Work sample 2016

Page 1

2

0

1

5

H A N K C H E N

Architecture Por tfolio 480 840 5065 cchen9299@gmail.com 902 Brightwood Manor Dr., Apt 2 Blacksburg, VA 24060


Performative Structures Blacksburg | Virginia Professor Nathan King Fall 2015

This is a study of the use of folded plate technology as a long-span structure, and as a beautiful alternative to conventional post-and-beam structures. This research proposes a way of expressing cross-lams within the design in an experimental fashion, and a joint that responds to custom angles and differently sized pieces, inherent to a folded plate structure. The joinery method introduces a third element, a bent metal plate, similar to a biscuit joint where the wooden plates are slit and that metal plate bent at the appropriate angle is inserted in the slits and bolted through the board to keep it in place. Integrating the computer as much as possible and as early as possible in the design phase as an apparatus to quickly create and iterate on ideas, refine them and generate the construction algorithm to execute by the machines, is key in making it an integral part of the process from the sketching to the construction phase.

2


511 West 28 Street New York City | New York Professor Joe Wheeler & DXA Studio Fall 2014 511 West 28th Street is a mid-rise residential apartment with a site cut through by the High Line in New York City. We had the opportunity to work with DXA, a New York City based firm, on a weekly bases over web-comm to explore the balance between design and development . One of the questions that is most frequently asked throughout the semester that I struggled with the most is how does an architect maintain their idea under limitations such as developers and zoning codes. The proposition aims to create a central public plaza that links the east and west tower. The first three levels of the towers are commercial spaces due to the value of having a store front facing the highly visited High Line and privacy issues. The residential tower have a separate entrance and circulation core that has access to each level. The tower consists of units ranging from studio apartments to four bedroom apartments and penthouses. Spaces such as bathrooms and closets are located towards the center of the tower to free up valuable perimeter space for the living quarters.

Window Sill

Window Sill

3-1/4” Finishing Floor

Structrual Silicone Sealant

2x4 Sleeper 3-1/4” Finishing Radiant HeatingFloor Tubing

Backer Rod Structrual Silicone Sealant Space Bracket

6” 2x4Concrete Sleeper Slab Radiant Heating Tubing

Backer Rod Vertical Mullion Space Bracket

6” Concrete Slab

Vertical Mullion Double Panel Glass

1-1/2” Main Runner Chanels

Double Panel Glass

3/4” CrossFurring 1-1/2” Main Runner Chanels Finishing Ceiling 3/4” CrossFurring Finishing Ceiling

Structrual Silicone Sealant Backer Rod Structrual Silicone Sealant Space Bracket Backer Rod Vertical Mullion Space Bracket Vertical Mullion Light Gauge Framing Metal Siding Light Gauge Framing Metal Siding

3-1/4” Finishing Floor 2x4 Sleeper 3-1/4” Finishing Radiant HeatingFloor Tubing 2x4Concrete Sleeper Slab 6” Radiant Heating Tubing 6” Concrete Slab 1-1/2” Main Runner Chanels 3/4” CrossFurring 1-1/2” Main Runner Chanels Finishing Ceiling 3/4” CrossFurring Finishing Ceiling

3


Test Cell Dwelling Blacksburg | Virginia Professor Patrick Doan Spring 2014

AXONOMETRIC DRAWINGS

A-4

A-3 A-301

A-3 A-301

SCALE 1/ ” = 1’ - 0”

A-2 A-202

STUDENT III 006

BATH 009

GARDEN

Ground Level

BATH 008

STUDENT I 004

STUDENT II 005

A-2 A-203

BATH 007

KITCHEN 002

A-2 A-204

Upper Level

BATH 010

FACULTY 003

PATIO

MEETING ROOM 001

A-2 A-201

A-103

4

LOWER LEVEL SCALE 1/8” = 1’ - 0”

A-103

GROUND LEVEL SCALE 1/8” = 1’ - 0”

A3 A-301

A3 A-301

PATIO

A-103

UPPER LEVEL SCALE 1/8” = 1’ - 0”

The Test Cell Dwelling is a project targeted to provide temporary housing to the researching staff at the Research Development Complex (RDF) in Blacksburg. The project includes four units of living quarters with individual bathrooms for one professor and three students, an open work space and a dinning area. The proposed project is three steel frame structures with mostly metal claddings. Dark colored concrete and wood finishing are used for specific walls to achieve certain spacial qualities desired. This is the first project that I had expressed what true beauty in architecture means to me and begin to formulate my own set of language and style; a sense of complex geometrical spaces that form not just the interior, but more so the exterior space of the project. As a result, each building and unit has a unique relationship with another and each space is experienced differently. Each space is planned through a grid that follows through the existing test cell buildings.


