENGKAP, MENYIAPKAN, MENTAULIAH DAN MENYELENGGARA KERJA-KERJA INFRASTRUKTUR, BANGUNAN DAN PERALATAN PENYIARAN BAGI BANDAR MEDIA ANGKASAPURIÂ DI ATAS SEBAHAGIAN LOT PT23, 8354, 47446 DAN 47447 BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK,

TETUAN KEMENTERIAN KOMUNIKASI DAN MULTIMEDIA MALAYSIA

DETAIL ARRANGEMENT A.3 - CONTROL ROOM Level 2 (MUSIC STUDIO & ORCHESTRA)

All dimens Figured dim All discrep

Pin


DESIGN INTENT NOTES *ALL SUPPORT DETAILS SHOWN ARE INDICATIVE SUBJECT TO CONTRACTORS DESIGN

*DRAWING IS TO BE READ IN CONJUCTION WITH ACOUSTIC TECHNICAL SPECIFICATION

LEGEND FOR ACOUSTIC SCOPE WP00

Wall Panel

AD 00

Acoustic Door

AW 00

Acoustic Window

ACL 00

Acoustic Ceiling

AFL 00

Acoustic Flooring

FCL 00mm

XX0

Floor to Ceiling Height Architecture specification

REFERENCE DRAWINGS :For Wall Panel Details refer to drawings : GDPi7/2453/MCD/TD/A.1, A.2, A.3, & A.4/10-04-001

ACL 102 IW 302

P 047

P 049

00

1000

00

ELEVATION

ment

Scale 1 : 50 @ A3

sions on this drawing shall be checked on site before work commences. mensions shall be taken in preference to scale dimensions. pancies are to be reported for clarification before work commences.

ndaan

Tarikh

Nota

TENDER DRAWING Skala

AS SHOWN

Tarikh

Di Lukis

SYA/MIZAH

Di Semak

Nombor Project

2453

Nombor Helaian

nurhamizah izyan GDPi7/2453/MCD/TD/A.3/06-01-006.5

30-Apr-18 SAB/MARFIN

Status Lukisan

TD

Pindaan

179 0


GET IN TOUCH ISSUU

LINKEDIN

PHONE

https://issuu.com/hamizahizyan

https://www.linkedin.com/in/ hamizah-izyan/

+60 19 265 9010

NURHAMIZAH IZYAN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.