Clerk’s Office Blacksburg | Virginia Professor Patrick Doan Fall 2013 Win ter S

un

Summer

Section B-B Pat h

@n

Venturi effect that draws hot air out during summer

oo

n

Long overhang designed to minimize sun exposure during summer and maximize it during winter

h@ Sun Pat

Solar mass with air gap in front of the glasses to create passive ventilation during winter Crawl space made for underground heating and mechanical systems

noon

The Clerk’s Office is part of the complex of the RDF, Research Development Complex, project. The purpose of the building is to provide office space that oversees the complex. It houses a main office space, a rest space and a restroom. This is the project where I began questioning the importance of an architect versus that of an engineer. What values architects may add to a project by holding certain visions that eventually forms into spaces of unique experience.

0

1’

1” : 2’

Originally a simple rectangular plan was chosen for a focus on how the building operates such as the orientation of the building, the roof angle and extension, solar mass, passive heating and cooling, connection between materials and other sustainable elements. The question of spacial quality rises later in the project which led to the division of the building and formation of the garden.

Sit e

Pla n 0 1” :

8’

5’ 10

’ 20

’ 30

50

5

3’

5’

10’


Industrial Design & Supplement Materials The study of industrial design has helped me communicate my architectural ideas through different design medias and perspectives. It was more than just the knowledge of how a two point perspective is composed free handed, how burning and dodging works in Photoshop or how to make prototype models. But how it can help me describe certain experience of spaces and how I am able to engage the user and audience in a different way that allows a better delivery of my idea.

6


H A N K C H E N

480 840 5065 cchen9299@gmail.com 902 Brightwood Manor Dr., Apt 2 Blacksburg, VA 24060

EDUCATION Virginia Tech Blacksburg VA | 2010 - Present Chandler-Gilbert Community College Chandler AZ | 2009 - 2010 The Orme School of Arizona Mayer AZ | 2006-2009

B.A. Architecture 2016 Minor Industrial Design University Studies High School

EXPERIENCE Performative Structure and Making Machine Blacksburg, VA | Fall 2015 Research

Design and analyz project derived from a structural typology. Assembly and construction analysis conducted through the making of partial prototype. Full project construction planned for the following semester.

isARK Studio Austin, TX | May 2015 - Present Intern Architect

Oversaw construction site and bridge communication between subcontractors and direct supervisor. Demolision experience including removing existing tile, concrete slabs, framing and interior finishing. Construction experience including concrete slab leveling, pouring, re-bar work, custom beam detailing and minor metal and framing work. Developed higher drafting and rednering skills through extensive use of Revit and aided permitting process. Communicated with vendors for purchase orders and completing purchases and attended client meetings.

European Travels Riva San Vitale, Switzerland | Spring 2015

Switzerland based program provided direct experience of local culture. Traveled across France, Spain, Germany, Italy and Switzerland.

CMG Leasing Blacksburg, VA | Summer 2014 Preparation Technician

Apartment renovations and maintenances including finishing removal and replacement, general mechanical, plumbing and appliances repair and replacement.

Summer Architecture Studio Blacksburg, VA | Summer 2013 Teaching Assistant

Technical supports with design softwares. Aided ideas and concepts development. Provided knowledge on material selection for modeling.

Deet’s Coffee Place Blacksburg, VA | Oct 2012 Oct 2015 Student Assistant Manager

Oversaw work stations directly and ensuring customer’s satisfaction if situation presents. Products and operation improvement proposals, development and evaluation.

SKILLS Revit, Illus trator, Photoshop, InDesign, Rhino, Draf ting,

Microsof t Of fice, Mandarin, Eng lish, woodworking, sketching, Vray, Mandarin Chinese, Eng lish, Sketchup, modeling, AutoCad, Grasshopper, Japanese, metalworking, photog raphy


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.